HomeMy WebLinkAboutResolution No. 00-C1470 0 RESOLUTION 00—C147 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA APPROVING A GRANT APPLICATION FOR "TRAFFIC SIGNAL RED LIGHT REPLACEMENT PROJECT" TO BE SUBMITTED TO THE CALIFORNIA ENERGY COMMISSION WHEREAS, the California Energy Commission provides grants to finance energy efficiency projects that will reduce peak electricity demand; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AZUSA DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The City of Azusa is authorized to apply for an energy efficiency grant from the California Energy Commission to implement Traffic Signal Red Light Replacement Project. SECTION 2. Upon Azusa application being recommended for funding by the California Energy Commission, The City of Azusa is authorized to accept a grant up to $29,060. SECTION 3. In accepting the grant, the City of Azusa agrees to plan for the future replacement of the funded measures with units equal or better efficiency. SECTION 4. The City Manager is authorized and empowered to execute in the name of the City of Azusa all necessary documents to implement and carry out the purpose of this Resolution, and to undertake all actions necessary top complete the energy efficiency project. SECTION 5. The City Clerk shall certify to the Adoption of this Resolution. ADOPTED this 18" day of December, 2000. I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the City Council of the City of Azusa, at a regular meeting thereof, held on the 18`h day of December, 2000, by the following vote of the Council: AYES: COUNCIL MEMBERS: HARIDOSN, STANFORD, ROCHA, BEEBE, MADRID NOES: COUNCIL MEMBERS: NONE ABSENT: COUNCIL MEMBERS: NONE ABSTAIN: COUNCIL MEMBERS: NONE ASSISTANT CITY CLERK r] APPLICATION FOR LIGHT EMITTING DIODE TRAFFIC SIGNAL GRANT I. APPLICANT INFORIVIATION Applicant: City of Azusa Mailing Address: 213 E. Foothill Blvd., Azusa, CA 91702 City Zip Federal Employer ID No. 95-6000670 County: Los Angeles Contact Person: Nasser Abbaszadeh Title: City Engineer Telephone: 626/812-5261 Fax: 626/812-9517_ E-mail address: Nabbaszadeh(a,ci.azusa.ca.us j2. PROJECT DESCAIPTION ----- ------ a. Describe your project. Indicate the traffic signal modules to be converted to LEDs, the total number of affected intersections and the specifications (i.e., Caltrans or ITE) you plan to use. We are planning on converting all the existing incandescent red lights to LED lights. We will use CalTrans specifications and 36 intersections will be effected by this project. b. If your current plans are to install incandescent traffic signals on some intersections and you are requesting grant funds to replace the incandescent with LEDs, please indicate the number of affected intersections and the types of LEDs that will be installed. We are planning ton replacing the existing reds with LED lights. c. Describe your LED installation plans, such as use of contracted or in-house labor. If using in-house labor, indicate whether the installation will occur as part of your regular workday or outside of your workday (e.g., overtime). A CalTrans approved contractor will be used to install the lights. d. Indicate project start date: March 2001 (assume two weeks after grant application submittal) Indicate project completion date: April 2001 (no later than June 1, 2001) 0 0 3. PROJECT BUDGET AND FUNDING REQUEST a. From Exhibit B, indicate: Grant Amount Requested: $29,060.00 Total Project Cost (Grant Amount and Your Cost): $37,922.00 b. The Commission's grant will pay for part of the material and installation costs for installing LED traffic signal modules. How will you fund the remaining portion of your project cost? We will use our own internal funds. $8,862 We are interested in a Commission loan. Application attached? No. We are receiving incentives from publicly owned utility, specify amount: We are working with others who will arrange the financing. Other, specify: L4. PROJECT WORK STATEMENT Complete Exhibit C. 5. ELECTRICITY PROVIDER _ LED traffic signal modules that are or will be funded in part or in whole by an investor owned utility (IOU), such as PG&E, SCE or SDG&E, are ineligible to receive funding from the Commission. Please check the one box that applies to your public agency. Use a separate page to indicate comments or explanations. We are served by a publicly owned utility. Name of utility: Azusa Light `7. SIGNATURE To the best of my knowledge and belief, data in this application are correct and complete. Name of Authorized Representative: Rick Cole Title: Signatu Telephone: 626/812-5238 Fax: 626/334-6358 E-mail address: Rcoleoci.azusa.ca.us 0 Exhibit C - Work Statement City of Azusa Public Agency Name Indicate the completion dates for Tasks 1, 2, and 3. If any tasks are not applicable then state the reason(s) in the comment section. If you need to add tasks, indicate them in the comment section and identify the completion date. Tasks Completion Date 1. Release bid documents for materials and labor February 2001 • Product: Provide Commission staff with a copy of the bid specifications for the LED modules within 10 days of bid release. 2. Select LED vendor and/or contractor February 2001 • Product: Provide Commission staff with a copy of the winning proposal within 10 days after vendor selection. 3. LED traffic signals installed and operating May 2001 • Product: Notify Commission staff when complete. 4. Prepare progress reports • Progress reports due monthly • Product: Submit progress report. 5. Prepare final report and invoice • Due within 60 days after LED traffic signals installed • Product: Submit final report and invoice. and operating Note: If you will be submitting a governing body resolution (Exhibit D) at a later date, one of the first tasks will be to provide the Commission with an executed copy of the resolution. Comments: None. Exhibit A Current and Proposed Traffic Signals Instructions for completing Exhibit A Table. The shaded columns ate the ones to be completed. All other columns will automatically calculate. If cannot load this spreadsheet electronically, contact the Commission at 916.6544008. If you provide us with the information in the shaded columns, we will calculate the rest of the spreadsheet for you. 1. Complete Utility Costs Box by indicating your current electricity rate and the name of your electric utility. 2. Column A: Enter the estimated number of LEDs of each type to be installed. Spare LEDs are Ineligible for incentives. 3. Column B: Nothing needs to be entered—this is the number of hours per year. 4. Column C: Nothing needs to be entered—this is the default load factor from Table B of the Grant Application. 5. Column D: Indicate the wattage of your existing Incandescent traffic signals. 6. Column E: This is a calculated field and is the product of columns A, B, C and D divided by 1000 (E=A'B'C'D/1000). 7. Column F: Indicate the wattage of your proposed LED modules. These wattages cannot exceed the maximums given in Table C of the Grant Application. 8. Column G: This is a calculated field and is the product of columns A, B, C and F divided by 1000 (G=A'B•C•F/1000) 9. Column H: This is a calculated field and Is the difference in columns G and E (H=E•G) 10. Column I: This is a calculated field and is the difference in columns D and F multiplied by columns C and A and divided by 1000 (1=(D-F)'A'C/1000) 11. Column J: This is a calculated field and is the product of column H and the current electricity costs (J=H' current electricity costs) UTILITY COSTS Current Electricity Costs , $ 0.06500 .per kWhr Name of Electric Utili : Azusa Li ht PROJECT SAVINGS Baseline Conditions Current Incandescent Proposed LED Modules Estimated Savings Conditions A B C D E F G H 1 J NUMBER OF OPERATING EXISTING EXISTING PROPOSED PROPOSED KWH/YR ESTIMATED ESTIMATED KW ESTIMATED TRAFFIC SIGNAL MODULE TYPE (INCH) TYPE UNITS TO BE HOURS PERCENT ON WADS KWH/YR (E = WATTS KWHlYR SAVINGS LOAD REDUCTION ANNUAL COST INSTALLED A'B'C -D/1000) (G=A•B•C•F/1000) (1=(D-F)•A'C/1000 SAVINGS H=E -G) 12 Red 158 - 8760 59% 116 94,726 12 9,799 84,927 10 $5,520 6 Red 124 8760 59% 118 74,342 12 7,691 66,652 8 $4,332 12 avows Red 44 8760 81% lie 36,216 12 3,748 32.469 4 $2,111 12 Green 8780 38% - - - - 0 $0 8 Green 8780 38% - - 0 $0 12 arrows Green 8760 16% 0 $0 12 Yellow 8760 3% - - - - 0 $0 8 Yellow 8760 3% - - 0 $0 12 arrows Yellow 8760 3% 0 $0 PED HAND (ONLY) 8760 90% - - 0 $0 PED HANDfWALKING PERSON COMBO 200 8760 90% lie _ 182,9 09 _ 10_1 15,768 167,141 19 $10,864 TOTAL 526 - 388,1931 1 37,004 1 351,189 1 40 1 $22,827 EXHIBIT A and 8 Final. EXH A - SIGNALS Page 1 Exhibit B: Project Budget 71m.ft"u'dorl completing Exhibit B Table. The shaded columns are the ones to be completed. All other columns will automatically calculate. If cannot load this spreadsheet electronically, tact thmmission at 916-654.4008. If you provide us with the Information in the shaded columns, we will calculate the rest of the spreadsheet for you. 1. Column A: Nothing needs to be entered—this Is the maximum wattages for eligible LED modules as Indicated in Table C of the Grant Application. 2. Column B: Enter the estimated number of LEDs of each type to be Installed. Spare LEDs are Ineligible for Incentives. This column should match Column A from Exhibit A. 3. Column C: Enter the estimated material cost for each type of unit, including sales tax. 4. Column D: Enter the estimated labor cost per unit Use the Labor Costs Table to indicate the assumptions, such as job classifications, hourly rates, number of hours installation, etc. 5. Column E: This is a Calculated field and is the sum of columns C and D (E=C+D). 6. Column F: Nothing needs to be entered—this Is the maximum Incentive amount that can be provided by the Commission based on Table A of the Grant Application. 7. Column G: This is a calculated field and is will indicate the Incentive amount for your project by selecting the smaller of columns E or F. 8. Column H: This Is a calculated field and Is the product of columns B and G (H=B'G) 9. Column I: This Is a calculated field and Is the product of columns B and E (I=B'E) FYPI ANGTON OF I AROR COSTS K A N B C 0 E F G H I Madmum LED Module hage, Labor Coat Module Cormeclor labor SDW 5000 le-Houae Labor Jab ca. Jab $se: ESTIMATED MAXIMUM ESTIMATED ESTIMATED ESTIMATED TRAFFIC SIGNAL MODULE TYPE MAXIMUM AT MAXIMUM AT NUMBER OF ESTIMATED ESTIMATED TOTAL UNIT PROJECT INCENTIVE AMOUNT TOTAL TOTAL (INCH) TYPE 7/' C 25' C UNITS MATERIAL LABOR COST COSTS INCENTIVE PER PER UNIT SMALLER INCENTIVE PROJECT COST INSTALLLLEDDTO COST PER UNIT PER UNIT (E -CSD) UNIT OF COLUMN E OR F) (H=B•G) (I=8•E) 12 Red 17 11 158 $50 325 $75 $50 $50 -7,800 S11,B50 e Red 13 8 124 $28 S25 $53 $40 S40 $4,960 36.572 ow 12 sns Red 12 9 44 S50 $25 $75 550 $50 $2,200 $3,300 12 Green 15 15 0 so $100 $0 $0 $0 8 Green 12 12 0 $0 $80 30 s0 $0 12 enowa Given 11 11 0 $0 $70 $0 so $0 12 Yellow 25 22 0 f0 f50 30 s0 $0 8 Yellow 16 13 0 $0 $50 $0 $0 $0 12 anowe yoA 12 10 0 $0 s50 $0 f0 $0 PED HANDS 12 10 0 $0 $25 f0 SO $0 HANDIWALKING PERSON COMBO 12 10 200 $56 $25 fol $70 $70 $14,000 $16,200 HANDM/ALKING PERSON COMBO 4.8 1 4 SO $100 $0 $0 $0 TOTAL 526 $29,060 $37,922 Protect paYbad, =Tout prelim matha real maim/ cog s mm, ESTIMATED PROJECT PAYBACK (YEARS) 2 ESTIMATED PROJECT PAYBACK WITH INCENTIVE YEARS 04 Pleiw Peyboo, with noxwl m=(Total prcjed mer- bramve Yawed merw cost FYPI ANGTON OF I AROR COSTS Explanation of How to Complete Labor Cost Table Cardnctor Labor. ' Column N: Irldkate the total labor coat charged by your contractor. ' Column O: Divide Column N by the Cam of Column E In -House Labor. • CelumnJ: WtMejobtltieforyourin-houseddl • Column K Indicale, your gully, hou ty rales, Including any overtime, ratae, Column L: Indleate me required hours for each job day • Column M: Specify the benefits percentage. • Column N: Indicate Me total labor coat ["WL).(ML•M)I • Column O: CMde Column N by the sum ol Column B (O=W(sum of Column B)). EXHIBIT A esti 8 Fire, EXH B - BUDGET Peg° 3 • K L N N O Type d Installation Labor Rata Smartta Total Estimelsd Labor Cwt per (lfhour) Total Houre (epeexy%) Labor Coat Module Cormeclor labor SDW 5000 le-Houae Labor Jab ca. Jab $se: $DAO $0.00 Job dile: $0.00 som Job title: $0.00 $0.00 Tout $0.00 $Dco Explanation of How to Complete Labor Cost Table Cardnctor Labor. ' Column N: Irldkate the total labor coat charged by your contractor. ' Column O: Divide Column N by the Cam of Column E In -House Labor. • CelumnJ: WtMejobtltieforyourin-houseddl • Column K Indicale, your gully, hou ty rales, Including any overtime, ratae, Column L: Indleate me required hours for each job day • Column M: Specify the benefits percentage. • Column N: Indicate Me total labor coat ["WL).(ML•M)I • Column O: CMde Column N by the sum ol Column B (O=W(sum of Column B)). EXHIBIT A esti 8 Fire, EXH B - BUDGET Peg° 3 •