Loading...
HomeMy WebLinkAboutResolution No. 8752pmt/RES86708 • RESOLUTION NO. 8752 E A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA FIXING THE FEES AND CHARGES TO BE COLLECTED BY THE BUILDING DEPARTMENT FOR PERMITS AND INSPECTIONS PURSUANT TO THE UNIFORM BUILDING CODE, UNIFORM PLUMBING CODE, UNIFORM MECHANICAL CODE, NATIONAL ELECTRICAL CODE, UNIFORM SWIMMING POOL, SPA AND HOT TUB CODE, AND THE UNIFORM SIGN CODE PURSUANT TO SECTION 15.04.020 OF THE AZUSA MUNICIPAL CODE ("FEE SCHEDULE RESOLUTION") THE CITY COUNCIL OF THE CITY OF AZUSA DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The City Council of the City of Azusa does hereby find, determine and declare that: A. The City has adopted the 1988 editions of the Uniform Building Code, Uniform Mechanical Code, Uniform Plumbing Code, Uniform Swimming Pool, Spa and Hot Tub Code and the Uniform Sign Code as well as the 1987 edition of the National Electrical Code; B. Section 15.04.020 of the Azusa Municipal Code provides that the City Council may by resolution, establish the fees and charges to be collected by the Building Department for issuance of permits and inspections pursuant to the Uniform Codes adopted in Section 15.04.010; C. The fees and charges to be imposed for the permits and inspections reflect the direct cost to the City of the staff time and reasonable administrative overhead spent in the research, preparation and issuance of the permits and in the inspections; D. The City Council finds pursuant to Section 15079.1 of the State CEQA Guidelines (14 Cal. Admin. Code Section 15079.1) that CEQA is not applicable to the approval of the rates and charges set forth herein because such rates and charges are for the purpose of: (1) Meeting operation expenses, including employee wage rates and fringe benefits and departmental operations; (2) Purchasing or leasing of supplies, equipment or materials; (3) Meeting financial reserve needs and requirements; (4) Obtaining funds for capital projects necessary to maintain a service within existing service areas. 10/17/89 pmt/RES86708 • 0 E. On November 6, 1989, the City Council of the City of Azusa held a duly noticed public hearing on the issue of the adoption of the fees as set forth in this Resolution. The City Council received the reports of staff and heard public testimony on the issues. Council carefully considered the information received at said public hearing prior to adopting this Resolution. SECTION 2. The fees and charges for various permits, inspections and other services as set forth in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code, Uniform Swimming Pool, Spa and Hot Tub Code and Uniform Sign Code as adopted pursuant to Section 15.04.010 shall be the fees and charges specified in the tables attached hereto as Exhibit A and by this reference incorporated herein. SECTION 3. The Reinspection Fee described in Azusa Municipal Code Section 15.04.040B. shall be thirty dollars ($30.00) per hour. SECTION 4. The additional plan check fee described in Azusa Municipal Code Section 15.04.040 shall be thirty dollars ($30.00) per hour. SECTION 5. All prior resolutions establishing fees and charges for the codes adopted pursuant to this Chapter are hereby repealed. SECTION 6. The City Clerk shall certify the adoption of this Resolution. PASSED, APPROVED AND ADOPTED this 6th day of November , 1989 . -2- 10/17/89 pmt/RES86708 • 0 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the City Council of the City of Azusa at a regular meeting thereof, held on the 6th day of November , 19$.Q_, by the following vote of the Council: AYES: COUNCILMEMBERS AVILA, STEMRICH, NARANJO, LATTA, MOSES NOES: COUNCILMEMBERS NONE ABSENT: COUNCIL4EMBERS NONE M -3- 10/17/89 0 0 CITY OF AZUSA BUILDING & SAFETY DIVISION SCHEDULE OF FEES Building valuation data will be based on the most recent publication of Building Standards Magazine (Published by I.C.B.O.). Permit Issuance .........................................$ 18.00 Building Permit Fee .....................................Table lA Building Plan Check Fee .................................Table lA Electrical Permit Fee ...................................Table 2A Electrical Plan Check ...................................Table 2A Plumbing Permit Fee .....................................Table 3A Plumbing Plan Check Fee .................................Table 3A Mechanical Permit Fee ...................................Table 4A Mechanical Plan Check Fee ...............................Table 4A Grading Permit Fee ......................................Table 5A Grading Plan Check Fee ..................................Table 5A Building Permit Fee for Changes to Original Permit ......Table 6A Energy Plan Check ...........................50 of Plan Check Fee Site Inspection .........................................$ 150.00 Occupancy (Based on square footage of all buildings) 0 - 5,000 sq. ft . .......................................$ 105.00 5,000 - 15,000 sq. ft . ..................................$ 300.00 15,000 - 100,000 sq. ft. ... ,...........................$ 570.00 100,000 sq. ft. or greater ..............................$ 705.00 Rehabilitation ..........................................$ 225.00 Demolition..............................................$ 75.00 Group A Division 4 (each) ...............................$ 75.00 EXHIBIT 'A' - PAGE 1 OF 21 0 0 SCHEDULE OF FEES (Cont'd.) Relocation of Buildings Floor Area: Less than 5,000 sq. ft . ..................$ 210.00 5,001 sq. ft. and greater ................$ 420.00 Trailer Coach (not installed in a mobilehome or trailer park) ....................................................$ 75.00 Swimming Pool Permit ..........................Table IA and/or Table 2A, 3A or 4A Swimming Pool Plan Check Fee ............................Table lA ReinspectionFee .....................................$ 30.00/hr. Emergency Inspections Fee ............................$ 45.00/hr. (2/hr. min.) Additional Plan Check Fee ............................$ 30.00/hr. (2/hr. min.) EXHIBIT 'A' - PAGE 2 OF 21 E CITY OF AZUSA BUILDING AND SAFETY DIVISION BUILDING PERMITS AND PLAN CHECKING FEES TABLE lA A permit issuance fee of $18.00 shall be added to all permit fees. VALUATION FEES NOT PLAN BLDG. OVER CHECK* PERMIT 400.00 ...... 37.50 ......... 18.00 700.00 ...... 37.50 ......... 22.50 1000.00 ...... 37.50 ......... 30.00 THEN BY THOUSANDS 2.........37.50.........39.38 3.........41.45.........48.75 4.........49.41.........58.13 5.........57.38.........67.50 6.........65.34.........76.88 7.........73.32.........86.25 8.........81.29.........95.63 9.........89.25........105.00 10.........97.22........114.38 11........105.20........123.75 12........113.16........133.13 13........121.13........142.50 14........129.09........151.88 15........137.07........161.25 16........145.04........170.63 17........153.00........180.00 18........160.97........189.38 19........168.95........198.75 20........176.91........208.13 21........184.88........217.50 22........192.86........226.88 23........200.82........236.25 24........208.79........245.63 25........216.75........255.00 26........223.77........263.25 27........230.78........271.50 28........237.80........279.75 29........244.80........288.00 30........251.82........296.25 VALUATION FEES NOT PLAN BLDG. OVER CHECK* PERMIT 31...........258.83.....304.50 32...........265.85.....312.75 33...........272.85.....321.00 34...........279.87.....329.25 35...........286.88.....337.50 36...........293.90.....345.75 37...........300.90.....354.00 38...........307.92.....362.25 39...........314.93.....370.50 40...........321.30.....378.00 41...........328.95.....387.00 42...........335.97.....395.25 43...........342.98.....403.50 44...........349.99.....411.75 45...........357.00.....420.00 46...........364.02.....428.25 47...........371.03.....436.50 48...........378.05.....444.75 49...........385.05.....453.00 50...........392.07.....461.25 51...........397.80.....468.00 52...........403.55.....474.75 53...........409.28.....481.50 54...........415.02.....488.25 55...........420.75.....495.00 56...........426.50.....501.75 57...........432.23.....508.50 58...........437.97.....515.25 59...........443.70.....522.00 60...........449.45.....528.75 61...........455.18.....535.50 62...........460.92.....542.25 63...........466.65.....549.00 64...........472.40.....555.75 65...........478.13.....562.50 EXHIBIT 'A' - PAGE 3 OF 21 0 0 BUILDING PERMIT AND PLAN CHECKING FEES (Cont'd.) VALUATION FEES NOT PLAN BLDG. OVER CHECK* PERMIT 66.........483.87.......569.25 67.........489.60.......586.00 68.........495.35.......582.75 69.........501.08.......589.50 70.........506.82.......596.25 71.........512.55.......603.00 72.........518.30.......609.75 73.........524.03.......616.50 74.........529.77.......623.25 75.........535.50.......630.00 76.........541.25.......636.75 77.........546.98.......643.50 78.........552.72.......650.25 79.........558.45.......657.00 80.........564.20.......663.75 81.........569.93.......670.50 82.........575.67.......677.25 83.........581.40.......684.00 84.........587.15.......690.75 85.........592.88.......697.50 86.........598.62.......704.25 87.........604.35.......711.00 88.........610.10.......717.75 89.........615.83.......724.50 90.........621.57.......731.25 91.........627.30.......738.00 92.........633.05.......744.75 93.........638.78.......751.50 94.........644.52.......758.25 95.........650.25.......765.00 96.........656.00.......771.75 97.........661.73.......778.50 98.........667.47.......785.25 99.........673.20.......793.50 100.........678.95.......798.75 101.........682.77.......803.25 102.........686.60.......807.75 103.........690.42.......812.25 104.........694.25.......816.75 105.........698.07.......821.25 VALUATION FEES NOT PLAN BLDG. OVER CHECK* PERMIT 106.........701.90.....825.75 107.........705.72.....830.25 108.........709.55.....834.75 109.........713.37.....839.25 110.........717.20.....843.75 111.........721.02.....848.25 112.........724.85.....852.75 113.........728.67.....857.25 114.........732.50.....861.75 115.........736.32.....866.25 116.........740.15.....870.75 117.........743.97.....875.25 118.........747.80.....879.75 119.........751.62.....884.25 120.........755.45.....888.75 121.........759.27.....893.25 122.........763.10.....897.75 123.........766.92.....902.25 124.........770.75.....906.75 125.........774.57.....911.25 126.........778.40.....915.75 127.........782.22.....920.25 128.........786.05.....924.75 129.........789.87.....929.25 130.........793.70.....933.75 131.........797.52.....938.25 132.........801.35.....942.75 133.........805.17.....947.25 134.........809.00.....951.75 135.........812.82.....956.25 136.........816.65.....960.75 137.........820.47.....965.25 138.........824.30.....969.75 139.........828.12.....974.25 140.........831.95.....978.75 141.........835.77.....983.25 142.........839.60.....987.75 143.........843.42.....992.25 144.........847.25.....996.75 145 ......... 851.07 ... 1,001.25 EXHIBIT 'A' - PAGE 4 OF 21 El 0 BUILDING PERMITS AND PLAN CHECKING FEES (Cont'd.) VALUATION FEES NOT PLAN BLDG. OVER CHECK* PERMIT 146 ......... 854.90 ..... 1,005.75 147 ......... 858.72 ..... 1,010.25 148 ......... 862.55.....1,014.75 1,068.75 149 ......... 866.37 ..... 1,019.25 150 ......... 870.20 ..... 1,023.75 151 ......... 874.02 ..... 1,028.25 152 ......... 877.85 ..... 1,032.75 153 ......... 881.67 ..... 1,037.25 154 ......... 885.50 ..... 1,041.75 155 ......... 889.32 ..... 1,046.25 156 ......... 893.15 ..... 1,050.75 157 ......... 896.97 ..... 1,055.25 158 ......... 900.80 ..... 1,059.75 159 ......... 904.62 ..... 1,064.25 160 ......... 908.45 ..... 1,068.75 161 ......... 912.27 ..... 1,073.25 162 ......... 916.10 ..... 1,077.75 163 ......... 919.92 ..... 1,082.25 164 ......... 923.75 ..... 1,086.75 165 ......... 927.57 ..... 1,091.25 166 ......... 931.40 ..... 1,095.75 167 ......... 935.22 ..... 1,100.25 168 ......... 939.05 ..... 1,104.75 169 ......... 942.87 ..... 1,109.25 170 ......... 946.70 ..... 1,113.75 * When plans are required 303-B) . VALUATION FEES NOT PLAN BLDG. OVER CHECK* PERMIT 171 ......... 950.52 ... 1,118.25 172 ......... 954.35 ... 1,122.75 173 ......... 958.17 ... 1,127.25 174 ......... 962.00 ... 1,131.75 175 ......... 965.82 ... 1,136.25 176 ......... 969.65 ... 1,140.75 177 ......... 973.47 ... 1,145.25 178 ......... 977.30 ... 1,149.75 179 ......... 981.12 ... 1,154.25 180 ......... 984.95 ... 1,158.75 181 ......... 988.77 ... 1,163.25 182 ......... 992.60 ... 1,167.75 183 ......... 996.42 ... 1,172.25 184 ........ 1000.25 ... 1,176.75 185 ........ 1004.07 ... 1,181.25 186 ........ 1007.90 ... 1,185.75 187 ........ 1011.72 ... 1,190.25 188 ........ 1015.55 ... 1,194.75 189 ........ 1019.37 ... 1,199.25 190 ........ 1023.20 ... 1,203.75 (See Building Code Section 301-C and FOR EACH ADDITIONAL $1,000 or fraction thereof OVER $190,000 (use the next full thousand for fractions), add $4.50 to the Permit Fee and add $3.82 to the Plan Check Fee. For a quick check of these large amounts OVER $190,000, 3 times the valuation in thousands plus $232.50 will equal the Permit Fee in dollars. Plan Check Fee equals 85% of the Permit Fee. SAMPLE: $299,200 (Permit Fee same as for $300,000) Permit Fee = $232.50 PLUS 300 X 3 - $1,132.50 + $16.25 issuance fee = $1,714.50 Plan Check Fee = $1,132.50 X (.85) _ $ 962.63 NOTE: DO NOT add $18.00 issuance fee to permit amount when calculating Plan Check Fee. EXHIBIT 'A' - PAGE 5 OF 21 CITY OF AZUSA BUILDING & SAFETY DIVISION ELECTRICAL PERMIT FEE TABLE 2A PERMITS 0 For issuing permits, each ...........................$ 18.00 UNIT FEE SCHEDULE (NOTE: The following do not include permit issuing fee.) Receptacle, Switch and Lighting, or other. For receptacle, switch lighting, smoke detectors, or other outlets at which current is used or controlled except services, feeders and meters: First20, each .................................$ 1.13 Additional outlets, each .......................$ .75 NOTE: For multi -outlet assemblies, each five feet for fraction thereof may be considered as one outlet. LIGHTING FIXTURES For lighting fixtures, sockets, or other lamp holding devices: First20, each ..................................$ 1.13 Additional fixtures, each .......................$ .75 For pole or platform mounted lighting fixtures, each............................................$ 1.13 For theatrical -type lighting fixtures or assemblies, each............................................$ 1.13 EXHIBIT 'A' - PAGE 6 OF 21 0 0 ELECTRICAL PERMIT FEES (Cont'd.) RESIDENTIAL APPLIANCES For fixed residential appliances or receptacle outlets for same, including wall -mounted electric ovens, counter -mounted cooking tops, electric ranges, self-contained room, console, or through -wall air conditioners, space heaters, food waste grinders, dishwashers, washing machines, water heaters, clothes dryers, or other motor -operated appliances, not exceeding one (1) horsepower (HP) in rating, each.................................................$ 5.25 NOTE: For other types of air conditioners and other motor - driven appliances having larger electrical ratings, see Power Apparatus. TEMPORARY POWER SERVICE For a temporary service power pole or pedestal, including all pole or pedestal mounted receptacle outlets and appurtenances, each ............................$ 22.50 For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative lighting, Christmas tree sales lots, firework stands, sales booths, additional pole, etc., each...........................................$ 10.50 EXHIBIT 'A' - PAGE 7 OF 21 0 0 ELECTRICAL PERMIT FEES (Cont'd.) NON-RESIDENTIAL APPLIANCES For residential appliances and self-contained, factory - wired, non-residential appliances not exceeding one (1) horsepower (HP), kilowatt (KW), or kilovolt -ampere (KVA) in rating, including medical and dental devices, food, beverage, and ice cream cabinets, illuminated showcases, drinking fountains, vending machines, laundry machines, or other similar types of equipment, each...........................................$ 6.00 NOTE: For other types of air conditioners and other motor -driven appliances having larger electrical ratings, see Power Apparatus. POWER APPARATUS For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, as follows: Rating in horsepower (HP), kilowatts (KW), kilovolt- ampers (KVA), or kilovolt -amperes -reactive (KVAR). Up to and including 1, each ....................$ 6.00 Over 1 and not over.10, each ...................$ 10.50 Over 10 and not over 50, each ..................$ 27.00 Over 50 and not over 100, each .................$ 54.00 Over 100, each .................................$ 90.00 EXHIBIT 'A' - PAGE 8 OF 21 Ll 0 ELECTICAL PERMIT FEES (Cont'd.) NOTE: 1. For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined rating may be used. NOTE: 2. These fees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment. BUSWAYS For trolley and plug-in type busways, each 100 feet or fraction thereof ...............................$ 15.00 NOTE: An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in type busways. SIGNS, OUTLINE LIGHTING, AND MARQUEES. For signs, outline lighting systems, or marquees supplied from one branch circuit, each ......... $ 22.50 For additional branch circuits within the same sign, outline lighting system, or marquee, each ...... $ 7.50 SERVICES, SWITCHBOARDS, SWITCHBOARD SECTIONS, MOTOR CONTROL CENTERS AND PANELBOARDS. For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less and not over 200 amperes in rating, each ....... $ 22.50 EXHIBIT 'A' - PAGE 9 OF 21 0 • ELECTRICAL PERMIT FEES (Cont'd.) For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less and over 200 amperes to 1,000 amperes in rating, each...........................................$ 45.00' For services, switchboards, switchboard sections, motor control centers and panelboards over 600 volts or over 1,000 amperes in rating, each ..................$ 105.00 MISCELLANEOUS APPARATUS, CONDUITS AND CONDUCTORS For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth ...............................$ 22.50 NOTE: This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment. PRIVATE SWIMMING POOLS For new private, residential, inground swimming pools for single, or multi -family occupancies, including a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping and other similar electrical equipment directly related EXHIBIT 'A' - PAGE 10 OF 21 ELECTRICAL PERMIT FEES (Cont'd.) to the operation of a swimming pool, each ...... $ 45.00 For other types of swimming pools, therapeutic whirpools, spas, hot tubs and alterations to existing swimming pools, each ....................................$ 30.00 CARNIVALS AND CIRCUSES Carnivals, circuses and other traveling shows or exhibitions utilizing transportable -type rides, booths, displays and attractions. For electrical generators and elecrically driven rides, each...........................................$ 22.50 For mechanically driven rides and walk-through attractions or displays having electric lighting, each ..... $ 9.00 For a system of area and booth lighting, each ....... $ 9.00 For permanently installed rides, booths, displays, and attractions.........................................$ 9.00 OTHER INSPECTIONS For inspection of electrical equipment for which no fee is herein set forth ..........................$ 30.00 EXHIBIT 'A' - PAGE 11 OF 21 0 0 CITY OF AZUSA BUILDING & SAFETY DIVISION PLUMBING FEES TABLE 3A Forissuing each permit ...................................$ 18.00 In Addition: For each plumbing fixture or trap or set of fixtures on one trap (including drainage, vent, water piping and backflow prevention devices therefor) .........................$ 9.00 For each permanent type dishwasher whether individually trapped or not .......................................$ 9.00 For each industrial waste pretreatment interceptor including its trap and vent, excepting kitchen type grease interceptors functioning as fixture traps ............ $ 9.00 For each swimming pool drainage trap and receptor whether connected to a building drain or a building sewer (water supply for pool not included) ........................$ 9.00 For each gas piping system of one to five outlets or alteration or retest of existing gas piping system ... $ 9.00 For each additional outlet over five .................$ 2.25 For each gas pressure regulator other than appliance regulators..........................................$ 3.00 For each water heater and/or vent ....................$ 9.00 For each solar potable water heating system, including water heaterand vent ......................................$ 30.00 For repair or alteration of drainage and/or vent piping ....................................................$ 9.00 For each piece of water -treating equipment and/or water piping installed without accompanying plumbing ....... $ 9.00 For lawn sprinkler systems on any one meter including backflow prevention devices therefor .................$ 9.00 For backflow prevention devices on unprotected water supplied, pools, tanks, vats, etc. (including incidential water piping) one to five ............................$ 9.00 For any Swimming Pool piping associated with the construction, remodeling or repair of a swimming pool, spa andhot tub ..........................................$ 25.00 EXHIBIT 'A' - PAGE 12 OF 21 0 0 PLUMBING PERMITS FEES (CONT'D.) For each additional device over five .................$ 2.25 Each building drain installed without accompanying plumbing.............................................$ 9.00 In Addition: For the connection of a house sewer to a public sewer or for the extension of a house lateral onto a lot for future use (Separate permit required for each connection or extension) ...........................................$ 25.50 For each house sewer manhole .........................$ 25.50 For each installation of a section of house sewer for future use..................................................$ 16.50 For the connection of each additional building or additional work to a house sewer ................................$ 16.50 For the connection of a house sewer to a private sewage disposalsystem ......................................$ 16.50 For each private sewage disposal system (septic tank and seepage pit or pits and/or drainfield)...............$ 52.50 For each cesspool, overflow seepage pit, percolation test pit, swimming pool drywell, or drainfield extension or replacement..........................................$ 25.50 For disconnection, abandonment, alteration or repair of any house sewer or private sewage disposal system or part thereof..............................................$ 16.50 PLAN CHECK FEE (a) A single building containing more than 216 drainage fixture units. (b) A potable water line serving one or more buildings with an aggregate demand of more than 180 water fixture units or 100 GPM (excluding buildings under item "a" and minor accessory buildings). 500 of Plumbing PERMIT FEE required 54.00 + 4.50 for each additional building over one. EXHIBIT 'A' - PAGE 13 OF 21 • 0 PLUMBING PERMIT FEES (CONT'D.) (c) A fuel gas line serving one or more 54.00 + 4.50 for each buildings with an aggregage demand additional building of 2,000,000 BTU's or more (excluding over one. buildings under item "a" and minor accessory buildings). (d) A sewer collection system serving 27.00 + 4.50 for each more than one building with an additional building aggregate load of more than 216 over one. drainage fixture units. (excluding minor accesorry buildings). (e) Any other plumbing system requiring 50% of Plumbing permit a plan check fee required. EXHIBIT 'A' - PAGE 14 OF 21 u 0 CITY OF AZUSA BUILDING AND SAFETY DIVISION MECHANICAL PERMIT FEES TABLE 4A For the issuance of each permit ..........................$ 18.00 For the installation, alteration or relocation of each refrigeration compressor or absorption unit, and for each fuel burning furnace, heater, boiler, and vented decorative appliance including vents attached thereto: Up to and including 100,000 BTU ......................$ 15.00 More than 100,000 BTU to and including 1,000,000 BTU..................................................$ 30.00 More than 1,000,000 BTU ..............................$ 75.00 For each air inlet and air outlet served by any air conditioningsystem ..................................$ 2.63 Or for each 1,000 square feet or fraction thereof of conditioned area ..................................$ 21.00 NOTE: When a permit is applied for and the total number of air inlets and air outlets is unknown, the fees shall be based on the square feet of conditioned area. For the installation, relocation or replacement of each appliance vent installed and not included in a appliance permit...............................................$ 7.50 For the installation or alteration of each air handling unit for air conditioning including ducts attached thereto: Up to and including 2,000 CFM Eachunit up to 10 ................................$ 7.50 Eachunit over 10 .................................$ 2.25 More than 2,000 CFM to and including 10,000 CFM ...... $ 22.50 More than 10,000 CFM .................................$ 37.50 NOTE: This fee shall not apply to an air handling unit which is a portion of a factory assembled air conditioned appliance for which a permit is required elsewhere in this Code. EXHIBIT 'A' - PAGE 15 OF 21 MECHANICAL PERMITS FEES (CONT'D.) For each evaporative cooler other than portable type................................................$ 12.00 For required ventilation fans which serve a single register: Each fan up to 10 .................................$ 9.00 Eachfan over 10 ..................................$ 3.00 For each required ventilation system which is not a portion of any air conditioning system for which a permit is required elsewhere in this Code ......................$ is.00 For the installation of each commercial kitchen hood or spray booth served by mechanical exhaust, including the fans and ducts attached thereto ...........................$ 37.50 For the installation of each fire damper .............$ 6.00 For the alteration of an existing duct system for which a permit is not required elsewhere in this Code ........ $ 15.00 NOTE: 1) For a refrigeration system rating one horsepower, one ton, or 12,000 BTU per hour shall mean the same quantity. 2) For steam boilers rated in boiler horsepower, one horsepower shall equal 50,000 BTU per hour. PLAN CHECK FEE REQUIREMENTS The plan check fee required is 50% of the permit fee shown below with the following exceptions: 1. Identical appliances of 100,000 BTU or less, installed in a single building: Up to and including 10 .............50% of the permit fee Over 10 .............................5% of the permit fee 2. When identical mechanical design is evident in more than one building on a single project and the Chief Mechanical Inspector so finds, plan check fees may be waived for other than the representative sample. 3. Any other mechanical system requiring a plan check ............................. 50% of the permit fee EXHIBIT 'A' - PAGE 16 OF 21 0 CITY OF AZUSA ENGINEERING DIVISION GRADING PERMIT AND PLAN CHECKING FEES TABLE 5A A permit issuance fee of $18.00 shall be added to all permit fees. VOLUME FEES VOLUME FEES - (CU. YDS.) (CU. YDS.) NOT PLAN GRDNG. NOT PLAN GRDNG. OVER CHECK PERMIT OVER CHECK PERMIT 50 $ 90.00 90.00 21 1,156.50 1,156.50 100 150.00 150.00 22 1,180.50 1,180.50 200 195.00 195.00 23 1,204.50 1,204.50 300 240.00 240.00 24 1,228.50 1,228.50 400 285.00 285.00 25 1,252.50 1,252.50 500 330.00 330.00 600 375.00 375.00 26 1,276.50 1,276.50 700 420.00 420.00 27 1,300.50 1,300.50 800 465.00 465.00 28 1,324.50 1,324.50 900 510.00 510.00 29 1,348.50 1,348.50 1000 555.00 555.00 30 1,372.50 1,372.50 THEN BY 31 1,396.50 1,396.50 THOUSANDS 32 1,420.50 1,420.50 33 1,444.50 1,444.50 2 592.00 592.00 34 1,468.50 1,468.50 3 630.00 630.00 35 1,492.50 1,492.50 4 667.50 667.50 5 705.00 705.00 36 1,516.50 1,516.50 37 1,540.50 1,540.50 6 742.50 742.50 38 1,564.50 1,564.50 7 780.00 780.00 39 1,588.50 1,588.50 8 817.50 817.50 40 1,612.50 1,612.50 9 855.00 855.00 10 892.50 892.50 41 1,636.50 1,636.50 42 1,660.50 1,660.50 11 916.50 916.50 43 1,684.50 1,684.50 12 940.50 940.50 44 1.708.50 1,708.50 13 964.50 964.50 45 1,732.50 1,732.50 14 988.50 988.50 15 1,012.50 1,012.50 46 1,756.50 1,756.50 47 1,780.50 1,780.50 16 1,036.50 1,036.50 48 1,804.50 1,804.50 17 1,060.50 1,060.50 49 1,828.50 1,828.50 18 1,084.50 1,084.50 50 1,852.50 1,852.50 19 1,108.50 1,108.50 20 1,132.50 1,132.50 EXHIBIT 'A' - PAGE 17 OF 21 0 • GRADING PERMIT FEES (CONT'D.) VOLUME FEES VOLUME FEES (CU. YDS.) (CU. YDS.) NOT PLAN GRDNG. NOT PLAN GRNDG. OVER CHECK PERMIT OVER CHECK PERMIT 51 $1,876.50 1,876.50 91 $2,836.50 2,836.50 52 1,900.50 1,900.50 92 2,860.50 2,860.50 53 1,924.50 1,924.50 93 2,884.50 2,884.50 54 1,948.50 1,948.50 94 2,908.50 2,908.50 55 1,972.50 1,972.50 95 2,932.50 2,932.50 56 1,996.50 1,996.50 96 2,956.50 2,956.50 57 2,020.50 2,020.50 97 2,980.50 2,980.50 58 2,044.50 2,044.50 98 3,004.50 3,004.50 59 2,068.50 2,068.50 99 3,028.50 3,028.50 60 2,092.50 2,092.50 100 3,052.50 3,052,50 61 2,116.50 2,116.50 110 3,112.50 3,112.50 62 2,140.50 2,140.50 120 3,172.50 3,172.50 63 2,164.50 2,164.50 130 3,232.50 3,232.50 64 2,188.50 2,188.50 140 3,292.50 3,292.50 65 2,212.50 2,212.50 150 3,352.50 3,352.50 66 2,236.60 2,236.50 160 3,412.50 3,412.50 67 2,260.50 2,260.50 170 3,472.50 3,472.50 68 2,284.50 2,284.50 180 3,532.50 3,532.50 69 2,308.50 2,308.50 190 3,592.50 3,592.50 70 2,332.50 2,332.50 200 3,652.50 3,652.50 71 2,356.50 2,356.50 210 3,712.50 3,712.50 72 2,380.50 2,380.50 220 3,772.50 3,772.50 73 2,404.50 2,404.50 230 3,832.50 3,832.50 74 2,428.50 2,428.50 240 3,892.50 3,892.50 75 2,452.50 2,452.50 250 3,952.50 3,952.50 76 2,476.50 2,476.50 260 4,012.50 4,012.50 77 2,500.50 2,500.50 270 4,072.50 4,072.50 78 2,524.50 2,524.50 280 4,132.50 4,132.50 79 2,548.50 2,548.50 290 4,192.50 4,192.50 80 2,572.50 2,572.50 300 4,252.50 4,252.50 81 2,596.50 2,596.50 310 4,312.50 4,312.50 82 2,620.50 2,620.50 320 4,372.50 4,372.50 83 2,644.50 2,644.50 330 4,432.50 4,432.50 84 2,668.50 2,668.50 340 4,492.50 4,492.50 85 2,692.50 2,692.50 350 4,552.50 4,552.50 86 2,716.50 2,716.50 360 4,612.50 4,612.50 87 2,740.50 2,740.50 370 4,672.50 4,672.50 88 2,764.50 2,764.50 380 4,732.50 4,732.50 89 2,788.50 2,788.50 390 4,792.50 4,792.50 90 2,812.50 2,812.50 400 4,852.50 4,852.50 EXHIBIT 'A' - PAGE 18 OF 21 0 • GRADING PERMIT FEES (CONT'D.) VOLUME FEES VOLUME FEES (CU. YDS.) (CU. YDS.) NOT PLAN GRDNG. NOT PLAN GRDNG. OVER CHECK PERMIT OVER CHECK PERMIT 410 $4,912.50 4,912.50 760 $6,427.50 6,427.50 420 4,972.50 4,972.50 770 6,465.00 6,465.00 430 5,032.50 5,032.50 780 6,502.50 6,502.50 440 5,092.50 5,092.50 790 6,540.00 6,540.00 450 5,152.50 5,152.50 800 6,577.50 6,577.50 460 5,212.50 5,212.50 810 6,615.00 6,615.00 470 5,272.50 5,272.50 820 6,652.50 6,652.50 480 5,332.50 5,332.50 830 6,690.00 6,690.00 490 5,392.50 5,392.50 840 6,727.50 6,727.50 500 5,452.50 5,452.50 850 6,765.00 6,765.00 510 5,490.00 5,490.00 860 6,802.50 6,802.50 520 5,527.50 5,527.50 870 6,840.00 6,840.00 530 5,565.00 5,565.00 880 6,877.50 6,877.50 540 5.602.50 5,602.50 890 6,915.00 6,915.00 550 5,640.00 5,640.00 900 6,952.50 6,952.50 560 5,677.50 5,677.50 910 6,990.00 6,990.00 570 5,715.00 5,715.00 920 7,027.50 7,027.50 580 5,752.50 5,752.50 930 7,065.00 7,065.00 590 5,790.00 5,790.00 940 7,102.50 7,102.50 600 5,827.50 5,827.50 950 7,140.00 7,140.00 610 5,865.00 5,865.00 960 7,177.50 7,177.50 620 5,902.50 5,902.50 970 7,215.00 7,215.00 630 5,940.00 5,940.00 980 7,252.50 7,252.50 640 5,977.50 5,977.50 990 7,290.00 7,290.00 650 6,015.00 6,015.00 1,000 7,327.50 7,327.50 660 6,052.50 6,052.00 1,010 7,365.00 7,365.00 670 6,090.00 6,090.00 1,020 7,402.50 7,402.50 680 6,127.50 6,127.50 1,030 7,440.00 7,440.00 690 6,165.00 6,165.00 1,040 7,477.50 7,477.50 700 6,202.50 6,202.50 1,050 7,515.00 7,515.00 710 6,240.00 6,240.00 1,060 7,552.50 7,552.50 720 6,277.50 6,277.50 1,070 7,590.00 7,590.00 730 6,315.00 6,315.00 1,080 7,627.50 7,627.50 740 6,352.50 6,352.50 1,090 7,665.00 7,665.00 750 6,390.00 6,390.00 1,100 7,702.50 7,702.50 EXHIBIT 'A' - PAGE 19 OF 21 GRADING PERMIT AND PLAN CHECKING FEES (CONT'D.) VOLUME (CU. YDS.) NOT OVER FEES PLAN GRDNG. CHECK PERMIT VOLUME (CU. YDS.) NOT OVER FEES PLAN GRDNG. CHECK PERMIT 1,110 $7,740.00 7,740.00 1,260 $8,302.50 8,302.50 1,120 7,777.50 7,777.50 1,270 8,340.00 8,340.00 1,130 7,815.00 7,815.00 1,280 8,377.50 8,377.50 1,140 7,852.50 7,852.50 1,290 8,415.00 8,415.00 1,150 7,890.00 7,890.00 1,300 8,452.50 8,452.50 1,160 7,927.50 7,927.50 1,310 8,490.00 8,490.00 1,170 7,965.00 7,965.00 1,320 8,527.50 8,527.50 1,180 8,002.50 8,002.50 1,330 8,565.00 8,565.00 1,190 8,040.00 8,040.00 1,340 8,602.50 8,602.50 1,200 8,077.50 8,077.50 1,350 8,640.00 8,640.00 1,210 8,115.00 8,115.00 1,360 8,677.50 8,677.50 1,220 8,152.50 8,152.50 1,370 8,715.00 8,715.00 1,230 8,190.00 8,190.00 1,380 8,752.50 8,752.50 1,240 8,227.50 8,227.50 1,390 8,790.00 8.790.00 1,250 8,265.00 8,265.00 1,400 8,827.50 8,827.50 FOR EACH ADDITIONAL 10,000 cubic yards or fraction thereof, (Use the next higher full ten thousand number), add $25.00 to the Permit Fee and add $25.00 to the Plan Check Fee. EXAMPLE: Permit Fee for 1,563.,000 cu. yds. _ $5,885 PLUS 17 X 25 = $6,310 + 18.00 issuance fee = $6,325.75 Plan Check Fee = $6,310.00 EXHIBIT 'A' - PAGE 20 OF 21 0 CITY OF AZUSA BUILDING & SAFETY DIVISION BUILDING PERMIT FEES FOR CHANGES TO ORIGINAL PERMITS TABLE 6A A permit issuance fee of $ 18.00 shall be added to all permit fees. FEES BASED ON VALUATION FROM ORIGINAL PERMIT $ 0 - 25,000 .......................................... $ 25.00 $ 25,001 - 50,000 ..................................... $ 50.00 $ 50,001 - 75,000 ..................................... $ 75.00 $ 75,001 - 100,000 .................................... $ 100.00 $ 100,001 - 250,000 ................................... $ 150.00- $ 50.00$ 250,001 - 500,000 ................................... $ 200.00 $ 500,001 and UP ...................................... $ 250.00 EXHIBIT 'A' - PAGE 21 OF 21