Loading...
HomeMy WebLinkAboutResolution No. 10-C43RESOLUTION NO. 10-C43 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, ESTABLISHING CERTAIN DEVELOPMENT PROJECT FEES AND SERVICE CHARGES WHEREAS, Chapter 8 (commencing with section 66016) of Division 1 of Title 7 of the California Government Code establishes a procedure for adopting fees or service charges for development projects; and WHEREAS, the City Council of the City of Azusa has determined that the cost of providing certain facilities or services is not of general benefit, but of special benefit to the applicant seeking to process a development application; and WHEREAS, the City Council has further determined that developer contribution in the form of development impact fees is necessary to offset the impact of future development on already - established community facilities and services and to maintain the current levels of services for these public facilities; and WHEREAS, the City is authorized to impose fees which will cover but do not exceed the estimated reasonable cost of providing the service or facility for which the fee is imposed; and WHEREAS, current fees charged for community development services or facilities do not fully recover the actual cost of providing the such services; and WHEREAS, Government Code sections 66016 and 66018 provide that the City may adopt new fees or increase existing fees after providing notice and holding a public hearing; and WHEREAS, notice of a public hearing on the establishment of new and increased fees was published in accordance with provisions of section 6062a of the California Government code; WHEREAS, notice of public hearing was mailed to all interested parties who filed a written request for a mailed notice with the City, WHEREAS, on July 19, 2010, at the time and place specified in the published and mailed notices, the City Council held a public hearing as required by law to allow oral or written presentations prior to levying new fees or service charges and prior to approving an increase in existing fees or service charges; and WHEREAS, at least ten (10) days prior to the commencement of the hearing, there was made available to the public a report containing the cost, or estimated cost, of providing the service for which the fee or service charge will be levied, and the revenue sources for providing such services; and WHEREAS, based upon evidence provided, the City Council hereby determines that the fees set forth in the Schedule of Fees and Charges for Fiscal Year 2010/2011 attached hereto and incorporated herein by reference will not exceed the estimated reasonable cost of providing the community development services and facilities for which the fee is charged; and WHEREAS, the proposed fees are statutorily and categorically exempt from the requirements of the California Environmental Quality Act since citing these fees fits within the statutory exemptions for local agency decisions involving the adoption and collection of rates, tolls and other charges, pursuant to Public Resources Code Section 21080(b)(8) and Section 15273 of the California Environmental Quality Act Guidelines. , NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, DOES FIND AND DECLARE THAT: SECTION 1. Adoption of Schedule of Fees. The City Council hereby adopts a fee schedule for the services set forth in the Schedule of Fees and Charges for Fiscal Year 2010/2011 attached hereto and incorporated herein by reference. SECTION 2. Collection of Fees. That the City is authorized to collect the user fees set forth herein. SECTION 3. Effective Date. This resolution shall become effective sixty (60) days from its adoption. PASSED, APPROVED AND ADOPTED ON JULY 19, 2010. J eph R. Rocha, Mayor I HEREBY CERTIFFY that the foregoing Resolution No. 10-C43 was duly adopted at a regular meeting of said City Council on the 19w day of July 2010, by the following vote of the Council: AYES: COUNCILMEMBERS: GONZALES, CARRILLO, MACIAS, HANKS, ROCHA NOES: COUNCILMEMBERS: NONE ABSENT: COUNCILMEMBERS: NONE City of Azusa Schedule of Fees and Charges (Developer Only) 2010-2011 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Area Adopted Proposed Item Description 2009-2010 2010-2011 Cost Per Cost Per S-1 BUILDING VALUATION S.F. Avg. S.F. Avg. APARTMENT HOUSES: Type I or II F.R. $104.85 $125.82 Good Type V - Masonry $129.08 $154.90 (or Type III) $85.58 $102.70 Good Type V - Wood Frame $104.85 $125.82 Good $75.42 $90.50 Type I - Basement Garage $96.93 $ 16.32 AUDITORIUMS; $44.21 $553.053.05 Type I or II F.R. $123.88 $148.66 Type II - 1 hour $89.72 $107.66 Type II - N $84.87 $101.85 Type III - 1 hour $94.33 $113.19 Type III - N $89.48 $107.38 Type.V - 1 hour $90.19 $106.23 Type V - N $84.16 $101.00 BANKS: Type I or II F.R. $175.06 $210.08 Type ll - 1 hour $128.96 $154.76 Type 11 - N $124.83 $149.79 Type III - 1 hour $142.32 $170.78 Type III - N $137.24 $164.68 Type V - 1 hour $128.96 $154.76 Type V -.N $123.53 $148.23 BOWLING ALLEYS: Type II - 1 hour $60.29 $72.34 Type 11 - N $56.27 $67.52. Type III - 1 hour $65.60 $78.73 Type III - N $61.35 $73.62 Type V - 1 hour $44.21 $53.05 CHURCHES: Type I or II F.R. $117.26 $140.71 Type II - 1 hour $88.06 $105.68 Type II - N $83.69 $100.43 Type III - 1 hour $95.75 $114.90 Type III - N $91.49 $109.79 Type V - 1 hour $89.48 $107.38 Type V - N $84.16 $101.00 CONVALESCENT HOSPITALS: Type I or II F.R. $164.54 $197.45 Type II - 1 hour $114.19 $137.02 Type III - 1 hour $117.02 $140.43 Type V - 1 hour $110.29 $132.34 Page 1 of 42 City of Azusa Schedule of Fees and Charges (Devel'oper Only) 2010-2011 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENTfCOMMUNITY IMPROVEMENT BUILDING AND SAFETY Adopted Proposed Area 2009-2010 2010-2011 Item Description Cost Per Cost Per S.F. Avg. S.F, Avg. DWELLINGS: Type V. - Masonry $89.48 $107.38 Good $114.54 $137.45 Type V - Wood Frame $79.55 $95.46 Good $109.23 $131.08 Basements - Semi -Finished $23.76 $28.51 Good $27.42 $32.90 Unfinished $17.26 $20.71 Good $20.92 $25.10 FIRE STATION: Type I or II F.R. $135.23 $162.27 Type II - 1 hour $89.01 $106.81 Type II - N $83.93 $100.71 Type III - 1 hour $97.40 $116.88 Type III - N $93.26 $111.92 Type V - 1 hour $91.37 $109.65 Type V.- N $86.65 $103.97 HOMES FOR THE ELDERLY: Type I or II F.R. $122.58 $147.10 Type II - 1 hour $99.53 $119.44 Type II - N $95.27 $114.33 Type III - 1 hour $103.67 $124.40 Type III - N $99.41 $119.29 Type V -1 hour $1,00.12 $120.14 Type V - N $96.69 $116.03 HOSPITALS: Type I or II F.R. $192.91 $231.49 Type III - 1 hour $159.70 $191.64 Type V - 1 hour $152.37 $182.84 HOTELS AND MOTELS: Type I or II F.R. $1.19.39 $143.27 Type III - 1 hour $103.43 $124.12 Type 111 - N $98.58 $118.30 Type V - 1 hour $90.07 $108.09 Type V - N $88.30 $105.96 INDUSTRIAL PLANTS: Type I or 11 F.R. $67.26 $80.71 Type It - 1 hour $46.81 $56.17 Type 11 - N $43.03 $51.63 Type III -1 hour $51.54 $61.85 Type. III - N $48.58 $58.30 Tilt -up $35.46 $42.55 Type V - 1 hour $48.58 $58.30 Type V - N $44.4.5 $53.33 Page 2 of 42 City of Azusa Schedule of Fees and Charges (Developer Only) 2010-2011 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Area Adopted Proposed Item Description 2009-2010 2010-2011 Cast Per Cost Per JAILS: S.F. Avg, S.F. Avg. Type I or II F.R. $188.07 $225.68 Type III - 1 hour $171.99 $206.39 Type V - 1 hour $128.96 $154.76 LIBRARIES: Type I or II F.R. $137.59 $165.11 Type II - 1 hour $100.71 $120.85 Type. 11 - N $95.75 $114.90 Type III - 1 hour $106.39 $127.66 Type III - N $101.07 $121.28 Type V - 1 hour $99.88 $11 Type V - N $95.75 $1144.86 .90 MEDICAL OFFICES: Type I or II F.R. $141.26 $169.51 Type II - 1 hour $108.99 $130.78 Type II - N $103.55 $124.26 Type III - 1 hour $118.21 $141.85 Type III - N $110.05 $132.06 Type V - 1 hour $106.62 $127.95 Type V - N $102.84 $123.41 OFFICES Type I or II F.R. $126.24 $151.49 Type II - 1 hour $84.52 $101.42 Type II - N $80.50 $96.60 Type III - 1 hour $91.26 $109.51 Type III - N $87.24 $104.68 Type V - 1 hour $85.45 $102.55 Type V - N - $80.50 -$96.60 PRIVATE GARAGES: Wood Frame $28.72 $34.47 Masonry $32.39 $36.87 Open Carports $19.62 $23.55 PUBLIC BUILDINGS: Type I or II F.R. $145.87 $175.04 Type II - 1 hour $118.21 $141.85 Type II - N $113.01 $135.61 Type III - 1 hour $122.70 $147.24 Type III - N $118.44 $142.13 Type V - 1 hour $112.30 $134.76 Type V - N $108.28 $129.93 Page 3 of 42 City of Azusa Schedule of Fees and Charges (Developer Only) 2010-2011 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Area Adopted Proposed Item Description 2009-2010 2010-2011 Cost Per Cost Per PUBLIC GARAGES: S.F. Avg. S.F. Avg. Type] or II F.R. $57.80 $69.36 Type I or II Open Parking $43.38 $52.06 Type II - N $33.10 $39.72 Type III - 1 hour $43.74 $52.48 Type III - N $38.89 $46.67 Type V - 1 hour $39.84 $47.80 RESTAURANTS Type III - 1 hour $115.13 $138.16 Type III - N $111.23 $133.48 Type V - 1 hour $105.44 $126.53 Type V - N $101.30 $121.56 SCHOOLS: Type I or II F.R. $131.45 $157.73 Type II - I hour $89.72 $107.66 Type III - 1 hour $95.98 $115:18 Type III - N $92.32 $110.78 Type V - 1 hour $89.95 $107.95 Type V - N $85.82 $102.98 SERVICE STATIONS: Type II - N $79.43 $95.32 Type III - 1 hour $82.86 $99.44 Type V - 1 hour $70.57 $84.68 Canopies $33.10 $39.72 STORES: Type I or II F.R. $97.40 $116.88 Type II -.1 hour $59.58 $71.49 Type II - N $58.28 $69.93 Type III - 1 hour $72.46 $86.95 Type III - N $67.97 $81.56 Type V - 1 hour $60.99 $73.19 Type V - N $56.38 $67.66 TOWN HOMES Type V - Masonry $102.38 $122.86 Type V - Wood Frame $97.63 $117.16 Garage- Wood Frame $39.84 $47.81 Garage- Masonry .$44.21 $53.05 THEATERS: Type I or II F:R. $129.79 $155.75 Type III - 1 hour $94.56 $113.48 Type III - N $90.07 $108.09 Type. V - 1 hour $89.•01 $106.81 Type V - N $84.16 $101.00 Page 4 of 42 City of Azusa Schedule of Fees and Charges (Developer Only) 2010-2011 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Page 5 of 42 Adopted Proposed . Area 2009-2010 2010-2011 Item Description Cost Per Cost Per S.F. Avg. S.F; Avg. WAREHOUSES Type I or II F.R. $58.39 $70.07 Type I or V - 1 hour $34.63 $41.56 Type I or V - N $32.51 $39.01 Type III - 1 hour $39.24 $47.09 Type III - N $37.35 $44.82 EQUIPMENT: AIR CONDITIONING Commercial $4.96 $5.96 Residential $4.14 $4.96 SPRINKLER SYSTEMS $3.07 $3:69 OTHER VALUATIONS REROOF Asphalt and Comp - per square foot of material $190.19 $228.23 Built-up - per square foot of material $201.38 $241.65 Light -weight tile - per square foot of material $520.23 $624.27 Concrete Tile or Slate Tile - per square foot of material $626.51 $751.81 Metal Shingles - per square foot of material $396.04 $475.25 Wood Shake - per square foot of material $240.54 $268.64 Wood Shingle - per square foot of material $231.59 $277.90 Rolled Roofing - minimum 300 soft. allowed on patio covers only $1,118.77 $1,342.52 Tear off and re -sheath - per square foot of material $11,1.88 $134.25 TENANT IMPROVEMENTS General Commercial $29.09 $34.91 Restaurants $33.56 $40.28 Medical Offices $34.68 $41.62 RETAINING WALLS- Concrete Block 6" $8.68 $10.41 81, $9.61. $11.53 12" $11.77 $14.13 MASONRY FIREPLACE -Minimum Valuation $3,546.50 $4,255.80 FOUNDATION PERMITS - based on 1/3 the overall valuation of the bldg These figures shaft be used when the applicant does not have a valuation, or if the valuation given is obviously low. FACTORY BUILT FIREPLACE- Minimum Valuation $1,182.54 $1,419.05 Page 5 of 42 City of Azusa Schedule of Fees and Charges (Developer Only) 2010.2011 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENTICOMMUNITY IMPROVEMENT BUILDING AND SAFETY Adopted Area 2009-2010 Item Description Cost Per S.F. Avg. SIGNS 1 SIDE Painted $45.87 Electrical $88.38 2 SIDES Painted $53.70 Electrical $111,88 POLE !Lineal Foot plus square foot of sign: 3" 0 $38.04 4" 0 $53.70 6" 0 $69.36 8" 0 $86.15 10" 0 $101J31 12" 0 $116.35 PHOTOVOLTAIC SYSTEMS Permit and Plan check fee's for photovoltaic systems shall be assessed at 45% of the fee generated by the declared valuation and the per unit electrical item cost SWIMMING POOLS Valuation based on actual construction cost. Minimum Valuation: SPAS Minimum Valuation Prefabricated Gunite Permit fees same as Building Permits. $14,767.77 SURCHARGE FEES Optical Records System - Per Permit General Plan Maintenance - 10% permit surcharge to recover 50% of costs Permit Automation Fee Page 6 of 42 $2,953.55 $5,929.48 $12 Variable $24 Proposed 2010-2011 Cost Per S.F. Avg. $55.04 $106.06 $64.44 $134.25 $45.65 $64.44 $83.24 $103.37 $122.17 $139.62 $17,721.33 $3,544.27 $7,115.38 $14.40 $28.80 City of Azusa Schedule of Fees and Charges (Developer Only) 2010-2011 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT $27.78 BUILDING AND SAFETY $ 501.00 to $2,000.00 Adopted Proposed Area 2009-2010 2010-2011 Item Description Cost Per Cost Per S.F. Avg. S.F. Avg. S-2 BUILDING PERMIT FEES $81.86 Permit Issuance $73 $87.60 TOTAL VALUATION $1.00 to $500.00 $27.78 $33.33 $ 501.00 to $2,000.00 $27.78 $33.33 For the 1st $500.00 plus $3.33 for ea. additional $100.00, or fraction thereof, to and including $2,DDD.00 $2,001.00 to $25,000.00 $81.86 $98.23 For the 1st $2,000.00 plus $15.28 for ea, additional $1,000.00, or fraction thereof, to and including $25,000.00 $25,001.00 to $50,000.00 $462.48 $554.98 For the 1st $25,000.00 plus $11.02 for ea. additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $760.95 $913.14 For. the 1st $50,000.00 plus $7.64 for ea. additional $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $ 500,000.00 $1,174.67 $1,409.61 For the 1st $100,000.00 plus $6.11 for ea. additional $1,000.00, or fraction thereof, to and including $500,000.00 $500,001.00 to $1,000,000.00 $3,822.49 $4,586.99 For the 1st $500,000.00 plus $5.18 for ea, additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $6,629.89 $7,955.87 For the 1st $1,000,000.00 plus $3.44 for ea. additional $1,000.00, or fraction thereof Other Inspections and Fees: 1. Inspections outside of normal business hours (per hour) $55.56 $66.67 (minimum charge - two hours) 2. Reinspection fees accessed under provisions of Section 305.8 (per hour) $55:56 $66.67 3. Inspections for which no fee is specifically indicated (per hour') $55.56 $66.67 (minimum charge - one-half hour) 4. Additional plan review required by changes, additions or revisions to plans $55.56 $66.67 (per hour) (minimum charge - one-half hour) 5. For use of outside consultants for plan checking and inspections, or both Actual cods' Actual costs' ' Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employee involved. 2 Actual costs include administrative and overhead costs. Page 7 of 42 City of Azusa Schedule of Fees and Charges (Developer Only) 2010-2011 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENTICOMMUNITY IMPROVEMENT BUILDING AND SAFETY Page 8 of 42 Adopted Proposed Area 2009-2010 2010.2011 Item Description Cost Per Cost Per S.F. Avg. S.F. Avg. S-3 ELECTRICAL PERMIT FEES Area Fee Rate - Single Family Dwellings (Rate x area/sq ft) $0.0880 $0.11 Unit Fee Schedule (note: does not include Permit Issuance Fee) Receptacle, Switch and Lighting, or other. For receptacle, switch lighting, smoke detectors, or other outlets, at which. current is used or controlled except services, feeders and meter: First 20, each $1.33 $1.60 Additional outlets, each $0.88 $1.06 (NOTE- For multi -outlet assemblies, each 5 ft. or fraction may be considered as 7 outlet.) ' LIGHTING FIXTURES For lighting fixtures, sockets, or other lamp holding devices: First 20, each $1.33 $1.60 Additional fixtures, each $0.88 $1.06 For pole or platform mounted lighting fixtures, each $1.33 $1.60 For theatrical -type lighting fixtures or assemblies each $1.33 $1.60 RESIDENTIAL APPLIANCES For fixed residential appliances or receptacle outlets for same, including wall - mounts electric ovens, counter -mounted cooking tops, electric ranges, self- contained room, console, or through -wall air conditioners, space heaters, food waste grinders, dishwasher $6.21 $7.45 (NOTE: For other types of air conditioners and other motor -driven appliances having larger electrical ratings, see Power Apparatus) TEMPORARY POWER SERVICE For a temporary service power pole or pedestal, including all pole or pedestal mounted receptacle outlets and appurtenances, each $26.59 $31.91 For a temporary" distribution system and temporary lighting and receptacle outlets for construction sites, decorative lighting, Christmas tree sales lots, firework stands, sales booths, additional pole, etc., each $12.41 $14.89 NON-RESIDENTIAL APPLIANCES For residential appliances and self-contained, factory -wired, non-residential appliances not exceeding one (1) horsepower (HP), kilowatt (KW), or kilovolt - ampere (KVA) in rating, including medical and dental devices, food, beverage, and ice cream cabinets $7.09 $8.51 Page 8 of 42 City of Azusa Schedule of Fees and Charges (Developer Only) 2010-2011 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENTICOMMUNITY IMPROVEMENT BUILDING AND SAFETY Page 9 of 42 Adopted Proposed Area 2009-2010 2010-2011 Item Description Cost Per Cost Per S.F. Avg. S.F. Avg. POWER APPARATUS For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, as follows: Rating in horsepower (HP), kilowatts (KW), kilovolt -amperes (KVA), or kilovolt - amperes -reactive (KVAR) Up to and including 1, each $7.09 $8.51 Over 1 and not over 10, each $12.41 $14.89 Over 10 and not over 50, each $31.92 $38.30 Over 50 and not over 100, each $63.83 $76.59 Over 100, each $106.38 $127.66 NOTE: 1. For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined refinp may be used. NOTE: 2. These fees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment. BUSWAYS For trolley and plug-in type busways, each 100 feet or fraction thereof $17.73 $21.28 (NOTE An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in type busways.) SIGNS, OUTLINE LIGHTING, AND MARQUEES For signs, outline lighting systems, or marquees supplied from one branch circuit, each $26.59 $31.91 For additional branch circuits within the same sign outline lighting system, or marquee, each $8.86 $10.63 SERVICES, SWITCHBOARDS, SWITCHBOARD SECTIONS, MOTOR CONTROL CENTERS AND PANELBOARDS For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less & not over 200 amperes in rating, ea. $26.59 $31.91 For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less and not over 200 amperes 1,000 amperes in rating, each $53.20 $63.84 For services, switchboards, switchboard sections, motor control centers and panelboards over 600 volts or over 1,000 amperes in rating, each $124.12 $148.94 MISCELLANEOUS APPARATUS, CONDUITS AND CONDUCTORS For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth $26.59 $31.91 (NOTE: This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment. Page 9 of 42 City of Azusa Schedule of Fees and Charges (Developer Only) 2010.2011 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Each plumbing fixture or trap or set of fixtures on one trap (including drainage vent, water piping and backflow prevention devices therefore) Adopted Proposed Area 2009-2010 2010-2011 Item Description Cost Per Cost Per kitchen type grease interceptors functioning as fixtures traps S.F. Avg. S.F. Avg. PRIVATE SWIMMING POOLS For new private, residential, inground swimming pools for single, or multi- $10.64 $12.77 family occupancies, including a complete system of necessary branch circuit wiring, bonding, grounding underwater lighting, water pumping and other $10.64 $12.77 similar electrical equipment $53.20 $63.84 For other types of swimming pools, therapeutic whirlpools, spas, hot tubs and $3.55 $4.26 alterations to existing swimming pools, each $35.47 $42.56 CARNIVALS AND CIRCUSES $35.47 $42.56 Carnivals, circuses and other traveling shows or exhibitions utilizing $10.64 $12.77 transportable -type rides, booths, displays and attractions. For electrical generators and electrical driven rides, each $26.59 $31.91 For mechanically driven rides and walk-through attractions or displays having $10.64 $12.77 electric lighting, each $10.64 $12.77 For a system of area and booth lighting, each $10.64 $12.77 For permanently installed rides, booths, displays, and attractions $10.64 $12.77 OTHER INSPECTIONS $29.55 $35.46 For inspection of electrical equipment for which no fee is herein set forth, the $2.66 $3.20 fee shall be determined by the Building Official S-4 PLUMBING FEES Each plumbing fixture or trap or set of fixtures on one trap (including drainage vent, water piping and backflow prevention devices therefore) $10.64 $12.77 Each permanent type dishwasher whether individually trapped or not $10.64 $12.77 Each industrial waste pretreatment interceptor including it's trap & vent, except kitchen type grease interceptors functioning as fixtures traps $10.64 $12.77 Each swimming pool drainage trap & receptor whether connected to a building drain or building sewer (water supply for pool not included) $10.64 $12.77 Each gas piping system of 1 to 5 outlets or alteration or retest of existing gas piping system $10.64 $12.77 Each additional outlet over five $2.66 $3.20 Each gas pressure regulator other than appliance regulators $3.55 $4.26 Each water heater and/or vent $10.64 $12.77 Each solar potable water heating system, including water heater/vent $35.47 $42.56 For repair or alteration of drainage and/or vent piping $10.64 $12.77 Each piece of water -treating equipment and/or water piping installed without accompanying plumbing $10.64 $12.77 Lawn sprinkler systems on 1 meter including backflow prevention devices $10.64 $12.77 Backflow prevention devices on unprotected water supplied, pools, tanks, vats, etc. (including incidental water piping) 1 to 5 $10.64 $12.77 Any swimming pool piping associated wit the construction, remodeling or repair of a swimming pool, spa and hot tub $29.55 $35.46 Each additional device over five (5) $2.66 $3.20 Page 10 of 42 City of Azusa Schedule of Fees and Charges (Developer Only) 2010-2011 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENTICOMM UNITY IMPROVEMENT BUILDING AND SAFETY Page 11 of 42 Adopted Proposed Area 2009-2010 2010.2011 Item Description Cost Per Cost Per S.F. Avg. S.F. Avg. S-4 PLUMBING FEES Each building drain installed without accompanying plumbing $10.64 $12,77 For connection of a house sewer to a public sewer or the extension of a house lateral onto a lot for future use $30.14 $36.17 For each house sewer manhole $30.14 $36.17 Each installation of a section of house sewer for future use $19.50 $23.40 For the connection of.each additional bldg, or work to house sewer $19.50 $23.40 For the connection of a house sewer to a private sewage disposal system $19.50 $23.40 For each private sewage disposal system (septic tank & seepage pit or pits and/or drainfield) $62.06 $74.47 For each cesspool, overflow seepage pit, percolation test pit, swimming pool drywell, or drainfield extension or replacement $30.14 $36.17 For disconnection, abandonment, alteration or repair of any house sewer or private sewage disposal system or part thereof $19.50 $23.40 S-5 MECHANICAL PERMIT FEES Installation, alteration or relocation of each refrigeration compressor or absorption unit, & each fuel burning furnace, heater, boiler, and vented decorative appliance. including vents attached thereto: Up to & including 100,000 BTU $17.73 $2128 More than 100,000 BTU to & including 1,000,000 BTU $35.47 $42.56 More than 1,000,000 BTU $88.65 $106.38 For each air inlet & air outlet served by any air conditioning system $3.11 $3.73 For each 1,000 sq.ft. or fraction thereof of conditioned area $24.83 $29,79 Note: When a permit is applied for and the total number of air inlets & air outlets is unknown, the fees shall be based on the sq.R. of conditioned area. For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit $8.86 $10.63 For the installation or alteration of each air handling unit for air conditioning including ducts attached thereto: Up to & including 2,000 CFM - Each unit up to 10 $8.86 $10.63 Each unit over 10 $2.66 $3.20 More than 2,000 CFM to and including 10,000 CFM $26.62 $31.94 More than 10,000 CFM $44.33 $53.19 Note: This fee shall not apply loan air handling unit which is a portion of a factory assembled air conditioned appliance for which a permit is required elsewhere in this Code. For each evaporative cooler other than portable type $14.19 $17.02 For required ventilation fans which serve a single register: Each fan up to 10 $10.64 $12.77 Each fan over 10 $3.55 $4.26 For each required ventilation system which is not a portion of any air conditioning system for which a permit is required elsewhere in this Code $21.28 $25.53 Page 11 of 42 City of Azusa Schedule of Fees and Charges (Developer Only) 2010-2011 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENTICOMMUNITY IMPROVEMENT BUILDING AND SAFETY Area Item Description S-5 MECHANICAL PERMIT FEES For the installation or each commercial kitchen hood or spray booth served by mechanical exhaust, including the fans and ducts attached thereto For the installation of each fire damper Alteration of existing duct system where a permit is not required elsewhere Note: 1) for refrigeration system rating one horsepower, one ton, or 12, 000 BTU per hour shall mean the same quantity Note: 2) for steam boilers rated in boiler horsepower, one horsepower shall equal 60, 000 BTU perhour PLAN CHECK FEES Building Plan Check Fee - 85% of Permit Fee - $15.00 minimum Electric Plan Check Fee - 80% of Permit Fee - $15.00 minimum Energy Plan Check Fee - 10% of Building Permit Fee Mechanical Plan Check Fee - 80% of Permit Fee - $15.00 minimum Plumbing Plan Check Fee - 80% of Permit Fee - $15.00 minimum Page 12 of 42 Adopted Proposed 2009-2010 2010.2011 Cost Per Cost Per S.F. Avg. S.F. Avg. $44.33 $53.19 $7.09 $8.51 $17.73 $21.28 City of Azusa Schedule of Fees and Charges Developer Only 2010-2011 Exhibit 1.2 BUILDING AND SAFETY Page 13 of 42 Approved Adopted Proposed Area 2008-2009 2009-2010 2010-2011 Item Description Fee/Unit Fee/Unit Fee/Unit S-045 Grading Plan Check Fee Variable Variable Variable <100 CY - $865 100-1,000 CY - $865 plus $14 per 100 CY 1,000 - 10,000 CY - $991 plus $74 per 1,000 CY 10,000 - 50,000 CY - $1,657 plus $17 per 1,000 CY 50,000+ CY - $2,337 plus $231 per 10,000 CY S-046 Grading Inspection Variable Variable Variable <100 CY - $345 100-1,000 CY - $345 plus $48 per 100 CY 1,000 - 10,000 CY - $777 plus $72 per 1,000 CY 10,000 - 50,000 CY - $1,425 plus $B7 per 1,000 CY 50,000+ CY - $4,905 plus $570 per 10,000 CY Grading Permit Fee - Based on Cubic Yards $130 $130 $156 Permit Fee for Changes to Original Permit: $83 $83 $100 $20,001 to $50,000 $83 $83 $100 $50,001 to $75,000 $112 $112 $134 $75,001 to $100,000 $171 $171 $205 $100,001 to $200,000 $224 $224 $269 $200,000 to $500,000 $289 $289 $347 $500,001 and up $354 $354 $425 Special Site Inspection $65 $65 $78 Commercial - Minimum 2 hours $130 $130 $156 Residential - Minimum 2 hour $130 $130 $156 Residential(non-habitable space) -Min. 2 hours $124 $124 $149 Occupancy Inspection Fee: 0-1 to 15,000 sq ft -1/2 hour of technical staff time $35 $35 $42 15,000 sq.ft. on - 1 hour of technical staff time $65 $65 $78 Bonds for Sign(s) - Refundable $195 $195 $234 Demolition Permit Fee - Minimum 1 hour $76 $76 $91 Deputy Inspection Registration Fee - Deputy $35 $35. $42 Emergency Inspection Fee - Minimum 1 hours $106 $106 $127 Hearing Officer Actual Cost Actual Cost Actual Cost Pre -Plan Check Submittal - Minimum 2 hours $135 $135 $162 Reinspection Fee - Minimum 1 hour $71 $71 $85 Room Addition Plan Check Fee - Minimum 2 hours $135 $135 $162 Trailer Coach $130 $130 $156 Trash Enclosure - $10 for additional enclosure $53 $53 $64 Page 13 of 42 City of Azusa Schedule of Fees and Charges Developer Only 2010-2011 Exhibit 1.2 BUILDING AND SAFETY On-site Improvement.Inspections: $2,000 deposit required for parking lot paving and miscellaneous testing Professional Staff - per hour Rates applied against deposit Technical Staff - per hour Rates applied against deposit Standard Plan check fee: Professional Staff - per hour Technical Staff - per hour Page 14 of 42 Adopted Approved Area 2008-2009 Item Description Fee/Unit Relocation of Buildings: $367 0 to 2,000 sq.ft. $306 2,001 to 5,000 sq.ft. $573 5,001 sq.ft. and up $826 Plan Checking Fee: Staff rates assessed against deposit. Executive Staff - per hour $118 Professional Staff - per hour $84 Technical Staff (Plan Checker/Inspector) - per hour $71 On-site Improvement.Inspections: $2,000 deposit required for parking lot paving and miscellaneous testing Professional Staff - per hour Rates applied against deposit Technical Staff - per hour Rates applied against deposit Standard Plan check fee: Professional Staff - per hour Technical Staff - per hour Page 14 of 42 Adopted Proposed 2009-2010 2010-2011 Fee/Unit Fee/Unit $306 $367 $573 $688 $826 $991 $118 $142 $84 $101 $71 $85 $71 $84 $65 $71 $84 $71 $101 $85 $101 $85 City of Azusa Schedule of Fees and Charges - Developer Only 2010-2011 Exhibit 2 PLANNING AND ENGINEERING Page 15 of 42 Approved Adopted Proposed Area 2008-2009 2009-2010 2010-2011 Item Description Fee/Unit Fee/Unit Fee/Unit S-001 Zoning Clearance $56 $56 $45 S-002 Minor Design Review (over the counter) $360 .$360 $1,165 S-003 Staff Level Design Review $1,431 $1,431 $3,110 Reduced to $350 for modifications to existing structures S-004 Major Design Review (Deposit) $5,100 (D) $6,100 (D) $10,000 (D) S-005 Use Permit Major UP $4,255 $4,255 $4,350 Minor UP $1,040 $1,040 S -005A Minor Use Permit - $715 S-006 UP Modifications Modifications to Major UP $1,926 $1,926 $2,035 Modifications to Minor UP $455 $455 $510 S-008 Minor Variance $738 $738 $820 S-009 Variance $4,384 $4,384 $4,105 $940 when Single Family Structure is involved S-010 Zone Change $5,000(D) $5,000(D) $5,000(D) S-011 Development Code Amendment N/A N/A $5,000 (D) S-012 Development Agreement $8,100 (D) $8,100 (D) $10,000 (D) Annual Monitoring $4,000 (D) $4,000 (D) $5,000 (D) Deposit for charges at fully allocated hourly rates. All costs recovered. S-013 General Plan Amendment $10,200 (D) $10,200 (D) $15,000(0) Deposit for charges.al fully allocated hourly rates. All costs recovered. S-014 Specific Plan $8,200 (D) $8,200 (D) $10,000 (D) Deposit for charges at fullyallocatedhourly rates. All costs recovered. S-015 Specific Plan Amendment $4,000 (D) $4,000 (D) $5,000 (D) S-016 Tentative Parcel Map $2,050 $2,050 $5,735 S-017 Tentative Tract Map . 5-20 lots $3,066 $3,066 $6,210 20-50 lots $3,717 $3,717 $7,455 50-100 lots $5,189 $5,189 $10,310 100+ lots $6,660 $6,660 $11,590 Page 15 of 42 City of Azusa Schedule of Fees and Charges - Developer Only 2010-2011 Exhibit 2 PLANNING AND ENGINEERING Page 16 of 42 Approved Adopted Proposed Area 2008-2009 2009-2010 2010-2011 Item Description Fee/Unit Fee/Unit Fee/Unit 5-018 Reversion to Acreage $1,336 $1,336 $1,955 S-019 Lot Merger $502 $502 $1,255 S-020 Environmental Categorical Exemption Rev. $106 $106 $200 S-021 Environmental Initial Study $1,035 $1,035 $3,680 S-023 Environmental Impact Report Review $4,500 (D) $4,500 (D) $10,000 (D) Deposit for charges at fully allocated hourly rates. All costs recovered. S-024 Mitigation Monitoring - CEQA Monitoring $289 $289 Deposit Deposit for charges at fully allocated hourly rates. All costs recovered. determined by staff S-025 Annexation $6,300 (D) $6,300 (D) Deposit Deposit for charges at fully allocated hourly rates. determined by staff All costs recovered. S-026 Condominium Conversion Map $5,124 $5,124 $4,640 Plus Consultant fee 5-027 Minor Sign Review $59 $59 $45 S-028 Major Sign Review $479 $479 $470 5.029 Zoning Letter Single Family Residential N/A N/A $125 Other N/A NIA $285 5-030 Temporary Occupancy Review $420 $420 $475 5.031 Temporary Use Permit $467 $467 $445 25% discount for Azusa based non-profit organizations 5-032 Continuance Processing $544 $544 $465 5-033 Time Extension Review - Staff $367 $367 $320 S-034 Time Extension Review - Planning Commission $544 $544 $715 5-035 Appeal To Planning Commission $478 $478 $1,590 5-036 Appeal To City Council $726 $726 $2,530 5-15 Preliminary Plan Review $237 $237 $1,355 Per meeting - 50% of the fee for the 1st meeting applied against future Planning/Engineering fee for the project. Page 16 of 42 City of Azusa Schedule of Fees and Charges - Developer Only 2010-2011 Exhibit 2 PLANNING AND ENGINEERING Page 17 of 42 Approved Adopted Proposed Area 2008-2009 2009-2010 2010-2011 Item Description Fee/Unit Fee/Unit Fee/Unit S -15A Nonconforming Use Time Extension $703 $703 $703 S-037 Certificate of Compliance $927 $927 $1,085 S-038 Street Name Processing W/O Map $916 $916 $1,085 S-039 Street Re -Name Processing $1,561 $1,561 $1,495 S-040 Building Address Processing W/O Map $319 $319 $620 S-041 Building Re -Address Processing $449 $449 $365 S -041A Com Dev Newspaper Publication NIA N/A $215 S-044 Special Building Inspection $213 $213 $110 2 hour minimum S-047 Public/Private Improvement Plan Check Variable Variable Variable $0-$100,000 - 3% of the estimated construction cost next $400,000 - 2.5% of the estimated construction cost amounts over $500,000 - Deposit of 2% of the estimated construction cost S-048 Public/Private Improvement Inspection Variable Variable Variable $04100,000 - 5% of the estimated construction cost next $400,000 - 3.5% of the estimated construction cost amounts over $500,000 - Deposit of 2% of the estimated construction cost S-649 Final Parcel Maps: $1,477 $1,477 $1,760 City Fee $1,060 County Fee $700 S-050 Final Maps: Map Analysis for Tracts: 1 - 5 Lots City Fee $963 County Fee $710 $1,673 $1,673 N/A 6 -10 Lots City Fee $1,001 County Fee $915 $1,916 $1,916 NIA 5 - 10 Lots City Fee $1,685 County Fee $915 NIA N/A $2,600 11 - 25 Lots City Fee $2,665 County Fee $1,350 $2,429 $2,429 $4,015 26 - 50 Lots City Fee $3,510- County Fee $2,200 $3,434 $3,434 $5,710 51 - 100 Lots City Fee $5,390 County Fee $3,300 $4,734 $4,734 $8,690 101 - 150 Lots City Fee $6,160 County Fee $5,000 $6,743 $6,743 $11,160 151 or more Lots City Fee $7,440 County Fee $6,600 $8,635 $8,635 $14,040 Page 17 of 42 City of Azusa Schedule of Fees and Charges - Developer Only 2010-2011 Exhibit 2 PLANNING AND ENGINEERING Area Item Description 5-051 Easement Checking for Tract Maps City Fee $295 County $210 Easement Checking for Parcel Maps City Fee $295 County $175 5-052 Monument Inspection each City Fee $205 County $125 S-053 Bond Processing City Fee $85 County $75 S-054 Tax Clearance Processing: 5 yr history (provided by County) City Fee $115 County $625 5-055 Lot Line Adjustment 5-056 Street/ROW Abandonment Proc. Deposit for charges at fully allocated hourly rates. All costs recovered. 5-056A SUSMP Plan Review 5-0568 SWPPP Plan Review 5-056C Hydrology/Traffic/Soils Report Rev Deposit for charges at fully allocated hourly rates. All costs recovered. 5-056D Drainage Plan Review $0-$100,000 - 3% of the estimated construction cost next $400,000 - 2.5% of the estimated construction cost amounts over $500,000 - Deposit of 2% of the estimated construction cost 5-057 Sidewalk/Curb/Gutter: Up to 75 LF Additional 75 LF, no deposit 5-057A Driveway Approach/Street Cut: Up to 100 SF Additional 100 SF, no deposit S-058 Obstruction Permit 5-059 Transportation Permits (oversized and/or overweight trucks): Single Trip/Rider Fee set by state Annual Permit Fee set by state S-060 House Moving Permit Page 18 of 42 Approved Adopted 2008-2009 2009-2010 Fee/Unit Fee/Unit $561 $561 $521 $521 $332 $332 $148 $148 $797 $797 Proposed 2010-2011 Fee/Unit $505 $470 $330 $160 $740 $1,051 $1;051 $1,205 $1,307 $1,307 $2,000(D) N/A N/A $1,600 N/A N/A $1,490 N/A N/A $1,500(D) N/A N/A Variable $183 $183 $475 $59 $59 $155 $183 $183 $475 $59 $59 $205 $65 $65 $85 $18 $18 $18 $98 $98 $98 $231 $231 $940 City of Azusa Schedule of Fees and Charges - Developer Only 2010-2011 Exhibit 2 PLANNING AND ENGINEERING Area Item Description S -060A Industrial Waste Permit NewfModification Annual 5-0608 Fats,Oiis and Grease Program New Annual 5-061 Sewer Saddle Sewer Dye Test Sewer Blockage Check 5-062 Blueprint/Map Copy Service, per sheet $20 or actual outside costs S-063 Real Property Records Report Condominium/Townhouses Vacant/Unimproved Land Single Family Dwellings Multi -Family Dwelling - per parcel (plus $10 for add'I unit) Commercial Properties 5-064 Residential Rental Housing Registration and Inspection: Per parcel - includesfirst unit (plus $7 for add'I unit) Reinspection - $85 S-065 Lien Release Substanard - $100 Admin Fine - $80 Page 19 of 42 Approved Adopted Proposed 2008-2009 2009-2010 2010-2011 Fee/Unit Fee/Unit Fee/Unit N/A N/A $620 N/A NIA $205 N/A N/A $410 NIA N/A $155 $243 $243 $290 See Exhibit 7 - Utility See Exhibit 7 - Utility $19 $19 $20 $30 $30 $50 $143 $143 $160 $143 $143 $160 $143 $143 $160 $143 $143 $160 $54 $54 $105 $65 $65 Variable City of Azusa Schedule of Fees and Charges - Developer Only 2010-2011 Exhibit 2 PLANNING AND ENGINEERING Approved Adopted Proposed Area -2008-2009 2009-2010 2010-2011 Item Description. Fee/Unit Fee/Unit Fee/Unit S-066 Admin. Hearing Appeal $201 $201 $250 CityFee $225 Court$25 5-066A Public Nuisance Admin Hearing N/A $75 $325 Refunded if the appelant prevails 5-066B Cost Recovery Hearing N/A $38 $120 Refunded if the appelant prevails S -066C Code Enforcement Fines First Offense $50 $50 $100 Second Offense $250 $250 $250 ThirdOffence$500 $500 $500 Project Plans/Specifications - Plus $10 if mailed $48 $48 $48 5-3.1 Block Wall Permit Verification of Conditions: County $172 $172 $172 City $148 $148 $148 Agreement and/or Improvement Security, each $195 $195 $195 Extension Time for Improvement Agreement, each $266 $266 $266 Fourth Submittal Originals/Prints $367 $367 $367 Sixth Submittal or Originals/Prints $1,288 $1,288 $1,288 Eighth and each subsequent submittal of originals/prints $1,536 $1,536 $1,536 Minor Land Divisions: Lot Split $544 $544 $544 Recording Fee: First Sheet $7 $7 $7 .Additional sheets, each $2 $2 $2 LOMA Surcharge (County maps only): Tract Map $367 $367 $367 Parcel Map $124 $124 $124 Overtime: Tract Map - $1,229 $1,229 $1,229 Parcel Map $857 $857 $857 S-6.3 Staff Rates: Director of Public Works - per hour $160 $160 $183.31 City. Engineer - per hour $140 $140 $150.87 Principal City Engineer- per hour $120 $120 $127.86 Assistant City Engineer- per hour $107 $107 $84.96 Associate City Engineer- per hour $97 $97 $146.04 Public Works Inspector- per hour $87 $87 $102.12 Consultant (Invoice + 36% Overhead) Variable Variable Page 20 of 42 City of Azusa Schedule of Fees and Charges - Developer Only 2010-2011 Exhibit 2 PLANNING AND ENGINEERING Area Item Description S-6.5 Code Compliance Fee S-7 Landscape Design Standards (Over the Counter Sales) S-18 City -provided Tree Planting - One 15 gallon Tree City -provided Tree Planting - One 24" Box Tree S-95.1 Recovery & Storage of Abandoned Shopping Carts Page 21 cf 42 Approved Adopted Proposed 2008-2009 2009-2010 2010-2011 Fee/Unit Fee/Unit Fee/Unit $35 $35 $35 $6 $6 $6 $100 $100 $100 $172 $172 $172 $11 $11 $11 City of Azusa Schedule of Fees and Charges Developer Only 2D10-2011 Exhibit 3 FIRE SAFETY" Miscellaneous Fire Fees - per hour Residential Inspection per Sec. 13146.2 of H&S Code Approved Adopted Proposed Area 2008-2009 2009-2010 2010.2011 Item Description Fee/Unit Fee/Unit FeelUnit 5-1.1 Fire Safety- Fee per Hour: $0 $96 $96 Fire Plan Check $0 $96 $96 Fire Alarm System $0 $96 $96 Fire Extinguisher Service $0 $96 $96 Flammable Storage $0 $96 $96 Hood System $0 $96 $96 Spray Booths $0 $96 $96 Subdivision Plan Checking $0 $96 $96 Fire Permit Fees Occupancy Inspection - per hour $0 $96 $96 Christmas Tree Lot Inspection - per hour $0 $96 $96 Circus/Carnival Inspection - Minimum 2 hours $0 $192 $192 Flammable Liquid Tank Site Inspection - Minimum 3 hours $0 $287 $287 Liquid Petroleum Gasses - per hour $0 $96 $95 Magnesium Working - Minimum 2 hours $0 $192 $192 Motor Vehicle Repair Garages - per hour $0 $96 $96 Oxygen System Installation - Minimum 2 hours $0 $192 $192 Storage/Handling Flammable Liquids - Minimum 2 hours $0 $192 $192 Underground Tank Installation - Minimum 4 hours $0 $384 $384 Underground Tank Removal - Minimum 3 hours $0 $287 $287 Fireworks Stands - Minimum Y: hour $0 $49 $49 Metal Foundry - Minimum 2 hours $0 $192 $192 Places of Assembly - Minimum 2 hours $0 $192 $192 Pyrotechnical Special Effects - per hour $0 $96 $96 Public Rifle/Gun Ranges - Minimum 2 hours $0 $192 $192 Tire Storage Areas in Excess of 1,000 cu. ft. - per hour $0 $96 $96 Automobile Dismantling/Storage Yards- Minimum 2 hours $0 $192 $192 Commercial Woodworking Facilities with Dust Collection Systems Greater than 25 gallons - Minimum 2 hours $0 $192 $192 Educational/Daycare Centers - Minimum 3 hours $0 $287 $287 Miscellaneous Fire Fees - per hour Residential Inspection per Sec. 13146.2 of H&S Code $0 $96 $96 Engine Company Standby $0 $96 $96 Hazardous Materials Response $0 $96 $96 Special Inspections $0 $96 $96 Weed Abatement (Processing & Referral) $0 $96 $96 -- Not included in fee study. Fees determined by County Fire Dept Page 22 of 42