HomeMy WebLinkAboutResolution No. 12-C37RESOLUTION NO. 12-C37
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA,
CALIFORNIA, ESTABLISHING CERTAIN DEVELOPMENT PROJECT FEES
AND SERVICE CHARGES
WHEREAS, Chapter 8 (commencing with section 66016) of Division 1 of Title 7 of the
California Government Code establishes a procedure for adopting fees or service charges for
development projects; and
WHEREAS, the City Council of the City of Azusa has determined that the cost of providing
certain facilities or services is not of general benefit, but of special benefit to the applicant seeking to
process a development application; and
WHEREAS, the City Council has further determined that developer contribution in the form
of development impact fees is necessary to offset the impact of future development on already -
established community facilities and services and to maintain the current levels of services for these
public facilities; and
WHEREAS, the City is authorized to impose fees which will cover but do not exceed the
estimated reasonable cost of providing the service or facility for which the fee is imposed; and
WHEREAS, current fees charged for community development services or facilities do not
fully recover the actual cost of providing the such services; and
WHEREAS, Government Code sections 66016 and 66018 provide that the City may adopt
new fees or increase existing fees after providing notice and holding a public hearing; and
WHEREAS, notice of a public hearing on the establishment of new and increased fees was
published in accordance with provisions of section 6062a of the California Government code;
WHEREAS, notice of public hearing was mailed to all interested parties who filed a written
request for a mailed notice with the City;
WHEREAS, on June 18, 2012, at the time and place specified in the published and mailed
notices, the City Council held a public hearing as required by law to allow oral or written
presentations prior to levying new fees or service charges and prior to approving an increase in
existing fees or service charges; and
WHEREAS, at least ten (10) days prior to the commencement of the hearing, there was
made available to the public a report containing the cost, or estimated cost, of providing the service
for which the fee or service charge will be levied, and the revenue sources for providing such
services; and
WHEREAS, based upon evidence provided, the City Council hereby determines that the fees
set forth in the Schedule of Fees and Charges for Fiscal Year 2012/2013 attached hereto and
incorporated herein by reference will not exceed the estimated reasonable cost of providing the
community development services and facilities for which the fee is charged; and
WHEREAS, the proposed fees are statutorily and categorically exempt from the
requirements of the California Environmental Quality Act since citing these fees fits within the
statutory exemptions for local agency decisions involving the adoption and collection of rates, tolls
and other charges, pursuant to Public Resources Code Section 21080(b)(8) and Section 15273 of the
California Environmental Quality Act Guidelines.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AZUSA,
CALIFORNIA, DOES FIND AND DECLARE THAT:
SECTION 1. Adoption of Schedule of Fees. The City Council hereby adopts a fee schedule
for the services set forth in the Schedule of Fees and Charges for Fiscal Year 2012/2013 attached
hereto and incorporated herein by reference.
SECTION 2. Collection of Fees. That the City is authorized to collect the user fees set forth
herein.
SECTION 3. Effective Date. This resolution shall become effective sixty (60) days from its
adoption.
PASSED, APPROVED AND ADOPTED ON JUNE 18, 2012.
kJoseph R. Rocha, Mayor
I HEREBY CERTIFFY that the foregoing Resolution No. 12-C37, was duly adopted at a
regular meeting of said City Council on the 18th day of June 2012, by the following vote of the
Council:
AYES: COUNCILMEMBERS: GONZALES, CARRILLO, MACIAS, HANKS, ROCHA
NOES: COUNCILMEMBERS: NONE
ABSENT: COUNCILMEMBERS: NONE
Vera Mendoza, City Clerk
City of Azusa
Schedule
of Fees and Charges (Developer Only)
2012-2013
Exhibit - 1
ECONOMIC & COMMUNITY
DEVELOPMENT/COMMUNITY IMPROVEMENT
BUILDING AND SAFETY
Adopted
Proposed
Area
2011-2012
2012-2013
Item Description
Cost Per
Cost Per
S.F. Avg.
S.F. Avg.
S-1 BUILDING VALUATION
APARTMENT HOUSES:
Type I or II F.R.
$129.97
$132.57
Good
$160.01
$163.21
Type V - Masonry
(or Type III)
$106.09
$108.21
Good
$129.97
$132.57
Type V - Wood Frame
$93.49
$95.35
Good
$120.15
$122.56
Type I - Basement Garage
$54.80
$55.90
AUDITORIUMS:
Type I or II F.R.
$153.56
$156.63
Type II - 1 hour
$111.22
$113.44
Type II - N
$105.21
$107.31
Type III - 1 hour
$116.93
$119.27
Type III - N
$110.92
$113.14
Type V - 1 hour
$111.80
$114.04
Type V - N
$104.33
$106.41
BANKS:
Type I or II F.R.
$217.01
$221.35
Type II - 1 hour
$159.86
$163.06
Type II - N
$154.73
$157.83
Type III - 1 hour
$176.42
$179.95
Type III - N
$170.12
$173.52
Type V - 1 hour
$159.86
$163.06
Type V - N
$153.12
$156.18
BOWLING ALLEYS:
Type II - 1 hour
$74.73
$76.22
Type 11 - N
$69.75
$71.14
Type III - 1 hour
$81.32
$82.95
Type III - N
$76.05
$77.57
Type V - 1 hour
$54.80
$55.90
CHURCHES:
Type I or II F.R.
$145.36
$148.26
Type ll - 1 hour
$109.16
$111.35
Type II - N
$103.74
$105.82
Type III - 1 hour
$118.69
$121.06
Type III - N
$113.41
$115.68
Type V - 1 hour
$110.92
$113.14
Type V - N
$104.33
$106.41
CONVALESCENT HOSPITALS:
Type I or 11 F.R.
$203.97
$208.05
Type II - 1 hour
$141.55
$144.38
Type 111 - 1 hour
$145.06
$147.96
Type V - 1 hour
$136.71
$139.45
Page 1 of 43
City of Azusa
Schedule of Fees and Charges (Developer Only)
2012-2013
Exhibit - 1
ECONOMIC & COMMUNITY DEVELOPMENTICOMMUNITY IMPROVEMENT
BUILDING AND SAFETY
Adopted Proposed
Area
2011-2012
2012-2013
Item Description
Cost Per
Cost Per
S.F. Avg.
S.F. Avg.
DWELLINGS:
Type V - Masonry
$110.92
$113.14
Good
$141.98
$144.82
Type V - Wood Frame
$98.61
$100.59
Good
$135.40
$138.11
Basements -
Semi -Finished
$29.45
$30.04
Good
$33.99
$34.67
Unfinished
$21.39
$21.82
Good
$25.93
$26.45
FIRE STATION:
Type I or II F.R.
$167.63
$170.98
Type II - 1 hour
$110.34
$112.54
Type II - N
$104.04
$106.12
Type III - 1 hour
$120.74
$123.15
Type III - N
$115.61
$117.92
Type V - 1 hour
$113.27
$115.53
Type V - N
$107.41
$109.55
HOMES FOR THE ELDERLY:
Type I or II F.R.
$151.95
$154.99
Type II - 1 hour
$123.38
$125.84
Type 11 - N
$118.10
$120.46
Type III - 1 hour
$128.51
$131.08
Type III - N
$123.23
$125.69
Type V - 1 hour
$124.11
$126.59
Type V - N
$119.86
$122.26
HOSPITALS:
Type I or II F.R.
$239.13
$243.92
Type III - 1 hour
$197.96
$201.92
Type V - 1 hour
$188.88
$192.65
HOTELS AND MOTELS:
Type I or II F.R.
$147.99
$150.95
Type III - 1 hour
$128.21
$130.78
Type III - N
$122.20
$124.65
Type V - 1 hour
$111.65
$113.89
Type V - N
$109.46
$111.65
INDUSTRIAL PLANTS:
Type I or II F.R.
$83.37
$85.04
Type 11 - 1 hour
$58.03
$59.19
Type II - N
$53.34
$54.40
Type III - 1 hour
$63.89
$65.16
Type III - N
$60.22
$61.43
Tilt -up
$43.96
$44.84
Type V - 1 hour
$60.22
$61.43
Type V - N
$55.09
$56.20
Page 2 of 43
City of Azusa
Schedule of Fees and Charges (Developer Only)
2012-2013
Exhibit -1
ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT
BUILDING AND SAFETY
Adopted Proposed
Area
2011-2012
2012-2013
Item Description
Cost Per
Cost Per
S.F. Avg.
S.F. Avg.
JAILS:
Type I or II F.R.
$233.13
$237.79
Type III - 1 hour
$213.20
$217.46
Type V - 1 hour
$159.86
$163.06
LIBRARIES:
Type I or II F.R.
$170.56
$173.97
Type II - 1 hour
$124.84
$127.34
Type II - N
$118.69
$121.06
Type III - 1 hour
$131.88
$134.51
Type III - N
$125.28
$127.79
Type V - 1 hour
$123.82
$126.29
Type V - N
$118.69
$121.06
MEDICAL OFFICES:
Type I or II F.R.
$175.10
$178.60
Type II - 1 hour
$135.10
$137.80
Type II - N
$128.36
$130.93
Type III - 1 hour
$146.53
$149.46
Type III - N
$136.42
$139.15
Type V -1 hour
$132.17
$134.81
Type V - N
$127.48
$130.03
OFFICES
Type I or II F.R.
$156.49
$159.62
Type II - 1 hour
$104.77
$106.86
Type II - N
$99.79
$101.78
Type III - 1 hour
$113.12
$115.38
Type III - N
$108.14
$110.30
Type V - 1 hour
$105.94
$108.06
Type V - N
$99.79
$101.78
PRIVATE GARAGES:
Wood Frame
$35.61
$36.32
Masonry
$40.15
$40.95
Open Carports
$24.32
$24.81
PUBLIC BUILDINGS:
Type I or II F.R.
$180.82
$184.43
Type II - 1 hour
$146.53
$149.46
Type II - N
$140.08
$142.88
Type III - 1 hour
$152.10
$155.14
Type III - N
$146.82
$149.76
Type V - 1 hour
$139.20
$141.99
Type V - N
$134.22
$136.90
Page 3 of 43
City of Azusa
Schedule of Fees and Charges (Developer Only)
2012-2013
Exhibit - 1
ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT
BUILDING AND SAFETY
Adopted Proposed
Area
2011-2012
2012-2013
Item Description
Cost Per
Cost Per
S.F. Avg.
S.F. Avg.
PUBLIC GARAGES:
Type I or II F.R.
$71.65
$73.09
Type I or II Open Parking
$53.78
$54.85
Type II - N
$41.03
$41.85
Type III - 1 hour
$54.22
$55.30
Type III - N
$48.21
$49.17
Type V - 1 hour
$49.38
$50.37
RESTAURANTS
Type III - 1 hour
$142.72
$145.57
Type III - N
$137.88
$140.64
Type V - 1 hour
$130.70
$133.32
Type V - N
$125.57
$128.09
SCHOOLS:
Type I or II F.R.
$162.94
$166.20
Type II - 1 hour
$111.22
$113.44
Type III - 1 hour
$118.98
$121.36
Type III - N
$114.44
$116.73
Type V - 1 hour
$111.51
$113.74
Type V - N
$106.38
$108.51
SERVICE STATIONS:
Type II - N
$98.47
$100.44
Type III - 1 hour
$102.72
$104.77
Type V - 1 hour
$87.48
$89.23
Canopies
$41.03
$41.85
STORES:
Type I or II F.R.
$120.74
$123.15
Type II - 1 hour
$73.85
$75.33
Type II - N
$72.24
$73.68
Type III - 1 hour
$89.82
$91.62
Type III - N
$84.25
$85.94
Type V - 1 hour
$75.61
$77.12
Type V - N
$69.89
$71.29
TOWN HOMES
Type V - Masonry
$126.91
$129.45
Type V -Wood Frame
$121.02
$123.44
Garage- Wood Frame
$49.39
$50.37
Garage- Masonry
$54.80
$55.90
THEATERS:
Type I or II F.R.
$160.89
$164.11
Type III - 1 hour
$117.22
$119.57
Type III - N
$111.65
$113.89
Type V - 1 hour
$110.34
$112.54
Type V - N
$104.33
$106.41
Page 4 of 43
City of Azusa
Schedule of Fees and Charges (Developer Only)
2012-2013
Exhibit - 1
ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT
BUILDING AND SAFETY
Adopted Proposed
Area
2011-2012
2012-2013
Item Description
Cost Per
Cost Per
S.F. Avg.
S.F. Avg.
WAREHOUSES
Type I or II F.R.
$72.39
$73.83
Type I or V - 1 hour
$42.93
$43.79
Type I or V - N
$40.30
$41.10
Type III - 1 hour
$48.65
$49.62
Type III - N
$46.30
$47.23
EQUIPMENT:
AIR CONDITIONING
Commercial
$6.15
$6.28
Residential
$5.13
$5.23
SPRINKLER SYSTEMS
$3.81
$3.89
OTHER VALUATIONS
REROOF
Asphalt and Comp - per square foot of material
$235.76
$240.48
Built-up - per square foot of material
$249.63
$254.62
Light -weight tile - per square foot of material
$644.88
$657.77
Concrete Tile or Slate Tile - per square foot of material
$776.62
$792.16
Metal Shingles - per square foot of material
$490.94
$500.76
Wood Shake - per square foot of material
$298.17
$304.13
Wood Shingle - per square foot of material
$287.07
$292.81
Rolled Roofing - minimum 300 sq.ft. allowed on patio covers only
$1,386.83
$1,414.56
Tear off and re -sheath - per square foot of material
$138.68
$141.46
TENANTIMPROVEMENTS
General Commercial
$36.06
$36.78
Restaurants
$41.60
$42.44
Medical Offices
$42.99
$43.85
RETAINING WALLS- Concrete Block
6"
$10.75
$10.97
8"
$11.91
$12.14
12"
$14.60
$14.89
MASONRY FIREPLACE -Minimum Valuation $4,396.24 $4,484.17
FOUNDATION PERMITS - based on 1/3 the overall valuation of the bldg
These figures shall be used when the applicant does not have a valuation, or
if the valuation given is obviously low.
FACTORY BUILT FIREPLACE- Minimum Valuation $1,465.88 $1,495.19
Page 5 of 43
City of Azusa
Schedule of Fees and Charges (Developer Only)
2012-2013
Exhibit - 1
ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT
BUILDING AND SAFETY
Adopted Proposed
Area
2011-2012
2012-2013
Item Description
Cost Per
Cost Per
$30.00
S.F. Avg.
S.F. Avg.
SIGNS
1 SIDE
Painted
$56.86
$58.00
Electrical
$109.56
$111.75
2 SIDES
Painted
$66.57
$67.90
Electrical
$138.68
$141.46
POLE /Lineal Foot plus square foot of sign:
3" 0
$47.15
$48.10
4" 0
$66.57
$67.90
61, 0
$85.98
$87.70
8" 0
$106.79
$108.92
10" 0
$126.20
$128.73
12" 0
$144.23
$147.11
PHOTOVOLTAIC SYSTEMS
Permit and Plan check fee's for photovoltaic systems shall be assessed at
45% of the fee generated by the declared valuation and the per unit
electrical item cost
SWIMMING POOLS
Valuation based on actual construction cost. Permit fees same as Building Per
Minimum Valuation: $18,306.13 $18,672.25
SPAS
Minimum Valuation
Prefabricated
Gunite
SURCHARGEFEES
Optical Records System - Per Permit
General Plan Maintenance - 10% permit surcharge to recover 50% of costs
Permit Automation Fee
Page 6 of 43
$3,661.23
$3,734.45
$7,350.19
$7,497.19
$15.00
$15.00
$30.00
$30.00
City of Azusa
Schedule of Fees and Charges (Developer Only)
2012-2013
Exhibit - 1
ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT
BUILDING AND SAFETY
Adopted
Area 2011-2012
Item Description Cost Per
S.F. Avg.
S-2 BUILDING PERMIT FEES
Permit Issuance
TnTA1 VAI IIATIr7N
Proposed
2012-2013
Cost Per
S.F. Avg.
$90.00 $90.00
$1.00 to $500.00
$34.43
$35.12
$ 501.00 to $2,000.00
$34.43
$35.12
For the 1st $500.00 plus $3.33 for ea. additional $100.00,
or fraction thereof, to and including $2,000.00
$2,001.00 to $25,000.00
$101.47
$103.50
For the 1st $2,000.00 plus $15.28 for ea. additional $1,000.00,
or fraction thereof, to and including $25,000.00
$25,001.00 to $50,000.00
$573.29
$584.76
For the list $25,000.00 plus $11.02 for ea. additional $1,000.00,
or fraction thereof, to and including $50,000.00
$50,001.00 to $100,000.00
$943.28
$962.14
For the 1st $50,000.00 plus $7.64 for ea. additional $1,000.00,
or fraction thereof, to and including $100,000.00
$100,001.00 to $ 500,000.00
$1,456.13
$1,485.25
For the 1st $100,000.00 plus $6.11 for ea. additional $1,000.00,
or fraction thereof, to and including $500,000.00
$500,001.00 to $1,000,000.00
$4,738.36
$4,833.13
For the list $500,000.00 plus $5.18 for ea. additional $1,000.00,
or fraction thereof, to and including $1,000,000.00
$1,000,001.00 and up
$8,218.41
$8,382.78
For the 1st $1,000,000.00 plus $3.44 for ea. additional $1,000.00,
or fraction thereof
Other Inspections and Fees:
1. Inspections outside of normal business hours (per hour)
$68.87
$70.25
(minimum charge - two hours)
2. Reinspection fees accessed under provisions of Section 305.8 (per hour')
$68.87
$70.25
3. Inspections for which no fee is specifically indicated (per hour)
$68.87
$70.25
(minimum charge - one-half hour)
4. Additional plan review required by changes, additions or revisions to plans
$68.87
$70.25
(per hour') (minimum charge - one-half hour)
5. For use of outside consultants for plan checking and inspections, or both
Actual costs2
Actual costs
' Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include
supervision, overhead, equipment, hourly wages and fringe benefits of the employee involved.
Actual costs include administrative and overhead costs.
Page 7 of 43
City of Azusa
Schedule of Fees and Charges (Developer Only)
2012-2013
Exhibit - 1
ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT
BUILDING AND SAFETY
Adopted Proposed
Area 2011-2012 2012-2013
Item Description Cost Per Cost Per
S.F. Avg. S.F. Avg.
S-3 ELECTRICAL PERMIT FEES
Area Fee Rate - Single Family Dwellings (Rate x area/sq ft) $0.11 $0.11
Unit Fee Schedule (note: does not include Permit Issuance Fee)
Receptacle, Switch and Lighting, or other.
For receptacle, switch lighting, smoke detectors, or other outlets, at which
current is used or controlled except services, feeders and meter:
First 20, each $1.65 $1.68
Additional outlets, each $1.10 $1.12
(NOTE: Formulti-outlet assemblies, each 5 k. orfraction maybe considered as 1 outlet.)
LIGHTING FIXTURES
For lighting fixtures, sockets, or other lamp holding devices:
First 20, each
$1.65 $1.68
Additional fixtures, each
$1.10 $1.12
For pole or platform mounted lighting fixtures, each
$1.65 $1.68
For theatrical -type lighting fixtures or assemblies each
$1.65 $1.68
RESIDENTIAL APPLIANCES
For fixed residential appliances or receptacle outlets for same, including wall -
mounts electric ovens, counter -mounted cooking tops, electric ranges, self-
contained room, console, or through -wall air conditioners, space heaters, food
waste grinders, dishwasher
$7.70 $7.85
(NOTE: For other types of air conditioners and other motor -driven appliances having larger
electrical ratings, see Power Apparatus)
TEMPORARY POWER SERVICE
For a temporary service power pole or pedestal, including all pole or pedestal
mounted receptacle outlets and appurtenances, each
$32.96 $33.62
For a temporary distribution system and temporary lighting and receptacle
outlets for construction sites, decorative lighting, Christmas tree sales lots,
firework stands, sales booths, additional pole, etc., each
$15.38 $15.69
NON-RESIDENTIAL APPLIANCES
For residential appliances and self-contained, factory -wired, non-residential
appliances not exceeding one (1) horsepower (HP), kilowatt (KW), or kilovolt -
ampere (KVA) in rating, including medical and dental devices, food, beverage,
and ice cream cabinets
$8.79 $8.97
Page 8 of 43
City of Azusa
Schedule of Fees and Charges (Developer Only)
2012-2013
Exhibit - 1
ECONOMIC & COMMUNITY DEVELOPMENTICOMMUNITY IMPROVEMENT
BUILDING AND SAFETY
Adopted Proposed
Area
2011-2012 2012-2013
Item Description
Cost Per Cost Per
S.F. Avg. S.F. Avg.
POWER APPARATUS
For motors, generators, transformers, rectifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps, cooking or
baking equipment, and other apparatus, as follows:
Rating in horsepower (HP), kilowatts (KW), kilovolt -amperes (KVA), or kilovolt -
amperes -reactive (KVAR)
Up to and including 1, each
$8.79 $8.97
Over 1 and not over 10, each
$15.38 $15.69
Over 10 and not over 50, each
$39.57 $40.36
Over 50 and not over 100, each
$79.12 $80.70
Over100,each
$131.87 $134.51
NOTE: 1. For equipment or appliances having more than one motor, transformer, heater, etc.,
the sum of the combined rating may be used.
NOTE: 2. These fees include all switches, circuit breakers, contractors, thermostats, relays and
other directly related control equipment.
BUSWAYS
For trolley and plug-in type busways, each 100 feet or fraction thereof
$21.98 $22.42
(NOTE: An additional fee will be required for lighting fixtures, motors and other appliances that
are connected to trolley and plug-in type busways.)
SIGNS, OUTLINE LIGHTING, AND MARQUEES
For signs, outline lighting systems, or marquees supplied from one branch
circuit, each
$32.96 $33.62
For additional branch circuits within the same sign outline lighting system, or
marquee, each
$10.98 $11.20
SERVICES, SWITCHBOARDS, SWITCHBOARD SECTIONS, MOTOR
CONTROL CENTERS AND PANELBOARDS
For services, switchboards, switchboard sections, motor control centers and
panelboards of 600 volts or less & not over 200 amperes in rating, ea.
$32.96 $33.62
For services, switchboards, switchboard sections, motor control centers and
panelboards of 600 volts or less and not over 200 amperes 1,000 amperes in
rating, each
$65.94 $67.26
For services, switchboards, switchboard sections, motor control centers and
panelboards over 600 volts or over 1,000 amperes in rating, each
$153.85 $156.93
MISCELLANEOUS APPARATUS, CONDUITS AND CONDUCTORS
For electrical apparatus, conduits and conductors for which a permit is
required but for which no fee is herein set forth
$32.96 $33.62
(NOTE: This fee is not applicable when a fee is paid for one or more services, outlets, fixtures,
appliances, power apparatus, busways, signs or other equipment.
Page 9 of 43
City of Azusa
Schedule of Fees and Charges (Developer Only)
2012-2013
Exhibit - 1
ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT
BUILDING AND SAFETY
Adopted Proposed
Area 2011-2012 2012-2013
Item Description Cost Per Cost Per
S.F. Avg. S.F. Avg.
PRIVATE SWIMMING POOLS
For new private, residential, inground swimming pools for single, or multi-
$13.19 $13.45
family occupancies, including a complete system of necessary branch circuit
$13.19 $13.45
wiring, bonding, grounding underwater lighting, water pumping and other
similar electrical equipment
$65.94 $67.26
For other types of swimming pools, therapeutic whirlpools, spas, hot tubs and
alterations to existing swimming pools, each
$43.96 $44.84
CARNIVALS AND CIRCUSES
Carnivals, circuses and other traveling shows or exhibitions utilizing
$13.19 $13.45
transportable -type rides, booths, displays and attractions.
$3.30 $3.37
For electrical generators and electrical driven rides, each
$32.96 $33.62
For mechanically driven rides and walk-through attractions or displays having
$13.19 $13.45
electric lighting, each
$13.19 $13.45
For a system of area and booth lighting, each
$13.19 $13.45
For permanently installed rides, booths, displays, and attractions
$13.19 $13.45
OTHER INSPECTIONS
$13.19 $13.45
For inspection of electrical equipment for which no fee is herein set forth, the
$13.19 $13.45
fee shall be determined by the Building Official
S-4 PLUMBING FEES
Each plumbing fixture or trap or set of fixtures on one trap (including drainage,
vent, water piping and backflow prevention devices therefore)
$13.19 $13.45
Each permanent type dishwasher whether individually trapped or not
$13.19 $13.45
Each industrial waste pretreatment interceptor including it's trap & vent, except
kitchen type grease interceptors functioning as fixtures traps
$13.19 $13.45
Each swimming pool drainage trap & receptor whether connected to a building
drain or building sewer (water supply for pool not included)
$13.19 $13.45
Each gas piping system of 1 to 5 outlets or alteration or retest of existing gas
piping system
$13.19 $13.45
Each additional outlet over five
$3.30 $3.37
Each gas pressure regulator other than appliance regulators
$4.40 $4.48
Each water heater and/or vent
$13.19 $13.45
Each solar potable water heating system, including water heater/vent
$43.96 $44.84
For repair or alteration of drainage and/or vent piping
$13.19 $13.45
Each piece of water -treating equipment and/or water piping installed without
accompanying plumbing
$13.19 $13.45
Lawn sprinkler systems on 1 meter including backflow prevention devices
$13.19 $13.45
Backflow prevention devices on unprotected water supplied, pools, tanks,
vats, etc. (including incidental water piping) 1 to 5
$13.19 $13.45
Any swimming pool piping associated wit the construction, remodeling or
repair of a swimming pool, spa and hot tub
$36.63 $37.36
Each additional device over five (5)
$3.30 $3.37
Page 10 of 43
City of Azusa
Schedule of Fees and Charges (Developer Only)
2012-2013
Exhibit - 1
ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT
BUILDING AND SAFETY
Adopted Proposed
Area
2011-2012
2012-2013
Item
Description
Cost Per
Cost Per
S.F. Avg.
S.F. Avg.
S-4
PLUMBING FEES
Each building drain installed without accompanying plumbing
$13.19
$13.45
For connection of a house sewer to a public sewer or the extension of a house
lateral onto a lot for future use
$37.36
$38.11
For each house sewer manhole
$37.36
$38.11
Each installation of a section of house sewer for future use
$24.17
$24.66
For the connection of each additional bldg. or work to house sewer
$24.17
$24.66
For the connection of a house sewer to a private sewage disposal system
$24.17
$24.66
For each private sewage disposal system (septic tank & seepage pit or pits
and/or drainfield)
$76.93
$78.47
For each cesspool, overflow seepage pit, percolation test pit, swimming pool
drywell, or drainfield extension or replacement
$37.36
$38.11
For disconnection, abandonment, alteration or repair of any house sewer or
private sewage disposal system or part thereof
$24.17
$24.66
Annual inspection of Fat, Oil and Grease
$160.00
$160.00
S-5
MECHANICAL PERMIT FEES
Installation, alteration or relocation of each refrigeration compressor or
absorption unit, & each fuel burning furnace, heater, boiler, and vented
decorative appliance including vents attached thereto:
Up to & including 100,000 BTU
$21.98
$22.42
More than 100,000 BTU to & including 1,000,000 BTU
$43.96
$44.84
More than 1,000,000 BTU
$109.89
$112.09
For each air inlet & air outlet served by any air conditioning system
$3.86
$3.93
For each 1,000 sq.ft. or fraction thereof of conditioned area
$30.77
$31.39
Note: When a permit is applied for and the total number of air inlets & air outlets is unknown, the
fees shall be based on the sq.R. of conditioned area.
For the installation, relocation or replacement of each appliance vent installed
and not included in an appliance permit
$10.98
$11.20
For the installation or alteration of each air handling unit for air conditioning
including ducts attached thereto:
Up to & including 2,000 CFM - Each unit up to 10
$10.98
$11.20
Each unit over 10
$3.30
$3.37
More than 2,000 CFM to and including 10,000 CFM
$32.99
$33.65
More than 10,000 CFM
$54.95
$56.05
Note: This fee shall not apply to an air handling unit which is a portion of a factory assembled air
conditioned appliance for which a permit is required elsewhere in this Code.
For each evaporative cooler other than portable type
$17.58
$17.94
For required ventilation fans which serve a single register:
Each fan up to 10
$13.19
$13.45
Each fan over 10
$4.40
$4.48
For each required ventilation system which is not a portion of any air
conditioning system for which a permit is required elsewhere in this Code
$26.38
$26.91
Page 11 of 43
City of Azusa
Schedule of Fees and Charges (Developer Only)
2012-2013
Exhibit - 1
ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT
BUILDING AND SAFETY
Area
Item Description
S-5 MECHANICAL PERMIT FEES
For the installation or each commercial kitchen hood or spray booth served by
mechanical exhaust, including the fans and ducts attached thereto
For the installation of each fire damper
Alteration of existing duct system where a permit is not required elsewhere
Note: 1) for refrigeration system rating one horsepower, one ton, or 12,000 BTU per hour shall
mean the same quantity
Note: 2) for steam boilers rated in boiler horsepower, one horsepower shall equal 50,000 BTU
per hour
PLAN CHECK FEES
Building Plan Check Fee - 85% of Permit Fee - $15.00 minimum
Electric Plan Check Fee - 80% of Permit Fee - $15.00 minimum
Energy Plan Check Fee - 10% of Building Permit Fee
Mechanical Plan Check Fee - 80% of Permit Fee - $15.00 minimum
Plumbing Plan Check Fee - 80% of Permit Fee - $15.00 minimum
Page 12 of 43
Adopted
Proposed
2011-2012
2012-2013
Cost Per
Cost Per
S.F. Avg.
S.F. Avg.
$54.95
$56.05
$8.79
$8.97
$21.98
$22.42
City of Azusa
Schedule of Fees and Charges Developer Only
2012-2013
Exhibit 1.2
BUILDING AND SAFETY
Adopted Adopted Proposed
Area 2010-2011 2011-2012 2012-2013
Item Description Fee/Unit Fee/Unit Fee/Unit
5-045 Grading Plan Check Fee Variable Variable Variable
<100 CY - $865
100-1,000 CY - $865 plus $14 per 100 CY
1,000 - 10,000 CY - $991 plus $74 per 1,000 CY
10,000 - 50,000 CY - $1,657 plus $17 per 1,000 CY
50,000+ CY - $2,337 plus $231 per 10,000 CY
S-046 Grading Inspection Variable Variable Variable
<100 CY - $345
100-1,000 CY - $345 plus $48 per 100 CY
1,000 - 10,000 CY - $777 plus $72 per 1,000 CY
10,000 - 50,000 CY - $1,425 plus $87 per 1,000 CY
50,000+ CY - $4,905 plus $570 per 10,000 CY
Grading Permit Fee - Based on Cubic Yards
$156 $161 $164
Permit Fee for Changes to Original Permit:
$100
$103
$105
$20,001 to $50,000
$100
$103
$105
$50,001 to $75,000
$134
$139
$142
$75,001 to $100,000
$205
$212
$216
$100,001 to $200,000
$269
$278
$283
$200,000 to $500,000
$347
$358
$365
$500,001 and up
$425
$439
$448
Special Site Inspection
$78
$81
$82
Commercial - Minimum 2 hours
$156
$161
$164
Residential - Minimum 2 hour
$156
$161
$164
Residential(non-habitable space) -Min. 2 hours
$149
$154
$157
Production Lot Plan Check -per lot
N/A
$200
$200
Occupancy Inspection Fee:
0-1 to 15,000 sq ft -1/2 hour of technical staff time
$42
$43
$44
15,000 sq.ft. on - 1 hour of technical staff time
$78
$81
$82
Bonds for Sign(s) - Refundable
$234
$242
$247
Demolition Permit Fee - Minimum 1 hour
$91
$94
$96
Deputy Inspection Registration Fee - Deputy
$42
$43
$44
Emergency Inspection Fee - Minimum 1 hours
$127
$131
$134
Hearing Officer
Actual Cost
Actual Cost
Actual Cost
Pre -Plan Check Submittal - Minimum 2 hours
$162
$167
$171
Reinspection Fee - Minimum 1 hour
$85
$88
$90
Room Addition Plan Check Fee - Minimum 2 hours
$162
$167
$171
Trailer Coach
$156
$161
$164
Trash Enclosure - $10 for additional enclosure
$64
$66
$67
Page 13 of 43
City of Azusa
Schedule of Fees and Charges Developer Only
2012-2013
Area
Item Description
Relocation of Buildings:
0 to 2,000 sq.ft.
2,001 to 5,000 sq.ft.
5,001 sq.ft. and up
Exhibit 1.2
BUILDING AND SAFETY
Adopted Adopted
2010-2011 2011-2012
Fee/Unit Fee/Unit
$367 $379
$688 $710
$991 $1,024
Proposed
2012-2013
Fee/Unit
$387
$724
$1,044
Plan Checking Fee:
Staff rates assessed against deposit.
Executive Staff - per hour
$142
$146
$149
Professional Staff - per hour
$101
$104
$106
Technical Staff (Plan Checker/Inspector) - per hour
$85
$88
$90
On-site Improvement Inspections:
$2,000 deposit required for parking lot paving and
miscellaneous testing
Professional Staff - per hour
$101
$104
$106
Rates applied against deposit
Technical Staff - per hour
$85
$88
$90
Rates applied against deposit
Standard Plan check fee:
Professional Staff - per hour
$101
$104
$106
Technical Staff - per hour
$85
$68
$90
Page 14 of 43
City of Azusa
Schedule of Fees and Charges - Developer Only
2012-2013
Exhibit 2
PLANNING AND ENGINEERING
Page 15 of 43
Adopted
Adopted
Proposed
Area
2010.2011
2011-2012
2012-2013
Item
Description
Fee/Unit
Fee/Unit
Fee/Unit
5-001
Zoning Clearance
$45
$46
$47
S-002
Minor Design Review (over the counter)
$1,165
$1,203
$1,228
S-003
Staff Level Design Review
$3,110
$3,213
$3,277
Reduced to $350 for modifications to existing structures
5-004
Major Design Review (Deposit)
$10,000 (D)
$10,000 (D)
$10,000 (D)
S-005
Use Permit
Major UP
$4,350
$4,494
$4,583
Minor UP
N/A
N/A
N/A
S -005A
Minor Use Permit
$715
$739
$753
S-006
UP Modifications
Modifications to Major UP
$2,035
$2,102
$2,144
Modifications to Minor UP
$510
$527
$537
S-008
Minor Variance
$820
$847
$864
S-009
Variance
$4,105
$4,240
$4,325
$940 when Single Family Structure is involved
5-010
Zone Change
$5,000 (D)
$5,000 (D)
$5,000 (D)
5-011
Development Code Amendment
$5,000 (D)
$5,000 (D)
$5,000 (D)
S-012
Development Agreement
$10,000 (D)
$10,000 (D)
$10,000 (D)
Annual Monitoring
$5,000 (D)
$5,000 (D)
$5,000 (D)
Deposit for charges at fully allocated hourly rates. All costs recovered.
5-013
General Plan Amendment
$15,000 (D)
$15,000 (D)
$15,000 (D)
Deposit for charges at fully allocated hourly rates. All costs recovered.
S-014
Specific Plan
$10,000 (D)
$10,000 (D)
$10,000 (D)
Deposit for charges at fully allocated hourly rales. All casts recovered.
S-015
Specific Plan Amendment
$5,000 (D)
$5,000 (D)
$5,000 (D)
S-016
Tentative Parcel Map
$5,735
$5,924
$6,043
S-017
Tentative Tract Map
5-20 lots
$6,210
$6,415
$6,543
20-50 lots
$7,455
$7,701
$7,855
50-100 lots
$10,310
$10,650
$10,863
100+ lots
$11,590
$11,972
$12,212
Page 15 of 43
City of Azusa
Schedule of Fees and Charges - Developer Only
2012-2013
Exhibit 2
PLANNING AND ENGINEERING
Page 16 of 43
Adopted
Adopted
Proposed
Area
2010-2011
2011-2012
2012-2013
Item
Description
Fee/Unit
Fee/Unit
Fee/Unit
S-018
Reversion to Acreage
$1,955
$2,020
$2,060
5-019
Lot Merger
$1,255
$1,296
$1,322
S-020
Environmental Categorical Exemption Rev.
$200
$207
$211
S-021
Environmental Initial Study
$3,680
$3,801
$3,877
S-023
Environmental Impact Report Review
$10,000 (D)
$10,000 (D)
$10,000 (D)
Deposit for charges at fully allocated hourly rates. All costs recovered.
5-024
Mitigation Monitoring - CEQA Monitoring
Deposit
Deposit
Deposit
determined by
determined by
determined by
Deposit for charges at fully allocated hourly rates. All costs recovered.
staff
staff
staff
S-025
Annexation
Deposit
Deposit
Deposit
determined by
determined by
determined by
Deposit for charges at fully allocated hourly rates.
staff
staff
staff
All costs recovered.
S-026
Condominium Conversion Map
$4,640
$4,793
$4,889
Plus Consultant fee
5-027
Minor Sign Review
$45
$46
$47
5.028
Major Sign Review
$470
$486
$495
5.029
Zoning Letter
Single Family Residential
$125
$129
$132
Other
$285
$294
$300
5-030
Temporary Occupancy Review
$475
$491
$500
S-031
Temporary Use Permit
$445
$460
$469
25% discount for Azusa based non-profit organizations
5-032
Continuance Processing
$465
$480
$490
S-033
Time Extension Review - Staff
$320
$331
$337
5-034
Time Extension Review - Planning Commission
$715
$739
$753
S-035
Appeal To Planning Commission
$1,590
$1,642
$1,675
S-036
Appeal To City Council
$2,530
$2,613
$2,666
S-15
Preliminary Plan Review
$1,355
$1,400
$1,428
Per meeting - 50% of the fee for the 1st meeting applied against
future Planning/Engineering fee for the project.
Page 16 of 43
City of Azusa
Schedule of Fees and Charges - Developer Only
2012.2013
Exhibit 2
PLANNING AND ENGINEERING
Page 17 of 43
Adopted
Adopted
Proposed
Area
2010-2011
2011-2012
2012-2013
Item
Description
Fee/Unit
Fee/Unit
Fee/Unit
S -15A
Nonconforming Use Time Extension
$703
$726
$741
S-037
Certificate of Compliance
$1,085
$1,121
$1,143
S-038
Street Name Processing W/O Map
$1,085
$1,121
$1,143
S-039
Street Re -Name Processing
$1,495
$1,544
$1,575
S-040
Building Address Processing W/O Map
$620
$640
$653
5-041
Building Re -Address Processing
$365
$377
$385
S -041A
Com Dev Newspaper Publication
$215
$222
$227
S-044
Special Building Inspection
$110
$114
$116
2 hour minimum
S-047
Public/Private Improvement Plan Check
Variable
Variable
Variable
$0-$100,000 - 3% of the estimated construction cost
next $400,000 - 2.5% of the estimated construction cost
amounts over $500,000 - Deposit of 2% of the estimated construction
cost
S-048
Public/Private Improvement Inspection
Variable
Variable
Variable
$04100,000 - 5% of the estimated construction cost
next $400,000 - 3.5% of the estimated construction cost
amounts over $500,000 - Deposit of 2% of the estimated construction
cost
S-049
Final Parcel Maps:
$1,760
$1,818
$1,854
City Fee $1,154 County Fee $700
S-050
Final Maps: Map Analysis for Tracts:
1 - 5 Lots
City Fee $963 County Fee $710
N/A
N/A
N/A
6 - 10 Lots
City Fee $1,001 County Fee $915
N/A
N/A
N/A
5 - 10 Lots
City Fee $1,825 County Fee $915
$2,600
$2,686
$2,740
11 - 25 Lots
City Fee $2,880 County Fee $1,350
$4,015
$4,147
$4,230
26 - 50 Lots
City Fee $3,816 County Fee $2,200
$5,710
$5,898
$6,016
51 - 100 Lots
City Fee $5,856 County Fee $3,300
$8,690
$8,977
$9,156
101 - 150 Lots
City Fee $6,759 County Fee $5,000
$11,160
$11,528
$11,759
151 or more Lots
City Fee $8,193 County Fee $6,600
$14,040
$14,503
$14,793
Page 17 of 43
City of Azusa
Schedule of Fees and Charges - Developer Only
2012-2013
Exhibit 2
PLANNING AND ENGINEERING
Page 18 of 43
Adopted
Adopted
Proposed
Area
2010-2011
2011.2012
2012-2013
Item
Description
Fee/Unit
Fee/Unit
Fee/Unit
S-051
Easement Checking for Tract Maps
$505
$522
$532
City Fee $322 County $210
Easement Checking for Parcel Maps
$470
$486
$495
City Fee $320 County $175
5-052
Monument Inspection each
$330
$341
$348
City Fee $223 County $125
S-053
Bond Processing
$160
$165
$169
City Fee $94 County $75
S-054
Tax Clearance Processing:
5 yr history (provided by County)
$740
$764
$780
City Fee $155 County $625
5-055
Lot Line Adjustment
$1,205
$1,245
$1,270
S-056
Street/ROW Abandonment Proc.
$2,000 (D)
$2,000 (D)
$2,000 (D)
Deposit for charges at fully allocated hourly rates. All costs recovered.
S -056A
SUSMP Plan Review
$1,600
$1,653
$1,686
S-0568
SWPPP Plan Review
$1,490
$1,539
$1,570
S -056C
Hydrology/Traffic/Soils Report Rev
$1,500 (D)
$1,500 (D)
$1,500 (D)
Deposit for charges at fully allocated hourly rates. All costs recovered.
S -056D
Drainage Plan Review
Variable
Variable
Variable
$0-$100,000 - 3% of the estimated construction cost
next $400,000 - 2.5% of the estimated construction cost
amounts over $500,000 - Deposit of 2% of the estimated construction
cast
5-057
Sidewalk/Curb/Gutter:
Up to 75 LF
$475
$491
$500
Additional 75 LF, no deposit
$155
$160
$163
5-057A
Driveway Approach/Street Cut:
Up to 100 SF
$475
$491
$500
Additional 100 SF, no deposit
$205
$212
$216
S-058
Obstruction Permit
$85
$88
$90
S-059
Transportation Permits (oversized and/or overweight trucks):
Single Trip/Rider
$18
$18
$18
Fee set by state
Annual Permit
$98
$98
$98
Fee set by state
S-060
House Moving Permit
$940
$971
$990
Page 18 of 43
City of Azusa
Schedule of Fees and Charges - Developer Only
2012-2013
Exhibit 2
PLANNING AND ENGINEERING
Area
Item Description
S -060A Industrial Waste Permit
New/Modification
Annual
5-0606 Fals,Oils and Grease Program
New
Annual
5-061 Sewer Saddle
Sewer Dye Test
Sewer Blockage Check
S-062 Blueprint/Map Copy Service, per sheet
$21 or actual outside costs
S-063 Real Property Records Report
C and o m iniu m/Townhouses
Vacant/Unimproved Land
Single Family Dwellings
Multi -Family Dwelling - per parcel (plus $10 for add'I unit)
Commercial Properties
S-064 Residential Rental Housing Registration and Inspection:
Per parcel - includes first unit (plus $7 for add'I unit)
Reinspection - $85
5-065 Lien Release
Substanard - $100
Admin Fine - $80
Page 19 of 43
Adopted
Adopted
Proposed
2010-2011
2011.2012
2012-2013
Fee/Unit
Fee/Unit
Fee/Unit
$620
$640
$653
$205
$212
$216
$410
$424
$432
$155
$160
$163
$290
$300
$306
See Exhibit 7 - Utility
See Exhibit 7 - Utility
$20
$21
$21
$50
$52
$53
$160
$165
$169
$160
$165
$169
$160
$165
$169
$160
$165
$169
$105
$108
$111
Variable
Variable
Variable
City of Azusa
Schedule of Fees and Charges - Developer Only
2012-2013
Exhibit 2
PLANNING AND ENGINEERING
Adopted
Adopted
Proposed
Area
2010-2011
2011-2012
2012-2013
Item
Description
Fee/Unit
Fee/Unit
Fee/Unit
S-066
Admin. Hearing Appeal
$250
$258
$263
City Fee $238 Court $25
S -066A
Public Nuisance Admin Hearing
$325
$336
$342
Refunded if the appelant prevails
S -066B
Cost Recovery Hearing
$120
$124
$126
Refunded if the appelant prevails
5-066C
Code Enforcement Fines
First Offense
$100
$100
$100
Second Offense
$250
$250
$250
Third Offence
$500
$500
$500
Project Plans/Specifications - Plus $10 if mailed
$48
$50
$51
5.3.1
Block Wall Permit
Verification of Conditions:
County
$172
$178
$181
City
$148
$153
$156
Agreement and/or Improvement Security, each
$195
$201
$205
Extension Time for Improvement Agreement, each
$266
$275
$280
Fourth Submittal Originals/Prints
$367
$379
$387
Sixth Submittal or Originals/Prints
$1,288
$1,331
$1,357
Eighth and each subsequent submittal of originals/prints
$1,536
$1,587
$1,618
Minor Land Divisions:
Lot Split
$544
$562
$573
Recording Fee:
$7
$7
$7
First Sheet
Additional sheets, each
$2
$2
$2
LDMA Surcharge (County maps only):
Tract Map
$367
$379
$387
Parcel Map
$124
$128
$131
Overtime:
Tract Map
$1,229
$1,270
$1,295
Parcel Map
$857
$885
$903
5-6.3
Staff Rates:
Director of Public Works - per hour
$183.31
$189
$193
City Engineer- per hour
$150.87
$156
$159
Principal City Engineer - per hour
$127.86
$132
$135
Assistant City Engineer - per hour
$84.96
$88
$90
Associate City Engineer - per hour
$146.04
$151
$154
Public Works Inspector - per hour
$102.12
$105
$108
Consultant (Invoice + 36% Overhead)
Page 20 of 43
City of Azusa
Schedule of Fees and Charges - Developer Only
2012-2013
Exhibit 2
PLANNING AND ENGINEERING
Page 21 of 43
Adopted
Adopted
Proposed
Area
2010-2011
2011-2012
2012-2013
Item
Description
Fee/Unit
Fee/Unit
Fee/Unit
S-6.5
Code Compliance Fee
$35
$36
$36
S-7
Landscape Design Standards (Over the Counter Sales)
$6
$6
$6
5-18
City -provided Tree Planting - One 15 gallon Tree
$100
$103
$105
City -provided Tree Planting - One 24" Box Tree
$172
$178
$181
S-95.1
Recovery & Storage of Abandoned Shopping Carts
$11
$11
$11
Page 21 of 43
City of Azusa
Schedule of Fees and Charges Developer Only
2012-2013
Exhibit 3
FIRE SAFETY"
" Not included in fee study. Fees determined by County Fire Dept
Page 22 of 43
Adopted
Adopted
Proposed
Area
2010-2011
2011-2012
2012-2013
Item Description
Fee/Unit
Fee/Unit
Fee/Unit
S-1.1 Fire Safety - Fee per Hour:
Fire Plan Check
$96
$99
$101
Fire Alarm System
$96
$99
$101
Fire Extinguisher Service
$96
$99
$101
Flammable Storage
$96
$99
$101
Hood System
$96
$99
$101
Spray Booths
$96
$99
$101
Subdivision Plan Checking
$96
$99
$101
Fire Permit Fees
Occupancy Inspection - per hour
$96
$99
$101
Christmas Tree Lot Inspection - per hour
$96
$99
$101
Circus/Carnival Inspection - Minimum 2 hours
$192
$198
$202
Flammable Liquid Tank Site Inspection - Minimum 3 hours
$287
$296
$302
Liquid Petroleum Gasses - per hour
$96
$99
$101
Magnesium Working - Minimum 2 hours
$192
$198
$202
Motor Vehicle Repair Garages - per hour
$96
$99
$101
Oxygen System Installation - Minimum 2 hours
$192
$198
$202
Storage/Handling Flammable Liquids - Minimum 2 hours
$192
$198
$202
Underground Tank Installation - Minimum 4 hours
$384
$397
$405
Underground Tank Removal - Minimum 3 hours
$287
$296
$302
Fireworks Stands - Minimum Y: hour
$49
$51
$52
Metal Foundry - Minimum 2 hours
$192
$198
$202
Places of Assembly - Minimum 2 hours
$192
$198
$202
Pyrotechnical Special Effects - per hour
$96
$99
$101
Public Rifle/Gun Ranges - Minimum 2 hours
$192
$198
$202
Tire Storage Areas in Excess of 1,000 cu. ft. - per hour
$96
$99
$101
Automobile Dismantling/Storage Yards - Minimum 2 hours
$192
$198
$202
Commercial Woodworking Facilities with Dust Collection
Systems Greater than 25 gallons - Minimum 2 hours
$192
$198
$202
Educational/Daycare Centers - Minimum 3 hours
$287
$296
$302
Miscellaneous Fire Fees - per hour
Residential Inspection per Sec. 13146.2 of H&S Code
$96
$99
$101
Engine Company Standby
$96
$99
$101
Hazardous Materials Response
$96
$99
$101
Special Inspections
$96
$99
$101
Weed Abatement (Processing & Referral)
$96
$99
$101
" Not included in fee study. Fees determined by County Fire Dept
Page 22 of 43