Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
D-1.1. Approval of Renewable Power Purchase and Sale Agreement between City of Azusa and Mesa Wind Power Corp.
E-2.1. Approval of the 2018 Power Source Disclosure Report and the 2018 Power Content Label and Attest to CEC
E-3.1. Approve First Amendment to PSA with Northstar Chemical to Provide Water Treatment Chemical and Equipment Svcs
E-4.1. Authorize BPO to Procure MeterLocking Rings from Inner-Tite Corp. for Phase II AMI Project
E-5.1. Award of Contract for CS-01 ALW Customer Service Lobby Remodel to RS Construction and Development Inc
E-6.1. Award Contract for Water Project W-347 Citrus and Foothill Blvd 830 Tie In no attachement
E-7.1. Approval of NOC for Capital Improvement Project W-280A Interconnect and Site Improvements
E-8.1. Award on call Engineering Task Order No 8 to Stantec for Design of Triangle Flow Control Structure Project W-354
E-9.1. Award engineering services to civiltec engineering, Inc For Design of North Reservoir Rehabilitation Project
F-1.1 FY 2018-2019 3rd Quarter Budget Reports for Electric and Water Funds
UB Agenda - May 28, 2019