HomeMy WebLinkAboutAgenda Packet - February 25, 2008 - UBIN i s AGENDA REGULAR MEETING OF AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL t I . AZUSA LIGHT & WATER FEBRUARY'25, 2008 1729 N. AZUSA AVENUE '6:30 P.M. AZUSA, CA 91702 i AZUSA UTILITY BOARD i KEITH HANKS 6:30 P.M. Convene to Regular Meeting of the Azusa Utility Board and Azusa City Council Call to Order Pledge to the Flag Roll Call IA. PUBLIC PARTICIPATION I (PeisonlGroup shall be allowed to speak without interruption up to five (5) minutes maximum time, subject to compliance with applicable meeting rules. Questions to the speaker or responses to the speaker's questions or comments shall be handled after the speaker has completed his/her comments. Public Participation wi0 be limited to sixty (60) minutes time.) I I oat CHAIRPERSON ANGELA CARRILLO ! IOSEPH R. ROCHA VICE CHAIRPERSON BOARD MEMBER i 'ORIEL E. MACIAS ! ROBERT GONZALES BOARD MEMBER BOARD MEMBER 6:30 P.M. Convene to Regular Meeting of the Azusa Utility Board and Azusa City Council Call to Order Pledge to the Flag Roll Call IA. PUBLIC PARTICIPATION I (PeisonlGroup shall be allowed to speak without interruption up to five (5) minutes maximum time, subject to compliance with applicable meeting rules. Questions to the speaker or responses to the speaker's questions or comments shall be handled after the speaker has completed his/her comments. Public Participation wi0 be limited to sixty (60) minutes time.) I I oat The Consent Calendar maybe adopted with one vote, and if so adopted the printed recommended action will be enacted. if 5taff or Councilmembers wish to address any item on the Consent Calendar individually, it will be considered as a SPEC/AL CALL /TEM. B. CONSENT CALENDAR Minutes. Recommendation: Approve minutes of regular meeting on January 28, 2008 as written. B-1. ]an 28-Minutes.doc 2. Approval of SSC Change Order No. 10. Recommendation: Approve change to SSC Construction Incorporated contract in amount of $22,693.21 for additional work required to relocate an existing 30 -inch waterline owned by American Water Company. INFUfl &2. WTP Change0rder.doc 3. Approval to Solicit Bids for Water Project W-243, Water Treatment Plant Water Main. Recommendation: Approve the advertisement for, and solicitation of bids for Project W-243, installation of two water mains in Daybreak Drive and San Gabriel Canyon Drive and sewer force main in Daybreak Drive. B-3. Daybreak-Wtr-Swr U 4. Approval to Solicit Bids for Water Project W-245, Water Main Replacements in various Streets to be resurfaced as part of Year 5 Pavement Management Program. Recommendation: Approve the advertisement for, and solicitation of bids for Project W-245, water main replacement in First Street, Barbara Street, et. al. and replacement of water services. 13-4. Water Main Project.doc 5. Approval of Budget Amendment for Settlement Agreement with California Parties in Amount of $560,000. Recommendation: Approve the following resolution: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, AMENDING THE FISCAL YEAR 2007-2008 OPERATING BUDGET FOR THE ELECTRIC UTILITY TO PAY FOR COST OF SETTLEMENT WITH CALIFORNIA PARTIES. B-5. CaFParties-Bud-Andr 002 I C. SCHEDULED ITEMS 1. Approval of Funding Request by California Resource Connections (CRC) in amount of $15,500 for Litter Clean-up Program and Backyard Composting(Gardening Workshop. Recommendation: Approve: (a) proposed funding request by CRC in amount of $15,500; (b) . approve a budget appropriation for fiscal year 2008-2009 in amount of $8,175 using AB 939 Fee Revenue to pay for Composting/Gardening Workshop; and (c) authorize use of budgeted Beverage Recycling Container Grant funds in amount of $7,325 to pay for the Litter Clean-up Program this fiscal year. i � r C-1. CRC Proposal.doc i I 2. Support of Senate Bill 691 (Calderon)- Requirements !for Recycling of Non -Ferrous Metal. Recommendation: Adopt a support position on SB 691 'and authorize staff to send letters to P' legislators advocating the City's position. I 4 I. I C -Z. 58691.doc Monthly Update on Water Shortage Declaration 1 61. MY Rpt Wtr i Shrtage.doc { 4 2. Monthly Update on Water Treatment Plant I� I D-2. WTP-Moly Update. pdf r 3. San Juan Environmental Project and Lodi #2 Project I i L I D3. S3-Lodl.doc . Monthly Power Resources Update 1 I D-4 Moly Pwr Res Rpt. ppt � I i 3 { 1 oas Alley Litter/Clean Up Options PER D-5. Ailey Utter.revl.doc 6. Offsite Meeting Update (Verbal) E. DIRECTOR'S COMMENTS I. Placement of Gladstone High School Football Boosters on permitted list of entities authorized to sell fireworks in Azusa F. ADIOURNMENT I. Adjournment. "7n compliance with the Americans with Disabilities Act, if you need special assistance to participate in a city meeting please contact the City Clerk at 616-8/2-5229. Notification three (3) working days prior to the meeting or time when special services are needed will assist staff in assuring that reasonable arrangements can be made to provide access to the meeting" 004 8-1 AZUSA CITY OF AZUSA I MINUTES OF THE REGULAR MEETING OF THE AZUSA UTILITY BOARD/CITY COUNCIL I, MONDAY, JANUARY 28, 2008 — 6:33 P.M. The Utility Board Members of the City of Azusa met in regular session, at the above date and time, at Azusa Light and Water Conference Room, located at 729. N. Azusa Avenue, Azusa, California. I Vice Chairman Carrillo called the meeting to order. 1. ROLL CALL PRESENT: BOARD MEMBERS: GONZALES, CARRILO, MACIAS, ROCHA ABSENT: BOARD MEMBERS: HANKS ALSO PRESENT: i City Attorney Martinez, City Manager Delach, Director of Utilities Hsu, Assistant to the Utilities Director Kalscheuer, Assistant City Manager Person, Assistant Director of Resource Management i Tang, Assistant Director of Water Operations Anderson, Assistant Director of Electric Operations Ramirez, Administrative Technician Cawte, Azusa Police Captain Streets, Finance Controller Aguilar, City Clerk Mendoza, Deputy City Clerk Toscano. i Public Participation I Mr. Dick Cortez addressed Council expressing his opinion regarding the drought and provided Ideas on how to conserve water. The CONSENT CALENDAR consisting of Items B -I through B-7, was approved by motion of Board Member Gonzales, seconded by Board Member Rocha and unanimously* carried with the exception of items B-4 and B-5, which were considered under the Special Call portion of the I Agenda. Call to Order Roll Call Also Present Pub Part D. Cortez Comments Consent Cal Approved 1. The Minutes of the regular meeting of December 17, 2007, were approved as written. Min Appvd i 1 2. Approval was given for the purchase of two secure storage containers to complete the recent Put storage upgrade to the Gladstone Water Yard in amount of $ 12,741.02: containers I 005 3. Approval was given for the addition of $22,000 to the Civiltec Engineering contract for Civiltec Engr inspection services on Project W=238, Replacement Pipeline Installation on Cypress and Inspect sys Sunset, et. al. in West Covina; and a three-month extension of contract to March 31, 2008. Extension 4. Special Call Item. 5. Special Call Item. 6. Approval was given to Award Contracts for Bill Print and Mail, Electronic Bill Presentment and Payment, and Pay -By -Phone and Web Payment Options as follows: (a) Infosend Incorporated to provide bill print and mail processing in amount of $54,600 per year for three years, excluding postage, and electronic bill presentment in amount of $22,000 with a one- time implementation charge of $3,250; (b) BankSery in an estimated annual amount of $5,600 per year for three years to act as bank merchant processor for electronic automated clearing house (ACH) payment transactions related to electronic billing; (c) Paymentus to collect and process pay -by -phone and web payments; and (d) Global Payments to act as bank merchant processor for one-time customer credit and debit card payments at transaction cost to customers per $500 increment of $3.25 for residential and $3.75 for businesses. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, APPROVING THE LOS ANGELES COUNTY SOLID WASTE MANAGEMENT PROGRAM (SWMP) AS THE LOCAL ENFORCEMENT AGENCY (LEA) RESPONSIBLE FOR ENFORCING ALL LAWS AND REGULATIONS PERTAINING TO THE MANAGEMENT OF SOLID WASTE WITHIN THE CITYOF AZUSA. Special Call Items Board Member Carrillo addressed item regarding retrofit of Electric Division trucks asking what percentage the five trucks being retrofitted represents for the Electric Division, and how many water trucks are anticipated to be retrofitted in the future; staff responded that the five trucks represent 100% of electric and there are five water trucks in the Water Division. Moved by Board Member Carrillo, seconded by Board Member Gonzales and unanimously* carried to approve the bid by Ironman Emissions Group in amount of $76,585.14 to retrofit five Electric Division diesel trucks with the Particular Matter (PM) Traps to comply with California Air Resources Board Requirements. Spec Call Spec Call Contracts Bill Print and Mail, Electronic Bill Presentment and Payment and Pay -By - Phone and Web Payment Res. 08 -CS LA Co. Solid Waste Mngmt Prgm Spec Call Items Carrillo Comments Ironman Emissions Group Board Member Carrillo addressed item regarding the purchase of two electric meter shop Carrillo vehicles, asking if the insurance was paid for the replacement of a truck that was stolen from the. Comments Electric Yard; staff responded $10,000 was received for the stolen truck and placed into the Electric Reserve Fund. Moved by Board Member Carrillo, seconded by Board Member Gonzales and unanimously* Purchase of carried to approve waive formal bidding procedures in accordance with the Municipal Code Two trucks Section 2-523(e) and approve the purchase of two Chevrolet 3/4 -ton 2WD extended cab work Coalinga trucks from Coalinga Motors, Incorporated in amount of $28,850.88 each, plus a State Motors Procurement Fee of 1.98%. 01/28/08 PAGE TWO lir , Scheduled Items Director of Utilities Hsu addressed the request for approval to Increase Replacement Water Cost Adjustment Factor stating that the water utility has had to purchase water supplied by the Metropolitan Water District (MWD) at a higher rate and although the final billing has not been ' received for December water purchases, staff estimates "Incrementally Higher" purchased water costs. There is a need to increase the current RWCAF by $0.2340 per•ccf, from $0.2896 per ccf. to $0.5236 per ccf for the next two months to recover the higher incremental cost of purchased water incurred. Discussion was held between Board Members and staff regarding the predicament the City is in with regard to the drought, water conservation and higher cost of purchased water. Further discussion was held regarding the process for capturing run off water from the rain, the need to build additional reservoirs, the need to take a holistic approach by the Legislators to work on water issues noting it is a Statewide problem; questions were answered regarding customers i outside the City, and Rosedale's requirements. i k I Assistant to the Utilities Director Kalscheuer responded to questions stating that the RWCAF is being reviewed every two months and staff would come back with a recommendation at March Board meeting as to future adjustment. He advised that in light of the recent rain storms the 4Water Utility stopped purchasing water from MWD; it was noted that water purchased went into the spreading ground to recharge the upper basin. Moved by Board Member Rocha, seconded by Board Member Gonzales and unanimously* carried to authorize staff to increase the Replacement Water Cost Adjustment Factor by $0.2340 per hundred cubic feet of water effective February 1, 2008 to recover the increased cost of purchasing water from Metropolitan Water District for November and December. I Director of Utilities Hsu addressed request for budget amendment stating that the original budget 1 was for normal water purchases; the revenue received from customers have gone into the reserve fund and there is a need to re -appropriate from the reserve into the budget to pay the bills. k Sched Items Dir of Utilities RWCAF Comments Discussion Asst Dir of Utilities Response to Questions Inc to RWCAF Approved Dir of Util Budget Amend Assistant to the Director of Utilities Kalscheuer responded to earlier question regarding the Asst Dir of balance of the reserve fund stating that the reserve was about twenty million dollars before the Utilities fifty-four million dollar bond issue. Director of Utilities Hsu stated that the amount of reserve is Response brought back at budget time each year identifying which amounts are encumbrances or committed and he would do the same this year. After additional discussion the following resolution was adopted. I Board Member Carrillo offered a Resolution entitled: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, AMENDING THE Res. 08-C6 FISCAL YEAR 2007-2008 OPERATING BUDGET FOR THE WATER UTILITY TO PAY FOR Budget i PURCHASED WATER. Amendment k Moved by Board Member Carrillo, seconded by Board Member Macias to waive further reading and adopt. Resolution passed and adopted by the following vote of the Board Members: AYES: BOARD MEMBERS: GONZALES, CARRILLO, MACIAS, ROCHA NOES: BOARD MEMBERS: NONE ABSENT: BOARD MEMBERS: HANKS 1 01/28/08 PAGE THREE 007 Staff Reports/Communications Staff Rpts Director of Utilities Hsu provided an update on the Water Shortage Declaration, first advising that Update on the water level in the Canyon basin has been coming up gradually and is at 40 feet below normal Water level. The Water Master announced that for the next ten years the MWD will not be delivering Shortage replacement water and gave a detailed explanation; he stated that he would like to stay at Stage 3 water shortage declaration due to the uncertainty of the drought. Discussion was held regarding the results on the phases of the water drought, recent rainfall and status of the water patrol. The Monthly Update on Water Treatment Plant was presented, power point presentation of the Update WTP plant was presented, and it was noted that it is 46% complete and the project may be complete by August/September. The Monthly Power Resources Update was presented and it was noted that California Update Independent System Operator's (CAISO) will be updating technology which should be online on Monthly Pwr April I "; the Garnet Wind power plant is about to construct the foundation for the Wind Farm in Resources the Palm Springs area, and staff is working with Southern California Public Power Authority (SCPPA) renewable resources RFP process for potentially additional renewable resources. U.S. Department of Energy kWh Rate Survey was presented with little discussion. Energy Survey The 2008 Utility Board Meeting Schedule was presented and it was consensus that March 24th, Schedule of June 23rd and October 27`h be designated as the Quarterly Off -Site meetings. Suggested_ for UB mtgs 8 - schools to hold meetings were Powell, Magnolia, and Gladstone schools; staff will check with the Quarterly Azusa Unified School District to confirm/seek availability of schools site. Off —site Director of Utilities Hsu announced the California Municipal Utilities Association (CMUA) March CMUA March Conference and requested that those members who will be attending advise his staff or City Conference Manger's Executive Assistant, in order to make reservations for the conference. Director of Utilities Hsu announced CMUA Capitol Day Activities providing handouts regarding The Dir of Util California Delta, and detailed ballot initiatives with regard to Renewable Energy, Solar Programs for CMUA schools, the Mylar Balloons and Copper thief. Capitol Day Directors Comments Dir Cmts Moved by Board Member Rocha, seconded by Board Member Gonzales and unanimously carried Cert of to approve Certificates of Appreciation to outgoing Miss Azusa, Jamie Pezold, outgoing Miss Apprec Outstanding Teen Jamie Alvarez, and Princess Crystal Munoz, to be presented on February 2, Miss Azusa 2008, Miss Azusa and Miss Outstanding Teen, Pageant. Outstanding Teen Board Member Rocha expressed concern regarding the palm trees at the Rosedale Promenade Rocha and possible liability; staff advised they would report on it at the February 4`h City Council Comments Meeting. Board Member Macias expressed concern regarding old shoes thrown up on power lines and the Macias possible negative connotation they portray. It was also noted that there is a need to replace Comments burned out street light as soon as they are reported. Staff advised that shoes would be removed and street lights replaced by Light and Water crews as soon as they are reported. 01/28/08 PAGE FOUR The Board Members recessed at 7:34 p.m. and reconvened at 7:42 p.m. to conduct a Workshop Recess on Solid Waste Issues. Reconvene WORKSHOP ON SOLID WASTE ISSUES { Workshop Solis Waste 'Assistant to the Utilities Director Kalscheuer addressed the Workshop introducing the following C. Kalscheuer challenges: Long Term Disposal, Diverting More Waste, and Controlling Costs. He explained the Comments solid waste flow which begins with city customers to Athens's MRF, to Puente Hills Landfill and Commerce Refuse to Energy Facility, and that Yard Waste goes directly to Puente Hills Landfill i which will be closing in 2013. He detailed the consequence of Puente Hills closure, the challenge of diverting more waste, and the challenge of controlling costs, how the existing contract with ;Athens helps and could hurt the City. i i !Mr. Dennis Chiappetta of Athens' Services addressed the Workshop presenting the Scope of D. Chappetta !Services for Azusa and responded to the following: Long Term Disposal, MRF Processing, Athen's Disp Diversion, AB 939 Diversion, SB 1016 Projecting, AB 939 Indemnification, Yard Waste, Food Waste, Rate Comparison, and Community Involvement. I i (Discussion was held regarding the presentation and language in thecontractto close gaps In Discussion/ diversion and address residential rate spikes, the litter in alleyways, possibility of an additional Direction IMRF in the area; Athens was invited to attend a City Council on the Move meeting. i. Moved by Board Member Rocha, seconded by Board Member Gonzales and unanimously' carried Adjourn �to adjourn. f TIME OF ADJOURNMENT: 8:39 P.M. I, I. f , SECRETARY NEXT RESOLUTION NO. 08-C7 *Indicates Hanks absent. k I 1/28/08 PAGE FIVE I 0(!9 AZUSA .. IIGNT i RATER Y' E i CONSENT CALENDAR TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOAR AND AZUSA CITY COUNCIL�,,� ) FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES ✓! / lc� DATE: FEBRUARY 25, 2008 SUBJECT: ADDITIONAL COMPENSATION TO SSC CONSTRUCTION, INC. FOR ADDITIONAL WORK REQUIRED TO RELOCATE AN INTERFERING CALIFORNIA AMERICAN WATER COMPANY WATERLINE EON PROJECT WVF-207 CANYON FILTRATION PLANT MEMBRANE TREATMENT.UPGRADE AND EXPANSION k RECOMMENDATION Y It is recommended that the Utility Board/City Council approve Change Order No. 10 for the addition of $22,693.21 to the SSC Construction, Inc. contract for construction of Project WVF-207, Canyon Filtration Plant Membrane Treatment Upgrade and Expansion. BACKGROUND ' At its November 20, 2006 regular meeting, the Azusa City Council accepted the bid of SSC Construction, Inc. to construct Project WVF-207, Canyon Filtration Plant Membrane Treatment Upgrade and Expansion. Before to starting work on changes in construction of WVF-207, the proposed changes and contract amount must be approved. I Change Order No. 10 for $22,693.21 covers the cost of materials and installation of 30 -inch reinforced concrete pipeline and fittings to realign an existing 30 -inch waterline owned by California American Water Company, successor to the Duarte Mutual Water Company. The existing waterline interferes with the northwest corner of the Operations and Maintenance Building being installed by SSC as part of the Canyon WTP-construction, and has been in place for many decades prior to the construction of the existing Canyon Filtration Plant. FISCAL IMPACT This request has a fiscal impact of $22,693.21 to be funded from the Capital Improvement Project Budget account number 32-80-000-721-7130/72107C-7130. Prepared by: Chet Anderson, Assistant Director- Water Operations SSC -Cal Am pdf i 00 at Anderson - Azusa Cal-AM Re-Route @ O&M Bldg Page 1 From: "Holden, Jacob S. (Jake)' <HoldenJS@bv.com> To: "Chet Anderson"<canderson@ci.azusa.ca.us> Date: 2/1/2008 11:53:58 AM Subject: Azusa Cal-AM Re-Route @ O&M Bldg > Hi Chet, > Based on the discussion from the last construction meeting (1/17/08), > it was brought to our attention that both you and Cal-AM would like to > know whether or not the re-route of the existing 30-inch Cal-AM line > at the south end of the O&M Building is necessary. It is our opinion > that the zone of influence of the O&M Building loads extends over a > significant enough portion of the 30-inch Cal-AM to deem the re-route > necessary. In addition, the existing Cal-AM line may be fragile as it > appears to be old concrete that is not reinforced. > Page 2 of the attached shows the location of the Cal-AM line in > relation to the O&M Building: ' > <<Azusa Cal-AM Pipe Relocation at O&M Building.pdf>> > Page 2, Section 1 of the attached shows the relative location, in > terms of elevation, between the pipe and the building foundation. > Please note that the step in the foundation was not implemented and > the bottom of the foundation is level across the span of the pipe. > <<SSC_RFI_003.1.pdf>> > > We recommend that ALW implement the re-route. > Thank You, > Jake > Jake S. Holden > Black & Veatch Corporation > 15615 Alton Parkway, Suite 300 > Irvine, CA 92618 > `Tel: (949) 788-4217 > `Fax: (949) 753-1252 >. Email: holdenjs@bv.com CC: "Boss, John F." <BossJF@bv.com>, "Chow, Bruce M." <ChowBM@bv.com>, <sseffer @ ci.azusa.ca.us> 011 Chet rriderson - SS C_RFI_003.1.pdf Page 1 15615 Plan Partway, Sute 300 trine, Carom§ 92618 Tet (949)753-0500 Fax 19491753-1252 0e BLACK & VEATCH i 1 Bladc& Vandi Cap"Im March 28h, 2007 To: Angel Bautista, Project Engineer SSC Construction, Inc. l I From Ashu Shirolkar, Project Engineer Bill Brant, Structures Engineer i Black & Veatch I Regarding: Canyon Filtration Plant MentraneTreatmentUpgrade and Expansion, SSC RFI #003.1 Black & Veatch Project Nurrber 140777 �Op Shop Drawing ❑x RFI ® Letter ® Other 1 Date �Sscii mba�ng i D�iption N 03/22/07 1003.1 0003, SM, M 30" RNV CAL AM Line RESPONSE (from Engineer): We have reviewed the 30 inch pipe interferen ce with the foundation of the 0&M building. In orderto accomrodatethe existing 30 inch pipe, tie foundation of theO&M building will need to be revised as indicated on the attached drawing. The foundation Will be stepped up in the area where it interferes with the pipe. The pipe shall be encased in concrete as indicated and a minimimof12inch ofselect fill shall beplaced above the concrete encaserrent. The foundation will bear at tie top of the select fill layer. l Page 1 of 1 I I l 012 et Anderson -SSC RFI 003 t.pdf v� — Page 2 sn;yo ea�ec [tli90 a•o5 013 . s � � Ili i I � � Ate• A ♦I`� D® BLACK & VEATCH 15615 Alton Parkway, Suite 300 i Black & Veatch Corporation I Irvine, California 92618 ! a i i Tel: (949) 753-0500 Fax: (949) 753-1252 . March 28h, 2007 To: Angel Bautista, Project Engineer SSC Construction, Inc. 3 From: Ashu Shirolkar, Project Engineer Bill Brant, Structures Engineer Black & Veatch i Regarding: Canyon Filtration Plant Membrane Treatment Upgrade and Expansion, SSC RFI #003.1 Black & Veatch Project Number 140777 ❑ Shop Drawing ❑X RFI ❑ Letter ❑ Other Date RFI Spec Section /Drawing Description Number Number 03/22/07 #003.1 C003, 5023, S025 30" RW CAL AM Line RESPONSE (from Engineer): We have reviewed the 30 inch pipe interference with the foundation of the O&M building. In order to accommodate the existing 30 inch pipe, the foundation of the O&M building will need to be revised as indicated on the attached drawing. The foundation will be stepped up in the area where it interferes with the pipe. The pipe shall be encased in concrete as indicated and a minimum of 12 inch of select fill shall be placed above the concrete encasement. The foundation will bear at the top of the select fill layer. r I i Page 1 of 1 r ®14 @@ I) ----------------------I I I I MAINTENANCE SHOP EL Ts0.00 L12' TMICN $ 7 3 ' I I I I 1 I I I I I I A TYP 12' MIN SELECT FILL BETWEEN FOOTING 6 ENCASEMENT .iT L__ @• THICK SLM 7 --------------------------------, I I MNSONNY DOWELS @ CENTFA OF WALL (1YP) (SEE ONG 5001) , MAWAWY OONElS EACH FACE / I (1HI5 WALL ONLY) (SEE ONG 5000) I I I I OPERATIONS EL 110.00 S GX$ I I i I I I I - - - - - - - - - - - - - - - - - - - - - I I I I 12'.(TVP - - - - - - - - - - - - - - - - ----------- EQUIPMENT PM (TVP) TYP A 5008 WK 1 FOUNDATION PLAN 5116• • P.O. FACE OF MASONRY W FAG (m F$T LTES: ONO 5001 FOR GEOTECH NEPONT & ALLOWABLE SOIL FQUNAATION EXGVATIONS YOS1 8E OBSEBVEO ANINEENIAtl GEOLOGIST AA9/ON PBO/ECT GEOTECNNIG C ETOF IF C TEL p het Anderson - FW: Azusa COR #1 Page t1 From: "Holden, Jacob S. (Jake)" <HoldenJS @ bv.com> To: "Chet Anderson" <canderson@ci.azusa.ca.us>, <sseffer@ci.azusa.ca.us> Date: 2/19/2008 9:12:24 AM Subject: FW: Azusa COR #1 Chet/Steve, i SSC's CAL -AM line Change Order Request is attached as requested. Our original intent was to hold on processing this until SSC provided requested credits for other items; however, it sounds like ALW would like to bring this before the board soon. Please advise if/when B&V's typical review paperwork will be needed. Thanks, Jake -----Original Message----- i From: Alfredo Bautista [mailto:alfredobautista@sscconstruction.net] Sent: Thursday, January 17, 2008 1:54 PM j To: Holden, Jacob S. (Jake) Cc: Boss, John F.; Chow, Bruce M.; 'Angel Bautista; 657correspondence@sscconstruction.net Subject: FW: COR #1 Jake, Attached please find the revised COR #1 for the CAL -AM reroute. Per our discussion today, SSC will not proceed with procurement until confirmation that the reroute will indeed be required. [ Thank you, Alfredo Bautista SSC Construction, Inc. I. -----Original Message ----- From: Azusa HP Printer [mailto:azusa@sscconstruction.net] Sent: None To: ALFREDOBAUTISTA@SSCCONSTRUCTIO Subject: COR #1 Please open the attached document. This document was digitally sent to you using an HP Digital Sending device. I CC: "Boss, John F." <BossJF@bv.com>, "Chow, Bruce M." <ChowBM@bv.com> i I B SSC Construction, Inc Cost Breakdown 30" Pipe Relocation for Southwest Corner of O&M Building Materials Pipe Materials Concrete for Encasement & Trust Blocks 5 Yds @ 125Nd Sub -Total Equipement John Deer Excavator Water Truck Crew Truck Misc Tools Labor Sub -Total 8 Hrs @ $ 175.00/Hr 4 Hrs @ $ 45.00/Hr 8 Hrs @ $ 25.00/Hr 8 Hrs @ S 25.00/Hr S 10,845.00 S 625.00 $ 11,470.00 $ 1,400.00 $ 180.00 S 200.00 $ 200.00 $ 1,980.00 Foreman 4Hrs @ $ 75.00 $ 300.00 Labor 3 Labors @ 24 Hrs $ 65 $ 4.680.00 PM Time 3 Hrs @ $95 $ 285.00 Sub -Total $ 5,265.00 Total Labor Materials & Equipment $ 18,715.00 Mark Up for Material Labor & Equipment $ 2,807.25 Taxes For Material $ 946.28 $ 22,468.53 Bond & Insurance $ 224.69 Total Change Order Request $ 22,693.21 0,1"7 ;SSC Construction, Inc. I CHANGE ORDER RI;QI'EsT ,2073 Railroad St. I No 00001 Corona. CALIFORNIA 92880 ------ - - TITLE: O&M Building 30" CAL -AMI Reroute DATE: 1/9/2008 t PROJECT: Canyon Filtration Plant JOB: 657 TO: Attn: Jake S. Holden t CONTRACT NO: I Black & Veatch Corporation t 15615 Alton Parkway t Suite 300 t Irvine, CA 92618 r Phone: (949) 788-1252 Fax: (949) 753-1252 I RE: To: From: 3 Number: DESCRIPTION or PROPOSAL Additional Cost for completion of 30" CAI, AVI Pipe relocation %coli:. II I Ilem Description Stock# Quantity Units Unit Price 'roc Rate Tax Amount Net Amount 00001 Materials: Pipe, Concrete, 1 000 SI i.470.00 8.25% S911628 5:1;170.00 i Sand `0002 Labor R Equipment 1000 I S7.245.00 0.00% 50.00 $7.245.00 ,PPROVAL: By: Jake S. Holden late: I I Description Contractor Markup 150/1 Bond & Insurance 1W I i I Unit Cost: Unit Tax: Unit Total: Subtotal: S18.715.00 S946.28 S19,661.28 S19,66I.28 ;Markup Percent Markup Amount S2,807.25 $224.69 Total Cost: 522,693.22 t ► Alfredo Bautista Date: I (r ? / ! 018 CONSENT CALENDAR TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES s „JJ DATE: FEBRUARY 25, 2008 1 1 SUBJECT: APPROVAL TO SEEK BIDS FOR THE INSTALLATION OF PROJECT W-243, WATER TREATMENT PLANT WATER MAIN IN DAYBREAK DRIVE AND SAN GABRIEL i CANYON AND SEWER FORCE MAIN IN DAYBREAK DRIVE P RECOMMENDATION I It is recommended that the Utility Board/City Council approve the advertisement for, and solicitation of bids for Project W-243, installation of Two Water Mains in Daybreak Drive and San Gabriel Canyon Drive and Sewer Force Main in Daybreak Drive. BACKGROUND The Water Division is currently installing improvements to the Canyon Water Filtration Plant located on Ranch Road. In order to receive supplemental water at the Filtration Plant, an 18 - inch waterline must be installed from the San Gabriel Valley MWD turnout on San Gabriel Canyon Boulevard to the Filtration Plant, and to distribute the treated water from the Filtration Plant to the Water System, a 24 -inch waterline must be installed from the Filtration Plant to Sierra Madre Boulevard. The Plant project also includes connecting the Plant to the Los Angeles County Sanitation District sewer line in San Gabriel Canyon Boulevard by means of a 6 -inch force main in Daybreak Drive. i FISCAL IMPACT The fiscal impact of this project will be funded from Capital Improvement Project budget account 32-80-000-721-7130/72107C-7130, which has a current balance of about $25.9 million. The 2006 Revenue Bonds serve as the funding source for this project along with the, Canyon Filtration Plant Membrane Treatment Upgrade and Expansion Project. Prepared by: Chet Anderson, Assistant Director- Water Operations Dig CONSENT CALENDAR TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL % T FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES DATE: SEPTEMBER 25, 2006 i SUBJECT: APPROVAL TO SEEK BIDS FOR THE INSTALLATION OF PROJECT W-245, WATER MAIN REPLACEMENT IN FIRST STREET, BARBARA STREET, ET. AL. (VARIOUS STREETS TO BE RESURFACED AS PART OF YEAR 5 PAVEMENT MANAGEMENT PROGRAM) AND REPLACEMENT OF WATER SERVICES IN VARIOUS STREETS RECOMMENDATION It is recommended that the Utility Board/City Council approve the advertisement for, and solicitation of bids for Project W-245, Water Main Replacement in First Street, McKinley St., Roosevelt St., Paramount St., Barbara Street, Virginia St., arid Replacement of Water Services. BACKGROUND The Water Division has a program of replacing water mains that are experiencing problems with leaks and that are, for various reasons, experiencing flow and pressure problems. The mains to be replaced in this project have both leak problems req uiring. constant repair and deliver less flow than is optimal for current residential area standards. Also, the mains to be replaced in the named streets are in streets designated by Public Works as Year 5 Pavement Management Program to be resurfaced this fiscal year. This project will allow the Water Division to lessen the probability of leaks within the newly paved streets. In all, approximately 1800 linear feet of water main and 36 water services will be replaced. FISCAL IMPACT There is no immediate fiscal impact to the bidding of this project. This item will be Funded from Capital Improvement Project Budget, account number 32-80-000-721-7130/72107B- 7130, 2-80-000-721-7130/72107B- 7130, which has a current balance of about $930,000. If necessary, staff will propose a budget amendment when award of this project is considered. Prepared by: Chet Anderson, Assistant Director- Water Operations r USA • wx+ry CONSENT CALENDAR TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL 7 FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES DATE: FEBRUARY 25, 2008 !, iSUBJECT: BUDGET AMENDMENT — SETTLEMENT AGREEMENT WITH CALIFORNIA {{ PARTIES I RECOMMENDATION I It is recommended that the Utility Board/City Council adopt the attached resolution authorizing a budget amendment of $560,000 to pay for the costs under a settlement agreement with California Parties. BACKGROUND The City has been negotiating with California Parties (the investor owned utilities; the CPUC; and the Attorney Generals' office) in the past eighteen months to settle litigious issues in connection with the 2000-2001 California energy crisis. The settlement agreement is to be executed by all Parties within one week. As part of the 'settlement, the City will pay cash consideration of $560,000 to resolve previously claimed overcharges for wholesale power sold to the California Independent System OperatorR markets. The proposed budget amendment is needed to pay the cost under the settlement agreement. FISCAL IMPACT ! A budget amendment of $560,000 is needed to pay for the cost under the agreement. Funds are available from Electric Utility fund balances for this budget item. I Prepared by: Bob Tang, Assistant Director of Resource Management 7 ml Reso.doc 021 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, AMENDING THE FISCAL YEAR 2007-2008 OPERATING BUDGET FOR THE ELECTRIC UTILITY TO PAY FOR COST OF SETTLEMENT WITH CALIFORNIA PARTIES. WHEREAS, the adopted Fiscal Year 2007-2008 Operating Budget for the Electric Utility included $33 million to pay for purchased power cost; and WHEREAS, the City has been in negotiation with California Parties in the past eighteen months to resolve 2000-2001 California energy crisis related issues; and WHEREAS, a settlement agreement has been reached and will be executed shortly; and WHEREAS, Azusa Municipal Code Section 2-450 requires that all budget amendments between $100,000 and $1 million be approved by resolution; and WHEREAS, the cash consideration under the settlement agreement is a payment of $560,000 to the California Parties within five days of the execution of the settlement agreement. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AZUSA, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That the Electric Utility Fiscal Year 2007-2008 Operating Budget is hereby amended in the amount of $560,000 to pay for cost of settlement with California Parties, budget expense account number 33-40-775-550- 6590. SECTION 4. The City Clerk shall certify to the adoption of this Resolution. PASSED, APPROVED AND ADOPTED THIS 25th day of February, 2008. Joseph Rocha, Mayor ATTEST: Vera Mendoza, City Clerk STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) ss. 022 y CITY OF AZUSA I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Utility Board/City Council of the City of Azusa at a regular meeting of the Azusa Light & Water Utility Board on the 25th day of February, 2008. i i AYES: COUNCILMEMBERS: NOES: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: Vera Mendoza, City Clerk 023 Id I Avg AGENDA ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL nn T 1 FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES 63� ( DATE: FEBRUARY 25, 2008 SUBJECT: REQUEST BY CALIFORNIA RESOURCE CONNECTIONS FOR $15,500 TO CONDUCT LITTER CLEAN-UP PROGRAM AND COMPOSTING / GARDENING WORKSHOP RECOMMENDATION i It is recommended that the Utility Board/City Council approve: (1) proposed funding request by California Resource Connections in amount of $15,500; and (2) approve a budget appropriation for fiscal year 2008-2009 in amount of $8,175 using AB 939 Fee Revenue to pay for a Composting / Gardening Workshop; and (3) authorize use of budgeted Beverage Container Recycling Grant funds in amount of $7,325 to pay for Litter Clean-up Program this fiscal year. BACKGROUND I I In August 2007, the City Council approved a Memorandum of Understanding (MOU) with California Resource Connections (CRC). The MOU was twofold. First, with about $52,500 in funding, it required CRC to make improvements to the Taylor House located in San Gabriel Canyon across the river from the former EI Encanto Restaurant. Second, the MOU committed j the City to provide $10,000 in funding to CRC for "environmental programs:' Vulcan Materials donated $50,000 in initial funding for improvements of the Taylor House property and Azusa Light & Water contributed $2,500 given CRCs promise to educate the public about the importance of the San Gabriel River as a water source and the need to keep it clean. At this time, CRC, through attached proposal, requests $15,500 in funding to conduct two environmental programs: (1) a river education and cleari up event in April 2008 to coincide with the City of Azusas Clean, Green, More Beautiful Azusa Celebration, and (2) a compost i and gardening workshop to be held in September 2008 at the Taylor house. As part of the compost workshop, CRC would provide free compostl bins to residents which would be purchased with funds provided by the City. The cost of, the compost bins would be about $5,500 and so this is why the funding request exceeds the amount in the MOU. However, 4 compost bin give -a -ways are common amongst City recycling programs and so staff If 024 t� � recommends approval of the higher amount using AB 939 fee revenues. FISCAL IMPACT Total cost of this approval is $15,500. Of this total, $7,325 will be provided from existing budget using account number 28-40-750-064-6625, or block grant funds from State of California for Beverage Container Recycling and Litter Clean-up. Since the Composting Workshop being proposed is scheduled for next fiscal year, $8,175 will be budgeted for this program in next years operating budget using AB 939 program fund since backyard composting is an eligible use of these funds. Prepared by: Cary Kalscheuer, Assistant to the Director of Utilities It CRC Proposal.doc 025 CALIFORNIA RESOURCE CONNECTIONS, INC. 1201 N. Azusa Ave. • Azusa, CA 91702 • 626.969.2491 • bugsuzanneOverizon.net I To: Robert Person, Assistant City Manager City of Azusa From: Suzanne Avila, Program Director California Resource Connections, Inc. Date: December 31, 2007 I i I Re: Proposal for education programs and activities pursuant to I. Memorandum of Understanding relating to the improvements of the Taylor Property, 2330 N. San Gabriel Canyon Road, Azusa - Aug 2007 Budget Item 1C: The Canyon Institute Program Implementation i Attached is a proposal, submitted by California Resource Connections, Inc. (CRC), for environmental education programs and activities at the Azusa River Wilderness Park as outlined in the August 2007 MOU between the City of. Azusa and CRC relating to the improvements of the Taylor Property. Program application guidelines are identified in the f MOU as Budget Item #1C. CRC is a non-profit working to develop the Azusa River Wilderness Park along with its main partners the Watershed Conservation Authority/Rivers and Mountains Conservancy and the California Conservation Corps. All program events planned are j environmentally -conscious, community-based, and have an educational activity as a main component. The goal of providing programs at the Azusa River Park is to educate l residents on the inherent value of the natural resources of the San Gabriel River watershed. CRC, and its main partners, will work with several City of Azusa departments to develop and produce these events and also outreach to other community organizations to build our partnership base in planning for these and additional future events. It is a pleasure to work with the City of Azusa in creating arid developing recycling and other conservation programs at the Azusa River Wilderness Park in the Canyon City! 026 EXERPT FROM THE AUGUST 2007 MOU RELATING TO THE IMPROVEMENTS OF THE TAYLOR PROPERTY BETWEEN THE CITY OF AZUSA AND CALIFORNIA RESOURCE CONNECTIONS, INC.: BUDGET ITEM - 1C: The Canyon Institute Program Implementation The City shall consider funding for CRC educational outreach programs and activities in amount of $10,000 as part of separate Program Application. Program Application shall center around the following types of Outreach Programs and target Azusa residents: 1. Watershed history and use of river water 2. River safety 3. How to keep the river water supply clean 4. How and why to conserve water 5. Natural and geologic setting of river, including plants and wildlife CRC may also propose environmental activities or events, such as: 1. Litter cleanups along the river banks, coupled with watershed education 2. Science programs to test river water quality, and assess geologic and botanical surroundings 3. Workshops on native plants and water conserving irrigation systems 4. Workshops on backyard composting and gardening 5. Activities to educate youths on storm water pollution prevention, e.g., storm drain stencils from Heal the Bay 6. Library Reading Program/Friends of Library event 7. Homework House After School Program (Eco Club) 8. Recreation and Family Services — Summer Program 9. Azusa Pacific University — Think River! 10. Earth Day Event Proposals for such education programs and activities are due by December 31, 2007 to the City of Azusa for review and funding consideration, for subsequent 12 months. Each Program/Activity Application To Include: 1. Description of Program 2. Dates when program or activities will be carried out 3. Description of how program helps the City comply with environmental regulations 4. Description of Target Audience 5. Description of How Program will be advertised and marketed 6. Description of Materials to be used in conducting outreach or activities 7. List of all costs associated with program or activities 8. Description of funding from other agencies or in-kind labor/volunteers 9. Description of how program results will be measured reported to the City 2 027 i Program Partners: It is desirable that additional Program sponsors be solicited for funding or in-kind support. The following may be considered: 1. Corporate sponsors 2. (Intentionally left blank) 3. Federal, State, and private grants ' 4. Water Agencies 5. Congressional Appropriations M > 3 028 Azusa River Park 2008 Program/Activity Application Description of Program California Resource Connections, Inc. (CRC), and its main partners, the Watershed Conservation Authority/Rivers and Mountains Conservancy (WCA/RMC) and the California Conservation Corps (CCC), are proposing 2 community environmental education events for 2008 to be offered at the Azusa River Wilderness Park. All events exemplify environmentally -conscious programs that are community-based and have an educational activity as a main component. The goal of providing programs at the Azusa River Park is to educate residents on the inherent qualities of the natural resources of the San Gabriel River watershed. CRC and its main partners will work with several City of Azusa departments to develop and produce these events and also outreach to other community organizations to build our partnership base. Descriptions for each of the 2 proposed programs are listed below, followed by a budget, and then the remaining application questions. 1 — "Think River! — Think Green, Clean, and Lean" Clean Up as part of Clean and Green Campaign Date: 04/12/08 Saturday 9:OOam—11:30am Description: This San Gabriel River clean up will be advertised as part of the City's April Clean and Green activities. Outreach will be made specifically to Azusa schools K-12, including the Jr. ROTC at both Azusa and Gladstone High Schools, and also to Citrus College and Azusa Pacific University emphasizing the fact that students can earn community service hours by participating. The day's activities will begin at the Azusa River Park/EI Encanto parking lot with a sign up list, morning snacks, and brief welcoming remarks. Recycling practices will be utilized when serving and cleaning up the snacks. All those participating will then be rotated through three 10 -minute educational sessions that will cover the following topics: definition of the San Gabriel River Watershed, how trash affects water quality, and safety along the river. Gloves and trash bags will be distributed during the educational sessions. Participants will then be escorted safely across Highway 39 to the northern terminus of the Azusa River Bike Trail and asked to walk south, picking up litter along the way. CCC members will be walking continuously up and down the bike trail to ensure safety of participants and to disseminate event information as needed. Two stations will be set-up strategically as one -mile markers along the trail and staffed with volunteers to give participants an opportunity to drink water and head back north if they chose. Turn around point is at Lario Park (Foothill Blvd and the San Gabriel River). At Lario Park, participants will have access to hydrating refreshments, an educational display hosted by a Park Ranger that focuses on native plants and animals, and free public. informational give-aways solicited from local conservation organizations. Conclusion of events is at EI Encanto where all trash bags will be collected, counted, and disposed of properly. Target Audience: Students, families, the community at -large 029 In -Kind LaborNolunteers: SPONSOR INCOME I RESOURCE Azusa Historical Society In -Kind Historical displays of the San Gabriel River Azusa Light & Water In -Kind Advertised as part of City's Clean and Green Campaign Azusa Recreation and Family In -Kind Advertisement in 2008 Activity Services Guide California Conservation Cors In -Kind Crew for event set up and removal California Conservation Corps In -Kind Event leaders with presence along the bike path to aid, escort, educate participants Watershed Conservation In -Kind Park Ranger as instructor/trainer for Authority safety session Watershed Conservation In -Kind Park Ranger hosting native plant Authority and animal display F 2 — Community Gardening and Composting Workshop Date: 09/20/08 Saturday 9:00am—11:00am Description: The goal of this event is to educate residents on native plant gardening and various methods of backyard composting, including vermiculture. Outreach will be to Azusa teens (via their high school science class), families, and the community at large. Free compost bin give-aways will be advertised prominently as a draw (proof of residency required/one per household). The workshop will take place at the Canyon Institute, former Taylor Property, to allow for site vegetation to be utilized as part of the native plant demonstration. Morning check-in will begin with a sign in sheet where addresses will be collected while light snacks are served. Recycling practices will be utilized when serving and cleaning up the snacks. Brief welcoming remarks will introduce the certified Landscape Architect and/or Master Composter who will conduct the educational demonstrations, complete with a safety lesson. Supplies and materials will be available for participants to practice safely on site under the guidance of a landscape professional. Biostack composting bins will be given away to those in attendance. Additional educational materials regarding sustainable practices will be available for participants to take home. Should funding be available in subsequent years, participants will be required to pre - register so that their address can be checked against those that received a free bin in the previous year. The workshop will conclude by disseminating 3 x5 cards that contain information of resources that participants are encouraged to follow up with (i.e. websites, book titles, journals, regional native plant sites, future watershed related events, etc.). Target Audience: Teenagers to Adults In -Kind LaborNolunteers: j. SPONSOR INCOME RESOURCE I 030 Azusa Historical Society In -Kind Historical displays of the San Gabriel River Azusa Recreation and Family In -Kind Advertisement in 2008 Activity Services Guide California Conservation Corps In -Kind Event leaders for demonstrations, Parking patrol Rainbow Canyon Equestrian In -Kind Use of property for off site parking Ranch List of all costs associated with program or activities See chart below. Description of Materials to be used in conducting outreach or activities See chart below. 6 031 7 032 ESTIMATED EVENT/MATERIALS FUNDING PARTNER NEEDED REQUESTED CONTRIBUTION TOTAL 1, 1 River Clean Up as part of Clean and Green Cam ai n Program Planner(s) stipend for $5,525.00 $5,525.00 85hours @ $65.00/hour i Trash Bags $100.00 $100.00 Disposable Gloves, non Latex $100.00 $100.00 Port-a-Pottie x 3 $1,600.00 i $1,600.00 Trash Bins x 3 @ $105.00 eachL $315.00 $315.00 Water $500.00 $500.00 Snacks (Fruit, Bread, Orange $100.00 $100.00 Juice CCC donation of Corps $920.00 $920.00 Members/Event Leaders 40 hours @ $23.00 hour LA County/Lario Park donation of f $100.00 $100.00 restroom maintenance 4 hours @ $25.00 hour WCA donation of MBCA Ranger 1 $300.00 $300.00 as parking patrol at EI Encanto �. 4 hours @ $75.00 hour WCA donation of MRCA Ranger $300.00 $300.00 as instructor of safety session and mid -point educational display on , native plants and animals i 4 hours @ $75.00 hour Event 1 Total $9,860.00 2 Community Gardening and ornposting Work hop Program Planner(s) stipend for $2,675.00 $2,675.00 41.15hours @ $65.00/hour Composting Bins $5,500.00 $5,500.00 Smith & Hawken Biostack I 100@$55.00 each Water $500.00 $500.00 Snacks (Fruit, Bread, Orange $100.00 $100.00 Juice CCC donation of Corps $368.00 $368.00 Members/Event Leaders 16 hours @ $23.00 hour Event 2 Total $9,143.00 TOTAL AMOUNT $15,500.00 $3,503.00 $19,003.00 REQUESTED 7 032 Description of how program helps the City comply with environmental regulations Communicating directly with Azusa Light and Water Representative(s) will be a guiding component of planning the events. All data gathered from participants will be solicited and compiled according to the requirements of any agency regulations that the City reports to (i.e. TMDL's, beverage recycling count, etc). Description of How Program will be advertised and marketed Azusa Herald Azusa Pacific University Azusa Unified School District Citrus Community College City of Azusa On-line calendar City Council meetings during public participation City hall marquee Friends of the Library newsletter Light and Water Clean and Green Campaign Recreation and Family Services Activity Guide Rotating cable bulletin Woman's Club newsletter CREEC—LA (California Regional Environmental Education Community — Los Angeles) San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy web site San Gabriel Valley Tribune Description of how program results will be measured and reported to the City Data on participants and outcomes will be collected at each event, along with organizational information such as number of volunteer hours received, in kind donations and amount of contributions. CRC shall provide the City with a report by December 31, 2008 of all outcomes, including participant data, any survey information collected, and a final budget showing all expenditures. Program Partners: The following organizations will be contacted for possible partnership opportunities Corporate Sponsor Athens Services CEMEX 033 i COSTCO EI Nativo Growers Miller Brewing Company Naked Juice Rain Bird Corporation ; REI U.S. Forest Service Vulcan Materials Company Federal, State, and private grants The Canyon City Foundation i Water Agencies Azusa Light and Water Metropolitan Water District, Community Partnering Program San Gabriel River Water Committee Congressional Appropriations I Not applicable. (Congressional appropriations requested in 2008 would not be reviewed/received until 2009). I i 034 AGENDA ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES 1.%��t.J—/ /[)7�% laer`1 , i DATE: FEBRUARY 25, 2008 1 SUBJECT: SUPPORT OF SENATE BILL 691 (CALDERON) -- REQUIREMENTS FOR RECYCLING OF NON-FERROUS METAL s RECOMMENDATION It is recommended that the Utility Board/City Council adopt a support position on SB 691 and authorize staff to send letters to legislators advocating the City's position. BACKGROUND Theft of non-ferrous metals such as copper has been on the rise this past few years due to the increasing value of the commodity. The problem has become so prevalent that structures at construction sites are often targeted and stripped of copper pipes or conduit; fire hydrants have been stolen, and materials have been stolen from utility storage yards. SB 691 (Calderon) was introduced to combat this problem by requiring recycling centers who pay for such metals to pay by check and obtain identifying information from those individuals who sell such materials or items for cash. Files identifying sellers are to be kept on hand for a period of 2 -years. Sales less than $20 would be exempt from the requirements of this bill as would beverage containers. I FISCAL IMPACT There is little fiscal impact of the City supporting this bill. ;The Utility has already experienced theft of its supplies and in some cases infrastructure, and passage of this bill may deter further theft of valuable equipment and supplies. E r Prepared by: Cary Kalscheuer, Assistant to the Director of Utilities 035 INFORMATIONAL ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL I }} r FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES 0 DATE: FEBRUARY 25, 2008 r SUBJECT: PHASE 3 WATER SHORTAGE DECLARATION STATUS REPORT (VERBAL) Two articles are attached for the Board's information regarding ongoing concerns related to the drought and regional water supply. One relates to the Sacramento -San Joaquin Delta and potential problem presented by the California Fish and Game Commission voting to protect a fish called the longfin smelt. The other article relates to ongoing local concerns as referenced by the Watermaster, and other local entities, especially potential impacts of the Metropolitan Water District's changing policies. I More information will be provided verbally on the water shortage by Director of Utilities at the Utility Board meeting. Prepared by: I Cary Kalscheuer, Assistant to the Director of Utilities J Attachment: I Drought Arti s.pdf ' i I 036 Fish rescue may mean drier times - sacbee.com 1te iu+51r of7TeS�mnhino Ra This story is taken from Sacbee / News. Page 1 of 3 Fish rescue may mean drier times To save the longfin smelt, a state panel sets new rules for exporting Delta water. By Matt Weiser - mweiser@sacbee.com Published 12.00 am PST Friday, February 8, 2008 The Bay Area and Southern California could be in for deeper water shortages this year after state officials on Thursday decided to protect another Delta fish. The California Fish and Game Commission, meeting in San Diego, voted unanimously to protect the longfin smelt under the state Endangered Species Act. The finger -length fish is now officially a candidate for stronger protection. State officials will spend the coming year deciding whether its status should be "threatened" or "endangered." Meanwhile, to protect the longfin, the commission also set new rules for state and federal agencies that export water from the Sacramento -San Joaquin Delta to 25 million Californians and 2 million acres of farmland. This could mean drier times ahead for parts of the state already dealing with shortages because of the Delta's troubles. "It's fair to say this is just another notch in the chokehold that is tightening our ability to move water," said Laura King -Moon of the State Water Contractors, which represents most of the agencies that buy Delta water from the state. The longfin smelt is one of nine Delta fish species to suffer steep declines over the past five years. Last year, the longfin population was the lowest in 40 years of record-keeping. State and federal water pumps in the Delta are blamed for killing millions of fish, but other culprits include poor water quality and invasive species. Government officials are working on plans to protect the Delta. But those will take years and billions of dollars. Hardships are coming in the meantime. Commission President Richard Rogers said he felt forced into a decision he called "repugnant." "The piper is standing at the door with an ax," he said. "This is something we have to solve and we have to solve now." State action to protect the longfin came after a petition by environmentalists. A similar petition is pending under federal law. http://www.sacbee.com/101/v-print/story/697540.htrnl 2/11/2008 037 Fish rescue may mean drier times - sacbee.com Page 2 of 3 "There is absolutely no doubt the species merited listing and is in desperate need of protection, along with its habitat," said Tina Swanson, 'a scientist at the Bay Institute, one of the petitioners. Rules adopted Thursday closely match limits imposed by a federal judge in December to protect the Delta smelt, a cousin of the longfin. Court restrictions slashed water deliveries by 42 percent in January, shorting water agencies about 1269,000 acre-feet, said Terry Erlewine, general manager of the State Water Contractors. That's enough for about a half -million homes. But the longfin has a different life cycle, generally breeding earlier in the year. So the Department of Fish and Game called for pumping limits that could begin earlier in the fall and possibly extend deeper into spring. The commission adopted those limits, voting 3-0, with two members absent. The new rules take effect later this month and will be in place through August. The commission then expects to extend them another six months. By then, state and federal officials intend to adopt new operating rules for water pumps that come with permanent protections for Delta fish. `. There is some doubt about whether Thursday's actions must bel heeded by the U.S. Bureau of Reclamation, which operates the Delta's federal pumping system. So the commission will ask the state Water Resources Control Board to also adopt the rules, which would then be binding on the bureau. j Jeff McCracken, a spokesman for the bureau, did not comment on how his agency will respond, saying officials had not yet reviewed the new rules. j Water agency representatives at Thursday's meeting warned the state's new rules would only lead to protracted litigation. I They complained of being singled out, while other Delta threats are ignored. They urged the commission to force agricultural water diverters within the Delta to screen intakes, for instance, and end protection of the striped bass, a nonnative species blamed for preying on protected fish. j i Water users favored having the federal court's Delta smelt limits cover the longfin as well, since the species are similar. I i "If you have an umbrella that keeps you dry, you don't need two umbrellas," said Jerry Johns, deputy director of the state Department of Water Resources. I I The commission instead agreed with state biologists that the longfin's unique breeding cycle demands special rules. Commission members also ordered a staff report on possible steps to control other threats. "We're really concerned about the health of the ecosystem, not just the health of this fish," said commissioner Michael Sutton. Go to: Sacbee / Back to story This article is protected by copyright and should not be printed Or distributed for anything except personal use. The Sacramento Bee, 2100 Q St., P.O. Box 15779, Sacramento, CA 95852 f_ Phone: (916) 321-1000 http://www.sacbee.com/101/v-print/story/697540.html 2/11/2009 1 I j; Pasadena Star -News - Pulling out of the drought Page 2 of 2 Second, the region must invest in ways to better capture storm run-off. One idea that should be explored is to establish a fresh water harbor at the end of the San Gabriel River in Long Beach. Captured run-off would then be used to recharge drinking wells. The low-tech way to capture more rainwater is to return land to its pristine state. Re -greening the Arroyo Seco, the Los Angeles, San Gabriel and Rio Hondo rivers would increase the amount of porous surface for rainwater recharge. We're pleased to hear the Watermaster is working with the Rivers and Mountains Conservancy to find more land for preservation. More green space - especially along our rivers - will send millions of gallons of rain and storm water back into underground aquifers. What about consumers? We'd rather use carrots than sticks for increasing conservation. More agencies should follow the lead of the Upper San Gabriel Valley Municipal Water District which gives away low -flush toilets, water -stingy shower heads and promotes water -efficient dishwashers and washing machines. All new buildings should be water wise and include drought -resistant landscaping. With these carrots, plus the good news of a wet year and a healthy snowpack both locally and in Northern California, cities such as Covina, Azusa and Glendora should suspend plans for mandatory water rationing. Requiring homeowners to use 10or 20 percent less water penalizes those who had been conserving and is unfair to senior citizens who use very little water anyway. We're seeing a rainbow at the end of the drought. Now, if only we could harvest that pot of gold. ----------------------------------------------------------------------------- e i cznces veion e FREE Twenty 4x6' basic prints r , ° � � � II�B�lilll��llll�lll�llll� , mko.anet a,:a�n ene+ar=:ane iees.m»rapnra-�mno,o es rteiocamr. ryeu.Onc na�.mte er:h iomaM�e mwc.iv. uma am nc� v oiM ec m�e+.. oea,a waecee,m rnMs.mcee �ro eoaes >;cw2 e�,k. wa n caoee.„se. r r rucwsM.mA]n•cmHm MwM'.ra crsn w�ue..x-.am�.+,:esei.aut E<m ro�comryem o -x wm. 9856-0113-2647-56/9-037E5806-89 � ____________________________________________________________________________J Print Powered By rd Fcrma'tDynamics” http://www,pasadenastarnews.com/opinions/ci_8218125 032/119/2008 Pasadena Star -News - Pulling out of the drought OUR VIEW Pulling out of the drought Article Launched: 02/092008 06:16:54 PM PST To water managers, the snow-capped San Gabriel Mountains are more than just pretty postcard material. They represent a return to normal well capacities. The future snow melt that will slowly percolate into groundwater recharge areas well into summer along the San Gabriel and Rio Hondo river banks is the key to ending years of drought. Is the region ready to capture this bounty? Or will it be wasted? Rainfall in downtown Los Angeles this season is four inches above normal. Behind the Santa Anita Dram, seasonal rain has equaled more than 20 inches. The winter storms and more importantly, melting mountain snowpack will "definitely" be good news for Azusa and Glendora, which draw from canyon wells and are most affected by a local drought, experts say. The key San Gabriel Basin well down 26 feet in December '07 over December '06 - will be on the rise. A state Department of Water Resources web site shows key reservoirs in central and Northern California at or approaching normal percentages as of Jan. 29.2008. So why aren't water folks cheering? They are like the American voter, worried about the tanking economy, gridlocked political environment and ominous environmental news - yet despite a gloomy outlook are voting in higher numbers. As Barrack Obama would say, do the water folks have the audacity to hope? Hope that California is showing signs of crawling out of a drought? i "This (rainfall, snow pack) is definitely going to help," said Carol Williams, general manager of the Main San Gabriel Basin Watermaster. But she said we'll need another wet year in '08-'09 before she and others would pronounce the drought dead. I i We understand such cautious optimism. The Watermaster is facing a go -it -alone future from mighty Metropolitan Water District, which has suspended its delivery of imported water for replenishing our overdrawn basins. Instead of annually, that may happen 'three out of 10 years," she said. Actually, going independent may be the best thing for communities sitting on top of ground water supplies. It is the stimulus this region needs to fix its own water problems. I As Rep. Grace Napolitano said last week, it will take a lot of agencies and people working together. We have some project suggestions: First, dean -up of polluted pockets of the basins must be accelerated. Yes, there's been progress. But cities, water agencies, the EPA, the state and the responsible parties must put more money into finishing the job. Having a pollution - free aquifer will establish San Gabriel Valley's water independence. ----------------------------------------------------------------------------t 1 I I � [%PIRCS JIB/0.9 I 1 , FREE Twenty 4x6' basic prints 1 1 I (Y'Cnre b`b n1 iR'eHC"0.�1l aryatalntl. Gn fn iO¢f.fM/PMloba:ekxtW..ennMe[1'au.OlmlbafevknL 'etl In nna�bn 9656-0tiI '— :vpacM. limp PnP ile^�aolk^Cy-m'�mn. Cper,d maiolYe la.'aM1ls cIX: an ll,a SWet Rcl�m Ccsk. `.tiPil <npeO. M1nnslrnetl. I pvcax.'l. ecuarm'l+"nmb...rm mnw�n xaemum rolCl v"uf<mlu rana,w vee Pne,. � 32647-5949-D376-5806-69 I I--------------------------------------------------------------------------J Print Powered By JF Forma�Dynainics'- i httl ://www.pasadenastamews.com/opinions/ci 8218125 Page I of 2 2/11/2008 040 PROJECT: PROJECT NO.: GENERAL CONTRACTOR: DESIGN ENGINEER: CONSTRUCTION MANAGER: PROJECT CONTRACT AMOUNT: CHANGE ORDERS TO DATE: MONTHLY ACTIVITIES As of 2/20/2007 - — - MONTHLY -REPORT FEBRUARY, 2008 MEMBRANE TREATMENT UPGRADE OF THE CANYON FILTRATION PLANT WVF-207 SSC CONSTRUCTION INC. BLACK & VEATCH INC. BLACK & VEATCH, INC. $35,905,500.00 $36,251,072.84 $100,642.76 10 DAYS Approved July 23, 2007 $164,975.54 14 DAYS Approved Sept 24, 2007 $57,261.33 4 DAYS Approved Nov 26, 2007 $22,693.21 Approved Feb 25, 2008 Construction progress meetings were held January 31 & February 14. Pretreatment Building handrail installed DYK - Finished Water Reservoir - installed 4 of 11 wall sections $1,622,767.82 O&M Building roof trusses set - exterior columns constructed $18,327,587.37 Chemical Feed Building- perimeter slabs and embeds poured $1,832,758.74 Sludge Drying Beds- some floor and slope concrete has been poured - with divider walls 50.56% Canal Diversion Structure - water through structure - canal operational - some slope grading done Membrane Building exterior walls being laid - nearly complete JANUARY PROGRESS PAYMENT REQUEST: $1,622,767.82 TOTAL PAID TO DATE $18,327,587.37 AMOUNT TO ESCROW $1,832,758.74 PROJECT PERCENT COMPLETE 50.56% O N r—� INFORMATIONAL ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES g� �O1�DYr lTl" DATE: FEBRUARY 25. 2008 SUBJECT: SAN JUAN ENVIRONMENTAL PROJECT AND LODI #2 PROJECT Attached include information on San Juan Environmental Project and Lodi #2 Project. Attachments: i San Juan Update. pdf LndVUpdate.doc r 3 A 042 rrI� s A pm wl commitment to Now Me dm Coordination Committee Update February 7, 2008 San Juan Generating Station ,, A pomml commitment b Now Maxie Q Ui ProteaYourself Avian Flu General Precautions Avian flu is viral disease and it can be very contagious and even deadly in poultry (e.g,. chickens). Of great concern are the highly pathogenic avian influenza (HPAI) HSN1 viruses that have killed millions of birds and infected humans in other countries, If these viruses are detested in the U.S. or if you travel on work assignments or are employed in countries that have HPAI H5N1 outbreaks, take appropriate Precautions, Avian Flu Symptoms in Humans Range from fever. cough, sore throat and muscle aches; to diarrhea, eye infections, pneumonia and severe respiratory diseases. The symptoms of avian influenza may depend on which virus caused the infection but are often similar to those associated with human seasonal influenza. How Humans Are Infected Contact with sick poultryor surfaces soiled with dis- charges from their mouths or beaks, or with feces. Inhaling contaminated particles from poultry. Treatment Some prescription antiviral drugs may be effective. General Precautions Wash hands thoroughly and frequently, for 15.20 sec - on s, preferably with soap and water. Avoid contact with possibly infected poultry. Avoid consuming uncooked or undercooked poultry or poultry products. Precautims When Exposed Use appropriate personal protective equipment (PPE): • Disposable gloves or gloves that can be disinfected; • Protective clothing (long-sleeved coveralls with a water- proof apron); • Disposable shoe covers or those that can be disinfected; *Safety goggles; and • Wear at least the minimum level of respiratory protec- tion, N95 or higher respirator. Employees should remove all PPE at work to avoid taking contaminated items home. If you develop flu-like symptoms, stay at home except to get medical attention. for more compete Information: U.S. Departront of tabor www.osha.gov (8001321 -OSHA AL� '�fi.��ip'�_*.r re M' d� e�"i �'�* !F se Y ��� � a�, �. Ia '.2 r� "Ill � a >ny i e+v® kH- i,L4 k/ r, 9+'?a'+• .. iro N yf • L i�i�' �.;ky,+`+ kp�Y�'4'r'r �Ffm;hwx vi r9r. P ; j ,'",''§§.. w t r a r a"a Apersano) c mftment xr ;w' ..' c` �+ �� to New Medw � ,' ' wr k$a � Ti r. !^«, i't�ii `v ,,rJ,u. +gi �:.a± , p .wte.. v4�`. �V^.r «-.. at ?.�a srf%= , .Y,k 's�„ ,,,,,, '.� ,�8 r ;,s..nn ... .. .., S�....aM. N. S.- • Safety — 927,210 man hours worked as of January 20, 2008 • OSHA reportable incident rate is 3.02 • Man Power 1-r MJ Westates B&W _ .. _ - - - - - -Electric Supervision 2 20 .15 Craft 15 329 75 1-r ��� Sdk P} y. Aprnolwl wmmitment �", w Nt Mww t 64 5 iS TM`e ri "'^tyy 1 r+ff Pcd�fit5$ Current Project Cost Estimate $320AM — Unit 4 Construction Is Complete. • Forecasted To Be Within $1M of $81.525 M Estimate — Includes Share of 3 & 4 Common — Unit 3 Construction Expected to Complete March 19th. • Estimated To Be Within $1.5M of $80.959 M Estimate — Includes Share of 3 & 4 Common _ - _ _ _ __ _ . _ •_ Labor_ Incentive. exposure. is. $3.OM._ _ _— _ — $1.5 M for Environmental Project Work. — $1.5M for Balance of Plant Outage Work. — Unit 2 Expected to be at Target. — Labor Incentive Exposure Dependant on Need. — Unit 1 Expected to be at Target. — Labor Incentive Exposure Dependant on Need N AK. cu § A Mex personal commilmenf� to New xr:�,-�41�,M Ni-td:;mti. s .:.-o ��"�:`:!�ix�X.•P+°i�`.;:,�[YY'a�cu.. s. _.'�.oµ'Rn"�?':,. ua�d. �4k n,... �fi�.u.!.Cb.��i:��a • Overall Unit 4 is 99.9% Complete — B&W Construction Complete (10/30/07) — Completing Commissioning Activities This Month • Overall Unit 3 is 83% Complete — Civil — 99% Complete — Mechanical — 75% Complete Electrical — 50% Complete • Baghouse is slightly behind schedule because of bag cages delivery delays. Delivery expected 02/20/08. • IDBooster Fans slightly ahead of schedule. • Burner Fronts slightly ahead of schedule. 9 R; 3�ax '. - a 4 i= fs9+F o- a + ;€'4'ut. s n ,� '� "N.'rt s f x{ of w4 +fit ���JP t 2y Fla` � : " 8 i r, ^� xM.p,� �'�-�'I�k`�3Fx "d';?', ,.p v w � • �..;�dts' „$wx k S (],???'. ��yy��`.a,.'a1' �i "'� ° k � ,t; P". __ • k�''-�'�YO �ZLJj. \/��r �b a? A y u " -kH 'vw �a"'a'+{�' d ApcNo commitment +2 m Now MGtico • Overall Unit 1 is 25% Complete — Civil — 99% Complete — Mechanical — 10% Complete • Baghouse & Duct Structural Steel Erection is on Schedule. — Electrical — 5% Complete - T ' Overall Unit 2 is 10 % Complete — Civil - 50% Complete — Mechanical — 1% Complete — Electrical — 1% Complete 0 c� A A personal wmmitment w New Meow C) M • Labor Retention Incentives — $1.5M - $2.OM Per Unit Project Cost Exposure — $1.5M - $2.0 M Per Unit Non -Project Cost Exposure — Reviewing and Revising Comprehensive Construction Schedule for Units 1&2 C=) Cal tv r e Ape ml milmcm to Nein MMM C) Cal w $35,000,000.00 $30,000,000.00 $25,000,000.00 $20,000,000.00 $15,000,000.00 $10,000,000.00 $5,000,000.00 r --•-•-•-•-•L Budget Comparison Unit4 ! ■Budgets ❑ Costs BWCC Scope FPD Scope PNM Construction PNM / S&L PNM Labor Scope 1\U hl to Nm Mridw $35,000,000.00 $30,000,000.00 $25,000,000.00 $20,000,000.00 $15,000,000.00 $10,000,000.00 $5,000,000.00 77 Budget Comparison Unit o costs BWCC Scope FPD Scope PNM Construcion PNM -S&L Scope PNM Libor Scope l v` A pars lommilmem. to New Miedw Ul Cil $35,000,000.00 $30,000,000.00 $25,000,000.00 $20,000,000.00 $15,000,000.00 $10,000,000.00 $5,000,000.00 $- Budget Comparison Unit2 ■ Budget I ®Cost To Date _ J BWCCScope FPD Scope PNM Construction PNM-S&LScope PNM Labor Scope A Pc nal Immitment to New modw (D Ul M $30,000,000.00 - $25,000,000.00 - $20,000,000.00 - $15 ,000,000 00 $10,000,000 00 - $15,000,000.00 - S- Budget Comparison Unit l 1 0 Budget I j im Cost ToDatej BWCC Scope FPD Scope PNM Construction PNM -S&L Scope PNM Labor Scope ON:, 0 'WIN fid;t I , k2" N "J i 94 W, P 1, 1_ -i MW ky '4, , Nl, q! 1- 4, .1 zj" F #0 t,WE ki sm, BWCC Scope FPD Scope PNM Construction PNM -S&L Scope PNM Labor Scope ID Task Name 0% BA Area Repairs; PNM MaInt. Absorber Unit Three System Activities PNM Maint. Bottom Ash System Activities Casing Leak Repairs E= 3A SAM Cold & Intermediate Basket Removal MEMI 38 SAM Cold & Intermediate Basket Removal 0% L -&E= 3A SAN Cold & Intermediate Basket Installation 0% 313 SAM Cold & Intermadlate Basket Installation 0% 3A SAM Mot End Basket Installation 0% 3B SAM Hot End Basket Installation 19%oCrown Seat Repairs Expansion Joint Bait & Flange Installation itiElPNM Maint. Sailer Air & Gas System Activities `Steam Drum Impeitlon and Repair 26% PSK/Econ.Demc, Existing Elements PSK/Econ-Demo Existing HeadersI 25% W SSH Area Repairs 254 SSH Split Ring Casting Replacements U -A SSH DMW Replacement 0% Firebox Water Wall Repairs O -A, Reheat Area DMW/ClipfNotis Repairs PSH/Econ-Penthouse Activities PSH/Econ4nstall New Elements L Power Piping NDE Inspectlan MS Block Valve Refurbishment Attemperator Spray/Control Valve Refurbishment PNM Maim. Boiler Water System Activities Project: NIS Project U308S, PG v2-2 Task Split ........... Milestone Deadline Date: Wed 215 1 Critical a3MZMC30X= Progress Summary Page 1 ... ..... Sys: ABSU3 1 .. Equip: SYSTEM PNM Maint. Absorber Unit TM 27% 001iiiii SO: BA Equip: HOPPER 175 RA Area Repairs Equip: SYSTEM jWell f-39--! PNM Maint. Bottom Ash Systx! 22% SYS: BAG jWOMEN Equip: BOILER 65 7 Casing Leak Repairs 25% IN i Equip: HEATER 214 3A SAM Cold & Intermediate E 2419 3B SAH Cold & Intermediate E 3A SAH Cold & Intermediate E 220 3B SAM Cold & Intermediate I 216 I 34 SAM Hot End Basket Insta 221 3B SAH Hot End Basket Insta Equlp., SYSTEM wonee Crown Seal Repairs 23-1- j Expansion Joint Bet & Flange 198 PNM Maint. Both 25% Sys: BW I WMENEEMEN Equip: BOILER ' 57 Steam Drum Inspection and R 65% 112 PSH/Econ,Derno Existing Elel! PSH/Econ-Demo Ex1stlng Hee 29 SSH Area Repairs SSH Split Ring Casting Replan 48 SSH DMW Replacement 33 Firebox Water Wag Repairs 140 I Reheat Area L)MW/Clip/Notis L. 107 PSH/Econ-Penthouse Actriftm 21% jg 115 PSH/EcoMnstal New Elennen Equip: SYSTEM weee""""' 14Power Piping NDE Inspection i 55% moi 7 MS Block Valle Refurbishmer: 45% Aftemperator SpraylCordrol V 30°A _78 1_4 PNM Maint. Boiler Water Sys; 9% Sys: CNTRL WE 0% BA Area Repairs; PNM MaInt. Absorber Unit Three System Activities PNM Maint. Bottom Ash System Activities Casing Leak Repairs E= 3A SAM Cold & Intermediate Basket Removal MEMI 38 SAM Cold & Intermediate Basket Removal 0% L -&E= 3A SAN Cold & Intermediate Basket Installation 0% 313 SAM Cold & Intermadlate Basket Installation 0% 3A SAM Mot End Basket Installation 0% 3B SAM Hot End Basket Installation 19%oCrown Seat Repairs Expansion Joint Bait & Flange Installation itiElPNM Maint. Sailer Air & Gas System Activities `Steam Drum Impeitlon and Repair 26% PSK/Econ.Demc, Existing Elements PSK/Econ-Demo Existing HeadersI 25% W SSH Area Repairs 254 SSH Split Ring Casting Replacements U -A SSH DMW Replacement 0% Firebox Water Wall Repairs O -A, Reheat Area DMW/ClipfNotis Repairs PSH/Econ-Penthouse Activities PSH/Econ4nstall New Elements L Power Piping NDE Inspectlan MS Block Valve Refurbishment Attemperator Spray/Control Valve Refurbishment PNM Maim. Boiler Water System Activities Project: NIS Project U308S, PG v2-2 Task Split ........... Milestone Deadline Date: Wed 215 1 Critical a3MZMC30X= Progress Summary Page 1 r 4i Task Name 95_-- DCS Demolition 65% Fam 143 DCS Installation . 145 DCS Loop Checks Sys: CON 0� Equip: CONDEN 251 -; Condenser Eddy Current Testi � Equ1P: OFAERA 69 DA Heater Inspection and Rer ! 34% moi" ___._.-..... _, Equip: PUMP 167 Clean & Inspect 3B HW Motor 34% Ogg 37 Clean & Inspect 3A HW Motor . 32% ......................� Equip: SYSTEM ®r_ 199 PNM Maint. Condensate Syst- 23% a _...-_..--_...' Sys; CW WORM Equip: PUMP tib 28 Clean & Inspect 3A CW Pump' 57% Connect & Couple 3A CW Pur, t Equip: SYSTEM 200 i PNM Maint. Circulating Water j 23% @3W Equip: TOWER .....-75_....... Cooling Tower Refurbishment ! 17% Sys: ENV _.! Equip: SH - 185 BH -Hopper Heaters 133 BH -Upper Baghouse -135 BH -Bypass Damper 26% BH -Inlet & Outlet. Dampers f•. - - 8°k '186 BH-Irstnanentation I 171 . BH -Ash System '2% 168 BH -Pulse Jet System 14% Equip: BLOWER 122 7 Booster Fen -General 39% 124 Booster Fan•"J-K-L" Outage N - - 120 Booster Fao-"K" Cefl 141A jaqW Booster Fan -:"L" Cell 23% _.121 _ Equip:BOILER- 211 1 Suckstaydnsulation & Lagging 197 ! Suckstay-Ciip & Reinforcemer j 56% 10�— Equip: BURNER - . )E� 008__...__- ....-.... . --:.March 2008 _ ... ..... Apd12008 14 7/11 ( 7110 -1 225 �_3l3 _ _3/10_ _ .�.,. 3/17. r.......324___ 3/31._..... ... 40,_ -.- DCS Demolition 0% EY'..M� DCS Mstalla0on 0% DCS Loop Checks i 0% Condenser Eddy Current Testing i DA Heater Inspection and Repair Clean & Inspect 3B HW Motor Clean & Inspect 3A HW Motor PNM Malnt. Condensate System Activities a i Clean & Inspect 3A CW Pump Motor Connect & Couple 3A CW Pump Motor PNM Mainl. Circulating Water System Activities wRMWICooling Tower Refurbishment i I 0% ° BH -Hopper Heaters . yi BH"Upper Saghouse BH -Bypass Damper -: BH4nlet-& Outlet Dampers -- -- - -- -- - --• 09 BHanstrumentatlon BH.Ash System BH -Pulse Jet System ' Booster Fan-Generai Booster Fan-"J.K-L" Outage Work "o. . Booster Fan."K" Cell Booster Fan -"L" Cell 0°A i Buckstapinsuialion & Lagging installation Buckstay-Clip & Reinforcement Installation Project: MS Project U308S, PG v2-2 Task Split.................MilestoneDeadline b Dale: Wed 2/6 Critical Progress Summary 911m=NEN=1e=0 j Page 2 ID Task Name i yFebrua_yr 2008 _ March 2008 ,_. April - 1212/4 - 2111_ f _,-2/18 225 -- ars _3no 3rg_- 3rzq__. 33i __. an .....-. _ 101 .--- _ LN&"A" Row Bumers - - - • - -- LR co Row Burners -- 89 _-LN&"C° Row Burners .: .. � � - � .. LNB= C" Row Burners � - 93 LNB-"D'Row Burners 14°6�- -- LNB='D"Row Bumers ....35.........: LNB-"F" Row Bumers 251A ...::.. �. - - ,..:... LNB='F" Row Bumers: 91 LNB-General Bumer Work -. • ., : - LNB-General Burner work 90 LNB-"E" Row Burners ! 19%. • . •- .. LNB-'E" Row Burners ! 88 LN&"B" Row Burners-- LNB-"B" Row Bumers j Equip: CHIMNE Stack -Liner Enhancements 22°A _ - Slack -Liner Enhancements _.- Equip: FLUE . .. 1 -,... ;.. 206 Flue Work -Outage Face Constr _- Flue Work -Outage Flue Construction 207 - Flue Work -Stiffening- EMm - y - - Flue WcukStlNening- EMra Equip: REG I 83 OFA.I7ectdcal Work ' r' OFA -Electrical Work 44 ' OFA•General 5516 .' .. ILi'"' '!'°'!o - . OFA.General 74 ..... OFA -Front Wali 20%�I' �. OFA -Front Wall 79 : OFA -Rear Wall 20°k _ - OFA•Rear Wail Equip: SYSTEM " mono 126 Ash Handling -Outage Construc Y1�' 'r' 'F�^c-' y•,"'^°� Ash Handling -Outage Construction Sys: FA � moi, .. ,-..�.*• : .. ..,.. ^ Equip: HOPPER 71 T" Precipitator Repairs i 21°,6 r .... ,..,t• Precipitator Repairs !I _. -.. i Equip: SYSTEM 137 PNM Maint. Fyash System Ac 1 28% �'^°"" PNM Main1. Flyash System Activities Sys: FW — Equip: SYSTEM .. 60.....1 FW Heater MOV Refurblshme 26%- --.. EFW Heater MOV Refurbishment 201 PNM Maint. Feedwater Syster 27% _.. - - PNM Malnt. Feedwater System Activities Sys: MF Equip: HEATER �. 224 PAH Intermediate Basket Ren 0% PAH Intermediate Basket Removal 225 PAH Intermediate Basket Insh j I 0% 12= PAH Intermediate Basket Installation -_ 227 --" PAH Cold End Basket InstaoeC. 0% PAH Cold End Basket Installation _ 226 PAH Hot end Basket Installati, ` 0% PAH Hot End Basket Installation i ........I II Equip: Pl1LVER � -. 85 _1 Coal Piping & Elbow Replacer 31% Coal Piping & Elbow Replacements 84 1 Pulverizer Damper Drive Instal : i 29%Pulverizer .. Damper Drive Installation ...... I Equip: SYSTEM . . 70, PNM Maint. Mein Fuel Systeo 22% _ - - - - • PNM Maint. Main Fuel System Activities ... Sys: MISC Project: MS Project U308S, PG v2-2 Task - Spot ,,,,,,,,,,,,,,,,"....... ................... ,,,,,, Milestone * Deadline Date: Wed 216 Critical Progress Summary 90MMOMMOMMM9 Page 3 Q Ul CD me 410 ID Task Name - --------- im 1) Equip: No Value MV & LV Breaker Maintenaneq 202 PNM Maint. Activities with an f j 23% Sys: TURB Equip: GEN I 92 Aterrex Cooler R eplacement Equip: LP 238 LP -A, Rotor SBINDFt-o Bucl 37% 239 LP -A, Phased Arrary/Boresonii 244 1 LP -B. Rotor SBINDEIL-O Bucl i 29% Equip: SYSTEM 111101"" Turbine Valve Inspection 34% 11 PNM Maint. Turbine System od, 2006 Marc A Irl I _prl-1-200 * 8 24 2f1 1 2/18 2r25 313 3110 ; 3/17 3/9' 3131,., 417 13% MV & LV Breaker Maintenance PNM Matint. Activities; with all Remaining Systems 0% Afterrex Cooler Replacement munwaCk LaML2oRF&MrA LPA Rotor SBINDEJL-O Bucket Installation OQA LP -A, Phased Array/Boresonic Inspection LP -B, Rotor SBINDEIL-0 Bucket Installation I Turbine Valve Inspection Maint. Turbine System Activities Project: MS Project U308S, PG v2-2 Task Spot ... .......... Milestone Deadline Date: Wed 2/5 Critical Progress summary WNOOOOOOOOOMW Page 4 Proposed 2008 Functional Organization LUL) l P N EKG Y U hN I EK Project Term Sheet 2-6-08 ` Project Name: Lodi Energy Center (LEC) Description: 255 MW base load Combined Cycle Natural Gas Fired Combustion Turbine Generating Station (one gas turbine and one steam turbine) with approximately 25 MW of peaking duct firing. L Location: Lodi, California, southwest of the intersection of Interstate 5 and Highway 12, adjacent to NCPA's existing CT2 project and the City of Lodi's White Slough Water Treatment Plant (see attached map): Project Manager Ed Warner, Northern California Power Agency, (209)728-1387 X-22 Performance: LEC is expected to have a heat rate -of approximately 7050 Btu per kWh of energy production and opeiate at about an 80% annual capacity factor resulting in expected annual energy production of 1,787,00 MWh and the consumption about 12,500,000 MMBtu of natural gas. 4 Cost Estimate: Total development and construction cost is anticipated to be approximately $275 million or about $1,080 / kW of project capacity. Utilizing a natural gas price of $7.00 / MMBtu and an 80% annual plant capacity factor results in a projected "all - in" energy cost of just under $70 / MWh. I Transmission: Either PG&E/CAISO 230kv or Western 230kv line. Status: Project participants are attaining approvals for participation in Phase 2 activities which include the acquisition of needed emissions credits, initiating the CEC application process, and commencing detailed engineering and design, all as a prelude to issuing final bid documents, likely toward the end of 2009. (see attached project Phase 2 Timeline) Commercial Operation Date: April 2012 Participants: Azusa (7MW, 2.7451/o); BART (15MW, 5.882%); Biggs (IMW, 0.392%); CDWR (60MW, 23.529%o); Gridley (SMW, 1:9610/6); Healdsburg (4MW, 1.5690/o); Lodi (30MW, 11.765%o); Lompoc (5MW,:1.961%); Modesto (60MW, 23.529%o); Plumas- Sierra (2MW, 0.7840/o); Port of Oakland (3MW, 1.1769/4); PWRPA (SMW, 1.961%); Silicon Valley Power (50MW, 19.608%); Ukiah (BMW, 3.137%) 1 062 Qumtlae $Ud _L_Fin_sM1 Ag4�____.......SL? 101 d 01 1010 13 1016 _.... ,;.q19_ ...... _.... New Lodi Project 1269 days mon 6/4/07 Thu 4/121121 Establish PM,W Team 0days Tue 11108 Tue t/11081 ♦; 1M Finalize Prolect Subsonplion 54 oat's Thu 5111107 Tue 1115108:t E] Paniclpams Appeoy¢ PhMe II 97 days Thu 11/117 Fn 3/14/08; . tf71 CAISO InleMonrep Process 125 days Tea 111108 Man 61231081. WAPA Imermnrnect Process 90 days Mon 2/2508 Fri W27M Emiromlremal Review of ERC 22 days Fd 1118MS Mon 2/18108: a Purchasa ERC 21 days Fd 2129108 Fri 3/28/08 .729 Select AFC Coordinator 11 days Mon 12108 Mon 1/21MB: - AaPennaPreparation 181 days IN 2/28108 IN 1116108 _•.,'.!'—.."•.,'�1'._',a"..�''°.'.`.,'..'. AFC Preparation 120 days Fri 2/15108 Thu )/31108', ; Finalize lease whh City of Lada 70 days T. 314106 Mon &9108 Negotiate W alar Supply and Retum Agreden 0 days Tue 111108 Tue 111/08 Errvimnmenlal Studies 403 days'/ Mon 3117108 Wed 913OM9 CEC Atlomey Selection Process 14 days Wed 112MB Mon 2/11108' AFC Engineering 90 days T. 2126108 Mon 6130/08 Site Land Surreys 120 days Mon W10MB Fri W22108. Drall AFC Completed 0 days Mon 7/21108 Mon 7/21108 ♦ 7121 AFC Fill, 0days MOn Bit 1108 Mon8/11108. ♦a/11 CEC Rena of AFC 327 days Thu 7/31108 Fri 10130109, Data Inequacy(CEC) 0days Fd IMO/09 Fd 1130109, ♦ 1130 AFC Granted 1 day Fd 10/30109 Fri 10/30109 ♦ 10130 Engineer Selection Process 36 days Fd 31281118 Fd 5116108; Erglneedrg DatsmWM Select Otlays Fri 5116108 Fd 5116108'. . SI16 Pmiect Engineedrg 1020 days Thu 50 SIBS Wed 4111/12! Prepare 3rd Phase Agreemerrt 90 days Mon 225108 Fd 827108 ; ThiN Phase Agmenhunt EsecWe l 30 days Fd 10/30/09 Thu 12/10109 Prol¢M Firlarcbg 95 days Mon 112/09 Fd 3112110' ♦ f 12 CprslrMzon Poneal 522 days Wed 4114110 Thu 4/12112 Mechlanmal Completion /day? Mon 1212 Mon 1121121♦ 12 Testing and Startup 108days Tue 11/15111 Thu 4111/121 Pedprmal &RoMtulily Testing 7 days Mon 42112 Tue 41101121 . 4124 Corn plan ial Operation 0 days Thu 4/12112 Thu 4112/12 ♦4112 CEC CediGution of Compliance 180 days Thu 4112112 Wed 12/19/121 -AgreemeNs will include out clauses 0days Tee 1/1108 i Tue 1/1MB ♦:III Task t,'.,'.'_.'..,..,.`,,',...,',_,'..,".,,1'.,1.,'.',,1.'.,' Summary ^ Rolled UP Progress Pmlecl3ummary tT New Lodi Milestone Schedule t:t29108 Progress Rolled Up Task Split Group By Summary DapecT. Dae, ••• •••••• - Milestone Rolled Up MileshoneQ Eldemal Tasks n 7,'Nn1'�`?5"}".r n. .... Deadline V Page 1 a Project Location 113 im 6a Col I 11 ador r aprings,.. . CAV ERAS Ange :n-fr 061 Power Resources Division Monthly Report ■ Power Resource Highlights ■ Power Consumption Comparison ■ Wholesale Market Trend ■ Power Resource Budget Update Power Resource Highlights ■ Garnet Wind Project broke ground to construct the wind generating units and the construction is proceeding satisfactorily. We continue to work with the CAISO to certify the project interconnection with CAISO transmission grid. Current projected in-service date is summer 2008. ■ We continue to participate in the Southern California Public Power Authority (SCPPA) renewable resources RFP process. The SCPPA RFP yielded about 50 proposals: 15 wind power; 30 solar power; 3 geothermal power; 1 small hydro; and 1 biomass. At this time, staff is evaluating 1 solar proposal and the biomass proposal for potential participation. ■ San Juan unit #3 went into the scheduled outage on January 25th and is expected to return to service in late March. So far, the outage is proceeding as scheduled and environmental project is about 90% complete. The latest environmental project report is attached. ■ Due to system software problems, the CAISO has once again delayed (the third time) the start up of the new power market. Although CAISO has not officially stated the new date, it is highly likely to be delayed toward fall of this year. However, CAISO market simulation is continuing apace and is expected continue through the fall. Staff continues to participate in the simulations. ■ The Lodi #2 project planning activities have been delayed due to not all potential participants has received the necessary authorization to proceed. It is now expected that the project will receive the final approval by all participants by the end of this month, and the planning activities will commence shortly thereafter. The project fact sheet is attached for information. CITY OF AZUSA PEAK DEMAND COMPARISON MONTH CITY OF AZUSA ENERGY CONSUMPTION COMPARISON ENERGY CONSUMPTION IN-MWH PERCENT CHANGE PERCENT MONTH FY 06-07 FY 07-08 CHANGE JUL 29,287 26,164 -10.660/6 AUG 25,912 28,014 8.11% SEP 24,379 23,760 -2.54% OCT 21,700 21,890 0.88% NOV 20,456 19,708 -3.65% DEC 20,510 20,029 -2.35% JAN 20,984 20,515 -2.24% _ FEB 18,414 -100.00% -100.00% MAR 20,916 -100.00% -100.00% APR 19,719 -100.00_% -100.000/6 MAY 21,064 -100.00% -100.00% JUN 21,949 -100.00% . TOTAL ., 265,291 160,080 -1.579/6 CITY OF AZUSA PEAK DEMAND COMPARISON MONTH FY06-07 FY 07-08 PERCENT CHANGE JUL 60.8 _55.5 -8.65% AUG 552 64.9 _ 17.39% SEP 63.7 63.9 0.27% OCT 43.9 46.7 6.34% NOV 46.0 41.1 -10.49% DEC 36.6 35.7 -2.68% _ JAN 36.8 34.9 -5.23% FEB 37.4 -100.00% -100.00% APR 40.7 _. .. ... -100.00% 483__._.._.........,..... -100.00_% JUN. 47.5 -100.00% PEAK DEMAND IN MW cz> a) WHOLESALE ELECTRICITY SPOT MARKET PRICES IN CALIFORNIA AVERAGE AVERAGE MONTH ON PEAK PRICE OFF PEAK PRICE DEC 06 $53.75 $44.63 JAN 07 $53.46 $44.36 FEB 07 $58.45 $47.79 MAR 07 $49.82 $36.44 APR 07 $57.29 $43.12 MAY 07 $63.55 $41.24 JUN 07 $67.77 $42.39 JUL 07 $75.35 $41.26 AUG 07 $66.95 $36.94 SEP 07 $52.66 $36.40 OCT 07 $59.42 $44.90 NOV 07 $50.79 $40.43 DEC 07 $58.53 $49.88 JAN 08 $64.02 $54.78 ALL PRICES IN $/MWH Power Resource Cost Accounting FY '07-08' (7) LONGTERM SHORT TERM i TRANSMISSION MCILLARY SCHEDIJUNG• TOTAL WHOLESALE NET NTHT'—doo NtR Adt§ PURCHASES --- -COSTS — - s'ffomCOSTS"DISPATCHING ct -costs6-JS0AtCHFNd`tbS-fS- COSTS COSTS Jul -07 238,050 74 30,926.72 1��2�377.S5 2,542.143.31 6,279261,906,382.12 07 Aug 07 1,35025271 26' 26,318.94 49.64 4.099.178.50 (1,964,700.19) Y'i"'vfEf.31 Sep 07 r 1 336 082 85 - 2 052,822.54 232,91122 12 313 76 _ 5-0j-87-.74 j,684.318.10, -(1.778.0-7.45)-- 1,906280.65 66�67 1,286,479.03215,47868.... ... . 3269.94 86,824.80 2,665246.60 (961.150,80) 1,704,096.00 Now07 1,333,840.63 1,113,135.45 215,81424 8207.0084,542.15 -� 2,755539.47 1 (886,102.15) 1,869,43732 Dec 07 1,333,458.34 950165 239,401.66 1 20,000.00 .$88,615.70 1 (908.000.41) 1,680,61529 i Jan -08 1,336,998.11 1.367.098.98 277,061:70 20,( )0600 -45.1-5-9.46 - U46,318.28j 403,734.70) 1 2,042,583.58 Feb -08 0.00 0 6 mar -00 .00 0.00 r-09 0.00 0.00 May -08 ...... . .00 60.06-t obo-� Jun -08- ------- -- • -0.66 TOTAL ......... $9,329,489.52 $11,53F3-28.59 $1.665,197.50 $126,036.35 $37 13243.87326 ... ..... ... ------------ SOPP A LONG TERM CONTRACTS -INCCUDE§kLSA6RTTtPIMOUAdHASESF(jAHt6GINd .LOAD BALANCING PURPOSES, FAR CAPACITY (3) INCLUDES ALL SHORT TERM AND LONG TRANSMISSION CONTRACT COSTS ----- ----- ....... _(d) C0.STSCHPAGED BVCPLIFORNIAINDEPENDENTSVSTEMOPERATOR FOR — --- ------ --- -------- INCLUDES COSTS FOR SCHEDULING PND -blSl5ATCHINGbFEL-E-CT-F31CITY .. ......... H (5) ....... ........... WHOLESALE REVENUES DERIVED FROM SALES OF EXCESS POWER + PTO BENEFTTS (8) ;DIFFERENCE bO (6)'AND ---------- ---- - -- ----- ----- - INFORMATION ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES 0 7 -epi F.j� ' `3, DATE: FEBRUARY 25 2008 / SUBJECT: ALLEY LITTER / CLEAN UP OPTIONS At solid waste workshop on January 28, 2008, concern was expressed by Board Member Macias about litter in alleys of the City. In response to this concern, Director of Utilities convened a meeting of Public Works staff, Utilities staff and service representatives of Athens Services. The meeting was intended to discuss the problem generally and put forth ideas on how to address the problem. The following are reported in no particular order: • Waste seems to originate from various sources: o When someone illegally discards a bulky waste item in a trash bin, this, then, limits space for regular trash and results in overflow conditions. o Cars often park illegally in alleys and prevent street sweepers from sweeping the alleys; then, when cars are moved, the public complains about the alley not being swept. o Street sweepers have difficulty getting the middle of alley gutters swept because of the "V" gutter of the alleys. o The manual trash collection system was also believed to be a source of much of the waste, because trash is not always covered or stored in a way that prevents overflow or litter from being blown from the cans, and Athens Services as a trash company has no obligation to pick up trash on the ground which they do not spill. o People illegally discard small amounts of litter in alleys—it's a "mindset" problem. • Ideas set forth to address problems were as follows: o Consider implementing an automated trash collection system; Athens Services representatives said that it has been their experience that cities with such systems have less litter on the ground, even,in alleys. o Post signs at both ends of alleys to notice drivers that it is illegal to park in alleys; then, enforce the no -parking laws. Consider having a parking enforcement vehicle follow the street sweepers and ticket cars illegally parked. o Conduct public information campaigns to encourage people not to park in alleys and not to litter prior to taking enforcement action, similar to how Azusa Light & Water approached water conservation—it worked. 070 o Establish a hotline and allow people to call for pick up service from LA Works when they are available. o Promote free collection of bulky waste as that is in contract with Athens Services for trash collection. o Increase the frequency of trash services if a dumpster is known to be regularly in overflow condition. o Begin with public information in April with Clean & Green Month promotional activities. As an aside to the situation in alleys, concern was expressed about the new street sweeping plan to sweep one side of each street on alternating days; the concern was that given our trash collection system, that trash could be blown to opposite side of street on windy days after one side is swept. Sweeping streets on alternating days may also make it more difficult to implement an automated trash collection system if that is desired. It was generally thought that a multi -faceted approach would be needed to address the origin of the waste, cleaning itup once on the ground, and ongoing prevention. Staff welcomes additional comments and/or suggestions from City Council/Utility Board on this matter. Prepared by: Cary Kalscheuer, Assistant to the Director of Utilities 1-17F