Loading...
HomeMy WebLinkAboutResolution No. 06-C0950 RESOLUTION NO. 06-C95 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, ESTABLISHING CERTAIN DEVELOPMENT PROJECT FEES AND SERVICE CHARGES WHEREAS, Chapter 8 (commencing with section 66016) of Division 1 of Title 7 of the California Government Code establishes a procedure for adopting fees or service charges for development projects; and WHEREAS, the City Council of the City of Azusa has determined that the cost of providing certain facilities or services is not of general benefit, but of special benefit to the applicant seeking to process a development application; and WHEREAS, the City Council has further determined that developer contribution in the form of development impact fees is necessary to offset the impact of future development on already - established community facilities and services and to maintain the current levels of services for these public facilities; and WHEREAS, the City is authorized to impose fees which will cover but do not exceed the estimated reasonable cost of providing the service or facility for which the fee is imposed; and WHEREAS, current fees charged for community development services or facilities do not fully recover the actual cost of providing the such services; and WHEREAS, Government Code sections 66016 and 66018 provide that the City may adopt new fees or increase existing fees after providing notice and holding a public hearing; and WHEREAS, notice of a public hearing on the establishment of new and increase fees was published in accordance with provisions of section 6062a of the California Government code; WHEREAS, notice of public hearing was mailed to all interested parties who filed a written request for a mailed notice with the City; WHEREAS, on October 16, 2006, at the time and place specified in the published and mailed notices, the City Council held a public hearing as required by law to allow oral or written presentations prior to levying new fees or service charges and prior to approving an increase in existing fees or service charges; and WHEREAS, at least ten (10) days prior to the commencement of the hearing, there was made available to the public a report containing the cost, or estimated cost, of providing the service for which the fee or service charge will be levied, and the revenue sources for providing such services; and WHEREAS, based upon evidence provided, the City Council hereby determines that the fees set forth in the Schedule of Fees and Charges for Fiscal Year 2006/2007 attached hereto and incorporated herein by reference will not exceed the estimated reasonable cost of providing the community development services and facilities for which the fee is charged; and WHEREAS, the proposed fees are statutorily and categorically exempt from the requirements of the California Environmental Quality Act since citing these fees fits within the statutory exemptions for local agency decisions involving the adoption and collection of rates, tolls and other charges, pursuant to Public Resources Code Section 21080(b)(8) and Section 15273 of the California Environmental Quality Act Guidelines. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, DOES FIND AND DECLARE THAT: SECTION 1. Adoption of Schedule of Fees. The City Council hereby adopts a fee schedule for the services set forth in the Schedule of Fees and Charges for Fiscal Year 2006/2007 attached hereto and incorporated herein by reference. SECTION 2. Collection of Fees. That the City is authorized to collect the user fees set forth herein. SECTION 3. Effective Date. This resolution shall become effective sixty (60) days from its adoption. PASSED, APPROVED AND ADOPTED ON OCTOBER 16, 2006. I HEREBY CERTIFFY that the foregoing Resolution No. 06-C95, was duly adopted at a regular meeting of said City Council on the 16th day of October 2006, by the following vote of the Council: AYES: COUNCILMEMBERS: HARDISON, HANKS, CARRILLO, CHAGNON NOES: COUNCILMEMBERS: ROCHA ABSENT: COUNCILMEMBERS: NONE 'lOwl Ci Clerk -2- City of Azusa Schedule of Fees and Charges (Fund 101 -Developer Only) 2006-2007 Exhibit - 1 Department/Description ECONOMIC & COMMUNITY DEVELOPMENTICOMMUNITY IMPROVEMENT BUILDING AND SAFETY Area Item S-1 BUILDING VALUATION" APARTMENT HOUSES: Type I or II F.R. (Good) $115.38 Type V - Masonry (or Type 111) (Good) $93.72 Type V -Wood Frame (Good) $86.64 Type I - Basement Garage AUDITORIUMS: Type I or II F.R. Type II - 1 hour Type 11-N Type.111 - 1 hour Type III - N Type V - 1 hour TypeV - N BANKS: Type I or II F.R. Type 11 - 1 hour Type 11-N Type III - 1 hour Type III - N Type V - 1 hour TypeV - N BOWLING ALLEYS: Type 11 - 1 hour Type 11-N Type III - 1 hour Type III - N Type V - 1 hour CHURCHES: Type I or II F.R. Type 11 - 1 hour Type 11-N Type III - 1 hour Type III - N Type V - 1 hour TypeV - N 2004-05 and earlier City used 'Building Standards" Magazine valuations for April 2002. These amounts have increased the 2002+C196 numbers by the last two years CPI or a total of 5.6572% Page 1 of 11 Approved Proposed 2005-2006 2006-2007 Cost Per Cost Per S.F. Ave. S.F. Ave. $93.72 $98.09 $76.50 $80.07 $67.41 $70.56 $39.52 $41.36 $110.73 $115.90 $80.19 $83.94 $75.86 $79.40 $84.31 $88.25 $79.98 $83.72 $80.62 $84.38 $75.23 $78.74 $156.48 $163.79 $115.27 $120.66 $111.57 $116.78 $127.21 $133.15 $122.67 $128.40 $115.27 $120.66 $110.41 $115.57 $53.89 $109.71 $56.40 $50.29 $74.81 $52.64 $85.58 $58.64 $81.78 $61.38 $79.98 $54.84 $75.23 $57.40 $39.52 $41.36 $104.81 $109.71 $78.71 $82.39 $74.81 $78.30 $85.58 $89.58 $81.78 $85.60 $79.98 $83.72 $75.23 $78.74 E 171 City of Azusa Schedule of Fees and Charges (Fund 101 -Developer Only) 2006-2007 Exhibit -1 CONVALESCENT HOSPITALS: Type I or II F.R. $147.07 $153.94 Type II - 1 hour $102.06 $106.83 Type III - 1 hour $104.60 $109.49 Type V - 1 hour $98.58 $103.18 DWELLINGS: Type V - Masonry $79.98 $83.72 (Good) $102.38 Type V - Wood Frame $71.11 $74.43 (Good) $97.63 Basements - Semi -Finished $21.24 $22.23 (Good) $24.51 Unfinished $15.43 $16.15 (Good) $18.70 FIRE STATION: Type I or II F.R. $120.87 $126.52 Type II - 1 hour $79.56 $83.28 Type II - N $75.02 $78.52 Type III - 1 hour $87.06 $91.13 Type III - N $83.36 $87.26 Type V - 1 hour $81.67 $85.49 Type V - N $77.45 $81.06 HOMES FOR THE ELDERLY: Type I or II F.R. $109.57 $114.68 Type II - 1 hour $88.96 $93.12 Type II - N $85.16 $89.14 Type III - 1 hour $92.66 $96.99 Type III - N $88.86 $93.01 Type V - 1 hour $89.49 $93.67 Type V - N $86.43 $90.46 HOSPITALS: Type I or II F.R. $172.43 $180.49 Type III - 1 hour $142.74 $149.41 Type V - 1 hour $136.19 $142.55 HOTELS AND MOTELS: Type I or II F.R. $106.71 $111.70 Type III - 1 hour $92.45 $96.77 Type III - N $88.12 $92.23 Type V - 1 hour $80.51 $84.27 Type V - N $78.93 $82.61 INDUSTRIAL PLANTS: Type I or II F.R. $60.12 $62.93 Type II - 1 hour $41.84 $43.79 Type II - N $38.46 $40.26 Type III - 1 hour $46.07 $48.22 Type III - N $43.43 $45.45 Tilt -up $31.70 $33.18 Type V - 1 hour $43.43 $45.45 Type V - N $39.73 $41.58 JAILS: Page 2 of 11 E 0 City of Azusa Schedule of Fees and Charges (Fund 101 -Developer Only) 2006-2007 Exhibit -1 Type I or II F.R. $168.10 $175.95 Type III - 1 hour $153.73 $160.91 Type V - 1 hour $115.27 $120.66 LIBRARIES: Type I or II F.R. $122.98 $128.73 Type II - 1 hour $90.02 $94.22 Type II - N $85.58 $89.58 Type III - 1 hour $95.09 $99.53 Type III - N $90.34 $94.56 Type V - 1 hour $89.28 $93.45 Type V - N $85.58 $89.58 MEDICAL OFFICES: Type I or II F.R. $126.26 $132.16 Type II - 1 hour $97.42 $101.97 Type II - N $92.56 $96.88 Type III - 1 hour $105.66 $110.59 Type III - N $98.37 $102.96 Type V - 1 hour $95.30 $99.75 Type V - N $91.92 $96.21 OFFICES Type I or II F.R. $112.84 $118.11 Type II - 1 hour $75.54 $79.07 Type II - N $71.95 $75.31 Type III - 1 hour $81.57 $85.38 Type III - N $77.98 $81.62 Type V - 1 hour $76.39 $79.96 Type V - N $71.95 $75.31 PRIVATE GARAGES: Wood Frame $25.67 $26.87 Masonry $28.95 $30.30 Open Carports $17.54 $18.36 PUBLIC BUILDINGS: Type I or II F.R. $130.38 $136.47 Type II - 1 hour $105.66 $110.59 Type II - N $101.01 $105.73 Type III - 1 hour $109.67 $114.79 Type III - N $105.87 $110.81 Type V - 1 hour $100.37 $105.06 Type V - N $96.78 $101.30 PUBLIC GARAGES: Type I or 11 F.R. $51.67 $54.08 Type I or 11 Open Parking $38.78 $40.59 Type II - N $29.58 $30.97 Type III - 1 hour $39.09 $40.92 Type III - N $34.76 $36.38 Type V - 1 hour $35.61 $37.27 RESTAURANTS Type III - 1 hour $102.91 $107.72 Type III - N $99.42 $104.07 Type V -I hour $94.25 $98.65 Type V - N $90.55 $94.78 Page 3 of 11 0 0 City of Azusa Schedule of Fees and Charges (Fund 101 -Developer Only) 2006-2007 Exhibit -1 SCHOOLS: Type I or II F.R. $117.49 $122.98 Type II - 1 hour $80.19 $83.94 Type III - 1 hour $85.79 $89.80 Type III - N $82.52 $86.37 Type V - 1 hour $80.41 $84.16 Type V - N $76.71 $80.29 SERVICE STATIONS: Type II - N $71.00 $74.32 Type III - 1 hour $74.07 $77.52 Type V - 1 hour $63.08 $66.02 Canopies $29.58 $30.97 'STORES: Type I or II F.R. $87.06 $91.13 Type II - 1 hour $53.25 $55.74 Type II - N $52.09 $54.52 Type III - 1 hour $64.77 $67.79 Type III - N $60.75 $63.59 Type V - 1 hour $54.52 $57.07 Type V - N $50.40 $52.75 THEATERS: Type I or II F.R. $116.01 $121.43 Type III - 1 hour $84.53 $88.47 Type III - N $80.51 $84.27 Type V - 1 hour $79.56 $83.28 Type V - N $75.23 $78.74 WAREHOUSES Type I or II F.R. $52.19 $54.63 Type I or V - 1 hour $30.96 $32.40 Type I or V - N $29.06 $30.41 Type III - 1 hour $35.08 $36.72 Type III - N $33.39 $34.95 EQUIPMENT: AIR CONDITIONING Commercial $4.44 $4.64 Residential $3.70 $3.87 SPRINKLER SYSTEMS $2.75 $2.88 OTHER VALUATIONS' REROOF Asphalt and Comp - per square of material $170.00 $177.94 Built-up - per square of material $180.00 $188.41 Light -weight tile - per square of material $465.00 $486.72 Concrete Tile or Slate Tile - per square of material $560.00 $586.15 Metal Shingles - per square of material $354.00 $370.53 Wood Shake - per square of material $215.00 $225.04 Wood Shingle - per square of material $207.00 $216.67 Rolled Roofing - minimum 300 sq.ft. allowed on patio covers only $1,000.00 $1,046.70 Tear off and re -sheath - per square of material $100.00 $104.67 TENANTIMPROVEMENTS General Commercial $26.00/s.f. $27.21 Restaurants $30.00/s.f. $31.40 Page 4 of 11 City of Azusa Schedule of Fees and Charges (Fund 101 -Developer Only) 2006-2007 Exhibit -1 Medical Offices RETAINING WALLS- Concrete Block 6" 8" 12" MASONRY FIREPLACE -Minimum Valuation FOUNDATION PERMITS - based on 113 the overall valuation of the bldg These figures shall be used when the applicant does not have a valuation, or if the valuation given is obviously low. Page 5 of 11 $31,00/s.f. $32.45 $6.00/s.f. $6.28 $8.00/s.f. $8.37 $10.00/s.f. $10.47 $3,170.00 $3,318.04 S-2 0 0 City of Azusa Schedule of Fees and Charges (Fund 101 -Developer Only) 2006-2007 Exhibit - 1 FACTORY BUILT FIREPLACE- Minimum Valuation $1,057.00 $1,106.36 SIGNS $24.83 $25.99 1 SIDE Painted $41.00/s.f. $42.91 Electrical $79.00/s.f. $82.69 2 SIDES Painted $48.00/s.f. $50.24 Electrical $100.00/s.f. $104.67 POLE /Lineal Foot plus square foot of sign: 3" 0 $34.00 $35.59 4" 0 $48.00 $50.24 6" 0 $62.00 $64.90 8" 0 $77.00 $80.60 10" 0 $91.00 $95.25 12" 0 $104.00 $108.86 SWIMMING POOLS Valuation based on actual construction cost. Permit fees same as Building Permits. Minimum Valuation: $13,200.00 $13,816.44 SPAS Minimum Valuation Prefabricated $2,640.00 $2,763.29 Gunite $5,300.00 $5,547.51 SURCHARGE FEES Optical Records System - Per Permit $11.00 $11.51 General Plan Maintenance - 10% permit surcharge to recover 50% of costs Variable Variable Permit Automation Fee $21.00 $21.98 BUILDING PERMIT FEES' Permit Issuance $66.00 $69.08 TnTA1 VAI IIATInN Proposed 2005-2006 Fee/Unit $1.00 to $500.00 $24.83 $25.99 $ 501.00 to $2,000.00 $24.83 $25.99 For the 1st $500.00 plus $3.22 for ea. additional $100.00, or fraction thereof, to and including $2,000.00 $2,001.00 to $25,000.00 $73.17 $76.58 For the 1st $2,000.00 plus $14.79 for ea. additional $1,000.00, or fraction thereof, to and including $25,000.00 $25,001.00 to $50,000.00 $413.38 $432.69 For the 1st $25,000.00 plus $10.67 for ea. additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $680.17 $711.93 For the 1st $50,000.00 plus $7.40 for ea. additional $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $ 500,000.00 $1,049.97 $1,099.00 For the 1st $100,000.00 plus $5.92 for ea. additional $1,000.00, or fraction thereof, to and including $500,000.00 Page 6 of 1'1 0 City of Azusa Schedule of Fees and Charges (Fund 101 -Developer Only) 2006-2007 Exhibit -1 $500,001.00 to $1,000,000.00 $3,416.69 $3,576.25 For the 1st $500,000.00 plus $5.02 for ea. additional $1,000.00, (NOTE: For multioulet assemblies, eac. 5 ft. or fraction may be considered as 1 outlet.) or fraction thereof, to and including $1,000,000.00 For lighting fixtures, sockets, or other lamp holding devices: $1,000,001.00 and up $5,926.05 $6,202.79 For the 1st $1,000,000.00 plus $3.33 for ea. additional $1,000.00, $0.79 $0.83 For pole or platform mounted lighting fixtures, each or fraction thereof For theatrical -type lighting fixtures or assemblies each $1.19 $1.25 Other Inspections and Fees: For fixed residential appliances or receptacle outlets for same, including wall - 1. Inspections outside of normal business hours (per hour) $49.66 $51.98 (minimum charge - two hours) food waste grinders, dishw 2. Reinspection fees accessed under provisions of Section 305.8 (per hour) $49.66 $51.98 3. Inspections for which no fee is specifically indicated (per hour) $49.66 $51.98 (minimum charge - one-half hour) For a temporary service power pole or pedestal, including all pole or pedestal 4. Additional plan review required by changes, additions or revisions to plans $49.66 $51.98 (per hour) (minimum charge - one-half hour) outlets for construction sites, decorative lighting. Christmas tree sales lots, Actual costs2 Actual costs2 5. For use of outside consultants for plan checking and ins ections, or both 'Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employee involved. 2 Actual costs include administrative and overhead costs. - * 2004-05 and earlier City used California Building Code fees numbers by the last two years CPI or a total of 5.6572% S-3 ELECTRICAL PERMIT FEES Unit Fee Schedule (note: does not include Permit Issuance Fee) Receptacle, Switch and Lighting, or other. For receptacle, switch lighting, smoke detectors, or other oulets, at which current is used or controlled except services, feeders and meter: First 20, each $1.19 $1.25 Additional outlets, each $0.79 $0.83 (NOTE: For multioulet assemblies, eac. 5 ft. or fraction may be considered as 1 outlet.) LIGHTING FIXTURES For lighting fixtures, sockets, or other lamp holding devices: First 20, each $1.19 $1.25 Additional fixtures, each $0.79 $0.83 For pole or platform mounted lighting fixtures, each $1.19 $1.25 For theatrical -type lighting fixtures or assemblies each $1.19 $1.25 RESIDENTIAL APPLIANCES For fixed residential appliances or receptacle outlets for same, including wall - mounts electric ovens, counter -mounted cooking tops, electric ranges, self- contained room, console, or through -wall air conditioners, space heaters, food waste grinders, dishw $5.55 $5.81 (NOTE: For other types of air conditioners and other motor -driven appliances having larger electrical ratings, see Power Apparatus) TEMPORARY POWER SERVICE For a temporary service power pole or pedestal, including all pole or pedestal mounted receptacle outlets and appurtenances, each $23.77 $24.88 For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative lighting. Christmas tree sales lots, firework stands, sales booths, additional pole, etc., each $11.09 $11.61 NON-RESIDENTIAL APPLIANCES Page 7 of 11 0 • City of Azusa Schedule of Fees and Charges (Fund 101 -Developer Only) 2006-2007 Exhibit - 1 For residential appliances and self-contained, factory -wired, non-residential appliances not exceeding one (1) horsepower (HP), kilowatt (KW), or kilovolt - ampere (KVA) in rating, including medical and dental devices, food, $23.77 $24.88 beverage, and ice cream cabinets $6.34 $6.64 POWER APPARATUS $7.92 $8.29 For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, as follows: Rating in horsepower (HP), kilowatts (KW), kilovolt -amperes (KVA), or $23.77 $24.88 kilovolt -amperes -reactive (KVAR) Up to and including 1, each $6.34 $6.64 Over 1 and not over 10, each $11.09 $11.61 Over 10 and not over 50, each $28.53 $29.86 Over 50 and not over 100, each $57.05 $59.71 Over 100, each $95.09 $99.53 NOTE., 1. For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined rating may be used. $23.77 $24.88 NOTE: 2. These fees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment. BUSWAYS For trolley and plug-in type busways, each 100 feet or fraction thereof $15.85 $16.59 (NOTE., An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in type busways.) SIGNS, OUTLINE LIGHTING, AND MARQUEES For signs, outline lighting systems, or marquees supplied from one branch circuit, each $23.77 $24.88 For additional branch circuits within the same sign outline lighting system, or marquee, each $7.92 $8.29 SERVICES, SWITCHBOARDS, SWITCHBOARD SECTIONS, MOTOR CONTROL CENTERS AND PANELBOARDS For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less & not over 200 amperes in rating, ea. $23.77 $24.88 For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less and not over 200 amperes 1,000 amperes in rating, each $47.55 $49.77 For services, switchboards, switchboard sections, motor control centers and panelboards over 600 volts or over 1,000 amperes in rating, each $110.94 $116.12 MISCELLANEOUS APPARATUS, CONDUITS AND CONDUCTORS For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth $23.77 $24.88 (NOTE., This fee is not applicable when a fee is paid for one ormore services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment. PRIVATE SWIMMING POOLS For new private, residential, inground swimming pools for single, or multi- family occupancies, including a complete system of necessary branch circuit wiring, bonding, grounding underwater lighting, water pumping and other similar electrical equipment dir $47.55 $49.77 For other types of swimming pools, therapeutic whirlpools, spas, hot tubs and alterations to existing swimming pools, each $31.70 $33.18 CARNIVALS AND CIRCUSES Page 8 of 11 City of Azusa Schedule of Fees and Charges (Fund 101 -Developer Only) 2006-2007 Exhibit -1 Carnivals, circuses and other traveling shows or exhibitions utilizing transportable -type rides, booths, displays and attractions. For electrical generators and electrical driven rides, each $23.77 $24.88 For mechanically driven rides and walk-through attractions or displays having electric lighting, each $9.51 $9.95 For a system of area and booth lighting, each $9.51 $9.95 For permanently installed rides, booths, displays, and attractions $9.51 $9.95 Page 9 of 11 S-4 S-5 0 0 City of Azusa Schedule of Fees and Charges (Fund 101 -Developer Only) 2006-2007 Exhibit -1 OTHER INSPECTIONS For inspection of electrical equipment for which no fee is herein set forth shall be determined by the Building Official PLUMBING FEES Each plumbing fixture or trap or set of fixtures on one trap (including drainage, vent, water piping and backflow prevention devices therefore) $9.51 $9.95 Each permanent type dishwasher whether individually trapped or not $9.51 $9.95 Each industrial waste pretreatment interceptor including it's trap & vent, except kitchen type grease interceptors functioning as fixtures traps $9.51 $9.95 Each swimming pool drainage trap & receptor whether connected to a $31.70 $33.18 bldg.drain or bldg -sewer (water supply for pool not included) $9.51 $9.95 Each gas piping system of 1 to 5 outlets or alteration or retest of existing gas $2.78 $2.91 piping system $9.51 $9.95 Each additional outlet over five $2.38 $2.49 Each gas pressure regulator other than appliance regulators $3.17 $3.32 Each water heater and/or vent $9.51 $9.95 Each solar potable water heating system, including water heater/vent $31.70 $33.18 For repair or alteration of drainage and/or vent piping $9.51 $9.95 Each piece of water -treating equipment and/or water piping installed without accompanying plumbing $9.51 $9.95 Lawn sprinkler systems on 1 meter including backflow prevention devices $9.51 $9.95 Backflow prevention devices on unprotected water supplied, pools, tanks, vats, etc. (including incidental water piping) 1 to 5 $9.51 $9.95 Any swimming pool piping associated wit the construction, remodeling or repair of a swimming pool, spa and hot tub $26.41 $27.64 Each additional device over five (5) $2.38 $2.49 Each bldg. Drain installed without accompanying plumbing $9.51 $9.95 For connection of a house sewer to a public sewer or the extension of a house lateral onto a lot for future use $26.94 $28.20 For each house sewer manhole $26.94 $28.20 Each installation of a section of house sewer for future use $17.43 $18.24 For the connection of each additional bldg. or work to house sewer $17.43 $18.24 For the connection of a house sewer to a private sewage disposal system $17.43 $18.24 For each private sewage disposal system (septic tank & seepage pit or pits and/or drainfield) $55.47 $58.06 For each cesspool, overflow seepage pit, percolation test pit, swimming pool drywell, or drainfield extension or replacement $26.94 $28.20 For disconnection, abandonment, alteration or repair of any house sewer or private sewage disposal system or part thereof $17.43 $18.24 MECHANICAL PERMIT FEES Installation, alteration or relocation of each refrigeration compressor or absorption unit, & each fuel burning furnance, heater, boiler, and vented decorative appliance including vents attached thereto: Up to & including 100,000 BTU $15.85 $16.59 More than 100,000 BTU to & including 1,000,000 BTU $31.70 $33.18 More than 1,000,000 BTU $79.24 $82.94 For each air inlet & air outlet served by any air conditioning system $2.78 $2.91 Page 10 of 11 0 49 City of Azusa Schedule of Fees and Charges (Fund 101 -Developer Only) 2006-2007 Exhibit - 1 For each 1,000 sq.ft. or fraction thereof of conditioned area Note: When a permit is applied for and the total # of air inlets & air outlets is unknown, the fees shall be based on the sq.ft. of conditioned area. For the installation, relocation or replacement of each appliance vent installed and not included in a appliance permit For the installation or alteration of each air handling unit for air conditioning including ducts attached thereto: Up to & including 2,000 CFM - Each unit up to 10 Each unit over 10 More than 2,000 CFM to and including 10,000 CFM More than 10,000 CFM Note: This fee shall not apply to an air handling unit which is a portion of a factory assembled air conditioned appliance for which a permit is required elsewhere in this code. For each evaporative cooler other than portable type For required ventilation fans which serve a single register: Each fan up to 10 Each fan over 10 For each required ventilation system which is not a portion of any air conditioning system for which a permit is required elsewhere in this Code For the installation or each commercial kitchen hood or spray booth served by mechanical exhaust, including the fans and ducts attached thereto For the installation of each fire damper Alteration of existing duct system where a permit is not required elsewhere Note: 1) for refrigeration system rating one horsepower, one ton, or 12,000 BTU per hour shall mean the same quantity Note: 2) for steam boilers rated in boiler horsepower, one horsepower shall equal 50, 000 BTU per hour PLAN CHECK FEES Building Plan Check Fee - 85% of Permit Fee - $15.00 minimum Electric Plan Check Fee - 80% of Permit Fee - $15.00 minimum Energy Plan Check Fee - 10% of Building Permit Fee Mechanical Plan Check Fee - 80% of Permit Fee - $15.00 minimum Plumbing Plan Check Fee - 80% of Permit Fee - $15.00 minimum Page 11 of 11 $22.19 $23.23 $7.92 $8.29 $7.92 $2.38 $23.79 $39.62 $12.68 $9.51 $3.17 $19.02 $39.62 $6.34 $15.85 $8.29 $2.49 $24.90 $41.47 $13.27 $9.95 $3.32 $19.91 $41.47 $6.64 $16.59 0 0 City of Azusa Schedule of Fees and Charges Developer Only Exhibit 1.2 BUILDING AND SAFETY De pa rtme nt/Des cri ption Page 1 of 2 Approved Approved Approved Proposed Area 2003-2004 2004-2005 2005-2006 2006-2007 Item Fee/Unit Fee/Unit Fee/Unit Fee/Unit S-045 Grading Plan Check Fee Variable Variable Variable Variable 50% of Grading Permit Fee S-046 Grading Inspection Variable Variable Variable Variable Fee is 1 112% of estimated construction costs Grading Permit Fee - Based on Cubic Yards $110 $112 $116 $122 Permit Fee for Changes to Original Permit: $1 to $20,000 $70 $71 $73 $77 $20,001 to $50,000 $70 $71 $73 $77 $50,001 to $75,000 $95 $96 $100 $105 $75,001 to $100,000 $145 $148 $154 $161 $100,001 to $200,000 $190 $193 $201 $210 $200,000 to $500,000 $245 $249 $259 $271 $500,001 and up $300 $306 $317 $332 Special Site Inspection $55 $56 $58 $61 Commercial - Minimum 2 hours $110 $112 $116 $122 Residential - Minimum 2 hour $110 $112 $116 $122 Residential (non -habitable space) - Minimum 2 hours $105 $107 $111 $116 Occupancy Inspection Fee: 0-1 to 15,000 sq. ft. - 1/2 hour of technical staff time $30 $31 $32 $33 15,000 sq.ft. on - 1 hour of technical staff time $55 $56 $58 $61 Bonds for Sign(s) - Refundable $165 $168 $175 $183 Demolition Permit Fee - Minimum 1 hour $65 $66 $69 $72 Deputy Inspection Registration Fee - Deputy $30 $31 $32 $33 Emergency Inspection Fee - Minimum 1 hours $90 $92 $96 $100 Hearing Officer Actual Cost Actual Cost Actual Cost Actual Cost Pre -Plan Check Submittal - Minimum 2 hours $115 $117 $122 $127 Rehabilitation Permit Fee $255 $260 $270 $283 Reinspection Fee - Minimum 1 hour $60 $61 $64 $67 Room Addition Plan Check Fee - Minimum 2 hours $115 $117 $122 $127 Swimming Pool Permit Fee - Based on Valuation $70 $71 $74 $77 Swimming Pool Plan Check Fee - 80% of Permit Fee $55 $56 $58 $61 Trailer Coach $110 $112 $116 $122 Trash Enclosure - $10 for additional enclosure $45 $45 $47 $49 Relocation of Buildings: 0 to 2,000 sq.ft. $260 $264 $274 $287 2,001 to 5,000 sq.ft. $485 $494 $513 $537 5,001 sq.ft. and up $700 $713 $740 $775 Page 1 of 2 i Plan Checking Fee: Staff rates assessed against deposit. Executive Staff - per hour Professional Staff - per hour Technical Staff (Plan Checker lnspector) - per hour 0 $100 $101 $105 $110 $60 $61 $64 $67 $70 $72 $74 $78 On-site Improvement Inspections: $2,000 deposit required for parking lot paving and miscellaneous testing Professional Staff - per hour $60 Rates applied against deposit Technical Staff - per hour $55 Rates applied against deposit Page 2 of 2 $61 $64 .$67 $56 $58 $61 City of Azusa • • Schedule of Fees and Charges -Developer Only Exhibit 2 PLANNING AND ENGINEERING Department/Description Page 1 of 4 Full Cost Approved Approved Approved Proposed Area Recovery 2003-2004 2004-2005 2005-2006 20DS-2007 Item 2003-2004 FeelUnit Fee/Unit Fee/Unit Fee/Unit S-001 Zoning Clearance $50 $50 $50 $50 $52 5-002 Minor Design Review (over the counter) $452 $305 $310 $322 $337 5-003 Staff Level Design Review $1,572 $1,210 $1,232 $1,279 $1,339 Reduced to $350.00 for modifications to existing structures S-OD4 Major Design Review (Deposit) $5,989 $5,990 $6,095 $6,100(0) If filed with a CUP or Variance, discount by 50% $2,995 $3,047 delete If filed with a Zone Change or GPA, discount by 30% $4,193 $4,266 delete If files with other applications, all fees are deposited 5-005 Use Permit Major UP $4,934 $3,505 $3,567 $3,804 $3,981 Minor UP $880 $895 $930 $973 S-006 UP Modifications - $1,532 Modifications to Major UP $1,535 $1,562 $1,722 $1,802 Modifications to Minor UP $385 $391 $407 $426 5-007 Minor Deviation $666 $340 $346 delete 5-008 Minor Variance $1,130 $625 $636 $660 $691 5-009 Variance $3,998 $3,615 $3,678 $3,919 $4,102 $850.00 when Single Family Structure is involved 5-010 Zone Change $4,890 $4,890 $4,976 $5,000 (D) 5-011 Zone Change W/GPA $2,605 $2,605 $2,651 delete In addition to the GPA fee S-012 Development Agreement $7,869 $7,870 $8,008 $8, 100(D) Annual Monitoring $4,000 (D) Deposit for charges at fully allocated hourly rates. All costs recovered. 5-013 General Plan Amendment $9,262 $10,000 $10,175 $10,200 (D) Deposit for charges at fully allocated hourly rates. All costs recovered. S-014 Specific Plan $8,571 $8,000 $8,140 $8,200(D) Deposit for charges at fully allocated hourly rates. All costs recovered. 5-015 Specific Plan Amendment $3,858 $3,860 $3,928 $4,000 (D) 5-016 Tentative Parcel Map $1,641 $1,640 $1,669 $1,833 $1,918 5-017 Tentative Tract Map $3,068 5-20 lots $2,500 $2,544 $2,741 $2,869 20-50 lots $3,050 $3,103 $3,323 $3,478 50-100 lots $4,295 $4,370 $4,638 $4,855 100+ lots $5,540 $5,637 $5,953 $6,231 5-018 Reversion to Acreage $1,129 $1,130 $1,150 $1,194 $1,250 S-019 Lot Merger $425 $425 $432 $449 $470 5-020 Environmental Categorical Exemption Rev. $90 $90 $92 $95 $100 5-021 Environmental Initial Study $873 $875 $890 $925 $968 5-022 Environmental Negative Declaration Rev. $123 $125 $127 delete 5-023 Environmental Impact Report Review $3,547 $4,000 $4,070 $4,500 (D) Deposit for charges at fully allocated hourly rates. All costs recovered. 5-024 Mitigation Monitoring - CEOA Monitoring $849 $245 $249 $259 $271 Plus $85 hourly rate when applicable Page 1 of 4 I City of Azusa • Schedule of Fees and Charges - Developer Only • Exhibit 2 PLANNING AND ENGINEERING Department/Description 5-025 Annexation $6,396 $6,000 $6,105 $6,300 (D) Deposit for charges at fully allocated hourly rates. All costs recovered. S-026 Condominium Conversion Map $4,336 $4,335 $4,411 $4,580 $4,794 5-027 Minor Sign Review $50 $50 $51 $53 $55 S-028 Major Sign Review $405 $405 $412 $428 $448 S-030 Temporary Occupancy Review $355 $355 $361 $375 $393 5-031 Temporary Use Permit $394 $395 $402 $417 $437 25% discount for Azusa based non-profit organizations 5-032 Continuance Processing $458 $460 $468 $486 $509 5-033 Time Extension Review - Staff $311 $310 $315 $328 $343 S-034 Time Extension Review - Planning Commission $458 $460 $468 $486 $509 S-035 Appeal To Planning Commission $1,195 $310 $315 $427 $447 5-036 Appeal To City Council $1,804 $520 $529 $649 $679 5-15 Preliminary Plan Review $200 $203 $211 $221 New Nonconforming Use Time Extension $629 $658 S-037 Certificate of Compliance $786 $785 $799 $829 $868 S-038 Street Name Processing W/O Map $774 $775 $789 $819 $857 S-039 Street Re -Name Processing $1,319 $1,320 $1,343 $1,395 $1,460 5-040 Building Address Processing W/O Map $268 $270 $275 $285 $299 5-041 Building Re -Address Processing $380 $380 $387 $401 $420 S-044 Special Building Inspection $179 $180 $183 $190 $199 S-047 Public/Private Improvement Plan Check $2,434 Variable 2 112% of estimated construction costs 5-048 Public/Private Improvement Inspection $5,341 Variable 2 1/2% of estimated construction costs S-049 Final Parcel Maps: $550 $1,250 $1,272 $1,321 $1,382 City Fee 550, County Fee 700 5-050 Final Maps: Map Analysis for Tracts: $704 1 - 5 Lots City Fee 705, County Fee 710 $1,415 $1,440 $1,495 $1,565 6 - 10 Lots City Fee 705, County Fee 915 - $1,620 $1,648 $1,712 $1,792 11 - 25 Lots City Fee 705, County Fee 1350 $2,055 $2,091 $2,171 $2,273 26 - 50 Lots City Fee 705, County Fee 2200 $2,905 $2,956 $3,069 $3,213 51 - 1- Lots City Fee 705, County Fee 3300 $4,005 $4,075 $4,232 $4,429 101 - 150 Lots City Fee 705, County Fee 5000 $5,705 $5,805 $6,028 $6,309 151 or more Lots City Fee 705, County Fee 6600 $7,305 $7,433 $7,718 $8,079 5-051 Easement Checking for Tract Maps $238 $475 $483 $502 $525 City Fee 265, County 210 Easement Checking for Parcel Maps $440 $448 $465 $487 City Fee 265, County 175 Page 2 of 4 City of Azusa • • Schedule of Fees and Charges -Developer Only Exhibit 2 PLANNING AND ENGINEERING Department/Desc ri ption S-052 Monument Inspection each $149 $280 $285 $296 $310 City Fee 155, County 125 , S-053 Bond Processing $47 $125 $127 $132 $138 City Fee 50, County 75 S-054 Tax Clearance Processing: 5 yr history (provided by County) $47 $675 $687 $713 $746 City Fee 50, County 625 S-055 Lot Line Adjustment $891 $890 $906 $940 $984 S-056 Street/ROW Abandonment Proc. $1,105 $1,105 $1,124 $1,168 $1,222 S-057 Sidewalk/Curb/Gutter: $131 Up to 75 LF $155 $158 $164 $171 Addl 75 LF, no deposit $50 $51 $53 $55 Driveway Approach/Street Cut: Up to 100 S.F. $155 $158 $164 $171 Addl 100 S F, no deposit $50 $51 $53 $55 S-058 Obstruction Permit - $54 $55 $56 $58 $61 S-059 Transportation Permits (oversized and/or overweight trucks): $18 Single Trip/Rider Various Fee set by state Annual Permit Various Fee set by state 5-060 House Moving Permit $194 $195 $198 $206 $216 Engineering Standard Drawing S-061 Sewer Saddle $208 $205 $209 $217 $227 S-062 Blueprint/Map Copy Service $13 $15 $15 $16 $17 S-063 Real Property Records Report $76 Condominium/Townhouses $25 $25 $26 $28 Vacant/Unimproved Land $120 $122 $127 $133 Single Family Dwellings $120 $122 $127 $133 Multi -Family Dwelling - per parcel $120 $122 $127 $133 Per Unit +$8.00 $120 $122 $127 $133 Commercial Properties $120 $122 $127 $133 S-064 Residential Rental Housing Registration and Inspection: $66 Per parcel $45 $46 $48 $50 First unit, $7 each addl unit Per Unit + $8.00 $45 $46 $48 $50 First unit, $7 each addl unit Condominium (per unit) $45 $46 $48 $50 First unit, $7 each addl unit S-065 Lien Release $53 $55 $56 $58 $61 S-066 Admin. Hearing Appeal $146 $170 $173 $180 $188 City fee 35,Court 25 Project Plans/Specifications - Plus $10 if mailed $39 $40 $42 $44 S-3.1 Block Wall Permit Verification of Conditions: " County $145 $148 $154 $161 City $125 $127 $132 $138 Agreement and/or Improvement Security, each $165 $168 $175 $183 Extension Time for Improvement Agreement, each $225 - $229 $238 $249 Page 3 of 4 Page 4 of 4 City of Azusa • Schedule of Fees and Charges -Developer Only • Exhibit 2 PLANNING AND ENGINEERING Department/Description Fourth Submittal Originals/Prints $310 $315 $327 $343 Sixth Submittal or Originals/Prints $1,090 $1,109 $1,152 $1,205 Eighth and each subsequent submittal of originals/prints $1,300 $1,322 $1,373 $1,437 Minor Land Divisions: Lot Split $460 $468 $486 $509 Recording Fee: First Sheet $6 $6 $7 $7 Additional sheets, each $2 $2 $2 $2 LDMA Surcharge (County maps only): Tract Map $310 $315 $327 $343 Parcel Map $105 $107 $111 $116 Overtime: Tract Map $1,040 $1,058 $1,099 $1,150 Parcel Map $725 $738 $766 $802 5-6.3 Staff Rates: Professional Staff - per hour $85 $87 $90 $94 Inspection Staff - per hour $65 $66 $69 $72 5-6.5 Code Compliance Fee $30 $31 $32 $33 S-7 Landscape Design Standards (Over the Counter Sales) $5 $5 $5 $6 5-11 Postage Public Hearing - Notice Publication $55 $56 delete Variance/Precise Plan or CUP. $2,010 $2,046 delete Temporary Use Permit $150 $152 delete Precise Plan & CUP + Variance $2,740 $2,788 delete 5-18 City -provided Tree Planting - One 15 gallon Tree $85 $87 $90 $94 City -provided Tree Planting - One 24" Box Tree $145 $148 $154 $161 Page 4 of 4 0 City of Azusa Schedule of Fees and Charges Developer Only Exhibit 3 FIRE SAFETY Approved Approved Approved Proposed Area Department/Description 2003-2004 2004-2005 2005.2006 2006.2007 Item Fee/Unit Fee/Unit Fee/Unit Fee/Unit S-1.1 Fire Safety - Fee per Hour: Fire Plan Check $85 $87 $90 $90 Fire Alarm System $85 $87 $90 $90 Fire Extinguisher Service $85 $87 $90 $90 Flammable Storage $85 $87 $90 $90 Hood System $85 $87 $90 $90 Spray Booths $85 $87 $90 $90 Subdivision Plan Checking $85 $87 $90 $90 Fire Permit Fees . Occupancy Inspection - per hour $85 .$87 $90 $90 Christmas Tree Lot Inspection - per hour $85 $87 $90 $90 Circus/Carnival Inspection - Minimum 2 hours $170 $173 $180 $180 Flammable Liquid Tank Site Inspection - Minimum 3 hours $255 $259 $269 $269 Liquid Petroleum Gasses - per hour $85 $87 $90 $90 Magnesium Working - Minimum 2 hours $170 $173 $180 $180 Motor Vehicle Repair Garages - per hour $85 $87 $90 $90 Oxygen System Installation - Minimum 2 hours $170 $173 $180 $180 Storage/Handling Flammable Liquids - Minimum 2 hours $170 $173 $180 - $180 Underground Tank Installation - Minimum 4 hours $340 $346 - $359 $359 Underground Tank Removal - Minimum 3 hours - $255 $259 $269 $269 Fireworks Stands - Minimum'M. hour $43" $44 $45 $45 Metal Foundry - Minimum 2 hours $170 $173 $180 $180 Places of Assembly - Minimum 2 hours $170 $173 $180 $180 Pyrotechnical Special Effects - per hour $85 $87 $90 $90 Public Rifle/Gun Ranges - Minimum 2 hours $170 $173 $180 $180 Tire Storage Areas in Excess of 1,000 cu.ft. - per hour $85 $87 $90 $90 Automobile Dismantling/Storage Yards - Minimum 2 hours $170 $173 $180 $180 Commercial Woodworking Facilities with Dust Collection Systems Greater than 25 gallons - Minimum 2 hours $170 $173 $180 $180 Educational/Daycare Centers - Minimum 3 hours $255 $259 $269 $269 Miscellaneous Fire Fees - per hour Residential Inspection per Sec. 13146.2 of H&S Code $85 $87 $90 $90 Engine Company Standby $85 $87 $90 $90 Hazardous Materials Response $85 $87 $90 $90 Special Inspections $85 $87 $90 $90 Weed Abatement (Processing & Referral) $85 $87 $90 $90 " Rate adjusted by City Council