AGENDA
REGULAR MEETING OF
AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL
t I .
AZUSA LIGHT & WATER FEBRUARY'25, 2008
1729 N. AZUSA AVENUE '6:30 P.M.
AZUSA, CA 91702
i
AZUSA UTILITY BOARD
i
KEITH HANKS
6:30 P.M. Convene to Regular Meeting of the Azusa Utility Board and Azusa City Council
Call to Order
Pledge to the Flag
Roll Call
IA. PUBLIC PARTICIPATION
I
(PeisonlGroup shall be allowed to speak without interruption up to five (5) minutes maximum
time, subject to compliance with applicable meeting rules. Questions to the speaker or
responses to the speaker's questions or comments shall be handled after the speaker has
completed his/her comments. Public Participation wi0 be limited to sixty (60) minutes time.)
I
I
oat
CHAIRPERSON
ANGELA CARRILLO
! IOSEPH R. ROCHA
VICE CHAIRPERSON
BOARD MEMBER
i
'ORIEL E. MACIAS
! ROBERT GONZALES
BOARD MEMBER
BOARD MEMBER
6:30 P.M. Convene to Regular Meeting of the Azusa Utility Board and Azusa City Council
Call to Order
Pledge to the Flag
Roll Call
IA. PUBLIC PARTICIPATION
I
(PeisonlGroup shall be allowed to speak without interruption up to five (5) minutes maximum
time, subject to compliance with applicable meeting rules. Questions to the speaker or
responses to the speaker's questions or comments shall be handled after the speaker has
completed his/her comments. Public Participation wi0 be limited to sixty (60) minutes time.)
I
I
oat
The Consent Calendar maybe adopted with one vote, and if so adopted the printed recommended action
will be enacted. if 5taff or Councilmembers wish to address any item on the Consent Calendar individually,
it will be considered as a SPEC/AL CALL /TEM.
B. CONSENT CALENDAR
Minutes. Recommendation: Approve minutes of regular meeting on January 28, 2008 as written.
B-1. ]an
28-Minutes.doc
2. Approval of SSC Change Order No. 10. Recommendation: Approve change to SSC Construction
Incorporated contract in amount of $22,693.21 for additional work required to relocate an existing
30 -inch waterline owned by American Water Company.
INFUfl
&2. WTP
Change0rder.doc
3. Approval to Solicit Bids for Water Project W-243, Water Treatment Plant Water Main.
Recommendation: Approve the advertisement for, and solicitation of bids for Project W-243,
installation of two water mains in Daybreak Drive and San Gabriel Canyon Drive and sewer force main
in Daybreak Drive.
B-3.
Daybreak-Wtr-Swr U
4. Approval to Solicit Bids for Water Project W-245, Water Main Replacements in various Streets to
be resurfaced as part of Year 5 Pavement Management Program. Recommendation: Approve the
advertisement for, and solicitation of bids for Project W-245, water main replacement in First Street,
Barbara Street, et. al. and replacement of water services.
13-4. Water Main
Project.doc
5. Approval of Budget Amendment for Settlement Agreement with California Parties in Amount of
$560,000. Recommendation: Approve the following resolution:
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, AMENDING THE
FISCAL YEAR 2007-2008 OPERATING BUDGET FOR THE ELECTRIC UTILITY TO PAY FOR COST OF
SETTLEMENT WITH CALIFORNIA PARTIES.
B-5.
CaFParties-Bud-Andr
002
I
C. SCHEDULED ITEMS
1. Approval of Funding Request by California Resource Connections (CRC) in amount of $15,500 for
Litter Clean-up Program and Backyard Composting(Gardening Workshop. Recommendation:
Approve: (a) proposed funding request by CRC in amount of $15,500; (b) . approve a budget
appropriation for fiscal year 2008-2009 in amount of $8,175 using AB 939 Fee Revenue to pay for
Composting/Gardening Workshop; and (c) authorize use of budgeted Beverage Recycling Container
Grant funds in amount of $7,325 to pay for the Litter Clean-up Program this fiscal year.
i � r
C-1. CRC
Proposal.doc
i
I
2. Support of Senate Bill 691 (Calderon)- Requirements !for Recycling of Non -Ferrous Metal.
Recommendation: Adopt a support position on SB 691 'and authorize staff to send letters to
P' legislators advocating the City's position. I
4 I.
I C -Z. 58691.doc
Monthly Update on Water Shortage Declaration
1
61. MY Rpt Wtr i
Shrtage.doc
{
4
2. Monthly Update on Water Treatment Plant
I� I
D-2. WTP-Moly
Update. pdf
r
3. San Juan Environmental Project and Lodi #2 Project
I
i
L I
D3. S3-Lodl.doc
. Monthly Power Resources Update
1
I
D-4 Moly Pwr Res
Rpt. ppt
� I
i
3 {
1
oas
Alley Litter/Clean Up Options
PER
D-5. Ailey
Utter.revl.doc
6. Offsite Meeting Update (Verbal)
E. DIRECTOR'S COMMENTS
I. Placement of Gladstone High School Football Boosters on permitted list of entities authorized to sell
fireworks in Azusa
F. ADIOURNMENT
I. Adjournment.
"7n compliance with the Americans with Disabilities Act, if you need special assistance to participate in
a city meeting please contact the City Clerk at 616-8/2-5229. Notification three (3) working days prior
to the meeting or time when special services are needed will assist staff in assuring that reasonable
arrangements can be made to provide access to the meeting"
004
8-1
AZUSA
CITY OF AZUSA
I
MINUTES OF THE REGULAR
MEETING OF THE AZUSA
UTILITY BOARD/CITY COUNCIL
I,
MONDAY, JANUARY 28, 2008 — 6:33 P.M.
The Utility Board Members of the City of Azusa met in regular session, at the above date and
time, at Azusa Light and Water Conference Room, located at 729. N. Azusa Avenue, Azusa,
California. I
Vice Chairman Carrillo called the meeting to order.
1.
ROLL CALL
PRESENT: BOARD MEMBERS: GONZALES, CARRILO, MACIAS, ROCHA
ABSENT: BOARD MEMBERS: HANKS
ALSO PRESENT: i
City Attorney Martinez, City Manager Delach, Director of Utilities Hsu, Assistant to the Utilities
Director Kalscheuer, Assistant City Manager Person, Assistant Director of Resource Management
i Tang, Assistant Director of Water Operations Anderson, Assistant Director of Electric Operations
Ramirez, Administrative Technician Cawte, Azusa Police Captain Streets, Finance Controller
Aguilar, City Clerk Mendoza, Deputy City Clerk Toscano.
i
Public Participation
I Mr. Dick Cortez addressed Council expressing his opinion regarding the drought and provided
Ideas on how to conserve water.
The CONSENT CALENDAR consisting of Items B -I through B-7, was approved by motion of
Board Member Gonzales, seconded by Board Member Rocha and unanimously* carried with the
exception of items B-4 and B-5, which were considered under the Special Call portion of the
I Agenda.
Call to Order
Roll Call
Also Present
Pub Part
D. Cortez
Comments
Consent Cal
Approved
1. The Minutes of the regular meeting of December 17, 2007, were approved as written. Min Appvd
i 1
2. Approval was given for the purchase of two secure storage containers to complete the recent Put storage
upgrade to the Gladstone Water Yard in amount of $ 12,741.02: containers
I
005
3. Approval was given for the addition of $22,000 to the Civiltec Engineering contract for Civiltec Engr
inspection services on Project W=238, Replacement Pipeline Installation on Cypress and Inspect sys
Sunset, et. al. in West Covina; and a three-month extension of contract to March 31, 2008. Extension
4. Special Call Item.
5. Special Call Item.
6. Approval was given to Award Contracts for Bill Print and Mail, Electronic Bill Presentment and
Payment, and Pay -By -Phone and Web Payment Options as follows: (a) Infosend
Incorporated to provide bill print and mail processing in amount of $54,600 per year for three
years, excluding postage, and electronic bill presentment in amount of $22,000 with a one-
time implementation charge of $3,250; (b) BankSery in an estimated annual amount of
$5,600 per year for three years to act as bank merchant processor for electronic automated
clearing house (ACH) payment transactions related to electronic billing; (c) Paymentus to
collect and process pay -by -phone and web payments; and (d) Global Payments to act as
bank merchant processor for one-time customer credit and debit card payments at
transaction cost to customers per $500 increment of $3.25 for residential and $3.75 for
businesses.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, APPROVING
THE LOS ANGELES COUNTY SOLID WASTE MANAGEMENT PROGRAM (SWMP) AS THE
LOCAL ENFORCEMENT AGENCY (LEA) RESPONSIBLE FOR ENFORCING ALL LAWS AND
REGULATIONS PERTAINING TO THE MANAGEMENT OF SOLID WASTE WITHIN THE CITYOF
AZUSA.
Special Call Items
Board Member Carrillo addressed item regarding retrofit of Electric Division trucks asking what
percentage the five trucks being retrofitted represents for the Electric Division, and how many
water trucks are anticipated to be retrofitted in the future; staff responded that the five trucks
represent 100% of electric and there are five water trucks in the Water Division.
Moved by Board Member Carrillo, seconded by Board Member Gonzales and unanimously*
carried to approve the bid by Ironman Emissions Group in amount of $76,585.14 to retrofit five
Electric Division diesel trucks with the Particular Matter (PM) Traps to comply with California Air
Resources Board Requirements.
Spec Call
Spec Call
Contracts
Bill Print and
Mail,
Electronic Bill
Presentment
and Payment
and Pay -By -
Phone and
Web Payment
Res. 08 -CS
LA Co. Solid
Waste
Mngmt Prgm
Spec Call
Items
Carrillo
Comments
Ironman
Emissions
Group
Board Member Carrillo addressed item regarding the purchase of two electric meter shop
Carrillo
vehicles, asking if the insurance was paid for the replacement of a truck that was stolen from the.
Comments
Electric Yard; staff responded $10,000 was received for the stolen truck and placed into the
Electric Reserve Fund.
Moved by Board Member Carrillo, seconded by Board Member Gonzales and unanimously*
Purchase of
carried to approve waive formal bidding procedures in accordance with the Municipal Code
Two trucks
Section 2-523(e) and approve the purchase of two Chevrolet 3/4 -ton 2WD extended cab work Coalinga
trucks from Coalinga Motors, Incorporated in amount of $28,850.88 each, plus a State Motors
Procurement Fee of 1.98%.
01/28/08 PAGE TWO
lir
, Scheduled Items
Director of Utilities Hsu addressed the request for approval to Increase Replacement Water Cost
Adjustment Factor stating that the water utility has had to purchase water supplied by the
Metropolitan Water District (MWD) at a higher rate and although the final billing has not been
' received for December water purchases, staff estimates "Incrementally Higher" purchased water
costs. There is a need to increase the current RWCAF by $0.2340 per•ccf, from $0.2896 per ccf.
to $0.5236 per ccf for the next two months to recover the higher incremental cost of purchased
water incurred.
Discussion was held between Board Members and staff regarding the predicament the City is in
with regard to the drought, water conservation and higher cost of purchased water. Further
discussion was held regarding the process for capturing run off water from the rain, the need to
build additional reservoirs, the need to take a holistic approach by the Legislators to work on
water issues noting it is a Statewide problem; questions were answered regarding customers
i outside the City, and Rosedale's requirements. i
k
I
Assistant to the Utilities Director Kalscheuer responded to questions stating that the RWCAF is
being reviewed every two months and staff would come back with a recommendation at March
Board meeting as to future adjustment. He advised that in light of the recent rain storms the
4Water Utility stopped purchasing water from MWD; it was noted that water purchased went into
the spreading ground to recharge the upper basin.
Moved by Board Member Rocha, seconded by Board Member Gonzales and unanimously* carried
to authorize staff to increase the Replacement Water Cost Adjustment Factor by $0.2340 per
hundred cubic feet of water effective February 1, 2008 to recover the increased cost of purchasing
water from Metropolitan Water District for November and December.
I Director of Utilities Hsu addressed request for budget amendment stating that the original budget
1 was for normal water purchases; the revenue received from customers have gone into the reserve
fund and there is a need to re -appropriate from the reserve into the budget to pay the bills.
k
Sched Items
Dir of Utilities
RWCAF
Comments
Discussion
Asst Dir of
Utilities
Response to
Questions
Inc to RWCAF
Approved
Dir of Util
Budget
Amend
Assistant to the Director of Utilities Kalscheuer responded to earlier question regarding the Asst Dir of
balance of the reserve fund stating that the reserve was about twenty million dollars before the Utilities
fifty-four million dollar bond issue. Director of Utilities Hsu stated that the amount of reserve is Response
brought back at budget time each year identifying which amounts are encumbrances or
committed and he would do the same this year. After additional discussion the following
resolution was adopted. I
Board Member Carrillo offered a Resolution entitled:
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, AMENDING THE Res. 08-C6
FISCAL YEAR 2007-2008 OPERATING BUDGET FOR THE WATER UTILITY TO PAY FOR Budget
i PURCHASED WATER. Amendment
k
Moved by Board Member Carrillo, seconded by Board Member Macias to waive further reading
and adopt. Resolution passed and adopted by the following vote of the Board Members:
AYES: BOARD MEMBERS: GONZALES, CARRILLO, MACIAS, ROCHA
NOES: BOARD MEMBERS: NONE
ABSENT: BOARD MEMBERS: HANKS
1 01/28/08 PAGE THREE
007
Staff Reports/Communications Staff Rpts
Director of Utilities Hsu provided an update on the Water Shortage Declaration, first advising that Update on
the water level in the Canyon basin has been coming up gradually and is at 40 feet below normal Water
level. The Water Master announced that for the next ten years the MWD will not be delivering Shortage
replacement water and gave a detailed explanation; he stated that he would like to stay at Stage
3 water shortage declaration due to the uncertainty of the drought. Discussion was held
regarding the results on the phases of the water drought, recent rainfall and status of the water
patrol.
The Monthly Update on Water Treatment Plant was presented, power point presentation of the Update WTP
plant was presented, and it was noted that it is 46% complete and the project may be complete
by August/September.
The Monthly Power Resources Update was presented and it was noted that California Update
Independent System Operator's (CAISO) will be updating technology which should be online on Monthly Pwr
April I "; the Garnet Wind power plant is about to construct the foundation for the Wind Farm in Resources
the Palm Springs area, and staff is working with Southern California Public Power Authority
(SCPPA) renewable resources RFP process for potentially additional renewable resources.
U.S. Department of Energy kWh Rate Survey was presented with little discussion.
Energy Survey
The 2008 Utility Board Meeting Schedule was presented and it was consensus that March 24th, Schedule of
June 23rd and October 27`h be designated as the Quarterly Off -Site meetings. Suggested_ for UB mtgs 8 -
schools to hold meetings were Powell, Magnolia, and Gladstone schools; staff will check with the Quarterly
Azusa Unified School District to confirm/seek availability of schools site. Off —site
Director of Utilities Hsu announced the California Municipal Utilities Association (CMUA) March CMUA March
Conference and requested that those members who will be attending advise his staff or City Conference
Manger's Executive Assistant, in order to make reservations for the conference.
Director of Utilities Hsu announced CMUA Capitol Day Activities providing handouts regarding The Dir of Util
California Delta, and detailed ballot initiatives with regard to Renewable Energy, Solar Programs for CMUA
schools, the Mylar Balloons and Copper thief. Capitol Day
Directors Comments Dir Cmts
Moved by Board Member Rocha, seconded by Board Member Gonzales and unanimously carried
Cert of
to approve Certificates of Appreciation to outgoing Miss Azusa, Jamie Pezold, outgoing Miss
Apprec
Outstanding Teen Jamie Alvarez, and Princess Crystal Munoz, to be presented on February 2,
Miss Azusa
2008, Miss Azusa and Miss Outstanding Teen, Pageant.
Outstanding
Teen
Board Member Rocha expressed concern regarding the palm trees at the Rosedale Promenade Rocha
and possible liability; staff advised they would report on it at the February 4`h City Council Comments
Meeting.
Board Member Macias expressed concern regarding old shoes thrown up on power lines and the Macias
possible negative connotation they portray. It was also noted that there is a need to replace Comments
burned out street light as soon as they are reported. Staff advised that shoes would be removed
and street lights replaced by Light and Water crews as soon as they are reported.
01/28/08 PAGE FOUR
The Board Members recessed at 7:34 p.m. and reconvened at 7:42 p.m. to conduct a Workshop Recess
on Solid Waste Issues. Reconvene
WORKSHOP ON SOLID WASTE ISSUES {
Workshop
Solis Waste
'Assistant to the Utilities Director Kalscheuer addressed the Workshop introducing the following
C. Kalscheuer
challenges: Long Term Disposal, Diverting More Waste, and Controlling Costs. He explained the
Comments
solid waste flow which begins with city customers to Athens's MRF, to Puente Hills Landfill and
Commerce Refuse to Energy Facility, and that Yard Waste goes directly to Puente Hills Landfill
i which will be closing in 2013. He detailed the consequence of Puente Hills closure, the challenge
of diverting more waste, and the challenge of controlling costs, how the existing contract with
;Athens helps and could hurt the City.
i
i
!Mr. Dennis Chiappetta of Athens' Services addressed the Workshop presenting the Scope of
D. Chappetta
!Services for Azusa and responded to the following: Long Term Disposal, MRF Processing,
Athen's Disp
Diversion, AB 939 Diversion, SB 1016 Projecting, AB 939 Indemnification, Yard Waste, Food
Waste, Rate Comparison, and Community Involvement.
I i
(Discussion was held regarding the presentation and language in thecontractto close gaps In
Discussion/
diversion and address residential rate spikes, the litter in alleyways, possibility of an additional
Direction
IMRF in the area; Athens was invited to attend a City Council on the Move meeting.
i.
Moved by Board Member Rocha, seconded by Board Member Gonzales and unanimously' carried
Adjourn
�to adjourn.
f
TIME OF ADJOURNMENT: 8:39 P.M.
I,
I.
f ,
SECRETARY
NEXT RESOLUTION NO. 08-C7
*Indicates Hanks absent.
k
I
1/28/08 PAGE FIVE
I
0(!9
AZUSA
.. IIGNT i RATER
Y'
E
i CONSENT CALENDAR
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOAR
AND AZUSA CITY COUNCIL�,,� )
FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES ✓! / lc�
DATE: FEBRUARY 25, 2008
SUBJECT: ADDITIONAL COMPENSATION TO SSC CONSTRUCTION, INC. FOR
ADDITIONAL WORK REQUIRED TO RELOCATE AN INTERFERING CALIFORNIA
AMERICAN WATER COMPANY WATERLINE EON PROJECT WVF-207 CANYON
FILTRATION PLANT MEMBRANE TREATMENT.UPGRADE AND EXPANSION
k
RECOMMENDATION Y
It is recommended that the Utility Board/City Council approve Change Order No. 10 for the
addition of $22,693.21 to the SSC Construction, Inc. contract for construction of Project
WVF-207, Canyon Filtration Plant Membrane Treatment Upgrade and Expansion.
BACKGROUND '
At its November 20, 2006 regular meeting, the Azusa City Council accepted the bid of SSC
Construction, Inc. to construct Project WVF-207, Canyon Filtration Plant Membrane Treatment
Upgrade and Expansion. Before to starting work on changes in construction of WVF-207, the
proposed changes and contract amount must be approved.
I
Change Order No. 10 for $22,693.21 covers the cost of materials and installation of 30 -inch
reinforced concrete pipeline and fittings to realign an existing 30 -inch waterline owned by
California American Water Company, successor to the Duarte Mutual Water Company. The
existing waterline interferes with the northwest corner of the Operations and Maintenance
Building being installed by SSC as part of the Canyon WTP-construction, and has been in place
for many decades prior to the construction of the existing Canyon Filtration Plant.
FISCAL IMPACT
This request has a fiscal impact of $22,693.21 to be funded from the Capital Improvement
Project Budget account number 32-80-000-721-7130/72107C-7130.
Prepared by:
Chet Anderson, Assistant Director- Water Operations
SSC -Cal Am pdf
i
00
at Anderson - Azusa Cal-AM Re-Route @ O&M Bldg Page 1
From: "Holden, Jacob S. (Jake)' <HoldenJS@bv.com>
To: "Chet Anderson"<canderson@ci.azusa.ca.us>
Date: 2/1/2008 11:53:58 AM
Subject: Azusa Cal-AM Re-Route @ O&M Bldg
> Hi Chet,
> Based on the discussion from the last construction meeting (1/17/08),
> it was brought to our attention that both you and Cal-AM would like to
> know whether or not the re-route of the existing 30-inch Cal-AM line
> at the south end of the O&M Building is necessary. It is our opinion
> that the zone of influence of the O&M Building loads extends over a
> significant enough portion of the 30-inch Cal-AM to deem the re-route
> necessary. In addition, the existing Cal-AM line may be fragile as it
> appears to be old concrete that is not reinforced.
> Page 2 of the attached shows the location of the Cal-AM line in
> relation to the O&M Building: '
> <<Azusa Cal-AM Pipe Relocation at O&M Building.pdf>>
> Page 2, Section 1 of the attached shows the relative location, in
> terms of elevation, between the pipe and the building foundation.
> Please note that the step in the foundation was not implemented and
> the bottom of the foundation is level across the span of the pipe.
> <<SSC_RFI_003.1.pdf>>
>
> We recommend that ALW implement the re-route.
> Thank You,
> Jake
> Jake S. Holden
> Black & Veatch Corporation
> 15615 Alton Parkway, Suite 300
> Irvine, CA 92618
> `Tel: (949) 788-4217
> `Fax: (949) 753-1252
>. Email: holdenjs@bv.com
CC: "Boss, John F." <BossJF@bv.com>, "Chow, Bruce M." <ChowBM@bv.com>,
<sseffer @ ci.azusa.ca.us>
011
Chet rriderson - SS C_RFI_003.1.pdf Page 1
15615 Plan Partway, Sute 300
trine, Carom§ 92618
Tet (949)753-0500
Fax 19491753-1252
0e
BLACK & VEATCH
i
1
Bladc& Vandi Cap"Im
March 28h, 2007
To: Angel Bautista, Project Engineer
SSC Construction, Inc. l
I
From Ashu Shirolkar, Project Engineer
Bill Brant, Structures Engineer i
Black & Veatch I
Regarding: Canyon Filtration Plant MentraneTreatmentUpgrade and Expansion,
SSC RFI #003.1
Black & Veatch Project Nurrber 140777
�Op Shop Drawing ❑x RFI ® Letter ® Other
1
Date
�Sscii mba�ng
i D�iption
N
03/22/07
1003.1
0003, SM, M
30" RNV CAL AM Line
RESPONSE (from Engineer):
We have reviewed the 30 inch pipe interferen ce with the foundation of the 0&M building. In
orderto accomrodatethe existing 30 inch pipe, tie foundation of theO&M building will need
to be revised as indicated on the attached drawing. The foundation Will be stepped up in the area
where it interferes with the pipe. The pipe shall be encased in concrete as indicated and a
minimimof12inch ofselect fill shall beplaced above the concrete encaserrent. The foundation
will bear at tie top of the select fill layer. l
Page 1 of 1
I
I
l
012
et Anderson -SSC RFI 003 t.pdf v� — Page 2
sn;yo
ea�ec
[tli90
a•o5
013
. s
�
�
Ili
i I
�
� Ate• A ♦I`�
D®
BLACK & VEATCH
15615 Alton Parkway, Suite 300 i Black & Veatch Corporation
I Irvine, California 92618 !
a
i
i
Tel: (949) 753-0500
Fax: (949) 753-1252 .
March 28h, 2007
To: Angel Bautista, Project Engineer
SSC Construction, Inc. 3
From: Ashu Shirolkar, Project Engineer
Bill Brant, Structures Engineer
Black & Veatch
i
Regarding: Canyon Filtration Plant Membrane Treatment Upgrade and Expansion,
SSC RFI #003.1
Black & Veatch Project Number 140777
❑ Shop Drawing ❑X RFI ❑ Letter ❑ Other
Date
RFI
Spec Section /Drawing
Description
Number
Number
03/22/07
#003.1
C003, 5023, S025
30" RW CAL AM Line
RESPONSE (from Engineer):
We have reviewed the 30 inch pipe interference with the foundation of the O&M building. In
order to accommodate the existing 30 inch pipe, the foundation of the O&M building will need
to be revised as indicated on the attached drawing. The foundation will be stepped up in the area
where it interferes with the pipe. The pipe shall be encased in concrete as indicated and a
minimum of 12 inch of select fill shall be placed above the concrete encasement. The foundation
will bear at the top of the select fill layer.
r
I
i
Page 1 of 1 r
®14
@@
I)
----------------------I
I
I
I
MAINTENANCE
SHOP
EL Ts0.00
L12' TMICN $ 7
3 '
I
I
I
I
1
I
I
I
I
I
I
A
TYP
12' MIN SELECT FILL
BETWEEN FOOTING 6
ENCASEMENT
.iT
L__
@• THICK SLM 7
--------------------------------,
I
I
MNSONNY DOWELS @ CENTFA OF WALL
(1YP) (SEE ONG 5001)
,
MAWAWY OONElS EACH FACE
/ I
(1HI5 WALL ONLY) (SEE ONG 5000)
I
I
I
I
OPERATIONS
EL 110.00
S
GX$
I
I
i
I
I
I
I
- - - - - - - - - - - - - - - - - - - - -
I
I
I
I
12'.(TVP
- - - - - - - - - - - - - - - - -----------
EQUIPMENT
PM (TVP) TYP A
5008
WK
1
FOUNDATION PLAN
5116• • P.O.
FACE OF MASONRY
W
FAG
(m
F$T
LTES:
ONO 5001 FOR GEOTECH NEPONT & ALLOWABLE SOIL
FQUNAATION EXGVATIONS YOS1 8E OBSEBVEO ANINEENIAtl GEOLOGIST AA9/ON PBO/ECT GEOTECNNIG
C ETOF IF C TEL
p
het Anderson - FW: Azusa COR #1 Page t1
From: "Holden, Jacob S. (Jake)" <HoldenJS @ bv.com>
To: "Chet Anderson" <canderson@ci.azusa.ca.us>, <sseffer@ci.azusa.ca.us>
Date: 2/19/2008 9:12:24 AM
Subject: FW: Azusa COR #1
Chet/Steve, i
SSC's CAL -AM line Change Order Request is attached as requested. Our
original intent was to hold on processing this until SSC provided
requested credits for other items; however, it sounds like ALW would
like to bring this before the board soon. Please advise if/when B&V's
typical review paperwork will be needed.
Thanks,
Jake
-----Original Message----- i
From: Alfredo Bautista [mailto:alfredobautista@sscconstruction.net]
Sent: Thursday, January 17, 2008 1:54 PM j
To: Holden, Jacob S. (Jake)
Cc: Boss, John F.; Chow, Bruce M.; 'Angel Bautista;
657correspondence@sscconstruction.net
Subject: FW: COR #1
Jake,
Attached please find the revised COR #1 for the CAL -AM reroute. Per our
discussion today, SSC will not proceed with procurement until
confirmation that the reroute will indeed be required. [
Thank you,
Alfredo Bautista
SSC Construction, Inc.
I. -----Original Message -----
From: Azusa HP Printer [mailto:azusa@sscconstruction.net]
Sent: None
To: ALFREDOBAUTISTA@SSCCONSTRUCTIO
Subject: COR #1
Please open the attached document. This document was digitally sent to
you
using an HP Digital Sending device. I
CC: "Boss, John F." <BossJF@bv.com>, "Chow, Bruce M." <ChowBM@bv.com>
i
I
B
SSC Construction, Inc
Cost Breakdown
30" Pipe Relocation for Southwest Corner of O&M Building
Materials
Pipe Materials
Concrete for Encasement & Trust Blocks 5 Yds @ 125Nd
Sub -Total
Equipement
John Deer Excavator
Water Truck
Crew Truck
Misc Tools
Labor
Sub -Total
8 Hrs @ $ 175.00/Hr
4 Hrs @ $ 45.00/Hr
8 Hrs @ $ 25.00/Hr
8 Hrs @ S 25.00/Hr
S 10,845.00
S 625.00
$ 11,470.00
$ 1,400.00
$ 180.00
S 200.00
$ 200.00
$ 1,980.00
Foreman 4Hrs @ $ 75.00
$
300.00
Labor 3 Labors @ 24 Hrs $ 65
$
4.680.00
PM Time 3 Hrs @ $95
$
285.00
Sub -Total
$
5,265.00
Total Labor Materials & Equipment
$
18,715.00
Mark Up for Material Labor & Equipment
$
2,807.25
Taxes For Material
$
946.28
$
22,468.53
Bond & Insurance
$
224.69
Total Change Order Request $ 22,693.21
0,1"7
;SSC Construction, Inc. I CHANGE ORDER RI;QI'EsT
,2073 Railroad St. I No 00001
Corona. CALIFORNIA 92880 ------ - -
TITLE: O&M Building 30" CAL -AMI Reroute DATE: 1/9/2008
t
PROJECT: Canyon Filtration Plant JOB: 657
TO: Attn: Jake S. Holden t CONTRACT NO: I
Black & Veatch Corporation
t
15615 Alton Parkway t
Suite 300 t
Irvine, CA 92618
r
Phone: (949) 788-1252 Fax: (949) 753-1252
I
RE: To: From: 3 Number:
DESCRIPTION or PROPOSAL
Additional Cost for completion of 30" CAI, AVI Pipe relocation %coli:. II
I
Ilem Description Stock# Quantity Units Unit Price 'roc Rate Tax Amount Net Amount
00001 Materials: Pipe, Concrete, 1 000 SI i.470.00 8.25% S911628 5:1;170.00
i Sand
`0002 Labor R Equipment 1000 I S7.245.00 0.00% 50.00 $7.245.00
,PPROVAL:
By:
Jake S. Holden
late:
I
I
Description
Contractor Markup 150/1
Bond & Insurance 1W
I
i
I
Unit Cost:
Unit Tax:
Unit Total:
Subtotal:
S18.715.00
S946.28
S19,661.28
S19,66I.28
;Markup Percent Markup Amount
S2,807.25
$224.69
Total Cost: 522,693.22
t
►
Alfredo Bautista
Date: I (r ? /
!
018
CONSENT CALENDAR
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD
AND AZUSA CITY COUNCIL
FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES
s „JJ
DATE: FEBRUARY 25, 2008
1 1
SUBJECT: APPROVAL TO SEEK BIDS FOR THE INSTALLATION OF PROJECT W-243, WATER
TREATMENT PLANT WATER MAIN IN DAYBREAK DRIVE AND SAN GABRIEL
i
CANYON AND SEWER FORCE MAIN IN DAYBREAK DRIVE
P
RECOMMENDATION I
It is recommended that the Utility Board/City Council approve the advertisement for, and
solicitation of bids for Project W-243, installation of Two Water Mains in Daybreak Drive and
San Gabriel Canyon Drive and Sewer Force Main in Daybreak Drive.
BACKGROUND
The Water Division is currently installing improvements to the Canyon Water Filtration Plant
located on Ranch Road. In order to receive supplemental water at the Filtration Plant, an 18 -
inch waterline must be installed from the San Gabriel Valley MWD turnout on San Gabriel
Canyon Boulevard to the Filtration Plant, and to distribute the treated water from the Filtration
Plant to the Water System, a 24 -inch waterline must be installed from the Filtration Plant to
Sierra Madre Boulevard. The Plant project also includes connecting the Plant to the Los
Angeles County Sanitation District sewer line in San Gabriel Canyon Boulevard by means of a
6 -inch force main in Daybreak Drive. i
FISCAL IMPACT
The fiscal impact of this project will be funded from Capital Improvement Project budget
account 32-80-000-721-7130/72107C-7130, which has a current balance of about $25.9
million. The 2006 Revenue Bonds serve as the funding source for this project along with the,
Canyon Filtration Plant Membrane Treatment Upgrade and Expansion Project.
Prepared by:
Chet Anderson, Assistant Director- Water Operations
Dig
CONSENT CALENDAR
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD
AND AZUSA CITY COUNCIL % T
FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES
DATE: SEPTEMBER 25, 2006
i
SUBJECT: APPROVAL TO SEEK BIDS FOR THE INSTALLATION OF PROJECT W-245, WATER
MAIN REPLACEMENT IN FIRST STREET, BARBARA STREET, ET. AL. (VARIOUS
STREETS TO BE RESURFACED AS PART OF YEAR 5 PAVEMENT MANAGEMENT
PROGRAM) AND REPLACEMENT OF WATER SERVICES IN VARIOUS STREETS
RECOMMENDATION
It is recommended that the Utility Board/City Council approve the advertisement for, and
solicitation of bids for Project W-245, Water Main Replacement in First Street, McKinley St.,
Roosevelt St., Paramount St., Barbara Street, Virginia St., arid Replacement of Water Services.
BACKGROUND
The Water Division has a program of replacing water mains that are experiencing problems
with leaks and that are, for various reasons, experiencing flow and pressure problems. The
mains to be replaced in this project have both leak problems req uiring. constant repair and
deliver less flow than is optimal for current residential area standards. Also, the mains to be
replaced in the named streets are in streets designated by Public Works as Year 5 Pavement
Management Program to be resurfaced this fiscal year. This project will allow the Water
Division to lessen the probability of leaks within the newly paved streets. In all, approximately
1800 linear feet of water main and 36 water services will be replaced.
FISCAL IMPACT
There is no immediate fiscal impact to the bidding of this project. This item will be Funded
from Capital Improvement Project Budget, account number 32-80-000-721-7130/72107B-
7130,
2-80-000-721-7130/72107B-
7130, which has a current balance of about $930,000. If necessary, staff will propose a
budget amendment when award of this project is considered.
Prepared by: Chet Anderson, Assistant Director- Water Operations
r
USA
• wx+ry
CONSENT CALENDAR
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD
AND AZUSA CITY COUNCIL 7
FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES
DATE: FEBRUARY 25, 2008 !,
iSUBJECT: BUDGET AMENDMENT — SETTLEMENT AGREEMENT WITH CALIFORNIA
{{ PARTIES
I RECOMMENDATION
I
It is recommended that the Utility Board/City Council adopt the attached resolution
authorizing a budget amendment of $560,000 to pay for the costs under a settlement
agreement with California Parties.
BACKGROUND
The City has been negotiating with California Parties (the investor owned utilities; the CPUC;
and the Attorney Generals' office) in the past eighteen months to settle litigious issues in
connection with the 2000-2001 California energy crisis. The settlement agreement is to be
executed by all Parties within one week. As part of the 'settlement, the City will pay cash
consideration of $560,000 to resolve previously claimed overcharges for wholesale power
sold to the California Independent System OperatorR markets. The proposed budget
amendment is needed to pay the cost under the settlement agreement.
FISCAL IMPACT !
A budget amendment of $560,000 is needed to pay for the cost under the agreement. Funds
are available from Electric Utility fund balances for this budget item.
I
Prepared by: Bob Tang, Assistant Director of Resource Management
7 ml
Reso.doc
021
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF AZUSA, CALIFORNIA, AMENDING THE FISCAL
YEAR 2007-2008 OPERATING BUDGET FOR THE
ELECTRIC UTILITY TO PAY FOR COST OF
SETTLEMENT WITH CALIFORNIA PARTIES.
WHEREAS, the adopted Fiscal Year 2007-2008 Operating Budget for the Electric
Utility included $33 million to pay for purchased power cost; and
WHEREAS, the City has been in negotiation with California Parties in the past eighteen
months to resolve 2000-2001 California energy crisis related issues; and
WHEREAS, a settlement agreement has been reached and will be executed shortly; and
WHEREAS, Azusa Municipal Code Section 2-450 requires that all budget amendments
between $100,000 and $1 million be approved by resolution; and
WHEREAS, the cash consideration under the settlement agreement is a payment of
$560,000 to the California Parties within five days of the execution of the settlement agreement.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AZUSA, DOES HEREBY
RESOLVE AS FOLLOWS:
SECTION 1. That the Electric Utility Fiscal Year 2007-2008 Operating Budget is
hereby amended in the amount of $560,000 to pay for cost of settlement
with California Parties, budget expense account number 33-40-775-550-
6590.
SECTION 4. The City Clerk shall certify to the adoption of this Resolution.
PASSED, APPROVED AND ADOPTED THIS 25th day of February, 2008.
Joseph Rocha, Mayor
ATTEST:
Vera Mendoza, City Clerk
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
022
y
CITY OF AZUSA
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Utility Board/City
Council of the City of Azusa at a regular meeting of the Azusa Light & Water Utility Board on
the 25th day of February, 2008. i
i
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
Vera Mendoza, City Clerk
023
Id
I
Avg
AGENDA ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD
AND AZUSA CITY COUNCIL nn T 1
FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES 63� (
DATE: FEBRUARY 25, 2008
SUBJECT: REQUEST BY CALIFORNIA RESOURCE CONNECTIONS FOR $15,500 TO
CONDUCT LITTER CLEAN-UP PROGRAM AND COMPOSTING / GARDENING
WORKSHOP
RECOMMENDATION
i
It is recommended that the Utility Board/City Council approve: (1) proposed funding request
by California Resource Connections in amount of $15,500; and (2) approve a budget
appropriation for fiscal year 2008-2009 in amount of $8,175 using AB 939 Fee Revenue to
pay for a Composting / Gardening Workshop; and (3) authorize use of budgeted Beverage
Container Recycling Grant funds in amount of $7,325 to pay for Litter Clean-up Program this
fiscal year.
BACKGROUND I
I
In August 2007, the City Council approved a Memorandum of Understanding (MOU) with
California Resource Connections (CRC). The MOU was twofold. First, with about $52,500 in
funding, it required CRC to make improvements to the Taylor House located in San Gabriel
Canyon across the river from the former EI Encanto Restaurant. Second, the MOU committed
j the City to provide $10,000 in funding to CRC for "environmental programs:' Vulcan Materials
donated $50,000 in initial funding for improvements of the Taylor House property and Azusa
Light & Water contributed $2,500 given CRCs promise to educate the public about the
importance of the San Gabriel River as a water source and the need to keep it clean.
At this time, CRC, through attached proposal, requests $15,500 in funding to conduct two
environmental programs: (1) a river education and cleari up event in April 2008 to coincide
with the City of Azusas Clean, Green, More Beautiful Azusa Celebration, and (2) a compost
i
and gardening workshop to be held in September 2008 at the Taylor house. As part of the
compost workshop, CRC would provide free compostl bins to residents which would be
purchased with funds provided by the City. The cost of, the compost bins would be about
$5,500 and so this is why the funding request exceeds the amount in the MOU. However,
4 compost bin give -a -ways are common amongst City recycling programs and so staff
If 024
t� �
recommends approval of the higher amount using AB 939 fee revenues.
FISCAL IMPACT
Total cost of this approval is $15,500. Of this total, $7,325 will be provided from existing
budget using account number 28-40-750-064-6625, or block grant funds from State of
California for Beverage Container Recycling and Litter Clean-up. Since the Composting
Workshop being proposed is scheduled for next fiscal year, $8,175 will be budgeted for this
program in next years operating budget using AB 939 program fund since backyard
composting is an eligible use of these funds.
Prepared by:
Cary Kalscheuer, Assistant to the Director of Utilities
It
CRC Proposal.doc
025
CALIFORNIA RESOURCE CONNECTIONS, INC.
1201 N. Azusa Ave. • Azusa, CA 91702 • 626.969.2491 • bugsuzanneOverizon.net
I
To: Robert Person, Assistant City Manager
City of Azusa
From: Suzanne Avila, Program Director
California Resource Connections, Inc.
Date: December 31, 2007 I
i I
Re: Proposal for education programs and activities pursuant to
I.
Memorandum of Understanding relating to the improvements of the
Taylor Property, 2330 N. San Gabriel Canyon Road, Azusa - Aug 2007
Budget Item 1C: The Canyon Institute Program Implementation
i
Attached is a proposal, submitted by California Resource Connections, Inc. (CRC),
for environmental education programs and activities at the Azusa River Wilderness Park as
outlined in the August 2007 MOU between the City of. Azusa and CRC relating to the
improvements of the Taylor Property. Program application guidelines are identified in the
f
MOU as Budget Item #1C.
CRC is a non-profit working to develop the Azusa River Wilderness Park along with
its main partners the Watershed Conservation Authority/Rivers and Mountains
Conservancy and the California Conservation Corps. All program events planned are
j environmentally -conscious, community-based, and have an educational activity as a main
component. The goal of providing programs at the Azusa River Park is to educate
l residents on the inherent value of the natural resources of the San Gabriel River
watershed.
CRC, and its main partners, will work with several City of Azusa departments to
develop and produce these events and also outreach to other community organizations to
build our partnership base in planning for these and additional future events. It is a
pleasure to work with the City of Azusa in creating arid developing recycling and other
conservation programs at the Azusa River Wilderness Park in the Canyon City!
026
EXERPT FROM THE AUGUST 2007 MOU RELATING TO THE IMPROVEMENTS OF
THE TAYLOR PROPERTY BETWEEN THE CITY OF AZUSA AND CALIFORNIA
RESOURCE CONNECTIONS, INC.:
BUDGET ITEM - 1C: The Canyon Institute Program Implementation
The City shall consider funding for CRC educational outreach programs and activities in
amount of $10,000 as part of separate Program Application.
Program Application shall center around the following types of Outreach Programs and
target Azusa residents:
1. Watershed history and use of river water
2. River safety
3. How to keep the river water supply clean
4. How and why to conserve water
5. Natural and geologic setting of river, including plants and wildlife
CRC may also propose environmental activities or events, such as:
1. Litter cleanups along the river banks, coupled with watershed education
2. Science programs to test river water quality, and assess geologic and botanical
surroundings
3. Workshops on native plants and water conserving irrigation systems
4. Workshops on backyard composting and gardening
5. Activities to educate youths on storm water pollution prevention, e.g., storm drain
stencils from Heal the Bay
6. Library Reading Program/Friends of Library event
7. Homework House After School Program (Eco Club)
8. Recreation and Family Services — Summer Program
9. Azusa Pacific University — Think River!
10. Earth Day Event
Proposals for such education programs and activities are due by December 31, 2007 to
the City of Azusa for review and funding consideration, for subsequent 12 months.
Each Program/Activity Application To Include:
1. Description of Program
2. Dates when program or activities will be carried out
3. Description of how program helps the City comply with environmental regulations
4. Description of Target Audience
5. Description of How Program will be advertised and marketed
6. Description of Materials to be used in conducting outreach or activities
7. List of all costs associated with program or activities
8. Description of funding from other agencies or in-kind labor/volunteers
9. Description of how program results will be measured reported to the City
2 027
i
Program Partners:
It is desirable that additional Program sponsors be solicited for funding or in-kind
support. The following may be considered:
1. Corporate sponsors
2. (Intentionally left blank)
3. Federal, State, and private grants '
4. Water Agencies
5. Congressional Appropriations M
>
3 028
Azusa River Park 2008 Program/Activity Application
Description of Program
California Resource Connections, Inc. (CRC), and its main partners, the Watershed
Conservation Authority/Rivers and Mountains Conservancy (WCA/RMC) and the California
Conservation Corps (CCC), are proposing 2 community environmental education events for
2008 to be offered at the Azusa River Wilderness Park.
All events exemplify environmentally -conscious programs that are community-based and
have an educational activity as a main component. The goal of providing programs at the
Azusa River Park is to educate residents on the inherent qualities of the natural resources
of the San Gabriel River watershed. CRC and its main partners will work with several City
of Azusa departments to develop and produce these events and also outreach to other
community organizations to build our partnership base.
Descriptions for each of the 2 proposed programs are listed below, followed by a budget,
and then the remaining application questions.
1 — "Think River! — Think Green, Clean, and Lean" Clean Up as part of Clean and
Green Campaign
Date: 04/12/08 Saturday 9:OOam—11:30am
Description: This San Gabriel River clean up will be advertised as part of the City's
April Clean and Green activities. Outreach will be made specifically to Azusa schools K-12,
including the Jr. ROTC at both Azusa and Gladstone High Schools, and also to Citrus
College and Azusa Pacific University emphasizing the fact that students can earn
community service hours by participating. The day's activities will begin at the Azusa River
Park/EI Encanto parking lot with a sign up list, morning snacks, and brief welcoming
remarks. Recycling practices will be utilized when serving and cleaning up the snacks. All
those participating will then be rotated through three 10 -minute educational sessions that
will cover the following topics: definition of the San Gabriel River Watershed, how trash
affects water quality, and safety along the river. Gloves and trash bags will be distributed
during the educational sessions. Participants will then be escorted safely across Highway
39 to the northern terminus of the Azusa River Bike Trail and asked to walk south, picking
up litter along the way. CCC members will be walking continuously up and down the bike
trail to ensure safety of participants and to disseminate event information as needed. Two
stations will be set-up strategically as one -mile markers along the trail and staffed with
volunteers to give participants an opportunity to drink water and head back north if they
chose. Turn around point is at Lario Park (Foothill Blvd and the San Gabriel River). At
Lario Park, participants will have access to hydrating refreshments, an educational display
hosted by a Park Ranger that focuses on native plants and animals, and free public.
informational give-aways solicited from local conservation organizations. Conclusion of
events is at EI Encanto where all trash bags will be collected, counted, and disposed of
properly.
Target Audience: Students, families, the community at -large
029
In -Kind LaborNolunteers:
SPONSOR
INCOME
I RESOURCE
Azusa Historical Society
In -Kind
Historical displays of the San
Gabriel River
Azusa Light & Water
In -Kind
Advertised as part of City's Clean
and Green Campaign
Azusa Recreation and Family
In -Kind
Advertisement in 2008 Activity
Services
Guide
California Conservation Cors
In -Kind
Crew for event set up and removal
California Conservation Corps
In -Kind
Event leaders with presence along
the bike path to aid, escort, educate
participants
Watershed Conservation
In -Kind
Park Ranger as instructor/trainer for
Authority
safety session
Watershed Conservation
In -Kind
Park Ranger hosting native plant
Authority
and animal display
F
2 — Community Gardening and Composting Workshop
Date: 09/20/08 Saturday 9:00am—11:00am
Description: The goal of this event is to educate residents on native plant gardening
and various methods of backyard composting, including vermiculture. Outreach will be to
Azusa teens (via their high school science class), families, and the community at large.
Free compost bin give-aways will be advertised prominently as a draw (proof of residency
required/one per household). The workshop will take place at the Canyon Institute, former
Taylor Property, to allow for site vegetation to be utilized as part of the native plant
demonstration. Morning check-in will begin with a sign in sheet where addresses will be
collected while light snacks are served. Recycling practices will be utilized when serving
and cleaning up the snacks. Brief welcoming remarks will introduce the certified
Landscape Architect and/or Master Composter who will conduct the educational
demonstrations, complete with a safety lesson. Supplies and materials will be available for
participants to practice safely on site under the guidance of a landscape professional.
Biostack composting bins will be given away to those in attendance. Additional educational
materials regarding sustainable practices will be available for participants to take home.
Should funding be available in subsequent years, participants will be required to pre -
register so that their address can be checked against those that received a free bin in the
previous year. The workshop will conclude by disseminating 3 x5 cards that contain
information of resources that participants are encouraged to follow up with (i.e. websites,
book titles, journals, regional native plant sites, future watershed related events, etc.).
Target Audience: Teenagers to Adults
In -Kind LaborNolunteers:
j.
SPONSOR INCOME RESOURCE
I
030
Azusa Historical Society
In -Kind
Historical displays of the San
Gabriel River
Azusa Recreation and Family
In -Kind
Advertisement in 2008 Activity
Services
Guide
California Conservation Corps
In -Kind
Event leaders for demonstrations,
Parking patrol
Rainbow Canyon Equestrian
In -Kind
Use of property for off site parking
Ranch
List of all costs associated with program or activities
See chart below.
Description of Materials to be used in conducting outreach or activities
See chart below.
6 031
7 032
ESTIMATED
EVENT/MATERIALS
FUNDING
PARTNER
NEEDED
REQUESTED
CONTRIBUTION
TOTAL
1,
1
River Clean Up as part of Clean and Green Cam ai n
Program Planner(s) stipend for
$5,525.00
$5,525.00
85hours @ $65.00/hour
i
Trash Bags
$100.00
$100.00
Disposable Gloves, non Latex
$100.00
$100.00
Port-a-Pottie x 3
$1,600.00
i
$1,600.00
Trash Bins x 3 @ $105.00 eachL
$315.00
$315.00
Water
$500.00
$500.00
Snacks (Fruit, Bread, Orange
$100.00
$100.00
Juice
CCC donation of Corps
$920.00
$920.00
Members/Event Leaders
40 hours @ $23.00 hour
LA County/Lario Park donation of
f $100.00
$100.00
restroom maintenance
4 hours @ $25.00 hour
WCA donation of MBCA Ranger
1 $300.00
$300.00
as parking patrol at EI Encanto
�.
4 hours @ $75.00 hour
WCA donation of MRCA Ranger
$300.00
$300.00
as instructor of safety session and
mid -point educational display on
,
native plants and animals
i
4 hours @ $75.00 hour
Event 1 Total
$9,860.00
2
Community Gardening and ornposting Work hop
Program Planner(s) stipend for
$2,675.00
$2,675.00
41.15hours @ $65.00/hour
Composting Bins
$5,500.00
$5,500.00
Smith & Hawken Biostack
I
100@$55.00 each
Water
$500.00
$500.00
Snacks (Fruit, Bread, Orange
$100.00
$100.00
Juice
CCC donation of Corps
$368.00
$368.00
Members/Event Leaders
16 hours @ $23.00 hour
Event 2 Total
$9,143.00
TOTAL AMOUNT
$15,500.00
$3,503.00
$19,003.00
REQUESTED
7 032
Description of how program helps the City comply with environmental
regulations
Communicating directly with Azusa Light and Water Representative(s) will be a guiding
component of planning the events. All data gathered from participants will be solicited and
compiled according to the requirements of any agency regulations that the City reports to
(i.e. TMDL's, beverage recycling count, etc).
Description of How Program will be advertised and marketed
Azusa Herald
Azusa Pacific University
Azusa Unified School District
Citrus Community College
City of Azusa
On-line calendar
City Council meetings during public participation
City hall marquee
Friends of the Library newsletter
Light and Water Clean and Green Campaign
Recreation and Family Services Activity Guide
Rotating cable bulletin
Woman's Club newsletter
CREEC—LA (California Regional Environmental Education Community — Los Angeles)
San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy web site
San Gabriel Valley Tribune
Description of how program results will be measured and reported to the City
Data on participants and outcomes will be collected at each event, along with
organizational information such as number of volunteer hours received, in kind donations
and amount of contributions. CRC shall provide the City with a report by December 31,
2008 of all outcomes, including participant data, any survey information collected, and a
final budget showing all expenditures.
Program Partners:
The following organizations will be contacted for possible partnership opportunities
Corporate Sponsor
Athens Services
CEMEX
033
i
COSTCO
EI Nativo Growers
Miller Brewing Company
Naked Juice
Rain Bird Corporation ;
REI
U.S. Forest Service
Vulcan Materials Company
Federal, State, and private grants
The Canyon City Foundation i
Water Agencies
Azusa Light and Water
Metropolitan Water District, Community Partnering Program
San Gabriel River Water Committee
Congressional Appropriations
I
Not applicable. (Congressional appropriations requested in 2008 would
not be reviewed/received until 2009).
I
i
034
AGENDA ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD
AND AZUSA CITY COUNCIL
FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES 1.%��t.J—/ /[)7�% laer`1
,
i
DATE: FEBRUARY 25, 2008 1
SUBJECT: SUPPORT OF SENATE BILL 691 (CALDERON) -- REQUIREMENTS FOR
RECYCLING OF NON-FERROUS METAL
s
RECOMMENDATION
It is recommended that the Utility Board/City Council adopt a support position on SB 691 and
authorize staff to send letters to legislators advocating the City's position.
BACKGROUND
Theft of non-ferrous metals such as copper has been on the rise this past few years due to
the increasing value of the commodity. The problem has become so prevalent that structures
at construction sites are often targeted and stripped of copper pipes or conduit; fire hydrants
have been stolen, and materials have been stolen from utility storage yards. SB 691
(Calderon) was introduced to combat this problem by requiring recycling centers who pay for
such metals to pay by check and obtain identifying information from those individuals who
sell such materials or items for cash. Files identifying sellers are to be kept on hand for a
period of 2 -years. Sales less than $20 would be exempt from the requirements of this bill as
would beverage containers.
I
FISCAL IMPACT
There is little fiscal impact of the City supporting this bill. ;The Utility has already experienced
theft of its supplies and in some cases infrastructure, and passage of this bill may deter
further theft of valuable equipment and supplies. E
r
Prepared by: Cary Kalscheuer, Assistant to the Director of Utilities
035
INFORMATIONAL ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD
AND AZUSA CITY COUNCIL I }} r
FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES 0
DATE: FEBRUARY 25, 2008
r
SUBJECT: PHASE 3 WATER SHORTAGE DECLARATION STATUS REPORT (VERBAL)
Two articles are attached for the Board's information regarding ongoing concerns related to
the drought and regional water supply. One relates to the Sacramento -San Joaquin Delta and
potential problem presented by the California Fish and Game Commission voting to protect a
fish called the longfin smelt. The other article relates to ongoing local concerns as referenced
by the Watermaster, and other local entities, especially potential impacts of the Metropolitan
Water District's changing policies. I
More information will be provided verbally on the water shortage by Director of Utilities at the
Utility Board meeting.
Prepared by: I
Cary Kalscheuer, Assistant to the Director of Utilities J
Attachment:
I
Drought Arti s.pdf '
i
I
036
Fish rescue may mean drier times - sacbee.com
1te iu+51r of7TeS�mnhino Ra
This story is taken from Sacbee / News.
Page 1 of 3
Fish rescue may mean drier times
To save the longfin smelt, a state panel sets new rules for
exporting Delta water.
By Matt Weiser - mweiser@sacbee.com
Published 12.00 am PST Friday, February 8, 2008
The Bay Area and Southern California could be in for deeper water shortages this year after state
officials on Thursday decided to protect another Delta fish.
The California Fish and Game Commission, meeting in San Diego, voted unanimously to protect the
longfin smelt under the state Endangered Species Act.
The finger -length fish is now officially a candidate for stronger protection. State officials will spend the
coming year deciding whether its status should be "threatened" or "endangered."
Meanwhile, to protect the longfin, the commission also set new rules for state and federal agencies that
export water from the Sacramento -San Joaquin Delta to 25 million Californians and 2 million acres of
farmland.
This could mean drier times ahead for parts of the state already dealing with shortages because of the
Delta's troubles.
"It's fair to say this is just another notch in the chokehold that is tightening our ability to move water,"
said Laura King -Moon of the State Water Contractors, which represents most of the agencies that buy
Delta water from the state.
The longfin smelt is one of nine Delta fish species to suffer steep declines over the past five years. Last
year, the longfin population was the lowest in 40 years of record-keeping.
State and federal water pumps in the Delta are blamed for killing millions of fish, but other culprits
include poor water quality and invasive species.
Government officials are working on plans to protect the Delta. But those will take years and billions of
dollars. Hardships are coming in the meantime.
Commission President Richard Rogers said he felt forced into a decision he called "repugnant."
"The piper is standing at the door with an ax," he said. "This is something we have to solve and we have
to solve now."
State action to protect the longfin came after a petition by environmentalists. A similar petition is
pending under federal law.
http://www.sacbee.com/101/v-print/story/697540.htrnl 2/11/2008
037
Fish rescue may mean drier times - sacbee.com Page 2 of 3
"There is absolutely no doubt the species merited listing and is in desperate need of protection, along
with its habitat," said Tina Swanson, 'a scientist at the Bay Institute, one of the petitioners.
Rules adopted Thursday closely match limits imposed by a federal judge in December to protect the
Delta smelt, a cousin of the longfin.
Court restrictions slashed water deliveries by 42 percent in January, shorting water agencies about
1269,000 acre-feet, said Terry Erlewine, general manager of the State Water Contractors. That's enough
for about a half -million homes.
But the longfin has a different life cycle, generally breeding earlier in the year. So the Department of
Fish and Game called for pumping limits that could begin earlier in the fall and possibly extend deeper
into spring.
The commission adopted those limits, voting 3-0, with two members absent.
The new rules take effect later this month and will be in place through August. The commission then
expects to extend them another six months.
By then, state and federal officials intend to adopt new operating rules for water pumps that come with
permanent protections for Delta fish. `.
There is some doubt about whether Thursday's actions must bel heeded by the U.S. Bureau of
Reclamation, which operates the Delta's federal pumping system. So the commission will ask the state
Water Resources Control Board to also adopt the rules, which would then be binding on the bureau.
j Jeff McCracken, a spokesman for the bureau, did not comment on how his agency will respond, saying
officials had not yet reviewed the new rules.
j Water agency representatives at Thursday's meeting warned the state's new rules would only lead to
protracted litigation. I
They complained of being singled out, while other Delta threats are ignored.
They urged the commission to force agricultural water diverters within the Delta to screen intakes, for
instance, and end protection of the striped bass, a nonnative species blamed for preying on protected
fish. j
i
Water users favored having the federal court's Delta smelt limits cover the longfin as well, since the
species are similar. I
i
"If you have an umbrella that keeps you dry, you don't need two umbrellas," said Jerry Johns, deputy
director of the state Department of Water Resources. I
I
The commission instead agreed with state biologists that the longfin's unique breeding cycle demands
special rules. Commission members also ordered a staff report on possible steps to control other threats.
"We're really concerned about the health of the ecosystem, not just the health of this fish," said
commissioner Michael Sutton.
Go to: Sacbee / Back to story
This article is protected by copyright and should not be printed Or distributed for anything except personal use.
The Sacramento Bee, 2100 Q St., P.O. Box 15779, Sacramento, CA 95852 f_
Phone: (916) 321-1000
http://www.sacbee.com/101/v-print/story/697540.html 2/11/2009 1
I j;
Pasadena Star -News - Pulling out of the drought
Page 2 of 2
Second, the region must invest in ways to better
capture storm run-off. One idea that should be
explored is to establish a fresh water harbor at
the end of the San Gabriel River in Long Beach.
Captured run-off would then be used to recharge
drinking wells.
The low-tech way to capture more rainwater is
to return land to its pristine state. Re -greening
the Arroyo Seco, the Los Angeles, San Gabriel and
Rio Hondo rivers would increase the amount of
porous surface for rainwater recharge.
We're pleased to hear the Watermaster is
working with the Rivers and Mountains
Conservancy to find more land for preservation.
More green space - especially along our rivers -
will send millions of gallons of rain and storm
water back into underground aquifers.
What about consumers? We'd rather use
carrots than sticks for increasing conservation.
More agencies should follow the lead of the
Upper San Gabriel Valley Municipal Water District
which gives away low -flush toilets, water -stingy
shower heads and promotes water -efficient
dishwashers and washing machines. All new
buildings should be water wise and include
drought -resistant landscaping.
With these carrots, plus the good news of a wet
year and a healthy snowpack both locally and in
Northern California, cities such as Covina, Azusa
and Glendora should suspend plans for
mandatory water rationing. Requiring
homeowners to use 10or 20 percent less water
penalizes those who had been conserving and is
unfair to senior citizens who use very little water
anyway.
We're seeing a rainbow at the end of the
drought. Now, if only we could harvest that pot of
gold.
-----------------------------------------------------------------------------
e
i cznces veion e
FREE Twenty 4x6' basic prints
r ,
° � � � II�B�lilll��llll�lll�llll�
, mko.anet a,:a�n ene+ar=:ane iees.m»rapnra-�mno,o es rteiocamr. ryeu.Onc na�.mte er:h iomaM�e
mwc.iv. uma am nc� v oiM ec m�e+.. oea,a waecee,m rnMs.mcee �ro eoaes >;cw2 e�,k. wa n caoee.„se. r
r rucwsM.mA]n•cmHm MwM'.ra crsn w�ue..x-.am�.+,:esei.aut E<m ro�comryem o -x wm.
9856-0113-2647-56/9-037E5806-89 �
____________________________________________________________________________J
Print Powered By rd Fcrma'tDynamics”
http://www,pasadenastarnews.com/opinions/ci_8218125 032/119/2008
Pasadena Star -News - Pulling out of the drought
OUR VIEW
Pulling out of the drought
Article Launched: 02/092008 06:16:54 PM PST
To water managers, the snow-capped San
Gabriel Mountains are more than just pretty
postcard material. They represent a return to
normal well capacities.
The future snow melt that will slowly percolate
into groundwater recharge areas well into
summer along the San Gabriel and Rio Hondo
river banks is the key to ending years of drought.
Is the region ready to capture this bounty? Or will
it be wasted?
Rainfall in downtown Los Angeles this season is
four inches above normal. Behind the Santa Anita
Dram, seasonal rain has equaled more than 20
inches. The winter storms and more importantly,
melting mountain snowpack will "definitely" be
good news for Azusa and Glendora, which draw
from canyon wells and are most affected by a
local drought, experts say. The key San Gabriel
Basin well down 26 feet in December '07 over
December '06 - will be on the rise. A state
Department of Water Resources web site shows
key reservoirs in central and Northern California
at or approaching normal percentages as of Jan.
29.2008.
So why aren't water folks cheering? They
are like the American voter, worried about the
tanking economy, gridlocked political
environment and ominous environmental news -
yet despite a gloomy outlook are voting in higher
numbers. As Barrack Obama would say, do the
water folks have the audacity to hope? Hope that
California is showing signs of crawling out of a
drought?
i
"This (rainfall, snow pack) is definitely going to
help," said Carol Williams, general manager of
the Main San Gabriel Basin Watermaster. But she
said we'll need another wet year in '08-'09
before she and others would pronounce the
drought dead. I
i
We understand such cautious optimism. The
Watermaster is facing a go -it -alone future from
mighty Metropolitan Water District, which has
suspended its delivery of imported water for
replenishing our overdrawn basins. Instead of
annually, that may happen 'three out of 10
years," she said.
Actually, going independent may be the best
thing for communities sitting on top of ground
water supplies. It is the stimulus this region
needs to fix its own water problems.
I
As Rep. Grace Napolitano said last week, it will
take a lot of agencies and people working
together. We have some project suggestions:
First, dean -up of polluted pockets of the basins
must be accelerated. Yes, there's been
progress. But cities, water agencies, the EPA, the
state and the responsible parties must put more
money into finishing the job. Having a pollution -
free aquifer will establish San Gabriel
Valley's water independence.
----------------------------------------------------------------------------t
1 I
I � [%PIRCS JIB/0.9 I
1 ,
FREE Twenty 4x6' basic prints
1
1
I (Y'Cnre b`b n1 iR'eHC"0.�1l aryatalntl. Gn fn iO¢f.fM/PMloba:ekxtW..ennMe[1'au.OlmlbafevknL 'etl In nna�bn
9656-0tiI
'— :vpacM. limp PnP ile^�aolk^Cy-m'�mn. Cper,d maiolYe la.'aM1ls cIX: an ll,a SWet Rcl�m Ccsk. `.tiPil <npeO. M1nnslrnetl. I
pvcax.'l. ecuarm'l+"nmb...rm mnw�n xaemum rolCl v"uf<mlu rana,w vee Pne,. � 32647-5949-D376-5806-69
I
I--------------------------------------------------------------------------J
Print Powered By JF Forma�Dynainics'-
i
httl ://www.pasadenastamews.com/opinions/ci 8218125
Page I of 2
2/11/2008
040
PROJECT:
PROJECT NO.:
GENERAL CONTRACTOR:
DESIGN ENGINEER:
CONSTRUCTION MANAGER:
PROJECT CONTRACT AMOUNT:
CHANGE ORDERS TO DATE:
MONTHLY ACTIVITIES
As of 2/20/2007
- — - MONTHLY -REPORT
FEBRUARY, 2008
MEMBRANE TREATMENT UPGRADE OF THE CANYON FILTRATION PLANT
WVF-207
SSC CONSTRUCTION INC.
BLACK & VEATCH INC.
BLACK & VEATCH, INC.
$35,905,500.00
$36,251,072.84
$100,642.76 10 DAYS
Approved July 23, 2007
$164,975.54 14 DAYS
Approved Sept 24, 2007
$57,261.33 4 DAYS
Approved Nov 26, 2007
$22,693.21
Approved Feb 25, 2008
Construction progress meetings were held January 31 & February 14.
Pretreatment Building handrail installed
DYK - Finished Water Reservoir - installed 4 of 11 wall sections
$1,622,767.82
O&M Building roof trusses set - exterior columns constructed
$18,327,587.37
Chemical Feed Building- perimeter slabs and embeds poured
$1,832,758.74
Sludge Drying Beds- some floor and slope concrete has been poured - with divider walls
50.56%
Canal Diversion Structure - water through structure - canal operational - some slope grading done
Membrane Building exterior walls being laid - nearly complete
JANUARY PROGRESS
PAYMENT REQUEST:
$1,622,767.82
TOTAL PAID TO DATE
$18,327,587.37
AMOUNT TO ESCROW
$1,832,758.74
PROJECT PERCENT COMPLETE
50.56%
O
N
r—�
INFORMATIONAL ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD
AND AZUSA CITY COUNCIL
FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES g� �O1�DYr lTl"
DATE: FEBRUARY 25. 2008
SUBJECT: SAN JUAN ENVIRONMENTAL PROJECT AND LODI #2 PROJECT
Attached include information on San Juan Environmental Project and Lodi #2 Project.
Attachments:
i
San Juan Update. pdf LndVUpdate.doc
r
3
A
042
rrI� s
A pm wl commitment
to Now Me dm
Coordination Committee
Update
February 7, 2008
San Juan Generating Station
,,
A pomml commitment
b Now Maxie
Q
Ui
ProteaYourself
Avian Flu
General Precautions
Avian flu is viral disease and it can be very contagious and
even deadly in poultry (e.g,. chickens). Of great concern are
the highly pathogenic avian influenza (HPAI) HSN1 viruses
that have killed millions of birds and infected humans in other
countries, If these viruses are detested in the U.S. or if you
travel on work assignments or are employed in countries that
have HPAI H5N1 outbreaks, take appropriate Precautions,
Avian Flu Symptoms in Humans
Range from fever. cough, sore throat and muscle aches; to
diarrhea, eye infections, pneumonia and severe respiratory
diseases. The symptoms of avian influenza may depend on
which virus caused the infection but are often similar to
those associated with human seasonal influenza.
How Humans Are Infected
Contact with sick poultryor surfaces soiled with dis-
charges from their mouths or beaks, or with feces.
Inhaling contaminated particles from poultry.
Treatment
Some prescription antiviral drugs may be effective.
General Precautions
Wash hands thoroughly and frequently, for 15.20 sec -
on s, preferably with soap and water.
Avoid contact with possibly infected poultry.
Avoid consuming uncooked or undercooked poultry or
poultry products.
Precautims When Exposed
Use appropriate personal protective equipment (PPE):
• Disposable gloves or gloves that can be disinfected;
• Protective clothing (long-sleeved coveralls with a water-
proof apron);
• Disposable shoe covers or those that can be disinfected;
*Safety goggles; and
• Wear at least the minimum level of respiratory protec-
tion, N95 or higher respirator.
Employees should remove all PPE at work to avoid taking
contaminated items home.
If you develop flu-like symptoms, stay at home except to
get medical attention.
for more compete Information:
U.S. Departront of tabor
www.osha.gov (8001321 -OSHA
AL� '�fi.��ip'�_*.r re M' d� e�"i �'�* !F se Y ��� � a�, �. Ia '.2 r� "Ill � a >ny i e+v® kH- i,L4 k/ r, 9+'?a'+• .. iro N yf • L i�i�' �.;ky,+`+ kp�Y�'4'r'r �Ffm;hwx vi r9r.
P ; j ,'",''§§.. w t r a r a"a
Apersano) c mftment xr ;w' ..' c` �+ ��
to New Medw � ,' ' wr k$a � Ti r. !^«, i't�ii `v ,,rJ,u. +gi �:.a± , p .wte.. v4�`. �V^.r «-.. at ?.�a srf%= , .Y,k 's�„ ,,,,,, '.� ,�8
r ;,s..nn ... .. .., S�....aM. N. S.-
• Safety — 927,210 man hours worked as of
January 20, 2008
• OSHA reportable incident rate is 3.02
• Man Power
1-r
MJ
Westates
B&W
_ .. _
- - - - -
-Electric
Supervision
2
20
.15
Craft
15
329
75
1-r
��� Sdk
P} y.
Aprnolwl wmmitment �",
w Nt Mww
t
64
5 iS
TM`e
ri
"'^tyy
1 r+ff Pcd�fit5$
Current Project Cost Estimate $320AM
— Unit 4 Construction Is Complete.
• Forecasted To Be Within $1M of $81.525 M Estimate
— Includes Share of 3 & 4 Common
— Unit 3 Construction Expected to Complete March 19th.
• Estimated To Be Within $1.5M of $80.959 M Estimate
— Includes Share of 3 & 4 Common
_ - _ _ _ __ _ . _ •_ Labor_ Incentive. exposure. is. $3.OM._ _ _— _
— $1.5 M for Environmental Project Work.
— $1.5M for Balance of Plant Outage Work.
— Unit 2 Expected to be at Target.
— Labor Incentive Exposure Dependant on Need.
— Unit 1 Expected to be at Target.
— Labor Incentive Exposure Dependant on Need
N
AK.
cu §
A Mex
personal commilmenf�
to New
xr:�,-�41�,M Ni-td:;mti. s .:.-o ��"�:`:!�ix�X.•P+°i�`.;:,�[YY'a�cu.. s. _.'�.oµ'Rn"�?':,. ua�d. �4k n,... �fi�.u.!.Cb.��i:��a
• Overall Unit 4 is 99.9% Complete
— B&W Construction Complete (10/30/07)
— Completing Commissioning Activities This Month
• Overall Unit 3 is 83% Complete
— Civil — 99% Complete
— Mechanical — 75% Complete
Electrical — 50% Complete
• Baghouse is slightly behind schedule because of bag cages
delivery delays. Delivery expected 02/20/08.
• IDBooster Fans slightly ahead of schedule.
• Burner Fronts slightly ahead of schedule.
9 R;
3�ax '. -
a 4 i= fs9+F o- a
+ ;€'4'ut. s n ,� '�
"N.'rt s f x{ of w4 +fit ���JP t 2y Fla`
� : " 8 i r, ^� xM.p,� �'�-�'I�k`�3Fx "d';?', ,.p v w � • �..;�dts' „$wx k S (],???'. ��yy��`.a,.'a1' �i "'� ° k � ,t;
P". __ • k�''-�'�YO �ZLJj. \/��r �b a? A y u " -kH 'vw �a"'a'+{�' d
ApcNo commitment +2
m
Now MGtico
• Overall Unit 1 is 25% Complete
— Civil — 99% Complete
— Mechanical — 10% Complete
• Baghouse & Duct Structural Steel Erection is
on Schedule.
— Electrical — 5% Complete
- T ' Overall Unit 2 is 10 % Complete
— Civil - 50% Complete
— Mechanical — 1% Complete
— Electrical — 1% Complete
0
c�
A
A personal wmmitment
w New Meow
C)
M
• Labor Retention Incentives
— $1.5M - $2.OM Per Unit Project Cost Exposure
— $1.5M - $2.0 M Per Unit Non -Project Cost Exposure
— Reviewing and Revising Comprehensive
Construction Schedule for Units 1&2
C=)
Cal
tv
r e
Ape ml milmcm
to Nein MMM
C)
Cal
w
$35,000,000.00
$30,000,000.00
$25,000,000.00
$20,000,000.00
$15,000,000.00
$10,000,000.00
$5,000,000.00
r --•-•-•-•-•L
Budget Comparison Unit4 ! ■Budgets
❑ Costs
BWCC Scope FPD Scope PNM Construction PNM / S&L PNM Labor
Scope
1\U hl
to Nm Mridw
$35,000,000.00
$30,000,000.00
$25,000,000.00
$20,000,000.00
$15,000,000.00
$10,000,000.00
$5,000,000.00
77
Budget Comparison Unit
o costs
BWCC Scope FPD Scope PNM Construcion PNM -S&L Scope PNM Libor
Scope
l v`
A pars lommilmem.
to New Miedw
Ul
Cil
$35,000,000.00
$30,000,000.00
$25,000,000.00
$20,000,000.00
$15,000,000.00
$10,000,000.00
$5,000,000.00
$-
Budget Comparison Unit2
■ Budget
I ®Cost To Date
_ J
BWCCScope FPD Scope PNM Construction PNM-S&LScope PNM Labor
Scope
A Pc nal Immitment
to New modw
(D
Ul
M
$30,000,000.00 -
$25,000,000.00 -
$20,000,000.00 -
$15 ,000,000 00
$10,000,000 00 -
$15,000,000.00 -
S-
Budget Comparison Unit l
1 0 Budget I
j im Cost ToDatej
BWCC Scope FPD Scope PNM Construction PNM -S&L Scope PNM Labor
Scope
ON:, 0 'WIN
fid;t I
, k2" N
"J
i 94
W,
P 1, 1_ -i
MW
ky '4,
, Nl, q! 1- 4, .1
zj"
F #0
t,WE
ki
sm,
BWCC Scope FPD Scope PNM Construction PNM -S&L Scope PNM Labor
Scope
ID Task Name
0%
BA Area Repairs;
PNM MaInt. Absorber Unit Three System Activities
PNM Maint. Bottom Ash System Activities
Casing Leak Repairs
E= 3A SAM Cold & Intermediate Basket Removal
MEMI 38 SAM Cold & Intermediate Basket Removal
0% L -&E= 3A SAN Cold & Intermediate Basket Installation
0% 313 SAM Cold & Intermadlate Basket Installation
0% 3A SAM Mot End Basket Installation
0% 3B SAM Hot End Basket Installation
19%oCrown Seat Repairs
Expansion Joint Bait & Flange Installation
itiElPNM Maint. Sailer Air & Gas System Activities
`Steam Drum Impeitlon and Repair
26% PSK/Econ.Demc, Existing Elements
PSK/Econ-Demo Existing HeadersI
25% W SSH Area Repairs
254 SSH Split Ring Casting Replacements
U -A SSH DMW Replacement
0% Firebox Water Wall Repairs
O -A, Reheat Area DMW/ClipfNotis Repairs
PSH/Econ-Penthouse Activities
PSH/Econ4nstall New Elements
L Power Piping NDE Inspectlan
MS Block Valve Refurbishment
Attemperator Spray/Control Valve Refurbishment
PNM Maim. Boiler Water System Activities
Project: NIS Project U308S, PG v2-2 Task Split ........... Milestone Deadline
Date: Wed 215 1 Critical a3MZMC30X= Progress Summary
Page 1
... .....
Sys: ABSU3 1
..
Equip: SYSTEM
PNM Maint. Absorber Unit TM
27% 001iiiii
SO: BA
Equip: HOPPER
175
RA Area Repairs
Equip: SYSTEM jWell
f-39--!
PNM Maint. Bottom Ash Systx!
22%
SYS: BAG jWOMEN
Equip: BOILER
65 7
Casing Leak Repairs
25% IN
i Equip: HEATER
214
3A SAM Cold & Intermediate E
2419
3B SAH Cold & Intermediate E
3A SAH Cold & Intermediate E
220
3B SAM Cold & Intermediate I
216
I 34 SAM Hot End Basket Insta
221
3B SAH Hot End Basket Insta
Equlp., SYSTEM
wonee
Crown Seal Repairs
23-1-
j Expansion Joint Bet & Flange
198
PNM Maint. Both
25%
Sys: BW
I
WMENEEMEN
Equip: BOILER
'
57
Steam Drum Inspection and R
65%
112
PSH/Econ,Derno Existing Elel!
PSH/Econ-Demo Ex1stlng Hee
29
SSH Area Repairs
SSH Split Ring Casting Replan
48
SSH DMW Replacement
33
Firebox Water Wag Repairs
140
I Reheat Area L)MW/Clip/Notis
L. 107
PSH/Econ-Penthouse Actriftm
21% jg
115
PSH/EcoMnstal New Elennen
Equip: SYSTEM
weee""""'
14Power
Piping NDE Inspection i
55% moi
7
MS Block Valle Refurbishmer:
45%
Aftemperator SpraylCordrol V
30°A
_78
1_4
PNM Maint. Boiler Water Sys; 9%
Sys: CNTRL
WE
0%
BA Area Repairs;
PNM MaInt. Absorber Unit Three System Activities
PNM Maint. Bottom Ash System Activities
Casing Leak Repairs
E= 3A SAM Cold & Intermediate Basket Removal
MEMI 38 SAM Cold & Intermediate Basket Removal
0% L -&E= 3A SAN Cold & Intermediate Basket Installation
0% 313 SAM Cold & Intermadlate Basket Installation
0% 3A SAM Mot End Basket Installation
0% 3B SAM Hot End Basket Installation
19%oCrown Seat Repairs
Expansion Joint Bait & Flange Installation
itiElPNM Maint. Sailer Air & Gas System Activities
`Steam Drum Impeitlon and Repair
26% PSK/Econ.Demc, Existing Elements
PSK/Econ-Demo Existing HeadersI
25% W SSH Area Repairs
254 SSH Split Ring Casting Replacements
U -A SSH DMW Replacement
0% Firebox Water Wall Repairs
O -A, Reheat Area DMW/ClipfNotis Repairs
PSH/Econ-Penthouse Activities
PSH/Econ4nstall New Elements
L Power Piping NDE Inspectlan
MS Block Valve Refurbishment
Attemperator Spray/Control Valve Refurbishment
PNM Maim. Boiler Water System Activities
Project: NIS Project U308S, PG v2-2 Task Split ........... Milestone Deadline
Date: Wed 215 1 Critical a3MZMC30X= Progress Summary
Page 1
r
4i
Task Name
95_--
DCS Demolition
65% Fam
143
DCS Installation .
145
DCS Loop Checks
Sys: CON
0�
Equip: CONDEN
251
-; Condenser Eddy Current Testi
� Equ1P: OFAERA
69
DA Heater Inspection and Rer !
34% moi"
___._.-.....
_, Equip: PUMP
167
Clean & Inspect 3B HW Motor
34% Ogg
37
Clean & Inspect 3A HW Motor .
32%
......................�
Equip: SYSTEM
®r_
199
PNM Maint. Condensate Syst-
23% a
_...-_..--_...'
Sys; CW
WORM
Equip: PUMP
tib
28
Clean & Inspect 3A CW Pump'
57%
Connect & Couple 3A CW Pur,
t Equip: SYSTEM
200
i PNM Maint. Circulating Water j
23% @3W
Equip: TOWER
.....-75_.......
Cooling Tower Refurbishment !
17%
Sys: ENV
_.!
Equip: SH
- 185
BH -Hopper Heaters
133
BH -Upper Baghouse
-135
BH -Bypass Damper
26%
BH -Inlet & Outlet. Dampers f•.
- - 8°k
'186
BH-Irstnanentation I
171
. BH -Ash System '2%
168
BH -Pulse Jet System 14%
Equip: BLOWER
122
7 Booster Fen -General
39%
124
Booster Fan•"J-K-L" Outage N - -
120
Booster Fao-"K" Cefl
141A jaqW
Booster Fan -:"L" Cell
23%
_.121
_
Equip:BOILER-
211
1 Suckstaydnsulation & Lagging
197
! Suckstay-Ciip & Reinforcemer j
56% 10�—
Equip: BURNER - . )E�
008__...__- ....-.... . --:.March 2008 _ ... ..... Apd12008
14 7/11 ( 7110 -1 225 �_3l3 _ _3/10_ _ .�.,. 3/17. r.......324___ 3/31._..... ... 40,_ -.-
DCS Demolition
0% EY'..M� DCS Mstalla0on
0% DCS Loop Checks
i
0% Condenser Eddy Current Testing i
DA Heater Inspection and Repair
Clean & Inspect 3B HW Motor
Clean & Inspect 3A HW Motor
PNM Malnt. Condensate System Activities
a i
Clean & Inspect 3A CW Pump Motor
Connect & Couple 3A CW Pump Motor
PNM Mainl. Circulating Water System Activities
wRMWICooling Tower Refurbishment i
I
0% ° BH -Hopper Heaters
. yi BH"Upper Saghouse
BH -Bypass Damper
-: BH4nlet-& Outlet Dampers --
-- - -- -- - --•
09 BHanstrumentatlon
BH.Ash System
BH -Pulse Jet System
' Booster Fan-Generai
Booster Fan-"J.K-L" Outage Work
"o.
. Booster Fan."K" Cell
Booster Fan -"L" Cell
0°A i Buckstapinsuialion & Lagging installation
Buckstay-Clip & Reinforcement Installation
Project: MS Project U308S, PG v2-2 Task Split.................MilestoneDeadline b
Dale: Wed 2/6 Critical Progress Summary 911m=NEN=1e=0 j
Page 2
ID
Task Name i
yFebrua_yr 2008
_ March 2008 ,_. April -
1212/4
-
2111_ f _,-2/18 225
-- ars _3no 3rg_- 3rzq__. 33i __. an .....-.
_
101
.--- _ LN&"A" Row Bumers
- -
- • -
--
LR co Row Burners
-- 89
_-LN&"C° Row Burners
.:
.. �
� - � .. LNB= C" Row Burners �
- 93
LNB-"D'Row Burners
14°6�-
--
LNB='D"Row Bumers
....35.........:
LNB-"F" Row Bumers
251A ...::..
�. -
- ,..:... LNB='F" Row Bumers:
91
LNB-General Bumer Work
-. •
., : -
LNB-General Burner work
90
LNB-"E" Row Burners !
19%.
• .
•- .. LNB-'E" Row Burners !
88
LN&"B" Row Burners--
LNB-"B" Row Bumers
j Equip: CHIMNE
Stack -Liner Enhancements
22°A _
- Slack -Liner Enhancements
_.- Equip: FLUE
. ..
1
-,... ;..
206
Flue Work -Outage Face Constr
_-
Flue Work -Outage Flue Construction
207
- Flue Work -Stiffening- EMm
-
y
- - Flue WcukStlNening- EMra
Equip: REG
I
83
OFA.I7ectdcal Work
'
r' OFA -Electrical Work
44
' OFA•General
5516
.' ..
ILi'"' '!'°'!o - . OFA.General
74 .....
OFA -Front Wali
20%�I'
�.
OFA -Front Wall
79
: OFA -Rear Wall
20°k
_ - OFA•Rear Wail
Equip: SYSTEM
"
mono
126
Ash Handling -Outage Construc
Y1�' 'r' 'F�^c-'
y•,"'^°� Ash Handling -Outage Construction
Sys: FA �
moi,
.. ,-..�.*• :
.. ..,.. ^
Equip: HOPPER
71 T"
Precipitator Repairs i
21°,6
r .... ,..,t•
Precipitator Repairs !I
_. -..
i Equip: SYSTEM
137
PNM Maint. Fyash System Ac 1
28%
�'^°""
PNM Main1. Flyash System Activities
Sys: FW
—
Equip: SYSTEM
..
60.....1
FW Heater MOV Refurblshme
26%-
--.. EFW Heater MOV Refurbishment
201
PNM Maint. Feedwater Syster
27% _..
- - PNM Malnt. Feedwater System Activities
Sys: MF
Equip: HEATER
�.
224
PAH Intermediate Basket Ren
0%
PAH Intermediate Basket Removal
225
PAH Intermediate Basket Insh j
I 0%
12= PAH Intermediate Basket Installation
-_ 227
--" PAH Cold End Basket InstaoeC.
0% PAH Cold End Basket Installation _
226
PAH Hot end Basket Installati,
`
0% PAH Hot End Basket Installation i
........I
II Equip: Pl1LVER �
-.
85
_1 Coal Piping & Elbow Replacer
31%
Coal Piping & Elbow Replacements
84
1 Pulverizer Damper Drive Instal :
i
29%Pulverizer
.. Damper Drive Installation
......
I Equip: SYSTEM
. .
70,
PNM Maint. Mein Fuel Systeo
22%
_
- - - - • PNM Maint. Main Fuel System Activities
...
Sys: MISC
Project: MS Project U308S, PG v2-2 Task - Spot ,,,,,,,,,,,,,,,,"....... ................... ,,,,,, Milestone * Deadline
Date: Wed 216 Critical Progress Summary 90MMOMMOMMM9
Page 3
Q
Ul
CD
me
410
ID
Task Name
- ---------
im 1)
Equip: No Value
MV & LV Breaker Maintenaneq
202
PNM Maint. Activities with an f j
23%
Sys: TURB
Equip: GEN I
92
Aterrex Cooler R eplacement
Equip: LP
238
LP -A, Rotor SBINDFt-o Bucl
37%
239
LP -A, Phased Arrary/Boresonii
244
1 LP -B. Rotor SBINDEIL-O Bucl i
29%
Equip: SYSTEM
111101""
Turbine Valve Inspection
34% 11
PNM Maint. Turbine System od,
2006
Marc A
Irl I _prl-1-200 * 8
24 2f1 1 2/18 2r25 313 3110 ; 3/17 3/9'
3131,., 417
13% MV & LV Breaker Maintenance
PNM Matint. Activities; with all Remaining Systems
0% Afterrex Cooler Replacement
munwaCk LaML2oRF&MrA LPA Rotor SBINDEJL-O Bucket Installation
OQA LP -A, Phased Array/Boresonic Inspection
LP -B, Rotor SBINDEIL-0 Bucket Installation
I
Turbine Valve Inspection
Maint. Turbine System Activities
Project: MS Project U308S, PG v2-2 Task Spot ... .......... Milestone Deadline
Date: Wed 2/5 Critical Progress summary WNOOOOOOOOOMW
Page 4
Proposed 2008 Functional Organization
LUL) l P N EKG Y U hN I EK
Project Term Sheet
2-6-08 `
Project Name: Lodi Energy Center (LEC)
Description: 255 MW base load Combined Cycle Natural Gas Fired Combustion Turbine
Generating Station (one gas turbine and one steam turbine) with approximately 25
MW of peaking duct firing. L
Location: Lodi, California, southwest of the intersection of Interstate 5 and Highway 12,
adjacent to NCPA's existing CT2 project and the City of Lodi's White Slough Water
Treatment Plant (see attached map):
Project Manager Ed Warner, Northern California Power Agency, (209)728-1387 X-22
Performance: LEC is expected to have a heat rate -of approximately 7050 Btu per kWh of energy
production and opeiate at about an 80% annual capacity factor resulting in expected
annual energy production of 1,787,00 MWh and the consumption about 12,500,000
MMBtu of natural gas. 4
Cost Estimate: Total development and construction cost is anticipated to be approximately $275
million or about $1,080 / kW of project capacity. Utilizing a natural gas price of
$7.00 / MMBtu and an 80% annual plant capacity factor results in a projected "all -
in" energy cost of just under $70 / MWh.
I
Transmission: Either PG&E/CAISO 230kv or Western 230kv line.
Status: Project participants are attaining approvals for participation in Phase 2 activities
which include the acquisition of needed emissions credits, initiating the CEC
application process, and commencing detailed engineering and design, all as a
prelude to issuing final bid documents, likely toward the end of 2009. (see attached
project Phase 2 Timeline)
Commercial
Operation Date: April 2012
Participants: Azusa (7MW, 2.7451/o); BART (15MW, 5.882%); Biggs (IMW, 0.392%); CDWR
(60MW, 23.529%o); Gridley (SMW, 1:9610/6); Healdsburg (4MW, 1.5690/o); Lodi
(30MW, 11.765%o); Lompoc (5MW,:1.961%); Modesto (60MW, 23.529%o); Plumas-
Sierra (2MW, 0.7840/o); Port of Oakland (3MW, 1.1769/4); PWRPA (SMW, 1.961%);
Silicon Valley Power (50MW, 19.608%); Ukiah (BMW, 3.137%)
1 062
Qumtlae
$Ud _L_Fin_sM1 Ag4�____.......SL?
101 d
01 1010 13
1016 _.... ,;.q19_ ...... _....
New Lodi Project
1269 days
mon 6/4/07
Thu 4/121121
Establish PM,W Team
0days
Tue 11108
Tue t/11081
♦; 1M
Finalize Prolect Subsonplion
54 oat's
Thu 5111107
Tue 1115108:t
E]
Paniclpams Appeoy¢ PhMe II
97 days
Thu 11/117
Fn 3/14/08;
. tf71
CAISO InleMonrep Process
125 days
Tea 111108
Man 61231081.
WAPA Imermnrnect Process
90 days
Mon 2/2508
Fri W27M
Emiromlremal Review of ERC
22 days
Fd 1118MS
Mon 2/18108:
a
Purchasa ERC
21 days
Fd 2129108
Fri 3/28/08
.729
Select AFC Coordinator
11 days
Mon 12108
Mon 1/21MB:
-
AaPennaPreparation
181 days
IN 2/28108
IN 1116108
_•.,'.!'—.."•.,'�1'._',a"..�''°.'.`.,'..'.
AFC Preparation
120 days
Fri 2/15108
Thu )/31108',
;
Finalize lease whh City of Lada
70 days
T. 314106
Mon &9108
Negotiate W alar Supply and Retum Agreden 0 days
Tue 111108
Tue 111/08
Errvimnmenlal Studies
403 days'/
Mon 3117108
Wed 913OM9
CEC Atlomey Selection Process
14 days
Wed 112MB
Mon 2/11108'
AFC Engineering
90 days
T. 2126108
Mon 6130/08
Site Land Surreys
120 days
Mon W10MB
Fri W22108.
Drall AFC Completed
0 days
Mon 7/21108
Mon 7/21108
♦ 7121
AFC Fill,
0days
MOn Bit 1108
Mon8/11108.
♦a/11
CEC Rena of AFC
327 days
Thu 7/31108
Fri 10130109,
Data Inequacy(CEC)
0days
Fd IMO/09
Fd 1130109,
♦ 1130
AFC Granted
1 day
Fd 10/30109
Fri 10/30109
♦ 10130
Engineer Selection Process
36 days
Fd 31281118
Fd 5116108;
Erglneedrg DatsmWM Select
Otlays
Fri 5116108
Fd 5116108'.
. SI16
Pmiect Engineedrg
1020 days
Thu 50 SIBS
Wed 4111/12!
Prepare 3rd Phase Agreemerrt
90 days
Mon 225108
Fd 827108
;
ThiN Phase Agmenhunt EsecWe l
30 days
Fd 10/30/09
Thu 12/10109
Prol¢M Firlarcbg
95 days
Mon 112/09
Fd 3112110'
♦ f 12
CprslrMzon Poneal
522 days
Wed 4114110
Thu 4/12112
Mechlanmal Completion
/day?
Mon 1212
Mon 1121121♦
12
Testing and Startup
108days
Tue 11/15111
Thu 4111/121
Pedprmal &RoMtulily Testing
7 days
Mon 42112
Tue 41101121
. 4124
Corn plan ial Operation
0 days
Thu 4/12112
Thu 4112/12
♦4112
CEC CediGution of Compliance
180 days
Thu 4112112
Wed 12/19/121
-AgreemeNs will include out clauses
0days
Tee 1/1108
i
Tue 1/1MB
♦:III
Task
t,'.,'.'_.'..,..,.`,,',...,',_,'..,".,,1'.,1.,'.',,1.'.,'
Summary
^ Rolled UP Progress
Pmlecl3ummary
tT New Lodi Milestone Schedule
t:t29108
Progress
Rolled Up Task
Split
Group By Summary
DapecT.
Dae,
••• ••••••
-
Milestone
Rolled Up MileshoneQ
Eldemal Tasks
n
7,'Nn1'�`?5"}".r n. .... Deadline V
Page 1
a
Project Location
113
im
6a
Col
I
11
ador
r
aprings,.. .
CAV ERAS
Ange
:n-fr
061
Power Resources Division Monthly Report
■ Power Resource Highlights
■ Power Consumption Comparison
■ Wholesale Market Trend
■ Power Resource Budget Update
Power Resource Highlights
■ Garnet Wind Project broke ground to construct the wind generating units
and the construction is proceeding satisfactorily. We continue to work
with the CAISO to certify the project interconnection with CAISO
transmission grid. Current projected in-service date is summer 2008.
■ We continue to participate in the Southern California Public Power
Authority (SCPPA) renewable resources RFP process. The SCPPA RFP
yielded about 50 proposals: 15 wind power; 30 solar power; 3
geothermal power; 1 small hydro; and 1 biomass. At this time, staff is
evaluating 1 solar proposal and the biomass proposal for potential
participation.
■ San Juan unit #3 went into the scheduled outage on January 25th and is
expected to return to service in late March. So far, the outage is
proceeding as scheduled and environmental project is about 90%
complete. The latest environmental project report is attached.
■ Due to system software problems, the CAISO has once again delayed
(the third time) the start up of the new power market. Although CAISO
has not officially stated the new date, it is highly likely to be delayed
toward fall of this year. However, CAISO market simulation is continuing
apace and is expected continue through the fall. Staff continues to
participate in the simulations.
■ The Lodi #2 project planning activities have been delayed due to not all
potential participants has received the necessary authorization to
proceed. It is now expected that the project will receive the final approval
by all participants by the end of this month, and the planning activities will
commence shortly thereafter. The project fact sheet is attached for
information.
CITY OF AZUSA PEAK DEMAND COMPARISON
MONTH
CITY OF AZUSA ENERGY CONSUMPTION COMPARISON
ENERGY CONSUMPTION IN-MWH
PERCENT
CHANGE
PERCENT
MONTH
FY 06-07
FY 07-08
CHANGE
JUL
29,287
26,164
-10.660/6
AUG
25,912
28,014
8.11%
SEP
24,379
23,760
-2.54%
OCT
21,700
21,890
0.88%
NOV
20,456
19,708
-3.65%
DEC
20,510
20,029
-2.35%
JAN
20,984
20,515
-2.24%
_ FEB
18,414
-100.00%
-100.00%
MAR
20,916
-100.00%
-100.00%
APR
19,719
-100.00_%
-100.000/6
MAY
21,064
-100.00%
-100.00%
JUN
21,949
-100.00%
. TOTAL
., 265,291
160,080
-1.579/6
CITY OF AZUSA PEAK DEMAND COMPARISON
MONTH
FY06-07
FY 07-08
PERCENT
CHANGE
JUL
60.8
_55.5
-8.65%
AUG
552
64.9
_
17.39%
SEP
63.7
63.9
0.27%
OCT
43.9
46.7
6.34%
NOV
46.0
41.1
-10.49%
DEC
36.6
35.7
-2.68%
_ JAN
36.8
34.9
-5.23%
FEB
37.4
-100.00%
-100.00%
APR
40.7
_. .. ...
-100.00%
483__._.._.........,.....
-100.00_%
JUN.
47.5
-100.00%
PEAK DEMAND IN MW
cz>
a)
WHOLESALE ELECTRICITY SPOT MARKET
PRICES IN CALIFORNIA
AVERAGE AVERAGE
MONTH
ON PEAK PRICE
OFF PEAK PRICE
DEC 06
$53.75
$44.63
JAN 07
$53.46
$44.36
FEB 07
$58.45
$47.79
MAR 07
$49.82
$36.44
APR 07
$57.29
$43.12
MAY 07
$63.55
$41.24
JUN 07
$67.77
$42.39
JUL 07
$75.35
$41.26
AUG 07
$66.95
$36.94
SEP 07
$52.66
$36.40
OCT 07
$59.42
$44.90
NOV 07
$50.79
$40.43
DEC 07
$58.53
$49.88
JAN 08
$64.02
$54.78
ALL PRICES IN $/MWH
Power Resource Cost Accounting
FY '07-08'
(7)
LONGTERM SHORT TERM i TRANSMISSION MCILLARY SCHEDIJUNG•
TOTAL
WHOLESALE
NET
NTHT'—doo
NtR Adt§ PURCHASES --- -COSTS — - s'ffomCOSTS"DISPATCHING ct -costs6-JS0AtCHFNd`tbS-fS-
COSTS
COSTS
Jul -07
238,050 74 30,926.72
1��2�377.S5 2,542.143.31 6,279261,906,382.12
07
Aug 07
1,35025271 26' 26,318.94 49.64
4.099.178.50
(1,964,700.19)
Y'i"'vfEf.31
Sep 07
r 1 336 082 85 - 2 052,822.54 232,91122 12 313 76 _ 5-0j-87-.74
j,684.318.10,
-(1.778.0-7.45)--
1,906280.65
66�67
1,286,479.03215,47868.... ...
. 3269.94 86,824.80
2,665246.60
(961.150,80)
1,704,096.00
Now07
1,333,840.63 1,113,135.45 215,81424 8207.0084,542.15 -�
2,755539.47 1
(886,102.15)
1,869,43732
Dec 07
1,333,458.34 950165 239,401.66 1 20,000.00
.$88,615.70 1
(908.000.41)
1,680,61529 i
Jan -08
1,336,998.11 1.367.098.98 277,061:70 20,( )0600 -45.1-5-9.46
-
U46,318.28j
403,734.70)
1
2,042,583.58
Feb -08
0.00
0 6
mar -00
.00
0.00
r-09
0.00
0.00
May -08
...... .
.00
60.06-t
obo-�
Jun -08-
------- --
•
-0.66
TOTAL
......... $9,329,489.52 $11,53F3-28.59 $1.665,197.50 $126,036.35 $37
13243.87326
... ..... ...
------------
SOPP A LONG TERM CONTRACTS
-INCCUDE§kLSA6RTTtPIMOUAdHASESF(jAHt6GINd .LOAD BALANCING PURPOSES, FAR CAPACITY
(3)
INCLUDES ALL SHORT TERM AND LONG TRANSMISSION CONTRACT COSTS
----- -----
.......
_(d)
C0.STSCHPAGED BVCPLIFORNIAINDEPENDENTSVSTEMOPERATOR FOR
— ---
------
--- --------
INCLUDES COSTS FOR SCHEDULING PND -blSl5ATCHINGbFEL-E-CT-F31CITY
.. .........
H (5)
.......
...........
WHOLESALE REVENUES DERIVED FROM SALES OF EXCESS POWER + PTO BENEFTTS
(8)
;DIFFERENCE bO (6)'AND
----------
---- - -- -----
----- -
INFORMATION ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD
AND AZUSA CITY COUNCIL
FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES 0 7 -epi F.j�
' `3,
DATE: FEBRUARY 25 2008 /
SUBJECT: ALLEY LITTER / CLEAN UP OPTIONS
At solid waste workshop on January 28, 2008, concern was expressed by Board Member
Macias about litter in alleys of the City. In response to this concern, Director of Utilities
convened a meeting of Public Works staff, Utilities staff and service representatives of Athens
Services. The meeting was intended to discuss the problem generally and put forth ideas on
how to address the problem. The following are reported in no particular order:
• Waste seems to originate from various sources:
o When someone illegally discards a bulky waste item in a trash bin, this, then,
limits space for regular trash and results in overflow conditions.
o Cars often park illegally in alleys and prevent street sweepers from sweeping
the alleys; then, when cars are moved, the public complains about the alley
not being swept.
o Street sweepers have difficulty getting the middle of alley gutters swept
because of the "V" gutter of the alleys.
o The manual trash collection system was also believed to be a source of much
of the waste, because trash is not always covered or stored in a way that
prevents overflow or litter from being blown from the cans, and Athens
Services as a trash company has no obligation to pick up trash on the ground
which they do not spill.
o People illegally discard small amounts of litter in alleys—it's a "mindset"
problem.
• Ideas set forth to address problems were as follows:
o Consider implementing an automated trash collection system; Athens Services
representatives said that it has been their experience that cities with such
systems have less litter on the ground, even,in alleys.
o Post signs at both ends of alleys to notice drivers that it is illegal to park in
alleys; then, enforce the no -parking laws. Consider having a parking
enforcement vehicle follow the street sweepers and ticket cars illegally parked.
o Conduct public information campaigns to encourage people not to park in
alleys and not to litter prior to taking enforcement action, similar to how Azusa
Light & Water approached water conservation—it worked.
070
o Establish a hotline and allow people to call for pick up service from LA Works
when they are available.
o Promote free collection of bulky waste as that is in contract with Athens
Services for trash collection.
o Increase the frequency of trash services if a dumpster is known to be regularly
in overflow condition.
o Begin with public information in April with Clean & Green Month promotional
activities.
As an aside to the situation in alleys, concern was expressed about the new street sweeping
plan to sweep one side of each street on alternating days; the concern was that given our
trash collection system, that trash could be blown to opposite side of street on windy days
after one side is swept. Sweeping streets on alternating days may also make it more difficult
to implement an automated trash collection system if that is desired.
It was generally thought that a multi -faceted approach would be needed to address the origin
of the waste, cleaning itup once on the ground, and ongoing prevention.
Staff welcomes additional comments and/or suggestions from City Council/Utility Board on
this matter.
Prepared by:
Cary Kalscheuer, Assistant to the Director of Utilities