HomeMy WebLinkAboutOrdinance No. 2015-O8ORDINANCE NO. 2015-08
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF AZUSA
APPROVING THE DHAMMAKAYA INTERNATIONAL MEDITATION CENTER
SPECIFIC PLAN SP -8 AND ZONE CHANGE FROM INS
(INSTITUTIONAL/SCHOOL) TO SP -8 (SPECIFIC PLAN 8 — DHAMMAKAYA
INTERNATIONAL MEDITATION CENTER) LOCATED AT 865 EAST
MONROVIA PLACE, AZUSA, CALIFORNIA, PURSUANT TO GOVERNMENT
CODE SECTION 65450 ET SEQ.
WHEREAS, the application for a Meditation Hall (the "Proposed Project") was proposed by
Dhammakaya International Meditation Center ("Applicant") to the City of Azusa ("City") on April 10, 2013;
and
WHEREAS, the Proposed Project, which would include the demolition of the existing Montserrat
Building, the Xavier Center meeting hall, rose garden, and eight one-story Organizational Housing
(dormitory) buildings. No changes to the MacNeil Mansion are proposed. Implementation of the Specific
Plan will result in several improvements to the project site including the construction of a 69,179 -square -foot
Meditation Hall, nine two-story Organizational Housing buildings, a storage/workshop building, a
stormwater detention/water quality basin, a fire access road, additional parking, a reflecting pool, and
landscaping. The Proposed Project is located on property owned by the Applicant at 865 East Monrovia
Place, in the City of Azusa, within the County of Los Angeles; and
WHEREAS, local governments are authorized by Government Code section 65450 et seq., to
prepare specific plans for the systematic implementation of the general plan; and
WHEREAS, the Dhammakaya International Meditation Center Specific Plan SP -8 ("Specific Plan")
has been initiated and prepared on behalf of the City of Azusa to facilitate a master plan for the development
of a mediation center on approximately 12 acres of land; and
WHEREAS, the Specific Plan is a comprehensive guide to defining future improvements to, and use
of, the Dhammakaya International Meditation Center Property; providing the City more clarity in regulating
the phasing of physical improvements and the on-going use of the Property; and
WHEREAS, the Specific Plan implements the policies of the General Plan by providing an orderly,
functional and compatible land use pattern to guide the fixture growth and development of Azusa and its
planning area; ensuring that the type, amount, design, and pattern of all land uses throughout the City and
planning area serve to protect and enhance the character and image of Azusa as a desirable residential urban
community; and providing for an orderly pattern of future development and change throughout the City that
will be both compatible with and beneficial to existing land uses and which will provide residents with a
desirable urban environment in which to live, work, shop, and play; and
WHEREAS, the Specific Plan contains all the necessary elements required by section 65451 of the
Government Code, and the Specific Plan was referred to all affected public agencies pursuant to sections
65453 and 65352 of the Government Code; and
WHEREAS, the Specific Plan was reviewed, studied, and found to be subject to the California
Environmental Quality Act and an Environmental Impact Report has been prepared for the project in
compliance with CEQA, as more fully described below; and
WHEREAS, the City of Azusa Cultural and Historic Preservation Commission held a public
meeting on May 19, 2015 to consider the compliance of the proposed Specific Plan and DEIR with the
Azusa Municipal Code Section 55 — Historic Preservation, and with the California Environmental Quality
Act (CEQA) Section 15064.b.3; and
WHEREAS, the Cultural and Historic Preservation Commission recommended additional
Conditions of Approval and the approval of the Cultural and Paleontological Resources Assessment for the
Dhammakaya Project Specific Plan and Draft EIR.
WHEREAS, on June 10, 2015, the Planning Commission conducted a meeting to take comments on
the Specific Plan, associated entitlements, and Draft EIR and;
WHEREAS, on June 24, 2015, the Planning Commission held a Special Planning Commission
meeting to tour the Dhammakaya International Meditation Center, located at 865 East Monrovia Place for
informational purposes only. No discussion or action took place at that meeting; and
WHEREAS, the Planning Commission held a public hearing on July 29, 2015, in the Civic Center
Auditorium located at 213 East Foothill Boulevard, Azusa, California. A notice of the time, place and
purpose of the aforesaid meeting was provided in accordance with CEQA and the Azusa Municipal Code.
The Specific Plan, associated entitlements, DEIR, Final Environmental Impact Report (FEIR) which consists
of Responses to Comments, Corrections and Additions to DEIR (collectively, the EIR), and Mitigation
Monitoring and Reporting Program (MMRP), the draft Findings and Facts in Support of Findings (Findings),
staff report, and evidence, both written and oral, were presented to and considered by the Planning
Commission at these hearings; and
WHEREAS, the Planning Commission recommends approval of the Applicant's proposal to (1)
create a reflecting pool in front of the MacNeil Mansion designed with a similar shape as the original pool
and similar colored tile; (2) salvage and reuse the existing balustrade to frame the new reflecting pool; and
(3) create an outline of the existing pool on top of the new shop building and provide a plaque with an
explanation of the history of the original pool. In addition to the Applicant's proposal, the Planning
Commission recommends (1) an additional plaque or display be located near the reflecting pool to also
explain the history of the pool and display salvaged pieces of pool tile, and (2) the Cultural and Historic
Preservation Committee should be consulted about the design of the display and/or signage; and
WHEREAS, on July 29, 2015, the Planning Commission adopted Resolution Nos. 2015-23 and
2015-24 by unanimous vote of 3-0, recommending certification of the EIR and approval of the Project to the
City Council; and
Page 2 of 18
WHEREAS, the City Council held a public hearing on September 8, 2015, in the Civic Center
Auditorium located at 213 East Foothill Boulevard, Azusa, California. A notice of the time, place and
purpose of the aforesaid meeting was provided in accordance with CEQA and the Azusa Municipal Code.
The Specific Plan, associated entitlements, DEIR, Final Environmental Impact Report (FEIR) which consists
of Responses to Comments, Corrections and Additions to DEIR (collectively, the EIR), and Mitigation
Monitoring and Reporting Program (MMRP), the draft Findings and Facts in Support of Findings (Findings),
staff report, and evidence, both written and oral, were presented to and considered by the City Council at this
hearing; and
WHEREAS, the City Council finds that the added conditions of approval and project
revisions, based on their nature, description, and limited scope, would not result in any new or
substantially greater significant impacts, as compared to those identified in the Final EIR, and
therefore recirculation of the EIR is not required.
WHEREAS, all other legal prerequisites to the adoption of this Ordinance have occurred.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AZUSA DOES HEREBY
ORDAIN AS FOLLOWS:
SECTION 1: Pursuant to, and in compliance with, the California Environmental Quality Act
("CEQA") (Public Resources Code section 21000 et seq.), the State CEQA Guidelines (14 Cal. Code Regs.
§§ 15000 et seq.), and the City of Azusa Local CEQA Guidelines, the City determined that an
Environmental Impact Report ("EIR") should be prepared pursuant to CEQA in order to analyze all potential
adverse environmental impacts of the Proposed Project. The City Council, having final approval authority
over the Project, adopted and certified as complete and adequate the Dhammakaya International Meditation
Center FEIR, and adopted " Findings and Facts in Support of Findings for the Dhammakaya International
Meditation Center Project Final Environmental Impact Report" (CEQA Findings) containing within
Resolution No. 2015—C40 on September 8, 2015, which are hereby incorporated by reference.
SECTION 2: Based on the entire record before the City Council and all written and oral evidence
presented to the City Council, the City Council finds the Specific Plan is consistent with the General Plan of
the City of Azusa and systematically implements the goals and policies of the General Plan in the following
ways:
A. That the proposed amendment is in the public interest and that there will be a community
benefit resulting from the amendment
The proposed Dhammakaya International Meditation Center (DIMC) Specific Plan will
contribute to the following community benefit:
• Teach meditation to promote inner peace through the principals of Buddhism.
• Cultural and learning opportunities that contribute to the quality of life for the Azusa
community.
Page 3 of 18
• Move the "activity" center of the DIMC retreat (that currently occurs in the MacNeil
Mansion) to the central/southem portions of the Property, which would allow the
MacNeil Mansion and Organization Housing to function as the very "quiet" area in
the northern part of the Property.
• Construct a new Meditation Hall large enough to accommodate DIMC's existing
ceremonies, and house all teaching and meditation programs inside a structure during
inclement weather and outside when the weather permits.
• Design the Meditation Hall to be compatible with the MacNeil Mansion by
incorporating certain key design aspects, such as the roof balustrade design and
material colors from the MacNeil Mansion into the Meditation Hall design.
• Construct new Organization Housing to provide housing for guests and staff that
meet current earthquake standards and has updated plumbing, electrical, heating, and
cooling systems.
• Maintain the historic value of the MacNeil Mansion by placing the new Organization
Housing buildings behind the Mansion and, therefore, shielding the new housing
from view to the north.
• Enhance the lawn in front of the MacNeil Mansion to create more formal gardens in a
manner that celebrates the history and formality of the building, as well as
incorporate a reflecting pool that provides a tribute to the original pool, located
southeast of the MacNeil Mansion.
• Provide sufficient on-site parking to accommodate the largest ceremonies; encourage
participants to use public transportation, specifically the Gold Line, by providing a
shuttle service from the Citrus Avenue station to DIMC during events.
• Transplant as many qualified trees as possible and incorporate them into a robust
landscape plan that maintains and enhances the retreat setting and provides screening
from neighboring properties.
• Provide new water quality treatment and storm detention facilities that connect to
City and County storm drain facilities.
• Provide emergency access throughout the Property that meets current building and
safety codes.
B. That the proposed amendment is consistent with the goals and policies of the General
Plan.
Pursuant to California Government Code Section 65454, a Specific Plan shall be consistent
with the local jurisdiction's General Plan. The DIMC Property has a land use designation of
Institutional/School, which allows for religious, meeting, school, and government land uses.
Page 4 of 18
The following provides an assessment of consistency between the City's goals and objectives
of the current General Plan and the DIMC Specific Plan.
Citv of Azusa General Plan
'BUILT
Proposed
olicy
CHAPTER 3: THE
ENVIRONMENT
City Design Element
Urban Form Goals and Policies
GOAL 1: PROTECT THE HISTORIC
AND SIGNIFICANT BUILT AND
NATURAL RESOURCES IN THE CITY.
A Cultural and Paleontological Resources
Assessment was prepared for the project site
(Appendix C). The assessment establishes the
Policy 1.1: Require development projects
historic value of the existing buildings and
to establish the historicity of existing
landscapes located on site. The Xavier Center
buildings and landscapes and require City
Meeting Hall and Montserrat building will be
review and permission to allow for the
demolished as part of the proposed improvements
removal in accordance with California
to the project site. The MacNeil Mansion will
Environmental Quality Act (CEQA) and
remain. According to the Cultural and
the Cultural and Historic Preservation
Paleontological Resources Assessment, the Xavier
Ordinance.
Center meeting hall (1977) and the Montserrat
building (1987) are not considered historic
resources pursuant to CEQA. Thus, the Specific
Plan is consistent with Policy 1.1.
Page 5 of 18
Citv of Azusa General Plan
Proposed Project Elements
Goal/Policv
GOAL 11: TRANSFORM EXISTING
COMMERCIAL CORRIDORS INTO
MIXED-USE CORRIDORS
INCORPORATING HOUSING WITH
COMMERCIAL USES
CONCENTRATED IN NODES AT
MAJOR INTERSECTIONS.
The proposed project will not generate sources of
glare as discussed in Section 4.1 Aesthetics. In
addition, the Development Plan included within
the Specific Plan states that light spill-over will be
shielded from neighboring properties. Single -
family homes are located approximately 50 feet
Policy 11.2: Front new buildings directly
from the project site's northern and eastern border.
on the thoroughfares and respect the
Townhomes are located approximately 70 feet
presence of neighborhoods immediately
south of the project site's southern boundary.
behind them by protecting the privacy of
According to the Acoustical Site Assessment
residential uses and minimizing intrusions
prepared for the project site (Appendix F), no
such as noise, light, and glare.
unusual or excessive noise occurs as a result of
current activities at the project site and no unusual
or excessive noise will occur as a result of the
proposed activities at the project site. In addition,
no construction noise impacts were identified that
exceeded City of Azusa thresholds.
GOAL 12: ENSURE VISUAL VARIETY
ON CORRIDORS THROUGH A
VARIETY OF BUILDING TYPES AND
SIZES, VARIETY INLANDSCAPE, AND
THE REDUCTION OF SURFACE
PARKING LOTS.
The proposed landscape plan is designed to
complement the existing landscaping, which
Policy 12.2: Where landscape occurs
includes large oak trees, stands of olive trees, and
between the sidewalk and building or
citrus trees as well as walking paths, benches, and
parking lot, it should define the specific
low retaining walls. Many of the existing trees
character of each project.
have been identified as candidates for relocation
and will remain on site. Thus, the proposed
Specific Plan is consistent with Policy 12.2.
Page 6 of 18
Citv of Azusa General Plan
Goal/Policv
Proposed Project Elements
Mobility Element
Mobility Goals and Policies
GOAL 3: PROVIDE A CONNECTED,
BALANCED, AND INTEGRATED
TRANSPORTATION SYSTEM THAT
ENABLES AZUSANS TO WALK, BIKE,
AND TAKE TRANSIT, RATHER THAN
USING THEIR CAR.
The proposed project will include the construction
Policy 3.1: Develop and maintain a
of a public sidewalk along Monrovia Place. The
citywide pedestrian network of both on-
sidewalk will stretch from the existing driveway to
street and off-street walkways as shown
the eastern site boundary. To ensure that the public
on the Non -Motorized Circulation Plan.
sidewalk along Monrovia Avenue is connected to
Network shall link new neighborhoods
the project site, Mitigation Measure 4.8.A-1 is
with existing neighborhoods, connect
incorporated. Mitigation Measure 4.8.A-1 requires
neighborhood centers, schools, parks,
the applicant to provide a pedestrian linkage
commercial centers, and citywide
between the public sidewalk and the proposed
destinations such as Downtown, the San
Meditation Hall on construction drawings prior to
Gabriel River, Civic Center.
the issuance of building permits. Impacts will be
less than significant with mitigation incorporated.
Policy 3.3: Provide pedestrian amenities
The proposed project will include the construction
(such as benches, seats, water fountains,
of a public sidewalk along Monrovia Place. The
shady street trees, etc.) and conditions
sidewalk will stretch from the existing driveway to
that enhance the pedestrian experience
the eastern site boundary. The proposed project
along the pedestrian network.
will retain existing mature trees to provide shade.
Page 7 of 18
City of Azusa General Plan
Goal/Policy
Proposed Project Elements
Policy 3.4: Develop and maintain a
citywide bicycle network of both on -street
bike lanes and off -street bike paths in
accordance with the Bicycle Routes. The
Chapter 3 of the Azusa General Plan includes a
network provides for off -street paths
map of bicycle routes within the city (Figure M-2,
along the San Gabriel River, railroad
Bicycle Routes). According to the map, Palm
rights -of way, alongside flood control
Drive and Monrovia Place are both designated as
channels, and within existing and new
signed routes and Rosedale Avenue is classified as
neighborhoods, where feasible. The
a path/trail. Thus, bicycle routes already exist in
network improves connections between
the project site vicinity.
residential neighborhoods, schools and
commercial centers, as well as providing
connections to citywide destinations such
as Downtown, the University District, the
San Gabriel River, and Civic Center.
The project will provide bike parking as part of the
required parking amenities. Chapter 3 of the Azusa
General Plan includes a map of bicycle routes
Policy 3.5: Provide bicycle amenities
within the city (Figure M-2, Bicycle Routes).
(bicycle parking spaces, bike lockers,
According to the map, Palm Drive and Monrovia
etc.) on/near the bicycle network.
Place are both designated as signed routes and
Rosedale Avenue is classified as a path/trail. Thus,
the proposed project will not interfere with bike
facilities.
The new Metro Gold Line station is expected to be
completed in September 2015 and will be located
approximately 0.25 miles from the project site.
Policy 3.6: Improve/enhance local and
The Dhammakaya International Meditation Center
regional transit service in the city.
will provide a private shuttle to and from the
station for its visitors during large events. This
private shuttle service will enhance the provided
Gold Line transit service. The proposed project
will not interfere with this policy.
Page 8 of 18
of Azusa General Plan
ProposedCitv
Project
GOAL 8: ENCOURAGE WALKING,
BIKING, AND THE USE OF TRANSIT
THROUGH A VARIETY OF LAND USE
DEVELOPMENTAND URBANDESIGN
MEASURES.
A Parking Demand Study was prepared as part of
the Traffic Impact Assessment for the proposed
project (Appendix G). The Parking Demand Study
determined that, based on the maximum
occupancy of 700 participants, 238 parking spaces
are required. The project proposes to construct 277
parking spaces located in three areas. According to
Policy 8.1: Plan for an adequate amount,
the proposed Development Plan, 130 spaces will
not an oversupply, of parking for autos,
be located surrounding the proposed Meditation
carpool vans, and bicycles for each land
Hall, 69 spaces will be located in front of the
MacNeil Mansion, and 78 spaces will be located in
use.
the northwest corner of the property. Construction
of the proposed parking will be phased along with
implementation of the overall project. In the event
that celebrations attract additional attendants, the
39 additional parking spaces are provided to
prevent overflow parking onto Monrovia Place.
Thus, the proposed project will not interfere with
this policy.
Historic/Cultural Resources
Historic/Cultural Resources Goals and
Policies
GOAL 2: PROVIDE THE CITY WITH
OPEN SPACE AND
CULTURAL/HISTORIC AREAS IN THE
DOWNTOWN, IN THE SAN GABRIEL
RIVER CORRIDOR, AND IN
NEIGHBORHOODS THAT CAN
PROVIDE EDUCATIONAL BENEFITS.
Page 9 of 18
Citv of Azusa General Plan
Proposed
Policy 2.1: Combine historically and
The project site will continue to be used as a
culturally significant sites such as those
on the proposed landmark list with
Buddhist meditation center and any historic
recreational learning opportunities, where
resource learning opportunities that may take place
appropriate. Examples may include the
on the site in the future will be at the discretion of
train depot, the Woman's Club, the citrus
the
mnt. International Meditation Center
processing buildings, and the Wells Fargo
management.
Building.
GOAL 3: PRESERVE AND PROTECT
PLACES, BUILDINGS, AND OBJECTS
THAT EMBODY THE CITY'S SOCIAL,
COMMERCIAL, ARCHITECTURAL,
AND AGRICULTURAL HISTORY.
A Cultural and Paleontological Resources
Policy 3.1 • Encourage property owners to
Assessment was prepared for the project site
maintain and preserve the historic
(Appendix C); it determined that the MacNeil
properties currently listed on the
Mansion remains eligible for its current local
landmarks list and those properties that
designation of "Potential Landmark" under the
may be added in the future. Large-scale
Historic Preservation Ordinance of the City of
examples include Route 66, the Santa F
Fe
Azusa (Ord. no. 00-012, §2, 10/16/00). The
Depot, the citrus packing buildings, the
MacNeil Mansion will not undergo any changes as
mining activities, and the downtown core.
a result of the proposed improvements to the
project site and thus will be consistent with Policy
3.1.
Regarding Policy 3.2, the project site is located
approximately 1.5 miles south of the San Gabriel
River and is not located in an area where mining
Policy 3.2• Incorporate natural resources
activity has occurred. However, mitigation
such as the San Gabriel River drainage
measures are incorporated in Section 4.3 Cultural
into development when appropriate as a
Resources to ensure that archeological or
means of understanding and appreciating
paleontological resources are preserved if
the history of the site or area. This may
uncovered during ground disturbing activities
include the mining activities and any
(Mitigation Measures 4.3.13-1 and 4.3.0-1).
prehistoric sites that maybe encountered
Incorporating any resources found on site during
during subsequent studies of the drainage.
ground disturbing activities into the development
will be the decision of the applicant and the City of
Azusa.
Page 10 of 18
Citv of Azusa General Plan
Proposed Project Elements
The MacNeil Mansion is an example of adaptive
Policy 3.3: Support preservation of
reuse and the use of tax incentives to support
historic resources, including providing for
preservation of the MacNeil Mansion is the
adaptive reuse and tax incentives where
decision of the applicant.
appropriate.
Infrastructure Element
Infrastructure Goals and Policies
COAL 2: PROVIDE A WATER SUPPLY
SYSTEM THATISABLE TO MEET THE
PROJECTED WATER DEMANDS;
UPGRADE AND EXPAND WATER
TREATMENT, SUPPLY, AND
DISTRIBUTION FACILITIES; AND
PURSUE FUNDING SOURCES TO
REDUCE THE COST OF WATER
PROVISION FOR THE CITY.
Policy 2.4: Require that new development
The project site will include construction and
and retro -fit existing developments to
operational Best Management Practices (BMPs)
contain safeguards and measures
that are designed to protect water quality (see
preventing water supply degradation.
Section 4.7 Hydrology and Water Quality).
The City of Azusa has adopted the 2013 California
Building Code, which includes the California
Green Building Standards Code (CALGreen) (Part
11 of Title 24, California Code of Regulations).
Policy 2.6: Minimize water consumption
CALGreen requires every building constructed
through site design, use of efficient
after January 1, 2001 meet a certain baseline for
systems, and other techniques.
water efficiency and conservation. Thus, the
proposed project will be consistent with Policy 2.6
through adherence to the California Building Code
requirements.
Page 11 of 18
City of Azusa General Plan
''
Proposed Project Elements
Coal/Policy
The City of Azusa has adopted the 2013 California
Building Code, which includes the California
Green Building Standards Code (CALGreen) (Part
Policy 2.8: Continue to require the
1 I of Title 24, California Code of Regulations).
incorporation of water conservation
CALGreen requires every building constructed
features in the design of all new
after January 1, 2001 meet a certain baseline for
construction and site development.
water efficiency and conservation. Thus, the
proposed project will be consistent with Policy 2.8
through adherence to the California Building Code
requirements
GOAL 4: PROVIDE A FLOOD
CONTROL SYSTEM THAT IS ABLE TO
SUPPORT THE PERMITTED LAND
USES WHILE PRESERVING THE
PUBLIC SAFETY; UPGRADE
EXISTING DEFICIENT SYSTEMS, AND
PURSUE FUNDINING SOURCES TO
REDUCE THE COSTS OF FLOOD
CONTROL PROVISION IN THE CITY.
Policy 4.6: During development review,
determine if any structures meant for
The proposed location of the structures will be
human habitation are constructed within
reviewed during the Building Permit process for
the 100 -year flood plain. If necessary,
flood safety, however, according to the Federal
evaluate the structure's flood safety, and
Emergency Management Agency, the project site
require remedial actions.
is located outside of any 100 -year flood plain.
The proposed improvements to the site include a
new storm drain system with 13 catch basins that
Policy 4.8: Require new developments to
will direct on-site drainage into a proposed
employ the most efficient drainage
detention basin located within the southern portion
technology to increase ground
of the project site. A Drainage Study and a
percolation, control drainage, and
Standard Urban Stormwater Mitigation Plan
minimize damage to environmentally
(Appendix E) were prepared for the project site to
sensitive areas.
ensure that the proposed detention basin has
adequate capacity. Thus, the proposed project is
consistent with Policy 4.8.
Policy 4.9• Conduct public education
Regarding Policy 4.9, as mentioned in Section 4.7
programs to discourage dumping of
Hydrology and Water Quality, all of the on-site
materials into the streets or into the
storm drain catch basins will be stenciled with
stormwater collection facilities.
prohibitive language such as "No Dumping —
Drains to Ocean".
Page 12 of 18
City of Azusa General Plan
Proposed Project Elements
GOAL S: MAINTAIN SOLID WASTE
COLLECTION AND DISPOSAL
SERVICES IN ACCORDANCE WITH
THE CALIFORNIA INTEGRATED
WASTE MANAGEMENT ACT OF 1989;
PURSUE FUNDING SOURCES TO
REDUCE THE COST OF THE
COLLECTION AND DISPOSAL
SERVICES IN THE CITY.
Policy 5.3: Monitor reduction and
recycling programs to ensure proper
The Dhammakaya Meditation Center (DIMC)
implementation and achievement of
currently separates their solid waste into landfill
mandated solid waste reduction and
waste and recyclable materials. The landfill trash is
diversion goals. Revise and replace
picked up by the Athens Disposal and DIMC staff
programs that do not achieve their
sells the recyclable material at a recycling facility.
intended purpose.
CHAPTER 4: ECONOMY AND
COMMUNITY
Public Services Element
Public Services Goals and Policies
GOAL 1: PROTECT THE COMMUNITY
FROM CRIMINAL ACTIVITY, RED UCE
THE INCIDENCE OF CRIME, AND
PROVIDE OTHER NECESSARY
SERVICES WITHIN THE CITY.
Policy 1.3: Require development projects
contribute fees based on their
proportional impact and demand for new
The proposed project will pay all development
resources, in accordance with State Nexus
impact fees as required by the City.
legislation.
GOAL 2: ENSURE ADEQUATE
PROTECTION FROM FIRE AND
MEDICAL EMERGENCIES FOR AZUSA
RESIDENTS AND PROPERTY
OWNERS.
Page 13 of 18
Citv of Azusa General Plan
Proposed Project Elements
Policy 2.5: Require new development be
assessed a pro -rated fee to pay for fire
The proposed project will pay all development
facilities and personnel.
impact fees as required by the City.
Currently, the northern portion of the site (near the
existing Organizational Housing buildings) does
Policy 2.6: Require all new development
not have a code -compliant emergency access road.
to design site plans and structures with
The proposed emergency access road will be 26
fire and emergency access and safety in
feet wide, which is consistent with Los Angeles
mind.
County Fire Department emergency access
standards. Thus, the proposed project will be
consistent with Policy 2.6.
The project site will be subject to Chapter 30 of
Policy 2.7• Ensure that buildings and lots
the City of Azusa Municipal Code (Fire Prevention
are maintained in a manner that is
and Protection), which has adopted the 2014 Los
consistent with fire prevention and
Angeles County Fire Code. The proposed project
personal safety.
will be consistent with Policy 2.7 through
adherence to the requirements set forth in the 2014
Los Angeles County Fire Code.
CHAPTER5:NATURAL
ENVIRONMENT
Geology Hazards Element
Geology Hazards Goals and Policies
Page 14 of 18
Citv of Azusa General Plan
Proposed Project Elements
Goal/oliev
,THE
GOAL 1: ENSURE CONTINUED
FUNCTIONING OF ESSENTIAL
(CRITICAL, SENSITIVE AND HIGH -
OCCUPANCY) FACILITIES
FOLLOWING A DISASTER; HELP
PREVENT LOSS OF LIFE FROM THE
FAILURE OF CRITICAL AND
SENSITIVE FACILITIES IN AN
EARTHQUAKE, AND HELP PREVENT
MAJOR PROBLEMS FOR POST -
DISASTER RESPONSE, SUCH AS
DIFFICULT OR HAZARDOUS
EVACUATIONS OR RESCUES,
NUMEROUS INJURIES, AND MAJOR
CLEANUP OR DECONTAMINATION
OF HAZARDOUS MATERIALS.
Policy 1.4 refers to High Occupancy facilities
Policy 1.4: Prohibit the location of
located in proximity to active or potentially active
Sensitive and High -Occupancy facilities
fault zones. The proposed project will include the
within 100 feet of the identified active
construction of a four-story, 69,179 square -foot
fault zone or potentially active fault zone
meditation hall complete with two 700 -seat
of concern, unless it is determined by a
meditation areas. Only one meditation area is
qualified geologic engineer that a closer
intended to be utilized at a time. According to the
location will not result in undue risks
Preliminary Geotechnical Review prepared for the
based on detailed site investigations.
project site (Appendix D), active faults are not
(Geo 1, Geo2, Geo 11, Geo 14, and
present on the site nor within 100 feet of the
meditation hall and Organizational Housing.
GOAL 3: PROTECT LIVES AND
PROPERTY AND ENSURE THAT
STRUCTURES PROPOSED FOR SITES
LOCATED ON FLOOD PLAINS
SUBJECT TO THE 100 -YEAR FLOOD
ARE PROVIDED ADEQUATE
PROTECTIONFROMFLOODS WHILE
PRESERVING AS OPEN SPACE IN
THOSE AREAS THAT CANNOT BE
MITIGATED FOR FLOOD HAZARD.
Page 15 of 18
Policy 3.2: Where feasible, given flood
control requirements, maintain the natural
condition of waterways and flood plains
to ensure adequate groundwater recharge
and water quality, preservation of habitat,
and access to mineral resources.
According to FEMA, the project site is located
outside of the 100 -year flood plain. In addition, the
proposed improvements to the site include a new
storm drain system with 13 catch basins that will
direct on-site drainage into a proposed detention
basin located within the southern portion of the
project site. A Drainage Study and a Standard
Urban Stormwater Mitigation Plan (Appendix E)
were prepared for the project site to ensure that the
proposed detention basin have adequate capacity.
C. That the proposed Specific Plan will not conflict with the provisions of the zoning
ordinance, subdivision regulations, or any applicable specific plan.
This Specific Plan is a comprehensive guide to defining future improvements to, and use of,
the DIMC Property and meets all of the applicable provisions of the Development Code. The
dormitories onsite are classified as an Organizational Housing, which under Azusa Municipal
Code (AMC) is defined as "a residential lodging facility operated by a membership
organization for its members and not opens to the general public. Includes fraternity and
sorority houses, student dormitories, convents, monasteries, and religious residential retreats.
" (Chapter 88.70 Definitions). The modifications to the DIMC Property will not change the
current use of the Property, which has been operating consistently with the General Plan
designation for 17 years.
D. That the proposed Specific Plan will not adversely affect surrounding properties.
An Environmental Impact Report with mitigation measures has been prepared. The
mitigation measures serve to prevent adverse impacts on surrounding sensitive land uses and
service systems. The document recommends the adoption of five mitigation measures to
reduce the potentially significant adverse effects to a less than significant level.
SECTION 3: Based on the aforementioned findings, the City Council does hereby find and ordain
that the Specific Plan and Zone Change for the Proposed Project, located at 865 East Monrovia Place, Azusa
is consistent with the City of Azusa General Plan, the City of Azusa Development Code, including Chapter
88.51 of the Development Code, California Government Code, Section 65450 et seq. and based on the
findings contained herein, approves the Dhammakaya International Meditation Center Specific Plan SP -8
and Zone Change from INS (Institutional/School) to SP -8, substantially in the form attached hereto as
Exhibit "A" and the Conditions or Approval, substantially in the form attached hereto as Exhibit `B."
Page 16 of 18
SECTION 4: The applicant shall indemnify, protect, defend, and hold the City, and any of its
officials, officers, employees, agents, departments, agencies, and instrumentalities thereof, harmless from
any and all claims, demands, lawsuits, writs of mandamus, and other actions and proceedings (whether legal,
equitable, declaratory, administrative or adjudicatory in nature), and alternative dispute resolution procedures
(including, but not limited to arbitrations, mediations, and other such procedures), judgments, orders, and
decisions (collectively "Actions"), brought against the City, and/or any of its officials, officers, employees,
agents, departments, agencies, and instrumentalities thereof, that challenge, attack, or seek to modify, set
aside, void, or annul, this or any other action of, or any permit or approval issued by the City and/or any of
its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof (including
actions approved by the voters of the City) for or concerning the project, whether such Actions are brought
under the Ralph M. Brown Act, California Environmental Quality Act, the Planning and Zoning Law, the
Subdivision Map Act, Community Redevelopment Law, Surface Mining and Reclamation Act, Code of
Civil Procedure Sections 1085 or 1094.5, or any other federal, state, or local constitution, statute, law,
ordinance, charter, rule, regulation, or any decision of a court of competent jurisdiction. It is expressly agreed
that the City shall have the right to approve, which approval will not be unreasonably withheld, the legal
counsel providing the City's defense, and that applicant shall reimburse City for any costs and expenses
directly and necessarily incurred by the City in the course of the defense. City shall promptly notify the
applicant of any Action brought and City shall cooperate with applicant in the defense of the Action. The
applicant or successor in interest shall be the real party in interest and shall assume primary responsibility for
the defense of any legal action or proceeding commenced against the City to challenge this approval or the
City's approval of Land Use Entitlements and/or the City s approval related to this approval or such land use
approval. The applicant or successor in interest shall reimburse the City for all reasonable attorneys' fees
and other reasonable costs incurred by the City in defending such action or proceeding.
SECTION 5: If any section, subsection, sentence, clause or phrase of this Ordinance is, for any
reason, held to be invalid or unconstitutional, such decision shall not affect the validity or constitutionality of
the remaining portions of this ordinance. The City Council hereby declares that it would have passed this
Ordinance, and each section, subsection, clause or phrase hereof, irrespective of the fact that any one or more
sections, subsections, sentences, clauses and phrases be declared unconstitutional.
SECTION 6: The City Clerk shall certify to the passage and adoption of this Ordinance, causing it
to be posted as required by law, and it shall be effective (30) days after its adoption.
SECTION 7: A summary of this Ordinance shall be published in the manner required by law.
PASSED, APPROVED and ADOPTED this 21s` day of September, 2015.
/2,4
oseph Romero Rocha
Mayor
Page 17 of 18
ATTEST:
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF AZUSA )
I HEREBY CERTIFY that the foregoing Ordinance No. 2015-08, was duly introduced and placed
upon its first reading at a regular meeting of the Azusa City Council on the 8"` day of September, 2015 and
that thereafter, said Ordinance was duly adopted and passed at a regular.meeting of the Azusa City Council
on the 21st day of September, 2015 by the following vote to wit:
AYES: COUNCILMEMBERS: GONZALES, CARRILLO, MACIAS, ALVAREZ, ROCHA
NOES: COUNCILMEMBERS: NONE
ABSENT: COUNCILMEMBERS: NONE
APPROVED AS TO FORM:
Best est & Krieg•, LLP
City ttomey
Page 18 of 18
Exhibit "A"
Dhammakaya International Meditation Center Draft Specific Plan
Provided to the City Council under separate cover.
Additional copies of the Draft Specific Plan are available for review at:
City of Azusa Economic and Community Development Department
213 E. Foothill Boulevard
Azusa CA 91702
or
http://www.ci.azusa.ca.us/Search/Results?searchPhrase=dhammakava&page=l &perPape=10
EXHIBIT `B"
tionarttons of
SP -8 Dhammakaya International Meditation Center
865 East Monrovia Place
8625-005-015
Specific Plan to allow the construction of a new meditation hall and replacement
existing dormitories with new dormitory structures.
These conditions of approval shall be printed on or attached to working drawings submitted to the
Building Division for approval.
A. All requirements of the Planning Division shall be met, including but not limited to the
following:
1. The Design Review shall be exercised within one (1) year after its approval, or said permit shall expire
and be subject to revocation, unless an extension of time is approved in compliance with Section
88.52.040 of the Development Code. The permit shall not be deemed "exercised" until the applicant has
obtained a building permit.
2. All applicable Building Division and Fire Department requirements shall be met at all times.
3. Within 10 calendar days from the date of approval the applicant/property owner shall provide the
following to the Planning Division:
a. Sign and return the "Owner's Acceptance" form provided by the Planning Division.
b. Submit a check for $75 payable to the Los Angeles County Clerk for filing of a Notice of
Exemption with the County of Los Angeles.
4. All construction and uses shall be in substantial conformance with the approved plot plan and elevations
pursuant to the conditions listed herein;
a. The applicant shall comply with the City of Azusa's allowable construction hours as follows:
Monday thru Saturday 7:00 a.m. to 6:00 p.m.
b. Applicant shall ensure that the design of the proposed development is compatible with the
surround environment.
5. Signs shall not be placed on the public right-of-way. Those projections over the existing or proposed
public right-of-way shall meet the State of California Encroachment requirements.
6. Parking of vehicles on areas other than paved surfaces or in garages is prohibited. Use of permeable
surface as an alternative material to reduce the amount of paved surfaces may be utilized subject to City
staff review and approval.
7. Parking shall be striped and shall have adequate guards for protection of other vehicles on same lot (i.e.
wheel stops.)
8. Landscaping shall be adequately maintained at all times including, but not limited to, irrigation, weeding,
and/or replacement when necessary.
9. All portions of the lot, with the exception of driveway areas and building locations show on plans
submitted, shall be completely and adequately landscaped at all times.
10. The premises shall be maintained in a clean and acceptable condition at all times. All buildings and walls
shall be maintained in good repair at all times. Any offensive markings shall be removed immediately.
Any graffiti shall be painted over within forty-eight (48) hours to match existing wall in color and tone.
it. If it becomes necessary for the City to take any legal action or commence any administrative proceedings
against the applicant or any successor in interest in order to enforce any of the conditions of approval set
forth herein, the City shall recover from the applicant or successor in interest reasonable attorney's fees
and other reasonable costs incurred in such action or proceeding, provided that the City obtains a
judgment in its favor in any portion of such action or proceeding.
12. The applicant or successor in interest shall be the real party in interest and shall assume primary
responsibility for the defense of any legal action or proceeding commenced against the City to challenge
the City's approval of Land Use Entitlements and/or the City's approval related to such land use approval.
The applicant or successor in interest shall reimburse the City for all reasonable attorneys' fees and other
reasonable costs incurred by the City in defending such action or proceeding.
13. By accepting approval of the Land Use Entitlements subject to the conditions set forth herein, the
applicant or successor in interest shall be deemed to have agreed to the terms and conditions set forth
herein and the City shall have the right to enforce in its sole discretion such terms and conditions by
pursuing any and all available legal and equitable remedies.
14. The pool/rose garden will be removed and replaced with a workshop building. On the roof of the
workshop building, a meditation garden will be created. Within the meditation garden, a plaque and a
display of the pool's history will be constructed. The design and content of the plaque and display will be
coordinated with the Cultural and Historic Preservation Commission. An outline of the pool will be
constructed in the meditation garden as well. The pool balustrade will be placed on the perimeter of the
workshop roof and will include a plexiglass safety fencing outside of the balustrade wall.
15. Shuttle buses or other buses with a capacity of more than 20 passengers are not permitted.
B. All requirements of the Building Division shall be met, including but not limited to the following:
1. Applicant shall conform to the 2013 California Building Standards Code; including the 2013 California
Code, 2013 California Residential Code, 2013 California Green Building Code, 2013 California Electrical
Code, 2013 California Plumbing Code, 2013 California Mechanical Code, 2013 California Energy Code
and the City of Azusa Municipal Code.
2. All plan check fees shall be paid at the time of plan check submittal. Once plan check is completed and
approved, applicant shall be responsible to pay in full all other appropriate development fees (i.e. school
district fees, water reimbursement fees, and park fees, sanitation fees) priorto the issuance of any buildine
permit.
3. Electrical, mechanical, plumbing plan check fees are required for commercial projects.
4. Energy plan check fees are required.
5. Applicant shall submit 3 copies of site plan, 3 copies of architectural plans including floor, elevations, and
architectural details, 3 copies of structural including foundation, roof, wall structural elements and
structural details, 3 copies of plumbing, electrical and mechanical plans for plan check.
6. Applicant shall provide an additional copy of the building floor plan to be submitted to the County
Assessor.
7. Structural, architectural, electrical, mechanical, pluming plans shall be designed by a State of California
Registered Engineer, or a State of California Registered Architect.
S. Applicant shall submit 3 copies of structural calculations concurrently with the constructions plans.
9. Applicant shall submit 3 copies of energy calculations concurrently with the construction plans.
10. Electrical, mechanical, plumbing plans shall be submitted for plan check concurrently with the
construction plans.
IL Prior to issuance of a permit, the applicant shall submit approval from the Los Angeles County Health
Department, and the Los Angeles County Fire Department.
12. Applicant shall submit 3 copies of soil report concurrently with the construction plans.
13. Property falls within an area of potential earthquake induced Liquefaction, Landslides or both. A site-
specific Geologic investigation must be conducted for the property. The site -investigation report must be
prepared by a certified engineering geologist or registered engineer who must have competence in the field
of seismic hazard evaluation and mitigation. The geologic report must be submitted to the Department of
Community Development for review. Plan review fees will based on actual costs with a minimum deposit
of $1,000.00. due when the report is submitted. Final report must be submitted to RMA for approval.
14. Plans as submitted are not acceptable for Building Division submittal.
15. Grading and Drainage plan must be approved by City Engineer Division prior to permit issuance.
16. Grading plan must be reviewed and approved by Petra prior to permit issuance.
C. All requirements of the Electric Division shall be met, including but not limited to the
following:
1. Prior to approval of proposed project, contact Electric Division as soon as possible for details on;
specifications and requirements, meter spot and method of service.
2. Incoming electric utility facilities shall be underground. Developers to provide the following: All conduits
pull boxes, and transformer pads.
3. Extensive electrical line rebuilding may be necessary. Applicant is directed to contact and make
arrangement with the Electric Division immediately.
4. Special Conditions for new or upgrade of electric service on commercial construction projects:
a. Owner/Developer shall contact Consumer Service Division for information on the establishment
of new or upgraded electric accounts.
b. Owner/Developer shall submit to Azusa Light and Water (2) separate plans showing the
following:
()Site survey plan of building to include additions and foundation, elevations, sections,
and location of existing electric easements.
2)Electric service desired, electrical load calculation and single line diagram. Transformer
will not be ordered until this information supplied.
3)Locations of electric meter panel and main switchgear on or in building and drawings, if
necessary.
4)Location of transformer pad and related substructures.
5. Property owner shall grant easement to Azusa Light and Water any electric facilities such as underground
vault, power lines, transformer pad, and power pole installed in his/her property. All cost of installations
of electric facilities to purvey service to proposed or existing structures within this campus shall be paid
fully by the applicant/developer.
6. All existing electric service and facilities shall remain. Any relocation, modification, alteration, or upgrade
of existing electric service and facilities shall be at the sole cost and expense of
owner/applicant/developer.
D. All requirements of the Engineering Division shall be met, including but not limited to the
following:
1. Dedicate 10 feet on along the frontage of property for street purposes. Deed shall be executed before
Notary Public and delivered to the City Engineer prior to issuance of building permits.
2. Prior to performing any grading, obtain a permit from the Engineering Division. Prepare and submit 2 sets
of grading/drainage plans per the City's Grading Guidelines and the latest edition of the Los Angeles
County Building Code. The plans shall be stamped and signed by a California State Registered Civil
Engineer.
3. Prepare and submit 2 sets of geotechnical reports, less than one year old. The reports shall include
information on the nature, distribution, physical, and engineering properties ofthe soils onsite and/or soils
to be used as fill, and include recommendations on grading procedures.
4. Prepare and submit 2 sets of hydrology and hydraulic calculations for sizing of all proposed drainage
devices. The analysis shall also determine if changes in the post -development versus pre -development
conditions have occurred. The analysis shall be stamped and signed by California State Registered Civil
Engineer and prepared per the Los Angeles County Department of Public Works Hydrologic method.
5. State law under the County of Los Angeles "National Pollution Discharge Elimination System" (NPDES)
permit requires certain new development and redevelopment projects/activities to incorporate post
construction Best Management Practices (BMPs) into the grading/drainage plans to control pollutants.
Please refer to the City's Standard Urban Stormwater Mitigation Plan (SUSMP) Guidelines for specific
comments and requirements.
6. The contractor shall take every step necessary to contain all dirt, construction materials, and construction
run-off on site. No grading or construction -related debris, either directly or indirectly carried by water, will
be permitted to leave the construction site.
7. All grading projects require an Erosion Control Plan as part of the grading plans. Grading permits will not
be issued until an Erosion Control Plan is approved. For projects with a disturbed area of one acre or
greater, a Storm Water Pollution Prevention Plan (S W PPP) is required. A Notice of Intent (NOI) shall also
be filed with the State Water Resource Control Board. When submitting the SWPPP for the City's review,
please include the NOI and the Waste Discharger Identification (WDID) number.
8. A City Encroachment Permit shall be obtained for all work undertaken in the public right-of-way. All
work shall be done in accordance with City of Azusa Standards and Standard Specifications for Public
Works'Construction (Green Book), latest edition and to the satisfaction of the City Engineer or his
designee and shall be completed before issuance of Certificate of Occupancy.
9. Prepare and submit 2 sets of improvement plans for work in the right of way per the Improvement Plan
Guidelines. Improvement Plan Guidelines may be obtained from the Engineering Division. The
Improvement Plans shall be stamped and signed by a California State Registered Civil Engineer.
10. All work shall be done in accordance with the Work Area Traffic Control Handbook (WATCH), latest
edition.
11. Construct sidewalk per City Standard Plan R-6 along the frontage of the property.
12. Construct or reconstruct driveway apron per City Standard R-5 along the frontage of the property (3 total)
13. Construct or reconstruct wheelchair ramp along the frontage of the property. Ramps shall comply with the
latest Americans with Disabilities Act (ADA) requirements.
14. Limits of paving restoration shall be determined by the City Engineer or Public Works Inspector. Paving
shall be per City Standard Plan R-12.
15. All on-site asphalt driveway and parking area shall be repaired and resurfaced.
16. Obtain a demolition permit from the Building Division.
17. All work to be coordinated with Rosedale Land Partners as they are the current owners of the roadway.
18. Provide ADA access from Public -Right -of Way in conformance with current codes.
19. Obtain written or stamped approvals from Los Angeles County Fire Department for access and roadways.
20. Work hours shall be limited to 7:00 am to 6:00 pm Monday thru Saturday; No work shall be performed on
Sundays, holidays or at night.
21. Prior to issuance of grading permit provide verification of fee payment to the County Sanitation Districts
of Los Angeles County.
22. Verify, after grading and construction, drainage run-off flows for the project and adjacent properties are
clear and unimpeded.
23. All storm drain infrastructure must meet Municipal Separate Storm Sewer System (MS4) requirements.
24. A construction permit from the State of California Department of Regional Water Quality Board may be
required for the project.
25. Provide all Los Angeles County Flood Control District permits for connections to Flood Control District
infrastructure.
26. Provide traffic study for both day to day traffic and major event traffic.
27. Traffic control shall be maintained during construction to provide adequate vehicular and pedestrian
access to facilities in the work area.
28. Haul route approval and transportation permits are required for all construction vehicles.
29. Provide sewer study and include capacity analysis of existing system from location of project to treatment
facility. Note: La County Sanitation District requires a capacity review for a permit.
30. The sewer system connections shall be accomplished while maintaining service to the upstream tributary
areas.
31. Provide Engineering Division with copies of ALTA Site Survey.
32. Provide City of Azusa with a complete site boundary survey, wet -signed and stamped by a licensed
surveyor.
33. Provide easement documents for any requirements due to development of the site.
E. All requirements of the Code Enforcement shall be met, including but not limited to the
following:
No comments at this time.
F. All requirements of the Fire Department shall be met, including but not limited to the
following:
A Fire Plan Review and approval by the Fire Department shall be required prior to issuance of building permits.
G. All requirements of the Water Division shall be met, including but not limited to following:
I. Applicant shall apply for water service & meter and pay applicable associated installation deposit and
inspection fees.
2. Each unit will require a water meter and service.
3. Will require an approved backflow device.
4. Will require installation of new water main.
5. Will require a water utility plan submitted for review and approval.
6. Plan check is required.
7. The owner or project applicant shall take sole responsibility for cost incurred due to any modification,
relocation or alteration of existing water facilities caused by this projectto the satisfaction of the Light and
Water Department.
8. This project is subject to Ordinance No. 96-08 City of Azusa Municipal Code Section 78-471 through 477
of Article VI, Division 5 entitled "Water System Development Fee" of there is any change in floor
footage. Fee must be paid to the Light and Water Department following the final plan approval by
Building Department.
9. This project is subject to Ordinance No. 07-012, City of Azusa Municipal code Section 501 through 513
of Article VI, Division 6 entitled "Conservation Plan". This includes the installation of water saving
devices, such as ultra -low -flow toilets (1.6 gallons), and participation in the retrofitting of existing house
units either by installing retrofits or providing funds to perform retrofits.
10. Shall completely remove and abandon water services and sever from the main line unused water services
within the project vicinity per the ALW Water Division requirements.
H. Contact Water Division for details on Specifications and Requirements. Submit required
meter(s)/service(s) size needed, etc.
12. Special conditions: submit an analysis of project demands, ADD, MDD, MDD +fire flow. Submit water
plan for review/approval.
The following estimated Water System Development Fee is based on Resolution No. 14-C41 and will be
changed to reflect the actual rate as of the day fees are paid. Required WSD fees shall refer to the adopted
FIR and proposed SF/AC of new chanced development to assess fees
H. All requirements of the Parks Division shall be met, including but not limited to the following:
I . Parkway trees are required, located no closer than 30ft. but no greater than 6511. a part and shall be
irrigated per city plan specifications. Variety to be specified by Parks Division, Roy Chavez, Park
Maintenance Crew Supervisor or his designee, (626-812-5259), and shall be at least 15 gallon size in
accordance with the Azusa Municipal Code Section 62-202
2. Landscape and irrigation plans shall show locations, quantities, sizes, and types of plant materials, as well
as design of an automatic irrigation system. No final release from this department shall be granted until
these plans have been approved.
3. Special Condition(s)
a. Must follow city of Azusa's Water Efficient Landscape Regulations.
b. Existing irrigation must be automatic with smart controllers, weather base and rains sensors.
C. Monrovia Place Parkway landscape improvement will be base on Engineers sidewalk
improvement plan.
I. All requirements of the Police Department shall be met, including but not limited to the
following:
I . Install lighting systems that provide uniformed white light which provide night time vision for motorists to
increase the visibility of pedestrians, other vehicles and objects (which should be seen and avoided).
2. Install lighting systems that provide uniformed white light which provide night time vision forpedestrians
and homeowners to permit pedestrians to see one another, to see risks involved in walking at night and to
reduce the risk of trip and fall accidents. Moreover, provide lighting systems which will enhance police
ability to surveillance, patrol and pursuit.
3. Install lighting systems that provide uniformed white light that minimize glare, light pollution, and light
trespass. Where necessary, provide light transition zones. Special attention should be focused on areas of
property that border neighboring residential tract.
4. All lighting systems should be protected from vandalism (e.g., unbreakable exterior, tamperproof
hardware, non -corrosive design components and shock absorbing bracket design).
5. Clear signs must be posted where parking is prohibited (e.g., fire lane parking). These signs shall be
minimally installed at points which are recommended by the Building/Planning Divisions.
6. Fire lanes shall be marked in compliance with CVC 22500.1
7. If applicable, all containers in trash enclosure areas must have lid, kept closed, and either the containers
and/or enclosures should be lockable to deter illegal dumping.
8. It is recommended that shrubbery be maintained to a height of no more than 2' tall and the canopy of trees
to not fall below 6' in height to allow for clear unobstructed views.
9. It is recommended that graffiti resistant finishes be used wherever possible.
10. Knox boxes shall be installed at every entry access gate which will normally be locked.
IL Consideration should be given to recommendations made by the Building Department in regards to
handicap accessibility provisions.
12. Handicapped parking stalls shall be marked in compliance with CVC 22511.8
13. If the property owner wants illegally parked cars to be towed or cited, the property must be have signs
posted in compliance with CVC 22658.
14. If any of the proposed structures are to be equipped with an audible or silent burglary alarm, it should be
monitored by a reputable alarm company and be compliance with pertinent AMC requirements for alarm
systems.
J. All requirements of the City of Azusa Cultural and Historic Preservation Commission shall be
met, including but not limited to the following:
1. The existing historical structure will be used as it was historically, i.e. a meeting facility.
2. The historic character of the existing structure will be retained and preserved. The removal of distinctive
materials or alterations of features, spaces, and spatial relationships that characterize a property is
prohibited.
3. The existing historic property will be recognized as a physical record of its time, place and use. Changes
that create a false sense of historical development, such as adding conjectural features or elements from
other historic properties, will not be undertaken.
4. Distinctive materials, features, finishes and construction techniques or examples of craftsmanship that
characterize the existing historic structure will be preserved.
S. Deteriorated historic features of the existing historic structure will be repaired rather than replaced. Where
the severity of deterioration requires replacement of a distinctive feature, the new feature will match the
old in design, color, texture and, where possible, materials. Replacement of missing features will be
substantiated by documentary and physical evidence as well as through a separate Design Review.
6. Chemical or physical treatments to the existing historic structure, if appropriate, will be undertaken using
the gentlest means possible. Treatments that cause damage to historic materials will not be used. Any
treatments to the historic structure will require a separate Design Review.
7. Archeological resources will be protected and preserved in place. if such resources must be disturbed,
archeological monitoring and mitigation measures will be required and undertaken.
8. New additions, exterior alterations or related new construction shall not destroy historic materials, features
and spatial relationships that characterize the existing historic property. The proposed new work shall be
differentiated from the old and will be compatible with the historic materials, features, size, scale and
proportion, and massing to protect the integrity of the property and its environment.
9. In the event that human remains are found or disturbed on the project site, the applicant shall adhere to
State Health and Safety Code Section 7050.5.
10. New additions and adjacent or related new construction will be undertaken in such a manner that, if
removed in the future, the essential form and integrity of the historic property and its environment would
be unimpaired.
it. All construction and uses shall be in substantial conformance with the approved plot plan and elevations.