HomeMy WebLinkAboutResolution No. 7694RESOLUTION NO. 7694
A RESOLUTION OF THE CITY COUNCIL OF
THE CITY OF AZUSA CERTIFYING THE
NEGATIVE DECLARATION FOR ZONE CHANGE
CASE Z-242
WHEREAS, an Initial Study of Environmental Impact
and a Negative Declaration have been prepared for Zone
Change Case No. Z-242 (hereinafter "Project") in accordance
with the provisions of the California Environmental Quality
Act and the State CEQA Guidelines;
WHEREAS, a duly -noticed public hearing was held by
the Planning Commission for the City of Azusa on the 20th
day of March, 1985, and the City Council of the City of
Azusa on the 15th day of April, 1985, at which times
evidence was heard on the proposed Project and the Negative
Declaration;
WHEREAS, prior to approving the Project the City
Council of the City of Azusa considered the Initial Study of
Environmental Impact and the Negative Declaration together
with any comments received during the public review process;
WHEREAS, the City Council of the City of Azusa
hereby finds and determines that on the basis of the Initial
Study and any comments received in the public review process,
there is no substantial evidence that the project will have
a significant adverse effect upon the environment.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF AZUSA that the Negative Declaration for the
Project, attached hereto as Exhibit "A" and by this refer-
ence incorporated herein, is hereby certified and approved
and determined that this Negative Declaration shall be filed
with the County Clerk of the County of Los Angeles.
The City Clerk shall certify to the adoption of
this Resolution.
ADOPTED AND APPROVED THIS 15th day of April ,
1985.
I hereby certify that the foregoing Resolution
was duly adopted by the City of Azusa at a regular meeting
thereof held on the 15th day of April 198_, by the
following vote of the Council:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
ity Clerk
CRUZ, COOK, CAMARENA, LATTA, MOSES
NINIkiD
hNiklo
+ CITY OF AZUSA
INITIAL STUDY OF ENVIRONMENTAL IMPACT
I. BACKGROUND
1. Name of Proponent/Applicant:
City of Azusa City Council and Planning Commission
2. Address and phone number of Proponent/Applicant:
213 E. Foothill Boulevard
Azusa, California 91702
(818) 334-5125 Ext. 262
3. :Name of Project (if applicable):
Pre -Zoning Case No. Z-242
4. Description of Project and Address:
Pre -Zoning of unincorporated Los Angeles County area generally
bounded by the Atchison, Topeka and Santa Fe Railroad line, the
extension of Citrus Avenue, Sierra Madre Avenue and the Azusa
City Limits.
5. Identification of Environmental Setting:
Rural Agricultural.
-1-
•�\ CITY OF AZUSA • ,'
ASSESSMENT OF ENVIRONMENTAL IMPACT REPORT
INITIAL STUDY
A copy of the Initial Study for Public Works projects will be available
to the public in the Azusa Public Works Department. A copy of the initial
study for the Planning Department projects will be in the Planning
Department and the Public Library. Comments from the public on the
projects may be made, in writing, to the respective department directors
or at the public hearings for the projects.
Project Description:
Pre -Zoning Case No..Z-242,.pre-zoning of unincorporated Los Angeles County area
generally bounded by the Atchison, Topeka and Santa -Fe Railroad line, the extension
of Citrus Avenue, Sierra Madre Avenue and the Azusa City Limits.
II. ENVIRONMENTAL IMPACTS
(Explanations_ of all."yes" and "maybe",answers are required
on attached sheets:)
1. Earth Will the project result in:
YES MAYBE NO
a. Unstable earth conditions or'in
changes in geologic substructures? X
b. Disruptions, displacements, compac-
tion or overcovering of the soil?
c. Change in -topography or ground surface
relief features? X
d. The destruction, covering or modifica-
tion of any unique geologic or physical X
features?
e. Any increase in wind or water erosion
of soils, either on or off the site? X
f. Changes in deposition or erosion of
beach sands, or changes in siltation,
deposition or erosion which may modify
the .channel.of .a river.or ,stream ,or,
the bed of the ocean or any bay, inlet
or lake?
g. Exposure of people or property to geo-
logic hazards such as earthquakes,
landslides, mudslides, ground failure
or similar hazards?
2. Air Will the project result in:
X
a. Substantial air emissions or deteriora-
tion of ambient air quality?
b. The creation of objectionable odors? X
C. Alteration of air movement, moisture
or temperature, or any change in
climate, either locally or regionally?
3. Water Will the project result in -
a. Changes in currents, or the course or
direction of water movements, in either
marine or fresh waters?
b. Changes in absorption -rates, drainage
patterns, or the rate and amount of
surface water runoff?
-2-
X
x
X
I
•
YES MAYBE NO
c. Alterations to the course or flow of
floodwaters? X
d. Change in the amount of surface water
in any water body? X
e. Discharge into surface waters, or in
any.alteration of surface water quality,
including but not limited to tempera-
ture, dissolved oxygen or turbidity? X
f. Alteration of the direction or rate of
flow of ground waters? X
g. Change in the quantity of ground waters,
either through direct additions or with-
drawals, or through interception of an X
aquifer by cuts or excavations?
h. Change in quality of ground water? X
I. Substantial reduction in the amount of
water otherwise available for public X
water supplies?
J.
Exposure of people or property to
water related hazards such as flooding
or.tidal waves?
x
4. Plant Life Will the project result in:
a.
Change in the diversity of species, or
number of any species of plants (includ-
ing trees, shrubs, grass, crops, micro-
X
flora and aquatic plants)?
b.
Reduction of the numbers of any unique,
X
rare or endangered species of plants?
C.
Introduction of new species of plants
into an area, or in a barrier to the
normal replenishment of existing
X
species?
d.
Reduction in acreage of any agricultural
X
crop?
5. Animal Life Will the project result in:
a.
Change in the diversity of species, or
numbers or any species of animals (birds,
land animals, including reptiles, fish
and shellfish, benthic organisms,
insects or microfauna)?
X
b.
Reduction of the numbers of any unique,
X
rare or endangered species of animals?
C.
Introduction of new species or animals
into an area, or result in a barrier to
x
the migration or movement of animals?
d.
Deterioration to existing fish or wild-
X
life habitat?
6. Noise .Will the project result in:
a. Increase in existing noise levels? X
b. Exposure of people to severe noise
levels? X
7. Light and Glare Will the project produce
new light or glare? X
-3-
2
10.
12
13.
• • 1 YES
.Land Use Will the project result in:
a. Substantial alteration of the present or
planned land use of an area? -
b. Incompatibility with existing zoning,
the.General Plan, any specific plan, or
other applicable land use control?
Natural Resources Will the project result in:
a. Increase in the rate of use of any nat-
ural resources? .,
b. Substantial depletion of any nonrenew-
able.natural.resource?
Risk ofUpsetDoes the project involve a
risme of -n explosion or the release of
hazardous substances (including, but not
d-iinited to, oil, pesticides, chemicals or
radiation) in.the-event of.an accident
or upset conditions?
Population Will the project alter the
location, distribution, density or growth
rate of the human population of.an area?
Nousing Will the project affect existing
_housing or create a.demand for additional
housing?
Transportat1on/C-i'r'cul'ation' Will the :.
project result in:'"
a. Generation of substantial additional
vehicular movement?
b. Effects on existing parking facilities
or demand for new parking?
C. Substantial impact upon existing trans-
portation systems?
d. Alterations to present patterns of -
circulation or movement of people and/
or goods?
e. Alterations to waterborne, rail or air
traffic?
f. Increase in.traffic Hazards to motor
vehicles,. _b.icyclists, or pedestrians?
14. Public_ Services Will the project have an
ettect upon_,, ,or result in a need for new
or altered governmental services in any
of the following areas:
a. Eire protection?
b. Police protection?
C. Schools?
d.- Parks or other -recreational facilities?
e. Maintenance of. public facilities,
including roads?
f. Other -governmental services?
-4-
MAYBE NO
X
X
X
X
X
X
x
X
X
X
X
y
7
a. Does the project have the potential to
degrade the quality of the environment,
substantially reduce the habitat of a
fish or wildlife species, cause a fish
or wildlife population to drop below
self-sustaining levels, threaten to
eliminate a plant or animal community,
reduce the number or restrict the range
of a rare or endangered plant or animal 1
or eliminate important examples of the
major periods of California history or X
prehistory?
b. Does the project have the potential to
achieve short-term, to the disadvantage
of long-term, environmental goals? (A
short-term impact on the environment is
one which occurs in a relatively brief
definitive period of time while long-
term impacts will endure well into the
future.) X
YES MAYBE NO
15.
Energy Will the project result in:
a. Use of substantial amounts of fuel
or energy?
X
b. Substantial increase in demand upon
existing sources of energy, or require
the development of new sources of
energy?
X
16.
Utilities Will the project result in a
need for new systems, or substantial
alterations to the follbwing utilities?
a. Power or natural gas?
X
b. Communications systems?
X
c. Water?
X
Sewer or septic tanks?
X
e. Storm water drainage?
X
f. Solid waste and disposal?
X
17.
human Health Will the project result in:
a. Creation of any health hazard or po-
tential health hazard (excluding
mental health)?
X
b. Exposure of people to potential
health hazards?
X
ld.
Aesthetics Will the project result in the
obstruction of any scenic vista or view
open to the public, or will the proposal
result in the creation of an aesthetically
X
offensive site open to public view?
19.
Recreation Will the project result in an
impact upon the quality or quantity of ex-
isting recreational opportunities?
X
20.
Archeolo ical/Elistorical Will the project
res—uTt in an a terat-Ion of a significant
archeological or historical site, struc-
ture, object or building?
X
21.
mandatory Findings of Significance
a. Does the project have the potential to
degrade the quality of the environment,
substantially reduce the habitat of a
fish or wildlife species, cause a fish
or wildlife population to drop below
self-sustaining levels, threaten to
eliminate a plant or animal community,
reduce the number or restrict the range
of a rare or endangered plant or animal 1
or eliminate important examples of the
major periods of California history or X
prehistory?
b. Does the project have the potential to
achieve short-term, to the disadvantage
of long-term, environmental goals? (A
short-term impact on the environment is
one which occurs in a relatively brief
definitive period of time while long-
term impacts will endure well into the
future.) X
• • ''" l YES MAYBE NO
c. Does the project have impacts which are
individually limited but cumulatively
.considerable? (A project may impact on
two or more separate resources where the
impact on each resource is relatively
small, but where the effect of -the total
of those impacts on the -environment -is
significant.) X
d. .Does the project have environmental `--
effects-which will cause substantial
adverse effects on human beings -directly
or indirectly? '
III. DISCUSSION OF ENVIRONMENTAL EVALUATION
IV. MITIGATION.MEASURES
Describe mitigation measures included -in the project, if
any are needed, to avoid potentially significant effects:
None required.
V. DETERMINATION
(To be completed by the Lead Agency)..
On the basis.of this initial evaluation: .
X_ I find the proposed project .COULD NOT have a significant
effect -on the environment,,and a.NEGATIVE DECLARATION
has-been.prepared and is attached.
I find that although the proposed project could have
a significant effect on the envi-ronment, there will not
be a significant effect in this case because the
mitigation measures described on an attached sheet have
been added to -the. project. A.NEGATIVE DECLARATION WILL
BE PREPARED._ J
I find the proposed project MAY have.a significant
effect on the environment and an ENVIRONMENTAL IMPACT
REPORT is required.
Date 3/1/85 Signature�U�uX��ro�,
DANIEL-WATRO S
" Title ASSOCIATE CITY PLANNER ._
NEGATIVE DECLARATION
1. Description of the Project:
Pre -Zoning Case No. Z-242, pre -zoning of unincorporated Los Angeles County
area.
2. Location of the Proiect:
Unincorporated Los Angeles County area generally bounded by the Atchison, Topeka
and Santa Fe Railroad line, the extension of Citrus Avenue, Sierra Madre
Avenue, and the Azusa City Limits.
3. Findin
I find that the proposed project COULD NOT have a significant effect on the
environment, and a NEGATIVE DECLARATION has been prepared and is attached.
4. Initial Studv:
Attached
5. Mitigation Measures:
None required.