Loading...
HomeMy WebLinkAboutResolution No. 2015-C38RESOLUTION NO. 2015-C38 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, ESTABLISHING CERTAIN DEVELOPMENT PROJECT FEES AND SERVICE CHARGES WHEREAS, Chapter 8 (commencing with section 66016) of Division 1 of Title 7 of the California Government Code establishes a procedure for adopting fees or service charges for development projects; and WHEREAS, the City Currently imposes development related fees upon applicants to recover the costs of staff time, inspection, copying costs and other expenses related to the review and processing of applications for property development; and WHEREAS, the City Council of the City of Azusa has determined that the cost of providing development related services is not of general benefit, but of special benefit to the applicant seeking to process an application for property development; and WHEREAS, the City is authorized to impose fees which will cover but do not exceed the estimated reasonable cost of providing the service for which the fee is imposed; and WHEREAS, current fees charged for development services do not fully recover the actual cost of providing such services; and WHEREAS, Government Code sections 66016 and 66018 provide that the City may adopt new development fees or increase existing fees after providing notice and holding a public hearing; and WHEREAS, notice of a public hearing on the establishment of new and increased fees were published in accordance with provisions of section 6062a of the California Government code; and WHEREAS, notice of public hearing was mailed to all interested parties who filed a written request for a mailed notice with the City, or a waiver of notice was obtained; and WHEREAS, on July 27 , 2015, at the time and place specified in the published and mailed notices, the City Council held a public hearing as required by law to allow oral or written presentations prior to levying new development fees or service charges and prior to approving an increase in existing development .fees or service charges; and WHEREAS, at least ten (10) days prior to the commencement of the hearing, there was made available to the public a report containing the cost, or estimated cost, of providing the service for which the fee or service charge will be levied, and the revenue sources for providing such services; and WHEREAS, based upon evidence provided, the City Council hereby determines that the fees set forth in the Schedule of Fees and Charges for Fiscal Year 2015-2016 attached hereto and incorporated herein by reference will not exceed the estimated reasonable cost of providing the property development services for which the fee is charged; and WHEREAS, the proposed fees are statutorily and categorically exempt from the requirements of the California Environmental Quality Act since citing these fees fits within the statutory exemptions for local agency decisions involving the adoption and collection of rates, tolls and other charges, pursuant to Public Resources Code Section 21080(b) (8) and Section 15273 of the California Environmental Quality Act Guidelines. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, DOES FIND AND DECLARE THAT: SECTION 1. Adoption of Schedule of Fees. The City Council hereby adopts a fee schedule for the services set forth in the Schedule of Fees and Charges for Fiscal Year 2015- 2016 attached hereto and incorporated herein by reference. SECTION 2. Collection of Fees. That the City is authorized to collect the user fees set forth herein. SECTION 3. Effective Date. This resolution shall become effective sixty (60) days from its adoption. PASSED, APPROVED and ADOPTED this 27th day of July, 2015. /w.._.t. /seph Romero Rocha Mayor ATTEST: Jef e a� e Cornejo, S,-(' City Clerk STATE OF CALIFORNIA) COUNTY OF LOS ANGELES) ss. CITY OF AZUSA) I HEREBY CERTIFY that the foregoing Resolution No. 2015-C38 was duly adopted by the City Council of the City of Azusa at a special meeting thereof, held on the 27th day of July, 2015, by the following vote of Council: AYES: COUNCILMEMBERS: GONZALES, CARRILLO, MACIAS, ALVAREZ, ROCHA NOES: COUNCILMEMBERS: NONE ABSENT: COUNCILMEMBERS: NONE Je€ re a e Comejo, J?' City Clerk APPROVED AS TO FORM: Best BestKriege41P7 4 City Atto ey CITY OF AZUSA ADOPTED SCHEDULE OF FEES AND CHARGES Fiscal Year 2015-2016 CPI rate isacquiredfrom US Dept of Labor/All Consumers for area of LA/RiversidelOC - May 2015 #-. CPl not factored in. _ City of Azusa Schedule of Fees and Charges (Developer Only) 2015-2016 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENTICOMMUNITY IMPROVEMENT BUILDING AND SAFETY Area Item Description S-1 BUILDING VALUATION APARTMENT HOUSES: Type I or II F.R. Good Type V - Masonry (or Type III) Good Type V - Wood Frame Good Type I - Basement Garage AUDITORIUMS: Type I or II F.R. Type II - 1 hour Type II - N Type III - 1 hour Type III - N Type V - 1 hour Type V - N BANKS: Type I or II F.R. Type II - 1 hour Type II - N Type III - 1 hour Type III - N Type V -1 hour Type V - N BOWLING ALLEYS: Type II - 1 hour Type II - N Type III - 1 hour Type III - N Type V - 1 hour CHURCHES: Type I or II F.R. Type II - 1 hour Type]I - N Type III - 1 hour Type III - N Type V - 1 hour Type V - N Approved Approved Approved 2013-2014 2014.2015 2015-2016 Cost Per Cost Per Cost Per S.F. Avg. S.F. Avg. S.F. Avg. $133.90 $136.17 $137.67 $164.84 $167.64 $169.49 $109.29 $111.15 $112.37 $133.90 $136.17 $137.67 $96.30 $97.94 $99.02 $123.79 $125.89 $127.27 $56.46 $57.42 $58.05 $158.20 $160.89 $162.66 $114.57 $116.52 $117.80 $108.38 $110.23 $111.44 $120.46 $122.51 $123.86 $114.27 $116.21 $117.49 $115.18 $117.14 $118.43 $107.47 $109.30 $110.50 $223.56 $227.36 $229.87 $164.69 $167.49 $169.33 $159.41 $162.12 $163.90 $181.75 $184.84 $186.87 $175.26 $178.23 $180.20 $164.69 $167.49 $169.33 $157.74 $160.42 $162.19 $76.98 $78.29 $79.15 $71.85 $73.07 $73.88 $83.78 $85.20 $86.14 $78.35 $79.68 $80.55 $56.46 $57.42 $58.05 $149.74 $152.29 $153.96 $112.46 $114.38 $115.63 $106.88 $108.70 $109.89 $122.27 $124.35 $125.72 $116.84 $118.82 $120.13 $114.27 $116.21 $117.49 $107.47 $109.30 $110.50 City of Azusa Schedule of Fees and Charges (Developer Only) 2015-2016 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Area Item Description CONVALESCENT HOSPITALS: Type I or II F.R. Type 11 - 1 hour Type III -11 hour Type V - 1 hour DWELLINGS: Type V - Masonry Good Type V - Wood Frame Good Basements - Semi -Finished Good Unfinished Good FIRE STATION: Type I or II F.R. Type 11 - 1 hour Type II - N Type III - 1 hour Type III - N Type V - 1 hour TypeV - N HOMES FOR THE ELDERLY: Type I or II F.R. ' Type II - 1 hour Type II - N Type III - 1 hour Type III - N Type V - 1 hour TypeV - N HOSPITALS: Type I or II F.R. Type III - 1 hour Type V - 1 hour HOTELS AND MOTELS: Type I or 11 F.R. Type III - 1 hour Type III - N Type V - 1 hour Type V - N Approved Approved Approved 2013-2014 2014-2015 2015.2016 Cost Per Cost Per Cost Per S.F. Avg. S.F. Avg. S.F. Avg. $210.13 $213.70 $216.05 $145.82 $148.30 $149.93 $149.44 $151.98 $153.65 $140.84 $143.24 $144.81 $114.27 $116.21 $117.49 $146.27 $148.76 $150.39 $101.59 $103.32 $104.46 $139.49 $141.86 $143.42 $30.34 $30.86 $31.20 $35.02 $35.61 $36.00 $22.04 $22.41 $22.66 $26.72 $27.17 $27.47 $172.69 $175.63 $177.56 $113.67 $115.60 $116.87 $107.18 $109.00 $110.20 $124.39 $126.50 $127.89 $119.10 $121.13 $122.46 $116.69 $118.67 $119.98 $110.65 $112.53 $113.77 $156.54 $159.20 $160.95 $127.10 $129.26 $130.69 $121.67 $123.74 $125.10 $132.39 $134.64 $136.12 $126.95 $129.11 $130.53 $127.86 $130.03 $131.46 $123.48 $125.58 $126.96 $246.36 $250.54 $253.30 $203.94 $207.41 $209.69 $194.58 $197.89 $200.06 $152.46 $155.05 $156.76 $132.08 $134.33 $135.81 $125.90 $128.04 $129.44 $115.03 $116.98 $118.27 $112.76 $114.68 $115.94 Area Item City of Azusa Schedule of Fees and Charges (Developer Only) 2015-2016 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENTICOMMUNITY IMPROVEMENT BUILDING AND SAFETY Description INDUSTRIAL PLANTS: Type I or II F.R. Type ll - 1 hour Type 11 - N Type III - 1 hour Type III - N Tilt -up Type V - 1 hour Type V - N JAILS: Type I or II F.R. Type III - 1 hour Type V -1 hour LIBRARIES: Type I or II F.R. Type II - 1 hour Type II - N Type III -I hour Type III - N Type V - 1 hour Type V - N MEDICAL OFFICES: Type I or It F.R. Type II - 1 hour Type 11 - N Type III - 1 hour Type III - N Type V - 1 hour TypeV-N OFFICES Type I or II F.R. Type II - 1 hour Type II - N Type III - 1 hour Type 111-N Type V - 1 hour Type V - N PRIVATE GARAGES: Wood Frame Masonry Open Carports Approved Approved 2013.2014 2014-2015 Cost Per Cost Per S.F. Avg. S.F. Avg. Approved 2015-2016 Cost Per S.F. Avg. $85.89 $87.35 $88.31 $59.78 $60.79 $61.46 $54.95 $55.88 $56.50 $65.82 $66.93 $67.67 $62.04 $63.10 $63.79 $45.29 $46.06 $46.56 $62.04 $63.10 $63.79 $56.76 $57.72 $58.36 $240.17 $244.25 $246.94 $219.64 $223.37 $225.83 $164.69 $167.49 $169.33 $175.71 $178.70 $180.66 $128.61 $130.80 $132.24 $122.27 $124.35 $125.72 $135.86 $138.17 $139.69 $129.07 $131.26 $132.70 $127.56 $129.72 $131.15 $122.27 $124.35 $125.72 $180.39 $183.46 $185.47 $139.18 $141.55 $143.10 $132.24 $134.48 $135.96 $150.95 $153.52 $155.21 $140.54 $142.93 $144.50 $136.16 $138.47 $140.00 $131.33 $133.56 $135.03 $161.22 $163.96 $165.76 $107.93 $109.77 $110.97 $102.80 $104.55 $105.70 $116.54 $118.52 $119.82 $111.40 $113.30 $114.54 $109.14 $110.99 $112.22 $102.80 $104.55 $105.70 $36.68 $37.31 $37.72 $41.36 $42.06 $42.53 $25.06 $25.48 $25.76 City of Azusa Schedule of Fees and Charges (Developer Only) 2015-2016 Exhibit - 1 ECONOMIC 8 COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Approved Approved Approved Area 2013-2014 2014-2015 2015-2016 Item Description Cost Per Cast Per Cost Per S.F. Avg. S.F. Avg. S.F. Avg. PUBLIC BUILDINGS: Type I or II F.R. $186.28 $189.44 $191.53 Type II - 1 hour $150.95 $153.52 $155.21 Type ll- N $144.31 $146.76 $148.38 Type III - 1 hour $156.69 $159.35 $161.11 Type III - N $151.26 $153.83 $155.52 Type V -1 hour $143.41 $145.84 $147.45 Type V - N $138.27 $140.62 $142.17 PUBLIC GARAGES: Type I or 11 F.R. $73.82 $75.07 $75.90 Type I or II Open Parking $55.40 $56.34 $56.96 Type II - N $42.27 $42.99 $43.46 Type III - 1 hour $55.85 $56.80 $57.43 Type III - N $49.66 $50.51 $51.06 Type V - 1 hour $50.87 $51.74 $52.31 RESTAURANTS Type III - 1 hour $147.03 $149.53 $151.17 Type III- N $142.05 $144.46 $146.05 Type V - 1 hour $134.65 $136.94 $138.45 Type V - N $129.37 $131.57 $133.01 SCHOOLS: Type I or II F.R. $167.86 $170.71 $172.59 Type II - 1 hour $114.57 $116.52 $117.80 .Type III - 1 hour $122.57 $124.66 $126.03 Type III - N $117.89 $119.90 $121.22 Type V - 1 hour $114.88 $116.83 $118.11 Type V - N $109.59 $111.46 _$112.68 SERVICE STATIONS: Type II - N $101.44 $103.17 $104.30 Type III - 1 hour $105.82 $107.62 $108.80 Type V - 1 hour $90.12 $91.65 $92.66 Canopies $42.27 $42.99 $43.46 STORES: Type I or II F.R. $124.39 $126.50 $127.89 Type II - 1 hour \ $76.08 $77.37 $78.23 Type II - N $74.42 $75.69 $76.52 Type III - 1 hour $92.53 $94.11 $95.14 Type III - N $86.80 $88.27 $89.24 Type V - 1 hour $77.89 $79.22 $80.09 Type V - N $72.00 $73.23 $74.03 Area Item City of Azusa Schedule of Fees and Charges (Developer Only) 2015-2016 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENTICOMMUNITY IMPROVEMENT BUILDING AND SAFETY Description TOWN HOMES Type V - Masonry Type V - Wood Frame Garage- Wood Frame Garage- Masonry THEATERS: Type I or II F.R. Type III -I hour Type III - N Type V - 1 hour Type V - N WAREHOUSES Type I or 11 F.R. Type I or V - 1 hour TypeIorV - N Type III - 1 hour Type III - N EQUIPMENT: AIR CONDITIONING Commercial Residential SPRINKLER SYSTEMS OTHER VALUATIONS REROOF Asphalt and Comp - per square foot of material Built-up - per square foot of material Light -weight tile - per square foot of material Concrete Tile or Slate Tile - per square foot of material Metal Shingles - per square foot of material Wood Shake - per square foot of material Wood Shingle - per square foot of material Rolled Roofing - minimum 300 sq.ft. allowed on patio covers only Tear off and re -sheath - per square foot of material TENANTIMPROVEMENTS General Commercial Restaurants Medical Offices RETAINING WALLS- Concrete Block 6" 8" 12" Approved Approved 2013-2014 2014-2015 Cost Per Cost Per S.F. Avg. S.F. Avg. Approved 2015-2016 Cost Per S.F. Avg. $130.74 $132.97 $134.43 $124.68 $126.80 $128.19 $50.88 $51.74 $52.31 $56.46 $57.42 $58.05 $165.75 $168.56 $170.42 $120.76 $122.82 $124.17 $115.03 $116.98 $118.27 $113.67 $115.60 $116.87 $107.48 $109.31 $110.51 $74.57 $75.84 $76.67 $44.23 $44.98 $45.48 $41.51 $42.22 $42.68 $50.12 $50.97 $51.53 $47.70 $48.51 $49.05 $6.34 $6.45 $6.52 $5.28 $5.37 $5.43 $3.92 $3.99 $4.04 $242.88 $247.01 $249.73 $257.17 $261.54 $264.42 $664.35 $675.64 $683.08 $800.08 $813.68 $822.63 $505.76 $514.36 $520.02 $307.17 $312.39 $315.83 $295.74 $300.77 $304.08 $1,428.71 $1,453.00 $1,468.98 $142.87 $145.30 $146.90 $37.15 $37.78 $38.19 $42.86 $43.59 $44.07 $44.29 $45.04 $45.54 $11.08 $11.27 $11.39 $12.27 $12.47 $12.61 $15.04 $15.29 $15.46 Area Item City of Azusa Schedule of Fees and Charges (Developer Only) 2015.2016 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Description MASONRY FIREPLACE -Minimum Valuation FOUNDATION PERMITS - based on 1/3 the overall valuation of the bldg permit These figures shall be used when the applicant does not have a valuation, or if the valuation given is obviously low. FACTORY BUILT FIREPLACE- Minimum Valuation SIGNS 1 SIDE Painted Electrical 2 SIDES Painted Electrical POLE /Lineal Foot plus square foot of sign: 3" 0 4" 0 6" 0 8" 0 10" 0 12" 0 PHOTOVOLTAIC SYSTEMS Permit and Plan check fee's for photovoltaic systems shall be assessed at 45% of the fee generated by the declared valuation and the per unit electrical item cost Residential 15 kW or less=$500 or 45% of the fee generated by the declared valuation, whichever is less. Residential more than 15 kW=$500 + 15 PER kW OVER 15 or 45% of the fee generated by the declared valuation, whichever is less. Commercial 50 kW or less=$ 1000 or 45% of the fee generated by the declared valuation, whichever is less. Approved Approved Approved 2013-2014 2014-2015 2015.2016 Cost Per Cost Per Cost Per S.F. Avg. S.F. Avg. S.F. Avg. $4,529.01 $4,606.00 $4,656.67 $1,510.15 $1,535.82 $1,552.71 $58.56 $59.57 $60.23 $112.87 $114.79 $116.05 $68.58 $69.74 $70.51 $142.87 $145.30 $146.90 $48.58 $49.40 $49.95 $68.58 $69.74 $70.51 $88.58 $90.09 $91.08 $110.01 $111.88 $113.11 $130.01 $132.22 $133.68 $148.59 $151.11 $152.77 $500 or 45% of the fee by the declared valuation $500 or 45% of the fee by the declared valuation $1000 or 45% of the fee by the declared valuation Commercial more than 50 kw-250kw = $500 + $7 PER kW ABOVE 50 kW or 45% of $500 + $7 Per KW above 50 kW or 45% of the fee generated by the declared valuation, whichever is less. the fee generated by the declared valuation COMMERCIAL MORE THAN 250 kW =$2400 + 5 kW above 250 kW or 45% of the $2400 + $5 Per KW above 25okw or 45% of fee generated by the declared valuation, whichever is less. the fee generated by the declared valuation City of Azusa Schedule of Fees and Charges (Developer Only) 2015-2016 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENTICOMMUNITY IMPROVEMENT BUILDING AND SAFETY Area Item Description SWIMMING POOLS Valuation based on actual construction cost. Permit fees same as Building Permits. Minimum Valuation: SPAS Minimum Valuation Prefabricated Gunite SURCHARGEFEES # Optical Records System - Per Permit General Plan Maintenance - 10% permit surcharge to recover 50% of costs # Permit Automation Fee Approved Approved Approved 2013-2014 2014-2015 2015-2016 Cost Per Cost Per Cost Per S.F. Avg. S.F. Avg. S.F. Avg. $18,858.98 $19,179.58 $19,390.55 $3,771.80 $3,835.92 $3,878.11 $7,572.16 $7,700.89 $7,785.60 $15.00 $15.00 $15.00 $30.00 $30.00 $30.00 City of Azusa Schedule of Fees and Charges (Developer Only) 2015-2016 Exhibit - 1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Area Item Description S-2 BUILDING PERMIT FEES # Permit Issuance TnTAI Val IIATION Approved Approved 2013-2014 2014-2015 Cost Per Cost Per S.F. Avg. S.F. Avg. $90.00 $90.00 Approved 2015-2016 Cost Per S.F. Avg. $90.00 $1.00 to $500.00 $35.47 $36.08 $36.47 $ 501.00 to $2,000.00 $35.47 $36.08 $36.47 For the 1st $500.00 plus $3.33 for ea. additional $100.00, - or fraction thereof, to and including $2,000.00 $2,001.00 to $25,000.00 $104.54 $106.31 $107.48 For the 1st $2,000.00 plus $15.28 for ea. additional $1,000.00, or fraction thereof, to and including $25,000.00 $25,001.00 to $50,000.00 $590.61 $600.65 $607.25 For the 1st $25,000.00 plus $11.02 for ea. additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $971.76 $988.28 $999.15 For the 1 st $50,000.00 plus $7.64 for ea. additional $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $ 500,000.00 $1,500.10 $1,525.60 $1,542.38 For the 1 st $100,000.00 plus $6.11 for ea. additional $1,000.00, or fraction thereof, to and including $500,000.00 $500,001.00 to $1,000,000.00 $4,881.46 $4,964.44 $5,019.05 For the 1st $500,000.00 plus $5.18 for ea. additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $8,466.61 $8,610.54 $8,705.25 For the 1st $1,000,000.00 plus $3.44 for ea. additional $1,000.00, or fraction thereof Other Inspections and Fees: 1. Inspections outside of normal business hours (per hour') $70.95 $72.15 $72.95 (minimum charge - two hours) 2. Reinspection fees accessed under provisions of Section 305.8 (per hour) $70.95 $72.15 $72.95 3. Inspections for which no fee is specifically indicated (per hour) $70.95 $72.15 $72.95 (minimum charge - one-half hour) 4. Additional plan review required by changes, additions or revisions to plans -$70.95 $72.15 $72.95 (per hour) (minimum charge - one-half hour) 5. For use of outside consultants for Ian checkingand inspections, or both Actual costs Actual oosts2 Actual costs1 ' Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall inclutle supervision, overhead, equipment, hourly wages and fringe benefits of the employee involved. 'Actual costs include administrative and overhead costs. City of Azusa Schedule of Fees and Charges (Developer Only) 2015-2016 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Area Item Description S-3 ELECTRICAL PERMIT FEES Area Fee Rate - Single Family Dwellings (Rate x arealsq ft) Unit Fee Schedule (note: does not include Permit Issuance Fee) Receptacle, Switch and Lighting, or other. For receptacle, switch lighting, smoke detectors, or other outlets, at which current is used or controlled except services, feeders and meter: First 20, each Additional outlets, each (NOTE: For multi -outlet assemblies, each 5 ft. or fraction maybe considered as 1 outlet.) LIGHTING FIXTURES For lighting fixtures, sockets, or other lamp holding devices: First 20, each Additional fixtures, each For pale or platform mounted lighting fixtures, each For theatrical -type lighting fixtures or assemblies each RESIDENTIAL APPLIANCES For fixed residential appliances or receptacle outlets for same, including wall -mounts electric ovens, counter -mounted cooking tops, electric ranges, self-contained room, console, or through -wall air conditioners, space heaters, food waste grinders, dishwasher (NOTE: For other types of air conditioners and other motor driven appliances hawing larger electrical ratings, see PowerApparatus) TEMPORARY POWER SERVICE For a temporary service power pole or pedestal, including all pole or pedestal mounted receptacle outlets and appurtenances, each For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative lighting, Christmas tree sales lots, firework stands, sales booths, additional pole, etc., each NON-RESIDENTIAL APPLIANCES For residential appliances and self-contained, factory -wired, non-residential appliances not exceeding one (1) horsepower (HP), kilowatt (KW), or kilovolt -ampere (KVA) in rating, including medical and dental devices, food, beverage, and ice cream cabinets Approved Approved 2013-2014 20142015 Cost Per Cost Per S.F. Avg. S.F. Avg. Approved 2015-2016 Cost Per S.F. Avg. $0.11 $0.11 $0.11 $1.70 $1.73 $1.75 $1.13 $1.15 $1.16 $1.70 $1.73 $1.75 $1.13 $1.15 $1.16 $1.70 $1.73 $1.75 $1.70 $1.73 $1.75 $7.93 $8.06 $8.15 $33.96 $34.54 $34.92 $15.84 $16.11 $1629 $9.06 $9.21 $9.31 City of Azusa Schedule of Fees and Charges (Developer Only) 2015-2016 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Area Item Description POWER APPARATUS For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, as follows: Rating in horsepower (HP), kilowatts (KW), kilovolt -amperes (KVA), or kilovolt -amperes - reactive (KVAR) Up to and including 1, each Over 1 and not over 10, each Over 10 and not over 50, each Over 50 and not over 100, each Over100,each NOTE: 1. For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined radnq maybe used NOTE: 2 These fees include all switches, circuit breakers, contractors, thermostats relays and other directly related control equipment. BUSWAYS For trolley and plug-in type busways, each 100 feet or fraction thereof (NOTE An additional fee will be required for fighting f mires motors and other appliances that are connected to volley and plug-in type busways.) SIGNS, OUTLINE LIGHTING, AND MARQUEES For signs, outline lighting systems, or marquees supplied from one branch circuit, each For additional branch circuits within the same sign outline lighting system, or marquee, each SERVICES, SWITCHBOARDS, SWITCHBOARD SECTIONS, MOTOR CONTROL CENTERS AND PANELBOARDS For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less & not over 200 amperes in rating, ea. For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less and not over 200 amperes 1,000 amperes in rating, each For services, switchboards, switchboard sections, motor control centers and panelboards over 600 volts or over 1,000 amperes in rating, each MISCELLANEOUS APPARATUS, CONDUITS AND CONDUCTORS For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth (NOTE: This fee is not applicable when a fee is paid for one or more services, outlets fixtures appliances power apparatus, busways, signs or other equipment Approved Approved Approved 2013-2014 2014-2015 2015.2016 Cost Per Cost Per Cost Per S.F. Avg. S.F. Avg. S.F. Avg. $9.06 $9.21 $9.31 $15.84 $16.11 $16.29 $40.76 $41.45 $41.91 $81.51 $82.89 $83.81 $135.86 $138.17 $139.69 $22.65 $23.03 $23.28 $33.96 $34.54 $34.92 $11.32 $11.51 $11.63 $33.96 $34.54 $34.92 $67.94 $69.09 $69.85 $158.50 $161.20 $162.97 $33.96 $34.54 $34.92 City of Azusa Schedule of Fees and Charges (Developer Only) 2015-2016 Exhibit - 1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Area Item Description PRIVATE SWIMMING POOLS For new private, residential, inground swimming pools for single, or multi -family occupancies, including a complete system of necessary branch circuit wiring, bonding, grounding underwater lighting, water pumping and other similar electrical equipment For other types of swimming pools, therapeutic whirlpools, spas, hot tubs and alterations to existing swimming pools, each CARNIVALS AND CIRCUSES Carnivals, circuses and other traveling shows or exhibitions utilizing transportable -type rides, booths, displays and attractions. For electrical generators and electrical driven rides, each For mechanically driven rides and walk-through attractions or displays having electric lighting, each For a system of area and booth lighting, each For permanently installed rides, booths, displays, and attractions OTHER INSPECTIONS For inspection of electrical equipment for which no fee is herein set forth, the fee shall be determined by the Building Official S-4 PLUMBING FEES Each plumbing fixture or trap or set of fixtures on one trap (including drainage, vent, water piping and backflow prevention devices therefore) Each permanent type dishwasher whether individually trapped or not Each industrial waste pretreatment interceptor including it's trap & vent, except kitchen type grease interceptors functioning as fixtures traps Each swimming pool drainage trap & receptor whether connected to a building drain or building sewer (water supply for pool not included) Each gas piping system of 1 to 5 outlets or alteration or retest of existing gas piping system Each additional outlet over five Each gas pressure regulator other than appliance regulators Each water heater and/or vent Each solar potable water heating system, including water heater/vent For repair or alteration of drainage and/or vent piping Each piece of water -treating equipment and/or water piping installed without accompanying plumbing Lawn sprinkler systems on 1 meter including backflow prevention devices Backflow prevention devices on unprotected water supplied, pools, tanks, vats, etc. (including incidental water piping) 1 to 5 Any swimming pool piping associated wit the construction, remodeling or repair of a swimming pool, spa and hot tub Each additional device over five (5) Approved Approved 2013-2014 2014-2015 Cost Per Cost Per S.F. Avg. S.F. Avg. Approved 2015-2016 Cost Per S.F. Avg. $67.94 $69.09 $69.85 $45.29 $46.06 $46.57 $33.96 $34.54 $34.92 $13.59 $13.82 $13.97 $13.59 $13.82 $13.97 $13.59 $13.82 $13.97 $13.59 $13.82 $13.97 $13.59 $13.82 $13.97 $13.59 $13.82 $13.97 $13.59 $13.82 $13.97 $13.59 $13.82 $13.97 $3.40 $3.46 $3.50 $4.53 $4.61 $4.66 $13.59 $13.82 $13.97 $45.29 $46.06 $46.57 $13.59 $13.82 $13.97 $13.59 $13.82 $13.97 $13.59 $13.82 $13.97 $13.59 $13.82 $13.97 $37.73 $38.37 $38.80 $3.40 $3.46 $3.50 City of Azusa Schedule of Fees and Charges (Developer Only) 2015-2016 Exhibit - 1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Approved Approved Approved Area 2013-2014 2014-2015 2015-2016 Item Description Cost Per Cost Per Cost Per S.F. Avg. S.F. Avg. S.F. Avg. S-4 PLUMBING FEES Each building drain installed without accompanying plumbing $13.59 $13.82 $13.97 For connection of a house sewer to a public sewer or the extension of a house lateral $45.29 $46.06 $46.57 onto a lot for future use $38.49 $39.14 $39.57 For each house sewer manhole $38.49 $39.14 $39.57 Each installation of a section of house sewer for future use $24.90 $25.33 $25.60 For the connection of each additional bldg. or work to house sewer $24.90 $25.33 $25.60 For the connection of a house sewer to a private sewage disposal system $24.90 $25.33 $25.60 For each private sewage disposal system (septic tank & seepage pit or pits and/or drainfield) $79.25 $80.60 $81.48 For each cesspool, overflow seepage pit, percolation test pit, swimming pool drywell, or drainfield extension or replacement $38.49 $39.14 $39.57 For disconnection, abandonment, alteration or repair of any house sewer or private $11.32 $11.51 $11.63 sewage disposal system or part thereof $24.90 $25.33 $25.60 # Annual inspection of Fat, Oil and Grease $160.00 $160.00 $160.00 S-5 MECHANICAL PERMIT FEES Installation, alteration or relocation of each refrigeration compressor or absorption unit, & each fuel burning furnace, heater, boiler, and vented decorative appliance including vents attached thereto: Up to & including 100,000 BTU $22.65 $23.03 $23.28 More than 100,000 BTU to & including 1,000,000 BTU $45.29 $46.06 $46.57 More than 1,000,000 BTU $113.21 $115.14 $116.40 For each air inlet & air outlet served by any air conditioning system $3.97 $4.04 $4.08 For each 1,000 sq.ft. or fraction thereof of conditioned area $31.70 $32.24 $32.60 Note: When a permit is applied for and the fatal number ofairiniets & airoutlels is unknown, the fees shall be based on the sqitt ofcondilioned area. For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit $11.32 $11.51 $11.63 For the installation or alteration of each air handling unit for air conditioning including ducts attached thereto: Up to & including 2,000 CFM - Each unit up to 10 $11.32 $11.51 $11.63 Each unit over 10 $3.40 $3.46 $3.50 More than 2,000 CFM to and including 10,000 CFM $33.99 $34.57 $34.95 More than 10,000 CFM $56.61 $57.57 $58.20 Note: this lee shad not apply to an air handling unit which is a portion of a factory assembled air conditioned appliance for which a permit is required elsewhere in this Code. For each evaporative cooler other than portable type $18.12 $18.42 $18.63 For required ventilation fans which serve a single register: Each fan up to 10 $13.59 $13.82 $13.97 Each fan over 10 $4.53 $4.61 $4.66 For each required ventilation system which is not a portion of any air conditioning system for which a permit is required elsewhere in this Code $27.17 $27.64 $27.94 City of Azusa Schedule of Fees and Charges (Developer Only) 2015.2016 Exhibit -1 ECONOMIC & COMMUNITY DEVELOPMENT/COMMUNITY IMPROVEMENT BUILDING AND SAFETY Area Item Description S-5 MECHANICAL PERMIT FEES For the installation or each commercial kitchen hood or spray booth served by mechanical exhaust. including the fans and ducts attached thereto For the installation of each fire damper Alteration of existing duct system where a permit is not required elsewhere Note: 1) forretrigeration system rating one horsepower, one ton, or 12, 000 8TU per hour shall mean the same quantity Note: 2) forsteam boilers rated in boilerhorsepower, one horsepower shall equa150, 000 8TU per hour PLAN CHECK FEES Building Plan Check Fee - 85% of Permit Fee - $15.00 minimum Electric Plan Check Fee - 80% of Permit Fee - $15.00 minimum Energy Plan Check Fee - 10% of Building Permit Fee Mechanical Plan Check Fee - 80% of Permit Fee - $15.00 minimum Plumbing Plan Check Fee - 80% of Permit Fee - $15.00 minimum n CPI not factored in. Approved Approved Approved 2013-2014 2014-2015 2015-2016 Cost Per Cost Per Cost Per S.F. Avg. S.F. Avg. S.F. Avg. $56.61 $57.57 $58.20 $9.06 $9.21 $9.31 $22.65 $23.03 $23.28 Area Item Description City of Azusa Schedule of Fees and Charges Developer Only 2015-2016 Exhibit 1.2 BUILDING AND SAFETY Approved Approved Approved 2013-2014 2014-2015 2015.2016 Fee/Unit Fee/Unit Fee/Unit S-045 Grading Plan Check Fee Variable Variable Variable <100 CY - $865 100-1,000 CY - $865 plus $14 per 100 CY 1,000 - 10,000 CY - $991 plus $74 per 1,000 CY 10,000 - 50,000 CY - $1,657 plus $17 per 1,000 CY 50,000+ CY - $2,337 plus $231 per 10,000 CY S-046 Grading Inspection Variable Variable Variable <100 CY - $345 100-1,000 CY - $345 plus $48 per 100 CY 1,000 -10,000 CY - $777 plus $72 per 1,000 CY 10,000 - 50,000 CY - $1,425 plus $87 per 1,000 CY 50,000+ CY - $4,905 plus $570 per 10,000 CY Grading Permit Fee - Based on Cubic Yards $166 $169 $170 Permit Fee for Changes to Original Permit: $106 $108 $108 $20,001 to $50,000 $106 $108 $108 $50,001 to $75,000 $143 $145 $147 $75,001 to $100,000 $218 $222 $224 $100,001 to $200,000 $286 $291 $294 $200,000 to $500,000 $369 $375 $379 $500,001 and up $452 $460 $464 Special Site Inspection $83 $84 $85 Commercial - Minimum 2 hours $166 $169 $170 Residential - Minimum 2 hour $166 $169 $170 Residential(non-habitable space) -Min. 2 hours $158 $161 $162 # Production Lot Plan Check -per lot $200 $200 $202 Occupancy Inspection Fee: 0-1 to 15,000 sq ft -1l2 hour of technical staff time $45 $45 $45 15,000 sq.ft. on - 1 hour of technical staff time $83 $84 $85 Bonds for Sign(s) - Refundable $249 $253 $256 Demolition Permit Fee - Minimum 1 hour $97 $99 $99 Deputy Inspection Registration Fee - Deputy $45 $45 $45 Emergency Inspection Fee - Minimum 1 hours $135 $138 $139 Hearing Officer Actual Cost Actual Cost Actual Cost Pre -Plan Check Submittal - Minimum 2 hours $172 $175 $177 Reinspection Fee - Minimum 1 hour $91 $92 $93 Room Addition Plan Check Fee - Minimum 2 hours $172 $175 $177 Trailer Coach $166 $169 $170 Trash Enclosure - $10 for additional enclosure $68 $69 $69 City of Azusa Schedule of Fees and Charges Developer Only 2015-2016 Exhibit 1.2 BUILDING AND SAFETY s CP1 not factored in. Approved Approved Approved Area 2013-2014 2014-2015 2015.2016 Item Description Fee/Unit Fee/Unit Fee/Unit Relocation of Buildings: 0 to 2,000 sq.ft. $391 $397 $401 2,001 to 5,000 sq.ft. $732 $744 $752 5,001 sq.ft. and up $1,055 $1,073 $1,084 Plan Checking Fee: Staff rates assessed against deposit. Executive Staff - per hour $151 $153 $154 Professional Staff - per hour $107 $109 $110 Technical Staff (Plan Checker/Inspector) - per hour $91 $92 $93 On-site Improvement Inspections: $2,000 deposit required for parking lot paving and miscellaneous testing Professional Staff - per hour $107 $109 $110 Rates applied against deposit Technical Staff - per hour $91 $92 $93 Rates applied against deposit Standard Plan check fee: Professional Staff - per hour $107 $109 $110 Technical Staff - per hour $91 $92 $93 s CP1 not factored in. City of Azusa Schedule of Fees and Charges - Developer Only 2015-2016 Exhibit 2 PLANNING AND ENGINEERING Area Item Description 5-001 Zoning Clearance 5-002 Minor Design Review (over the counter) S-003 Staff Level Design Review Reduced to $350 for modifications to existing structures 5-004 #Major Design Review (Deposit) 5-005 Use Permit Major UP Minor UP 5.005A Minor Use Permit S-006 UP Modifications Modifications to Major UP Modifications to Minor UP 5-008 Minor Variance S-009 Variance $940 when Single Family Structure is involved S-010 # Zone Change 5-011 # Development Code Amendment S-012 # Development Agreement # Annual Monitoring Deposit for charges at fully allocated hourly rates. All costs recovered. 5-013 # General Plan Amendment Deposit for charges at fully allocated hourly rates. All costs recovered. 5-014 Specific Plan # Deposit for charges at fully allocated hourly rates. All costs recovered. S-015 # Specific Plan Amendment 5-016 Tentative Parcel Map Approved Approved Approved 2013-2014 2014-2015 2015.2016 Fee/Unit Fee/Unit Fee/Unit $48 $49 $49 $1,240 $1,261 $1,274 $3,310 $3,366 $3,402 $10,000(D) $10,000(D) $10,000(D) $4,629 $4,708 $4,759 N/A N/A N/A $761 $774 $782 $2,166 $2,202 $2,226 $543 $552 $558 $873 $887 $897 $4,369 $4,443 $4,491 $5,000 (D) $5,000 (D) $5,000 (D) $5,000 (D) $5,000 (D) $5,000 (D) $10,000 (D) $10,000 (D) $10,000 (D) $5,000(D) $5,000(D) $5,000(D) $15,000 (D) $15,000 (D) $15,000 (D) $10,000(D) $10.000(D) $10,000(D) $5,000 (D) $5,000 (D) $5,000 (D) $6,103 $6,207 $6,275 City of Azusa Schedule of Fees and Charges - Developer Only 2015-2016 Exhibit 2 PLANNING AND ENGINEERING Area Item Description 5-017 Tentative Tract Map 5-20 lots 20-50 lots 50-100 lots 100+ lots S-016 Reversion to Acreage 5-019 Lot Merger 5.020 Environmental Categorical Exemption Rev. S-021 Environmental Initial Study 5-023 # Environmental Impact Report Review Deposit for charges at fully allocated hourly rates. All costs recovered. Approved Approved Approved 2013-2014 2014-2015 2015-2016 Fee/Unit Fee/Unit Fee/Unit $6,609 $6,721 $6,794 $7,934 $8,068 $8,157 $10,972 $11,158 $11,281 $12,334 $12,544 $12,681 $2,081 $2,116 $2,139 $1,336 $1,358 $1,373 $213 $216 $218 $3,916 $3,983 $4,026 $10.000 (D) $10,000 (D) $10,000 (D) 5-024 Mitigation Monitoring - CEQA Monitoring Deposit Deposit Deposit Deposit for charges at fully allocated hourly rates. All costs recovered. determined by staff determined by staff determined by staff S-025 Annexation Deposit Deposit Deposit Deposit for Charges at fully allocated hourly rates. determined by staff determined by staff determined by staff All costs recovered. 5-026 Condominium Conversion Map $4,938 $5,022 $5,077 Plus Consultant fee 5-027 Minor Sign Review $48 $49 $49 5-026 Major Sign Review $500 $509 $514 S-029 Zoning Letter Single Family Residential $133 $135 $136 Other $303 $308 $311 5-030 Temporary Occupancy Review $505 $514 $519 S-031 Temporary Use Permit $474 $482 $486 25% discount for Azusa based non-profit organizations S-032 Continuance Processing $495 $503 $508 City of Azusa Schedule of Fees and Charges - Developer Only 2015-2016 Exhibit 2 PLANNING AND ENGINEERING Approved Approved Approved Area 2013-2014 2014-2015 2015.2016 Item Description - Fee/Unit Fee/Unit Fee/Unit S-033 Time Extension Review - Staff $341 $346 $350 5-034 Time Extension Review- Planning Commission $761 $774 $782 5-035 Appeal To Planning Commission $1,692 $1,721 $1,739 5-036 Appeal To City Council $2,692 $2,738 $2,768 5-15 Preliminary Plan Review $1,442 $1,467 $1,482 Per meeting - 50% of the fee for the 1 st meeting applied against future Planning/Engineering fee for the project. S -15A Nonconforming Use Time Extension $748 $761 $769 5-037 Certificate of Compliance $1,155 $1,174 $1,187 5-038 Street Name Processing W/O Map $1,155 $1,174 $1,187 S-039 Street Re -Name Processing $1,591 $1,618 $1,635 5-040 Building Address Processing W/O Map $660 $671 $678 5-041 Building Re -Address Processing $388 $395 $399 S -041A Com Dev Newspaper Publication $229 $233 $235 5-044 Special Building Inspection $117 $119 $120 2 hour minimum 5-047 Public/Private Improvement Plan Check Variable Variable Variable $0-$100,000 - 3% of the estimated construction cost next $400,000 - 2.5% of the estimated construction cost amounts over $500,000 - Deposit of 2% of the estimated construction cost 5-048 Public/Private Improvement Inspection Variable Variable Variable $04100,000 - 5% of the estimated construction cost next $400,000 - 3.5% of the estimated construction cost amounts over $500,000 - Deposit of 2% of the estimated construction cost City of Azusa Schedule of Fees and Charges - Developer Only 2015-2016 Exhibit 2 PLANNING AND ENGINEERING Approved Approved Approved Area 2013-2014 2014-2015 2015-2016 Item Description Fee/Unit Fee/Unit Fee/Unit S-049 Final Parcel Maps: $1,873 $1,905 $1,926 City Fee $1,173 County Fee $700 5-050 Final Maps: Map Analysis for Tracts: 1 - 5 Lots City Fee $963 County Fee $710 N/A N/A N/A 6 - 10 Lots City Fee $1,001 County Fee $915 N/A N/A N/A 5 - 10 Lots City Fee $1,852 County Fee $915 $2,767 $2,814 $2,844 11 - 25 Lots City Fee $2,923 County Fee $1,350 $4,273 $4,345 $4,393 26 - 50 Lots City Fee $3,877 County Fee $2,200 $6,077 $6,180 $6,247 51 - 100 Lots City Fee $5,948 County Fee $3,300 $9,248 $9,405 $9,508 101 - 150 Lots City Fee $6,876 County Fee $5,000 $11,876 $12,078 $12,211 151 or more Lots City Fee $8,341 County Fee $6,600 $14,941 $15,195 $15,362 5-051 Easement Checking for Tract Maps City Fee $327 County $210 $537 $547 $552 Easement Checking for Parcel Maps City Fee $325 County $175 $500 $509 $514 S-052 Monument Inspection each City Fee $226 County $125 $351 $357 $361 5-053 Bond Processing City Fee $95 County $75 $170 $173 $175 5-054 Tax Clearance Processing: 5 yr history (provided by County) City Fee $163 County $625 $788 $801 $809 5-055 Lot Line Adjustment $1,282 $1,304 $1,318 S-056 # Street/ROW Abandonment Proc. $2,000 (D) $2,000(0) $2,000 (D) Deposit for charges at fully allocated hourly rates. All costs recovered. 5-056A SUSMP Plan Review $1,703 $1,732 $1,750 S-0568 SWPPP Plan Review $1,586 $1,613 $1,630 5-056C # Hydrology/Traffic/Soils Report Rev $1,500 (D) $1,500 (D) $1,500 (D) City of Azusa Schedule of Fees and Charges - Developer Only 2015.2016 Exhibit 2 PLANNING AND ENGINEERING Approved Approved Approved Area 2013-2014 2014-2015 2015-2016 Item Description Fee/Unit Fee/Unit Fee/Unit Deposit for charges at fully allocated hourly rates. All costs recovered. 5-056D Drainage Plan Review Variable Variable Variable $04100,000 - 3% of the estimated construction cost next $400,000 - 2.5% of the estimated construction cost amounts over $500,000 - Deposit of 2% of the estimated construction cost 5-057 Sidewalk/Curb/Gutter: Up to 75 LF $505 $514 $519 Additional 75 LF, no deposit $165 $168 $169 5-057A Driveway Approach/Street Cut: Up to 100 SF $505 $514 $519 Additional 100 SF, no deposit $218 $222 $224 5.058 Obstruction Permit $90 $92 $93 5-059 Transportation Permits (oversized and/or overweight trucks): Single Trip/Rider $18 $18 $18 Fee set by state Annual Permit $98 $98 $99 Fee set by state S-060 House Moving Permit $1,000 $1,017 $1,028 S -060A Industrial Waste Permit NewlModification $660 $671 $678 Annual $218 $222 $224 5-0608 Fats,Oils and Grease Program New $436 $444 $448 Annual $165 $168 $169 S-061 Sewer Saddle $309 $314 $317 Sewer Dye Test See Exhibit 7 - Utility Sewer Blockage Check See Exhibit 7 - Utility 5-062 Blueprint/Map Copy Service, per sheet $21 $22 $21 $21 or actual outside costs City of Azusa Schedule of Fees and Charges - Developer Only 2015-2016 Exhibit 2 PLANNING AND ENGINEERING Approved Approved Approved Area 2013-2014 2014-2015 2015-2016 Item Description Fee/Unit Fee/Unit Fee/Unit S-063 Real Property Records Report Condominium/Townhouses $53 $54 $54 Vacant/Unimproved Land $170 $173 $175 Single Family Dwellings $170 $173 $175 Multi -Family Dwelling - per parcel (plus $10 for add'I unit) $170 $173 $175 Commercial Properties $170 $173 $175 5-064 Residential Rental Housing Registration and Inspection: Per parcel - includes first unit (plus $7 for add'I unit) $112 $114 $114 Reinspection - $85 S-065 Lien Release Variable Variable Variable Substanard - $100 Admin Fine- $80 5-066 Admin. Hearing Appeal $266 $271 $273 City Fee $241 Court $25 S -066A Public Nuisance Admin Hearing $346 $352 $355 Refunded if the appelant prevails 5-0668 Cost Recovery Hearing $128 $130 $131 Refunded if the appelant prevails S -066C Code Enforcement Fines # First Offense $100 $100 $101 # Second Offense $250 $250 $252 # Third Offense $500 $500 $505 Project Plans/Specifications - Plus $10 if mailed $51 $52 $52 5-3.1 Block Wall Permit Verification of Conditions: County $183 $186 $188 City $158 $160 $161 Agreement and/or Improvement Security, each $208 $211 $213 Extension Time for Improvement Agreement, each $283 $288 $291 Fourth Submittal Originals/Prints $391 $397 $402 Sixth Submittal or Originals/Prints $1,371 $1,394 $1,409 Eighth and each subsequent submittal of originals/prints $1,635 $1,662 $1,680 Minor Land Divisions: City of Azusa Schedule of Fees and Charges - Developer Only 2015-2016 Exhibit 2 PLANNING AND ENGINEERING Area Item Description Lot Split Recording Fee: First Sheet Additional sheets, each LDMA Surcharge (County maps only): Tract Map Parcel Map Overtime: Tract Map Parcel Map 5-6.3 Staff Rates: Director of Public Works - per hour City Engineer- per hour Principal City Engineer- per hour Assistant City Engineer - per hour Associate City Engineer - per hour Public Works Inspector - per hour Consultant (Invoice + 36% Overhead) 5.6.5 Code Compliance Fee S-7 Landscape Design Standards (Over the Counter Sales) 5-18 City -provided Tree Planting - One 15 gallon Tree City -provided Tree Planting - One 24" Box Tree 5-032.5 Weed Abatement Inspection (Processing & Referring) S-95.1 # Recovery & Storage of Abandoned Shopping Carts u CPI not factored in. Approved 2013-2014 Fee/Unit $579 Approved 2014-2015 Fee/Unit $589 Approved 2015-2016 Fee/Unit $595 $7 $8 $8 $2 $2 $2 $391 $397 $401 $132 $134 $135 $1,308 $1,330 $1,344 $912 $928 $937 $195 $198 $200 $161 $163 $165 $136 $138 $139 $90 $92 $92 $155 $158 $159 $109 $111 $111 $37 $37 $37 $6 $6 $6 $106 $108 $109 $183 $186 $188 $320 $325 $329 $12 $12 $12 City of Azusa Schedule of Fees and Charges Developer Only 2015-2016 Exhibit 3 FIRE SAFETY" -' Not included in fee study. Fees determined by County Fire Dept Approved Approved Approved Area 2013.2014 2014-2015 2015-2016 Item Description Fee/Unit Fee/Unit Fee/Unit S-1.1 Fire Safety - Fee per Hour: Fire Plan Check $102 $104 $105 Fire Alarm System $102 $104 $105 Fire Extinguisher Service $102 $104 $105 Flammable Storage $102 $104 $105 Hood System $102 $104 $105 Spray Booths $102 $104 $105 Subdivision Plan Checking $102 $104 $105 Fire Permit Fees Occupancy Inspection - per hour $102 $104 $105 Christmas Tree Lot Inspection - per hour $102 $104 $105 Circus/Camival Inspection - Minimum 2 hours $204 $208 $210 Flammable Liquid Tank Site Inspection - Minimum 3 hours $305 $311 $314 Liquid Petroleum Gasses - per hour $102 $104 $105 Magnesium Working - Minimum 2 hours $204 $208 $210 Motor Vehicle Repair Garages - per hour $102 $104 $105 Oxygen System Installation - Minimum 2 hours $204 $208 $210 Storage/Handling Flammable Liquids - Minimum 2 hours $204 $208 $210 Underground Tank Installation - Minimum 4 hours $409 $416 $420 Underground Tank Removal - Minimum 3 hours $305 $311 $314 Fireworks Stands - Minimum Y. hour $52 $53 $53 Metal Foundry - Minimum 2 hours $204 $208 $210 Places of Assembly - Minimum 2 hours $204 $208 $210 Pyrotechnical Special Effects - per hour $102 $104 $105 Public Rifle/Gun Ranges - Minimum 2 hours $204 $208 $210 Tire Storage Areas in Excess of 1,000 cu. ft. - per hour $102 $104 $105 Automobile Dismantling/Storage Yards - Minimum 2 hours $204 $208 $210 Commercial Woodworking Facilities with Dust Collection Systems Greater than 25 gallons - Minimum 2 hours $204 $208 $210 Educational/Daycare Centers - Minimum 3 hours $305 $311 $314 Miscellaneous Fire Fees - per hour Residential Inspection per Sec. 13146.2 of H&S Code $102 $104 $105 Engine Company Standby $102 $104 $105 Hazardous Materials Response $102 $104 $105 Special Inspections $102 $104 $105 Weed Abatement (Processing & Referral) $102 $104 $105 -' Not included in fee study. Fees determined by County Fire Dept