Loading...
HomeMy WebLinkAboutAgenda Packet - January 28, 2008 - UBAGENDA REGULAR MEETING OF AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL l AZUSA LIGHT & WATER 729 N. AZUSA AVENUE AZUSA, CA 91702 AZUSA UTILITY BOARD KEITH HANKS CHAIRPERSON CHAIRPERSON URIEL E. MACIAS BOARD MEMBER JANUARY 28, 2008 6:30 P.M. IOSEPH R. ROCHA BOARD MEMBER ROBERT GONZALES BOARD MEMBER P.M. Convene to Regular Meeting of the Azusa Utility Board and Azusa City Council • Call to Order • Pledge to the Flag • Roll Call PUBLIC PARTICIPATION (Person/Group shall be allowed to speak without interruption up to five (5) minutes maximum time, subject to compliance with applicable meeting rules. Questions to the speaker or responses to the speaker's questions or comments shall be handled after the speaker has completed hls/her comments. Public Participation will be limited to sixty (60) minutes time.) 001 The Consent Calendar maybe adopted with one vote, and if so adopted the printed recommended action will be enacted. lfStaff or Councilmembers wish to address any item on the Consent Calendar individual/y, it will be considered as a SPECIAL CALL ITEM. B. CONSENT CALENDAR Minutes. Recommendation: Approve minutes of regular meeting on December 17, 2007 as written. &1. Dec 17 Minutes.doc 2. Approval of Purchase of Water Utility Storage Containers. Recommendation: Approve purchase of two secure storage containers to complete the recent upgrade to the Gladstone Water Yard in Amount of $12,741.02. &2. Purch Storage Dns.DOc 3. Approval of Contract Extension and Additional Compensation for Civiltec Entdneering. Recommendation: Approve (a) the addition of $22,000 to the Civiltec Engineering contract for inspection services on Project W-238, Replacement Pipeline Installation on Cypress and Sunset, et. al. in West Covina; and (b) three-month extension of contract to March 31, 2008. .® ml I &3. CruRec.doc Approval of Bid to Retrofit Electric Division Trucks. Recommendation: Approve bid by Ironman Emissions Group in amount of $76,585.14 to retrofit five Electric Division diesel trucks with the Particular Matter (PM) Traps to comply with California Air Resources Board Requirements. B -a. PurchPMTraps.doc Approval of Purchase of Two Electric Meter Shop Vehicles. Recommendation: Waive formal bidding procedures in accordance with the Municipal Code Section of two Chevrolet 3/4 -ton 2WD extended cab work trucks to Coalinga of $28,850.88 each, plus a State Procurement Fee of 1.98%. &5. Veh Purch.DOC 2-523(e) and award the purchase Motors, Incorporated in amount 402 i i iI 6. Approval to Award Contracts for Bill Print and Mail. Electronic Bill Presentment and Payment, and Pay -By -Phone and Web Payment Options. Recommendation: Approve the award of contracts to: (a) Infosend Incorporated to provide bill print and mail processing in amount of $54,600 per year for three years, excluding postage, and electronic bill presentment in amount of $22,000 with a one-time implementation charge of $3,250; (b) BankSery in an estimated annual amount of $5,600 per year for three years to act as bank merchant processor for electronic automated clearing house (ACH) payment transactions related to electronic billing; (c) Paymentus to collect and process pay -by -phone k and web payments; and (d) Global Payments to act as bank merchant processor for one-time 1 customer credit and debit card payments at transaction cost to customers per $500 increment of $3.25 for residential and $3.75 for businesses. In B-6. Bill Pyrrnt Svc Agrmts.DOC Approval of Resolution for the Designation of Los Angeles County Solid Waste Management Program as Local Enforcement Agency. Recommendation: Approve the following resolution: A RESOLUTION OF THE CITY.COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, APPROVING THE LOS ANGELES COUNTY SOLID WASTE MANAGEMENT PROGRAM (SWMP) AS THE LOCAL ENFORCEMENT AGENCY (LEA) RESPONSIBLE FOR ENFORCING ALL LAWS AND REGULATIONS PERTAINING TO THE MANAGEMENT OF SOLID WASTE WITHIN THE CITY OF AZUSA. B-7. SWMP-LEA.doc SCHEDULED ITEMS Approval to Increase Replacement Water Cost Adjustment Factor. Recommendation: Authorize staff to increase the Replacement Water Cost Adjustment Factor by $0.2340 per hundred cubic feet of water effective February 1, 2008 to recover the increased cost of purchasing water from Metropolitan Water District for November and December. C-1. Water-RWCAF.doc Z. Approval of Budget Amendment for Purchased Water Costs. Recommendation: Approve the following resolution: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, AMENDING THE FISCAL YEAR 2007-2008 OPERATING BUDGET FOR THE WATER UTILITY.TO PAY FOR PURCHASED WATER. Lai C-2. Wtr Budget Arrend.doc 003 S I . Monthly Update on Water Shortage Declaration D-1. Moly Rpt Wtr Shrtage.doc 2. Monthly Update on Water Treatment Plant D-2. wrr Moly Rpt. pdf 3. Monthly Power Resources Update D-3. PwrResMolyRpt.ppt 4. Department of Energy kWh Rate Survey DA DOE Survey.doc 5. 2008 Utility Board Meeting Schedule D-5. Offske Meetings.doc 6. California Municipal Utilities Association (CMUA) March Conference 66. CMUA MAR CONF.doc 7. Report by Director of Utilities on CMUA Capitol Day Activities (Verbal) 4 004 j I,. E. DIRECTOR'S COMMENTS 'I. Request for Certificates of Appreciation to outgoing Miss Azusa, Jamie Pezold, outgoing Miss Outstanding Teen Jamie Alvarez, and Princess Crystal Munoz, to be presented on February 2, 2008, Miss Azusa and Miss Outstanding Teen Pageant. RECESS REGULAR UTILITY BOARD MEETING AND CONDUCT WORKSHOP ON SOLID WASTE ISSUES WORKSHOP Workshop On Solid Waste Issues ma —Ifl F -I. SW_Workshop.doc Adjournment In compliance with the Americans with Disabilities Act, ifyou need special assistance to participate in a city meeting, please contact the City Clerk at 626-812-5229. Notification three (3) working days prior to the meeting or time when special services are needed will assist staff in assuring that reasonable I rrangements can be made to provide access to the meeting " I 005 CITY OF AZUSA MINUTES OF THE REGULAR MEETING OF THE AZUSA UTILITY BOARD/CITY COUNCIL MONDAY, DECEMBER 17, 2007 — 9:51 P.M. The Utility Board Members of the City of Azusa met in regular session, at the above date and jtime, at Azusa Auditorium, located at 213 E. Foothill Boulevard, Azusa, California. Chairman Hanks called the meeting to order. ROLL CALL PRESENT: BOARD MEMBERS: GONZALES, CARRILO, MACIAS, HANKS, ROCHA ABSENT: BOARD MEMBERS: NONE ALSO PRESENT: Call to Order Roll Call Also Present (City Attorney Carvalho, City Manager Delach, Director of Utilities Hsu, City Clerk Mendoza, 4Deputy City Clerk Toscano. Public Participation Pub Part CMike Lee addressed the Board Member regarding Water Conservation stating that the fines for not conserving water during the drought are causing too much stress and there should be less punishment and more education. :The CONSENT CALENDAR consisting of Items B-1 and B-2, was approved by motion of Board IMember Carrillo, seconded by Board Member Rocha and unanimously carried. M. Lee Consent Cal Approved 1. The Minutes of the regular meeting of November 26, 2007, were approved as written. Min Appvd 2. The Minutes of the Workshop held on November 26, 2007, were approved as written. Min Appvd 1 Staff Reports/Communications Staff Rpts Director of Utilities Hsu presented the Quarterly Fuel Cost Adjustment (FCA) for San Juan Resource Quarterly and noted that although the FCA credits exceed $150,000 amount which would be credited back Fuel Cost to customers; due to the anticipated large San Juan replacement power costs in the first quarter Adjustment of 2008 due to its unit 3 major maintenance outage, staff is recommending the FCA credits be San Juan carried over to offset the foreseeable charges which will come due in the second quarter of 2008. Resource Director of Utilities Hsu presented the Monthly Power Resources highlighting the finalized replacement power planning for San Juan maintenance outage in the first quarter of 2008. He stated that the cost of replacement power is expected to be less than the budget by $450,000 due to declining spot market prices. He talked about the continuing active participation in SCPPA and the municipal utility community's regulatory efforts on greenhouse gas issue and responded to question posed that it would be about six months before anything definitive comes of this. Director of Utilities Hsu provided a presentation on the Water Shortage Declaration, stating that they are purchasing water from MWD, buying more during November. He stating that Azusa and Glendora are taking from the same spreading ground; Azusa does have excess water going into the water basin, but it is still 60 feet below level compared to last year. He responded to questions posed stating that most public outreach campaign has gone to large commercial users who have reduced consumption by 23% since last year. Directors Comments None Monthly Pwr Res. Update Water Shortage Update Dir Cmts None Moved by Board Member Carrillo seconded by Board Member Rocha and unanimously carried to Adjourn adjourn. TIME OF ADJOURNMENT: 10:06 P.M. SECRETARY lZI *A 111111 #111] 111 Y it COWNLIi:•111K:K" 007 CONSENT CALENDAR TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES DATE: JANUARY 28, 2008 SUBJECT: PURCHASE OF TWO SECURE STORAGE CONTAINERS FOR GLADSTONE YARD RECOMMENDATION It is recommended that the Utility Board/City Council approve the purchase of two secure storage containers in the amount of $12,741.02, to complete the recent upgrade to the Gladstone Water Yard. BACKGROUND Due to increased theft of our water meters and other brass products, the Gladstone yard has had to store the water meters indoors where space is limited. The Gladstone yard has just finished a recent upgrade which is allowing space for these secure storage facilities to be located. The storage units are 401 x 8'W x 87 steel shipping containers modified with 4 rollup doors along their length. These will be used to store the water meters, supplies, and other equipment to prevent theft and to free up limited indoor space. There are no planning issues or building permits required. The Mobile Storage Group - $12,741.02 J Stall Storage - $13,110.12 Aztec Technology Corp.- $14,050.84 The storage units will be purchased from The Mobile Storage Group, the lowest qualified bidder, for the amount of $12,741.05 including tax and delivery charges. FISCAL IMPACT Funds are available in the Water Division's O&M Budget account 32-40-723-752-6563 for Purchase of the storage facilities. Prepared by: Chet Anderson mm 8-3 AzusTI A R SA CONSENT CALENDAR TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES DATE: JANUARY 28, 2008 SUBJECT: REQUEST FOR CONTRACT EXTENSION AND ADDITIONAL COMPENSATION FOR CIVILTEC ENGINEERS FOR INSPECTION ON PROJECT W-238, REPLACEMENT PIPELINE INSTALLATION ON CYPRESS &SUNSET ET AL. RECOMMENDATION It is recommended that the Utility Board/City Council approve: (a) the addition of $22,000 to the Civiltec Engineering Contract for Inspection Services on Project W-238, replacement pipeline installation on Cypress and Sunset et al. in West Covina; and (b) three-month contract extension for Civiltec to March 31, 2008. BACKGROUND At its April 23, 2007 regular meeting, the Utility Board approved a $58,208 Professional Services Contract with Civiltec Engineers to perform inspection of water pipeline installation for project W-238, located in Cypress and Sunset Streets. The Contract was set to expire December 31, 2007. Due to the project running over the date of completion and additional time on the site required to observe the contractor, an additional $22,000 is estimated to be necessary to compensate Civiltec for the extra hours the inspector will likely have to spend on the project. Because the contractor has not yet completed the project within allowable days of contract completion date of November 7, 2007, liquidated damages for non -justified days will be assessed against the contractor. At a meeting held January 16, the contractor, J. DeSigio Construction, estimated that the project will require'approximately four additional weeks to complete, which would put the project completion at February 13, 2008, ninety- eight calendar days behind schedule. Liquidated damages for non -justified additional days are $500 per day, and if the 98 days of delay are all non -justified, this would equate to $49,000 in liquidated damages. FISCAL IMPACT This action authorizes an addition of up to $22,000 for inspection services. It is likely this amount will be offset by liquidated damages; however, non -justified days warranting liquidated damages have not yet been determined. Payment of the addition to Civiltec will be made from the Capital Improvement Budget Account 32-80-000-721-7145/72106E-7145. Prepared by: Chet Anderson, Assistant Director- Water Operations 009 w _ a CONSENT CALENDAR TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES�1�� DATE: JANUARY 28, 2008 SUBJECT: RETROFIT OF ELECTRIC DIVISION DIESEL TRUCKS WITH PARTICULATE MATTER TRAPS TO COMPLY WITH CALIFORNIA AIR RESOURCES BOARD REQUIREMENTS RECOMMENDATION It is recommended that the Utility Board/City Council approve bid by Ironman Emissions Group in amount of $76,585.14 to retrofit five (5) Electric Division diesel trucks with the Particular Matter (PM) Traps. BACKGROUND In 2005, the California Air Resources Board (CARB) approved a regulation pursuant to title 13, California Code of Regulations (CCR), sections 2020, 2022, and 2022. 1, the Fleet rule for Public Agencies and Utilities. This rule requires a municipality or utility that owns, leases, or operates an on -road diesel -fueled heavy-duty vehicle greater than 14,000 pounds gross vehicle weight rating (GVWR) with a 1960 to 2006 model year medium or heavy duty engine to install best available control technology (BACT) to reduce particulate emissions. The regulation requires that 20 percent of the fleet be retrofitted with BACT by 2008, and then 50 percent by 2009. The installed BACT should reduce toxic diesel Particulate Matter (PM) emissions to 0.01 gram per brake horsepower hour (g/bhp-hr) or to lowest emission level possible for a specific engine without jeopardizing the original engine warranty. The Electric Division has identified five (5) diesel trucks weighing over 14,000 pounds that fall under this regulation and has sought quotes to install the required equipment. Two quotes were received, one from Diesel Emission Group in amount of $83,392.20, and the other from Ironman Emissions Groups in amount of $76,585.14, including sales taxes. FISCAL IMPACT Award of $76,585.14 is included in fiscal year 2007-2008 operating budget as capital outlay in account 33-40-733-920-7135. Prepared by: Dan Kjar, Electric Distribution Supervisor CARB_Ltr.pdf 010 unda S. Adams St=a'ary for Eire* omgfal .ay 17. __iX7 Air Resources Board Robert F. Sawyer, Ph.D., Chair 1OD1 I Sheg • P;O. Box 2815 Saaamwtio, Caiirorrta 85812 • vvA-zrh_ca-gm, Dear City and County Officials: In 2005, the California Air Resources Board (ARB or Board) approved a regulation to reduce toxic diesel particulate matter (diesel PM) emissions from diesel -fueled public agency and utility fleet vehicles beginning in 2007. Diesel PM, the tiny soot particles from diesel engines, was identified as a toxic air contaminant in 1998, Exposure to diesel PM is a significant health hazard, particularly to children whose lungs are still developing, and the elderly who may have other serious health problems. Each year in California, diesel PM contributes to 3,700 premature deaths, 2,200 hospital admissions. 100,000 asthma attacks and respiratory symptoms, 8,500 cases of chronic bronchitis, 620,000 lost workdays and 3.6 million minor restricted activity days. Reducing exposure to diesel PM is one of ARB's highest priorities - The Fleet Rule for Public Agencies and Utilities regulation is particularly effective because if reduces diesel PM concentrations in the heart of residential communities where municipal and utility vehicles frequently conduct business. But while the regulation brings significant clean -air benefits, it also brings cost increases to municipal fleet administrators, who already may be on very tight fiscal budgets. Depending on the age and type of vehicle, implementing the regulation can average from $3,000 to more than $40,000 per vehicle. During the development of the regulation, one of the major issues of concern was how a municipal fleet administrator would pay for the cost of the regulation. The Board shared this concern, and approved modifications to the regulation with this in mind, including extending the initial compliance deadline for most fleets, and allowing low -population counties additional time to budget and plan for the cost of compliance. The first implementation deadline of the regulation is December 31, 2007, when twenty percent of a municipality's vehicles between the model years 1960 through 2002 must be in compliance with the regulation. As both elected county officials and Board members, we understand compliance by many municipal fleet administrators will be challenging_ Because of this, we encourage county and city governments to support the efforts of their municipal fleet administrator in complying with this regulation. rHa energy Chariange (sting Cah`hmre is reef. Every C;aAlwman neods to take immediam aGfan to reduce energy rnnsumpeon, For a W of simple ivgys you can reduce demand and cut your ene+gy costs, see aurwebacehod 7Fmm.arb ca.aay. California Environmental Protection Agency Primed an Rocycw Gaper 011 Dear City and County Officials t-* v, n7 Page 2 For Californians to realize the health benefits from this regulation, municipal and utility fleets must meet the challenge and reduce diesel PM in accordance with this regulation. The Board is counting on your support of your municipal and utility fleet administrators, which will aid in successful implementation of this regulation. Sincerely, Ron Roberts, Supervisor San Diego County . Board Member Mayor Ronald O. Loveridge City of Riverside Board Member Barbara Riordan, Former Supervisor San Bernardino County Board Member Jerry Hill, Supervisor San Mateo County Board Member 012 r �, x I zip ioS 13 NI • AZUSA 1:111 % WLTri CONSENT CALENDAR TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES< DATE: JANUARY 26, 2008 SUBJECT: WATER RATE STUDY PROPOSAL RECOMMENDATION It is recommended that the Utility Board/City Council approve proposal by HDR Engineering for not-to-exceed amount of $31,767 and authorize the City Manager to execute Professional Services Agreement. BACKGROUND In November 2008, the Utility Board authorized staff to release a request for proposals (RFP) to conduct a third party review of the Utility's water rates to determine if they are adequate given reduced revenues resulting from aggressive promotion of water conservation and other changes to water rates this last year. Two proposals were received in response to the City's RFP, one from HDR Engineering in amount of $31,767, and one from HFH Consultants in amount of $51,110. Both firms had highly qualified managers overseeing their proposed project plans, and both presented excellent work plans in response to the RFP. One difference with the work plans was with respect to looking at how to manage the loss of revenues associated with drought declarations and imposition of the drought charge or emergency rate structure. HDR Engineering included this work with their proposed scope, whereas HFH Consultants recommended this work, however, stated that this work was not included in their cost proposal, implying that this would cost extra. dOA/ / ) All things being roughly equal--with exception of total not-to-exceed cost and minor technical differences in the scopes of work, it is staff recommendation to have HDR Engineering perform the study at the lower proposed cost and save $19,343. Following approval by the Utility Board, staff will prepare agreement for execution by City Manager. Once the notice to proceed is issued, the study is expected to be completed within 10 weeks. Currently, there is an approved rate adjustment of 6% set to go into effect July 1, 2009. The study will evaluate the adequacy of the approved rate adjustment to satisfy our bond debt service obligations. If any adjustment in rates beyond the 6% is necessary, such adjustment would have to be approved at a duly noticed public hearing. FISCAL IMPACT The study will cost $31,767, including one on-site meeting. Funding for this study is available from the approved water operating budget. Prepared by: Cary Kalscheuer, Assistant to the Director of Utilities Bob Tang, Assistant Director of Resources Management Attachment POF CostOfServProposa I- HDR.pdf 019 ONE COMPANY 1111auy Solutions •' January 12,2009. Mr. Cary Kalscheuer Assistant to the Director of Utilities Azusa Light&Water 729 North Azusa Avenue Azusa,CA 91702 RE: Proposal for Cost of Service Study for Municipal Water Utility Dear Mr.Kalscheuer; We are pleased to submit our proposal summarizing our team's qualifications,scope of work,and cost estimate.We believe HDR's team provides the expertise and experience needed to successfully re-evaluate the Azusa Light&Water's(AL&W's)water rates and revenue projections, and evaluate other cost-of-service issues. Someof the attributes of our team include: • HDR is nationally recognized for its expertise in municipal utility financial planning and rate analysis.Our proposed team.has successfully performed hundreds of similar studies throughout California and the U.S. • HDR's staff is'exceptionally.strong.Our project manger,Greg Clumpner,prepared AL&W's last rate study and is thoroughly familiar with issues addressed in this study. Our Principal-in-Charge,Tom Gould,is nationally recognized as one of the top rate experts in this type of cost-of-service study, arid will be in charge of ensuring this study meets the most stringent quality standards. Our approach to this study will be to essentially update the assumptions and current conditions affecting AL&W's water rate structure and revenues.We agree with AL&W• staff that the rates do not need to be restructured or radically changed;however, the financial forecast and associated rate adjustments will need to be re-evaluated. • We believe the three primary components involved in this study are: •_ A five-year financial plan that more accurately projects the budgets, capital improvement program(CIP)costs,expected revenues, and other operating conditions affecting AL&W's water system. HDR Engineering,Inc. 2365 iron Point Road,Suite 300 Phone(916)817-4700 O Folsom,CA 95530 Fax(916)817-4747 www.hdrinc.com Mr. Cary Kalscheuer ' January 12,2009 Page 2 • Adjustments to rates that reflect a re-evaluation of the number of accounts and consumption, as well as AL&W's conservation concerns, to more accurately project future rates. • Rate and financial models that can test the adequacy and sufficiency of the water rate revenues, and that AL&W staff can use to perform sensitivity analysis and then make future adjustments as needed. We look forward to discussing our proposal with you further and making any modifications you deem necessary.Should you have any questions about our proposal, all communications should be directed to Greg Clumpner at(916)817-4873 or by e-mail to greg.clumpner@hdrinc.com.Thank you again for the opportunity to submit our proposal for your consideration. Sincerely, R Ot- Timothy R Fleming,P.E. Gregory C.Clumpner Senior Vice President Project Manager GCC:pk/09003 021 dS to ffQualifications E. Company an CONTACT INFORMATION environmental and civil engineering,and engineering design services.This diversity About 110 R adds breadth to our knowledge and expertise on all projects. Formed in 1917,HDR is one of the top 500 engineering firms in the U.S.,and is Principal Place of Business particularly strong in water and wastewater engineering and financial services.HDR HDR Engineering,Inc. employs over 7,500 employees in 165 offices 2365 Iron Point Road,Suite 300 nationwide.Our firm has been part of the Folsom, California,95630-8709 California business landscape since 1960. (916) 817-4700 Phone Today, it employs more than 700 people in (916)817-4747 Fax 15 California offices,offering a full range of engineering, architectural,environmental, Project Team Locations community planning, and management consulting services to public and private The majority of the work(over 70 percent) sector clients. will be performed by team members located in HDR's Folsom office,where our project manager and financial analyst are located. , .i' - HDR Engineering,Inc. 2365 Iron Point Road,Suite 300 0 Lf % p,, '. rte " iCalifornia, Folsom, 95630-8709 (916) Phone (916)817-4747 Fax 1: x A'lklAdditional support services will be provided from the following HDR offices: F'- ,. '440.0 0'-1 -4 4- 0-�,' HDR Engineering, Inc. (6 percent) . 8690 Balboa Avenue,Suite 200 San Diego,California,92123-1502 By virtue of being a multi-disciplinary engineering (858) 712-8400 Phone and consulting firm,HDR has a number of (858)712-8333 Fax individuals with highly specialized expertise in financial planning and rates. While these HDR Engineering,Inc. (20 percent) individuals are highly specialized,they and HDR 500 108th Avenue NE,Suite 1200 do not lose sight of the overall need for good Bellevue, Washington,98004-5549 utility management and engineering practices. (425)450-6200 Phone (425)453-7107 Fax • When necessary, HDR can draw on other expertise in the firm,such as asset management, water resource planning, 09003 1-1 022 • to I . Company and Staff Qualifications _____... .....,_ ,,,p41,4.i.:4, 10 41 S u b c o n s u I t a n t s specific objectives,can help clients modify their financing strategies to better meet a° All of the services required for Azusa Light changing system demands, aging &Water's project will be performed in- infrastructure, or technology upgrades. , house, without the use of subconsultants. As shown in Figure 1-1,HDR has prepared H D R'S FIRM QUALIFICATIONS water utility cost of service and rate studies for over 150 clients throughout the U.S. Our 4; Ie!DR's Overall Experience in rate study experience includes preparing Water Utility Cost of Service revenue requirements,rate structure design, Studies and Rate Designs conservation-based rates,cost allocations, multi-year financial plans,funding analysis, $' HDR is nationally recognized for its bond feasibility studies, and Proposition 218 So excellence in financial planning and rate requirements for water utilities.Table 1-1 setting for public utilities. Our illustrates the wide variety of water and understanding of financing options and rate wastewater clients in California for which designs,tailored to accomplish client- HDR has completed similar studies. ` 03 City of Winters •A ;` Town of Yountville n r _ . Dublin San Ramon SD - �' ' �° til City of Pleasanton : East Bay MUD :;, 3 ' ; _ r - City of Stockton t City of Santa Cruz , City of San Luis Obispo - !b Grp City of Azusa :-:,� City of Norfolk Mesa Consolidated W[3 _> p City of Pomona a�%± • 110 City of Imperial Beach _ r 1,4 $g is .San Antonio Water System Sweetwater Authority to 110 Figure 1-1. The HDR Team's Experience in Water Utility i+ Cost of Service and Rate Studies 0 6 6 1-2 09003. O23 I. Company and Staff Qualifications Table 1-1. Examples of HOR's Recent Project Experience in California � Waf rfSevrrer lbw Rate_ Frrraneial Rate Connection Special v Service Conser Utility Structure Plan Mode! Fees-:_ Concerns Rafes • City of Santa Water ✓ ✓ ✓ ✓ ✓ ': '. Desalination Plant Cruz • Water/ Re-Design City of Folsom Sewer ✓ ✓ ✓ ✓ ✓ Water/Sewer Rates, • and Conservation City of Water! Conservation,Re-Use Pleasanton Sewer ✓ Rates,and Rate Design City of Stockton Water ✓ ✓ ✓ ✓ ✓ Rate Structure Design • City of SanLuis Water/ Automatic Meter ✓ ✓ ✓ ✓ Reading(AMR) Obispo Sewer System Review City of Fresno Water ✓ ✓ ✓ Zonal Energy Charge Alternatives • Dublin-San Water! Ramon Services Sewer ✓ ✓ ✓ ✓ ✓ Rate Structure Design District City of Galt Water! ✓ �/ ✓ Meter Implementation Sewer DESCRIPTIONS O F PAST town's water and sewer rates to meet PROJECTS AND REFERENCES multiple town objectives, including a restructuring of the water and sewer rates, The following projects are recent studies Proposition 218 rate equity requirements, similar in scope and technical nature to the increasing water conservation,and Azusa Light Sr Water rate study that were potentially eliminating an annual contract completed by our project manager and team for backup supplies from the North Bay within the last three Aqueduct.Rate alternatives included: years: • a Across-the-board increases to the Water & Sewercurrent rate structures. Rate Analysis - were s Sewer Rate S,udy ViiRestructured cost of service rates. Town of T of Younle Yountville, CA a New more conservation-oriented water rates. In 2006,Mr.Clumpner r completed an " evaluation of the 09003 - _ _ 1-3 024 r • I. Company and Staff Qualifications Ten-year financial plans were also developed for each utility,including new reserve fund policies. ` LNO A EPORT ' SPRING VALLEY "Mr. Clumpner demonstrated considerable xGRo P r<RAu>SE VALIEr knowledge of water and sewer rates, rate structures, and overall enterprise financial SWA operations. He professionally and �'`..-•s respectfully considered the policy issues raised by Council,and staff. Finally, he >, clearly conveyed,•explained, and clarified the technical recommendations"of the study to. our Council... (this)will move us towards a BONAN multi-year approach to.rate adjustments and „ "r"" " SP GS greater financial stability. Mr. Richard Stranzl, Finance Director., • Town of Montville q STA "' 6550 Yount Street Montville, California,94599 (707) 944-8851 The complexity of developing rates and connection fees for 16 Lake County municipal operations demonstrate Mr. Clumpner's capabilities to manage and successfully complete Multi-Agency Sewer & Water studies for multiple agencies. Rates and Connection Fees = Lake County Special Services '6Throu hoot all these efforts, District, Lakeport, CA g . .. Mr. Clumpner was professionai,t.friendly,;and hel ful: e p H . In October 2007,Mr.Clumpner began answered highly techrncal.questions in a straight forward manner that;was:easily evaluating the water and sewer rates andry' ' understood by nearly.everyone His k connection fees for the 10 water districts and communication skills are,impressive," six sewer districts under the control of the J �' a ' , Mr Mark Dellinger, county's Office of Special Districts.The ° '` t lake County Special Distnds Administrator, primary objectives of this study was to ? =23UA MainStreet evaluate and update the customer classes Lakeport,California, 95453. and rate structures,develop equitable rates (T07)263-0119 and fees,and lay the ground work to fund the necessary capital improvements for the Azusa Municipal Water Rates - individual districts. This study, which was Azusa Light & Water, Azusa, completed in October 2008, included a CA thorough review of the county's policies and procedures, administrative practices, and _ ;,, �77 7 7 C Az As usa Light L v `� ' &Water is well financial system operations. LIGHT & W A T E r3F' aware,prior to Foresight's acquisition by HDR,Greg 1-4 09003 025 I. Company and Staff Qualifications Clumpner evaluated Azusa Light&Water's factors,which had previously not been water rate structure to ensure rate equity, considered. compliance with Proposition 218,and the adequate funding of planned capital Reference: improvements. Mr.Clumpner developed Ms.Amy Montgomery, General Manager water rate structure alternatives that Santa Nella County Water District adjusted the tier breakpoints,tier rate 12931 South Highway 33 differentials, and assumed minimum Santa Nella, California, 95322 consumption levels for each customer class. (209) 826-0920 Follow-up work included evaluating MiIIer Brewery's water rates and agreement. Water & Sewer Rate a n d Capacity Fees a City of Water & Sewer Rates and Pomona, CA Connection Fees - Santa Nelle County Water District, Santa Ci oo , on a Y , Shelia, CA '�; �._. r`�w.. ... In 2006,Mr. Clumpner prepared a complete The district was preparing to fund the construction of entirely new water and evaluation of the city's water and sewer sewer treatment plants in anticipation of rates to meet several city objectives, new subdivisions that would add more than including water conservation. Rate 7,000 new homes,plus related commercial alternatives included: across-the-board development to the district's service area increases to the current rate structures;strict cost of service rates;and a new rate structure within the next 10 years.Mr.Clumpner provided financial planning services that that better addressed the city's overall rate included developing new rate structures for objectives.Among the key tasks,Mr. both utilities, and structuring voluntary Clumpner restructured water rates, developer contributions to operating funds including revising the tier breakpoints and that bridge the gap between new facilities cost allocations to fixed and variable construction and the time when new charges.Connection fees were also updated, along with the preparation of 10-year customers would start paying service charges. financial plans,new reserve fund policies, and a rate model for each utility. In June of 2007,the consortium of developers decided to put these plans on Reference: hold due to market conditions.However,the Ms. Meg McWade, district still needed to develop a new set of Utility Business Services Manager rates to fund current operations.Therefore, City of Pomona Mr. Clumpner restructured the new rates to 505 Garey Avenue conform to existing conditions. New rates Pomona, California, 91766 included a full cost of service analysis and (909) 620-2392 incorporated wastewater effluent strength 09003 026 V I. Company and Staff Qualifications V Comprehensive Water and Reference: Sewer Rate Study & System Mr. Todd Eising, Senior Utility Engineer Development Charge Study - City of Folsom V City of Folsom, CA 50 Natoma Street aip In 2007,HDR provided a comprehensive Folsom, California, 95630 (916)355-3502 - water and sewer rate study and connection V • fee analysis.The major focus of the study IP was on the water utility,establishing Water and Sewer Rate ,? metered rates for a previously un-metered Structure, AMR, and Billing residential area of the city (Ashland).At the System Enhancements a City of same time, the city did not have financial San Luis Obispo, CA rate setting policies in place and,as a result, the water rates were under-funding the In 2006,HDR * renewal and replacement capital projects. s.,tois«bkro conducted a ; ="M'--- comprehensive The study also created an improved policy -.7_777 study of the city's concerning the use of system development � -3` `,77'!-C. ',,,,,.. -:- rifutility billing * fees and their application against debt -�` I� =� •ri PP $ S „ system and rate 0 service.While the city's historical approach =1Z structure for water minimizes rates in the short-term, the city is 47/1. ""'"'". and sewer services, nearing build-out and expects the fees to ,-.<= ,--..- and recommended decrease significantly in the future. Given Wit ) enhancements to * that,HDR developed a financial plan to meet the city's rate structure goals.This transition the rates to more cost-based levels. project also involved a comprehensive $ review of AMR systems that would support A significant element of the study was the 01 public outreach element of the study as it the city's goals of customer satisfaction, F related to the implementation of the rates increased operational efficiency, and cost and the requirements under Proposition 218. recovery. HDR assisted with a number of community HDR project team members included Tom • meetings and city council meetings. As a Gould. part of the study,HDR developed cost-based 0 impact fees for the city for the water and Reference: 0 sewer utility. Mr. John Moss, Utilities Director • City of San Luis Obispo • HDR project team members included Tom 879 Morro Street ®', Gould. San Luis Obispo,.California, 93401 0 (805) 781-7205 •• 0 4 4 4 027 4 1-6 09003 I. Company and Staff Qualifications Comprehensive Water Rate Water Conservation Pricing and Supply Capacity Charges - Rancho Murieta Community City of Stockton, CA Services District, CA In 2008,HDR developed a financial model to HDR is currently developing conservation calculate the connection fees for a new water based rates for the city and district water source developed to meet the demands of customers. A "Rates 101"presentation was growth.The emphasis of this study was to provided to the council and board to get ensure that the various project cost elements everyone familiar with the issues associated were allocated equitably among future with rate design, particularly conservation customers versus the existing customers. rates,and to gain policy direction from the council to help form rates to meet their i' r e 1 I goals. HDR project team members included Sunny tA Yoshitomi. 1,74:1104 4 14,110, t Reference: Mr. Ed Crouse,General Manager — Rancho Murieta Community Services District saki !" � r -'' 15160 Jackson Road ,,.‘ 1 Rancho Murrieta, California, 95683 (916) 354-3700 �_. PROJECT TEAM Water Service Areas � Organization Chart HDR developed a financial model to calculate the Our proposed project team,shown in Figure connection fees for a new water source. 1-2,consists of HDR personnel with specialized experience who are exceptionally HDR project team members included Tom well-suited for the policy development, Gould and Alex Palmatier. financial planning, rate design, and cost of service issues addressed in this study. Reference: Resumes are included in the appendix. Ms. Melissa Price, Project Manager Municipal Utilities Department 72500 Navy Drive Estimated Man-Hours Stockton, California, 95206 (209) 937-8782 Table 1-2 shows the estimated man-hours to be expended on the study. 09003 1-7 Ogg } i, Company and Staff Qualifications • • AZUSA LIGHT L WATER I For Quality of Life Principal-inCharge and Quality Assurance/Quality; Control (QAIQC) Torn Gould Project Manager • Greg Clumpner Meetings &Reports, Financial Projections Rate Analysis • -and Models!: and Model Greg Clumpner Alex Palmatier Alex Palmatier Greg Clumpner Sunny Yoshitomi Alex Palmatier • Figure 1-2. Project Team Organization Table 1-2. Estimated Man-Hours Task Principal/ Project Senior Financia Adminl Total `• • QA/QC Manager H.Financial I Analyst Clerical.'.'. Man- (Gould) :(Clumpner) Analyst.. ; (Yoshitorrii) , Hours;; (Palmatier) 6 F1 1'ro�ect�lMAanage{nent and 2, 2; k 2 Mf f j S •2Fnancial Analysis 1 4' t ++ } 30 2°� x 37 3'Cost of Service Analysis 648 32 d C 4Final Report" ` • 1 16 2 4 23 5 2 .5 t ' ti y 3 Tota)(without optional a 10 „ 70 32 34 " 6 1 2 meetings) . • • Total (w/options! 10 76 32 34 6 meetings) 5 1-g 09003 029 , V I. Company and Staff Qualifications ,fit. - / years as a senior economist and rate consultant t Qualifications and Experience of e�,.TeaMemberswith an multi-national engineering firm, six 1 years as the managing principal of Foresight 9 The HDR project team members, their Consulting,and completion of more than 100 P qualifications, and their related experience are water and sewer rate studies,primarily for provided below. California dients.He has more than 24 years of 1 professional experience preparing rate / Greg l rn p ri e r - Project analyses for local water and sewer 1Manager municipalities.More than 90 percent of his b work is rate analyses, with the remainder Mr.Greg Clumpner will covering various aspects of infrastructure r r5- ? provide the day-to-day planning and project financing. Q� oversight of this study, and 1w will attend meetings and "I have worked with Greg for over five years ) - workshops,provide rate on special studies, rate studies for water and 1 analyses and models,and sewer in California and in Colorado. He is 1 prepare the study report.He is one of the easiest consultants to work with." a senior financial manager and rate economist Mr. Greg Baird / Deputy Director/Chief Financial Officer _ with national and international experience in 1 water and sewer projects.His academic Aurora Water / background includes a Master's degree in 1 Managerial Economics from the University of Table 1-3 summarizes Mr.Clumpner's most 1 California at Davis.His experience include 13 recent experience. 1 1 Table 14. Recent Water & Wastewater Rate Experience for HDR's Project Manager 1 Recent Municipal Utility Clients 1 Water/Sewer Cost of water Utili New Rate ;, - Financial; Rate Connection -, Service Conser- Special Concerns 1 Structure Plan Model Fees Rates' nation - 1Azusa Light& Water ` J J fl . ,% �/ r Rate Design and 1 Water r ,, Proposition 218 Concerns Water! J Conservation,Re-Use •1 City of Pomona i `J J ' ./ J Sewer ,. Rates,and Rate Design =• City of Winters Water! J J J ° 1 Rate Design,Metering,and 1 Sewer , :. Water Conservation 1Lake County Water/ J J J J - .`J ; Re-Design Water/Sewer 1 (Special Districts) Sewer • ;. Rate Structures,Funding 1 Santa Nella Co. Water/ J J J J 'J Formation of New 7,000- Water District Sewer Unit Subdivision • 9' i City of Modesto Water J J J 1 i Major Improvements and Rate Design 1 09 003 ---- --.. _ .. ._ 1-9 1. 030 0 I. Company and Staff Qualifications _ ;j _ 0 0 0 Table 1-3. Recent Water & Wastewater Rate Experience for HDR's Project Manager Recent Municipal Utility Clients IP Water/Sewer cast of - Water t- UtilityNew Rate Financial Rate Connection a Serwce_ Conser- Special Concerns Structure, Plan ��Model Fees a Rates nation o + '. * ,'� Non-Potable Water P ''.,-,>••••` " SourcesCapital of Ripon t , Water 5 v ✓ xf ;' t ✓ 0 Improvement Program ',,, (CIP)Funding p •Town of x ' Water/ Youn40 tville -. Sewer ✓ '� '� ' '� Restructuring Rates M1 t CiOP ty of Davis Sewer ✓ ' ✓ i/=' ` ✓ ✓`; Major Wastewater ' Treatment Plant Upgrade '41 b T o m Gould - Principal-in- this section of the proposal. 61 Charge and QA/QC ir Alex Patmatier - Senior (13 Mr.Tom Gould is a Vice financial Analyst President and the National ,`, way Mr.Alex Palmatier is an � -3 Technical Director of Finance �� and Rates at HDR.He is his experienced financial analyst Sp nationally recognized for s . t with more than 10 years of 4 financial planningexperience expertise in utility financial � ..:..:><;; tfa planning and rate setting.He P for water and wastewater 43is the current instructor for the American facilities.His diverse Water Works Association(AWWA)financial i experience includes extensive * management seminar.In addition,he is a management and operational * contributing author to the AWWA Ml Manual, assessments in customer service,billing and 4 Principles of Water Rates,Fees and Charges, and collection,accounting,business unit the M34 Manual, Water Rate Structures and development, and project/transition ' Pricing. management. His management consulting 6 experience includes cost of service analysis, Mr. Gould has . _w cost-of-capital determination, and financial participated in over 100 modeling.He is well suited for the rate and cost of service studies, = 11,financial analysis tasks included in this study. including those for the .. --'-;;..L.:7,_., Ae _! City of San Luis . ,i,-:-...T.1. He has conducted cost of service studies for 0 Obispo, City of :; . `, �- the City of Big Bear Lake,City of Stockton, /„ Folsom, and City of A Victor Valley Wastewater Reclamation, and - gi Stockton projects.., City of San Diego. presented earlier in l 1-1 0 09003 031 2. Work Plan ?...„.----- 1°-.:,,/_:',, PURPOSE OF THE STUDY E Rate and financial models that can test the revenue sufficiency of the water Although Azusa Light&Water(AL&W) rates and that AL&W staff can use to recently updated their water rates, several perform sensitivity analysis,making factors have reduced water-related future adjustments as needed. revenues and prompted the need for additional rate adjustments: HAR's project manager Greg Clumpner authored ® Drought conditions,combined with �„T AL&W's 2007 cost of AL&W's conservation efforts,have Fn°"°°'� " -..i Nu wre•� service study, which FA Swsl c°• reduced consumption. ""°'�' needs to be updated to ,,,wu reflect current I3 The economic downturn has constricted '�°' conditions affecting the the housing market and also affected water rate structure. water use. -----tf..=' The study will Ai The adjustment to the master-meter require a consultant billing practices was modified, also that has top-notch credentials in reducing revenues. financial planning and rate analysis,and 1 This rate study is essentially an update of who also understands AL&W's utility the assumptions and current conditions systems. Communication between the affecting AL&W's water rate structure. We consultant and AL&W staff regarding the agree with AL&W staff that the rates do not staff's priorities and study objectives will be E need to be restructured or radically an important part of this study,along with a I changed.But the financial forecast and good understanding of AL&W's policies. I associated rate adjustments do need to be tK re-evaluated. 40Aso I The three primary components involved in AO"' �J 1 this study are: `0j s w`czp AT/ go ill 1m A five-year financial plan that more o ;�� 13 4 f Study .e accurately projects the budgets, OP .l to o costs,expected revenues, and other ', - Goals 131 p i, 0 ` operating conditions affecting the r` a utility's water system. --1 f, • i ,..,-„,-,,,,,,, 1 ® Adjustments to rates that reflect a re- 5 d evaluation of the number of accounts, �9e consumption, and AL&W's went conservation concerns to more accurately project future rates. HDR's Goal:Effective communication between AL&W'staff, consultants,and ultimately the project stakeholders, 0 ) 09003 2-1 0 3 2 • tg to 2. Work Plan * N_ . _ �_ x_ a- : ,s V iit STUDY APPROACH Subtask 1.1 - Project Management and QA/QC I' Our overall approach to this study, and our tle ability to meet AL&W's two-month study This subtask includes the management schedule, are enhanced by our recent work activities required to ensure the project is 40 with AL&W staff on their last water rate completed on time and within budget.HDR study.We already have the rate model and will prepare invoices and progress reports V understand the changes that have occurred on a monthly basis.The monthly progress V since that study was completed. reports will summarize budget and schedule status in measurable terms.Other Overall,we will hold a kick-off meeting to activities include the scheduling of staff and review those changes, clarify the issues 0 coordinating the quality assurance effort. needing to be addressed, and collect the 0 updated customer account,water Regarding the QA/QC,we would note the consumption,and financial data needed to significance of having Tom Gould perform re-evaluate the rates and financial this role. Mr.Gould will review the cost of projections.Following this kick-off meeting, service analysis, cost allocations,and rate we will begin updating the rate model and adjustments to ensure they meet not only 0 discussing the modifications with AL&W Proposition 218 and cost of service 4 staff. principles,but also best meet AL&W's objectives for this study. Our intent is to maintain close 0 communications with staff to ensure we are Subtask 1.2 — Meetings (Optional) 0 addressing all the issues of concern and are developing new rate and financial models Although these meetings are optional, and that meet your objectives and enhance would be used as determined by AL&W future management of the rates and staff, we have proposed an approach to Q financial planning efforts. meetings that we believe will facilitate a * smooth study process, sufficient AL&W fil Task 1 - Prosect Management, review, and efficient completion of the Meetings, and QA/QC study. Kick-off Meeting:The purpose of the initial fit Task Objective: A kick-off meeting followed project meeting, attended by our project • by regular Contact with City staff Will ensure manager,is to make sure that the HDR team we have a mutual understanding`of the and AL&W's staff are "on the same page." 6 objectives,direchand on� outcome of the study. This meeting allows both parties to discuss the overall goals and objectives for this e study, as well as data concerns and specific 4 difficulties addressed in the study. second. twjeeiing.This meeting, attended by our project manager,will be used to review ti e 4 2-2 09003 2. Work Plan ii the initial results of the study, particularly develop a model for forecasting the water the financial planning and rate adjustments. revenues,including the projected CIP costs, We will forward a meeting agenda and the source of supply increases,updated initial results for staff's review. depreciation costs, repair and replacement reserves, and other expenditures. )1.`•. ..1;1;.1,l I hiU Meeting (-ai'ilr/i -r�^>s.; .>>`:=. '.":; `.{ i�,r * i; ry+ :ii itis -s'`'v`t i i� - F . . ;>��r+Y,.�:We will explain the financial and _ yye1alre Ci ha4e the rate(node) ,14 5 ; rate modeling process as theyare r if x b �.� '7 un�erstanc�t a chc�n es�h�t ave-accurred , developed duringthe study.However,this T, =xN ,�. to - ps ce atr dy wassompteted --� optional meeting will provide up to four .... -._-Y:�ul• _.- `"` 3 hours of detailed training to AL&W staff to This task will include a detailed breakdown ensure they know how to use the financial of trial balance items,various revenues,and and rate models.This meeting could be fees,and the development of the five-year attended by our project manager and our forecast on this basis. senior financial analyst,Alex Palmatier. We also propose to review the sensitivity of E :.) ;r: >C d A t_ W S u p'p o r t for Task 1 : the financial projections by developing a table that provides both the baseline and the 51 Have key AL&W staff coordinate times plus and minus a sensitivity factor(e.g., 15 and dates for, and ensure the attendance percent) that can be applied to variables 0 of,meetings. such as annual water consumption, inflation, capital costs, and similar financial 0 Task 2 .. Financial Analysis components affecting the projections.These 0 variables will be evaluated to determine Task Objective: This task builds a financial whether the sensitivity of the rate increases model that projects revenues,expenditures, to changes in these variables.We will 1 and net revenue requirements (revenue to be q develop a rational and reasonable approach recovered from water and sewer rates). to the forecasts by reviewing these results with AL&W staff. 1 This task lays the groundwork for the The primary work product from this 1 financial projections and development of subtask will be a financial forecasting model I' revenue requirements, and is reflected in that will be used to test the appropriateness , the rate analysis. of current and scheduled water rates. Subtask 2.1 - Revenue and Subtask 2.2 - Develop Net Revenue s Expenditure Forecasting Model Requirements 0 The first aspect of this task will be to collect Using the forecasting model from Subtask and review the detailed budget information 2.1,we will develop the net revenue for the water and sewer utilities.Based on requirements, which are total revenue discussions with AL&W staff, we will requirements less non-rate revenues. ----_ _ -- -- - -- 09003 034 tat 2. Work Plan t .. to ,, ,:: to W However,we will also consider the use of Subtask 3.1 - Evaluate Water V' reserves in determining these net revenue Consumption and Billing Data requirements. Accurate data on the consumption and The primary purpose of this subtask will be number of customers within each tier V to develop the revenue requirements to be allows for accurate adjustments to fixed 40 used to determine recommended rates.The meter service charges and commodity rates. V revenue requirement analysis will be part of Additionally,this kind of analysis is IP the financial forecastingmodel,but will important for revenue stability because it identify the revenue to be collected from improves accuracy when predicting the water rates. total amount of rate revenue generated by V tiered,volumetric-based rates. V' Expected AiIOdti' Support for Task 2: We will re-evaluate AL&W's water is Provide the financial data requested. consumption data to develop a realistic and ® Review initial alternatives and provide more conservative basis for the cost of comments and direction as needed. service analysis("conservative" means Qe projections that consider current economic conditions and trends of reductions in Task 3 - Cost of Service Analysis water use).This includes: ir ® Typical consumption by meter size. Task Objective:.Developa cost of service ® The number of meters and accounts by analysis that updates critical billing and water system data, meets Proposition 218 consumption level(i.e., the distribution VP mandates,and provides verification of the ' ' curve of consumption identifying the revenue projections based on proposed number of residential customers by rates. .. r consumption level). * This task will provide the technical cost of We will use various graphs and tables to service analysis of water rates,including help illustrate the results of this analysis to 0 cost allocations and proposed changes to AL&W staff,Council members, and the projected revenues and rates by customer public,similar to Figure 2-1. 0 class. Subtask 3.2 - Evaluate Current Water The rate model developed will consist of Rates Microsoft Excel-based worksheets and will provide a series of figures comparing: (1) AL&W's current water rate structure relies 0 the annual revenue as a total and by on meter sizes.Adjustments to the projected 0 customer class;and(2) the customer bills future rates will, to a large extent,reflect the under current and projected rates.The number of accounts/meters and the fl following subtasks provide details of the consumption data developed in Subtask 3.1. 4 cost of service analysis. I Ivii,,.i 2-4 09003 35 J 2. Work Plan z Figure 2-1. Examples of Water SUbtask 3.3 - Cost of Consumption Data Analysis l Service Analysis Monthly Consumption by Class ! The primary purpose of City of Pomona this analysis will be to 700,000 follow industry standards 600,000 Single Family and AWWA 500,000 methodologies and to Total 400,000 ensure Proposition 218 Monthly Use(hct) 300,000 Multi-Family requirements are met. 200,000 :; .- However,we believe the 100,000: Commercial current rate structure is 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec sufficient with the exception of revenue- related adjustments to the 2006 Residential Consumption,Number of Customers, actual meter service and Seasonal Averages charges and commodity City of Aurora, CO rates. 6,000 5,000- To, Rasiden iaii=a..,:yr 5i)c.;:olcioz, . As a part of the cost of = 4 service update to the No.of 4'000 ''rifitr�'.-uv,it:fi r?�afa•;i6 � '� ts�� < rates,we will provide Customers t . ge'-5,1:iU�a:tl. r,5(E L 3,000 r,cl: detailed tables showing wt!rrine•r f:i:.;arter 2,000 JAViracy)1.,sage= lo..-1. the allocations to ;.,"oi-s 120 F3"Gil functional categories (e.g., 1'000 customer costs, fixed 0 ,��� "' ' `�'�'a®°p g�a,- ' costs,distribution-related, 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 etc.). Average Monthly Use (1,000 gallons/month) The cost of service analysis will then re- To focus on revenue sufficiency and cost of evaluate fixed charges, which largely reflect service principles, some adjustments to the capacity, and commodity charges,which current rates to be evaluated include: address water conservation objectives. e Cost allocations between fixed meter a Fixed Service Charges: We will rely on charges and commodity charges. AWWA's methodology of using ® Adjustments to meter service charges equivalent meters(hydraulic capacity) and commodity rates. in setting the meter service charges. is Commodity Charges:Include all costs not allocated to fixed service charges. Tier rates will be set so as to meet the 09003 _.._-----_ ---__.._._____._ 2-5 036 2. Work Ran _ __w, _ - �_. _. - a 90 revenue required for each customer The updated rates will then be compared to p class, thereby fulfilling the cost of current rates to determine the impacts on V service requirements of Proposition 218. customers at various consumption levels. V An example of this comparison is shown in V The commodity rates will consider: Figure 2-2. a ® Tier Break Points:Based on thele updated consumption data,we will re- Subtask 3.4 - Other Rate evaluate whether any adjustments to the Considerations M tier breakpoints are needed. b AL&W has experienced the impacts that occur in times of water shortages,such as ® Tier Rates:Likewise,we will re- g evaluate adjustments to the tier rates revenue shortfalls;when supplies are b based on the updated consumption data reduced and consumption drops, AL&W b and number of accounts. cannot proportionally reduce operating b costs. Hence, the need for a plan that b We will also prepare, as a part of this rate ensures revenue stability during shortage 6 analysis and rate model,a revenue periods. adequacy test within the model to b demonstrate that the forecasted sales data, 6 rates, and other data will indeed produce 1/4 sufficient revenues. b b b Monthly Commodity Charges for 518"-314" Meters by Consumption Level 6 City of Azusa b ii $165 L 0 Current 2-Tier Rates w/Rate Increases _ —. i r` - New Rates are Higher o0 $150 : ® Recommended 2-Tier Rates than Previous $135 w/Rate Increases a. $120 . rn $105 1 Average Month ^ csi rn �� $/Month $90 New Rates are Consumption ^ M co ti �`R t j i Lower than =27.7 ccf - co. Yom► . $75 Previous N P a I p $60 co co :1 .,,i $45 M m vs -il sl f . y x $30 cq o cv o M 0 10 ccf 15 ccf 20 ccf 30 ccf 40 ccf 50 ccf 60 ccf 70 ccf 100 ccf t Figure 2-2. Example of Rate Comparisons q 1 i 2-6 09003 037 2. Work Plan We propose using two primary means of Task 4 _ Final Reports a n d meeting revenue sufficiency during supply Presentation t shortages: 1 Task Objective: To communicate as clearly m Establishing an Emergency Reserve: as possible the changes in the water ' This involves establishing a reserve consumption and account data affecting 0 fund that will cover temporary revenue rates, how financial and rate models were ) shortfalls during the initial period of developed, and the comparisons of 0 supply reductions or shortages.This projected rates. reserve will need to be included in the revenue requirements. Subtask 4.1 - Prepare Study Reports 9 and Presentation p ® Developing an Emergency Rate Structure:AL&W will need to increase We will provide a study report,including the fixed and/or variable charges to two draft reports for AL&W's review and a provide the revenue needed during final report,that address the following 4 reduced water sales.This involves topics: 0 identifying: (1) the level of supply 1 shortage;and(2)the rates needed to ® Executive Summary(an overview of 1 continue producing the necessary rate two pages or less). revenue. ® Changes in accounts and consumption b Used together, the reserve fund and the data,as well as financial projections that emergency rate structure can be very have affected rate revenue. effective in meeting AL&W's revenue ® Proposed water rates by meter size as requirements during supply shortages with compared to current rates. 0 rates that still comply with Proposition 218 1 and cost of service principles. ® Figures similar to those shown 1 previously in this proposal illustrating In addition,HDR will consider the fiscal bills under current and recommended 1 impacts of compliance with bond debt rates and various consumption levels. 1 coverage requirements when formulating 1 cost and revenue forecasts. We will emphasize the need for a clear, 1 concise, and understandable report using lfxr, c ,=.-r. MAW Skiff Support for Task tables,graphs, and charts as appropriate. 1 After reviewing the first and second draft ® Provide the data requested. reports with AL&W staff and receiving their 1 1 Review preliminary results and confer comments,we will prepare the final report f with the HDR team as needed. incorporating those comments. 1 Based on the final report,we will prepare _ the Powerpoint presentation.We will work t f t 09003 - _ - -- 2-7 038 ter► V 2. Work Plan Lw yy .41 IP with staff to determine the appropriate E Cell comments would be used to Vi' number and types of slides to be included indicate the sources of data and in this presentation. explanations relevant to the updating V process. ®p We will plan to provide AL&W with 10 copies of the final report,including a =.e r, t;v; y ,A n c ;y.i s: reproducible original and the electronic V copies (Microsoft Word and Excel),and an We will also make special note of variables fiF electronic file of the Powerpoint that can be modified when evaluating the presentation. sensitivity of the projected rates to changes w u ty in those variables. For example, total net op ou rdro ne orts`�ve also' •h revenue requirements,the number of ::7.-.9u9.09/19, •dire• 1=,- --,-....„-dha 9 s Q, .., accounts, annual water consumption, ill 'a , * , / ,r " inflation rates,and CIP costs are key t :.:46;',.4,4,-A-,, 40,1;"'*,..', i! v sc .euer�Pg- � variables that AL&W staff may want to use t �, ski ' I e o 14hes to test the sensitivity of the models. '• usa g a er r..�- :.,,,'-- -S-:•--- ;-. .i_�i ' :_,;,s iy'� .. rYice._.4. 4 Ex ,ectea AL&W Support for Tosk 4: ffi Subtask 4.2 - Prepare Financial and ® Review preliminary results and confer Rate Model with the HDR team as needed. The basic approach to documenting the ® Review first and second draft reports, financial and rate models is to make the 4" model and calculations as"transparent" as and provide comments to HDR. 0 possible, in contrast to a "black-box" 0 approach where it's not apparent how calculations are made. The financial and rate models will indude: sli ® An index of the tables (table names and 0 functions). 0 El Explanations of how each table in the model works. 0 0 ® Color-coding and highlighting those 0 cells that need updating, such as budget data,number of accounts,water 0 consumption, in contrast to other, static 0 parts of the model,like calculations and . 0 rate results. e e e 2-8 09003 45 • 039 9 ' Data Request Table 3-1 shows a summary of the data requested from AL&W and the options if data is not available. • Table 3-1. Summary of Data Request ' Options if Not Data Requested Available- - vailable .- Financial Data • • Most Recent 12 Months of Monthly/Bi-Monthly Revenues(by ` 1 Customer Class)for Azusa City Azusa Valley,and the Replacement Historical Records Water Cost Adjustment Factor(RWCAF) P 2 Schedule of Long-Term Debt Service Payments -;:':Staff Estimates .. 3 Water Enterprise Fund Budgets/Revenue Requirements (Actual, Historical Records Budgeted, and Projected) 4 Miller Brewery Revenues(Actual, Budgeted, and Projected) Historical Records Year-End Water Fund Cash Reserves(Fiscal Year 07-08)and 5 Historical Records Beginning-Year Cash Balance(Fiscal Year 08-09) • Assumptions for Projected Inflation Adjustments(Salaries, Franchise 6 Previous Rate Study Fees, Operating Expenses, General and Admin.,etc.) AL&W Financial Policies(e.g.,target coverage ratios and year-end 7 Previous Rate Study fund balances) €ustomer Billing Information Number of Accounts and Units by Meter Size(Previous, Current, Protections Based on 8 and Projected) Historical Records Water Consumptiorn Data Most Recent 12 Months of.Monthly/Bi-Monthly Water Consumption ... 9 Historical Records (by customer class)for Azusa City,Azusa Valley, and the RWCAF 10 Most Recent 12 Months-of Monthly Water Consumption(by meter Historical Records size) 09003 d..- --- 3-1 0 4 0 4. Scope Exclusions/Addenda en a HDR has addressed the requirements of the request for proposal (RFP)in scope of work detailed in Section 2 of this proposal.The scope of work included in Section 2 also contains additional and optional tasks that were not identified in the RFP scope of work.These include: Subtask 1.1 -Project Management and QA/QC. Subtask 3.1 —Evaluate Water Consumption and Billing Data. Subtask 3.4--Other Rate Considerations (establishing emergency reserves and rate structure). • ! 1 . 1 09003 4-1 041 { 5. Deliverables ` Table 5-1 summarizes the deliverables anticipated for each task. i • • ' Table 5-1. Deliverables L ' No Task Description Deliverables; i 1 Project Management, .-! Monthly progress reports and invoices. i Meetings(Optional), ® and QA/QC 'Meetingagenda prior to meetings with AL&W.staff. i 'I Meeting minutes following the meetings,with AL&W staff I i 2 Financial Analysis Summary of net revenuem .requireents,as well'as detailed backup` , ..-•,..:•,!)•! -,::..:udget rojections i 3 Cost of Service » Summary of customer accounts and water consumpti•on data. Analysis s 'Proposed adjustments to current meter service charges and , commodity rates: 1 :� Projected revenue requirements by customer class and worksheets 1 de•monstrating revenue sufficiency I ® Projected customer bills by customer class and consumption level. 1 4 Final Reports and Four bound copies and one electronic copy •(Microsoft Word and 1 Presentation Excel)of the first draft report,which will include complete executive I summary, background,methodology,analysis,findings and , ' recommendations;and proposed rateschedule I ® pour bound copies and ane electronic copy(MicrosoftWord and • 1 Excel)of the second draft repoii.end proposed`rate schedule,after 1 incorporation of AL&W s comments on the first:draft report I Four bound copies and one electronic copy(Microsoft:Word and 1 Excel)of the final report'and.proposed,rate schedule, after 1 incorporation of AL&W s comments on the second draft report ,iid PowerPoint presentation summarizing the final report,"in an electronic; 1 1 file.(NlicrosoftPowerPoint) 1 1 1 1 1 1 1 1 . 1 1 1 09003 _--__------ _ __ 5-1 042 6 x .._.._.....:.... ._.,_.... ._ ... ._.......... .. ... Study Schedule Figure 6-1 below presents the study schedule that we believe is realistic and meets AL&W's requested time Iine. • Figure 6-1. Project Schedule Weeks from Notice-to-Proceed -Fask ! Task 1 Protect ManagementQAInd'M QC,_aeetings/Workshops 1.1 Project Management and QA/QC 1.2 Meetings(Optional) - �.®. , Task2 Financial Analysis - r 2.1 Revenue and Expenditure Forecasting Model 2.2 Develop Net Revenue Requirements 1111111111 ,: �.�. 7as€3 Dost of Service Analysis 3.1 Evaluate Water Consumption and Billing Data ®®®®mum � 3.2 Evaluate Current Water Rates 1 3.3 Cost of Service Analysis .. 3.4 Other Rate Considerations 11/1 11111. Km Fask44 nal Reports ✓ a -r, e. vrr 9 I 4.1 Prepare Study Reports Powerpoint Presentation TO ALS: . _ Planned Activity on Tasks. 19 Meeting,Report or Other Work Product ) I ) i . I ) 1 09003 ---- b-, 04 3 1 • 1 Lump Sum Not-to-Exceed 1 1 Table 7-1 summarizes the total lump sum, classifications expected to be used on this 1 not-to-exceed cost estimate for this study, study. 1 including the hourly rates for all personnel 1 Table 7-1. Total Lump Sum Not-to-Exceed Fee 1 - Principal! Project Sr Financial Frnariciai Admin(' Total Total Total Total ) Task Description _ QAIQC` Manager Analyst Analyst Clerical Hours Labor(5) Expenses($ ) Cost-($}' Task+s Tom Gould:, Greg '' .Palmatieri Sunny 1vLsc Np ClUmpncr JI _ Yashrtom id QC s aTask1-Pro�ecttManagementMeetngs and r a , , � _ ®Project Management and QA/OC -2 �: 2 2. 6 $1,130 $90 $1,220 / 11111 Subtotal Task 1 2 2 0 0 2 c " 6 _'$1,130 . $90 .$1,220 ) ask 2-Financial Analys•s - Revenue and Expenditure Forecasting 1 2 26 2 31 ~ $4,692 $235 $4,927 DModel 1 ®Develop Net Revenue Requirements 2 4 6 $1,038 $87 ``$1,125 1111 Subtotal Task 2 1 4 30 2 0'; 37 $5,730 $322 .$6,052 Task 3 Cost at Service Anafyei � �'' ?`3 7 ®Evaluate Water Consumption and 6 20 26 53,938 $197 $4135 Billing Data ( ®Evaluate Current Water Rates 111EM 4 5 $1,186 $119 ,•$1,305 3.3 Cost of Service Analysis Mill32 6 42 $9,234 $462 :$9,696 ) D Other Rate ConsiderationsIMINHIENI 6 ® 13 $2,414 $241 $2,655 �SubtotalTask3 6 48 •'�:0 �:.•` 32 0.:':' 86 $16,772 $1,019 $17,791 ) Ta 4 Final Reports and Presentation �y y 2 :,--:___, '^ Prepare Study Reports and PowerPoint 1 16 2 4` : 23 $4,580 $229 $4809 ) Presentation ) 1111 Subtotal Task 4 t`' 1 16 FF •.'.,:2':,'.• `(( 0 is 4.,`:': 23 : '$4,580 ,_,,,,$.2,9___,,!..47,78'0,9_, TOTALS, _ I`. 10 76. . f _.: 32 I 3d . -6.-> `152f 1 $26,212! = S1 660j$2987 ) Optio .-- --s,,,,,-....c-,..„__ 1.2 Meetings(Project Manager to Attend)' 6 , . 6 ,,'$1,398. $497 $1,895 'This is the per meeting cost,not including preparing additional presentations. 1 ) ) . ) ) ) 1 1, 1, 1 09003 - — ------ - _. ._..... _, ---- 7-1 I - 8. Fee Schedule/Hourly Rates HDR ENGINEERING, INC. STANDARD RATE SCHEDULE January to December 2009 City of Manhattan Beach Water and Sewer Rate Analysis Principal $254 Project Manager 233 Senior Financial Analyst 143 Financial Analyst 127 Senior Project Controller 110 Project Coordinator 72 Technical Editor 70 Clerical 65 Please Note:Rates include current overhead rate plus profit and are adjusted annually. EXPENSES In-House Expenses Technology Charge per Direct Labor Hour $3.70 Vehicle Mileage(per mile) $0.55 Color Copy(per copy) $0.75 to$1.50 Photocopies(per copy) $0.10 to$0.20 Bond Plotting-Black&White(per square foot) $0.135 Bond Plotting-Color(per square foot) $0.50 !. Vellum-Black&White(per square foot) $0.50 Mylar-Black&White(per square foot) $0.90 Please Note:Technology charges include computer, CADD, network, software, and other related technology services.Expenses are charged with a 10 percent markup. 09003 8-1 045 . 9. OtherCommttments I 1 I All members of our team have adequate lower-level staff and there will be no 1 time available to complete your project substitution of team members.Table 9-1 1 successfully within the time frame indicated summarizes the projected staff 1 in the schedule, and are fully committed to commitments to other clients over the study ) this project.Work will not be delegated to period. Table 9-1. Project Team Availability and Commitments ) Project Team " Avaiilability`to Member AL&W -- Other Client Commitments I Greg Clumpne f r. .-.: 30%to 40% • City of Williams I Project Manager ® City of Riverbank ) ® City of Hayward i Humboldt Community Seivices District ) City of Shaffer Tom Gould 5%to 10% 11 Saint John Water Utility i Principal-in-Charge and ® City of Spokane . QA/QC.. ® ,,City of Millon City of Fresno i ® City of Bentopvlile t Ci of Mount Vernon 1 to Southside:Water.and Sewer District. ! - Soos Creek Water and Sewer Distract I Alex Palmatier. ' 30%to 40% • .ACity of San Diego Senior`Financia!Analyst a ` Moulton Niguel`Water District 'a:v .. s,.. i I Clark County Wastewater Reclamation District f;' � acyof San Clemente i B .South Orange County Wastewater Authority Sunny Yoshitomi 40%to 50% • . City of Sutter Creek Financial Anal st . y , City of Woodland 1 ® Sacramento Regional County Sanitation District _ 1 l 1 • 1 09003 -- ---- -- -- _ • 9-1 046 Greg C. Clumpner •Experience Mr.Clumpner's 25-year professional career has focused on financial and economic analyses, and management consulting assignments for municipal water,wastewater, and solid waste agencies.His increasing levels of responsibility cover technical and project management aspects of operating and capital improvement projects for both domestic and international Project Role projects. He is an expert in developing financialmodels and proforma Project Manager analyses to evaluate the consequences of various infrastructure development alternatives. Meetings and Reports a Cost-of-Service Rate Studies:His cost-of-service experience includes Rate Analysis and Model preparing revenue requirements,rate structure design, cost-of-service Education studies,multi-year financial plans, conservation-oriented water rates, funding analysis,and Proposition 218 requirements for water,sewer, M.S.,Agricultural/ and solid waste utilities. He has prepared more than 100 cost-of- Managerial Economics, service water and sewer rate studies throughout California and the U.S. University of California, Multi-year financial plans address annual cashflows,reserve levels, Davis, 1983 inter-fund transfers, and rate adjustments. In addition,he has evaluated B.S., Environmental Planning new and existing development impact fees for water,wastewater,and and Management,University other municipal improvements for the more than 60 municipal clients. of California, Davis, 1977 a Utility System Valuations:His utility system valuations experience Professional includes assessment of the field condition and likely market value of Endeavors private water,storm drainage,and electric transmission/distribution HDR Engineering, Inc., systems. 2008 to Present a Management Consulting&Strategic Planning:His management Foresight Consulting Services, consulting and strategic planning experience includes operational and 2003 to 2008 financial analyses related to system acquisitions,municipal versus Hilton Farnkopf&Hobson, private operations, and funding strategies for municipal agencies. LLC, 1998 to 2003 ■ Project Financing/Bond Feasibility Studies:His project financing/bond Resource Management Int'l, feasibility study experience includes preparing bond feasibility reports Inc., 1997 to 1998 resulting in the issuance of more than$450 million in revenue bonds CH2M HILL, 1984 to 1997 to finance the acquisition or construction of municipal facilities. • Waste Management Economics:His waste management economics experience includes evaluating and comparing the operational advantages, capital and operations and maintenance (O&M) costs,rate impacts,and financing issues for waste management facilities and system alternatives such as transfer station/long haul systems and landfill expansions. Representative project experience includes: WATER AND SEWER SYSTEMS Valuation of Production Wells-Arcade Water District,Sacramento, California.Evaluated the production capacity and field condition of wells and distribution network. Azusa Municipal Water Rates-City of Azusa,California.Azusa Light & Water needed to evaluate its water rate structure to ensure rate equity, compliance with Proposition 218 requirements, and adequate funding of its planned capital improvements. Water conservation and revenue stability were additional concerns for the city. Developed several water rate I 047 ♦ `I Greg C. Clumpner o op o structure alternatives that adjusted the tier breakpoints,tier rate differentials,and assume minimum consumption for residential customers. The city serves over 20,000 residents and businesses, consuming 0 approximately 10 billion gallons of water per year. . Professional Sewer Capacity Fee Study-City of Corning, California.Conducted a rate Affiliations study 00and prepared a financial plan for the city's sewer system (population 6,7American Water Works Association (AWWA), Sewer Rate Analysis&Consumption Based Sewer Rates-City of Davis, 4 Member California_Evaluated the city's sewer rates primarily to develop a financial strategy to fund$165 million of improvements to the city's wastewater Planning Commission, treatment plant. Restructured the customer classes and developed new Chairman, City of Davis cost-of-service rates.As a separate follow-on task, developed winter water Budget &Finance consumption-based residential rates,which have now been adopted and Commission, Planning implemented. Commission Liaison, City of Davis Water and Sewer Rate Study-City of Winters,California.Evaluated the W city's revenue requirements,rate structure and customer classes,water Former Board Member, consumption data, and billing records to provide the basis for developing American Youth Soccer rate alternatives that fully fund operating and capital costs and provide a Association (AYSO),Davis high degree of revenue stability. Developed revenue requirements and 10- w (Region218) year financial plans, Recommended rate structures that were compatible Sacramento Economics with the city's billing system, are easy to understand, and easy to till Roundtable (Past President) implement, and conducted a cost-of-service rate analysis. 1 Training Valuation of Privately Owned Utility Systems-Elk Grove Water Works and 10. AWWA Cost-of-Service Elk Grove Community Services District,Elk Grove, California Conducted a Analysis,Decision Analysis, valuation of water utility for possible acquisition by the Elk Grove Project Management, Community Services District (now called the City of Elk Grove). Estimated tiO Technical Writing. the fair market value of the Elk Grove Water Works and assisted with Publications acquisition negotiations of this water utility.Four basic approaches were evaluated,including rate.base book value,and replacement cost less 0 "The Drought's Here...Now depreciation under two depreciation methods.This study included detailed What?A Look at Water 110 investigation of allowable asset valuations under California Public Utility Budgets and Water Consumption Data in Commission rules.Developer contributions were evaluated from a public 0 Designing Water utility perspective. Negotiation strategies and assistance were also fr Conservation Rate provided. Structures," California- Sewer Capacity -Fee Study0 Nevada Section AWWA City o f Imperial Beach, California.Conducted a Accepted for Presentation at rate study and prepared a financial plan for the city's sewer system. 0 the 2008 Water Quality& Multi Agency Sewer&Water Rates and Connection Fees-Lake County - 0 Regulatory Conference, Special Districts,Lakeport,California.Evaluated the water and sewer rates Ontario, CA, October 2008. and connection fees for the 10 water districts and six sewer districts.The "Conservation Rates and the primary objectives of this study was to evaluate and update the customer 0 New Age of Supply Shortages classes and rate structures, develop equitable rates and fees,and lay the 0 - Using Water Conservation ground work for funding necessary capital improvements for the individual Data to Design an Effective . districts.This study included a thorough review of the county's policies and 0 Water-Conservation Rate procedures, administrative practices, and system operations. w Structure,"California-Nevada Section AWWA,Source, Water Rate Study and Financial Plan-City of Lakeport,California. ti Volume 22, Number 1,Spring Conducted a rate study and prepared a financial plan for the city's water 2008. system,which includes four wells,a surface water treatment facility,and distribution system to the meter. 0 IA FDZ . 048p Greg C. Clumpner , . 1 1 Evaluation of Water Main Replacement Program-City of Merced, 1 California.Conducted an engineering analyses and field inspection to 1 assess the condition of water mains and potential changes needed in funding the water main replacement program. 1 Publications (continued) Water Rate and Capacity Fee Analysis-City of Modesto,California.The city 1 "Conservation Rates and the did not prepare a full cost-of-service rate analysis of its water rates in more New Age of Supply Shortages than 10 years and needed to fund over$150 million from rates within the I -Using Water Conservation , next five to 10 years.This required significant rate increases and a well- Data to Design an Effective constructed financial plan that combined annual rate increases,new Water-Conservation Rate I Structure,"Technical Paper connection fees, and issuance of new revenue bonds. Prepared a cost-of- prepare for AWWA service rate model,which included projecting revenue requirements, I Publication, November,2007. thoroughly analyzing rate structure alternatives, reviewing and updating i "Conservation and the rate policies, analyzing water consumption by customer class, and Consumption Conundrum: evaluating cost allocation methodologies. Prepared extensive analyses of The Relationship Between customer water use characteristics for flat and metered water utility Water Consumption Patterns customers. By combining three zones, each with flat and metered and Effective Multi-Tiered customers,into a single zone and a uniform rate structure; a new water I Water Rates" Presentation at rate structure was developed. Once the water rate analysis,report, and ) the AWWA Fall Conference, Proposition 218 process were completed,the city successfully implemented Sacramento, California, the new water rates and connection fees.The City operates and maintains I October 25,2007(Co- over 70,000 water connections, 927 miles of water lines, 129 water wells, ) authored with Greg Baird, seven water storage tanks, one surface water treatment facility, and one CFO/Assistant General terminal storage area. I Manager,Aurora Water, I Aurora,CO). Water&Sewer Rate Study-City of Morgan Hill,California.Conducted a "Compliance Strategies for rate study and prepared a financial plan for the city's water and sewer ( Meeting AB939 Goals," systems (population 39,218). ) Presentation to the California Water&Sewer Rate Study-City of Mount Shasta,California.Conducted a Debt Advisory Commission, rate study and prepared a financial plan for the city's water and sewer I Long Beach, California, 1995. systems. I `Estimated Property Value Water and Sewer Rate Studies-City of Paso Robles, California.The city Impacts Related to the needed to start planning for major system improvements,including new Proposed HELCO Generation Project."Testimony prepared water supply alternatives,additional reservoir and above-ground storage for the Hawaiian Electric tanks, and major sewer treatment upgrades. Developed the rate analysis ) Company (HELCO), Hawaii, and prepared the connection fee analysis.The city implemented all ) 1994. recommendations, and now operates and maintains 14 wells,five booster "The Economics of Mandated stations,four reservoirs that hold a total of 12,150,000 gallons (two 4 Source Reduction and million-gallon [MG] tanks, one 4 MG reservoir,and a 150,000-gallon tank I Recycling Programs in on Merryhill), and 148 miles of water pipe.The water system serves nearly California,"Annual 8,000 residential,over 130 commercial, 700 irrigation, and approximately ) Conference, National Solid 370 construction meter customers. ) Waste Managers Association, spate.&Sewer Rate and Capacity Fees-City of Pomona, California. Toronto, CN, 1994. Prepared a complete evaluation of the city's water and sewer rates to meet several city objectives,including water conservation.Rate alternatives ) included: (1) across-the-board increases to the current rate structures; (2_ ) strict cost-of-service rates; and'(2) a new rate structure that better addresses the city's overall rate objectives. Restructured water rates, ) including revising the tier breakpoints and cost allocations to fixed and ) variable charges. Connection fees were also updated, along with preparation of 10-year financial plans,new reserve fund policies,and a rate model for each utility. 104 9 • Greg C. Clumpner Comprehensive Water Rate Study-City of Ripon, California.The city needed to re-evaluate its water rate structure to ensure equity among its customers, and ensure its planned capital improvements would be qrsi adequately funded. Conducted a study that addressed pricing for the city's non-potable water supply and rate alternatives that included more conservation-oriented rates for residential and commercial customers. Sewer Rate Study-City of Riverbank, California.Conducted a rate study and prepared a financial plan for the city's sewer systems (population 21,750). Wastewater Disposal Alternatives Net Economic Benefits Analysis—City of Santa Rosa,California.As a part of an incremental recycled water �1 program,evaluated the net present value of cost and benefits for more than a dozen water reclamation,reuse, and disposal alternatives,for the Santa Rosa Regional Wastewater Treatment Facility.This covered a planning period of 40 years and provided financial and economic results used to screen and further develop these alternatives. Water&Sewer Rates and Connection Fees-Santa Nella County Water District,Santa Nella, California.The district was planning on funding construction of new water and sewer treatment plants in anticipation of �A new subdivisions that would add more than 7,000 new homes,plus related commercial development to the district's service area within the next 10 years.Developed new rate structures for both utilities that included w voluntary developer contributions to operating funds to bridge the gap between new facilities construction and when new customers would start paying service charges.Also restructured the new rates to fund current operations after the consortium of developers decided to put the plans for new water and sewer treatment plants on hold due to market condition. These new rates included full cost-of-service analysis and incorporated 1g wastewater effluent strength factors, which had previously not been considered. Water Rate Study-Valley of the Moon Water District,El Merano,California. Conducted a rate study and prepared a financial plan for the district's P1 water system(population 23,000, 6,832 service connections). Water System Feasibility and Capacity Fee Study-City of Visalia, California. Conducted a financial analysis of developing a city-nm water system in addition to existing California Water Service operations.Developed projected system costs and connection fees for the new municipal operations. Water and Sewer Rate Study-City of Williams,California.Conducted a cost-of-service rate study, prepared a financial plan, and re-structured the 0; city's water and sewer rate schedules (population 4,800).Also assisted with01 developing a revenue program,as part of the Clean Water Service State Revolving Fund (SRF)loan application process. M Water&Sewer Rate Analysis-Town of Yountville,California.Completed an evaluation of the town's water and sewer rates to meet multiple town objectives,including a restructuring of the water and sewer rates, Proposition 218 rate equity requirements,increasing water conservation, and potentially eliminating an annual contract for backup supplies from the North Bay Aqueduct. Rate alternatives included: (1) across-the-board • e HR 05011, ) Greg C. Clumpner ) increases to the current rate structures; (2)restructured cost-of-service ) rates; and (3) new more conservation-oriented water rates.Ten-year financial plans were also developed for each utility,including new reserve fund policies. ) Water Rate Structure Review/Rate Analysis-Aurora Water,Aurora, Colorado.Aurora Water was experiencing significant problems with their ) water rates and billing system due to their recent adoption of a water budget-based rate structure.Reviewed and evaluated specific rate structure and billing problems, and recommended changes. Primary concerns were cost-of-service principles and rate structure design.As a result of the analysis,the city decided to re-evaluate rates and revert to a more traditional tiered water rate design. Pricing of Water and Reclaimed Water-Cyrus.Prepared a financial ) evaluation of the costs of several new water and reclaimed water alternatives,including the costs of transportation and distribution facilities, operations and maintenance (O&M),financing costs, and the resulting ) costs of water to consumers. Pricing of potable and non-potable water for agricultural and M&I customers was an important aspect of this study. No in-country assignments were required in this project. ) STORM DRAINAGE SYSTEMS Storm Drainage Funding Alternatives—City of Alameda,California. Developed multi-year financial plans to evaluate potential funding sources .for operations and maintenance (O&M) and capital costs of storm drainage programs. ) Storm Drainage Funding Alternatives—City of Belmont, California. Developed multi-year financial plans to evaluate potential funding sources ) for operations and maintenance (O&M) and capital costs of storm drainage programs. Storm Drainage Funding Alternatives—City of Petaluma,California. Developed.multi-year financial plans to evaluate potential funding sources for operations and maintenance (O&M) and capital costs of storm drainage programs. Storm Drainage Funding Alternatives—City of Redwood City,California. Developed multi-year financial plans to evaluate potential funding sources for operations and maintenance (O&M) and capital costs of storm • drainage programs. Storm Drainage System Valuation-City of Tracy, California.Prepared an analysis of the storm water drainage system owned and operated by the West Side Irrigation District.The city was negotiating the purchase of this system,which serves the city.Analysis includes an evaluation of the condition, capacity, annual operations and maintenance (O&M) costs, projected capital improvement, and a valuation of the entire system using book value less depreciation,replacement costs, replacement costs less depreciation,and market value.Also performed an inventory and inspection of canals, culverts, and pumping facilities, and assessed needed capital improvements for the possible acquisition of the city from the Tracy Irrigation District. 1 051 Thomas E. Gould Experience Mr. Gould has more than 34 years of experience providing financial planning and rate studies for water,wastewater,and storm drainage Project Role utilities. He is nationally renowned for his expertise in regards to financial and rate planning. Cities or districts faced with rapid customer growth, Principal-in-Charge and potential partnerships, or large capital projects have relied on his Quality Assurance/Quality experience to formulate financial plans, or implement fair rate adjustments, Control (QA/QC) via comprehensive studies and open communication. Education A number of utilities have utilized Mr.Gould's negotiation services, Master of Business Admin, primarily as they relate to developing contractual agreements for wholesale Business Administration, electric,water,and wastewater services. His services have included the Willamette University, 1976 areas of negotiation, mediation,facilitation, cost analysis, and drafting of Bachelor of Arts, Business contract language. Administration,Central Project experience includes: Washington University, 1974 Water and Sewer Rate Structure and Billing System Enhancements-City of San Luis Obispo,California. Project manager for a comprehensive study of the city's utility billing system and rate structure for water and sewer servicesand recommendation of enhancements to meet the city's rate structure goals.This project also involved a comprehensive review of AMR systems that would support the city's goals of customer satisfaction, increased operational efficiency,and cost recovery. Comprehensive Water and Sewer Rate Study and System Development Charge Study-City of Folsom, California.Project manager for a comprehensive water and sewer rate study and connection fee analysis. The major focus of the study was on the water utility and establishing • metered rates for a previously un-metered residential area of the city (Ashland).At the same time,the city did not have financial rate setting policies in place and,as a result,the water rates were under-funding the renewal and replacement capital projects.The study also created an improved policy concerning the use of system development fees and their application against debt service.While the city's historical approach minimizes rates in the short-term,the city was nearing build-out and expected the fees to decrease significantly in the future. Developed a financial plan to transition the rates to more cost-based levels.A significant element of the study was the public outreach element of the study as it related to the implementation of the rates and the requirements under Proposition 218.Assisted with a number of community meetings and city council meetings.Also developed cost-based impact fees for the city for the water and sewer utility. Comprehensive Water&Sewer Rate Study and Capacity Charges-Dublin San Ramon Services District Dublin, California.Project manager for a comprehensive water and sewer rate study and system development charge analysis.The district had significant growth and capital facilities plans. Given that,a major component of the study was developing financial • policies to address these capital planning issues and the development of cost-based system development charges for each utility. In developing the system development charges,revised the district's methodology to be in conformance with AB 1600 and create a clear nexus between new development and capacity expansion. For the rate studies, developed water 1-01 052 Thomas E. Gould and sewer rate models for the district that were designed based upon their it) specific chart of accounts and flow of funds between replacement related capital and growth-related capital projects.Worked extensively with the district's board of directors to discuss the various policy issues and recommendations of the study. Comprehensive Water Rate Study and System Development Charge Study- City of Santa Cruz,California. Principal-in-Charge for a comprehensive water rate study and review of water connection charges that would support large capital improvement projects associated with the expansion of its source of supply.Thecity was facing large capital improvement projects associated with the expansion of its source of supply (desalination plant).This project involved developing a financial plan that established rate policies and determined the appropriate rate differential for outside city customers.An important part of the study was the development of conservation-based water rates to extend the existing water supplies. As a part of the cost-of-service study, determined the appropriate rate differential for outside city customers. Comprehensive Water Rate and Supply Capacity Charges-City of Stockton, California.Provided quality assurance/quality control (QA/QC)for development of a financial model to calculate the connection fees for a new water source developed to meet the demands of growth,.The emphasis v� of this study was to ensure that the various project cost elements were allocated equitably to future versus existing customers. qd Sewer Rate Study-South Tahoe Public Utilities District,South Lake Tahoe, California. Project manager for a comprehensive financial planning and cost of service study for the district's wastewater utility and updated system development charges.This project involved working with the district's board to establish financial policies for rates. Other tasks included developing a comprehensive financial plan and cost of service analysis. By critical determination of reasonable assumptions concerning wastewater flows; developed reasonable surrogate information that met the district's ®e board and client approval. Water Rate Study-Mesa Consolidated WaterDistrict Costa Mesa, California Principal-in-Charge for a project that established written financial policies to help determine the district's rates,including minimum reserve levels,replacement funding levels,target debt service coverage ratios,and the use of"generally accepted"analyses to establish rates. Other • tasks included developing a financial plan that incorporated the master 111 plan and asset replacement plan into a 10-year forecast.A forecast of water 111 supply costs based upon the mix of water supply resources available to the district was also prepared. �I Sewer Rate Design-Squaw Valley Public Service District,Olympic Valley, California.Project manager for review of the methodologies used by the fit district to allocate its sewer costs. Squaw Valley has system usage characteristics.Recommended allocating the capacity related costs associated with the districts source of supply and distribution mains. Chosen to update the district's cost of service model and a more equitable 411 allocation between customers, and the expansion of the model to consider additional customer classes of service. a53 ► Thomas E. Gould Comprehensive Cost of Service Study-Nevada Irrigation District,Grass Valley,Nevada..Project manager for a comprehensive water and wastewater cost of service/rate study that required allocating costs between potable and non-potable customers.The retail water costs were also allocated between retail and wholesale customers.Also conducted an analysis and update of the district's annexation/connection fees,and on their non-potable irrigation rate structures.This study provided the basis for cost-based connection fees for the district. Comprehensive Water Rate Study-City of Reedley,California.Developing a water rate study. Water and Sewer Utility Rate Study-Tahoe City Public Utility District, Tahoma,California.Conducted a rate study for the water and sewer utilities. Galt Meter Implementation Plan and Water/Wastewater Cost of Service Studies-City of Galt,California. Provided quality assurance/quality control (QA/QC)for development of a meter implementation plan(6,500 customers),water and wastewater cost of service studies to develop cost based water and wastewater rates, and update of the city's current wastewater treatment plant upgrade fee. • Sewer Fee Model,Analysis,and Recommendations-City of Pleasanton, California. Project manager for a comprehensive local sewer rate study, which included rate policy evaluation and technical evaluation. Fresno Water Metering Implementation and Water Rate Study-City of Fresno,California. Project manager for update of the city's residential water meter program/system evaluation and rate study. Developed a water meter implementation plan to identify meter and automated meter reading (AMR) requirements and an installation timeline for the city to meet AB 514 and US Bureau of Reclamation schedule requirements. Developed residential volumetric metered rates for the city's current flat rate customers.The metered rate was "revenue neutral",meaning it was designed to collect the same amount of revenue as the City's flat rates. (2006 to 2008) On-Call Financial Consulting Services-Sweetwater Authority, Chula Vista, California. Principal-in-Charge for assisting Sweetwater's Board and management in understanding approaches to pricing and buying water from a wholesaler,the economic theory behind each approach,and the • advantages and disadvantages of each. Water,Sanitary Sewer,and Stoma Drainage Rate Study,System Development Charges,and Financial Plan-City of Bonney Lake,Washington. Project manager for a comprehensive water. sanitary sewer,and storm drainage rate study. For the sewer utility,the rate structure for residential customers was revised to a volumetric approach. Also conducted a comprehensive water.sewer and storm drainage study to develop a financial plan to meet the infrastructure funding requirements and provide equitable and cost- based rates. Developed system development charges to fund capacity related improvements.Also reviewed the storm drainage capital improvement program. 054 49 Thomas E. Gould Water,Sanitary Sewer,and Storm Drain Rate Study-City of Mountlake 49 Terrace, Washington. Project manager for a comprehensive rate study for the water,sanitary sewer, and storm drainage utilities. Other tasks included development of a storm water utility financial plan and rates,work session on financial policies to aid in setting rates,review of the city's reserves to determine target reserve balances for each system, and setting aside of funds for the possible repercussions of the Endangered Species Act (ESA). The rate structure proposed was based on the amount of impervious surface area of a property. Kalispell Water,Sanitary Sewer,and Storm Drainage Rate Studies and System Development Charges-City of Kalispell,Montana Developed financial plans for the water,sanitary sewer, and storm drainage utilities. The plans looked at the adequacy of rate revenue to pay for operation and maintenance, debt service,maintain minimum cash balances,and pay for • capital improvements.The storm drainage master plan was developed to provide for incremental increases in the storm water rates over the five- year period and at the same time provide increased funding for storm water infrastructure improvements. Water,Sewer,and Storm Drainage Rate Study-City of Bremerton, Washington. Project manager for development of a comprehensive water, sewer. and storm drainage rate study as a result of litigation against the city. Other tasks included providing expert witness testimony on the city's behalf. Prioritized rate issues,such as levels, structures,equity between customers,and debt service needs. Previously established the storm drainage utility and rates, and over time,implemented rates based on impervious surface area. Lastly,this project involved assisting in contract negotiations for water and sewer service rates used by a U.S. Navy facility. Water and Sewer Rate Study and System Development Charges-City of �1 Water,Sanitary Sewer,and Storm Drainage Rate Study-City of Bremerton, Washington.The city is undergoing a significant level of growth. Conducted a study to establish cost-based rates and create a transition plan $I to move the city's rates to adequate levels.Additional responsibilities involved developing a cost-based system development charges (impact fees)for water,sewer.and storm drainage utilities, and assisting in the negotiation of new wholesale water and sewer rates with the U.S. Navy. Rate Study Update for Water,Sanitary Sewer,and Storm Drainage Utilities- City of Renton, Washington. Project manager for a comprehensive water, • sanitary sewer,and storm drainage rate study focusing on the long-term capital improvement program of the utilities and the optimal means of financing projects with the least impact upon rates. Rate Study for Pasco Water,Sanitary Sewer,Stormwater,and Irrigation Utilities-City of Pasco, Washington. Project manager for a comprehensive rate study for financing capital improvements projects for the water, sanitary sewer.stormwater. and irrigation utilities. Whitefish Water,Sanitary Sewer,and Storm Drainage System Master Plan- City of Whitefish,.Montana.Provided financial planning assistance during preparation of a comprehensive water. sanitary sewer, and storm drainage q system master plan. Work included evaluating population growth, modeling the existing and future systems, evaluating alternatives for 055 Thomas E. Gould • meeting existing and future demand, defining necessary improvements to meet demand and regulatory requirements, estimating the cost impacts of ► the necessary improvements,prioritization of improvements, capital improvement program development, and financial management evaluation. Water and Sewer Rate Study and System Development Charge Analysis- Woodinville Water District,Woodinville, Washington. Project manager for a, ► comprehensive water and sewer rate study and system development charge (impact fee) analysis. Bozeman Impact Fee Analysis-City of Bozeman,Montana.Assisted the city with analyzing and implementing impact fee for water, sanitary sewer, police, and fire services. Marysville Water and Sewer Rate Study-City of Marysville, Washington. Conducted a comprehensive water and sewer rate study as a resultof the • need to expand and upgrade both their water and sewer facilities.Analyzed the financial/rate impacts of various financing scenarios and worked with the city council to develop a plan to phase-in the rates over a two-year time period. Water and Sewer Rate Studies-City of PortAngeles, Washington. Project manager for development of a financial model that provided the city with water and sewer rates that were cost-based and easy to administer. Water and Sewer Rate Study-City of Sandpoint,Idaho. Project manager for a water and wastewater rate study and review of new user facility fees. Developed a rate transition plan and cost-based impact fees to fund the needed expansion to the water and sanitary sewer infrastructure. Hanover Water and Wastewater Rate Study-Hanover County,Hanover, Virginia. Project manager for a comprehensive water and wastewater rate study for the county that focused on establishing financial policies for establishing rates.The county had relied upon impact fees to fund debt obligations,and as growth slowed, a new philosophy or approach was required.This study developed financial policies to address these issues and established adequate funding for debt service and capital improvement funding.Additional tasks involved establishing a cost-based impact fees. Walla Walla Wastewater Rate Study-City of Walla Walla, Washington. Conducted a comprehensive rate study for the city's wastewater utility that ij included revenue requirements, cost of service,and rate design. Developed a seven-year financial plan that phased in rates over time to minimize impacts, as well as identified several rate options that assisted the City determine the most equitable option for implementation. Cost of Service Study-Municipality of Anchorage,Anchorage Water and Wastewater Utility,Anchorage,Alaska. Project manager for a comprehensive water and wastewater rate study. Added data and reviewed the operations of the utilities existing cost of service model. Other tasks involved reviewing various classification and allocation costs and methods • for reasonableness, specifically for the funding of public and private fire protection.Reviewed rates of contractual customers to assure they were in compliance with their contract. Developed expert witness testimony on the • results of the revenue requirements, cost of service, and rate design issues, 056a 1R Thomas E. Gould a 4, Review of Water and Sewer Rates and Operational Study-City of Fayetteville,Arkansas. Reviewed the city's water and sewer rate study, conducted by another outside consultant, to assure that the study 4, conformed to the wholesale contract requirements and generally accepted rate making techniques. Other tasks included assisting in negotiating a new wholesale sewer rate with one of the city's wholesale customers.Also 4, provided an operations study,in conformance with the city's bond covenants. • Comprehensive Sewer Rate Study-City of Logan, Utah. Project manager for a comprehensive sewer cost of service study.Analyzed infiltration and 4 inflow based upon customer location and infrastructure age and type. Reviewed equity of rates charged to customers. Developed wholesale-based rate comparison of an allocation of treatment costs based upon i contribution to the treatment plant. Determined retail rate using the same • methodology as well as an allocation of collection system costs based upon location within the city's retail service area. 6 i 0 i • • 4 S S r I t I t a 0 4 x}57 4 CONSENT CALENDAR TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIEST ni DATE: JANUARY 28, 2008 SUBJECT: REQUEST TO AWARD CONTRACTS AND COMMIT FUNDS FOR BILL PRINT AND MAIL, ELECTRONIC BILL PRESENTMENT AND PAYMENT, AND PAY -BY -PHONE AND WEB PAYMENT OPTIONS I RECOMMENDATION It is recommended that the Azusa Utility Board/City Council approve the award of contracts to: (1) Infosend, Inc. to provide (a) bill print and mail processing in the amount of $54,600 per year for three years, excluding postage, and (b) electronic bill presentment in the amount of $22,000 with a one-time implementation charge of $3,250, (2) BankSery in the estimated annual amount of $5,600 per year for three years to act as bank merchant processor for electronic automated clearing house (ACH) payment,transactions related to electronic billing, (3) Paymentus to collect and process pay -by -phone and web payments, and (4) Global Payments to act as bank merchant processor for one-time customer credit and debit card payments at transaction cost to customers per $500 increment of $3.25 for residential and $3.75 for businesses. BACKGROUND Recently the contracts with InfoSend, Inc. for bill print and mail services and Western Union Speedpay for taking credit and debit card payments over the phone and web expired. A request for proposals was distributed for these services and also electronic bill presentment and payment (EBPP). Of the eleven responses received, three stood out for being multiple - service vendors. While no vendors provide all services directly, the three short-listed vendors have existing banking merchant vendor relationships to seamlessly provide other services. Vendor presentations were held with the short-listed vendors. j Since all three provided essentially identical services we recommend next to the lowest cost vendor, InfoSend, Inc.., our current vendor for bill print and mail services to continue providing these services and add EBPP. We have had five years of excellent service and like their progressive ideas for serving our customers and willingness and Flexibility to customize their products to meet our needs. 014 The short-listed vendors as well as two others also offer pay -by -phone and over the web payment options. One vendor stood out for lowest cost to customers and superior reports for our business needs. The recommended vendor is Paymentus. Here is how the process works: An electronic file is sent from Light & Water to the vendor and they print and mail the utility bills the same day they receive the file. This same file is put on Azusa Light & Water's secure web site. Once enrolled for EBPP, a customer can log in to the secure portal anytime. Customers who enroll in electronic bill presentment will receive an e-mail when their bills are ready for viewing. Customers can simply click on the link to get to the Light & Water web site and view their bills exactly as they would see them as paper bills, including any bill inserts or messages. From there they can then click to make an ACH payment online from their checking or savings account at no cost to the customer. Behind the scenes, we will contract via a merchant agreement with BankServ, who will process these types of payments at no cost to customers. The small fee will be absorbed by Light & Water. Enrolled customers will have their paper bills turned off after three months and Light & Water will get a credit from Infosend equal to the cost of printing and mailing the bill. The savings will easily cover Light & Water's cost for the customer payment. Enrolled customers can also elect to set an automatic recurring payment with or without a maximum payment threshold. With a maximum payment threshold, should an unusually high bill occur, the enrolled customer would be notified before payment is automatically taken from his/her account. We are considering a modest drawing of two $50.00 dinner gift certificates to introduce EBPP and encourage customers to participate in this easy and convenient billing and payment model. Non -enrolled customers, those who choose to continue receiving paper bills, will be able to pay by credit card, debit card, or real-time a -check for a fee per $500 increment of $3.25 for residential and $3.75 for business customers by calling our IVR to make a pay -by -phone payment or make a payment through Paymentus via the Light & Water web site. This is less than the current $3.95 cost per transaction. Non -enrolled customers can make one-time payments only and must enter their card or check information every time a payment is made. This is vendor -supported by Paymentus with Global Payments as the processing merchant. Advantages of putting all bills and notices online include the ability for: • both customers and Customer Service Representatives (CSR's) to view up to 24 months of bills, notices, and payments; • CSR's to see bills exactly as customers see them; • CSR's to view notices (we don't have this capability now); • CSR's to be able to e-mail, print, fax duplicate bills and notices for customers; • customization of our web site to display graphs of any field on the bill; and • special messages and bill inserts can be added for customer viewing. Using Paymentus for the online payment and pay -by -phone portal: • no set-up cost or monthly minimum, • customers get a payment confirmation number, • lower cost for customers than current online payment and pay -by -phone vendor, • agent dashboard allows CSR's to see payments made by date and time of payment, • agent dashboard is in real- time, • star check network validates funds available and secured for payment to be accepted, 015 l • CSR can search for a payment by confirmation number, payment type, account number, or payment amount, and i • can upload unpaid late payers, send automated calls to remind them with an opportunity to make a payment over the phone immediately, thus'removing the embarrassment factor. All of these companies — InfoSend, Inc., BankServ, Paymentus and Global Payments have been in business several years and are highly recommended. Once approved and implemented, these services will be communicated to customers by bill message, bill insert, Light & Water web site, message on phone, and Azusa Tomorrow article. An option whereby Azusa Light & Water would pay the credit and debit card transaction charges was considered, and even with the utility discount rate it would still cost Light & Water over $19,000 annually. Costs could be higher if more customers pay by credit or debit card in the future. This cost would be too much for the utility to absorb especially since we are proposing a cost-free alternative to our customers. All contracts have been reviewed by our City Attorney and are available for public review at the counter on second floor of Azusa Light & Water office located at 729 N. Azusa Avenue, Azusa, CA 91702. FISCAL IMPACT Current bill print and mail processing costs, excluding postage, are approximately $89,000 annually. Annual cost for all services described will be approximately $70,750 plus postage for bill mailing and $3,250 for EBPP implementation. Postage was negotiated to be calculated differently for an annual savings of $4,300. This represents savings of $19,300 the first year and $22,550 the second year, or a total two-year savings of $41,850. Funds already budgeted in account 31-40-711-903-6493 for bill print and mail will adequately cover the cost for these contracts during the remainder of this fiscal year. Prepared by: Karen Vanca, Assistant Director Customer Care & Solutions 016 C AGENDA ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES /Vk DATE: JANUARY 28, 2008 <-1k` "� ` SUBJECT: INCREASE IN REPLACEMENT WATER COST ADJUSTMENT FACTOR RECOMMENDATION It is recommended that the Utility Board/City Council authorize staff to increase the Replacement Water Cost Adjustment Factor by $0.2340 per hundred cubic feet of water effective February 1, 2008, to recover the increased cost of purchasing water from the Metropolitan Water District for November and December. BACKGROUND i The existing water rates of the Azusa Water Utility include an annual adjustment factor called the "Replacement Water Cost Adjustment Factor (RWCAF)" which is a charge applied to each rI one hundred cubic feet (ccf) of water sold. The RWCAF is calculated based on both (1) a fr forecast of anticipated replacement or purchased water costs, and (2) a cost recovery mechanism for deficits related to water purchases made in the preceding years. i `. Each year the RWCAF is adjusted in June for the upcoming fiscal year. This fiscal year's RWCAF I was initially set at $0.1306 per ccf and was intended to continue throughout fiscal year 2007- 2008, however, due to extraordinary drought conditions, replenishment water from local I Idistricts has not been available for purchase and so the water utility has had to purchase water supplied by the Metropolitan Water District or MWD at a much higher rate. Rather than wait until fiscal year end to re -calculate the RWCAF for next fiscal year, staff has been proposing adjustments to the RWCAF every two months since we started purchasing water at the higher cost back in July. The recommended adjustments are intended to recover only the incrementally higher amount we are paying for water, or $146.41 per acre foot (AF). In November and December water purchases continued from MWD. Also, Covina Irrigating Company started using more of their own well water during this time and Azusa sought to replenish the Canyon Basin water levels which dropped to unsafe levels. See attached chart depicting the drop in our water table in the Canyon Basin. 021 Based on above, the water purchases from MWD essentially doubled compared. to prior period, from 1,521.6 acre feet in September — October to about 3,010 acre feet in November - December. While the final billing has not been received for December water purchases, staff estimates our "incrementally higher" purchased water costs during the November - December period will be $440,679.46. At the same time we are incurring higher costs, we have been promoting conservation, and in December consumers reduced consumption by 21.9% compared to same month in 2006. Although this reduction complied with the phase III water shortage declaration and mandatory conservation, it also reduced revenues by 16.4% at a time when we are supposed to be seeing our revenues increase to build up operating income to pay debt service obligation that resulted -from issuance of the 2006 revenue bonds. As of the end of January, the RWCAF stands at $0.2896 per ccf. Based on attached calculation, the Water Utility needs to increase our current RWCAF by $0.2340 per ccf, from $0.2896 per ccf to $0.5236 per ccf for the next two months to recover the higher increment cost of purchased water incurred by the Utility in November and December. l Given above referenced financial impacts and dynamics, staff will be assessing our reserve levels, adequacy of our rate structure, and will report our findings and any necessary recommendations on these topics in the next update on the RWCAF at the end of March. FISCAL IMPACT Since the RWCAF was increased in November to $0.2896 the net increase resulting from this action will be $0.2340 per ccf, however, this brings the total of the RWCAF above the baseline amount for the year to $0.3930 which will generate about $440,680 in next two months with a conservative estimate of 10% reduction in water sales as compared to the same period last year; if consumers continue to conserve 20%+ of water, the revenue will be less. The estimated impact on the average residential water consumer of continuing the higher level RWCAF adjustment is about $7.07 per month ($0.3930 X 18 ccfs). The effective period of two months is appropriate for this incremental adjustment since residential customers outside the City are billed every two months. Prepared by: Cary Kalscheuer, Assistant to the Director of Utilities RWCAF CalcAs Key Well Elevatbns.pdf - 1Li INCREMENTAL INCREASE IN WATER COST TO 287,716 373,744 661,460 Azusa Valley - ccf AZUSA LIGHT & WATER - COST RECOVER FOR PURCHASED WATER COST 584,350 Total DUE TO 2007-2008 DROUGHT 658,774 1,245,810 I Conservation Discount of 10% 528,332 PURCHASES ,1,121,229 t j Incremental Purchased Water Costs(') $221,064.46 $219,615.00 Incremental $ _ Month Acre Feet Azusa's % $0.39110 $146.41 /AF Jul -07 1733.80 40% $ 101,538.26 Aug -07 1813.10 40% $ 106,182.39 Sep -07 1842.40 40% $ 107,898.31 Oct -07 1961.60 40% $ 114,879.14 Nov -07 2013.20 75% $ 221,064.46 Dec -07 2000.00 75% $ 219,615.00 COST RECOVERY 2008 2008 Extension (3) City o'f Azusa - ccf 287,716 373,744 661,460 Azusa Valley - ccf 299.320 285.030 584,350 Total 587,036 658,774 1,245,810 I Conservation Discount of 10% 528,332 592,897 ,1,121,229 t j Incremental Purchased Water Costs(') $221,064.46 $219,615.00 $440,679.46 RWCAF per ccf (2) $0.4184 $0.3704 $0.39110 Total Required to Recover MWD Costs $0.5236 Current Amount Due to Prior Increases to Baseline $0.2896 Net Increase Required to Pay for Incremental Cost Increase $0.2340 (') These are incremental costs to purchase water from MWD above what we would normally pay for water from local districts. $221,064.46 was incremental cost for Nov 2007, and $219,615 was incremental cost for Dec 2007. Incremental costs are divided by total projected sales in ccfs to determine RWCAF. (3j RWCAF stands for Replacement Water Cost Adjustment Factor and is a rate for one per hundred cubic feet (ccf) of water. "' Additional RWCAF for Feb 2007 and Mar 2008 period. 023 6605 ---- -- UNLIMITED PRODUCTION _______________________________________________________________________________ 85 _______________________________ __ _------------------------ _______________________ AM 640 830 _________________________________ ___-------------------------------------------------- ---_ ___________------------ ----____------_-------------- 25 __ __________________________ _______________________________________________ LIMITED T05 -V EAR AVERAGE PRODUCTION -------------- ------------------------- x-815 ________________ J 1110 <605 _ _____________________ 0_600 ---- ____------------------------------- _____________________------------------- __ ____________________ 111590 LIMITEDTOSAPE --- --- - ----------- ______ _______ YIELD ALLOCATION __ __ __________ 1565 __________________________________________________ ____________________ 580___________________________________________________ ______________________________________ ______ ____ _________. 675 570 ______________ 585 560 555_________________________________________________________ ____________________________________________________ 550 a a a$$ s' a 1-2 $ a a a a a a a a a$ o a `aaait`a --a;3 a� E' ?bA�a��n� ac c 5 �� STETSON ENGINEERS INC. Covina Sen Rafael Mesa, Arizona WATER RESOURCE ENGINEERS Jabs\1205\1205-lMC8MOU%A=unIIng Records\CSMOU_WL_Data.xls KEY WELL ELEVATIONS AT GLENDORA WELL NO. 8E 12/5/07 C W AGENDA ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES^ DATE: JANUARY 28, 2008 SUBJECT: BUDGET AMENDMENT FOR PURCHASED WATER COSTS RECOMMENDATION It is recommended that the Utility Board/City Council adopt attached resolution approving budget amendment in the amount of $800,000 to account number 32-40-722-704-6563 to pity for purchased water costs through March 2008.. BACKGROUND The Utilities Department budgeted $2 million for purchased water costs for Fiscal Year 2007- 2008, and amended the budget in October 2007 by $800,000. The budget balance for purchased water costs is currently about $1.4 million; however, we expect invoices of about $1,055,000 near end of January for water purchases made in November and December. Once payment is made our budget balance will be about $400,000 for purchasing water. Because of substantially lower than normal Canyon Basin water levels, we anticipate water purchases will continue to be necessary from the Metropolitan Water District in the coming months, and so are recommending at this time another budget amendment in the amount of $800,000 to ensure ongoing water purchasing capacity. If substantial rainfall is realized over the coming months, actual purchased water costs could be reduced. FISCAL IMPACT Funding for his amendment will come from water fund balance or reserves. Given the dynamic financial situation wherein we are seeing lower revenues from reduced water consumption due to conservation, and higher costs due to the need to purchase water, staff will be reviewing our reserves and rate schedule over the next two months and present our findings and recommendations at the March Utility Board meeting. Prepared by:. Cary Kalscheuer, Assistant to the Director of Utilities IN Budget Resolution.doc 02'r., RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, AMENDING THE FISCAL YEAR 2007-2008 OPERATING BUDGET FOR THE WATER UTILITY TO PAY FOR PURCHASED WATER. WHEREAS, the adopted and amended Fiscal Year 2007-2008 Operating Budget for the Water Utility included $2.8 million to pay for purchased water; and WHEREAS, Southern California is in the midst of one of the most severe droughts in recorded history; and WHEREAS, the current drought has made it necessary for the Water Utility to purchase water from the Metropolitan Water District at costs higher than anticipated when the Fiscal Year 2007-2008 budget was prepared; and WHEREAS, the budget balance at the end of January 2008 will be approximately $400,000; and WHEREAS, the continuing drought is making it necessary to continue water purchases to replenish water in the Canyon Basin to safe levels in order to provide water service to our customers; and WHEREAS, it is estimated that an amendment in the amount of $800,000 to the Water Utility Operating budget will be adequate to cover purchase water costs through March 2008. WHEREAS, Azusa Municipal Code Section 2-450 requires that all budget amendments between $100,000 and $1 million be approved by resolution; and NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AZUSA, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That the Water Utility Fiscal Year 2007-2008 Operating Budget is hereby amended in the amount of $800,000 to pay for purchased water costs, budget expense account number 32-40-722-704-6563. SECTION 4. The City Clerk shall certify to the adoption of this Resolution. PASSED, APPROVED AND ADOPTED THIS 28th day of January, 2008. Joseph Rocha, Mayor ATTEST: i Vera Mendoza, City Clerk STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) ss. CITY OF AZUSA ) I 14EREBY CERTIFY that the foregoing Resolution was duly adopted by the Utility Board/City Council of the City of Azusa at a,regular meeting of the Azusa Light & Water Utility Board on the 28th day of January, 2008. AYES: COUNCILMEMBERS: NOES: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: s Vera Mendoza, City Clerk 027 INFORMATIONAL ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES DATE: JANUARY 28, 2008 SUBJECT: PHASE 3 WATER SHORTAGE DECLARATION STATUS REPORT (VERBAL) Supplemental information is attached regarding certain actions being considered by the Metropolitan Water District (MWD) in response to the ongoing drought. Azusa Light & Water has been making water purchases from MWD since July 2007 to replenish the Canyon Basin. Of note in attached article, is MWD's consideration to limit water deliveries to cities and member agencies, and possibly charge a penalty of $1,347 per acre-foot if an agency exceeds its allotment. More information will be provided verbally on the water shortage by Director of Utilities at the Utility Board meeting. Prepared by: Cary Kalscheuer, Assistant to the Director of Utilities Attachment: MWD ArtL*. pdf Los Angeles Times: MWD may cut water to area cities Page 1 of 4 �A gyp! r Unlifnited Local +& Long Distance Calling Get 1 month FR ILt� t It4LtCS itlte£€ only$24.99/month FREE phone adapre http://www.latimes.com/news/local/la-me-water7janO7,1,7894190, story?coll=la-headlines-california From the Los Angeles Times MWD may cut water to area cities Facing shortages, the agency is reviewing a new allocation formula, which some contend penalizes older areas. By Deborah Schoch Los Angeles Times Staff Writer January 7, 2008 The Metropolitan Water District is considering a contingency plan to cut water deliveries to its member cities using a new formula that critics contend favors faster -growing areas while penalizing older, poor communities. The district's staff is recommending the plan in case the agency, which serves 18 million people in six counties, is forced to slash water deliveries this spring in the event of continuing shortages. This weekend's heavy rainfall will do little to ease those shortages because Southern California depends heavily on imported water that has been reduced by prolonged drought and court-ordered cutbacks, water officials said Sunday. The current discussion signals growing worries that the region's water supplies cannot meet demand, due to last year's record dry weather, an eight-year drought in the Colorado River Basin and a federal court order last month that sharply reduces water deliveries from Northern California. The MWD is also considering rate hikes of 10% to 20% for next year, in part to buy more water to shore up supplies. The new formula for water allocations will be publicly discussed this afternoon in Los Angeles by a panel of the MWD board of directors. A final vote by the full board is not expected until February or March, MWD officials said. The plan could be activated as early as May, although that is unlikely, the officials said. The formula recommended by the MWD staff would be the first adopted by the 80 -year-old district, which manages the delivery of water to cities from Ventura County to the Mexican border. It acts as a water wholesaler,'importing water from Northern California and the Colorado River and selling it to its 26 member cities and water districts. The agency did not use a formula during the droughts of the late 1970s and early 1990s, instead cutting deliveries by a set percentage across the board. The proposed formula would determine how much water is allotted to cities and water agencies. Most MWD water is sold to cities at $508 per acre-foot. If a city or agency exceeds its allotment by up to 10%, it would be charged a penalty fee of $1,347 per acre-foot. If it uses even more water, the penalty would be higher. An -acre- foot is the amount of water that would cover an acre of land, one foot deep. http://www.latimes.com/news/local/la-me-water7jan07,1,7696678,print.story 029 /2008 Los Angeles Times: MWD may cut water to area cities Page 2 of 4 The costs would ultimately be borne by ratepayers. All cities and districts would see supplies cut, although details for individual cities were not available last week. "INo one: is going to be shielded from this," said MWD spokesman Bob Muir. Some critics are focusing on several parts of the plan, including its shift away from historic water rights, credits for conservation efforts and the potential effect on low-income residents. I The formula has been debated privately since last summer by MWD staff and officials from water districts throughout the region. The staffs written recommendation takes into account retail customers and the economy, population growth, losses in local water supplies, conservation efforts and other issues. For instance, cities might receive more water if a large portion of their supply comes from MWD, if population in their county is growing, or if a large number of low -flow toilets and other water -saving devices have been installed.. i MWD was founded in 1928 by a consortium of cities to finance the building of the Colorado River Aqueduct that helped develop Southern California. In return, the act creating the agency granted preferential water rights tb the early member cities that paid for the district's infrastructure. Those cities include Los Angeles, Long Beach, Burbank, Compton, Pasadena and Santa Monica. Preferential rights would be trumped by the new formula, critics say. The proposal does not eliminate any preferential rights, MWD officials said in an e-mail Sunday night. The purpose in developing this proposal was to determine if there was a more equitable manner to distribute water under today's circumstances." i Los Angeles Deputy Mayor Nancy Sutley, an MWD board member, also said Friday that the formula does not require cities to give up their rights. ".We're better off trying to figure this out cooperatively than going back to the way things were before we were Bona," said Sutley, who is chairwoman of the board's Water Planning and Stewardship Committee. I "I think we all realize that life has changed since then," added the panel's vice chairman, James M. Barrett, San Diego's water director. I But officials in other cities aren't convinced the proposal encourages cooperation or is an improvement. Long Beach aa:id other southeastern L.A. County cities estimate that they would lose 20% more water under the formula than if water was divvied up by preferential rights. Some say the MWD plan would force lower-income communities to subsidize water use in growing areas. "We're completely the losers in this current situation," said Joone Lopez, deputy general manager of the City of Commerce -based Central Basin Municipal Water District, which buys water from MWD to serve 2 million people in southern Los Angeles County. About 47% of residents in the Central Basin district are low income, http://wwvr.latimes.com/news/local/la-me-water7j an07,1,7696678,print. story 1/7/2008 Q' � Q Los Angeles Times: MWD may cut water to area cities Page 3 of 4 she said. MWD spokesman Muir, in response to the criticism, said: "The foundation of this plan is equity, and not . whether one area is growing and another is built out." No conservation credits are granted for cities in which residents have heeded calls to use their sprinklers less and added drought -resistant landscaping -- changes that water experts say can save far more water than low - flow toilets and shower heads. An estimated 40% to 70% of water in the region is used for landscape irrigation. Long Beach, for instance, has adopted a mandatory plan that achieved 10 -year lows in water consumption. Los Angeles residents, by contrast, used slightly more water after Mayor Antonio Villaraigosa's call for a voluntary 10% cut. Cities with successful conservation records in recent dry years could actually lose out, because the MWD staff plans to use the years 2004 to 2006 as the base for making cuts, said Art Aguilar, general manager at the Central Basin district, which, he said, has invested heavily in conservation measures. "The better water policy you practice, the worse you're going to be under the new allocation plan," Aguilar said. "If we knew this was coming, we could have just used the water, not used any conservation, and been better off." MWD General Manager Jeff Kightlinger said that his staff sought to measure local conservation with "clear measurable steps" such as low -flow toilets and other devices. The effects of reduced lawn sprinkling and new drought -resistant landscapes are more difficult to gauge, he said. Some municipal officials in Los Angeles County say they feel steamrolled by the process. They say that the formula would penalize low-income minority residents who could be hit twice, by penalty charges and then by proposed 2009 rate increases. The formula is designed in a way that those cities could be affected more severely than growing cities in the Inland Empire or big cities such as Los Angeles and San Diego, and so would likely pay proportionately more in penalties, they said. The Southeast Water Coalition, a regional authority that includes Cerritos, Downey, Whittier and eight other cities, has written MWD to ask for more time to review the plan. The Long Beach Board of Water Commissioners will also send a letter, criticizing key points of the plan and asking for more review. Kightlinger said that MWD has not been able to confirm that the plan would disproportionately hurt lower income, largely minority cities. "We haven't been able to verify that that's necessarily correct. There are parts of Riverside County that are very poor," Kightlinger said. Much of southeastern Los Angeles County are not areas of high growth, meaning that cuts there would have less effect on the economy, he added. http://www.latimes.com/newsAocal/la-me-water7jan07,1,7696678,print.story 1/7/2008 031 Los Angeles Times: MWD may cut water to area cities " Page 4 of 4 "It's a very complicated social issue, and it's something that we're trying to work through." E.A. Deputy Mayor Sutley said that she supports creating a plan now, before serious shortages occur. I As for lower-income cities, she said: "We really feel for them, and Los Angeles is in the same position. We ave a lot of DWP customers that live below the poverty line." The plan will be discussed today at 1:30 p.m. at MWD headquarters, Room 2-456, 700 N. Alameda St., Los Angeles. deborah. Schoch@latimes. coin If you want other stories on this topic, search the Archives at latimes.com/archives. ' MISReprints i Article licensing and reprint options Copyright 2008 Los Angeles Times I Privacy Policy I Terms of Service Home Delivery I Advertise I Archives I Contact I Site Map I Help partners: ,. i W:la5GW http://ww, ,.Iatimes.com/news/local/la-me-water7janO7,1,7696678,print.story 1/7/2008 032 NOVEMBER PROGRESS MONTHLY REPORT PAYMENT REOUEST: JANUARY, 2008 PROJECT: MEMBRANE TREATMENT UPGRADE OF THE CANYON FILTRATION PLANT PROJECT NO.: WVF-207 GENERAL CONTRACTOR: SSC CONSTRUCTION INC. DESIGN ENGINEER: BLACK & VEATCH INC. CONSTRUCTION MANAGER: BLACK & VEATCH, INC. PROJECT CONTRACT AMOUNT: $35,905,500.00 $36,228,379.63 CHANGE ORDERS TO DATE: $100,642.76 10 DAYS Approved July 23, 2007 $164,975.54 14 DAYS Approved Sept 24, 2007 $57,261.33 4 DAYS Approved Nov 26, 2007 MONTHLY ACTIVITIES Construction progress meetings were held November 29, December 13, January 3, & January 17. As of 10/26/2007 Pretreatment Building substructure backfilled - tube settlers and equipment installed DYK onsite- installed foundation of the Finished Water Reservoir; setting reinforcing for reservoir floor O&M Building exterior walls laid Chemical Feed Building chemical tanks have been stored and substructure backfilled Sludge Drying Beds graded and some floor and slope concrete has been poured Equipment installed on Canal Diversion Structure - inlet and outlet channel concrete poured Membrane Building foundations backfilled and exterior walls being laid. NOVEMBER PROGRESS PAYMENT REOUEST: $1,623,234.87 DECEMBER PROGRESS PAYMENTREOUEST: $1,622,767.82 TOTAL PAID TO DATE $16,704,819.55 AMOUNT TO ESCROW $1,670,481.96 PROJECT PERCENT COMPLETE 46.11% W w Power Resources Division Monthly Report ■ Power Resource Update ■ Power Consumption Comparison ■ Wholesale Market Trend ■ Power Resource Budget Update ca w Power Resource Update ■ We are making final preparation for the start up of California Independent System Operator's (CAISO) new markets in early spring 2008. We are participating in the final market simulations and continuing the testing of our internal systems and operating procedures. ■ We are working with Garnet Wind to certify the wind farm generation to operate in the CAISO markets. Garnet Wind is completing the permitting process with Riverside County and the electric interconnection process with Edison. Construction of the wind generation facilities will commence shortly. ■ We are participating in the Southern California Public Power Authority (SCPPA) renewable resources RFP process for potentially additional renewable resources. ■ We are coordinating with SCPPA and PNM on San Juan unit 3 scheduled outage issues. The scheduled outage has been delayed for two weeks due to the need for additional outage planning. ■ We are participating in the Lodi #2 Project development process. A request for electric interconnection to the CAISO system has been submitted. Technical feasibility studies will soon be under way. ■ We receive a letter of interest from Municipal Energy Agency of Nebraska regarding long term power sales of City's share of San Juan Project. Staff is preparing a response to the letter. 0 W U li CITY OF AZUSA ENERGY CONSUMPTION COMPARISON ENERGY CONSUMPTION IN MWH PERCENT MONTH FY 06-07 FY 07-08 CHANGE JUL 29,287 26,164 -10.66% AUG 25,912 28,014 8.11 SEP 24,379 - 23,760 -2.54% OCT 21,700 21,890 0.88% NOV 20,456 19,708 -3.65%, DEC 20,510 20,029 -2.35% JAN 20,984 -100.000/6 FEB 18,414 -100.00% MAR 20,916 -100.00% APR 19,719 -100.00% MAY 21,064 .... -100.00%.., JUN 21,949 -100.00% TOTAL 265,291 139,565 -1.57% CITY OF AZUSA PEAK DEMAND COMPARISON PERCENT MONTH FY06.07 FY 07-08 CHANGE JUL - 60.8 55.5 -8.65% AUG 55.2 64.9 17.39 SEP 63.7 63.9 0.27% OCT _ 43.9. 46.76.34% NOV � 46.0 .............. 41.1 .. . -10.49 DEC 36.6 35.7 -2.68% JAN 36.8 -100.00% FEB 374 -100.00% MAR 42.8 -100.00% _.... .._..APR._ .. 407 ._...._...._ -�.._.._... -100.00% ...._MAY _... .__..:._._.. ._._...._483...._......___...__ ._. .... .. 10000% JUN 47.5 _ ;00.00% PEAK DEMAND IN MW - li WHOLESALE ELECTRICITY SPOT MARKET PRICES IN CALIFORNIA MONTH NOV 06 DEC 06 JAN 07 FEB 07 MAR 07 APR 07 MAY 07 JUN 07 JUL 07 AUG 07 SEP 07 OCT 07 NOV 07 DEC 07 ALL PRICES IN $/MWH Q W AVERAGE AVERAGE PEAK PRICE OFF PEAK PRICE $53.55 $41.34 $53.75 $44.63 $53.46 $44.36 $58.45 $47.79 $49.82 $36.44 $57.29 $43.12 $63.55 $41.24 $67.77 $42.39 $75.35 $41.26 $66.95 $36.94 $52.66 $36.40 $59.42 $44.90 $50.79 $40.43 $58.53 $49.88 Power Resource Cost Accounting FY'07-08' co to ONGTERM __-1 SH6kfTffM TRANS MISSIO- -' ANcILLMY SCHEDULING TOTAL -.._O N-.. WHOLESALE T CONTRACTS PLAbHAS . -..-N I COSTS _ ' SERVICE COSTS DISPATCHING COSTS COSTS -_NTH t_'_REVrNLFSCORYSf co to F A447 2.443277.75 M.479.n 26,31824 32,849.84 4.099,178.50 (1,964,700,19), 2,13447831 Sep 07 1,330,082.85 2,052,822.54 23Z911_22 12,313.75__ (1.778,037.45) 1.906.611A5 ...... 215, 4 78.68 8269.64 1" u6-4,33-9-8-0 -------- (9611�&jq' 3,189A9 4.._.._..... �T 1,333,840.63 1.113,135. 5 239,401.66 20,000 :00 86242.56'�_. _2'.*5'.62bN'_ Dec -07 1,Y3jASSA4 966,6l' 221 238,901.66 20;000:00 45,099.492587,971.70 • (908,00OA1)� 1,679,971.29 i Jan -68 I 0.00 6.60 Feb -08 0 0:00 -6.60 .00 0.001. pw--08- 0.00 i WY -08 00 6.00 I Jun -08 0.00 o.6o co to INFORMATIONAL ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES DATE: JANUARY 28, 2008 SUBJECT: U.S. DEPARTMENT OF ENERGY ELECTRIC RATE SURVEY Attached information shows how Azusa Light & Water electric rates per kWh compared to various other utilities in 2006, based info gathered by the U.S. Department of Energy in November 2007. Analysts doing cost -benefit analysis often look at cost data to quantify benefits of certain public services. In this case, Azusa's rates compare as follows to Edison's ra=:es: The above benefits total about $6.4 million and are in the form of savings to consumers. Other quantifiable public benefits would include Franchise Fees and In -Lieu Fees paid to the City from gross sales of electricity. These are embedded in above rates and provide about $3 million in annual revenue to the City. This is equivalent to the sales tax revenue the City might realize from about 6 Walmarts. The combine public benefit of having a public electric utility in Azusa is about $9.4 million annually. Prepared by: Cary Kalscheuer, Assistant to the Director of Utilities EIeiAveRev2006. pdf 039 Rates per kWh by Customer Class (in cents) Residential Commercial Industrial Southern California Edison 15.8 14.5 12.0 Azusa Light & Water 11.3 13.0 9_8 Dfference: 4.5 1.5 2.2 Annual MWh's (2005) 74,884 76,166 86,528 (MWh=1,000 kWh's) Savings (Public Benefit) $3,369,780 $1,142,490 $1,903,616 The above benefits total about $6.4 million and are in the form of savings to consumers. Other quantifiable public benefits would include Franchise Fees and In -Lieu Fees paid to the City from gross sales of electricity. These are embedded in above rates and provide about $3 million in annual revenue to the City. This is equivalent to the sales tax revenue the City might realize from about 6 Walmarts. The combine public benefit of having a public electric utility in Azusa is about $9.4 million annually. Prepared by: Cary Kalscheuer, Assistant to the Director of Utilities EIeiAveRev2006. pdf 039 L� Average Revenue per kWh, 2006 BENE® (in cents) RE United States and California DEC 16 2007 all&o, LIGHT & WATER U.S. Utilities Publicly Owned Investor -Owned Cooperative California Publicly Owned Investor -Owned Cooperative California Publicly Owned Alameda City of Anaheim City of Azusa City of Banning City -of Biggs City of Burbank City of Colton City of Corona DWP City of Escondido City of Glendale City of Gridley City of Healdsburg City of Imperial Irrigation District Lassen Municipal Utility District Lodi City of Lompoc City of Los Angeles Dept of Water & Power Merced Irrigation District Modesto Irrigation District Moreno Valley, City of Needles City of Palo Alto City of Pasadena City of Redding City of Riverside City of Roseville City of Sacramento Municipal Util Dist San Francisco City of (Hatch Hetchy W&P) Residential Commercial Industrial Total Rev/kWh Rev/kWh Rev/kWh Rev/kWh 11.3 _ a 13.0 9.2 8.5 6.0 8.1 10.5 9.3 5.9 8.9 9.5 8.7 5.8 8.5 10.9 10.1 8.8 10.0 15.3 14.2 11.1 14.2 11.5 11.1 7.3 10.0 12.1 12.5 - 12.4 9.9 9.8 8.6 9.3 11.3 _ a 13.0 9.8 11.4 12.9 11.9 12.5 12.4 13.2 13.0 7.2 8.8 13.1 13.1 12.2 12.6 13.0 15.8 9.5 . 12.2 17 14.6 12.8 13.8 6 - - 5.6 14.5 14.4 12.1 13.6 13.2 12.3 10.1 12.5 12.9 12.0 10.6 11.9 11.9 12.6 14.3 12.3 13.4 13.8 18.1 13.7 15.2 13.7 7.3 12.9 9.6 11.5 9.2 9.8 10.2 9.5 8.8 9.7 13.8 11.8 8.2 10.4 12.4 10.0 6.6 9.8 18.8 16.2 - 17.7 12.4 14.1 7.6 13.1 9.5 9.0 8.3 8.8 12.5 11.2 11.5 9.4 9.4 9.5 9.4 12.2 11.8 8.7 10.6 9.9 9.0 6.8 8.7 10.6 11.3 9.4 10.0 - 8.5 5.2 7.9 Shasta Lake City of Silicon Valley Power Trinity Public Utilities Dist Truckee Donner P U D Tuolumne County Pub Power Agny Turlock Irrigation District Ukiah City of Vernon City of California Investor -Owned Pacific Gas & Electric Co PacifiCorp San Diego Gas & Electric Co Sierra Pacific Power Co L Southern California Edison Co Southern California Water Co California Cooperative Anza Electric Coop Inc Plumas-Sierra Rural Elec Coop Surprise Valley Electrification Corp. Valley Electric Assn, Inc Residential Commercial Industrial Total Rev/kWh Rev/kWh Rev/kWh Rev/kWh 13.2 14.0 6.3 8.2 8.4 11.9 8.0 8.1 7.7 7.9 4.9 7.5 13.7 13.1 - 13.4 - 6.0 - 6.0 11.7 8.5 8.3 9.6 11.9 14.6 12.4 5.8 8.8 7.8 8.1 14.6 13.8 10.4 13.7 8.3 8.1 6.4 7.9 16.9 14.5 11.1 15.1 12.2 11.8 9.4 11.5 15.8 14.5 12.0 14.7 20.9 22.1 14.0 20.4 15.6 16.7 14.6 15.8 11.6 10.3 7.8 10.0 7.0 7.3 6.2 6.7 12.3 - 8.9 9.0 Source: U.S. Department of Energy, Energy Information Administration, Farm EIA -861. 2006 data. Prepared November 2007 by the American Public Power Association, Department of Statistical Analysis. 041 i.. INFORMATIONAL ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES ^ ,� DATE: JANUARY 28, 2008 CVi SUBJECT: OFFSITE UTILITY BOARD MEETINGS Attached includes Utility Board meeting schedule for calendar year 2008. Staff suggests that we resume offsite Utility Board meetings, if desired by the Board, for the March, June and October meetings. Staff welcomes input from the Board as to what school sites are preferred locations, and on any changes in the months proposed herein for offsite meetings. Prepared by: Cary Kalscheuer, Assistant to the Director of Utilities i Attachment: i i ' 2008 UB Mtg Schedule.doc 042 CITY OF AZUSA SCHEDULE OF UTILITY BOARD MEETINGS 2008 I" Floor Conference Room, Azusa Light & Water Building 729 N. Azusa Avenue, Azusa CA 91702 MONDAY JANUARY 28, 2008 6:30 P.M. MONDAY FEBRUARY 25; 2008 6:30 P.M. MONDAY MARCH 24, 2008 6:30 P.M. MONDAY APRIL 28, 2008 6:30 P.M. TUESDAY MAY 27, 2008 6:30 P.M. (DUE 0 MEMORIAL DAY HOLIDAY, 5/26/08) MONDAY JUNE 23, 2008 6:30 P.M. MONDAY JULY 28, 2008 6:30 P.M. MONDAY AUGUST 25, 2008 6:30 P.M. MONDAY SEPTEMBER 22 6:30 P.M. MONDAY OCTOBER 27, 2008 6:30 P.M. MONDAY NOVEMBER 24, 2008 6:30 P.M. MONDAY DECEMBER 22, 2008 6:30 P.M. 043 INFORMATIONAL ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIE� DATE: JANUARY 28, 2008 SUBJECT: CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION MARCH CONFERENCE Attached information on California Municipal Utilities Association (CMUA) March 2008 Conference is provided for your review and consideration. This year's conference will be held in Monterey, California, on Wednesday, March 12 — Friday, March 14. If you are interested in attending this conference, please contact Liza Cawte, Administrative Technician at 812-5171. Prepared by: Cary Kalscheuer, Assistant to the Director of Utilities Attachment: CMUA Conf. pdf � �' CMUA Conference Registration - March 12-14, 2008 76th Annual Conference Monterey Plaza Hotel 400 Cannery Row Monterey CA 93940 (800) 334-3999 or (831) 646-1700 California Municipal Utilities Association 915 L Street, Suite 1460 • Sacramento, CA 95814 (916) 326-5800 • (916) 326-5810 Fax We invite you to attend CMUA's 76th Annual Conference at the Monterey Plaza Hotel - March 12-14, 2008. The goal of the California Municipal Utilities Association's annual conference is to provide the perfect forum for bringing officials of publicly owned utilities together with government and industry policy makers, representatives of scientific, environmental, technological and economic interests to share information and views. CMUA's special sleeping room rates range from $215 to $345 based upon on your room choice. Please make reservations by calling 800-334-3999. To insure that you get this special rate be sure to mention CMUA and make reservations before CMUA's room block is released on February 9, 2007. TO REG{STEP. FOR THE CONFERENCE, PLEASE COMPLETE AND RETURN THE FORM BELOW. Registration for your companion/spouse is complimentary and they are welcome to participate in the conference events including the golf and tennis tournaments. Cancellation Policy: Conference registration cancellations must be received by 5:00 pm, Friday, March 7, 2008. Meal cancellations must be received 48 hours before the event. Payment: Please include payment or billing instructions with registration. Sorry, we do not accept credit cards. Detach and remit with your payment Name Title Companion/Spouse (For badge) Utility/Firm Phone Fax Email Mailing Address City Zip Code _$475 Member & Associate Member Registration / _ $675 Non -Member Registration $ _S525 Member Registration Received After February 20, 2008 & onsite Companion Registration is complimentary, companion is spouse, child, etc. and does not include co-worker Registration fee does not include items listed below Wednesday, March 12, 2008 Golf Tournament at Bayonet Black Horse Golf Courses: $75 (USGA Handicap or last 5 scores ) # $ (Golf Committee will establish pairings. Fee includes cart & green fees, lunch, range balls & drink tickets.) Please Note: You must be registered for the conference to participate in the golf tooroament. Thursday, March 13, 2008 Water Utility Manager's Breakfast (utility personnel only) $35: # $ Lunch: $55 # $ Banquet: $85 Chicken: Piccata # $ Fish: Halibut # $ Friday, March 14, 2008 Energy Utility Manager's Breakfast (utility personnel only) $35 # $ ❑ Vegetarian Meals ❑ Check Enclosed ❑ Please bill me at the address above Total S ❑ Check here if you have a disability that requires special accommodations Please make checks payable to: California Municipal Utilities Association (Tax ID No. 94-1510887) 045 CMUA's 76TH ANNUAL CONFERENCE Tentative Agenda Wednesday, March 12`n 10:00 Bayonet Black Horse Golf Courses (Seaside, CA) Putting Contest 12:00 Bayonet Black Horse Golf Courses (Seaside, CA) Gol(Tournament 10:00-5:00 Customer Services Committee 5:30-7:00 Get Acquainted Reception Thursday, March 131n 7:00-9:00 Attorney's Meeting 7:30-9:00 Continental Breakfast 7:30-9:00 Water Manager's Breakfast (Utility Personnel Only) 9:00-11:45 Opening GeneialSession President & Executive Director Reports Federal & State Issues Update 11.45-1:30 Luncheon with Speaker 1:30-3:15 Session: "Water Supply Solutions" • Managing Current Water Supplies • Contributions from De-salination? • Environmental Concerns •Increased Storage • Areas of Origin Concerns 3:15-5:00 Session; "Integrating California' Energy Challenges" • Integrating Climate Change Concerns into Resource Adequacy • Integrating Energy Policy in the Electric Grid • Integrating Economics into Energy Police 6:00-7:00 Pre -Banquet Reception 7:00 Banquet with Entertainment Friday, March 14`n 7:30-9:00 Continental Breakfast 7:30-9:00 Electric Manager's Breakfast ' (Utility Personnel Only) 9:00-10:00 Closing Business Session and Awards Presentations Board of Governors - immediately following Closing Business Session 10:00 -Noon FARECal Board Meeting 10:00 -Noon Legislative Committee he Delta is in crisis, and each day brings us 'L closer to a major disaster. What the nation learned from New Orleans and Hurricane Katrina is the terrible price of waiting. The Delta's problems can wait no longer: j The health of its ecosystem is not sustainable over the long-term and. regional climate change of even one meter above current sea level promises to inundate j many Delta towns audits infrastructure of highways, energy corridors, railroads, wildlife resources and its economic base of agriculture and tourism. (See Figure 2) A two -in -three chance of a major earthquake within the next few years in or near the Delta make its levees vulnerable to sudden collapse. In addition, increased urbanization poses an imminent threat to the Delta by placing more residents and their property in a floodplain. The vision's recommendations are designed to be implemented together as an integrated solution and then work together in an interdependent fashion to achieve success. An integrated solution is vital as the Delta cannot be "fixed" by any single action. Nor can California's water needs be met by any single action. No matter what policy choices are made, Californians must also change their relationship toward the environment and water. Conservation must become the next great cause toward quality of life, following in the footsteps of energy conservation. Delay in any of the important areas discussed in this vision will only make California's water problems and the Delta's ecosystem woes worsen over the next decades. (See Figures 10 and 11) For those who rush to discuss Delta water conveyance as if no other issue is of importance, the Task Force cautions that decisions about storage and conveyance flow from all 12 recommendations in their vision, and cannot be decided by themselves. The Delta formed by the Sacramento and San Joaquin Rivers is a critical habitat for more than 500 species, hub of the state's major water conveyance system, and crossed by major transportation and utility corridors. Delta Vision's 12 Integrated and Linked Recommendations 1. Delta ecosystem and a reliable water supply for California are the primary, co -equal goals for sustainable management of the Delta. 2. The California Delta is a unique and valued area, warranting recognition and special legal status from the State of California. 3. The Delta ecosystem must function as an integral part of a healthy estuary. 4. California's water supply is limited and must be managed with significantly more efficiency to be adequate for its future population, growing economy and vital environment. (See Figure 5) 5. The foundation for policy making about California water resources must be the longstanding constitutional principles of "reasonable use" and "public trust;" these principles are particularly important and applicable to the Delta. 6. The goals of conservation, efficiency and sustainable use must drive California water policies. 12 Recommendations fcont.l 91 10. A revitalized Delta ecosystem will require reduced diversions, or changes in patterns and timing of those diversions, upstream, within the Delta and exported from the Delta at critical times. (See Figures 7a, 7b and S) New facilities for conveyance and storage, and better linkage between the two, are needed to better manage California's water resources the estuary and exports. (See Figure 9) Major investments in the California Delta and the statewide water management system must be consistent with, and integrate specific policies in this vision. In particular, these strategic investments must strengthen selected levees, improve floodplain management and improve water circulation and quality. The current boundaries and governance system of the Delta must be changed. It is essential to have an independent body with authority to achieve the co -equal goals of ecosystem revitalization and adequate water supply for California while also recognizing the importance of the Delta as a unique and valued area. This body must have secure funding and the ability to approve spending, planning and water export levels. 11. Discouraging inappropriate urbanization of the Delta is critical both to preserve the Delta's unique character and to ensure adequate public safety. 12. Institutions and policies for the Delta should be designed for resiliency and adaptation. Near -Term Actions to Protect the Delta The Task Force also identified Near -Term Actions that must be taken in the very near future because threats to the Delta and Suisun Marsh are so serious. These focus on preparing for disasters in or around the Delta, protecting its ecosystem and water supply system from urban encroachment, and starting work soon on short-term improvements to both the ecosystem and the water supply system. These proposed actions should be initiated quickly with an attempt to build upon existing organizations and authorities, but not be bound by existing shortcomings. They are: 1. 2. 3. State government should immediately begin acquiring title or easements to floodplains, establish flood by where feasible and discourage residential building in flood -prone areas. Land that could provide flood protection is being threatened by urban development as this report is being written. The Governor should immediately, issue an Executive Order that provides guidance consistent with this vision on inappropriate land development in the Delta. State government should promptly set appropriate standards for all levee improvements to protect heavily populated areas and key parts of the water delivery system and other infrastructure. The State of California should also use available bond funds to address strategic levee and floodplain improvements. 4. State government should embark upon a comprehensive series of emergency management and preparation actions within a few months. California cannot wait for a flood before planning a response. 5. State government should promptly incorporate expected sea level increases into decision-making and improve knowledge of constructing more secure and affordable levees. 6. High priority ecosystem revitalization projects should be pursued aggressively by the responsible agencies and departments, upon direction by the Governor. 7. Improvements in the current water conveyance and groundwater surface water, storage systems should be pursued as rapidly as possible by the responsible agencies and departments, upon direction by the Governor. The Task Force urges the Govemor and the Legislature to incorporate these immediate steps in executive actions, upcoming bond measures or related legislation. Figure S. COINO 10 Frecipiftifl n History ' ago 7's:K? 1-9117 14A 1"0 1940 "50 1960 ON) 1980 TOW) 2000 116 year average: 21.88 IfIchre3 Ovii:+11 30 Y AM (1908,W37'j: 21.28 irie1af £: "VOIC:A1 :30 VOW -1 (1977-M- . 5: 24.88 iociat,4 Vearly precip"atien calculated From average of 95 stations spread ac.rcm. California. Data collected by Jim Goodridge, State cli.notalogist Form. efly with DW P. Source. California Depor men', of VAolel Resources I as UnaarP4vrasion shmAng his HCai trend 40------ 3v J� 25 1 13 f 117 1 1 T -- ' ago 7's:K? 1-9117 14A 1"0 1940 "50 1960 ON) 1980 TOW) 2000 116 year average: 21.88 IfIchre3 Ovii:+11 30 Y AM (1908,W37'j: 21.28 irie1af £: "VOIC:A1 :30 VOW -1 (1977-M- . 5: 24.88 iociat,4 Vearly precip"atien calculated From average of 95 stations spread ac.rcm. California. Data collected by Jim Goodridge, State cli.notalogist Form. efly with DW P. Source. California Depor men', of VAolel Resources I California Water Plan Update, 2005, Volume 3 Table 1-1 California Water Summary Imafl A r a a 9 AN 'a Key components of the illustrated flow diagram are shown as characteristic elements of the hydrologic cycle. This volume has flow diagrams for statewide water summary in this chapter and for regional water summaries in their respective chapters. . � 1998 2000 2001 (171%oi normal)° (97% of normae° i p2%of normal)° Total supply (precipitation &imports) - 336.9 194.7 145.5 Total uses, outflows, &evaporation 331.5 200.4 159.9 Net storage changes in state 5.5 -5.7 -14.3 Distribution of dedicated supply (includes reuse) to various applied water uses Urban uses 7.8 (8%) 8.9 (11%) 8b (13%) Agricultural uses 27.3 (29%) 34.2 (41%) 33.7 (52%) Environmental watero 59.4 (63%) 39.4 (48%) 22,5 (3590) Total dedicated supply 94.5 82.5 64,8 maf = million acre-feeta. Percent of normal precipitation. Water year 1998 represents a wet year; 2000, average water year; 2001, drier water year. b. Environmental water incO ludes instream Flows wild and scenic flows, required Delta outflow, and managed wetlands water use. Some environmental water is reused by agricultural and urban water users. Figure 7a, Historic Diversions From within the Delta la Dlky D:•101s0* MMOng Cordra cotta 1Va1or OrMOCl ON U" larIh5&VAq"dwt Stara %Voter Prola dt.%mtans from no %oL n Salta ! Cenlrl Valloy Project dtmrsbn ham tlra Data 7 Sunoco wal" dimrzionfor lmDdhom 'eW 1935 1949 1945 1950 1555 :999 1905 1970 1975 1990 INS 1980 1995 21109 2095 Source: measured, calculated and modeled from an orgy of data sources as compiled by fully and Young, Inc. Figure 7b. Historic Diversions before the Delta, in -Delta Uses and Exports from the Delta, plus Outflows ® 1o01 Cons our9ow eO Combhad central Vatlny Profatl and State 'Alator Profnnt dvarww, r+nn eft onlla (rut iildud:np CaKm costs water oiMuld diomRlnnsj �j QSnrrraia"tar dt,"Ion for In -Volts u- E3Deka 4141emhcd oansumpiim um of eppk:l anter and dixr-.roe. 70 tar Pnar:xam Carat, MIMU01- MDkalumm Aqua&Y-r, and St-PLK-f. NatctsWa Irp Aquadmt a- 60 c LL U d 50 L'. rh r 40 30 20 to a t MiN 19M 1935 1940 1945 IM 1955 INC 1995 1970 1975 iP33 1995 IM 1995 2000 2085 Trends In Destinations and Uses Pcrixl Averepe Annual WISI MlAr) C1t<liow -Deke I m-De:a 8'xlaons 'Natcr>;t1ed 1Sao to194D 23.80 81% 5% 0% 14% 1950 to 195? 31 71 67`8, 4% 44y 24% 1970 to 1989 34.34 51% 6%. 15;5 29% 1940 to 20Q5 3255 4291, 4'%. 17N 311% When the averages of 20-yeor periods are connpored. these dom show: • Outflows to the oceon go down from 81% to 46% of total flows; • In -Delta uses are essenflally constant of 4% to 54+ra of Iotal flows:. • Exports of .Hater taken in the Delta but conveyed etsetwhere as up, from none to 17% of total flows; and • In -Delta watershed (before reaching Della) uses also go up, (torr 14% to 31 % of total Sows {same of these are exportedi trom the Delta watershed). Source: measured, calculated and mcdeled data from an array of sources as comprled'by i ally & Young, Inc. with dam and assistance fre..,n D P, the Bay' Institute and the State Water Contractors. I Figure 8. Upstream and Export Diversions from the Delta Watershed YymPl Diwtlma F�gofPGPap 4wtI0YKa Source: Greg Young, Tully and Young, Inc. {. Upstream and Export Diversion from the Delta Watershed ii (Wa ter Yea, 7000) M�`� ,�f [j r � .t f 4.^{� '4'-- � F # O buNaydtW wayaAd yaalo Snamrb adSm Aap:b!¢brbplc PgprsuJel'r {6yDWPl � AnaolLey�b:bdM1pbnlDlwebn (t lamrti.M1Mt1aCM PManlytl D/ID,l1 NrM1I��a�wrMfrM✓�Inin� DbebibmfMM aCiiab� AnrwalMPprlup dµyar pray, rmm, wamwen . t. 1,500 i Cr YymPl Diwtlma F�gofPGPap 4wtI0YKa Source: Greg Young, Tully and Young, Inc. 1998 (Wet) Figure 9. Delta Water Balance by Water Year Type Sacramento River 28,964 Yolo Bypass 8,980+ Outflowto Bay 43,430 2000 (Average) 2001 (Dry) Sacramento River 18,327 Yolo Bypass 2,956 Outflow to Bay, 1%144 Sacramento River 10,499 4%k Yolo Bypass 366 i ,;/',Prrclprtation —1,421 Other 4410 2,093 Exports San Joaquin River 4,620 6,441 j4 Precipitation _ 954 Other f 1,076 San Joaquin River 2,841 Exports 6,321 �i Ji Preci pitation K 762 Other 1,076 Outflow to Bays 6,9631 - 7 Exports 5,076 Source: Status and Trends of Delta -Suisun Services, DWR 2007 San Joaquin River 1,729 Figure 10. Estimated Distribution of Water Sources used to Meet Daily Urban Water Demand (Water Year 2000) Using data from the 2005 California Water Plan Update, v.3, this graphic shows an estimated representation of how various sources of water available to a region may have been used to meet a region's urban per -capita water use. However, because data is not distinguished to separate the destination of source water, some of the water available to a region may have gone exclusively to agricultural uses or urban uses, thus skewing what is represented here. R 0 Diverted from a Delta Tributary 350 — Directly Diverted from the Delta [� Local Supply (surface and groundwater) 300 ® Imported Non -Delta Supply 1 N 31 44, 4 250 3 � c n 104 D y 200 ------ — (34%) 0 10 (6%) 60 . U 150 — (3>%) 238 IL d o - 63 (81°h) N m (41%)71 71 S3 100 44 (3606) 154 Q 44 (28%) (51%) (29%) 50 _ in 31 pone) 0 San Francisco Central South Delta Tulare Bay Coast Coast Watershed Lake Figure 11. Strategies to Reduce Demand for or Increase Supply of Water 3.5 T� i 1.0 0.5 0.0 Additional Annual Water 0 High Estimate ID Low Estimate 0.5 �eRN � ec C. J 5 QA 3.1 1.0 64"z QIOP 5� � ,md` Jye G map J This graph shows the potential range of more water demand reduction and supply augmentation each year for eight resource management strategies. Low estimates are shown in the lower (dark blue) section of each bar. The water supply benefits of the resource management strategies are not additive. As presented here, urban water use efficiency includes reduction in both consumptive and nonconsumptive uses (or applied water), whereas agricultural water Jse efficiency only includes reduction in consumptive uses (or net water). Source: California Department of Water Resources, California Water Plan Update, 2005, v.3. Figure 2. Area of Potential Inundation from a One Meter Rise in Sea Level Source: U.S. Geological Survey