HomeMy WebLinkAboutResolution No. 7236RESOLUTION NO. 7236
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF AZUSA FIXING AND ESTABLISHING FEES TO BE
CHARGED FOR THE ISSUANCE OF PERMITS FOR BUILDING
(INCLUDING GRADING), PLUMBING, ELECTRICAL AND
MECHANICAL INSTALLATIONS WITHIN THE CITY.
The City Council of the City of Azusa does hereby resolve
as follows:
SECTION 1. The fees to be charged by the Building Department
for the issuance of permits for building (including grading) installa-
tions within the City shall be as set forth on Exhibit A attached
hereto and incorporated herein by reference.
SECTION 2. The fees to be charged for permits for plumbing
installations to be installed in the City shall be as set forth in
Exhibit B attached hereto and incorporated herein by reference.
SECTION 3. The fees to be charged for permits to be issued
by the Building Department for electrical installations to be installed
in the City shall be as set forth in Exhibit C attached hereto and
incorporated herein by reference.
SECTION 4. The fees to be charged by the Building Department
for issuance, of permits for mechanical installations within the
City shall be as set forth in Exhibit D attached hereto and incorpor-
ated herein by reference.
SECTION 5. This resolution becomes effective upon adoption
by the City Council.
SECTION 6. The City Clerk shall certify to the adoption of
this resolution.
ADOPTED AND APPROVED this 7th day of March, 1983.
I hereby certify that the foregoing resolution was duly
adopted by the City Council of the City of Azusa at a regular meeting
thereof held on the 7th day of March, 1983, by the following vote of
Council:
AYES: COUNCILMEMBERS: DECKER, HART, CRUZ, LATTA, MOSES
NOES: COUNCILMEMBERS: NONE
ABSENT: COUNCILMEMBERS: NONE
City Clerk
T
RESOLUTION NO. 7236
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF AZUSA FIXING AND ESTABLISHING FEES TO BE
CHARGED FOR THE ISSUANCE OF PERMITS FOR BUILDING
(INCLUDING GRADING), PLUMBING, ELECTRICAL AND
MECHANICAL INSTALLATIONS WITHIN THE CITY.
The City Council of the City of Azusa does hereby resolve
as follows:
SECTION 1. The fees to be charged by the Building Department
for the issuance of permits for building (including grading) installa-
tions within the City shall be as set forth on Exhibit A attached
hereto and incorporated herein by reference.
SECTION 2. The fees to be charged for permits for plumbing
installations to be installed in the City shall be as set forth in
Exhibit B attached hereto and incorporated herein by reference.
SECTION 3. The fees to be charged for permits to be issued
by the Building Department for electrical installations to be installed
in the City shall be as set forth in Exhibit C attached hereto and
incorporated herein by reference.
SECTION 4. The fees to be charged by the Building Department
for issuance, of permits for mechanical installations within the
City shall be as set forth in Exhibit D attached hereto and incorpor-
ated herein by reference.
SECTION 5. This resolution becomes effective upon adoption
by the City Council.
SECTION 6. The City Clerk shall certify to the adoption of
this resolution.
ADOPTED AND APPROVED this 7th day of March, 1983.
I hereby certify that the foregoing resolution was duly
adopted by the City Council of the City of Azusa at a regular meeting
thereof held on the 7th day of March, 1983, by the following vote of
Council:
AYES: COUNCILMEMBERS: DECKER, HART, CRUZ, LATTA, MOSES
NOES: COUNCILMEMBERS: NONE
ABSENT: COUNCILMEMBERS: NONE
City Clerk
• COUNTY OF LOS ANGELES
DEPARTMENT OF COUNTY ENGINEER -FACILITIES
BUILDING AND SAFETY DIVISION
SCHEDULE OF FEES
CITY OF AZUSA
Permit Issuance
Building Permit
Building Plan Check
Building Standard Plan
Energy Plan Check (non-residential)
Site Inspection
Occupancy (Group R or M)
Affected floor area (Other than R or M)
0-5000 sq. ft.
5001 - 10,000 sq. ft.
10,001 - 100,000 sq. ft.
100,000 sq. ft. and greater
Rehabilation
Demolition
Group A, Div. 4 Structure (each)
Chapter 66 Structure or Device
Each additional
Relocation (application and inspection)
Floor area: Less than 5000 sq. ft.
5000 sq. ft. and greater
Trailer Coaches (investigation and/or inspection)
Grading Plan Check and Inspection
Rehabilitation Rehearing
Rehabilitation Processing
Combined Swimming Pool Permit
$10.50
Table 3A
85% of Table 3A ($25 Min)
70% of Plan Check
5% of Plan Check ($300 Min)
$100.00
70.00
$150.00
$200.00
$380.00
$470.00
$150.00
50.00.
50.00
50.00
8.50
$140.00
$280.00
50.00
Table 3B
$200.00
Table 99A
Double Table A
EXHIBIT A
Effective June.b,
1982
i.y a
• COUNTY OF LOS
ANGELES •
'
DEPARTMENT OF
COUNTY ENGINEER
-FACILITIES
BUILDING AND SAFETY
DIVISION
BUILDING PERMIT AND PLAN
CHECKING FEES
COUNTY
UNINCORPORATED AREA
A permit issuance
fee of $10.50
shall
be added to
all permit
fees.
VALUATION
FEES
VALUATION FEES
VALUATION
FEES
NOT
PLAN
BLDG.
NOT
PLAN
BLDG.
NOT
PLAN
BLDG.
OVER
CHECK*
PERMIT
OVER
CHECK*
PERMIT
OVER
CHECK*
PERMIT
400.00
25.00
12.00
31
172.55
203.00
66
322.58
379.50
700.00
25.00
15.00
32
177.23
208.50
67
326.40
384.00
1000.00
25.00
20.00
33
181.90
214.00
68
330.23
388.50
34
186.58
219.50
69
334.05
393.00
35
191.25
225.00
70
337,88
397.50
THEN BY
THOUSANDS
36
195.93
230.50
71
341.70
402.00
2
25.00
26.25
37
200.60
236.00
72
345.53
406.50
3
27.63
32.50
38
205.28
241.50
73
349.35
411.00
4
32.94
36.75
39
209.95
247.00
74
353.18
415.50
5
38.25
45.00
40
214.20
252.00
75
357.00
420.00
6
43.56
51.25
41
219.30
258.00
76
360.83
424.50
7
46.88
57.50
42
223.98
263.50
77
364.65
429.00
6
54.19
63.75
43
228.65
269.00
78
368.48
433.50
9
59.50
70.00
44
233.33
274.50
79
372.30
438.00
10
64.81
76.25
45
238.00
280.00
BO
376.13
442.50
11
70.13
82.50
46
242.68
285.50
81
379,95
447.00
12
75.44
88.75
47
247.35
291.00
82
383.78
451.50
13
80.75
95.00
48
252.03
296.50
83
387.60
456.00
14
86.06
101.25
49
256.70
302.00
84
391.43
460.50
15
91.38
107.50
50
261.38
307.50
85
395.25
465.00
16
96.69
113.75
51
265.20
312.00
86
399.08
469.50
17
102.00
120.00
52
269.03
316.50
87
402.90
474.00
18
107.31
126.25
53
272.85
321.00
88
406.73
478.50
19
112.63
132.50
54
276.68
325.50
B9
410.55
483.00
20
117.94
138.75
55
280.50
330.00
90
414.38
487.50
21
123.25
145.00
56
284.33
334.50
91
418.20
492.00
22
128.57
151.25
57
288.15
339.00
92
422.03
496.50
23
133.88
157.50
58
291.98
343.50
93
425.85
501.00
24
139.19
163.75
59
295.80
348.00
94
429.68
505.50
25
144.50
170.00
60
299.63
352.50
95
433.50
510.00
26
149.18
175.50
61
303.45
357.00
96
437.33
514.50
27
153.85
181.00
62
307.28
361.50
97
441.15
519.00
28
158.53
186.50
63
311.10
366.00
98
444.98
523.50
29
163.20
192.00
64
314.93
370.50
99
448.80
528.00
30
167.68
197.50
65
318.75
375.00
100
452.63
532.50
I
SEE OTHER
SIDE FOR
VALUATIONS
GREATER THAN
$100,000.
EXHIBIT
A
FRHTRTT e
BUILDII7
ERMIT AND
PLAN CHECKING
FEES
(Cont'd.)
.
VALUATION'
; FEES
VALUATION
FEES
VALUATION FEES
NOT
PLAN
BLDG.
NOT
PLAN
BLDG.
NOT
PLAN
BLDG.
OVER
CHECK*
PERMIT
OVER
CHECK*
PERMIT
OVER
CHECK'
PERMIT
101
455.18
535.50
131
531.68
625.50
161
608.18
715.50
102
457.73
538.50
132
534.23
628.50
162
610.73
718.50
103
460.28
541.50
133
536.78
631.50
163
613.28
721.50
104
462.83
544.50
134
539.33
634.50
164
615.83
724.5D
105
465.3B
547.50
135
541.88
637.50
165
618.38
727.50
106
467.93
550.50
136
544.43
64Q.50
166
620.93
730.50
107
470.46
553.50
137
546.98
643.50
167
623.48
733.50
108
473.03
556.50
138
549.53
646.50
168
626.03
736.50
109
475.58
559.50
139
552.08
649.50
169
628.58
739.50
110
478.13
562.50
140
554.63
652.50
170
631.13
742.50
ill
480.68
565.50
141
557.18
655.50
171
633.68
745.50
112
463.23
568.50
142
559.73
658.50
172
636.23
748.50
113
485.76
571.50-
143
562.28
661.50
173
638.78
751.50
114
488.33
574.50
144
564.83
664.50
174
641.33
754.50
115
490.88
577.50
145
567.38
667.50
175
643.88
757.50
116
493.43
580.50
146
569.93
670.50
176
646.43
760.50
117
495.98
583.50
147
572.48
673.50
177
648.98
763.50
118
498.53
586.50
148
575.03
676.50
178
651.53
766.50
119
501.08
589.50
149
577.58
679.50
179
654.08
769.50
120
503.63
592.50
150
580.13
682.50
180
656.63
772.50
121
506.18
595.50
151
582.68
685.50
181
659.18
775.50
122
508.73
598.50
152
585.23
688.50
182
661.73
778.50
123
511.28
601.50
153
587.78
691.50
183
664.28
781.50
124
513.83
604.50
154
590.33
694.50
184
666.83
784.50
125
516.38
607.50
155
592.88
697.50
185
669.38
787.50
126
518.93
610.50
156
595.43
700.50
186
671.93
790.50
127
521.48
613.50
157
597.98
703.50
187
674.48
793.50
" 128"
524.03
616.50
158
600.53
706.50
188
677.03
796.50
129
526.58
619.50
159
603.08
709.50
189
679.58
799.50
130
529.13
622.50
160
605.63
712.50
190
682.13
802.50
* When plans are required.
(See Building Code Section 3(11-C and 303-B.)
FOR EACH
ADDITIONAL $1,000
or fraction thereof OVER $190,000 (use the
next full
thousand
for fractions), add $3.00 to the Permit
Fee and
add $2.55
to the Pian
Check Fee.
For a quick check
of these
large amounts OVER $190,OO.a,
3
times the valuation in
thousands
plus $232.50 will
equal the Permit Fee in dollars.
Plan
Check Fee equals 85% of
the
i Permit Fee.
i
i
EXAMPLE:
$299,200
(Permit
Fee same as for $300,000)
Permit Fee
= $232.50 PLUS 300
X 3 $1,132.50
+
10.50 issuance
fee ;= $1,143.00.
Plan Check
Fee =
$1,132.50 X
(.85) _
$962.63,
NOTE: DO NOT add
$10.50 issuance fee to permit
amount when
calculating Plan Check Fee.
06/01/82
bl
FRHTRTT e
•�"
COUNTY
OPART;IENT
OF LOS
AINGE Lc
OF COUNTY
ENGINEER-
nCiLITIES
•
_
BUILDING AND SAFETY DIVISION
•
GRADING PERMIT
AND PLA14 CHECKING
FEES -
COUNTY UNINCORPORATED AREA
A permit
issuance fee of $10.50
shall
be added to all permit
fees_
VOLUME
FEES
VOLUME
FEES
VOLUME
FEES
(cu.yds.)
(cu.yds.)
(cu.yds.)
NOT
PLAN GRDNG.
NOT
PLAN
GRDNG.
NOT
PLAN
GRDNG.
OVER
CHECK PERMIT
OVER
CHECK
PERMIT
OVER
CHECK
PERMIT
50
$ D $
60
-31
$ 931
$ 931
71
$1,571
$1,571
100
100
100
32
947
947
72
1,587
1,587
200
130
130
33
963
963
73
1,603
1,603
300
160
160
34
979
979
74
1,619
1,619
400
190
190
35
995
995
75
1,635
1,635
500 -
220
220
600
250
250
36
1,011
1,011
76
1,651
1,651
70D
280
280
37
1,027
1,027
77
1,667
1,667
Bo0
310
310
38
1,043
1,043
78
1,683
1,683
900
340
340
39
-1,059
1,059
79
1,699
1,699
1000
370
370
40
.1,075
1,075
80
1,715
1,715
THEN BY
THOUS;OMS
41
1,091
1,091
.81
1,731
1,731
2
395
.395
42
1,107
1,107
82
1,747
1,741
3
420
420
43
1,123
1,123
83
1,763
1,763
4
445
445
44
1,139
1,139
84
1,779
1,779
5
470
470
45
1,155
1,155..
85
1,795
1,795
6
495
495"
46
1,171
1,171
86
1,811
1,811
7
520
520
47
1,187
7,187
87
1,827
1,827
B
545
545
48
1,203
1,203
88
1,643
1,843
9
570
570
49
1,219
1,219
B9
1,859
1,859
10
595
595
50
1,235
1,235
90
1,875
1,875
11
611
611
.51
1,251
1,251
91
1,891
1,691
12
627
-627
52
1,267
1,267
92-
1,907
1,907
13
643
643
53
1,283
1,283
93
1,923
1,923
14
659
659
54
1,299
1,299
94
1,939
1,539
15
675
675
55
1,315
1,313
95
1,955
1,955
16
691
691
56
1,331
1,331
96
1,971
1,971
17
707
707
.57
1,347
11347
97
1,987
1,987
18
723
723
58
1,363
1,363
96
2,003
2,C'03
19
739
739
59
1,379-
1,379
99
2,019
2,019
20
755
755
60
1,395
1,395
100.
2,035
2,035
21
771
771
61
1,411
110
2,075
2,075
22
.787
787
62
1,427
_1,411
1,427
120
2,115
2,115
23
803
803
63
1,443
1,443
130
2,155
2,155
24
819
819
64
1,459
1,459
140
2,195
2,195
25
835
835
65
1,475
1,475
150
2,235
2,235
26
B51
851
66
1,491
1,491
160
2,275
2,275
27
867
667
67
1,507
1,507
170
2,315
2,31-
28
883
-863
68
1,523
1,523
180
2,355
29
899
899
69
-1,539
1,539
190-
2,395
30
915
915
70
-1,555
1,555
200
2,435
_,-;3=
SEE
OTHER SIDE FOR_VOLUMES GREATER THAN 200,000
CUBIC YARDS
Volume shall be
largest Volume
of cut or
fill, nor
total of cut
an-� f_:
.
- FYNTHIT A
GRA*G PERtAJT AND PLAN CFiEC}:Zt3G OS (Cont' d. )
VOLUME -
-FEES
VOLUME
FEES
VOLUME
FEES
(cu.yds.)
(cu.yds.)
(cu.yds.)
NOT
PLAN
GRDNG.
NOT
PLAN
GRDNG.
NOT
PLAN
GRDNG.
OVER
CHECK
.PERMIT
OVER
CHECK
PERMIT
OVER
CHECK
PERMIT
210
$2,475
$2,475
610 $3,910
$3,910
1,010
.$4,910
$4,91D
220
2,515
2,515
-620
3,935
3,935
1,020
4,935
4,935
230
2,555
2,555
630
3,960
3,960
1,030
4,960
4,960
240
2,595
2,595
640
3,985
3,985
1,040
4,985
4,985
250
2,635
-2,635
650 _
4,010
4,010
1,050
5,010
5,010
260
2,675
2,675
660
4,035
.,4,035
1,060
5,035
5,035
270
2,715
2,715
670
4,060
4,060
1,070
5,060
5,060
280
2,755
2,755
680
4,085
4,085
1,080
5,085
5,085
290
2,793
2,795
690
4,110
4,110
1,090
5,110
5,110
300
2,835
2,835
700
4,135-
4,.135
1,100
5,135
5,135
310
2,875
2,875.
710 _
4,160
4,160.
1,110
3,160
5,160
320
2,915
2,915
720
4,185
4,185
1,120
.5,185
5,185
330
2,955
2,955
730
4,210
4,210
1,130-
5,210
5,210
340
2,995
2,995
740'
-4,235
4,235.
1,140
5,235
5,235
350
3,035
3,035
75D.
4,260
4,260
1,150
5,260
5,260
360
-3,075
3,075
760
4,285
-4,2B5.
1,160
5,285
5,285
370 -
3,115
3,113
770
4,310
4;310
11170
5,310
5,310
380
3,155
3,155
780
4,335
4,335
1,180
5,335
5,335
390
3,195
3,195
790
4,360
4,360
1,190..
.5,360.
5,360
400
-3,235
3,235
800
4,385
4,385
1,200
5,385
5,385
410
3,27.5
3,275
810-
4,410
4;410:-..--_'
1,210 ..-5,410
5,410
420'
3,315
3,315 -
820
4,435._
4,435
1,220
5,435
5,435
430
3,355,
3,355
830 -
4,460
4,46D.
-1,230
5,460
5,460
440
3,395
3,395
840
4,485
4,4B5
1,240:
5,485
5,485
450'
3,435-
'31435 _
850-
4,510
4,510. °-
1;250
5;510
5,510
460
3,475
:3,475 '-.=
860
4,535
4,535'-
1,260
5;'535
5,535
470
3,515
3,515-
870
4,560.
4,560 -
1,270
5,560
-5,560
480
3,55.5
_3,555
880
4,585
4,585
1,280
.5,585
5,585
490 _
3,595
3,595._
890.
4;610
4,610
1,290
5,610
-5,610
500
3,635
30635
900'._
4,635
"4,635 =.
1,300
5,635
5,635
510
3,660
3,660-
910
4,660
4,660
1,310
5,660
5,660-
520
3,685
3,685
920
4,685.
4,685 -
1,320
5,685
5,695
530
3,710
3,710_ _
930
4,710
4,710
1,330
5,710
5,710
.540
3,735
31735
940
4,735_
4.,735;-:.
1,340
5,735.
5,735
550
3,760:
3.,760
950..
4,76D
-.-4,760-.:`
."1;350
5,760
5,760
560
3,785
3,_785
960
4,785
4,785_
1;360.
5,785
5,765
570
3,810
3,810--
970
4,810
-4,810-'
1,370
5,810
5,810
.580
3,835
3,835
980
4,835
4,835
1,380
5,835
5,835
590'
3,860
3,860
990
4,860
4,860
.1,390
5,860
5,660
600
3,885
3,885
1,000
4,685
4,885
1,400
- 5,885
5,885
FOR EACH ADDITIONAL
10,000
cubic yards
or fraction thereof,:.
(use the
next higher _111
ten thousand
number),
add
$25.00 to the
Permit
see and add
$25.DD to
the Plan Check
Fee.
-
- -
-
- - -.
_X:u=roc Permit Fee for.
1,563, 000 cu.
yds. _
$5,885 PLUS -.i7 X.-25 =
$6,310 +
10.50
issuance
fee =
$6,320.50.
Plan.
Check Fee
= $6,310.
EXHIBIT
A
• TABLE 99A •
REHABILITATION PROCESSING FEES
Investigation and Processing
Preparation of job specifications
City Council Approval
Contract performance inspection
Billing
Record Special Assessment
Filing of Special Assessment
$100.00
$150.00
60.00
75.00
50.00
50.00
50.00
EXHIBIT A
COUNTY OF LOS ANGELES
DEPARTMENT OF COUNTY ENGINEER -FACILITIES
BUILDING 6 SAFETY DIVISION
Effective June 7, 1982, fees for Plumbing in the unincorporated territory of Los Angeles
County will be as follows:
Table No.
For issuing each permit............................................................. $10.5(
In Addition:
For each plumbing fixture or trap or set of fixtures on one trap (including drainage,
vent, water piping and backflow prevention devices therefor) $ 6.0(
For each permanent type dishwasher whether individually trapped or not ......... $ 6.0(
For each industrial waste pretreatment interceptor including its trap and vent, excepti
kitchen type grease interceptors functioning as fixture traps .................. $ 6.0(
For each swimming pool drainage trap and receptor whether connected to a building draii
or a building sewer (water supply for pool not included) •....................•• $ 6.0(
For each gas piping system of one to five outlets --or alteration or retest of existing
gas piping system.............................................................. $ 6.0(
For each additional outlet over five ......................................... $ 1.5(
For each gas pressure regulator other than appliance regulators ................ $ 2.01
For each water heater and/or vent .............................................. $ 6.01
For each solar potable water heating system, including water heater and vent.... $20.01
For repair or alteration of drainage and/or vent piping ........................ $ 6.01
For each piece of water -treating equipment and/or water piping installed without
accompanying plumbing.......................................................... $ 6.0
For lawn sprinkler systems on any one meter including backflow prevention devices
therefor....................................................... $ 6.0
For backflow prevention devices on unprotected water supplied, pools, tanks, vats,
etc. (including incidential water piping) one to five $ 6.0
For each additional device over five ......................................... $ 1.5
Each building drain installed without accompanying plumbing. .................... S 6.0
NOTE: FOR SEWER FEES AND PLAN CHECK FEES SEE REVERSE SIDE
...EXHIBIT B
For issuing each permit
In Addition:
• Table No. 2
.......................................................... $10.50
For the connection of a house sewer to a public sewer or for the extension of a house
lateral onto a lot for future use (Separate permit required for each connection or
extension)..................................................................... $17.00
For each house sewer manhole ................................................... $17.00
For each installation of a section of house sewer for future use ............... 511.00
For the connection of each additional building or additional work to a house
sewer.......................................................................... $11.00
For the connection of a house sewer to a private sewage disposal system ........ $11.00
For each private sewage disposal system (septic tank and seepage pit or pits and/or
drainfield).................................................................... $35.00
For each cesspool, overflow seepage pit, percolation test pit, swimming pool drywell,
or drainfield extension or replacement ......................................... $17.00
For disconnection, abandonment, alteration or repair of any house sewer or private
sewage disposal system or part thereof ......................................... S11.00
Plan Check Fee
(a) A single building containing more than
216 drainage fixture units.
(b) A potable water line serving one or more
buildings with an aggregate demand of more
than 180 water fixture units or 100 GPM
(excluding buildings under item "a" and
minor accessory buildings).
(c) A fuel gas line serving one or more
buildings with an aggregage demand of
2,000,000 BTU's or more (excluding
buildings under item "a" and minor accessory
buildings).
(d) A sewer collection system serving more than
one building with an aggregate load of more
than 216 drainage. fixture units. (excluding
minor accessory buildings).
5/32
25% of Plumbing* PERMIT FEE required
$36.00 + $3.00 for each additicnal
building over one.
$36.00 + $3.00 for each additional
building over one.
$18.00 + $3.00 for each additional
building over one.
EXHIBIT B
• COUNTY OF LOS ANGELES •
` DEPARTMENT OF COUNTY ENGINEER -FACILITIES
BUILDING & SAFETY DIVISION
Effective June 7, 1982, fees for Plumbing in the unincorporated territory of Los Angeles
County will be as follows:
Table No. 1
For issuing each permit............................................................. $10.50
In Addition:
For each plumbing fixture or trap or set of fixtures on one trap (including drainage,
vent, water piping and backflow prevention devices therefor) $ 6 -OC
For each permanent type dishwasher whether individually trapped or not ......... $ 6.00
For each industrial waste pretreatment interceptor including its trap and vent, excepti
kitchen type grease interceptors functioning as fixture traps .................. $ 6.0C
For each swimming pool drainage trap and receptor whether connected to a building drain
or a building sewer (water supply for pool not included) ....................••• $ 6.0C
For each gas piping system of one to five outlets --or alteration or retest of existing
gas piping system.............................................................. $ 6.0(
For each additional outlet over five ......................................... $ 1.5(
For each gas pressure regulator other than appliance regulators ................ $ 2.0(
For each water heater and/or vent .............................................. $ 6.0(
For each solar potable water heating system, including water heater and vent.... $20.0(
For repair or alteration of drainage and/or vent piping ........................ $ 6.0(
For each piece of water -treating equipment and/or water piping installed without
accompanying plumbing.......................................................... $ 6.01
For lawn sprinkler systems on any one meter including backflow prevention devices
therefor....................................................................... $ 6.01
For backflow prevention devices on unprotected water supplied, pools, tanks, vats,
etc. (including incidential water piping) one to five .......................... $ 6.01
For each additional device over five ......................................... $ 1.5
Each building drain installed without accompanying plumbing $ 6.0',
170TE: FOR SEWER FEES AND PLAN CHECK FEES SEE REVERSE SIDE
. EXHIBIT. B
Table No. 2
For issuing each permit............................................................. $10.50
In Addition:
For the connection of a house sewer to a public sewer or for the extension of a house
lateral onto a lot for future use (Separate permit required for each connection or
extension)..................................................................... $17.00
For each house sewer manhole ................................................... $17.00
For each installation of a section of house sewer for future use ............... $11.00
For the connection of each additional building or additional work to a house
sewer.......................................................................... $11.00
For the connection of a house sewer to a private sewage disposal system ........ $11.00
For each private sewage disposal system (septic tank and seepage pit or pits and/or
drainfield).................................................................... $35.00
For each cesspool, overflow seepage pit, percolation test pit, swimming pool drywell,
or drainfield extension or replacement. ......................................... $17.00
For disconnection, abandonment, alteration or repair of any house sewer or private
sewage disposal system or part thereof ......................................... $11.00
Plan Check Fee
(a) A single building containing more than
216 drainage fixture units.
(b) A potable water line serving one or more
buildings with an aggregate demand of more
than 180 water fixture units or 100 GPM
(excluding buildings under item "a" and
minor accessory buildings).
(c) A fuel gas line serving one or more
buildings with an aggregage demand of
2,000,000 BTU's or more (excluding
buildings under item "a" and minor accessory
buildings).
(d) A sewer collection system serving more than
one building with an aggregate load of more
than 216 drainage fixture units_ (excluding
minor accessory buildings).
5/32
25% of Plumbing* PERMIT FEE required
$36.00 + $3.00 for each additicnal
building over one.
$36.00 + $3.00 for each additional
building over one.
$18.00 + $3.00 for each additional
building over one.
. EXHIBIT B
ORDINANCE NO. 82-0103
An ordinance amending Title 27 of the Los Angeles County Code,
revising electrical permit fees and making other amendments.
The Board of Supervisors of the County of Los Angeles do ordain as
follows:
SECTION 1. Section -82-8(a) of Title No. 27 of the Los Angeles
County Code is amended to read:
(a) Electrical Permit Fees.
PERMITS
For issuing permits, each .............................5 10.50
SYSTEM FEE SCHEDULE
(Note: The following do not include permit issuing fee.)
New Residential Buildings
The following fees shall include all wiring
and electrical equipment in or on each building,
or other electrical equipment on the same
premises constructed at the same time.
For new multifamily residential buildings
(apartments and condominiums) having three (3)
or more living units not including garages,
carports, and other noncommercial automobile
storage areas constructed at the same time,
per square foot .................................. .035
Por garages, carports, and other accessory
buildings use UNIT FEE SCHEDULE.
1
EXHIBIT C
For new single and two-family residential
buildings not including garages, carports and
other minor accessory buildings constructed at
the same time, per square foot ................... 04
For other types of residential occupancies
and alterations, additions and modifications
to existing residential buildings, use UNIT
FEE SCHEDULE. .-
Private Swimming Pools
For new private, residential, inground swimming
pools for single, or multifamily occupancies,
including a complete system of necessary branch
circuit wiring, bonding, grounding, underwater
lighting, water pumping and other similar elec-
trical equipment directly related to the operation
of a swimming pool, each ......................... 30.00
For other types of swimming pools, therapeutic
whirlpools, spas, hot tubs and alterations to
existing swimming pools, each .................... 20.00
Carnivals and Circuses
Carnivals, circuses or other traveling shows or
exhibitions utilizing transportable -type rides,
booths, displays and attractions.
For electric generators and electrically driven
rides, each ...................................... 15.00
E
EXHIBIT C
For mechanically driven rides and walk-through
attractions or displays having electric light-
ing, each ........................................
6.00
For a system of area and booth lighting, each .......
6.00
For permanently installed rides, booths, displays,
and attractions, use UNIT FEE SCHEDULE.
Temporary Power Service
For a temporary service power pole or pedestal,
including all pole or pedestal mounted receptacle
outlets and appurtenances, each ..................
15.00
For a temporary distribution system and temporary
lighting and receptacle outlets for construction
sites, decorative lighting, Christmas tree sales
lots, firework stands, sales booths, additional
pole, etc., each .................................
5.00
UNIT FEE SCHEDULE
(Note: The following do not include permit issuing fee.)
Receptacle, -Switch and Lighting, or other.
For receptacle, switch, lighting, or other outlets
at which current is used or controlled except
services, feeders and meters:
First 20, each .75
Additional outlets, each .50
Note: For multi -outlet assemblies, each five
feet or fraction thereof may be considered as
one outlet.
3
"EXHIBIT C
M
FXHTRTT C
Lighting Fixtures
For lighting fixtures, sockets, or other lamp
holding devices:
First 20, each ...................................
.75
Additional fixtures, each ........................
.50
For pole or platform mounted lighting fixtures,
each.............................................
.75
For theatrical -type lighting fixtures or assemblies,
each.......................................•......
.75
Residential Appliances
For fixed residential appliance or receptacle outlets
for same, including wall -mounted electric ovens,
counter -mounted cooking tops, electric ranges,
self-contained room, console, or through -wall air
c
conditioners, space heaters, food waste grinders,
dishwashers, washing machines, water heaters,
clothes dryers, or other motor -operated appliances,
not exceeding one (1) horsepower (HP) in rating,
each.............................................
3.50
Note: For other types of air conditioners and
other motor -driven appliances having larger
elec rical ratings, see Power Apparatus.
M
FXHTRTT C
Non -Residential Appliances
For residential appliances and self-contained,
factory -wired, non-residential appliances not
exceeding one (1) horsepower (HP), kilowatt (KW),
or kilovolt -ampere (KVA) in rating, including
medical and dental devices, food, beverage, and
ice cream cabinets, illuminated showcases,
drinking fountains, vending machines, laundry
machines, or other similar types of equipment,
each ............................................. 4.00
Note: For other types of air conditioners and
other motor -driven appliances having larger
electrical ratings, see Power Apparatus.
Power Apparatus
For motors, generators, transformers, rectifiers,
synchronous converters, capacitors, industrial
heating, air conditioners and heat pumps, cooking
or baking equipment, and other apparatus, as
follows:
Rating in horsepower (HP), kilowatts (KW),
kilovolt -amperes (KVA), or kilovolt -amperes -
reactive (KVAR).
Up to and including 1, each ...................... 4.00
over 1 and not over 10, each 7.00
- over 10 and not over 50, each .................... 18.00
over 50 and not over 100, each ................... 36.00
Over 100, each ................................... 60.00
E
EXHIBIT C
0
Note: 1. For equipment or appliances having
more than one motor, transformer,
heater, etc., the sum of the combined
ratings may be used.
Note: 2. These fees include all switches, cir-
cuit breakers, contactors, thermostats,
relays and other directly related
control equipment.
Busways
For trolley and plug-in type busways, each 100 feet
or fraction thereof .............................. 10.00
Note: An additional fee will be required for
lighting fixtures, motors and other appliances
that are connected to trolley and plug-in_fype
busways. No fee is required for portable tools.
Signs, outline Lighting, and Marquees.
For signs, outline lighting systems, or marquees
supplied from one branch circuit, each ........... 15.00
For additional branch circuits within the same
sign, outline lighting system, or marquee,
each .....................:....................... 5.00
Services, Switchboards, Switchboard Sections, Motor
Control Centers and Panelboards
For services, switchboards, switchboard sections,
motor control centers and panelboards of 600
volts or less and not over 200 amperes in rating,
each ............................................. 15.00
6
EXHIBIT C
For services, switchboards, switchboard sections,
motor control centers and panelboards of 600
volts or less and over 200 amperes to 1,000
amperes in rating, each .......................... 30.00
For services, switchboards, switchboard sections,
motor control centers and panelboards over 600
volts or over 1000 amperes in rating, each ....... 70.00
Miscellaneous Apparatus, Conduits and Conductors
For electrical apparatus, conduits and conductors
for which a permit is required but for which no
fee is herein set forth .......................... 15.00
Note: This fee is not applicable when a fee
is paid for one or more services, outlets,
fixtures, appliances, power apparatus, busways,
signs or other equipment.
Other Inspections
For each extra inspection resulting from defective
workmanship or materials, each ................... 12.00
For inspection of electrical equipment for which
no fee is herein set forth and for emergency
inspections for the time consumed, per hour ...... 50.00
With a minimum charge of 1/2 hour or'less ........... 25.00
7 EXHIBIT C
SECTION 2. Section 82-8(b) of Title 27 of the Los Angeles County
Code is amended to read:
(b) Plan Checking Fee. Plans shall he submitted, fees paid, and
approval obtained before applying for a permit and installing any wiring
related to the following:
1. Any installation where one or more services, switchboards,
motor control centers or feeders have a rating of 600 amperes
or larger at 600 volts or less.
2. Any installations rated above 600 volts.
3. Theaters or motion picture theaters.
4. Assembly rooms or similar places having an assemblage or
seating capacity exceeding 500 persons.
5. A hospital or other health care facility with surgical
operating rooms falling within the scope of•Article 517
of the National Electrical Code.
6. Installations in location classed as hazardous locations
by the provisions of Chapter 5 of the National Electrical
Code, unless otherwise satisfactory to the Building and
Safety Division, or when the installation is supervised by
an Electrical Engineer who is duly registered by the State
of California Board of Registration for Civil and Profes-
sional Engineers, or supervised by a qualified maintenance
electrician or supervisor registered with the County of
Los Angeles as per Section 82-4(b) of this Code.
7.. Installation of lighting fixtures weighing more than 300
pounds.
8
EXHIBIT C
EXCEPTION: The above requirements do not apply to minor additions
or alterations where satisfactory to the Building and Safety
Division.
Said fee shall be equal to fifty percent (50%) of the required
electrical permit 'fee as set forth in subsection (a) of this section.
When identical electrical design is evident in more than one
building on a single project and the Chief Electrical Inspector so
finds, plan check fees may be waived for other than the initial example.
A new application shall he filed, and new plan checking fees paid,
if the original plans are not approved within one year of the date of
the first plan check submittal.
SECTION 3. Section 82-8(c) of Title 27 of the Los Angeles County
Code is ameaded to read:
(c) Information Required On Plans.
1. Every plan required by Section 82-8(b) shall be a print
or other type approved by the Electrical Section of the
Building and Safety Division. The information contained
on the plans shall be drawn in a professional manner,
be clearly legible and contain the information required
in subsection (2) below. The plans for the electrical
wiring in a building shall be of a scale no smaller than
one-eighth inch per foot. Reasonable symbols satisfactory
to the Division shall be used on ail plans.
EXCEPTION: A scale less than one-eighth inch per foot
may be used where acceptable to the Division.
E
EXHIBIT C
2. The following is required to be shown on the plans for the
wiring installations described in Section 82-8(b):
A complete plan showing the layout of the proposed elec-
tric wiring for each floor, including dimensions of all
working spaces, and legend of all symbols used.
A complete single line diagram.
The type, location and capacity of all service equipment.
The size and -the length of all service raceways to the
to the manhole, vault or pole of the serving agency or
to the service head.
The size of all raceways and the length of all feeder
raceways.
The dimensions of all pull or junction boxes larger than
four inches trade size.
The number, size and type of all conductors to be installed
in wiring enclosures.
The location of every proposed outlet and switch in all
parts of the building or structure including all fixed
showcases, wall cases, and similar wiring.
The wattage or ampere rating of each outlet for non-
inductive loads and the volt-ampere rating of each
unit or transformer for electric discharge lighting.
The location, voltage and H.P. rating of every motor
and the K.W. rating of every generator. The type
and code letter of every A.C. motor shall be given
unless otherwise satisfactory to the Department.
10
EXHIBIT C
The location and K.V.A., or equivalent rating of each
transformer, capacitor; ballast, converter, frequency
changer and similar egnipmentj and the locations and
ampere or wattage rating of other appliances of the
noninductive type.
Details of panelboard, switchboard and distribution
centers, showing type and arrangement of switches,
overcurrent devices, and general control equipment.
Panelboard and switchboard schedules showing wattage
and amperage, the numbez of active branch circuits to
be installed, and the number of spare branch circuits
for future use. This shall include identifying the
circuits to which the outlets are connected.
The existing load, as calculated in accordance with
Articles 210 and 220 of the National Electrical Code
or by other methods satisfactory to the Division
shall be indicated for existing installations having
alterations or additions made thereto.
Other additional information as the Division may con-
sider necessary for proper enforcement of this Code.
SECTION 4. Section 82-8(d) of Title 27 of the Los Angeles County
Code is amended to read:
(d) Maintenance Electrician Registration Fee. A fee shall be paid
for each Certificate of Registration as -Maintenance Electrician. Each
registration shall expire on June 30, biennially, in even numbered
11
EXHIBIT C
years, and each such certificate may be renewed on or before that date
upon payment of the renewal fee.
Registration and Renewal Fee, each ...............................$50.00
Section 5. Subsection (e) is added to Section 82-8 of Title 27 of
the Los Angeles County Code to read:
(e) Investigation Fee: Work Without a Permit. Whenever any work
for which a permit is required by this Code has been. commenced without
first obtaining said -permit, a special investigation shall be made by
the Chief Electrical Inspector before a permit may be issued for such
work. An investigation fee shall be collected whether or not a permit
is then or subsequently issued. The investigation fee shall be equal to
the amount of the permit fee required by this Code, but shall not exceed
five hundred dollars ($500). The payment of such investigation fee
shall not exempt any person from compliance with all.other provisions of
this Code.
The requirement to obtain a permit and to pay an investigation fee
shall not apply to emergency work when it shall be proved to the satis-
faction of the Chief Electrical Inspector that such work was urgently
necessary and that it was not practical to obtain a permit before the
commencement of work. In all cases, a permit must be obtained as soon
as practicable and if there be an unreasonable delay in applying for a
permit, an investigation shall be conducted and an investigation fee
shall be collected.
12
EXHIBIT C
COUNTY OF LOS ANGELES •
DEPARTMENT OF COUNTY ENGINEER -FACILITIES
BUILDING AND SAFETY DIVISION
Effective June 28, 1982, fees for Mechanical installations in the unincorporated
territory of Los Angeles County will be as follows:
Permit Fees
For the issuance of each permit ................................................ $10.50
For the installation, alteration or relocation of each refrigeration compressor or
absorption unit, and for each fuel burning furnace, heater, boiler, and vented
decorative appliance including vents attached thereto:
Up to and including 100,000 BTU ........................................... $10.00
More than 100,000 BTU to and including 1,000,000 BTU ...................... $20.00
More than 1,000,000 BTU ................................................... $50.00
For each air inlet and air outlet served by any air conditioning system ... $ 1.75
Or for each 1,000 square feet or fraction thereof of conditioned area ..... $14.00
.TOTE: When a permit is applied for and the total number of air inlets
and air outlets is unknown, the fees shall be based on the square
feet of conditioned area.
For the installation, relocation or replacement -of' each appliance vent
installed and not included in a appliance permit .......................... $ 5.00
For the installation or alteration of each air handling unit for air conditioning
including ducts attached thereto:
Up to and including 2,000 CFM
Each unit up to 10 .............................................. $ 5.00
Each unit over 10 ................................................ $ 1.50
More than 2,000 CFM to and including 10,000 CFM $15.00
More than 10,000 CFM ................................................. $25.00
NOTE: This fee shall not apply to an air handling unit which is a portion
of a factory assembled air conditioned appliance for which a permit
is required elsewhere in this Code.
For each evaporative cooler other than portable type ...................... S 8.00
For required ventilation fans which serve a single register:
Each fan up to 10 .................................................... $ 6.00
Each fan over 10 ..................................................... $ 2.00
EXHIBIT D
E
For each required ventilation system which is not a portion of any air
conditioning system for which a permit is required elsewhere in this
Code..................................................................... $12.00
For the installation of each commercial kitchen hood or spray booth served by
mechanical exhaust, including the fans and ducts attached thereto ........ $25.00
For the installation of each fire damper ................................. $ 4.00
For the alteration of an existing duct system for which a permit is not
required elsewhere in the Code ........................................... $10.00
Note: 1) For a refrigeration system rating one horsepower, one
ton, or 12,000 BTU per hour shall mean the same quantity.
2) For steam boilers rated in boiler horsepower, one horsepower
shall equal 50,000 BTU per hour.
PLAN CHECK FEE REQUIREMENTS
Ordinance No. 9544, the Mechanical Code requires an plan check fee to be paid at the
time of submitting plans and specifications for the installation of comfort heating and
cooling systems, refrigerating and ventilating systems and hoods for installations
where the aggregate BTU input/capacity for either comfort heating or comfort
cooling is 1,000,000 BTU and over, food processing establishments containing a
commercial type hood, or installations containing a single heating or comfort cooling
air handling system with a capacity of 10,000 cubic feet per minute or more.
The plan check fee required is 50% of the permit fee shown below with the following
exceptions:
1. Identical appliances of 100,000 BTU or less, installed in a single building:
Up to and including 10 ..................... 50% of the permit fee
Over 10 .................................... 5% of the permit fee
2. When identical mechanical design is evident in more than one building
on a single project and the Chief Mechanical Inspector so finds, plan
check fees may be waived for other than the representative sample.
EXHIBIT D
• COUNTY OF LOS ANGELES •
DEPARTMENT OF COUNTY ENGINEER -FACILITIES
BUILDING AND SAFETY DIVISION
Effective June 28, 1982, fees for Mechanical installations in the unincorporated
territory of Los Angeles County will be as follows:
Permit Fees
For the issuance of each permit ................................................ $10.50
For the installation, alteration or relocation of each refrigeration compressor or
absorption unit, and for each fuel burning furnace, heater, boiler, and vented
decorative appliance including vents attached thereto:
Up to and including 100,000 BTU ........................................... $10.00
More than 100,000 BTU to and including 1,000,000 BTU ...................... $20.00
More than 1,000,000 BTU ................................................... $50.00
For each air inlet and air outlet served by any air conditioning system ... $ 1.75
Or for each 1,000 square feet or fraction thereof of conditioned area ..... $14.00
NOTE: When a permit is applied for and the total number of air inlets
and air outlets is unknown, the fees shall be based on the square
feet of conditioned area.
For the installation, relocation or replacement of each appliance vent
installed and not included in a appliance permit .......................... $ 5.00
For the installation or alteration of each air handling unit for air conditioning
including ducts attached thereto:
Up to and including 2,000 CFM
Each unit up to 10 .............................................. $ 5.00
Each unit over 10 ................................................ $ 1.50
More than 2,000 CFM to and including 10,000 CFM ...................... $15.00
More than 10,000 CFM .................................................. $25.00
NOTE: This fee shall not apply to an air handling unit which is a portion
of a factory assembled air conditioned appliance for which a permit
is required elsewhere in this Code.
For each evaporative cooler other than portable type ...................... 5 8.00
For required ventilation fans which serve a single register:
Each fan up to 10 ---------------------------------------------------- $ 6.00
Each fan over 10 ..................................................... $ 2.00
EXHIBIT D
•
For each required ventilation system which is not a portion of any air
conditioning system for which a permit is required elsewhere in this
Code..................................................................... $12.00
For the installation of each commercial kitchen hood or spray booth served by
mechanical exhaust, including the fans and ducts attached thereto ........ $25.00
For the installation of each fire damper ................................. $ 4.00
For the alteration of an existing duct system for which a permit is not
required elsewhere in the Code ............................................ $10.00
Note: 1) For a refrigeration system rating one horsepower, one
ton, or 12,000 BTU per hour shall mean the same quantity.
2) For steam boilers rated in boiler horsepower, one horsepower
shall equal 50,000 BTU per hour.
PLAN CHECK FEE REQUIREMENTS
Ordinance No. 9544, the Mechanical Code requires an plan check fee to be paid at the
time of submitting plans and specifications for the installation of comfort heating and
cooling systems, refrigerating and ventilating systems and hoods for installations
where the aggregate BTU input/capacity for either comfort heating or comfort
cooling is 1,000,000 BTU and over, food processing establishments containing a
commercial type hood, or installations containing a single heating or comfort cooling
air handling system with a capacity of 10,000 cubic feet per minute or more.
The plan check fee required is 50% of the permit fee shown below with the following
exceptions:
1. Identical appliances of 100,000 BTU or less, installed in a single building:
Up to and including 10 ..................... 50% of the permit fee
Over 10 .................................... 5% of the permit fee
2. When identical mechanical design i:s evident in more than one building
on a single project and the Chief Mechanical Inspector so finds, plan
check fees may be waived for other than the representative sample.
EXHIBIT D
rt ,°r: • COUNTY OF LOS ANGELES •
DEPARTMENT OF COUNTY ENGINEER -FACILITIES
BUILDING AND SAFETY DIVISION
Effective June 28, 1982, fees for Mechanical installations in the unincorporated
territory of Los Angeles County will be as follows:
Permit Fees
For the issuance of each permit ................................................ $10.50
For the installation, alteration or relocation of each refrigeration compressor or
absorption unit, and for each fuel burning furnace, heater, boiler, and vented
decorative appliance including vents attached thereto:
Up to and including 100,000 BTU ........................................... $10.00
More than 100,000 BTU to and including 1,000,000 BTU ...................... $20.00
More than 1,000,000 BTU ................................................... $50.00
For each air inlet and air outlet served by any air conditioning system ... $ 1.75
Or for each 1,000 square feet or fraction thereof of conditioned area ..... $19.00
]OTE: When a permit is applied for and the total number of air inlets
and air outlets is unknown, the fees shall be based on the square
feet of conditioned area.
For the installation, relocation or replacement of' each appliance vent
installed and not included in a appliance permit .......................... $ 5.00
For the installation or alteration of each air handling unit for air conditioning
including ducts attached thereto:
Up to and including 2,000 CFM
Each unit up to 10 .............................................. $ 5.00
Each unit over 10 ................................ ............... $ 1.50
More than 2,000 CFM to and including 10,000 CFM ...................... $15.00
MOre than 10,000 CFM .................................................. $25.00
KOTE: This fee shall not apply to an air handling unit which is a portion
of a factory assembled air conditioned appliance for which a permit
is required elsewhere in this Code.
For each evaporative cooler other than portable type ...................... S 8.00
For required ventilation fans which serve a single register:
Each fan up to 10 .................................................... $ 6.00
Each fan over 10 ...................... $ 2.00
EXHIBIT D
For each required ventilation system which is not a portion of any air
conditioning system for which a permit is required elsewhere in this
Code..................................................................... $12.00
For the installation of each commercial kitchen hood or spray booth served by
mechanical exhaust, including the fans and ducts attached thereto ........ $25.00
For the installation of each fire damper ................................. $ 4.00
For the alteration of an existing duct system for which a permit is not
required elsewhere in the Code ........................................... $10.00
Note: 1) For a refrigeration system rating one horsepower, one
ton, or 12,000 BTU per hour shall mean the same quantity.
2) For steam boilers rated in boiler horsepower, one horsepower
shall equal 50,000 BTU per hour.
PIAN CHECK FEE REQUIREMENTS
Ordinance No. 9544, the Mechanical Code requires an plan check fee to be paid at the
time of submitting plans and specifications for the installation of comfort heating and
cooling systems, refrigerating and ventilating systems and hoods for installations
where the aggregate BTU input/capacity for either comfort heating or comfort
cooling is 1,000,000 BTU and over, food processing establishments containing a
commercial type hood, or installations containing a single heating or comfort cooling
air handling system with a capacity of 10,000 cubic feet per minute or more.
The plan check fee required is 50% of the permit fee shown below with the following
exceptions:
1. Identical appliances of 100,000 BTU or less, installed in a single building:
Up to and including 10 ..................... 50% of the permit fee
Over 10 .................................... 5% of the permit fee
2. When identical mechanical design i:s evident in more than one building
on a single project and the Chief Mechanical Inspector so finds, plan
check fees may be waived for other than the representative sample.
EXHIBIT D