HomeMy WebLinkAboutResolution No. 1928RESOLUTION NO. 1928
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AZUSA, LOS ANGELES COUNTY, CALIFORNIA, RELATIVE
TO SEWERS AND SEWER CONNECTIONS SERVING THE
PROPOSED SUBDIVISION, TRACT NO. 13736, BEING A
PORTION OF LOTS 50 AND 71 OF SUBDIVISION NO. 2,
AZUSA LAND AND WATER COMPANY.
WHEREAS, it is proposed to subdivide a portion of Lots
50 and 71 of Map of Subdivision No. 2, Azusa Land and Water
Company, as per map thereof recorded in Miscellaneous
Records, Book 43, at page 94, Records of Los Angeles County,
California; and
WHEREAS, it is intended by the owners of said property
to construct buildings on the lots within said subdivision
which must be provided with facilities for the disposal of
sewage therefrom in order to protect and preserve the public
health, and which necessitates the construction of sanitary
sewers to convey said sewage to the existing main outfall
sewer along First Street; and
WHEREAS, the development of this portion of the City
will be of general public benefit to the City as a whole;
and
WHEREAS, it has been the policy of the City in the
past to share a proportionate part of the expense of the
construction of sanitary sewers and appurtenances with the
property owners,
NOW, THEREFORE, IT IS HEREBY RESOLVED by the City
Council of the City of Azusa that the public interest,
necessity and convenience requires for the preservation of
the health of said City the construction of sanitary sewers
in and along the respective streets of said proposed
subdivision to be known and designated as Tract No. 13736,
and that the streets in which said sewers shall be construct-
ed, the proportionate costs thereof to be borne by the
subdividers and/or owners of said property and the City of
Azusa, and all other matters relating to the performance
of the work and time and amount of payments shall be as
follows:
1. Sanitary sewers shall be constructed in and along the
following streets:
(a) Third Street from Angeleno Avenue to Vernon Avenue.
(b) Second Street from Angeleno Avenue to Vernon Avenue.
(c) Unnamed Street located between First Street and
Second Street and parallel to said streets from the
easterly line of said Tract No. 13736 to Vernon Ave.
(d) Vernon Avenue from Third Street to the existing
main outfall sewer in First Street.
2. All engineering, inspection, supervision and testing of
materials necessary and required for the design and
construction of said work shall be performed by Paul E.
Kressly, City Engineer of the City of Azusa, or by his
authorized agents or representatives.
1�,
3. All construction of the work, purchase of materials,
furnishing of labor and equipment, superintendence, etc.
shall be performed by the City of Azusa or its
authorized agents or representatives, and the total
cost of any part or all of said work shall be the actual
cost expended by the City for wages and salaries for
labor and superintendence, supplies and materials furnish-
ed, regular rental rates for City-owned equipment,
engineering, and all other costs and expenses incidental
to the performance of said work plus ten (10) per cent
to cover costs of liability and compensation insurance,
and overhead office expenses.
4. The subdividers and/or property owners shall pay the
entire cost-of the following work to be constructed:
(a) All 6 -inch diameter house connection sewers from the,
existing main outfall sewer along First Street to
the southerly curb line of said First Street to
serve Lots 17 to 21, both inclusive, at a total
preliminary estimated cost of $74.00.
(b) All 6 -inch diameter house connection sewers from
the existing main outfall sewer along First Street
to the northerly curb line of said First Street to
serve Lots 22 to 34, both inclusive, at a total
preliminary estimated cost of $622.00.
5. The subdivider's and/or property owners shall pay 50%
of the total cost and the City of Azusa shall pay 50%
of the total cost of constructing sanitary sewers and
appurtenances in and along the streets more particularly
described herein under heading, numbered, 1, and the
total cost of constructing house connection sewers from
the above mentioned sewers to the nearest curb line of
the respective streets to serve Lots 35 to 101, both
inclusive, at a total preliminary estimated cost of
$120680.28.
6. The City of Azusa will not proceed with the purchasing
of the materials and/or the construction of the work
until the subdivider's and/or owners of the property
have paid to the City of Azusa the entire estimated cost
for the work enumerated under 4 (a)and 4 (b), namely,
the sums of $74.00 and $622.00 or a total of $696.00;
and 50%.of the entire estimated cost for the work
enumerated under 5, namely, 50% of $12,680.28 or
$6,340.14, making a grand total to be paid to the City
for all work to be constructed of $7,036.14.
7. After the work has been completed, the City of Azusa
shall furnish to the subdivider's and/or property
owners an itemized statement of the total cost of all
materials and supplies, labor, rental of equipment, and
and all incidental costs and expenses, including
engineering, inspection and supervision, expended by
the City of Azusa for the construction of said work
plus ten (10) per cent for liability and compensation
insurance, and overhead office expenses, and if such
costs are less than the amounts hereinbefore estimated
to be paid by the subdivider's and/or property owners,
the City of Azusa shall refund such difference. Like-
wise if the said amounts are more, than the subdivider's
and/or property owners shall pay to the City of Azusa
such difference. In either case, any such payments
shall be made within thirty (30) days from the date of
said itemized statement.
8. The work constructed shall at all times be the sole and
exclusive property of the City of Azusa, and said City
shall operate, repair and maintain the same at its own
expense.
9. The subdivider's and/or property owners shall by letter
addressed to the City Council of the City of Azusa
consent to and approve in writing all of the terms and
conditions hereinbefore mentioned, if acceptable, before
the City will proceed with the construction of said
work.
Passed and approved this 10th day of December, 1945.
ATTEST:
State of California )
County of Los Angeles ) as
City of Azusa )
I, M. A. Hynes, City Clerk of the City of Azusa
do hereby certify that the foregoing Resolution No. 1928
was duly and regularly adopted by the City Council of the
City of Azusa, signed by the Mayor of said City, and
attested by the City Clerk of said City, all at a regular
adjourned meeting thereof held on the 10th day of
December, 1945 and that the same was passed by the follow-
ing vote, to -wit:
AYES: Councilmen: Owens, Jumper, Memmesheimer, Lamm.
NOES: Councilmen: None.
ABSENT: Councilmen: Morden.
City Clerk of tW City of Azusa