RESOLUTION NO. 7198
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AZUSA AMENDING THE SCHEDULE OF RATES AND CHARGES
FOR THE POWER. -AND LIGHT. DEPARTMENT OF THE CITY -OF
AZUSA
THE'CITY,COUNCIL OF THE CITY OF AZUSA DOES RESOLVE
AS FOLLOWS:
1. The City Council finds pursuant to Sec.. 15079.1
of the State Ceqa Guidelines (14 Cal.Admin. Code Sec. 15079.1)
that Ceqa is not applicable to the approval of the rates and
charges set forth herein.because such rates and—charges are for
the purposes of: \„
.. (1) -Meeting. -operating expenses, including employee
wage rates and fringe benefits and departmental operations;
(2) Purchasing.or leasing of supplies, equipment
or materials;
(3) Meeting financial reserve needs and require -
ments;
(4) Obtaining funds for capital projects necessary
to maintain a service within existing service areas.
2. Pursuant to Sec..13.08.020 of the Azusa Municipal
Code, the schedule of rates and charges of the Power and Light
Department of the City of Azusa are hereby amended to read as
set forth in Exhibit "A"', attached to this Resolution, and
incorporated herein as though set forth in full.
3. The amended rates and charges schedule of the
Power and Light Department of the City of -Azusa set forth in
Sec. 2 of this Resolution shall be effective as of October 1,
1982.
4. The City Clerk shall.certify the adoption of this
resolution.
PASSED, APPROVED AND ADOPTED this 1st day of November ,
1982.
MAYOR
I HEREBY CERTIFY that the foregoing Resolution was duly
adopted by the City Council of the City of Azusa, at a regular
meeting thereof, held on. the lst day of November, 1982by the
following vote of the Council: ,
AYES: COUNCILMEN: DECKER, HART, LATTA, MOSES
NOES:
ABSENT:
COUNCILMEN: NONE
COUNCILMEN: NONE
General
SECTION III
PRESENT AND PROPOSED ELECTRIC RATE SCHEDULES
This Section includes a review of present rates, and proposed rates,
which have been designed to recover the estimated revenue requirements set
forth in Section II. The City presently has six rates for electric service,
" as follows:
Rate
R -
Residential Service
Rate
G-1 -
General Service (Non -Demand)
Rate
G-2 -
General Service (Demand)
Rate
GL -
Large General Service
Rate
SL -
Lighting (Street and Highway)
Rate
OL -
Outdoor Area Lighting
The existing rates of the City are the result of studies presented
in a report by R. W. Beck and Associates dated November 1979 with subsequent
"across-the-board" percent increases on February 1, 1982 and July 1, 1982. In
accordance with discussions with representatives of the City, the present form
of rates has basically been retained for the modified rates herein proposed,
except for the General Service Rates which have.been combined and simplified.
The rates proposed herein reflect the City's purchased power costs
under the wholesale rates of SCE that became effective June 2, 1982. It is
contemplated that under the rates herein proposed, the SCE fuel cost adjust-
ment applied to the City's purchased power would be passed through to the
EXHIBIT A
III -2
City's retail customers. Use of this approach, along with the proposed rates
recommended below, will allow the City to continue to pass through the total
amount of fuel costs as charges by SCE.
Residential Service
follows:
The existing and proposed rates for Residential Service are as
Residential Rate R
Existing
Rate
Monthly Rate:
Customer Charge . . . . . . $2,72
First 250 kWh . . . . . . . 5.71 per kWh
Additional kWh . . . . . . 6.53¢ per kWh
Proposed
Rate
$3.50
7.51 per kWh
8.51 per kWh
The City also has in effect a residential service rate for single -
metered multi -family housing units. This rate schedule is designated "Resi-
dential Service - Rate RM" and is identical to Rate R except that the kilo-
watt-hours in each block are multiplied by the number of single-family_accom-
modations being served from a particular meter. No adjustment is being pro-
posed for this rate schedule other than that the proposed Rate R above be used
in establishing the charges under Rate RM.
If the proposed residential rate had been in effect for the entire
fiscal year ending June 30, 1983, it is estimated that revenues from residen-
tial customers would increase from . . . . . . . . . . . . . . . . $3,404,124
to a total of approximately . . . . . . . . . . . . . . . . . . . $4,440,844
an increase of approximately . . . . . . . . . . . . . . . . . . . $1,036,720
or approximately . . . . . . . . . . . . . . . . . . . 0 . . . . . 30.55.
E
III -3
General Service
The City presently has three rates applicable for General Service
(Small, Medium and Large). The existing rates are as follows:
Existing Rate G-1
General Service (Non -Demand)
Monthly Rate:
Customer Charge -
Single -Phase Service . . . . . . . . . $3.07
Customer Charge -
Three -Phase Service . . . . . . . . . . $4.76
Energy Charge -
kWh . . . . . . . . . . . .
10.1971
per
First 100 kWh . . . . . . .
. . . . . . . 10.197
per
kWh
Next 400 kWh . . . . . . .
. . . . . . . 9.313¢
per
kWh
Next 1000 kWh . . . . . . .
. ... . . . . 8.429V
per
kWh
Next 1500 kWh . . . . . . .
. . . . . . . 7.341e
per
kWh
Additional kWh . . . . . .
. . . . . . . 6.9334
per
kWh
Existing Rate G-2
General Service (Demand)
Monthly Rate:
Customer Charge . . . . . . . . . . . . . . $4.76
Minimum Charge - 20 kW @ . . . . . . . . . $3.75 per kW
Demand Charge -
First 20 kW of Billing Demand . . . . None
Additional kW of Billing Demand . . . $3.75 per kW
Energy Charge
First 100
kWh . . . . . . . . . . . .
10.1971
per
kWh
Next
400
kWh . . . . . . . . . . . .
9.313¢
per
kWh
Next
1000
kWh . . . . . . . . . . . .
8.429e
per
kWh
Next
1500
kWh . . . . . . . . . . . .
7.341¢
per
kWh
Next
2000
kWh . . . . . . .
6.9334
per
kWh
Next
150
kWh per kW of Billing Demand
Over
20 kW
5.166e
per
kWh
Next
150
kwh per kW of Billing Demand
Over
20 kW . . . . . . . . . . .
4.758[
per
kWh
Additional
kWh . . . . . . . . . . . ..
4.350¢
per
kWh
Existing Rate GL
Large General Service
Monthly Rate:
Demand Charge -
be more
easily understood and applied.
The following rates
First 200 kW or less of
General
Service:
Billing Demand . . . .
$842.95
Next 1800 kW of Billing Demand . . . .
$ 4.02
kW
Additional KW of Billing Demand . . .
$ 3.88
per
kW
per
Energy Charge -
First 150 kWh per kW of Billing Demand
-
First 30,000 kWh . . . . . .
5.574¢
per
kWh
Balance of kWh
Next 150 kWh kW
5.166e
per
kWh
per of Billing Demand
Additional kWh
4.622e
per
kWh
. . . . . . . . . . . .
4.2144
per
kWh
Power Factor Adjustment -
The charges will be increased for each
kVAr in excess of 60% of the Billing
Demand in the amount of . . . . . $ 0.35/kVAr
High Voltage Discount -
A customer which takes service at a voltage level of 12 kV
will receive a discount of 4% of the total bill.
It is recommended that the three existing rates for General Service
be combined into two new rates. It is also recommended that demand and energy
blocks in the existing General Service rates be gradually flattened. In the
proposed General Service rates, we have combined or eliminated some of the
existing rate blocks. It is anticipated that the City will continue to flat-
ten these rate blocks in the future. The flattening or elimination of declin-
ing block rates will help to promote conservation and is in accordance with
the rate standards Included in the Public Utilities Regulatory Policies Act, a
part of the National Energy Act of 1978. The two proposed General Service
rates will also
be more
easily understood and applied.
The following rates
are proposed for
General
Service:
0 0
III -5
Proposed General Service Rate G-1
Monthly Rate:
Customer Charge . . . . . . . . . . . . . . $5.00
Energy Charge:
First 500 kWh . . . . . . . . . . . . 12.501 per kWh
Additional kWh . . . . . . . . . . . . 10.25¢ per kWh
Proposed General Service Rate G-2
Monthly Rate:
Demand Charge -
First 20 KW . . . . . . . . . . . . . No Charge
Additional kW . . . . . . . . . . . . $5.50 per kW
Energy Charge -
First 500 kWh . . . . . . . . . . . . 12.501 per kWh
Next 4500 kWh . . . . . . . . . . . . 10.251 per kWh
Additional kWh . . . . . . . . . . . . 6.251 per kWh
The power factor adjustment and the high voltage discount in the
existing Rate GL are not being changed and are to be included in the proposed
Rate G-2. Customers currently taking service under Rate GL. would take service
under the proposed Rate G-2.
If the proposed General Service Rate G-1 had been -in effect for the
entire fiscal year ending June 30, 1483, it is estimated that revenues from
the existing Rate G-1 customers would increase from . . . . . . . $ 965,064
to a total of approximately . . . . . . . . . . . . . . . . . . . $1,259,030
an increase of approximately . . . . . . . . . . . . . . . . . . . $ 293,966
or approximately . . . . . . . . . . . . . . . . . . . . . . . . 30.5%.
0
0
III -6
If the proposed General Service Rate G-2 had been in effect for the
entire fiscal year ending June 30, 1983, it is estimated that revenues from
the existing Rate G-2 customers would increase from . . . . . . . $2,837,800
to a total of approximately . . . . . . . . . . . . . . . . . . . $3,817,608
an increase of approximately . . . . . . . . . . . . . . . . . . . $ 979,808
or approximately . . . . . . . . . . . . . . . . . . . . . . . . . 34.5%.
If the proposed Large General Service Rate G-2 had been in effect
for the entire fiscal year ending June 30, 1983, it is estimated that revenues
from the existing Rate GL customers would increase from . . . . . '$3,131,224
to a total of approximately . . . . . . . . . . . . . . . . . . . $4,007,214
an increase of approximately . . . . . . . . . . . . . . . . . . . $ 875,990
or approximately . . . . . . . . . . . . . . . . . . . . . . . . . 28.0X.
Street Lighting Service
The Light and Power Department currently has a fixed charge per
month for each lamp size and/or type for street and highway lighting. The
applicable fixed charge is also determined by whether the facilities are owned
by the utility or by the customer. The existing and proposed rates for Street
Lighting Service are as follows:
0 •
III -7
Monthly Rate for
Street Lighting Service
Existing Proposed Monthly
Rate Rate kWh Usage
Facilities Owned by Utility:
Lumens . . . . . . . .
. . 5.98
5.80
Incandescent -
11,000
Lumens . . . . . . . .
. . 8.29
4,000 Lumens . . . . . . . . . .
$ 8.37
$11.00
116
Mercury Vapor -
12.75
160
35,000
7,000 Lumens . . . . . . . . . .
9.11
11.30
70
11,000 Lumens . . . . . . . . . .
11.22
14.60
101
20,000 Lumens . . . . . . . . . .
14.89
20.00
160
35,000 Lumens . . . . . . . . . .
23.46
30.00
243
High Pressure Sodium -
90
25,500
Lumens . . . . . . . .
9,500 Lumens . . . . . . . . . .
9.86
10.25
48
22,000 Lumens . . . . . . . . . .
13.26
14.25
90
25,500 Lumens . . . . . . . . . .
14.96
15.25
105
Facilities Not Owned by Utility:
Incandescent -
4,000 Lumens . . . . . . . . . .
6.53
7.00
116
Mercury Vapor
7,000
Lumens . . . . . . . .
. . 5.98
5.80
70
11,000
Lumens . . . . . . . .
. . 8.29
8.00
101
20,000
Lumens . . . . . . . .
. . 10.95
12.75
160
35,000
Lumens . . . . . . . .
. . 18.63
21.50
243
High Pressure Sodium -
9,500
Lumens . . . . . . . .
. . 4.42
4.00
48
22,000
Lumens . . . . . . . .
. . 7.48
7.00
90
25,500
Lumens . . . . . . . .
. . 9.18
8.50
105
If the proposed Street Lighting Service Rates had been in effect for
the entire fiscal year ending June 30, 1983, it is estimated that revenues
from the Street Lighting Service customers would increase from . . . $275,094
to a total of approximately . . . . . . . . . . . . . . . . . . . . $348,610
an increase of approximately . . . . . . . . . . . . . . . . . . . . $ 73,516
or approximately . . . . . . . . . . . . . . . . . . . . . . . . . . 26.12.
0
III -8
Outdoor Area Lighting Service
The rates presently in effect and proposed for Outdoor Area Lighting
Service are as follows:
Monthly Rate for
Outdoor Area Lighting Service
Existing Proposed Monthly
Rate Rate kWh Usage
Existing Pole
Mercury Vapor —
7,000 Lumens . . . . .
20,000 Lumens . . . . . . . . . .
High Pressure Sodium —
25,500 Lumens . . . . . . . . . .
New Pole
Mercury Vapor —
7,000 Lumens . . . . .
20,000 Lumens . . . . . . . . . .
High Pressure Sodium —
25,500 Lumens . . . . . . . . . .
$10.06 $11.50 70
18.29 21.00 160
— 14.50 105
13.53 14.35
21.77 23.60
— 17.50
70
160
105
If the proposed Outdoor Area Lighting Service Rate had been in
effect for the entire fiscal year ending June 30, 1980, it is estimated that
revenues from the Outdoor Area Lighting customers would increase from $ 8,545
to a total of approximately . . . . . . . .
$ 9,781
an increase of approximatley . . . . . . . . . .
- - $ 1,236
or approximately . . . . . . . . . . .
0 •
III -9
Summary — Estimated Effect of Proposed Rates
All of the proposed rate schedules set forth above are subject to a
fuel cost adjustment and to the State of California Energy Resources Surcharge
(currently 0.2 mills per kilowatt—hour). The following tabulation sets forth
a comparison of the estimated revenues for FY1983 from application of the
proposed rates to the revenues obtained from the rates presently in effect.
(1) Both existing and proposed' rate revenues include California Energy
Resources Surcharge of $0.0002 per kWh.
(2) Proposed rate revenues for General Service customers currently under
existing Rate GL are calculated using the proposed Rate G-2.
Energy Cost Adjustment
In the past, the City has generally followed a policy of passing on
to its electric customers the fuel cost adjustment charged to the City by
SCE. The procedure generally used to pass on these costs was the addition
Summary of
Revenues (1)
.
Existing vs
Proposed Rates
Customer Class
Existing
Rate Revenue
Proposed
Rate Revenue
Increase
AmountPercent
Residential . . .
. $ 3,404,124
$ 4,440,844
$1,036,720
30.5%
General—Rate Gl .
. 965,064
1,259,030
293,966
30.5%
General—Rate G2 .
. 2,837,800
3,817,608
979,808
34.5%
Large General—
Rate GL . . . .
. 3,131,224
4,007,214 (2)
875,990
28.0%
Street Lighting
275,094
348,610
.73,516
26.71
Outdoor Area
Lighting . . . .
. 8,545
9,781
1,236
14.52
Total . . . .
. $10,621,851
$13,883,087
$3,261,236
30.7%
(1) Both existing and proposed' rate revenues include California Energy
Resources Surcharge of $0.0002 per kWh.
(2) Proposed rate revenues for General Service customers currently under
existing Rate GL are calculated using the proposed Rate G-2.
Energy Cost Adjustment
In the past, the City has generally followed a policy of passing on
to its electric customers the fuel cost adjustment charged to the City by
SCE. The procedure generally used to pass on these costs was the addition
of the SCE fuel cost adjustment (in cents/kWh), adjusted upward by 6S to allow
for the City's electric distribution losses, to the base electric rates esta-
blished by the City. Inasmuch as the SCE fuel cost adjustment charges are
applied by SCE to kWh sold to the City, and the City applies the charges to
kWh sold in a different time period, the City's costs and charges to its cus-
tomers are not "synchronized'. This situation results in an over collection
or under collection of fuel adjustment costs by the City each month.
In order to assure collection of all fuel adjustment charges, as
contemplated in the design of the rates proposed herein, it is highly recom-
mended that the City establish a "fuel cost adjustment balancing account",
whereby the amount of the over collection or under collection of fuel adjust-
ment costs in a given month or other longer time period would be factored into
a subsequent fuel cost adjustment charge to City customers.
When the City begins receiving power from the Palo Verde Nuclear
Generating Station through the Southern California Public Power Authority in
approximately mid -1984, it will be necessary to modify the present fuel cost
adjustment procedure which is based solely upon a pass-through of SCE fuel
cost adjustments. It would be appropriate to establish a modified fuel cost
adjustment procedure at this time which would be applicable under the current
power supply arrangement (purchasing all requirements from SCE) and the new
arrangement which will begin in 1984.