Azusa, California, August 21,1911
To the Honorable Board of Trustees
of the City of Azusa, Calif.
Gentlemen: -
I hereby recommend that the City of Azusa make the
additions, changes and alterations in the contract between
said City and the B. R. Davisson Contracting Company for the
improvement of Azusa Avenue and Centre Street set forth in the
attached form of agreement providing for the same, and reeemmend
the adoption by your honorable Board of the resolutions author.
izing the same attached hereto.
Re
RESOLUTION N0, 179
31 AT EST:
32'
Moity Clerk 0 the City of Azusa.
RESOLUTION OF THE BOARD OF TRUSTEES OF THE CITY
1
I
OF AZUSA AUTHORIZING CERTAIN CHANGES IN THE CONTRACT
2
BETWEEN SAID CITY AND THE B. R. DAVISSON CONTRACTING
3
COMPANY FOR THE IMPROVEMENT OF AZUSA AVENUE AND CENTRE
4
STREET.
6
The Board of Trustees of the City of Azusa do
e
resolve as follows:
7
That whereas the said City of Azusa entered into
8
a certain contract with the B. R. Davisson Contracting Co m.
0
pany, dated January 20, 1911, providing for the improvement
LO
of Azusa Avenue and Centre Street from City limits to City
11
limits in said City of Azusa; and whereas said City of Azusa
12
reserved in said contract the right to make changes in said.
v
9d
13
,
work upon recommendation of the City Engineer; and
x
14
Whereas said City Engineer has recommended all those
�Ema
0
15
certain changes in said contract provided for in that certain
19
supplementary contract attached hereto.
e�
17
N
Now, therefore, be it resolved by the Board of Trustees
18
of the City of Azusa that said changes,slterations and additions
19
to said work recommended by said City Engineer be,and the same
20
are hereby ratified and approved, and that the President of the
21
Board of Trustees be, and he is hereby authorized and instructed
22
to execute said supplementary contract on behalf of said City
23
of Azusa and the City Clerk shall attest the same in the name
24
and on behalf of said City of Azusa,
26
The City Clerk shall certify to the passage of this
28
27
Resolution.
�
Adopted, this __ day of August, 1911.
28
29
✓T/ `fes /oG�� , Y�y��-s'-'
President of the Board of Trustees
30
of the City of Azusa.
31 AT EST:
32'
Moity Clerk 0 the City of Azusa.
11
2
3
4
6
e
7
8
9
to
11
12
v
b-
vb
13
� m6
�9ea° 14
<W'90o
x'a�m
V AOY 16
YO^n
;end
e e�, 18
:d b
"o 17
g 18
19
20
21
22
23
24
25
28
27
28
29
30
31
32
STATE OF CALIFORNIA,
se:
City of Azusa,_
T, G. E. Glover, City Clerk of the City of Azusa, do
hereby certify that the foregoing resolution was passed by
the Board of Trustees of the City of Azusa, State of California
and signed by the President of said Board at a regular ad-
journed meeting thereof held on the day of August, 1911,
and that the same was passed by the following vote:
Ayesr��
Noes -nom
Absent �-
Aley
City Clerk of the City of
Azmsa.
0
ME
i'
1 THIS MFORANDUM OF AGRKMMNT made this
2 day of August, 1911, between the CITY OF AZUSA, a municipal
3 corporation duly organized and existing under the laws of the
4 State of California, party of the first part, and the B. R.
6 DAYISSON CONTRACTING COLTANY, a corporation duly organized
6 and existing under.the laws of the State of California, party
7 of the second part.
24 NOW, THEREFORE, as supplementary to said original
26 contract, and in pursuance to the terms thereof aIbwing
26 changes in said work described therein, as above stated, and
27 in consideration of the payments and covenants hereinafter
mentioned, to be made and performed by said party of the first
28
29 pest, the said party of the second part hereby agrees to make
the following changes in said contract, it being matually un -
30
derstood that said original contract shall remain in full force
31
and effect he to all the terms thereof except as are expressly
32 modified hereby, which said changes are as follows, to wit:
8
WITNESSETH THAT WHEREAS the said party of the first
9
part entered into a certain contract, dated January 20th,
Lo
1911, with the said party of the second part, for the per-
11
formance of certain work and the furnishing of certain materials
12
by the said party of the second part for the improvement of
�v
a�
13
Azusa Avenue and Centre Street, from city limits to city limits,
14
in said City of Azusa; and
Y m�N
xaa
16
WHEREAS, the party of the first part reserved in
°we v9
4 am
16
said contract, the right to make such changes in the work to
�a
0
17
be done, or the manner of doing the same, as may, at any time
le
during the progress of the work, be recommended by the City
19
Engineer, when such changes appear to said City Engineer to
20
be necessary or desirable; and
21
WHEREAS, the said City Engineer has recommended
22
all tho as certain changes in said work hereinafter described.
23
24 NOW, THEREFORE, as supplementary to said original
26 contract, and in pursuance to the terms thereof aIbwing
26 changes in said work described therein, as above stated, and
27 in consideration of the payments and covenants hereinafter
mentioned, to be made and performed by said party of the first
28
29 pest, the said party of the second part hereby agrees to make
the following changes in said contract, it being matually un -
30
derstood that said original contract shall remain in full force
31
and effect he to all the terms thereof except as are expressly
32 modified hereby, which said changes are as follows, to wit:
21
22
23 II
24
25
28
27
28
29
30
31
32
I
To omit in the performance of said Rork all the
2
provieions of Section VI,entitled ""Broken Stone Foundations"
3
of the specifications referred to in said contract and in lieu
4
thereof to substitute the following-
5
After the sub -grade shall have been prepared as
8
above specified and accepted by the City Engineer, a layer of
7
broken stone of a size not larger than three -and -one-half inches
8
in its greatest dimension, and smaller than will be retained
9
by a three-quarter inch ring, shall be uniformly spread to such a
to
depth that after being thoroughly watered and rolled with a
11
twelve ton roller, the surface shall be tN�o inches below the
12
surface of the finished pavement. All depressions scall be filled
sd
13
with broken -.tone until a firm even surface, with the required
� ma
Cm3
14
grade and oross-section is obtained,
�wcu
�eae
15
Unpon this base,prepared as above specified shall
c<v�
w
18
be uniformly applied heavy asphaltic oil, at the rate of three.
17
fourths gallon to each square yard of surface,
g
18
19
20
21
22
23 II
24
25
28
27
28
29
30
31
32
1 Also that the following changes shall be made in the
2 work;
3 11 That Azusa Avenue between the South line of Ninth
4
Street
and
the North
line
of
Sixth Street,
and
that
Center Street
6
between
the
East line
of
San
Gabriel Avenue
and
the
West line of
9 Il Dalton Avenue shall be constructed of oil macadam on said de -
7 Ascribed streets from a point eight(8) feet on each side of the
8
center line of said streets and the curbing or gutter line of the
9
same, and that the specifications and plans for that portion of
to
said work shall be changed accordingly; and said oil macadam shall
11
be made as follows instead of as originally ptovided.
12
SUB-GR_OE
90
13
The sub -.grade shall be parallel to the finished surface
x m<
kBGj
14
thereof and three(3) inches below, it,
m�mw
�Pa
.o,
16
GRADING FOUNDATIONS
Wome
<0
18
'Grading shall include the removal of all earth,stone
q�
F
17
hard pan, clay, loose rook, or any other material that may be en -
18
countered in preparing the grade or sub -grade, the cleaning out of
19
waterways and old culverts, the excavation of all necessary drain -
20
age and outlet ditches and grading all intereseetions, and shall
21
also include all filling, borrow, trimming, picking down, shaping,
22
slo in refillin surfacin or an other work that m
P g, g, g, y may be necessary
23
in grading the surface of the road to the required sub -grade and
24
cross-section. When mud, Vegetable material, wood, soft oil cake,
25
or other soft material is encountered or discovered in the sub.
28
grade or foundation of the road before the final aeeeptitaoe of the
27
work, it shall be removed and the space refilled with good earth
28
or gravel. The Contraot,however,shall not be required in such
29
cases to excavate the mud or other soft material to a greater depth
30
than two (u) feet below the finished grade.
31
1 1 All grass,weeds or vegetation of any kind within the
32
lines of the improvement shall be removed,when required by the
and is broken formexcavation�or before
Engineer, before the gro
1
2
embankment is made thereon. fury a"
3 After the sub -grade shall have been prepared as above
4 specified and aocepted by the City Engineer, a layer of broken
stone of a size not larger than three (3) inches in its greatest
5
g dimension and smaller than will be retained b, � a 3/4 inch ring
7
shall be uniformly spread to such a depth that after being thVV-
8 oughly watered ani rolled with a 12 ton roller, the surface shall
9
be parallel with and 1/4" below the surface of the :finished pave -
10 went. All depressions hhall be filled with the same material
11
ae this course of stone sprinkled and again rolled until a firm,
unyielding surface is obtained. Heavy,asphaltie oil shall then
12 rd of
be applied at the rate of 3/4 gallons to each square .ya
13
xa°p 14 stone urfaoe, after which a coat of crushed stone of a size
"Umm and be retained on
xmay that will.pass through a three (3) inch ring
odg!: 15
aE E .. shall be uniformly spread over the
PAU 16 a one fourth(1/4) inch ring
�r 17 surface in sufficient quantity to thoroughly
bind the wearing
N O
18 course and form a true surface. The interstices shall be filled
19 to the surface with the three-fourths(3/4) inch screenings shall
20 not extend more than one-fouxth-(1/4) inch al;ove the larger rook
21
22
23
24
26
26
27
28
29
30
31
32
after thoroughly screening.
The surface shall be thoroughly watered an rolled,
followed by coating of heavy asphaltic oil, uniformly applied
at the rate of thredourth (3/4) gallon per square yard of rock
surface.
A light coating of rock screenings, one-fourth inch
and under in size or coarse sharp sand shall then be uniformly
spread or drifted over the urfaee in sufficient quantity to ab-
sorb all surplus oil and produce a uniform surface with no oil
exposed and no patches of excess screening or sand. The pave-
mc-nt shall then be watered and thoroughly rolled until it becomes
hard and smooth true to grade and cross-section, free from all
j'
• , i
1
hollows or irregularities.
whenever required by the engineer, the Contractor
2
3
shall ur-e a road grader to smooth the surface of the macadam
4
various
pavement or to spread the,c ourses of paving material.
6
The Engineer may at his discretion and as required by
e
the qualityofstone being used, increase or decrease the total
7
quantity of asphaltic oil to be used per square yard, by an
8
amount not exceeding thirty per cent of the above total quantity
9
but shall not require the oil to be placed in more than three
10
APPLICATIONS without extra compensation to the Contractor.
And it is hereby mutually agreed and understood that
11
12
additional charge shall be made for the foregoing changes
U
no
C�
13
from oil peiaement to oil macadam
<d
Ysy°�
14
and said party of the second part shall be paid at the rate of
�amw
16
fifteen (15) cents a square ;far8 for all of said oil .macadam
ado_
p
WHO
above described.
,d
ac
~�
17
18
Also that the following additions and changes in the
19
work shall be made,to-wit:
20
There shall be constructed on the West side of Azusa A
21
Avenue between Center Street and Ninth Street at the location
22
designated by the City Engineer two hundred and twenty-three
23
(223)lineal feet of curbing in accordance vith specification
24
No. VIII for the construction of cement curbs in the city of
25
Azusa on file in the City Clerk's office in said City of Azusa
2B
which are hereby referred to and made.a part hereof,at.an agreed
27
price of thirty-five(35) cents per lineal foot amounting to
28
$78.05; also "I Q.D lineal feet of curbing on the East side
29
of Azusa between (:enter Street and Sixth Street under said speci-
so
fication No. VIII at an agreed price of thirty-five(35) cents
31
per lineal foot amounting
Also that the following additions,changeti and alteratio
32
1 shall be made in the construction of culverts originally pro..
2 vided for in said contract, to -wit: -
8 Additional culverts as follows:
4 1 - 30'' pipe line culvert - 42 ft. to
to $94.50 $2.25 amounting y
5
1.- 14" pipe culvert - 38 ft. long ® 62 1
6 to $23.75 /2 ata. amounting
7 to 17,48ipe culvert - 36 ft. long at 46 eta, per foot amounting
8
2 - 14" pipe culverts each 100 ft* long with re-inforced concrete
9 top 1 75 eta. per ft, amounting to $150.00
i0 Allm of which SAID CULVERTS are to be constructed on said Centre
11 Street at the locations designated by the CitEngineer.
ngineer.
12 Also th t the 12" pipe culvert on Centre Street shall
13 be extended 20 feet at the agreed price of 46 cents per foot
14 amounting to $9.20,
16 Also thc..t the 20" pipe culvert'on said Centre Street
16 shall be extended 10 ft. at the agreed price of 85 cents per
17 foot amounting to $8.50.
18
19
20
21
22
23
24
26
26
27
28
29
30
31
32
Also th�.t 1 - 12" pipe culvert at the intersection of
San uabriel and Centre streets shall be replaced arra repaired
at the agreed price of $31.70.
Also that 5 - 8" culverts erected on Centre Street or
anally provided for in said plans shall be constructed of 14"
in size instead of 8" in size at an additional cost of $25.00
Per culvert amounting to $125.00.
Also that 2 - 8 " culverts originally provided for in
said plans shall be ohanged.to 14" culverts with wooden intakes
at an additional cost of $35.00 per culvert, amounting to $70.00
Also that one culvert on the West side of the inter-
section of Azusa Avenue and Centre Street shall be widened from
2 ft. 6 in. to 3 ft. at an additional cost of $28.80.
Also that the culvert provided for on the West side of
Azusa Avenue between Centre'Street and the Santa Fe Railway
I
C�
1 right-of-way shall be widened from 2 ft. 6 in. to 3 ft. at an
2 additional cost of 41.20.
3
4
6
8
7
8
' 9
10
11
12
:v
13
a �a
raga 14
�.I
16
Woa
�a4
ae e9
w Yo 16
a
�n
17
U 18
19
20
21
22
23
24
26
26
27
28
29
30
31
32 �..
That all of said culverts shall be constructed in
accordance with the original plans and specifications except in
these particulars above specified,
It is further agreed and particularly understood. that
said party of the first part will pay and allow said party of
the second part for said additions and changes in said work
above speeifidd the respective amounts thereof above set ferth f
for the same, and that said additional sums shall be due and
payable in accordance with the terms of said original contract
between the parties hereto; and raid party of the second part
hereby agrees to make an additional charges or claims on account
Of said changes or extra work other than as above specified,
IN 7,ITN3SS THEREOP said City of Azusa has,by the
President of its Board of Trustees, caused the corporate name to
be :signed hereto, and the corporate seal of said city to be
hd-eto affixed by its City Clerk, and said Second Party has here»
unto caused its corporate name and seal to be affixed by its
President and Secretary therein duly authorized,the day and year
first above written,
President of the Board of Trustees
of the City of Azusa.
AT T,h/
CITYCLH� of a CC1 y o zusa.