Loading...
HomeMy WebLinkAboutD-4 Staff Report - TOD Specific Plan AmendmentSCHEDULED ITEM D-4 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL VIA: TROY L. BUTZLAFF, ICMA-CM, CITY MANAGER FROM: KURT CHISTIANSEN, FAICP, ECONOMIC AND COMMUNITY DEVELOPMENT DIRECTOR DATE: JUNE 19, 2017 SUBJECT: PUBLIC HEARING - FIRST READING OF ORDINANCE FOR A SPECIFIC PLAN AMENDMENT (SPA-2017-01) AMENDING THE TRANSIT ORIENTED DEVELOPMENT SPECIFIC PLAN SUMMARY: On November 2, 2015, the City Council approved the Transit Oriented Development Specific Plan (TOT Specific Plan), Final Environmental Impact Report, and associated zone change. The Specific Plan is being amended to reflect recent changes in the downtown area. On May 25, 2017, the City of Azusa Planning Commission conducted a duly noticed public hearing and unanimously recommended to the City Council approval of Specific Plan Amendment No. SPA-2017- 01.The proposed actions consist of holding a public hearing, receiving public testimony, closing the Public Hearing and adopting Specific Plan Amendment No. SPA-2017-01 and Ordinance No. 2017-06. RECOMMENDATION: Staff recommends that the City Council take the following actions: 1)Open the Public Hearing, receive public testimony, close the Public Hearing; and; 2) Adopt Specific Plan Amendment No. SPA-2017-01; and 3)Introduce, waive further reading and read by title only Ordinance No. 2017-06, amending the TOD Specific Plan. APPROVED CITY COUNCIL 6/19/2017 Specific Plan Amendment No. SPA-2017-01 June 19, 2017 Page 2 of 5 BACKGROUND: On September 10, 2012, City staff submitted an application to the Los Angeles County Metropolitan Transportation Agency (Metro) for Round 3 of its Transit Oriented Development (TOD) Planning Grant Program. The TOD Planning Grant Program is designed to spur the adoption of local land use regulations that create a regulatory environmental supportive of TOD in Los Angeles County, as well as pre-regulatory planning efforts that can lead to the adoption of such local land use regulations. The Planning Grant Program was open to municipalities with land use regulatory control over property within 0.25 mile of designated transit corridors. In February 2013, Metro awarded the City a $653,000 grant to develop a specific Plan and to promote TOD around the Azusa Downtown God Line Station and Azusa Pacific University (APU)/Citrus College Station. The Azusa TOD Specific Plan Area encompasses 350 acres located in the central portion of the City of Azusa and is bounded by 9th Street to the north, Angeleno Avenue to the west, 5th and 6th Streets to the south, and Citrus Avenue to the east. The Specific Plan also supports regional goals and is consistent with the Southern California Association of Governments (SCAG) Compass Blueprint Program principles of enhancing mobility, livability, prosperity, and sustainability in Southern California communities. Additionally, the Specific Plan advances the objectives of AB32 and helps implement SB375 by encouraging compact, mixed use districts that locate housing, jobs, recreation, and other daily needs within close proximity. The planning effort for the TOD Specific Plan started in early 2014 with the formation of a planning team to guide the planning process and development of the Specific Plan’s vision and objectives. Several public meetings, focus groups, and study sessions were conducted to gather ideas and identify issues concerning the future planning of Azusa in relation to the Specific Plan area. This collaborative effort was a success and much information was collected. These ideas became the foundation for many of the recommendations contained within the Specific Plan. On November 2, 2015, the City Council approved the specific plan, Final Environmental Impact Report, and associated zone change. Copies of the Specific Plan and Final Environmental Impact report (FEIR) are available on the City’s website at www.ci.azusa.ca.us; at the Azusa City Hall, Community Development Department, 213 E. Foothill Blvd, Azusa CA; and at the Azusa City Library, 729 N. Dalton Avenue, CA during regular business hours, 7:00 a.m. to 5:30 p.m. DISCUSSION: The list below provides an overview of all the proposed revisions: Recommended Specific Plan Amendments Summary (Attachment D) 1. Entire Document • Revise date on page footers to May 2017. 2. Cover/TOC • Add “Amended on [Month] [Date], 2017” on Cover Page • Add “Amended by: Ordinance No. XXXX-XXX” on Title Page 3. Page 2-20, 2-30, 2-44, and 2-57 • Add text allowing architectural projections/features as follows: “Architectural projections/features may exceed the height limits of this District up to 10 feet, subject to Economic and Community Development Director approval. Projections/features Specific Plan Amendment No. SPA-2017-01 June 19, 2017 Page 3 of 5 should be architecturally compatible and aesthetically pleasing or be screened from view. Neon signage, historic graphics, and/or other non-business or project specific related screening methods may be considered appropriate, subject to Economic and Community Development Director approval.” 4. Page 2-16, 2-26, 2-40, 2-52, 2-66, and 2-77 • Add Superscript 1 to ‘Medical Office/Service’ use with Note stating “Only Medical Services – Doctor Office use permitted on a second or upper floor”. • Add Superscript 2 to ‘Office’ use with Note stating “Only Office-Processing and Office- Professional are permitted on a second or upper floor.” 5. Page 2-66 • Change ‘Medical Services – Doctor Office’ in Allowable Use Table to ‘Medical Office/Service’ to ensure consistency of language between Districts. 6. Page 2-59 • Modify text under subtitle ‘Use of Exposed Neon Tubing’ to read as follows:  “The use of neon (exposed gaseous light tubing) and LED signage is required within the Route 66 District and shall meet the following requirements:” 7. Page 2-26 • Add “Theater” as an allowable use under Recreation, Education, and Public Assembly in the Allowable Uses Table through a Minor Conditional Use Permit (MUP). 8. Page 2-16, 2-26, 2-40, and 2-52 • Add “Operating between 9:00 pm and 7:00 am” use under Retail Sales in the Allowable Uses Table through a Minor Conditional Use Permit (MUP). 9. Page 2-16, 2-26, and 2-40 • Add “Outdoor Displays and Sales” use under Retail Sales in the Allowable Uses Table through a Minor Conditional Use Permit (MUP). 10. Page 2-40 • Add “Massage Parlor” under Services General in the Allowable Uses Table through a Special Permit (SP). 11. Page 2-11 • Add text clarifying guest parking requirements for stand-alone and mixed-use projects as follows:  “Projects with only residential uses are required to provide 1 guest parking space for every 6 residential units. Mixed-use projects containing residential uses are not required to provide guest parking spaces.” • Add parking requirements for ‘Theater’ uses as follows:  “1 space/200 sf in a mixed-use project; may require a parking analysis to determine total spaces needed by use.” The Specific Plan Amendment provides consistent changes with the previous approved zones. Several sections were included to provide clarity on uses, hours of operation, outdoor dining, and signage. NOTICING: A legal notice of the public hearing was published in the legal advertisement section of San Gabriel Valley Tribune newspaper on May 12, 2017. This notice was posted in three public places and posted on the City’s website at www.ci.azusa.ca.us. As of the date of this Staff Report, no public correspondence has been received Specific Plan Amendment No. SPA-2017-01 June 19, 2017 Page 4 of 5 ENVIRONMENTAL REVIEW: On November 2, 2015, the City Council certified the Final Environmental Impact Report (SCH#2015021018) (FEIR) for the Specific Plan pursuant to the California Environmental Quality Act (Pub. Resources Code, §§ 21000 et seq.) and the State CEQA Guidelines (Cal. Code Regs., Title 14, §§ 15000 et seq.) As described above, the City is considering making certain minor modifications to the Specific Plan, each of which was analyzed in the FEIR. State CEQA Guidelines §15162 provide that when an EIR has been certified for a project, no subsequent EIR shall be prepared for that project unless the lead agency determines, on the basis of substantial evidence, one or more of the following: • Substantial changes are proposed in the project that would require major revision to the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or • Substantial changes occur with respect to the circumstances under which the project is undertaken which would require major revisions of the previous EIR due to the involvement of new significant effects or a substantial increase in the severity of previously identified significant effects; or • New information of substantial importance shows that the project would have one or more significant effects not discussed in the previous EIR, or that significant effects previously examined would be substantially more severe, or that mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects but the City Council declined to adopt them, or mitigation measures or alternatives that are different from those included in the previous EIR would substantially reduce one or more significant effects on the environment but the City Council declined to adopt them. Section 15006 of the State CEQA Guidelines expressly encourages public agencies to reduce delay and paperwork associated with implementation of CEQA by using previously prepared environmental documents when those previously prepared documents adequately address potential impacts of the proposed project. Here, because the City is not considering making any substantive changes to the Specific Plan, it can be seen with certainty that: (1) there will be no new significant impacts or more severe significant impacts than were previously disclosed in the EIR; (2) there have been no changes in the circumstances under which the Specific Plan was approved and the EIR certified such that previously undisclosed impacts will occur; and (3) no new information has come to light that was not known and could not have been known at the time the EIR was certified showing that previously undisclosed impacts will occur. In light of the standards for subsequent environmental review outlined in CEQA and the State CEQA Guidelines, no subsequent review is required here, and no changes to the previously certified EIR are necessary pursuant to Public Resources Code section 21166 and State CEQA Guidelines sections 15162 and 15164. FINDING OF FACTS: In accordance with Section 88.51.070.D of the Azusa Development Code, it is found that the project would not unreasonably interfere with the use or enjoyment of property in the vicinity, and would not Specific Plan Amendment No. SPA-2017-01 June 19, 2017 Page 5 of 5 adversely affect the public peace, health, safety or general welfare. The City Council may adopt the Specific Plan Amendment based on the following findings: 1. That the proposed amendment is consistent with the goals, policies, and objectives of the general plan, any applicable specific plan, development agreement; and The proposed Specific Plan Amendment is in the public interest and will benefit the community with consistent language with the General Plan, Development Code and Azusa Transit Oriented Development (TOD) Specific Plan. The Specific Plan Amendment revises sections of the TOD Specific Plan to provide standards consistent with the previous zones. The proposed Specific Plan Amendment is consistent with the goals, policies, and objectives of the current General Plan in that it encourages a balanced approach to meeting housing and employment needs that include maintaining and enhancing the quality of mixed uses in the districts zones. The TOD Specific Plan is consistent with other land use goals and policies of the General Plan, and maintains specific goals and policies that are aimed at maintaining and improving Azusa’s established downtown. There are no development agreements with this amendment. 2. That a proposed zone change will not adversely affect surrounding properties. A zone change was adopted by the City Council on November 2, 2015. The Specific Plan amendment will provide revisions to the adopted TOD Specific Plan. The change will not adversely affect surrounding properties but provide consistency with already approved businesses and uses. FISCAL IMPACT There is no fiscal impact associated with these actions. As proposed, the Metro grant will also allocate funding for Staff time, which will result in a savings to the City’s General Fund. The City is requesting the amendments and all associated entitlements costs are waived. Prepared by: Reviewed and Approved: Edson Ibañez Kurt Christiansen, FAICP Assistant Planner Economic and Community Development Director Reviewed and Approved: Reviewed and Approved: Louie F. Lacasella Troy L. Butzlaff, ICMA-CM Management Analyst City Manager Attachments: 1) Draft Ordinance No. 2017-06 2) Map of TOD Specific Plan Area 3) Specific Plan redline edits 4) TOD Specific Plan ORDINANCE NO. 2017-06 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA AMENDING THE TOD SPECIFIC PLAN WHEREAS, the City Council adopted the TOD Specific Plan and associated Zone Change at a regular meeting on November 2, 2015; WHEREAS, the Planning Commission of the City of Azusa, after giving notice thereof as required by law, held a public hearing on May 24, 2017 for a City -initiated amendment to the TOD Specific Plan (Specific Plan Amendment No. SPA-2017-01); and WHEREAS, the City Council conducted a public hearing on the proposed Specific Plan Amendment No. SPA-2017-01 at a regular meeting on June 19, 2017, and conducted a first reading of this Ordinance; and WHEREAS, all other legal prerequisites to the adoption of this Ordina nce have occurred. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. Incorporation of Recitals. The above recitals are true and correct and are incorporated herein by this reference. SECTION 2. The TOD Specific Plan is hereby revised as follows: 1. Entire Document Revise date on page footers to May 2017. 2. Cover/TOC Add “Amended on [Month] [Date], 2017” on Cover Page Add “Amended by: Ordinance No. XXXX-XXX” on Title Page 3. Page 2-20, 2-30, 2-44, and 2-57 Add text allowing architectural projections/features as follows: “Architectural projections/features may exceed the height limits of this District up to 10 feet, subject to Economic and Community Development Director approval. Projections/features should be architecturally compatible and aesthetically pleasing or be screened from view. Neon signage, historic graphics, and/or other non-business or project specific related screening methods may be considered appropriate, subject to Economic and Community Development Director approval.” 4. Page 2-16, 2-26, 2-40, 2-52, 2-66, and 2-77 Ordinance No. 2017-06 Page 2 of 5 Add Superscript 1 to ‘Medical Office/Service’ use with Note stating “Only Medical Services – Doctor Office use permitted on a second or upper floor”. Add Superscript 2 to ‘Office’ use with Note stating “Only Office-Processing and Office-Professional are permitted on a second or upper floor.” 5. Page 2-66 Change ‘Medical Services – Doctor Office’ in Allowable Use Table to ‘Medical Office/Service’ to ensure consistency of language betwe en Districts. 6. Page 2-59 Modify text under subtitle ‘Use of Exposed Neon Tubing’ to read as follows:  “The use of neon (exposed gaseous light tubing) and LED signage is required within the Route 66 District and shall meet the following requirements:” 7. Page 2-26 Add “Theater” as an allowable use under Recreation, Education, and Public Assembly in the Allowable Uses Table through a Minor Conditional Use Permit (MUP). 8. Page 2-16, 2-26, 2-40, and 2-52 Add “Operating between 9:00 pm and 7:00 am” use under Retail Sales in the Allowable Uses Table through a Minor Conditional Use Permit (MUP). 9. Page 2-16, 2-26, and 2-40 Add “Outdoor Displays and Sales” use under Retail Sales in the Allowable Uses Table through a Minor Conditional Use Permit (MUP). 10. Page 2-40 Add “Massage Parlor” under Services General in the Allowable Uses Table through a Special Permit (SP). 11. Page 2-11 Add text clarifying guest parking requirements for stand-alone and mixed-use projects as follows:  “Projects with only residential uses are required to provide 1 guest parking space for every 6 residential units. Mixed-use projects containing residential uses are not required to provide guest parking spaces.” Add parking requirements for ‘Theater’ uses as follows:  “1 space/200 sf in a mixed-use project; may require a parking analysis to determine total spaces needed by use.” SECTION 3. On November 2, 2015 , the City Council certified the Final Environmental Impact Report (SCH#2015021018) (FEIR) for the Specific Plan pursuant to the California Environmental Quality Act (Pub. Resources Code, §§ 21000 et seq.) and the State CEQA Guidelines (Cal. Code Regs., tit. 14, §§ 15000 et seq.) As described above, the City is considering making certain minor modifications to the Specific Plan, each of which was analyzed in the FEIR. Ordinance No. 2017-06 Page 3 of 5 State CEQA Guidelines §15162 provide that when an EIR has been certified for a project, no subsequent EIR shall be prepared for that project unless the lead agency determines, on the basis of substantial evidence, one or more of the following:  Substantial changes are proposed in the project that would require major revision to the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or  Substantial changes occur with respect to the circumstances under which the project is undertaken which would require major revisions of the previous EIR due to the involvement of new significant effects or a substantial increase in the severity of previously identified significant effects; or  New information of substantial importance shows that the project would have one or more significant effects not discussed in the previous EIR, or that significant effects previously examined would be substantially more severe, or that mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects but the City Council declined to adopt them, or mitigation measures or alternatives that are different from those included in the previous EIR would substantially reduce one or more significant effects on the environment but the City Council declined to adopt them. Section 15006 of the State CEQA Guidelines expressly encourages public agencies to reduce delay and paperwork associated with implementation of CEQA by using previously prepared environmental documents when those previously prepared documents adequately address potential impacts of the proposed project. Here, because the City is not considering making any substantive changes to the Specific Plan, it can be seen with certainty that: (1) there will be no new significant impacts or more severe significant impacts than were previously disclosed in the EIR; (2) there have been no changes in the circumstances under which the Specific Plan was approved and the EIR certified such that previously undisclosed impacts will occur; and (3) no new information has come to light that was not known and could not have been known at the time the EIR was certified showing that previously undisclosed impacts will occur. In light of the standards for subsequent environmental review outlined in CEQA and the State CEQA Guidelines, no subsequent review is required here, and no changes to the previously certified EIR are necessary pursuant to Public Resources Code section 21166 and State CEQA Guidelines sections 15162 and 15164. SECTION 4. Custodian of Records. The documents and materials that constitute the record of proceedings on which this Ordinance is based are located at the City Clerk’s office located at 213 E. Foothill Blvd., Azusa, CA 917025. The custodian of these records is the City Clerk. Ordinance No. 2017-06 Page 4 of 5 SECTION 5. Severability. If any section, sentence, clause or phrase of this Ordinance or the application thereof to any entity, person or circumstance is held for any reason to be invalid or unconstitutional, such invalidity or unconstitutionality shall not affect other provisions or applications of this Ordinance which can be given effect without the invalid provision or application, and to this end the provisions of this Ordinance are severable. The City Council of the City of Azusa hereby declares that it would have adopted this Ordinance and each section, sentence, clause or phrase thereof, irrespective of the fact that any one or more section, subsections, sentences, clauses or phrases be declared invalid or unconstitutional. SECTION 6. Effective Date. This Ordinance shall become effective thirty (30) days following its adoption. SECTION 7. Publication. The City Clerk shall certify to the adoption of this Ordinance. Not later than fifteen (15) days following the passage of this Ordinance, the Ordinance, or a summary thereof, along with the names of the City Council members voting for and against the Ordinance, shall be published in a newspaper of general circulation in the City of Azusa. PASSED, APPROVED AND ADOPTED by the City Council of the City of Azusa, California, at a regular meeting of the City Council held on the ____ day of ___________________, 20___, by the following vote: AYES: NOES: ABSENT: ABSTAIN: City of Azusa ________________________________ Joseph R. Rocha, Mayor ATTEST: ________________________________ Jeffrey Cornejo, City Clerk APPROVED AS TO FORM: BEST BEST & KRIEGER LLP Ordinance No. 2017-06 Page 5 of 5 _______________________________ Marco Martinez, City Attorney CERTIFICATION I, Jeffrey Cornejo, City Clerk of the City of Azusa, do hereby certify that the foregoing Ordinance No. ____ is the actual Ordinance No. ____ that was introduced at a regular meeting of said City Council on the _____ day of _______________, 20___ and was finally passed and adopted not less than five (5) days thereafter on the ____ day of _____________, 20___ by the following vote to wit: AYES: NOES: ABSENT: ABSTAIN: ______________________________ Jeffrey Cornejo, City Clerk Goldline & BNSF Railway8th StAT & SF RailwayAlameda Ave Dalton Ave Soldano Ave Pasadena Ave 10th StFoothill BlvdFoothill BlvdAzusa Ave San Gabriel Ave 10th StAngeleno Ave Sunset Ave Orange Ave Enid Ave 9th StOrange Ave Lemon Ave Sunset Ave Angeleno Ave 6th StSan Gabriel Ave Azusa Ave6th StSoldano Ave Pasadena Ave CerritosAveAlosta Ave5th StCitrus AveFoothill BlvdAzusaPacificUniversityCitrusCollegeTHE PROMENADEFoothill Vista Mobile Home ParkAzusa Light & WaterCVS PharmacyAT&TVerizonPost OfficeLindley-ScottHouseTargetParkPalm St APUHousingPublicLibrarySeniorCenterCitrusCrossingCitrus Ave Alameda Ave Dalton AvePackingHouse9th StToCanyonFromCanyon&&&&McKeever Ave Crescent Dr5th StAzusa Veterans Wy Foothill BlvdAREA OFNO CHANGEAREA OFNO CHANGEAREA OFNO CHANGEAtlantisGardensAREA OFNO CHANGEAzusa PacificUniversityRosedaleSpecific Plan AreaSt Francis ofRome SchoolVeteran'sFreedomParkCityHallSlausonParkLeeElementarySlausonMiddleSchoolDaltonElementaryAzusa DowntownStationAPU/Citrus College StationSOURCE AND REFERENCE DATABASE MAP FEATURESTOD General Plan/Development Code Update and Specific PlanSpecific Plan BoundaryCity BoundaryParcel BoundaryTransit SiteCITY OF AZUSASpecific Plan Districts05001,000250FeetµImage from EIR Report - TAHA Inc. 03.22.13Gold Line DistrictDowntown DistrictDowntown Expansion DistrictDate: 5/4/2015Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013No ChangeRoute 66 DistrictTransition DistrictCivic District SECTION 2 LAND USE AND URBAN FORM 2 Development Provisions, Standards, and Guidelines LAND USE AND URBAN FORM 2 2.1 INTRODUCTION ...................................................................2-1 2.1.1 Using this Section ....................................................................2-1 2.2 DISTRICT-BASED APPROACH ..............................................2-3 2.2.1 Introduction .............................................................................2-3 2.2.2 Specific Plan Districts ..............................................................2-4 2.2.3 Areas of No Change ..............................................................2-6 2.2.4 Mixed-Use Development and Good Neighbor/ Buffer Standards .....................................................................2-7 2.2.5 Parking Management Strategies and Standards ...............2-8 2.3 GOLD LINE DISTRICT .........................................................2-12 2.3.1 District Character .................................................................2-12 2.3.2 Land Use ................................................................................2-14 2.3.3 Development Standards .....................................................2-17 2.4 DOWNTOWN DISTRICT ......................................................2-22 2.4.1 District Character .................................................................2-22 2.4.2 Land Use ................................................................................2-24 2.4.3 Development Standards .....................................................2-27 2.4.4 Design Guidelines .................................................................2-33 2.5 DOWNTOWN EXPANSION DISTRICT .................................2-36 2.5.1 District Character .................................................................2-36 2.5.2 Land Use ................................................................................2-38 2.5.3 Development Standards .....................................................2-41 2.5.4 Design Guidelines .................................................................2-46 2.6 ROUTE 66 DISTRICT ............................................................2-48 2.6.1 District Character .................................................................2-48 2.6.2 Land Use ................................................................................2-49 2.6.3 Development Standards .....................................................2-53 2.6.4 Design Guidelines .................................................................2-60 2.7 TRANSITION DISTRICT ........................................................2-62 2.7.1 District Character .................................................................2-62 2.7.2 Land Use ................................................................................2-63 2.7.3 Development Standards .....................................................2-67 2.7.4 Design Guidelines .................................................................2-72 2.8 CIVIC DISTRICT ..................................................................2-73 2.8.1 District Character .................................................................2-73 2.8.2 Land Use ................................................................................2-74 2.8.3 Development Standards .....................................................2-78 SECTION 2 CONTENTS SUBSECTIONS LAND USE AND URBAN FORM2 2-1 Specific Plan Area District Boundaries ..............................2-3 2-2 Gold Line District ................................................................2-15 2-3 Downtown District .............................................................2-25 2-4 Downtown Expansion District ...........................................2-39 2-5 Route 66 District .................................................................2-51 2-6 Transition District ................................................................2-65 2-7 Civic District ........................................................................2-76 2-1 Gold Line District Allowable Uses .....................................2-16 2-2 Downtown District Allowable Uses ..................................2-26 2-3 Downtown Expansion District Allowable Uses ................2-40 2-4 Route 66 District Allowable Uses ......................................2-52 2-5 Transition District Allowable Uses .....................................2-66 2-6 Civic District Allowable Uses .............................................2-77FIGURESTABLES LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-1 May 2017 2.1 INTRODUCTION Section Two provides direction for development within the Specific Plan Area to shape the design character and built environment. It sets forth general provisions for development within the Specific Plan Area and details permitted land uses, development standards, and design guidelines for each of the Specific Plan districts. This was accomplished by combining community outreach input with the provision of regulatory development standards and discretionary design guidelines. These standards, guidelines, and uses are organized by district and are all designed to reinforce the individual district’s desired development pattern, character, and image. These tools will help achieve the overall Azusa TOD Specific Plan vision, and more specifically, provide refined direction for the types of uses that should occur and how these uses are allowed to develop in each district within the Specific Plan Area. 2.1.1 Using this Section In order to ensure the ease of use of this document, this section details the general provisions for development within the Specific Plan Area while also cross referencing additional sections applicable to individual properties. Each Specific Plan District contains common headings including: • District Character - Outlines the overall vision and identity of a specific district. • Land Use - Touches upon prominent land uses envisioned for a district. • Development Standards - Details standards for development that have been tailored to reflect the desired character of a district. SPECIFIC PLAN DISTRICTS • Gold Line • Downtown • Downtown Expansion • Route 66 • Transition • Civic Historic structures provide a sense of place and contribute to the architectural quality of the built environment. Character and identity of Azusa expressed through public art. LAND USE AND URBAN FORM2 2-2 City of Azusa | TOD Specific Plan May 2017 o Site Planning - Promotes an active street environment through standards and regulations that affect the planning of a site. o Building Placement and Orientation - Considers the physical siting of a structure within a district while promoting appropriate connections between a building and the street. o Building Form and Massing - Outlines general building shapes and configuration requirements to foster strong connections between a building and its environment. • District Design Guidelines - In some cases, individual districts have additional guidelines that more specifically direct design of buildings in order to more effectively guide the character and vision for that district. In addition, each Specific Plan District subsection also includes an Allowable Uses table designating the permitted and conditionally permitted uses for each district along with a list of prohibited uses. As outlined above, in addition to regulating the type of land uses allowed, development is further regulated by Development Standards that are critical to the performance of each use, i.e., building height, massing, setback, build-to lines and relationship to street and sidewalk, parking ratios, etc. The development standards guide new development as well as the re-use of existing buildings. The provisions of this section apply to building additions, exterior remodels, relocations, or new construction requiring a building permit within the Specific Plan Area. In addition to the common headings outlined for individual districts, property owners, applicants, and developers should refer to the following sections of this Specific Plan for additional policies and standards that apply to their individual properties. • Section 1.7: Vision and Guiding Principles • Section 1.8: Transit-Oriented Development • Section 1.9: Sustainability • Section 1.10: Healthy Communities • Section 1.11: Crime Prevention through Environmental Design • Section 2.2.5: Parking Management Strategies and Standards • Section 3: Mobility, Complete Streets, and Streetscape Improvements These sections contain guidelines, requirements, and policies that inform the development or redevelopment of a project. As stated in Section One, this Specific Plan supersedes the Development Code within the Specific Plan boundary. Where the Specific Plan is silent on a topic(s), the Development Code will remain in force. LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-3 May 2017 2.2.1 Introduction This Specific Plan presents a district-based zoning approach to accommodate future growth and development intensity adjacent to Azusa’s two new Gold Line transit stations. In a district-based zoning approach, each district has a unique vision and a tailored range of allowable uses and development standards that support the desired future condition. The district-based approach is by nature a “mixed-use” zoning approach where the desired activities and building forms dictate what is conditionally allowed and what is not allowed. This hybrid approach to zoning combines form-based development standards 2.2 DISTRICT-BASED APPROACH with a selection of compatible uses that have been tailored for each Specific Plan District. The development standards constitute the constraints for a project’s building envelope in which new construction or a structural remodel is permitted. In addition, design guidelines are provided in key areas to ensure high-quality design that reflects the district’s character. The intent of this district-based approach for the Specific Plan Area is to establish a regulating document that: • Improves the quality of life through the built environment; Figure 2-1: Specific Plan Area District Boundaries (Enlarged exhibits provided within each District of Sections 2.3-2.8). Goldline & BNSF Railway 8th St AT & SF R ail w a y Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid Ave9th St Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege THE PROMENADE Foothill Vista Mobile Home Park Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing PublicLibrary SeniorCenter CitrusCrossing Citrus AveAlameda AveDalton AvePackingHouse 9th St ToCanyonFromCanyon &&&&McKeever AveCrescent Dr 5th St Azusa Veterans WyFoothill Blvd AREA OFNO CHANGE AREA OFNO CHANGE AREA OFNO CHANGE AtlantisGardens AREA OFNO CHANGEAzusa PacificUniversity RosedaleSpecific Plan Area St Francis ofRome School Veteran'sFreedomPark CityHall SlausonPark LeeElementary SlausonMiddleSchool DaltonElementary Azusa DowntownStation APU/Citrus College Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Specific Plan Districts 0 500 1,000250Feet µ Image from EIR Report - TAHA Inc. 03.22.13 Gold Line District Downtown District Downtown Expansion District Date: 5/4/2015 Notes and Sources: 1)Base data from the City of Azusa GIS Dept. 2)Aerial photo from the City of Azusa GIS Dept - 2010 3)Aerial photo of Target area from Google Earth - 04.2013 No ChangeRoute 66 District Transition District Civic District LAND USE AND URBAN FORM2 2-4 City of Azusa | TOD Specific Plan May 2017 • Sets the stage for market-driven revitalization; • Creates an efficient mobility network; • Integrates sustainable and healthy living practices; • Protects historic structures; • Increases pedestrian mobility; • Enhances architectural quality; • Improves the overall identity of the Specific Plan Area; and • Maintains the character and identity of each unique area of Azusa. 2.2.2 Specific Plan Districts Building upon the Azusa General Plan, this Specific Plan focuses in greater detail on the Specific Plan Area by organizing land use and zoning regulations into six (6) unique Specific Plan districts. District boundaries are based upon existing and expected future development and shared characteristics including land use commonalities and proximity to community-wide destinations. The district boundaries are shown in Figure 2-1, Azusa TOD Specific Plan Area District Map. The geographic arrangement of the districts reflect their relationship to the two new Gold Line transit stations, Downtown Azusa, the City’s civic core, and the Foothill Boulevard corridor. Gold Line District The Gold Line District is the new gateway destination to the City of Azusa providing residents, students, and visitors with a lively day and nighttime environment. Inviting plaza spaces and colorful wayfinding signage encourage exploration through the Specific Plan Area. The Gold Line District provides increased density housing opportunities in close proximity to the transit station. The existing Target location adjacent to the Azusa Downtown Gold Line Station. The Azusa Downtown Gold Line Station provides new opportunities within Azusa for residents, businesses, and visitors. LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-5 May 2017 Existing buildings and successful businesses within Downtown provide a foundation for future development opportunities. Vintage signage provides the framework for enhancing the Route 66 environment. Existing commercial along San Gabriel Avenue. Downtown District The Downtown District encompasses the historic heart of the City of Azusa and is envisioned as a lively, walkable, and attractive town center area. The Downtown District’s character and charm are highlighted through new three- and four-story mixed-use buildings that remain appropriately scaled to preserve the historic character of Azusa’s downtown. The Downtown District focuses on the pedestrian experience by providing outdoor dining, retail shops, and community serving businesses located at street- level. Public realm amenities such as benches and pedestrian lighting are incorporated throughout the District enlivening the overall pedestrian experience. Downtown Expansion District The Downtown Expansion District provides an extension of, and is complementary to, the adjacent Downtown District. New stand- alone residential and office uses provide opportunities to live and work within walking distance of downtown shops, restaurants, and transit. Buildings located at the street edge and enhanced streetscape furnishings and design extend the Downtown pedestrian environment into this expansion area. Route 66 District The Route 66 District encompasses a large portion of Foothill Boulevard and offers a modern interpretation of the historic and iconic Route 66. Themed, 1950s styled diners, retail shops, and new hospitality uses create a vibrant, all ages atmosphere along Route 66. New development is oriented onto Foothill Boulevard and Alosta Avenue creating a continuation of the street edge and the street will be renamed “Route 66” to embrace its historic context. Unique, customized business signage and original public art pieces contribute to the District’s lively LAND USE AND URBAN FORM2 2-6 City of Azusa | TOD Specific Plan May 2017 and historic character. Stand-alone residential uses allowed on non-street fronting parcels along Foothill Boulevard provide appropriate buffering for existing single-family neighborhoods. Transition District The Transition District provides a buffering between commercial-oriented districts and established single-family neighborhoods. Existing single-family development within the District may be repurposed into professional office and art studios. A unique and specific overlay within the District allows for a neighborhood specialty market and food hall at the historic Packing House providing fresh produce to the Azusa community. Streetscape improvements along 9th Street enhance pedestrian and bicycle connections to the transit station. Civic District The Civic District is maintained as a central focus of the City, with prominent public buildings and open spaces reinforcing the community identity of Azusa. Any new development remains physically and visually complementary to the existing civic buildings. Enhancement of pedestrian connections within the District provide ease of access to the new Azusa Downtown Gold Line Station and enrich the character, community, and sense of place of “The Canyon City.” 2.2.3 Areas of No Change In some instances, only beautification and street improvements to the corridors are proposed. In these instances, the street right-of-way will be subject to the streetscape improvement standards identified in Section 3 - Mobility, Complete Streets, and Streetscape Improvements and zoning and land use will be guided by existing underlying zoning criteria. Refer to Figure 2-1 for locations of Areas of No Change. City Hall and the auditorium represent Azusa’s character. The historic packing house provides a unique opportunity to enhance the health of the community. LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-7 May 2017 2.2.4 Mixed-Use Development and Good Neighbor/Buffer Standards The Specific Plan Area contains many existing tightly clustered stores, housing, and civic uses all within close proximity of public transit. As new development occurs within the Specific Plan Area, the need to reduce potential impacts on the existing community will be necessary in order to preserve the quality of life that residents have come to enjoy. All new mixed-use development projects shall be required to meet the following standards. In addition, all projects located adjacent to existing low and medium density residential zones will be required to meet the Good Neighbor/Buffer Standards. MIXED-USE DEVELOPMENT STANDARDS A. Buildings shall be sited to reduce odor, noise, light, glare, shadowing, privacy, visual, and other conflicts between commercial and residential uses. B. Landscaping shall be used in addition to other design features to reduce light, privacy, and glare conflicts. C. Loading and service areas for commercial uses shall be properly designated, not located within residential parking areas, and shall not block access ways to residential areas. D. Noise-generating equipment, including but not limited to refrigeration units, air conditioning, and exhaust fans, shall be located away from residential uses and include noise-reducing screens or insulation. E. Parking for residential tenants shall be properly designated and separate from commercial use spaces. F. Commercial uses with residential units either above or attached shall provide ventilation systems to prevent odors from adversely affecting residential units. PARCELS ADJACENT TO LOW AND MEDIUM DENSITY ZONES A. Projects located adjacent to a Low or Medium Density (residential) zone shall be setback 10’ minimum from the residential property line. Those portions of a structure over 35’ tall shall be setback a minimum of 20’ from all abutting Low or Medium Density property lines. B. Loading docks, service areas, repair yards, noise and odor generating operations, and ground-mounted mechanical equipment abutting Low or Medium Density zoned properties are not permitted within 10’ of that property line. In addition, any use described above shall provide an 8’ masonry sound wall and a minimum 5’ landscaped setback along the abutting property lines. C. HVAC systems shall be selected based on noise rating or designed with features to reduce noise, such as parapet walls, equipment enclosures, and/or placement of equipment. D. All exterior lighting shall be focused internally within the property to decrease light pollution onto abutting residential properties. Outdoor lighting shall be shielded in a manner that prevents a direct line between its luminary and any property zoned Low or Medium Density. GOOD NEIGHBOR/BUFFER STANDARDS INTERPRETATION Good Neighbor/Buffer 20’ min. 45’ max.10’ min. LAND USE AND URBAN FORM2 2-8 City of Azusa | TOD Specific Plan May 2017 2.2.5 Parking Management Strategies and Standards As part of this Specific Plan effort, a comprehensive Parking Management Plan was prepared to address current and future parking conditions within the Gold Line, Downtown, Downtown Expansion, and Civic Districts. This technical document assessed the existing on- and off-street parking conditions within the Specific Plan Area while at the same time recommending appropriate parking strategies for potential future conditions based on proposed land uses. The complete version of the Parking Management Plan, including an additional parking strategies matrix, can be found within Appendix A of this document. On-Street Parking Strategies • Time Limits & Restrictions: Time limits are perhaps the simplest way to control the uses of on-street parking. Time-based parking restrictions prohibit parking for certain periods to preserve roadway capacity during peak commuting periods and to save parking resources for particular user groups. In commercial areas, parking time limits are used to discourage long-term parking by employees of the businesses so that the desirable parking spaces are available for customer, allowing a more efficient use and higher turnover rate for desired spaces. Opportunities for application of strategy: Time restrictions are currently in place on San Gabriel Avenue and Azusa Avenue and have promoted parking turnover at on- street parking spaces that are desirable and provide good access to adjacent businesses. Since this strategy is in place at some of the most desirable on-street spaces on San Gabriel Avenue and Azusa Avenue, future application of this strategy should focus on street frontages in which new land uses and businesses are added in Downtown Azusa. Potential focus areas to employ this strategy may include 9th Street, Foothill Boulevard, or 6th Street. • Urban Design/Signage/Traffic Calming: Urban design features can make more distant and likely less desired on-street parking spaces known to commuters and enhance pedestrian connections to those spaces. Good signage can direct parkers quickly and efficiently to available spaces. Sometimes, the solution is as simple as providing information about space location and availability. Supplemental traffic calming strategies that moderate traffic speeds in order to improve the pedestrian environment, can also support parking management strategies. Opportunities for application of strategy: This strategy has been employed on Azusa Avenue where the City has implemented curb extensions, wide sidewalks, diagonal parking, landscaping, lighting, and several pedestrian crossings. Making the environment safer and more inviting for pedestrians can encourage people to walk to destinations within Downtown instead of driving to each Urban design and traffic calming strategies employed along Azusa Avenue. LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-9 May 2017 location. There are several opportunities adjacent to Downtown Azusa to expand upon this strategy. These opportunities include San Gabriel Avenue, Santa Fe Avenue, and the existing paseos or pathways that can be integrated within the Specific Plan Area to better connect streets and activity nodes separated by large parcels or parking areas. In addition to replicating the treatments on Azusa Avenue, other potential measures include providing wayfinding to key assets (parking and transit) and destinations (Civic uses, retail areas), and modifications to the roadway cross-section that slow traffic or make crossing the street easier (i.e., lane reductions, conversion to two-way travel). • Assignment of Parking Location: This strategy involves assigning particular parking users to specific locations to increase the efficiency with which spaces are used. An employer policy could require all-day employees to park in remote facilities to free up close-in on-street parking. Alternatively, the most convenient spaces could be devoted to pick- up and drop off functions. Opportunities for application of strategy: Within Downtown Azusa potential applications include creating a pick-up/drop- off area for popular destinations or assigning parking locations to employees who might otherwise occupy non-time restricted spaces within close proximity to their place of employment. While this is listed as an on- street parking strategy, it can also be used in off-street parking, such as the Target parking lot, to prevent employees from occupying the most desirable parking spaces. Off-Street Parking Strategies • Access Control: Strategies to control access to off-street parking include signage that limits who can use parking facilities and for what purposes; chaining off parking entrances until stores open later in the morning can prevent transit commuters from poaching parking; use of gate arm access controls to prevent non- shoppers from using the facility. Opportunities for application of strategy: This parking management strategy is currently applied at the Azusa Police Department where only police vehicles can access the parking area. This strategy may be a appropriate to employ at the new Metro Gold Line parking structure within the Gold Line District. This strategy may also be applied at City-owned parking lots where the City off-street parking spaces must be retained. In an effort to make this parking available to the public patronizing the Downtown area, the City could implement access control strategies, complemented with a nominal parking fee, that could allow for parking validation by local businesses to ensure usage by business patrons. • On-Site Enforcement: On-site enforcement strategies can include security personnel giving warnings, post notices, and if necessary, arrange for towing. Simple information and enforcement programs can be very effective in preventing parking poaching. Opportunities for application of strategy: Parking enforcement is an important strategy to consider, particularly if there is a lack of turnover at time restricted parking spaces or if parking is beginning to encroach into areas not intended for parking. While the parking utilization data described within Appendix A does not indicate this is currently a significant LAND USE AND URBAN FORM2 2-10 City of Azusa | TOD Specific Plan May 2017 issue, there may be events or periods when there is a particularly high demand for parking at certain locations with time restrictions. If parking locations are difficult to access or if it is hard to find a parking space, people searching for parking may elect to park in residential areas or risk exceeding time limits to ensure convenient parking. Additionally, with the arrival of the Gold Line, some private and public land uses with a large number of off-street parking (i.e., Target, CVS, City Hall) may experience parking poaching by transit patrons that can be addressed through additional enforcement. • Time Limits & Restrictions: Time limits for spaces can be adjusted to reflect the specific purpose for the parking. The limits can be established on a differential basis to direct all day parkers to underutilized spaces. Time- based restrictions can prohibit parking for certain periods to reserve parking resources for a particular user group. Opportunities for application of strategy: Opportunities for application of this strategy exist in the large parking lots at locations such as Target and the future Metro Gold Line Station parking structure. Azusa may consider providing short-term and long-term parking spaces at the most appropriate locations based on where patrons may ultimately be destined. • Signage/ITS/Design: Signage is key to efficient and effective use of available parking resources. Intelligent Transportation Systems (ITS) can help guide drivers to available parking. ITS has been effectively used both district wide and in large parking structures to provide “live” information about available spaces at each level and in different public parking facilities throughout a district. Opportunities for application of strategy: As the construction of new parking structures within Downtown Azusa occurs, requiring this strategy to be incorporated will ensure accurate and effective parking information is available to users. This real time information can include signs indicating the number of spaces available on each level of a parking structure, and may also include lights that can be used to display whether a parking space is available or occupied. As previously discussed, wayfinding signage should also be considered in conjunction with this strategy to communicate to transit users or business patrons the locations of designated parking and popular destinations. • Shared Parking: Shared parking is the use of a parking space to serve two or more individual land uses without conflict or encroachment. The ability to share parking spaces is the result of two conditions: Variations in the accumulation of vehicles by hour, by day, or by season at the individual land uses; and City-owned parking lot along San Gabriel Avenue provides an opportunity to incorporate shared parking strategies for current and future land uses. LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-11 May 2017 PARKING RATIOS Non-Residential-Residential A. Retail: 1.5 spaces/1,000 sf B. Restaurant: 1.5 spaces/1,000 sf Outdoor Dining: 0 spaces required for up to 12 seats C. Office: 2 spaces/1,000 sf D. Bank: 1 space/1,000 sf E. Theater: 1 space/200 sf in a mixed-use project; may require a parking analysis to determine total spaces needed by use. Residential*A. Studio/1 Bedroom: 1 space/unit B. 2/2+ Bedrooms: 1.5 spaces/unit *Projects with only residential uses are required to provide 1 guest parking space for every 6 residential units. Mixed-use projects containing residential uses are not required to provide guest parking spaces. Parking Ratios for land uses not specifically identified, handicapped space requirements, and space dimensions shall be required to meet the parking standards of Chapter 88.36 - Parking and Loading of the Development Code. Parking Standards for the Specific Plan Area PARKING RATIOS A. Refer to Chapter 88.36 - Parking and Loading of the Development Code for land use specific parking standards. Gold Line, Downtown, Downtown Expansion, and Civic Districts Route 66 and Transition Districts relationships among the land uses that result in visiting multiple land uses on the same auto trip. Opportunities for application of strategy: With the relatively low parking utilization currently experienced in the Downtown area, shared parking presents an opportunity to increase effective parking supply without needing to construct additional parking or increase specific land use parking requirements. Areas where this strategy could be employed include the Target parking lot and the block bounded by Foothill Boulevard, 6th Street, San Gabriel Avenue, and Azusa Avenue. Target experiences relatively low parking utilization (approximately 25% utilized at peak hour) and may be willing to allow the use of a portion of their parking lot by other uses that have different peak parking time periods. For example, if a land use adjacent to Target, such as a coffee shop, wanted to open but couldn’t provide enough parking on-site, they could enter into an agreement with Target to utilize some portion their parking until a select closing time, so that Target could maintain a lower parking supply during off- peak hours (early in the day) and offer a larger parking supply during their peak utilization period. The other location mentioned above contains a variety of land uses and has a number of city-owned off-street spaces available to patrons. Provided the mix of uses is reviewed to ensure that different land uses have adequate amounts of parking and different peak parking utilization rates, a lower number of parking spaces could be provided by future land uses when proposed. LAND USE AND URBAN FORM GOLD LINE DISTRICT2 2-12 City of Azusa | TOD Specific Plan May 2017 2.3.1 District Character The Gold Line District is envisioned as the new community gateway to the City of Azusa, catering to residents and visitors commuting to and from work and families visiting Azusa for the weekend. An influx of daily transit users entering and exiting the Azusa Downtown Gold Line Station 2.3 GOLD LINE DISTRICT will be greeted by an inviting welcome plaza and colorful wayfinding signage, encouraging exploration into the surrounding Specific Plan districts. New, mixed-use developments reflecting the character of Azusa will cater to the pedestrian by incorporating an active and articulated front facade and increased intensity, Potential Welcome Plaza adjacent to the Azusa Downtown Gold Line Station. Plazas adjacent to transit stops provide enjoyable spaces to wait for your connecting route or for a traveling friend. Outdoor dining opportunities provide an active public realm and areas for people watching. GOLD LINE DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-13 May 2017 SPECIFIC PLAN GUIDING PRINCIPLES - Related to the Gold Line District TO-4 Increase development potential within the Gold Line District to sufficiently support high frequency, rapid transit service, and to provide a base for a variety of housing, employment, local services, and amenities that support a vibrant station area community. A. Emphasize mixed-use buildings around the Azusa Downtown Gold Line Station to increase the amount and variety of housing choices within the City. B. Enhance transit options and connectivity to regional job centers in the greater Los Angeles area. TO-5 Ensure that land uses within the Gold Line District are transit-supportive and provide a mixed-use activity node for visitors and the local community. A. Create a transit-oriented destination that caters to commuter, resident, student, and visitor needs in the morning and evening. TO-6 Establish pedestrian linkages to and from the future Azusa Downtown Gold Line Station to support a walkable station area that functions as a community gateway to Downtown Azusa. A. Establish a new community gateway to the City of Azusa from the Azusa Downtown Gold Line Station. B. Incorporate a welcome plaza and gathering space adjacent to the Azusa Downtown Gold Line Station (refer to Section 3.7). C. Improve walkability, pedestrian access, and bicycling opportunities through the incorporation of native landscaping, plazas, and streetscape designs. ED-4 Provide a range of supporting benefits for the local community, including a variety of housing, a more walkable environment, and community amenities. A Increase opportunities for the inclusion of public plazas, courtyards, and outdoor dining through tailored development standards. S-2 Maintain and enhance structures identified as having historic value to retain and support the existing historic character of Azusa. A. Maintain historic architectural character of structures located at 700 Azusa Avenue and 130 Santa Fe Avenue as shown in Figure 2-2. CP-1 Incorporate Crime Prevention through Environmental Design (CPTED) strategies that contribute to the safety and vitality of residents and visitors of Azusa. A. Encourage positive social interactions and deter potential criminal behavior through the design and development of both public and private spaces (refer to Section 1.7.6). while allowing for the greatest building heights within the Specific Plan Area. Coffeehouses, retail shops, and cafés with outdoor dining will be located at street-level along Azusa Avenue, enlivening the district environment and providing commuters and residents access to early morning coffee and after work dining opportunities. Structured parking, located above ground and hidden from public view, will provide commuters a safe place to park their vehicles and will provide convenient access to the nearby Azusa Downtown Gold Line Station. LAND USE AND URBAN FORM GOLD LINE DISTRICT2 2-14 City of Azusa | TOD Specific Plan May 2017 Walkable and pedestrian-friendly streets contribute to a lively public realm. Mixed-use development with residential units located above restaurants and retail provide a 24/7 downtown environment. 2.3.2 Land Use City-owned opportunity sites (see Figure 2-2) within the Gold Line District provide the underlying framework for creating a vibrant and attractive transit-oriented experience focused on the pedestrian. Vertical mixed-use development incorporating new housing options within the City are focused on both the north and south side of the Azusa Downtown Gold Line Station along Azusa Avenue and Alameda Avenue. Buildings, up to 60 feet in height, engage the street with appropriate frontages emphasizing and framing the public realm. While zero-foot setbacks are encouraged for new development, setbacks up to a maximum of 15 feet are allowed, provided plaza, courtyard, outdoor dining, and/or enhanced pedestrian connections are incorporated within the setback area. A wide variety of allowed land uses within the District include grocery, restaurant, retail, and recreation. Financial, professional, and general office uses offer expanded business opportunities in Azusa within close proximity to public transit. Streetscape improvements along Utilizing setback areas as functional space contributes to an active, pedestrian-friendly street scene. GOLD LINE DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-15 May 2017 Figure 2-2: Gold Line District Æb 8th St Foothill Blvd Azusa DowntownStation Azusa Light & Water CVS Pharmacy Target PublicLibrary SeniorCenter 9th St St Francis ofRome SchoolDalton AveAlameda AveSan Gabriel AveVeteran'sMemorialPark CityHallAzusa AveSoldano AvePasadena AvePackingHouse HistoricResource HistoricDepot SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 150 30075Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change City-Owned Opportunity Site City-Owned Opportunity Site N Foothill Blvd Azusa AveAzusa DowntownStation APU/CitrusCollege Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA District Key Map 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Gold Line District Downtown District Downtown Expansion District No ChangeRoute 66 District Transition District Civic District Gold Line District Key Map N 9th Street aid in appropriately transitioning nearby residential neighborhoods into the Gold Line District and provide improved access and safety for walking, running, and bicycling into and through adjacent districts. As a component of the new transit station, a multi-story parking structure will be constructed. This structure will be screened on the Azusa Avenue streetfront with shops and restaurants. The amount of parking to be provided will support parking strategies such as shared parking agreements or parking reductions as outlined in Section 2.2.5. City-Owned Opportunity Sites Historic Resources LAND USE AND URBAN FORM GOLD LINE DISTRICT2 2-16 City of Azusa | TOD Specific Plan May 2017 LAND USE REGULATION LAND USE REGULATION RECREATION, EDUCATION, AND PUBLIC ASSEMBLY SERVICES ‐ BUSINESS, FINANCIAL, AND PROFESSIONAL Conference/Convention Facility P ATM P Health/Fitness Facility P Banks, Financial Services P Live Entertainment UP Business Support Services P School ‐ Specialized Training UP Medical Office/Service P1 Studio‐Art, Dance, Martial Arts, Music, Etc.P Office P2 RESIDENTIAL SERVICES ‐ GENERAL Caretaker/Manager Unit P Day Care Center ‐ Child or Adult MUP Home Occupation P Lodging ‐ Bed & Breakfast Inn (B&B)P Live/Work Unit MUP Lodging ‐ Hotel or Motel P Multifamily P Personal Services P Residential Accessory Use or Structure P TRANSPORTATION, COMMUNICATIONS, AND INFRASTRUCTURE Residential Care (seven or more clients)MUP Parking Facility, Public or Commercial MUP Senior Citizen Apartment P Telecommunications Facility S RETAIL SALES Transit Station or Terminal P Bar/Tavern UP Utility Facilty P Farmers Markets MUP Furniture, Furnishings and Appliance Store P General Retail P     Alcoholic Beverage Sales UP     Floor Area Under 20,000 sf P     Floor Area Over 20,000 sf UP     Operating between 9:00 pm and 7:00 am MUP Groceries, Specialty Foods P Neighborhood Market P Night Club UP Outdoor Displays and Sales MUP Restaurant, Café, Coffee Shop P ALLOWABLE USES: Gold Line District P             Permitted Use, Zoning Clearance required Refer to Chapter 88.70 of the Development Code for Definitions               uses permitted on a second or upper floor.               permitted on a second or upper floor. 1             Only Medical Services ‐ Doctor Office use 2             Only Office‐Processing and Office‐Professional      MUP      Minor Use Permit required UP          Use Permit required S             Permit requirement set by Specific Use Regulations Table 2-1: Gold Line District Allowable Uses A. Commercial Recreation Facility-Indoor B. Organizational House C. Residential Care (six or fewer clients) D. Auto and Vehicle Sales/Rental E. Building and Landscape Materials Sales BUILDING USE Ground Floor Uses A. Ground floor uses fronting Azusa Avenue, Foothill Boulevard, or Alameda Avenue shall be non-residential except for lobby, gym, and other pedestrian-oriented uses. F. Drive-Through Retail or Service G. Mortuary, Funeral Home H. Repair Service I. Vehicle Services Note: A combination of any of the permitted uses may be provided within a horizontal or vertical mixed-use project provided the Ground Floor Use Standard (provided below) and Mixed-Use Standards provided on Page 2-7 are adhered to. PROHIBITED USES STANDARDS INTERPRETATION Building Use Retail & Restaurant Residential & Commercial Public S t r e e t GOLD LINE DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-17 May 2017 COVERAGE Lot Coverage A. 100% maximum. STANDARDS INTERPRETATION Lot Coverage 100% Lot Coverage 2.3.3 Development Standards The following development standards are specific to the Gold Line District. These standards have been tailored to reflect the desired character and implement the vision of the Gold Line District. They provide the framework for the creation of a safe, vibrant, and pedestrian-friendly environment in and around the Azusa Downtown Gold Line Station. In addition to the development standards located on the following pages, projects will be evaluated on their adherence to standards provided in Section 2.2.4, Section 3, and the design guidelines and strategies located in Sections 1.7 and 2.2.5. A. SITE PLANNING Site planning and design is key to quality development. The following standards promote orienting buildings toward the street, to promote an active street environment and regulations that minimize pedestrian and vehicular conflicts. Residential Open Space 25 sf/unit min. of Common Open Space 100 sf/unit min. of Private Open Space RESIDENTIAL OPEN SPACE Residential Private Open Space A. Private open space shall be provided at a minimum of 100 sf per unit with a minimum dimension of 6’ in any direction. Residential Common Open Space A. Common open space shall be provided at a minimum of 25 sf per unit with a minimum of 10’ in any direction. B. Common open space shall be purposefully designed as active or passive recreational facilities. C. Rooftop open space may satisfy this requirement, provided it is available for use by all residents. LAND USE AND URBAN FORM GOLD LINE DISTRICT2 2-18 City of Azusa | TOD Specific Plan May 2017 SERVICE AND DELIVERY AREAS Loading and Service Areas A. Loading docks and service bays shall be located a minimum of 20’ from any public street. B. Trash and recycling enclosures shall not be located adjacent to a public street. STANDARDS INTERPRETATION Service and Delivery Areas Service Loading 20’ min.Parking Public Stre e t Reciprocal Access Building Building 7’-6” min.7’-6” min.7’-6” min.Azusa Avenue Line of Sight RECIPROCAL ACCESS Ingress and Egress A. Reciprocal ingress and egress access with adjacent properties shall be provided for parcels fronting Azusa Avenue and Alameda Avenue. This requirement may be waived with City approval due to the following circumstances: • The location of existing structures or infrastructure • Lack of agreement between adjacent owners • Other extreme hardship VEHICULAR LINE OF SIGHT Clear Zones A. The clear zone shall consist of an isosceles right triangle with 7’6” sides on the driveway and street. B. The clear zone shall not be occupied by a ground floor building footprint, site features, or landscaping that is taller than 3’. GOLD LINE DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-19 May 2017 B. BUILDING PLACEMENT AND ORIENTATION Building placement refers to the physical siting of a structure on a parcel with considerations being given to building orientation, setbacks, and parking. The following standards promote building placement that creates an active public realm, creates a strong continuity of frontages, and contributes to greater utilization of parcels within the Gold Line District. 10’ m i n 15 ’ m a x 0’ Rear Setback 0’ Side Setback 0’ Street Setback BUILDING SETBACKS Street A. 0’ minimum. B. 15’ maximum to building. Setback area shall include plaza, courtyard, outdoor dining, or enhanced pedestrian connection. C. 10’ minimum landscape setback where surface parking areas are located adjacent to a public street. Side A. 0’ minimum. Rear A. 0’ minimum. STANDARDS INTERPRETATION Dining Setbacks Parking Setbacks Public StreetPublic StreetParki n g BUILDING LOCATION Placement A. Parcels fronting a public street shall orient buildings toward the street. Building Placement Public Street LAND USE AND URBAN FORM GOLD LINE DISTRICT2 2-20 City of Azusa | TOD Specific Plan May 2017 STANDARDS INTERPRETATION Primary Entrances Public Str e etBuilding E ntr a n c e s BUILDING ENTRANCES Primary Entrances A. Buildings shall have a primary entrance door facing Azusa Avenue, Alameda Avenue, and San Gabriel Avenue. Entrances at building corners may be used to satisfy this requirement. BUILDING HEIGHT Minimum Height A. 25’ minimum. BUILDING Maximum Height A. 60’ maximum. Building Height 60’ max25’ minC. BUILDING FORM AND MASSING Building form refers to the shape, configuration, and relationship of a building to its environment. A number of details must be considered when designing a building’s form including building height, plate height, configuration, roof form, facades, articulation, entrances, and window glazing. Building forms should encourage a pedestrian- friendly environment by including amenities, facade articulation, and street level building openings. Building Plate Height 14’ min.Floor StructureT.O.P. BUILDING ARTICULATION Plate Height A. Ground floor plate height shall be a minimum of 14’ along all streets. Historic Resources A. Buildings identified as having historical significance (Refer to Figure 2-2), shall retain their original character and building articulation. STANDARDS INTERPRETATION Architectural projections/features may exceed the height limits of this District up to 10 feet, subject to Economic and Community Development Director approval. Projections/features should be architecturally compatible and aesthetically pleasing or be screened from view. Neon signage, historic graphics, and/or other non-business or project specific related screening methods may be considered appropriate, subject to Economic and Community Development Director approval. GOLD LINE DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-21 May 2017 STANDARDS INTERPRETATION BUILDING MASSING Maximum Wall Plane A. No building façade visible from any public street shall extend more than 50’ in length without a 5’ minimum variation in the wall plane. Side and Rear Wall Planes A. Side and rear wall planes shall address site context through continuation of architectural features, fenestration, and/or building materials. Roofline Variation A. Building rooflines shall vary in height every 50’ in wall plane length. 50’ ma x . 50’ max.50’ max.50’ max. 5’ min. Maximum Wall Plane Roofline Variation Public Street Public Street 45% min. for retail 30% min. for office Window Glazing Public Street WINDOW GLAZING Solid-to-Void Ratio A. 45% minimum transparent glazing of first floor facade for retail uses adjacent to a public street. B. 30% minimum transparent glazing of first floor facade for office uses adjacent to a public street. C. Transparent or translucent glazing is required on the first floor facade of a commercial or retail use facing a public street. D. Opaque, reflective, or dark tinted glass is not permitted. E. Window stickers or exterior window treatments that obstruct interior building views at the street level are prohibited. F. The bottom of any window or product display window shall not be more than three and one- half feet above the adjacent sidewalk. G. Product display windows shall have a minimum height of four feet and be internally lit. LAND USE AND URBAN FORM DOWNTOWN DISTRICT2 2-22 City of Azusa | TOD Specific Plan May 2017 2.4.1 District Character Azusa’s Downtown District is the historic “Main Street” of the City, providing an attractive and inviting destination for friends, students, and families to gather. Capitalizing on the expanded pedestrian activity from the Azusa Downtown Gold Line Station, new outdoor dining, retail, and 2.4 DOWNTOWN DISTRICT Potential Downtown District plaza at the Southeast Corner of Azusa Avenue and Foothill Boulevard. commercial businesses will be juxtaposed next to wide, pedestrian-friendly sidewalks, enlivening the pedestrian environment and supporting day and nighttime activity within the district. Unique, historic qualities of the Downtown will be complemented by new, mixed-use developments that remain appropriately scaled Paseos provide internal connections between blocks and allow for outdoor dining and other pedestrian-friendly activities to occur. Continuous arcades and retail frontages engaging the sidewalk and enliven and contribute to the overall pedestrian experience. DOWNTOWN DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-23 May 2017 SPECIFIC PLAN GUIDING PRINCIPLES - Related to the Downtown District TO-3 Provide district-specific development standards and design guidelines that support and encourage TOD and increase safe, direct, and convenient pedestrian access to transit facilities. A. Create an active and vibrant street scene along Azusa Avenue and Foothill Boulevard to welcome visitors and enhance pedestrian connections to the adjacent Gold Line District and Azusa Downtown Gold Line Station. TO-6 Establish pedestrian linkages to and from the future Azusa Downtown Gold Line Station to support a walkable station area that functions as a community gateway to Downtown Azusa. A. Emphasize pedestrian mobility through the incorporation of public realm improvements, including landscaping, street furnishings, and wayfinding signage (refer to Section 3.6). ED-4 Provide a range of supporting benefits for the local community, including a variety of housing, a more walkable environment, and community amenities. A. Provide opportunities for a variety of new housing types within walking distance of the Azusa Downtown Gold Line Station. S-1 Maintain and enhance structures identified as having historic value to retain and support the existing historic character of Azusa. A. Maintain historic architectural character of structure located at 250 Foothill Boulevard as shown in Figure 2-3. HC-1 Provide district-specific development standards and design guidelines that enhance architectural quality, improve the overall identity of the Specific Plan Area, and enrich the quality of life through the built environment. A. Encourage buildings to be built to the back of sidewalks and engage the public realm. B. Require ground floor retail/commercial uses that are oriented toward Azusa Avenue and San Gabriel Avenue. C. Permit residential and office uses above and behind ground floor commercial (mixed-use) to promote a live, work, play environment. D. Encourage family-oriented activities and services through allowable, district specific land uses. CP-1 Incorporate Crime Prevention through Environmental Design (CPTED) strategies that contribute to the safety and vitality of residents and visitors of Azusa. A. Encourage positive social interactions and deter potential criminal behavior through the design and development of both public and private spaces (refer to Section 1.7.6). to accentuate the quaint nature of downtown through second and third-story setbacks. Public realm amenities incorporated throughout the district, such as plazas and paseos, will contribute to and enhance the overall active and walkable environment of the Downtown District. The close proximity of the district to the Azusa Downtown Gold Line Station will provide visitors and residents of nearby communities with ease of access to downtown shops and services without the need for an automobile. While the Downtown District provides opportunities for new growth and development within the Downtown, these developments will be reflective of the character and identity of “The Canyon City.” LAND USE AND URBAN FORM DOWNTOWN DISTRICT2 2-24 City of Azusa | TOD Specific Plan May 2017 Mixed-use developments provide opportunities for residents to live, work, and play within their neighborhood. Wide, pedestrian-friendly sidewalks activate the public realm by providing spaces for outdoor dining and informal gathering. Continuous building wall planes provide visual intrigue and entice exploration increasing overall walkability. 2.4.2 Land Use Incorporating new mixed-use developments up to 50 feet in height within the Downtown District strengthens and supports new and existing retail, office, and residential land uses within short walking distance of nearby residential neighborhoods and the Azusa Downtown Gold Line Station. Maximum building setbacks of 15 feet along Azusa Avenue promotes space dedicated to outdoor dining at cafes and restaurants and expanded sidewalks. Indoor commercial recreation facilities offer family- oriented entertainment activities while art, dance, and music studios provide residents multiple platforms for creative and cultural expression. Professional and medical offices support new job growth and career opportunities within the City while at the same time create a baseline of pedestrian activity throughout the Downtown District. Specific development opportunities within the District lie to the east and west of the Foothill Boulevard and Azusa Avenue intersection. This portion of the District sees high vehicular traffic DOWNTOWN DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-25 May 2017 Foothill Blvd Azusa AveAzusa DowntownStation APU/CitrusCollege Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA District Key Map 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Gold Line District Downtown District Downtown Expansion District No ChangeRoute 66 District Transition District Civic District Figure 2-3: Downtown District Foothill Blvd Angeleno AveSan Gabriel Ave6th St Pasadena Ave5th St CVS Pharmacy AT&T Verizon Post Office Park Alameda AveDalton AveSlausonParkSoldano AveAzusa AveCityHall HistoricResource SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 150 30075Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change City-Owned Opportunity Site Downtown District Key Map N on a daily basis and presents a dynamic palette for streetscape and pedestrian circulation improvements, including a new plaza at the southeast corner of the intersection (refer to Section 3.2). City-owned parcels located at the southeast corner of the intersection are viewed as essential to creating and implementing the desired land use mix for the Downtown District while at the same time strengthening the visual and physical connections to adjoining Specific Plan districts. In addition, building articulation standards and guidelines reinforce the historic character of the downtown. City-Owned Opportunity Sites Historic Resources LAND USE AND URBAN FORM DOWNTOWN DISTRICT2 2-26 City of Azusa | TOD Specific Plan May 2017 Table 2-2: Downtown District Allowable Uses BUILDING USE Ground Floor Uses A. Ground floor uses fronting Azusa Avenue, Foothill Boulevard, and Alameda Avenue shall be non-residential except for lobby, gym, and other pedestrian oriented uses. STANDARDS PROHIBITED USES INTERPRETATION Building Use Retail & Restaurant Residential & Commercial Public S t r e e t Note: A combination of any of the permitted uses may be provided within a horizontal or vertical mixed-use project provided the Ground Floor Use Standard (provided below) and Mixed-Use Standards provided on Page 2-7 are adhered to. A. Auto Vehicle Sales and Rental B. Building and Landscape Materials Sales C. Drive-Through Facility D. Public Safety Facility E. Mortuary, Funeral Home F. Repair Service G. Vehicle Service H. Utility Facility P             Permitted Use, Zoning Clearance required Refer to Chapter 88.70 of the Development Code for Definitions               uses permitted on a second or upper floor.               permitted on a second or upper floor. 1             Only Medical Services ‐ Doctor Office use 2             Only Office‐Processing and Office‐Professional      MUP      Minor Use Permit required UP          Use Permit required S             Permit requirement set by Specific Use Regulations LAND USE REGULATION LAND USE REGULATION RECREATION, EDUCATION, AND PUBLIC ASSEMBLY RETAIL SALES CONT. Commercial Recreation Facility‐Indoor MUP Groceries, Specialty Foods P Conference/Convention Facility UP Neighborhood Market P Health/Fitness Facility P Night Club MUP Live Entertainment MUP Outdoor Displays and Sales MUP Park, Playground P Restaurant, Café, Coffee Shop P School‐Specialized Education/Training UP SERVICES ‐ BUSINESS, FINANCIAL, AND PROFESSIONAL Studio‐Art, Dance, Martial Arts, Music, Etc.P ATM P Theater MUP Banks, Financial Services P RESIDENTIAL Business Support Services P Caretaker/Manager Unit P Medical Office/Service P1 Courtyard Housing P Office P2 Duplex/Triplex/Fourplex P SERVICES ‐ GENERAL Home Occupation P Day Care Center ‐ Child or Adult MUP Live/Work Unit MUP Lodging ‐ Bed & Breakfast Inn (B&B)P Multifamily P Lodging ‐ Hotel or Motel P Organizational House P Personal Services P Residential Care (seven or more clients)P TRANSPORTATION, COMMUNICATIONS, AND INFRASTRUCTURE Senior Citizen Apartment P Broadcasting Studio P RETAIL SALES Parking Facility, Public or Commercial MUP Bar/Tavern UP Telecommunications Facility S Farmers Markets MUP Furniture, Furnishings and Appliance store P General Retail P     Alcoholic Beverage Sales UP     Floor Area Under 20,000 sf P     Floor Area Over 20,000 sf UP     Operating between 9:00 pm and 7:00 am MUP ALLOWABLE USES: Downtown District DOWNTOWN DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-27 May 2017 COVERAGE Lot Coverage A. 100% maximum. Landscaping Standards A. Refer to Chapter 88.34 - Landscaping Standards of the Development Code for specific requirements. STANDARDS INTERPRETATION Lot Coverage 100% Lot Coverage 2.4.3 Development Standards The following development standards are specific to the Downtown District. These standards have been tailored to reflect the desired character and implement the vision of the Downtown District. They provide the framework for the creation of a safe, vibrant, and pedestrian-friendly downtown environment. In addition to the development standards located on the following pages, projects will be evaluated on their adherence to standards provided in Section 2.2.4, Section 3, and the design guidelines and strategies located in Sections 1.7, 2.2.5, and 2.4.4. A. SITE PLANNING Site planning and design is key to quality development. The following standards promote orienting buildings toward the street, to promote an active street environment and regulations that minimize pedestrian and vehicular conflicts. Residential Open Space 25 sf/unit min. of Common Open Space 100 sf/unit min. of Private Open Space RESIDENTIAL OPEN SPACE Residential Private Open Space A. Private open space shall be provided at a minimum of 100 sf per unit with a minimum dimension of 6’ in any direction. Residential Common Open Space A. Common open space shall be provided at a minimum of 25 sf per unit with a minimum of 10’ in any direction. B. Common open space shall be purposefully designed as active or passive recreational facilities. C. Rooftop open space may satisfy this requirement, provided it is available for use by all residents. LAND USE AND URBAN FORM DOWNTOWN DISTRICT2 2-28 City of Azusa | TOD Specific Plan May 2017 SERVICE AND DELIVERY AREAS Loading and Service Areas A. Loading docks and service bays shall be located a minimum of 20’ from any public street. B. Trash and recycling enclosures shall not be located adjacent to a public street. STANDARDS INTERPRETATION Service and Delivery Areas Service Loading 20’ min.Parking Public Stre e t Reciprocal Access Building Building 7’-6” min.7’-6” min.7’-6” min.Azusa Avenue Line of Sight RECIPROCAL ACCESS Ingress and Egress A. Reciprocal ingress and egress access with adjacent properties shall be provided for parcels fronting Azusa Avenue and Foothill Boulevard. This requirement may be waived with City approval due to the following circumstances: • The location of existing structures or infrastructure • Lack of agreement between adjacent owners • Other extreme hardship VEHICULAR LINE OF SIGHT Clear Zones A. The clear zone shall consist of an isosceles right triangle with 7’6” sides on the driveway and street. B. The clear zone shall not be occupied by a ground floor building footprint, site features, or landscaping that is taller than 3’. DOWNTOWN DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-29 May 2017 B. BUILDING PLACEMENT AND ORIENTATION Building placement refers to the physical siting of a structure on a parcel with considerations being given to building articulation, setbacks, and parking. The following standards promote building placement that creates an active public realm, creates a strong continuity of frontages, and contributes to greater utilization of parcels within the Downtown District. 15 ’ m a x 0’ Rear Setback 0’ Side Setback 0’ Street Setback BUILDING SETBACKS Ground-Level A. 0’ minimum to street, side, and rear. B. 15’ maximum to building. Setback area shall include plaza, courtyard, outdoor dining, or enhanced pedestrian connection. Upper Floors A. 8’ minimum setback required for those portions of a building exceeding three stories. Parking A. 10’ minimum landscape setback where surface parking areas are located adjacent to a public street. STANDARDS INTERPRETATION Ground-Level Setbacks Upper Floors Setback Public Street10’ m i n Parking Setbacks Public StreetParki n g 8’ min Upper Floor Public Street LAND USE AND URBAN FORM DOWNTOWN DISTRICT2 2-30 City of Azusa | TOD Specific Plan May 2017 BUILDING LOCATION Placement A. Parcels fronting a public street shall orient buildings toward the street. B. Parking is not permitted adjacent to Azusa Avenue or Foothill Boulevard. STANDARDS INTERPRETATION Building Placement Primary Entrances Azusa A v e n u eBuilding E ntr a n c e s Azusa Avenue BUILDING ENTRANCES Primary Entrances A. Buildings shall have a primary entrance door facing Azusa Avenue. Entrances at building corners may be used to satisfy this requirement. BUILDING HEIGHT Minimum Height A. 25’ minimum. Maximum Height A. 50’ maximum. Building Height 50’ max25’ minC. BUILDING FORM AND MASSING Building form refers to the shape, configuration, and relationship of a building to its environment. A number of details must be considered when designing a building’s form including building height, plate height, configuration, roof form, facades, articulation, entrances, and window glazing. Building forms should encourage a pedestrian- friendly environment by including amenities, facade articulation, and street level building openings. STANDARDS INTERPRETATION Architectural projections/features may exceed the height limits of this District up to 10 feet, subject to Economic and Community Development Director approval. Projections/features should be architecturally compatible and aesthetically pleasing or be screened from view. Neon signage, historic graphics, and/or other non-business or project specific related screening methods may be considered appropriate, subject to Economic and Community Development Director approval. DOWNTOWN DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-31 May 2017 STANDARDS INTERPRETATION BUILDING ARTICULATION Plate Height A. Ground floor plate height shall be a minimum of 14’ along all streets. Historic Resources A. Buildings identified as having historical significance (Refer to Figure 2-3), shall retain their original character and building articulation. BUILDING MASSING Maximum Wall Plane A. No building façade visible from any public street shall extend more than 50’ in length without a 5’ minimum variation in the wall plane. Side and Rear Wall Planes A. Side and rear wall planes shall address site context through continuation of architectural features, fenestration, and/or building materials. Roofline Variation A. Building rooflines shall vary in height every 50’ in wall plane length.50’ max.50’ max.50’ max. Roofline Variation Public Street Building Plate Height 14’ min.Floor StructureT.O.P. 50’ ma x . 5’ min. Maximum Wall Plane Public Street LAND USE AND URBAN FORM2 2-32 City of Azusa | TOD Specific Plan May 2017 WINDOW GLAZING Solid-to-Void Ratio A. 45% minimum transparent glazing of first floor facade for retail uses adjacent to Azusa Avenue. B. 30% minimum transparent glazing of first floor facade for office uses adjacent to Azusa Avenue. C. Transparent or translucent glazing is required on the first floor facade of a commercial or retail use facing a public street. D. Opaque, reflective, or dark tinted glass is not permitted. E. Window stickers or exterior window treatments that obstruct interior building views at the street level are prohibited. F. The bottom of any window or product display window shall not be more than three and one- half feet above the adjacent sidewalk. G. Product display windows shall have a minimum height of four feet and be internally lit. 45% min. for retail 30% min. for office Window Glazing Public Street STANDARDS INTERPRETATION 2 City of Azusa | TOD Specific Plan 2-33 May 2017 DOWNTOWN DISTRICT LAND USE AND URBAN FORM 2.4.4 Downtown District Design Guidelines 1. Architectural character of a building should build upon and maintain the traditional downtown image with an emphasis on historic architectural styles, building types, materials, and details. 2. Downtown streets should support an active and engaging pedestrian environment. Human scale should be created through the use of building articulation including elements such as awnings, arches, trellises, arbors, pergolas, and other architectural elements. These elements should be integrated into the building design to avoid the look of “tacked on” architectural features. 3. Existing historic or older structures with architectural details or ornamentation should be retained, restored, or replicated whenever possible. 4. Building entrances and storefronts should be incorporated with one of more of the following design elements: Ê A change in wall/window plane Ê Wall articulation around the door and projecting beyond the door Ê Placement of art or decorative detailing at the entry Ê A projecting element above the entrance 5. Clear glass is required on the street level to create interesting interior shop views for pedestrians. Heat gain can be limited by incorporating awnings, recessed storefronts, or user controlled interior shading device. 6. Locate windows and entrances adjacent to street and public spaces to improve public safety and security and provide “eyes on the street”. 7. Awnings should not be wrapped around buildings in continuous bands. Awnings should only be placed on top of doors, on top of windows, or within vertical elements when the façade of a building is divided into distinct structural bays. Emphasizing historic architectural styles of a place can maintain and build upon the existing community character. Clear storefront glass at street level creates visual interest for the pedestrian. LAND USE AND URBAN FORM DOWNTOWN DISTRICT2 2-34 City of Azusa | TOD Specific Plan May 2017 8. Property owners should not propose installing awnings unless they are prepared to maintain and regularly replace the awnings every eight to ten years. 9. Building materials and finishes should be true to the structure’s architectural style. 10. Material changes should occur at intersecting planes to appear substantial and integral to the façade. Material or color changes at the outside corners of structures give an impression of thinness and artificiality and should be avoided. 11. Parapets should have sufficient articulation of detail, such as precast treatments, continuous banding, or projecting cornices, lentils, caps, corner details, or variety in pitch (sculpted). 12. Parapets should not appear “tacked on” and should convey a sense of permanence. If the interior side of a parapet is visible from pedestrian view, it should be finished with the same materials and a similar level of detail as the front façade. 13. Traditional building widths generally do not exceed 25 feet wide to 30 feet wide at the ground level, irrespective of a building’s total width. Continuation of this familiar, human-scaled rhythm is encouraged in new construction. Infill buildings that are much wider than the existing facades should be broken down into a series of appropriately proportioned structural bays or components. Commercial street façade rhythm helps to visually tie the Downtown streets together. 14. A 360-degree architectural design philosophy, the full articulation of all building facades, should be incorporated into all new buildings and remodels. This includes variation in massing, roof forms, and wall planes, as well as surface articulation. Acknowledging sensitivity to budget, it is expected that the highest level of articulation will occur on the front facade and facades visible from public streets. However, similar and complementary massing, materials, and details should be incorporated into side and rear facades. Architectural elements should be continued to address the side and rear of buildings, where appropriate. Large building massings should be broken up through facade articulation and material changes. LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-35 May 2017 Landscape trellises soften vertical wall planes and provide visual interest to side and rear of buildings. Plazas and pocket parks incorporating fountains, art, and seating add to the pedestrian experience of a place. 15. Blank walls shall be avoided. Architectural elements such as windows, overhangs, trellises, arcades, projections, awnings, insets, materials, textures, and colors should be incorporated into every building facade. 16. Murals, espaliers/trellises, and/or vines may be placed on portions of large expanses of rear and side building walls to soften the wall and create interest. 17. Plazas, courtyards, pocket parks, and outdoor cafes should be designed in an inviting manner that encourages pedestrian use through the incorporation of trellises, fountains, art, seating, and shade trees. 18. Focal points should be created and incorporated into sites to establish a sense of place and orientation. Fountains, plazas, and artwork can be used to create focal points. 19. Public art is encouraged as an on-site amenity for all projects. 20. Buildings in highly visible locations, such as the intersection of Azusa and San Gabriel Avenues and Foothill Boulevard should incorporate architectural elements such as a small plaza, clock tower, varying roof lines, fountain, and/or public art. 21. Signs integrated into the building design provide a personal quality that contributes to the ambiance of the commercial complex or streetscape, especially the more unique signs. The following guidelines should be considered when developing private signage. Ê Signs that reflect the type of business through design, shape, or graphic form are encouraged. Ê The method of attaching the sign to the building should be integrated into the overall sign design. Ê Signs should not cover up windows or important architectural features. LAND USE AND URBAN FORM DOWNTOWN EXPANSION DISTRICT2 2-36 City of Azusa | TOD Specific Plan May 2017 2.5.1 District Character The Downtown Expansion District will extend and complement the adjacent Downtown District environment by including new residential, retail, and office land uses, while transitioning new development to enhance inter-district connectivity to the Route 66 and Civic Districts. Two and three-story, mixed-use buildings 2.5 DOWNTOWN EXPANSION DISTRICT City-owned opportunity sites east of Dalton Avenue. Wide sidewalks with parkway landscaping create a pleasant and safe environment for pedestrians. Neighborhood services at street level allow for convenient access for residents living in, and adjacent to, mixed-use developments. along Alameda Avenue, Dalton Avenue, and San Gabriel Avenue will afford residents the opportunity to live within short walking distances of coffeehouses, restaurants, shops, and the Azusa Downtown Gold Line Station. Local, neighborhood-serving businesses within the Downtown Expansion District will cater to the everyday needs of residents, with office spaces DOWNTOWN EXPANSION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-37 May 2017 SPECIFIC PLAN GUIDING PRINCIPLES - Related to the Downtown Expansion District TO-3 Provide district-specific development standards and design guidelines that support and encourage TOD and increase safe, direct, and convenient pedestrian access to transit facilities. A. Enhance connection to the Azusa Downtown Gold Line Station and adjacent districts through the incorporation of development standards and streetscape improvements that improve pedestrian safety and accessibility. ED-3 Provide increased uses, services, and transportation options to support and benefit the local community. A. Incorporate a wide variety of land uses, including retail, office, and residential. ED-4 Provide a range of supporting benefits for the local community including a variety of housing, a more walkable environment, and community amenities. A. Promote a variety of new housing options to benefit the community, including mixed-use and stand- alone residential. B. Encourage a more walkable environment through development standards that are meant to enhance the pedestrian experience. HC-1 Provide district-specific development standards and design guidelines that enhance architectural quality, improve the overall identity of the Specific Plan Area, and enrich the quality of life through the built environment. A. Enhance architectural quality through building placement, orientation, and guidelines. HC-3 Emphasize streetscape and landscaping enhancements to improve walking, bicycling, and transit use options. A. Improve pedestrian connectivity to the Downtown, Civic, and Route 66 Districts through the continuation of landscaping, streetscape, and sidewalk improvements. CP-1 Incorporate Crime Prevention through Environmental Design (CPTED) strategies that contribute to the safety and vitality of residents and visitors of Azusa. A. Encourage positive social interactions and deter potential criminal behavior through the design and development of both public and private spaces (refer to Section 1.7.6). expanding future business and job opportunities for Azusa residents. While similar to the Downtown District in character, the Downtown Expansion District will alternatively, allow for stand-alone residential and appropriately scaled live-work and mixed-use developments that will be oriented to provide local, neighborhood services, and convenient access to the Azusa Downtown Gold Line Station. Extension of the Downtown District landscaping, streetscape amenities, and wide sidewalks along San Gabriel Avenue and Alameda Avenue will provide additional layers of visual and physical linkages and provide opportunities to expand the Downtown Area. LAND USE AND URBAN FORM DOWNTOWN EXPANSION DISTRICT2 2-38 City of Azusa | TOD Specific Plan May 2017 Height transitioning and good-neighbor setback policies minimize shadowing, privacy issues, and other nuisances on existing residential uses. Pedestrian-oriented streets provide an attractive environment for walking, bicycling, and other non-motorized mobility methods. 2.5.2 Land Use A complementary mix of retail, office, and residential uses are envisioned within the Downtown Expansion District to provide easily accessible neighborhood-oriented services for the Azusa community. Stand-alone residential uses, such as duplexes and townhomes, provide additional housing opportunities within close walking and bicycling proximity to Downtown and the Azusa Downtown Gold Line Station. A major focus of this District is enhancing overall walkability. Pedestrian enhancements and streetscape beautification have been emphasized in order to entice non-motorized mobility through and into adjacent districts (refer to Section 3.2). Front setback development standards allow for a maximum of up to 15 feet. This encourages new development to incorporate plaza and/or outdoor dining spaces to create a social, visually attractive, and pedestrian-oriented public realm within the Downtown Expansion District. New residential housing expand options for existing and future residents of Azusa. DOWNTOWN EXPANSION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-39 May 2017 Figure 2-4: Downtown Expansion District Foothill Blvd Azusa AveAzusa DowntownStation APU/CitrusCollege Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA District Key Map 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Gold Line District Downtown District Downtown Expansion District No ChangeRoute 66 District Transition District Civic District way Foothill Blvd Sunset AveAngeleno AveSan Gabriel Ave6th St Pasadena AveAzusa Light & Water CVS Pharmacy AT&T Verizon Post Office Park PublicLibrary SeniorCenter Alameda AveDalton AveSt Francis ofRome School SlausonParkSoldano AveAzusa AveCityHall Soldano AvePasadena AveSOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 160 32080Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change City-Owned Opportunity Site City-Owned Opportunity Site Downtown Expansion District Key Map N City-owned properties along Dalton Avenue and San Gabriel Avenue provide opportunities for mixed-use development and will encourage additional private investment throughout the Downtown Expansion District. Land uses, building heights, and development intensities are intended to complement, not detract from, uses within adjacent districts through scaled height transitioning. Development standards outline the framework for focusing new development along street frontages with up to 100% lot coverage allowed. Maximum building heights for this District are allowed up to 45 feet and incorporate specific good-neighbor policies to minimize potential impacts on existing single-family residences. City-Owned Opportunity Sites LAND USE AND URBAN FORM DOWNTOWN EXPANSION DISTRICT2 2-40 City of Azusa | TOD Specific Plan May 2017 LAND USE REGULATION LAND USE REGULATION RECREATION, EDUCATION, AND PUBLIC ASSEMBLY RETAIL SALES CONT. Commercial Recreation Facility‐Indoor MUP Neighborhood Market P Conference/Convention Facility UP Night Club UP Health/Fitness Facility P Outdoor Displays and Sales MUP Live Entertainment MUP Restaurant, Café, Coffee Shop P Park, Playground P SERVICES ‐ BUSINESS, FINANCIAL, AND PROFESSIONAL School‐Specialized Education/Training UP ATM P Studio‐Art, Dance, Martial Arts, Music, Etc.P Banks, Financial Services P RESIDENTIAL Business Support Services P Caretaker/Manager Unit P Medical Office/Service P1 Courtyard Housing P Office P2 Duplex/Triplex/Fourplex P SERVICES ‐ GENERAL Home Occupation P Day Care Center ‐ Child or Adult MUP Live/Work Unit MUP Lodging ‐ Bed & Breakfast Inn (B&B)P Multifamily P Lodging ‐ Hotel or Motel P Organizational House P Massage Parlor SP* Residential Care (seven or more clients)P Personal Services P Senior Citizen Apartment P TRANSPORTATION, COMMUNICATIONS, AND INFRASTRUCTURE Townhouse, Rowhouse P Parking Facility, Public or Commercial MUP RETAIL SALES Public Facilities UP Bar/Tavern UP Telecommunications Facility S Farmers Markets MUP Furniture, Furnishings and Appliance Store P General Retail P     Alcoholic Beverage Sales UP     Floor Area Under 20,000 sf MUP     Floor Area Over 20,000 sf UP     Operating between 9:00 pm and 7:00 am MUP     Groceries, Specialty Foods P ALLOWABLE USES: Downtown Expansion District Table 2-3: Downtown Expansion District Allowable Uses BUILDING USE Ground Floor Uses A. Ground floor uses fronting Foothill Boulevard or San Gabriel Avenue shall be non-residential except for lobby, gym, and other pedestrian oriented uses. STANDARDS INTERPRETATION E. Public Safety Facility F. Mortuary, Funeral Home G. Repair Service H. Vehicle Service I. Utility Facility Building Use Commercial Residential & Commercial Public S t r e e t                Municipal Code. P             Permitted Use, Zoning Clearance required Refer to Chapter 88.70 of the Development Code for Definitions               uses permitted on a second or upper floor.               permitted on a second or upper floor. 1             Only Medical Services ‐ Doctor Office use 2             Only Office‐Processing and Office‐Professional      MUP      Minor Use Permit required SP*         Special Permit required ‐ see Chapter 88.48 of City  UP          Use Permit required S             Permit requirement set by Specific Use Regulations Note: A combination of any of the permitted uses may be provided within a horizontal or vertical mixed-use project provided the Ground Floor Use Standard (provided below) and Mixed-Use Standards provided on Page 2-7 are adhered to. PROHIBITED USES A. Residential Care (six or fewer clients) B. Auto Vehicle Sales and Rental C. Building and Landscape Materials Sales D. Drive-Through Facility DOWNTOWN EXPANSION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-41 May 2017 COVERAGE Lot Coverage A. 100% maximum. Landscaping Standards A. Refer to Chapter 88.34 - Landscaping Standards of the Development Code for specific requirements. STANDARDS INTERPRETATION Lot Coverage 100% Lot Coverage 2.5.3 Development Standards The following development standards are specific to the Downtown Expansion District. These standards have been tailored to reflect the desired character and implement the vision of the Downtown Expansion District. They provide the framework for the creation of a safe, vibrant, and pedestrian-friendly environment that enhances inter-district connectivity within the Specific Plan Area. In addition to the development standards located on the following pages, projects will be evaluated on their adherence to standards provided in Section 2.2.4, Section 3, and the design guidelines and strategies located in Sections 1.7, 2.2.5, and 2.5.4. A. SITE PLANNING Site planning and design is key to quality development. The following standards promote orienting buildings toward the street to promote an active street environment and regulations that minimize pedestrian and vehicular conflicts. Residential Open Space 25 sf/unit min. of Common Open Space 125 sf/unit min. of Private Open Space RESIDENTIAL OPEN SPACE Residential Private Open Space A. Private open space shall be provided at a minimum of 125 sf per unit with a minimum dimension of 6’ in any direction. Residential Common Open Space A. Common open space shall be provided at a minimum of 25 sf per unit with a minimum of 10’ in any direction. B. Common open space shall be purposefully designed as active or passive recreational facilities. C. Rooftop open space may satisfy this requirement, provided it is available for use by all residents. LAND USE AND URBAN FORM DOWNTOWN EXPANSION DISTRICT2 2-42 City of Azusa | TOD Specific Plan May 2017 SERVICE AND DELIVERY AREAS Loading and Service Areas A. Loading docks and service bays shall be located a minimum of 20’ from San Gabriel Avenue, Alameda Avenue, and Dalton Avenue. B. Trash and recycling enclosures shall not be located adjacent to a public street. STANDARDS INTERPRETATION Service and Delivery Areas Service Loading 20’ min.Parking Public Stre e t 7’-6” min.7’-6” min.7’-6” min.Public Street Line of SightVEHICULAR LINE OF SIGHT Clear Zones A. The clear zone shall consist of an isosceles right triangle with 7’6” sides on the driveway and street. B. The clear zone shall not be occupied by a ground floor building footprint, site features, or landscaping that is taller than 3’. DOWNTOWN EXPANSION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-43 May 2017 10’ m i n 15 ’ m a x 0’ Rear Setback 0’ Side Setback 0’ Street Setback BUILDING SETBACKS Street A. 0’ minimum. B. 15’ maximum to building. Setback area shall include plaza, courtyard, outdoor dining, or enhanced pedestrian connection. C. 10’ minimum landscape setback where surface parking areas are located adjacent to a public street. Side A. 0’ minimum. Rear A. 0’ minimum. STANDARDS INTERPRETATION Dining Setbacks Parking Setbacks Public StreetPublic StreetParki n g B. BUILDING PLACEMENT AND ORIENTATION Building placement refers to the physical siting of a structure on a parcel with considerations being given to building orientation, setbacks, and parking. The following standards promote building placement that creates an active public realm, creates a strong continuity of frontages, and contributes to greater utilization of parcels within the Downtown Expansion District. BUILDING LOCATION Placement A. Parcels fronting a San Gabriel Avenue, Alameda Avenue, and Dalton Avenue shall orient buildings toward the street. B. Parking is not permitted adjacent to Foothill Boulevard, San Gabriel Avenue, Alameda Avenue, and Dalton Avenue. Building Placement Public Street LAND USE AND URBAN FORM DOWNTOWN EXPANSION DISTRICT2 2-44 City of Azusa | TOD Specific Plan May 2017 BUILDING ARTICULATION Plate Height A. Ground floor plate height shall be a minimum of 14’. STANDARDS INTERPRETATION Primary Entrances Public Str e etBuilding E ntr a n c e s BUILDING ENTRANCES Primary Entrances A. Buildings shall have a primary entrance door facing San Gabriel Avenue, Alameda Avenue, and Dalton Avenue. Entrances at building corners may be used to satisfy this requirement. BUILDING HEIGHT Minimum Height A. 25’ minimum. Maximum Height A. 45’ maximum. Building Height 45’ max25’ minC. BUILDING FORM AND MASSING Building form refers to the shape, configuration, and relationship of a building to its environment. A number of details must be considered when designing a building’s form including building height, plate height, configuration, roof form, facades, articulation, entrances, and window glazing. Building forms should encourage a pedestrian- friendly environment by including amenities, facade articulation, and street level building openings. STANDARDS INTERPRETATION Building Plate Height 14’ min.Floor StructureT.O.P. Architectural projections/features may exceed the height limits of this District up to 10 feet, subject to Economic and Community Development Director approval. Projections/features should be architecturally compatible and aesthetically pleasing or be screened from view. Neon signage, historic graphics, and/or other non-business or project specific related screening methods may be considered appropriate, subject to Economic and Community Development Director approval. DOWNTOWN EXPANSION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-45 May 2017 STANDARDS INTERPRETATION BUILDING MASSING Maximum Wall Plane A. No building façade visible from any public street shall extend more than 50’ in length without a 5’ minimum variation in the wall plane. Roofline Variation B. Building rooflines shall vary in height every 50’ in wall plane length. Maximum Wall Plane WINDOW GLAZING Solid-to-Void Ratio A. 45% minimum transparent glazing of first floor facade for retail uses adjacent to a public street. B. 30% minimum transparent glazing of first floor facade for office uses adjacent to a public street. C. Transparent or translucent glazing is required on the first floor facade of a commercial or retail use facing a public street. D. Opaque, reflective, or dark tinted glass is not permitted. E. Window stickers or exterior window treatments that obstruct interior building views at the street level are prohibited. F. The bottom of any window or product display window shall not be more than three and one- half feet above the adjacent sidewalk. 50’ max.50’ max.50’ max. Roofline Variation Public Street 50’ max . 5’ min. Public Street 45% min. for retail 30% min. for office Window Glazing Public Street G. Product display windows shall have a minimum height of four feet and be internally lit. LAND USE AND URBAN FORM DOWNTOWN EXPANSION DISTRICT2 2-46 City of Azusa | TOD Specific Plan May 2017 2.5.4 Downtown Expansion District Design Guidelines All of the design guidelines provided in Section 2.4.4, Downtown Design Guidelines should be adhered to for buildings within the Downtown Expansion District. In addition, the following guidelines apply to stand- alone residential within this District. 1. A variety of one-, two-, and three-bedroom dwelling units should be provided to encourage a variety of product types. Units should be mixed throughout the development. 2. Units should front primary streets to provide eyes on the street, create pedestrian environments, and support the character of Downtown. 3. Dwellings should incorporate porches, trellises, landscaping, and other features to extend the living area toward the street and soften the transition between the street and the dwelling. 4. The site area adjacent to the street should not be dominated with parking. Parking should be concentrated in areas behind buildings, and away from the street when possible. 5. The design of multi-family developments should consider compatibility with the surrounding neighborhood by mimicking existing architectural styles, colors, and rhythm. 6. Monolithic structures should be avoided. Buildings designs should include a combination of the following techniques: Ê Variation in the wall plane (projecting and recessed elements). Ê Variation in wall height. Ê Roofs located at different levels. Ê Combinations of one-, one and one-half, and two-story units should be used to create visual interest and variation in the massing and building height. Residential units engage the street. Building designs that incorporate variations in wall planes, heights, and roof levels create visual interest at street-level. DOWNTOWN EXPANSION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-47 May 2017 Recessed upper stories reduce the overall massing and scale of a building. 7. Architectural features such as porches, balconies, chimneys, door placement, window proportions, dormers, wood detailing, fencing, siding, and color scheme should be used to complement the overall building design, site and neighborhood context. 8. Where appropriate, the upper stories of new multi-family buildings should be stepped back to reduce the scale of facades that face the street, courtyards, or open space areas. 9. Roofs should reflect a residential appearance through roof pitch and material selection. 10. Roofs covering the entire building such as hips and gables should be used rather than mansard roofs. 11. Locate windows and entrances adjacent to street and public spaces to improve public safety and security and provide “eyes on the street”. 12. Windows should be articulated with accent trim, sills, kickers, shutters, window flower boxes, balconies, awnings, or trellises authentic to the architectural style of the building. 13. Property owners should not propose installing awnings unless they are prepared to maintain and regularly replace the awnings every eight to ten years. 14. Windows on walls adjacent to a neighbor’s home should be offset to prevent direct views into neighbor’s windows, with specific attention to new second floor windows that look into windows, pools, spas, etc. on adjacent properties. Consider using clerestory windows or translucent glass to interrupt direct sight lines to neighbor’s windows and livable outdoor spaces. 15. If decorative shutters are installed, they should be proportional to the window and complement the architectural style of the building. LAND USE AND URBAN FORM ROUTE 66 DISTRICT 2-48 City of Azusa | TOD Specific Plan May 2017 2 Route 66-themed signage and public art aid in defining the unique character and identity of the Route 66 District. 2.6.1 District Character The Route 66 District will reflect a bold and modern interpretation of the historic and iconic Route 66 of the past. The portions of Foothill Boulevard and Alosta Avenue that traverse Azusa will be renamed “Route 66” to embrace and draw attention to its historic context. 2.6 ROUTE 66 DISTRICT While balancing the requirements of the automobile with the needs of the pedestrian, new development in this district will front onto Foothill Boulevard and Alosta Avenue, creating an active street environment with special signage and setback requirements. Thematic, 1950s-style diners and drive-thru restaurants, retail shops, Modern interpretations of the classic Route 66 diner reinvigorate the environment of the historic route. Route 66-themed signage provides visual intrigue and a unique identity for businesses and the community. ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-49 May 2017 SPECIFIC PLAN GUIDING PRINCIPLES - Related to the Route 66 District TO-3 Provide district-specific development standards and design guidelines that support and encourage TOD and increase safe, direct, and convenient pedestrian access to transit facilities. A. Enhance pedestrian street crossings, streetscapes, and landscaping to facilitate safe and convenient access to the Azusa Downtown and APU/Citrus College Gold Line Stations. ED-1 Provide zoning and land use regulations to support future market-driven revitalization and investment. A. Establish a Route 66-themed overlay zone with new development incentives for public art and signage along Foothill Boulevard and Alosta Avenue. ED-3 Provide increased uses, services, and transportation options to support and benefit the local community. A. Encourage mixed-use, commercial, hospitality, and other land uses to expand the variety of recreation, retail, and services within the community. ED-4 Provide a range of supporting benefits for the local community including a variety of housing, a more walkable environment, and community amenities. A. Allow for mixed-use and stand-alone residential uses in order to expand housing variety within the local community. HC-1 Provide district-specific development standards and design guidelines that enhance architectural quality, improve the overall identity of the Specific Plan Area, and enrich the quality of life through the built environment. A. Include good-neighbor development standards and guidelines to ensure new development remains compatible and minimizes impacts on adjacent residential neighborhoods. CP-1 Incorporate Crime Prevention through Environmental Design (CPTED) strategies that contribute to the safety and vitality of residents and visitors of Azusa. A. Encourage positive social interactions and deter potential criminal behavior through the design and development of both public and private spaces (refer to Section 1.7.6). and opportunities for new hospitality uses will populate Route 66, creating a fun and inviting environment for all ages. Stand-alone residences will be sited off Foothill Boulevard, allowing for appropriate buffering into adjacent neighborhood areas. Quirky, customized architectural elements are encouraged to create vibrant and colorful landmarks, paying homage to the historic route. Incentives will encourage developers and businesses to incorporate Route 66-themed public art and signage along the Foothill Boulevard and Alosta Avenue street frontages, creating a unique atmosphere and identity within the Route 66 District. 2.6.2 Land Use A wide array of commercial, retail, hospitality, and mixed-use residential uses are allowed within the Route 66 District focused along Foothill Boulevard and Alosta Avenue and are intended to reinvigorate this portion of the historic route. New development within the Route 66 District is permitted up to 40 feet in height, with hospitality uses allowed up to 50 feet. Maximum lot coverage is allowed up to 80%, with the remaining 20% required to be appropriately landscaped to accent the Route 66 District context. A Route 66 Overlay identifies LAND USE AND URBAN FORM ROUTE 66 DISTRICT 2-50 City of Azusa | TOD Specific Plan May 2017 2 Diners, creative signage, and landscape create a pleasant and thematic Route 66 street scene. parcels within the District that may take advantage of new height and setback incentives for incorporating Route 66-themed public art and/or signage along the Foothill Boulevard and Alosta Avenue street edge. Route 66 District proximity to existing low and medium density residential neighborhoods is addressed through the inclusion of good neighbor policies. These policies require new development to incorporate additional screening, setback, siting, and other site planning techniques to minimize light, noise, and other impacts within the community. A major component of the Route 66 District includes significant improvements to the streetscape along Foothill Boulevard and Alosta Avenue to provide a pleasant pedestrian experience while still accommodating the automobile, public transit, and other non- motorized transit options (refer to Section 3.2 and 3.3.5). Additional landscaping within the Route 66 District is required for new development where surface parking areas are to be located adjacent to public streets, requiring 15 feet minimum from the street edge. Route 66-themed public art creates visual interest and brings a vibrant energy to the historic route’s street frontage. ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-51 May 2017 AT & SF R ail w a y Foothill Blvd Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Light & Water CVS Pharmacy AT&T Verizon Post Office Park AzusaAveSOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 150 30075Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change 8th St 6th St Pasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveAPaUni C Foothill Vista Mobile Home Park Lindley-ScottHouse Palm StAPUHousing iorter Citrus Citrus AveFoothill Blvd AREA OFNO CHANGE AtlantisGardens AREA OFNO CHANGE Azusa PacificUniversity St Francis ofRome School SlausonPark LeeElementarySoldano AveSoldano AvePasadena AveSOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 250 500125Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change Foothill Blvd Azusa AveAzusa DowntownStation APU/CitrusCollege Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA District Key Map 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Gold Line District Downtown District Downtown Expansion District No ChangeRoute 66 District Transition District Civic District Route 66 District Key Map Western Portion Eastern Portion Figure 2-5: Route 66 District N Route 66 Overlay The Route 66 Overlay incentivizes private development to assist in implementing the District’s desired character. Parcels fronting onto Foothill Boulevard and Alosta Avenue (as noted in Figure 2-5: Route 66 District) have the opportunity to incorporate Route 66-themed public art and/or signage along the street edge in exchange for height and setback incentives. Appropriate examples of Route 66-themed public art and signage include restored classic cars, gas pumps, electric car chargers, unique and/or vintage signage, etc. Route 66 Overlay Parcels PROJECTS WITHIN ROUTE 66 OVERLAY A. Shall adhere to the guidelines presented in Section 2.6.4. B. Shall incorporate themed streetscape furnishings presented in Section 3.6.3. C. May take advantage of height, setback, and signage incentives provided on the following pages. LAND USE AND URBAN FORM ROUTE 66 DISTRICT 2-52 City of Azusa | TOD Specific Plan May 2017 2 LAND USE REGULATION LAND USE REGULATION RECREATION, EDUCATION, AND PUBLIC ASSEMBLY RETAIL SALES CONT. Commercial Recreation Facility‐Indoor P Groceries, Specialty Foods P Commercial Recreation Facility‐Outdoor MUP Neighborhood Market P Conference/Convention Facility P Night Club UP Health/Fitness Facility P Outdoor Displays and Sales MUP Library, Museum P Restaurant, Café, Coffee Shop P Live Entertainment MUP SERVICES ‐ BUSINESS, FINANCIAL, AND PROFESSIONAL Park, Playground P ATM P School‐College, University UP Banks, Financial Services P School‐Specialized Education/Training UP Buisness Support Service P Studio‐Art, Dance, Martial Arts, Music, Etc.P Medical Office/Service P1 RESIDENTIAL Office P2 Caretaker/Manager Unit P SERVICES ‐ GENERAL Courtyard Housing P Day Care Center ‐ Child or Adult MUP Duplex/Triplex/Fourplex P Lodging ‐ Bed & Breakfast Inn (B&B)P Home Occupation P Lodging ‐ Hotel or Motel P Live/Work Unit P Mortuary, Funeral Home MUP Multifamily P Personal Services P Organizational House UP Public Safety Facility P Residential Accessory Use or Structure P Repair Service ‐ Equipment, Large Appliance,  Etc.P Residential Care (six or fewer clients)P TRANSPORTATION, COMMUNICATIONS, AND INFRASTRUCTURE Residential Care (seven or more clients)P Parking Facility, Public or Commercial MUP Senior Citizen Apartment P Public Facilities P Townhouse, Rowhouse P Telecommunications Facility S RETAIL SALES Utility Facilty P Bar/Tavern UP Building and Landscape Materials Sales ‐  Indoor MUP Drive‐Thru Facilities P Farmers Markets MUP Furniture, Furnishings and Appliance Store P General Retail P     Alcoholic Beverage Sales UP     Floor Area Under 20,000 sf P     Floor Area Over 20,000 sf MUP     Operating between 9:00 pm and 7:00 am MUP ALLOWABLE USES: Route 66 District P             Permitted Use, Zoning Clearance required Refer to Chapter 88.70 of the Development Code for Definitions               uses permitted on a second or upper floor.               permitted on a second or upper floor. 1             Only Medical Services ‐ Doctor Office use 2             Only Office‐Processing and Office‐Professional      MUP      Minor Use Permit required UP          Use Permit required S             Permit requirement set by Specific Use Regulations Table 2-4: Route 66 District Allowable Uses A. Single-Family Dwellings - adjacent to Foothill Boulevard and Alosta Avenue. B. Auto Vehicle Sales and Rentals C. Vehicle ServiceNote: A combination of any of the permitted uses may be provided within a horizontal or vertical mixed-use project provided the Ground Floor Use Standard (provided below) and Mixed-Use Standards provided on Page 2-7 are adhered to. PROHIBITED USES ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-53 May 2017 2.6.3 Development Standards The following development standards are specific to the Route 66 District. These standards have been tailored to reflect the desired character and implement the vision of the Route 66 District. They provide the framework for the creation of a unique Route 66-themed automobile and pedestrian-oriented district environment. In addition to the development standards located on the following pages, projects will be evaluated on their adherence to standards provided in Section 2.2.4, Section 3, and the design guidelines and strategies located in Sections 1.7, 2.5.2, and 2.5.3. A. SITE PLANNING Site planning and design is key to quality development. The following standards promote orienting buildings toward the street to promote an active street environment and regulations that minimize pedestrian and vehicular conflicts. COVERAGE Lot Coverage A. 80% maximum. Landscaping Coverage A. 20% maximum. B. Areas dedicated to the installation of public art within the Route 66 Overlay may be counted to satisfy this requirement. Landscaping Standards A. Refer to Chapter 88.34 - Landscaping Standards of the Development Code for specific requirements. STANDARDS INTERPRETATION Lot Coverage Landscaping Coverage 80% Lot Coverage 20% Landscape Coverage BUILDING USE Ground Floor Uses A. Ground floor uses fronting Foothill Boulevard and Alosta Avenue shall be non-residential except for lobby, gym, and other pedestrian oriented uses. Building Use Retail & Commercial Residential & Office Public S t r e e t LAND USE AND URBAN FORM ROUTE 66 DISTRICT 2-54 City of Azusa | TOD Specific Plan May 2017 2 SERVICE AND DELIVERY AREAS Loading and Service Areas A. Loading docks and service bays shall be located a minimum of 15’ from Foothill Boulevard and Alosta Avenue. B. Trash and recycling enclosures shall not be located adjacent to a public street. STANDARDS INTERPRETATION Service and Delivery Areas Service Loading 15’ min.Parking Public Stre e t 7’-6” min.7’-6” min.7’-6” min.Public Street Line of SightVEHICULAR LINE OF SIGHT Clear Zones A. The clear zone shall consist of an isosceles right triangle with 7’6” sides on the driveway and street. B. The clear zone shall not be occupied by a ground floor building footprint, site features, or landscaping that is taller than 3’. Residential Open Space 30 sf/unit min. of Common Open Space 150 sf/unit min. of Private Open Space RESIDENTIAL OPEN SPACE Residential Private Open Space A. Private open space shall be provided at a minimum of 150 sf per unit with a minimum dimension of 10’x10’. Residential Common Open Space A. Common open space shall be provided at a minimum of 30 sf per unit with a minimum of 10’ in any direction. B. Common open space shall be purposefully designed as active or passive recreational facilities. C. Rooftop open space may satisfy this requirement, provided it is available for use by all residents. ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-55 May 2017 STANDARDS INTERPRETATION Single/Double-Vehicle Access Double-Vehicle Access Reciprocal Access Building Building RECIPROCAL ACCESS Ingress and Egress A. Reciprocal ingress and egress access with adjacent properties shall be provided for parcels fronting Foothill Boulevard and Alosta Avenue. This requirement may be waived with City approval due to the following circumstances: • The location of existing structures or infrastructure • Lack of agreement between adjacent owners • Other extreme hardship VEHICULAR ACCESS Single-Vehicle Access A. A maximum of one (1) vehicle point shall be provided from a public street for parcels with less than 100 linear feet of street frontage and/ or a parcel less than 15,000 sf. Double-Vehicle Access A. A maximum of two (2) vehicle access points shall be provided from a public street for parcels with more than 100 linear feet of street frontage. B. Access points shall be separated a minimum of 80’ in consultation with the Director of Public Works. C. Additional access points may be permitted from secondary streets with Economic and Community Development Director approval. D. Unused vehicle access points shall be closed and reconstructed per City standard. >100’ <100’ Public Street LAND USE AND URBAN FORM ROUTE 66 DISTRICT 2-56 City of Azusa | TOD Specific Plan May 2017 2 BUILDING LOCATION Placement A. Parcels fronting Foothill Boulevard and Alosta Avenue shall orient buildings toward the street. Building Placement Public Street 15’ m i n BUILDING SETBACKS Street A. 15’ minimum to building. B. 20’ minimum landscape setback where surface parking areas are located adjacent to a public street. Side A. 0’ minimum. Rear A. 0’ minimum. Route 66 Themed Public Art Incentive A. Development dedicating 5% of the front setback area to Route 66 themed public art within the Route 66 Overlay may reduce the minimum street setback requirements by 5’. B. An additional 5’ of building height is permitted (10’ for hospitality use) if 10% of the front setback area is dedicated to Route 66 themed public art within the Route 66 Overlay. C. Public art shall comply with Chapter 88.39 - Art in Public Places of the Development Code and shall be installed prior to occupancy. STANDARDS INTERPRETATION Building Setbacks Parking Setbacks Public StreetParki n g B. BUILDING PLACEMENT AND ORIENTATION Building placement refers to the physical siting of a structure on a parcel with considerations being given to building orientation, setbacks, and parking. The following standards promote building placement that creates an active public realm, creates a strong continuity of frontages, and contributes to greater utilization of parcels within the Route 66 District.15’ min.0’ min. Rear & Side SetbackPub l i c S t r e e t ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-57 May 2017 STANDARDS Primary Entrances Public Stree tBuilding Entrance s BUILDING ENTRANCES Primary Entrances A. Buildings shall have a primary entrance door facing the public street. Entrances at building corners may be used to satisfy this requirement. BUILDING HEIGHT Minimum Height A. 20’ minimum. Architectural projections/features may exceed the height limits of this District up to 10 feet, subject to Economic and Community Development Director approval. Projections/features should be architecturally compatible and aesthetically pleasing or be screened from view. Neon signage, historic graphics, and/or other non-business or project specific related screening methods may be considered appropriate, subject to Economic and Community Development Director approval. Route 66 Themed Public Art Incentive A. Development dedicating 5% of the required front setback area to Route 66 themed public art within the Route 66 Overlay area may increase the maximum allowed building height by 5’ (10’ for hospitality uses), subject to Economic and Community Development Director approval. Building Height 40’ max; 50’ max for hospitality uses20’ min.C. BUILDING FORM AND MASSING Building form refers to the shape, configuration, and relationship of a building to its environment. A number of details must be considered when designing a building’s form including building height, plate height, configuration, roof form, facades, articulation, entrances, and window glazing. Building forms should encourage a pedestrian-friendly environment by including amenities, facade articulation, and street level building openings. STANDARDS INTERPRETATION Public Stree t INTERPRETATION Maximum Height A. 40’ maximum; 50’ maximum for hospitality uses. B. Building height may be increased 10’ (20’ for hospitality use) if 10% of the required front setback area is dedicated to Route 66 themed public art within the Route 66 Overlay area, subject to Economic and Community Development Director approval. C. Public art shall comply with Chapter 88.39 - Art in Public Places of the Development Code and shall be installed prior to occupancy. LAND USE AND URBAN FORM ROUTE 66 DISTRICT 2-58 City of Azusa | TOD Specific Plan May 2017 2 STANDARDS INTERPRETATION Building Plate Height 14’ min.Floor StructureT.O.P. BUILDING ARTICULATION Plate Height A. Ground floor plate height shall be a minimum of 14’. BUILDING MASSING Maximum Wall Plane A. No building façade visible from a public street shall extend more than 50’ in length without a 5’ minimum variation in the wall plane. 50 ft. max. 5 ft. min. Building Massing Public Street 45% min. for retail 30% min. for office Window Glazing Public Street WINDOW GLAZING Solid-to-Void RatioA. 45% minimum transparent glazing of first floor facade for retail uses adjacent to a public street. B. 30% minimum transparent glazing of first floor facade for office uses adjacent to a public street. C. Transparent or translucent glazing is required on the first floor facade of a commercial or retail use facing a public street. D. Opaque, reflective, or dark tinted glass is not permitted. E. Window stickers or exterior window treatments that obstruct interior building views at the street level are prohibited. F. The bottom of any window or product display window shall not be more than three and one-half feet above the adjacent sidewalk. G. Product display windows shall have a minimum height of four feet and be internally lit. ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-59 May 2017 FREESTANDING/MONUMENT SIGNAGE Neon tube/LED freestanding/monument signage is required for those parcels fronting onto Foothill Boulevard (Route 66) within the Route 66 District. Freestanding/monument signage shall comply with the following requirements in addition to those outlined in Section 88.38 of the Azusa Sign Ordinance. MAXIMUM SIGN AREA The total sign area on a parcel shall comply with the following requirements. All other signage not identified within the Route 66 District shall comply with the requirements of Chapter 88.38 of the Azusa Sign Ordinance. 1. Maximum sign area per parcel. The total sign area on a parcel shall comply with the following requirements: A. 1.25 sf for each linear ft. of primary building frontage. B. 0.5 additional sf for each linear foot of secondary building frontage. C. Each use is allowed a total sign area of at least 25 sf regardless of frontage length. D. The total sign area per use shall not exceed 125 sf, without Master Sign Plan approval. 2. Maximum sign area per building frontage. The total area of all signs on a single structure frontage shall not exceed the total linear feet of that frontage. ROUTE 66 THEMED SIGNAGE In order to facilitate and further expand on the desired character of the Route 66 District, specific signage requirements, beyond those required under the City of Azusa’s Sign Ordinance (Chapter 88.38), have been provided below. In particular, expanded sign area and neon tube/LED lighting requirements are permitted in exchange for the design and installation of freestanding/monument signage that reflects the culture, character, form, and style historically present on Route 66 be incorporated into the project signage program. The standards provided below are subject to the approval of a Sign Permit or Master Sign Plan, in compliance with Chapter 88.38. 3. Site with 4 or more tenants. An additional freestanding identification sign of 0.35 sf for each linear ft. of total primary structure frontage, up to 125 sf maximum. USE OF EXPOSED NEON TUBING The use of neon (exposed gaseous light tubing) and LED signage is permitted required within the Route 66 District and shall meet the following requirements: A. Neon signs and linear tubing shall be UL (Underwriters Laboratories) listed with a maximum 20 amps for each circuit; B. Neon manufacturer shall be registered with Underwriters Laboratories; C. Neon tubing shall not exceed 13 millimeters in diameter; D. Neon lighting adjacent to residential uses shall not exceed 1/2 foot candle measured at the property line; E. When used as an architectural element, neon tubing shall be used only to reinforce specific architectural elements of the structure and shall be concealed from view through the use of parapets, cornices, ledges or similar devices; and F. Neon signs, together with other permitted window signs, shall not occupy more than 25% of the total window area, and shall be used to enhance the business name, not a specific brand or product. LAND USE AND URBAN FORM2 2-60 City of Azusa | TOD Specific Plan May 2017 ROUTE 66 DISTRICT 2.6.4 Route 66 District Design Guidelines In the early 1900s, Route 66 served motorists making a long east/west trip. Consequently small stores, gas stations, cafes, and motels began to pop up along the route. Building designs were creative to capture the attention and desires of motorists and made of local materials such as wood, brick, and stucco. Early hotels were organized as cabins or individual structures and often were characterized by labels such as the “Colonial Clapboard,” “Western Bungalow,” “Craftsman Bungalow,” “Spanish Colonial,” or “Spanish Pueblo.” With the establishment of indoor plumbing, a more unified architectural style was desired and motel builders adopted the “Streamline Moderne” architecture. These unique attributes provide the foundation for Route 66 architecture. Designers are encouraged to embrace this whimsical and creative approach to architecture and signage along the corridor and conform to the following guidelines: 1. Design features should be incorporated to capture the essence of Streamline Modern or Art Deco, such as curved canopies and walls, thin horizontal canopies over sidewalks, elements with oblique angles, or creative roof forms. 2. “Off the shelf” or “chain” corporate architecture and generic designs are not recommended for new development. Each project should strive to achieve the unique theme of the corridor. 3. Signs in a 1950s theme are encouraged. Consider the use of neon, pylons, signs with angular geometric configurations, and signs with animated displays. Roof signs and pole-mounted may also be considered, if provided as a part of Master Sign Plan application. In addition, the corridor is composed of larger parcels with extensive street frontage. As such, the following guidelines shall be considered in the design of any project within this district. 4. 360-Degree architecture is the concept of designing a building where all sides of the building have been detailed to complement the primary street elevation in architecture, massing, and materials. Buildings should be aesthetically pleasing from all angles. Massing design should include: Ê Variation in the wall plane (project and recess) Ê Variation in wall height Ê Roofs located at different levels Ê Surface detailing should not serve as a substitute for distinctive massing 5. Building scale should be reduced through the proper use of window patterns, structural bays, roof overhangs, siding, awnings, moldings, fixtures, and other details. 6. Locate windows and entrances adjacent to street and public spaces to improve public safety and security and provide “eyes on the street”. 7. The ground level should be distinguished from the upper levels of a building, especially where a building orients to the street and/or defines public space. Design elements such as separate storefronts, display windows, shop entrances, awnings and overhangs should be incorporated to add interest and give a human dimension to street- level building facades. 8. Pedestrian-level exterior walls should have elements of building depth and character. Emphasize windows, trellises, roof overhangs, Example of streamlined modern style architecture. ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-61 May 2017 recessed or projected stories, columns, balconies, wainscots, and awnings. 9. Property owners should not propose installing awnings unless they are prepared to maintain and regularly replace the awnings every eight to ten years. 10. Parapets should have sufficient articulation of detail, such as precast treatments, continuous banding, or projecting cornices, lentils, caps, corner details, or variety in pitch (sculpted). 11. Parapets should not appear “tacked on” and should convey a sense of permanence. 12. If the interior side of a parapet is visible from pedestrian view, it should be finished with the same materials and a similar level of detail as the front façade. 13. Parking lots should be well landscaped to help reduce heat buildup and soften the perceived negative impact of large paved areas. 14. Parking lot trees are intended to provide a broad shade canopy for the majority of the parking spaces. Utilize shade trees that have a canopy of 25 feet to 35 feet at maturity. 15. Parking lots should be well lit to provide safety, convenience, and promote evening use. Use pedestrian-scale lighting to avoid excessively tall stadium style lighting. 16. Any outdoor equipment, whether on a roof, side of a structure, or on the ground should be appropriately screened from view and should not be placed adjacent to the street. The method of screening should be architecturally integrated with the adjacent structure in terms of materials, color, shape and size. 17. Service, utility, and loading areas should be carefully designed, located, and integrated into the site plan. They should be located and designed for easy access by service vehicles, for convenient access by each tenant, and located to minimize circulation conflicts Thematic, Route 66 themed signage. Buildings should be placed to engage the street and designed with a creative architectural style. with other site uses. These critical functional elements should not detract from the public viewshed area or create a nuisance for adjacent property owners. 18. Roof access should be provided from the interior of the building. Exterior roof access ladders are strongly discouraged. 19. The trash/recycle enclosure should be consistent with the design and materials with the project and building architecture. LAND USE AND URBAN FORM TRANSITION DISTRICT2 2-62 City of Azusa | TOD Specific Plan May 2017 2.7.1 District Character The Transition District will maintain a residentially-oriented environment that provides an appropriately scaled buffer for existing single- family residential neighborhoods, adjacent to areas of higher intensity within the Specific Plan Area. Professional office and creative studio cottages will repurpose existing single- 2.7 TRANSITION DISTRICT Local neighborhood market and food hall located at the historic Packing House off 9th Street and Soldano Avenue. family residences, maintaining the residential character of the district, while creating new job opportunities within the community. New, detached courtyard and attached townhome residential developments will enhance the housing variety within the City and enable convenient access to dining, service, retail, and public transit. A Neighborhood Market/Food Repurposing single-family residences into professional office cottages maintains the residential character of a neighborhood. Attached townhomes with front porches expand housing options and create semi-private spaces to engage the neighborhood. TRANSITION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-63 May 2017 SPECIFIC PLAN GUIDING PRINCIPLES - Related to the Transition District ED-1 Provide zoning and land use regulations to support future market-driven revitalization and investment. A. Incorporate development standards that promote desired architectural features and conditions. ED-3 Provide increased uses, services, and transportation options to support and benefit the local community. A. Provide opportunities for expansion of small, home businesses through allowable land uses. ED-4 Provide a range of supporting benefits for the local community including a variety of housing, a more walkable environment, and community amenities. A. Maintain residential character and orientation, while encouraging additional stand-alone housing variety within the community. HC-1 Provide district-specific development standards and design guidelines that enhance architectural quality, improve the overall identity of the Specific Plan Area, and enrich the quality of life through the built environment. A. Include standards that require new development to remain appropriately scaled and compatible with existing residential neighborhoods. B. Encourage protection and reuse of existing single-family residences through allowable land use opportunities for office, art and dance studios, live-work, and other residentially compatible uses. HC-2 Encourage grocery, outdoor dining, and other healthy food related land uses that are easily accessible to the community. A. Incentivize repurposing of the historic packing house location into a neighborhood market and food hall making unique foods and healthy produce easily accessible to the community through a Specialty Market/Food Hall Overlay. HC-3 Emphasize streetscape and landscaping enhancements to improve walking, bicycling, and transit use options. A. Enhance pedestrian connectivity to other districts within the Specific Plan Area through landscaping, mobility, and streetscape improvements. CP-1 Incorporate Crime Prevention through Environmental Design (CPTED) strategies that contribute to the safety and vitality of residents and visitors of Azusa. A. Encourage positive social interactions and deter potential criminal behavior through the design and development of both public and private spaces (refer to Section 1.7.6). Hall Overlay to the historic Packing House, at the corner of 9th Street and Soldano Avenue, will allow for a neighborhood specialty market and food hall, creating a regional destination for unique and healthy foods, as well as a local gathering space that facilitates community interaction. Bicycle lanes and streetscape improvements within the district will enhance pedestrian and bicycle mobility and create a pleasant and enjoyable experience when traveling to the historic Packing House, the Azusa Downtown Gold Line Station, or nearby districts. 2.7.2 Land Use Expanding the housing variety within the Transition District creates additional housing opportunities near the Azusa Downtown Gold Line Station. New courtyard, townhome, and LAND USE AND URBAN FORM TRANSITION DISTRICT2 2-64 City of Azusa | TOD Specific Plan May 2017 IMAGE PLACEHOLDER Recent landscaping and streetscape enhancements within the Rosedale development may inspire improvements to 9th Street. Food halls and specialty markets create community gathering spaces that provide convenient access to unique, healthy foods. duplex residential development within this District supports the commercial, retail, and restaurant uses within adjacent Specific Plan districts. Office, dance and martial arts studios, and day care center uses repurpose existing single-family residences in order to protect and maintain the residential character of the Transition District. Lot coverage for new development within the Transition District is restricted to 80% maximum of the total lot area. The remaining 20% is required to be landscaped in order to beautify and enhance the District’s character. Maximum building heights for new development are limited to 35 feet within this District in order to remain compatible with existing building heights. Street setbacks are required to be a minimum of 10 feet, although porches may encroach 5 feet within the required street setback. Lack of appropriate buffers and transitioning of higher intensity uses can negatively affect neighboring properties. Landscaping improvements are encouraged to form a gradual change in character from surrounding Specific Plan districts. Bicycle lanes and streetscape enhancements along 9th Street, San Gabriel Avenue, Soldano Avenue, and Alameda Avenue improve non-motorized mobility and beautify the Transition District TRANSITION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-65 May 2017 Figure 2-6: Transition District Foothill Blvd Azusa AveAzusa DowntownStation APU/CitrusCollege Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA District Key Map 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Gold Line District Downtown District Downtown Expansion District No ChangeRoute 66 District Transition District Civic District Æb Goldline & BNSF Railway 8th St AT & SF R ail w a y Foothill Blvd Foothill Blvd Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel Ave6th St Pasadena AveCerritosAve5th St Azusa DowntownStation Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Target Park PublicLibrary SeniorCenter Alameda AveDalton Ave9th St 5th St AREA OFNO CHANGE AtlantisGardens Azusa PacificUniversity Sp St Francis ofRome School SlausonPark LeeElementarySoldano AveDalton AveAlameda AveAzusa AveSan Gabriel AveVeteran'sMemorialPark CityHallAzusa AveSoldano AvePasadena AvePackingHouse SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 280 560140Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change Transition District Key Map Azusa Foothill Citrus Association Packing House NSpecialty Market/Food Hall Overlay environment. Recent enhancements along 10th Street provide a local example for informing future 9th Street improvements. A. SPECIALTY MARKET/FOOD HALL OVERLAY The former Azusa Foothill Citrus Association Packing House is located at 9th Street and Soldano Avenue (see Figure 2-6). The Specialty Market/Food Hall Overlay encourages the protection and repurposing of the historic structure. A specialty market and food hall is envisioned as a unique culinary and ethnic food hall that sells local products and fresh produce to the community while creating a regional destination for visitors. Refer to Page 2-71 for detailed Specialty Market/Food Hall incentives. LAND USE AND URBAN FORM TRANSITION DISTRICT2 2-66 City of Azusa | TOD Specific Plan May 2017 Table 2-5: Transition District Allowable Uses A. Commercial Recreation Facility-Indoor B. Conference/Convention Facility C. Health/Fitness Facility D. Library/Museum E. School-Specialized Education/Training F. Alcoholic Beverage Sales G. Auto Vehicle Sales and Rental H. Bar/Tavern I. Drive-Through Facility J. Furniture, Furnishings, and Appliance Store K. General Retail L. Night Club M. Lodging - Hotel or Motel N. Mortuary, Funeral Home O. Public Safety Facility P. Repair Service Q. Vehicle Service R. Public Facility S. Telecommunications Facility T. Transit Station or Terminal U. Utility Facility P             Permitted Use, Zoning Clearance required Refer to Chapter 88.70 of the Development Code for Definitions               uses permitted on a second or upper floor.               permitted on a second or upper floor. 1             Only Medical Services ‐ Doctor Office use 2             Only Office‐Processing and Office‐Professional      MUP      Minor Use Permit required UP          Use Permit required S             Permit requirement set by Specific Use Regulations Note: A combination of any of the permitted uses may be provided within a horizontal or vertical mixed-use project provided the Ground Floor Use Standard (provided below) and Mixed-Use Standards provided on Page 2-7 are adhered to. PROHIBITED USES LAND USE REGULATION LAND USE REGULATION RECREATION, EDUCATION, AND PUBLIC ASSEMBLY SERVICES ‐ BUSINESS, FINANCIAL, AND PROFESSIONAL Museum P ATM P Park, Playground P Banks, Financial Services P Studio‐Art, Dance, Martial Arts, Music, Etc.P Business Support Service P RESIDENTIAL Medical Services Doctor Office Office/Service P1 Caretaker/Manager Unit P Office P2 Courtyard Housing P SERVICES ‐ GENERAL Duplex/Triplex/Fourplex P Day Care Center ‐ Child or Adult MUP Home Occupation P Lodging ‐ Bed & Breakfast Inn (B&B)P Live/Work Unit MUP Personal Services P Mixed‐Use P Organizational House MUP Residential Accessory Use or Structure P Residential Care (six or fewer clients)P Senior Citizen Apartment P Single‐Family Dwelling P Multifamily P RETAIL SALES Neighborhood Market P Restaurant, Café, Coffee Shop P Specialty Market P ALLOWABLE USES: Transition District TRANSITION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-67 May 2017 COVERAGE Lot Coverage A. 80% maximum. COVERAGE Landscaping Coverage A. 20% maximum. Landscaping Standards A. Refer to Chapter 88.34 - Landscaping Standards of the Development Code for specific requirements. STANDARDS INTERPRETATION Lot Coverage Landscaping Coverage 2.7.3 Development Standards The following development standards are specific to the Transition District. These standards have been tailored to reflect the desired character and implement the vision of the Transition District. They provide the framework for the creation of a safe, vibrant, and pedestrian-friendly environment that maintains the residential orientation of the District. In addition to the development standards located on the following pages, projects will be evaluated on their adherence to standards provided in Section 2.2.4, Section 3, and the design guidelines and strategies located in Sections 1.7, 2.5.2, and 2.7.4. A. SITE PLANNING Site planning and design is key to quality development. The following standards promote orienting buildings toward the street to promote an active street environment and regulations that minimize pedestrian and vehicular conflicts. 80% Lot Coverage 20% Landscape Coverage LAND USE AND URBAN FORM TRANSITION DISTRICT2 2-68 City of Azusa | TOD Specific Plan May 2017 SERVICE AND DELIVERY AREAS Loading and Service Areas A. Loading docks and service bays shall be located a minimum of 15’ from any public street. B. Trash and recycling enclosures shall not be located adjacent to a public street. STANDARDS INTERPRETATION Service and Delivery Areas Service Loading 15’ min.Parking Public Stre e t 7’-6” min.7’-6” min.7’-6” min.Public Street Line of SightVEHICULAR LINE OF SIGHT Clear Zones A. The clear zone shall consist of an isosceles right triangle with 7’6” sides on the driveway and street. B. The clear zone shall not be occupied by a ground floor building footprint, site features, or landscaping that is taller than 3’. Residential Open Space 40 sf/unit min. of Common Open Space 200 sf/unit min. of Private Open Space RESIDENTIAL OPEN SPACE Residential Private Open Space A. Private open space shall be provided at 200 sf per unit minimum and a minimum dimension of 10’x10’. Residential Common Open Space A. Common open space shall be provided at a minimum of 40 sf per unit with a minimum of 10’ in any direction. B. Common open space shall be purposefully designed as active or passive recreational facilities. C. Rooftop open space may satisfy this requirement, provided it is available for use by all residents. TRANSITION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-69 May 2017 10’ m i n BUILDING SETBACKS Street A. 10’ minimum to building. Porches may encroach 5’ into the required street setback. B. 10’ minimum landscape setback where surface parking areas are located adjacent to a public street. Side A. 5’ minimum. Rear A. 10’ minimum. STANDARDS INTERPRETATION Building Setbacks Parking Setbacks Public StreetParki n g B. BUILDING PLACEMENT AND ORIENTATION Building placement refers to the physical siting of a structure on a parcel with considerations being given to building orientation, setbacks, and parking. The following standards promote building placement that creates an active public realm, creates a strong continuity of frontages, and contributes to greater utilization of parcels within the Transition District. 10’ m i n .5’ min.10 ’ m i n .Public StreetBUILDING LOCATION Placement A. Parcels fronting a public street shall orient buildings toward the street. Building Placement Public Street LAND USE AND URBAN FORM TRANSITION DISTRICT2 2-70 City of Azusa | TOD Specific Plan May 2017 BUILDING ARTICULATION Plate Height A. Ground floor plate height shall be a minimum of 14’. STANDARDS INTERPRETATION Primary Entrances Public Str e et Building En t r a n c e s BUILDING ENTRANCES Primary Entrances A. Buildings shall have a primary entrance door facing the public street. Entrances at building corners may be used to satisfy this requirement. BUILDING HEIGHT Maximum Height A. 35’ maximum. Building Height C. BUILDING FORM AND MASSING Building form refers to the shape, configuration, and relationship of a building to its environment. A number of details must be considered when designing a building’s form including building height, plate height, configuration, roof form, facades, articulation, entrances, and window glazing. Building forms should encourage a pedestrian- friendly environment by including amenities, facade articulation, and street level building openings. STANDARDS INTERPRETATION 35’ maxBuilding Plate Height 14’ min.Floor StructureT.O.P. TRANSITION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-71 May 2017 STANDARDS INTERPRETATION Window Glazing Public Stre e t WINDOW GLAZING Solid-to-Void Ratio A. Transparent or translucent glazing is required on the first floor facade of a commercial or retail use facing a public street. B. Opaque, reflective, or dark tinted glass is not permitted. C. Window stickers or exterior window treatments that obstruct interior building views at the street level are prohibited. D. The bottom of any window or product display window shall not be more than three and one- half feet above the adjacent sidewalk. E. Product display windows shall have a minimum height of four feet and be internally lit. SPECIALTY MARKET/FOOD HALL OVERLAY INCENTIVES A. Lot Coverage: 100% maximum B. Landscape Coverage: 0% C. 0’ minimum setback on all sides. D. Parking Ratio: 1 space/1,000 sf E. Loading and unloading is not permitted off of 9th Street. F. Historic architectural character shall be maintained. SPECIALTY MARKET/FOOD HALL OVERLAY INCENTIVES LAND USE AND URBAN FORM TRANSITION DISTRICT2 2-72 City of Azusa | TOD Specific Plan May 2017 2.7.4 Transition District Design Guidelines 1. Architectural character of a building should build upon and maintain the traditional neighborhood character with an emphasis on historic architectural styles, building type, materials and details. 2. 360-Degree architecture is the concept of designing a building where all sides of the building have been detailed to complement the primary street elevation in architecture, massing, and materials. Buildings should be aesthetically pleasing from all angles. 3. Continuity among buildings contributes to neighborhood identity. The intent of the Transition District is to provide a physical and visual buffer between more intense districts and established single-family development. As the area develops, buildings within this District should complement the form, scale, and proportion (relationship of height and width) of adjacent buildings within the District and should acknowledge the historic character of the neighborhood. 4. Conversions of residential structures to commercial use shall retain the residential character of the existing building and existing architectural moldings, ornamentation, and other interesting detailing should be retained and repaired or replaced to match the original detail. 5. The main entrance to a building or residential unit should be clearly identifiable and unique. These elements should be integrated into the building design to avoid the look of “tacked on” architectural features. One or more of the following methods should be incorporated in the entrance design: Ê A change in wall plane Ê Wall articulation around the door and projecting beyond the door Ê Placement of decorative detailing at the entry Ê A projecting element above the entrance Ê A change in material or detailing Ê Implementation of architectural elements such as flanked columns or decorative fixtures Ê Recessed doors, archways, or cased openings Ê A portico or formal porch projecting from or set into the surface Ê Changes in the roof line 6. Locate windows and entrances adjacent to street and public spaces to improve public safety and security and provide “eyes on the street”. 7. Porches, stoops, and balconies are encouraged to complement and enhance overall building design. 8. Covered porches or patios at the first floor level oriented toward the front and/or side yard should be a minimum of 6’ in depth, and shapes, sizes, and setbacks should vary from house to house. 9. Siding should wrap around the outside corners of the building to the fence line at a minimum. The use of siding on the entire building is recommended. 10. Fencing and wall materials should be compatible with the building and should be used to reinforce the architectural theme of the building. CIVIC DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-73 May 2017 2.8.1 District Character The Civic District will remain the focal point of community involvement and identity in Azusa through the historic buildings, public facilities, and memorials that provide special functional and symbolic importance. Limited changes to the Azusa Development Code will ensure that any new development remains both physically 2.8 CIVIC DISTRICT City of Azusa City Hall. and visually complementary to the existing City Hall, library, senior center, police station, and other public buildings. Veteran’s Freedom Park and other open spaces within the Civic District will provide opportunities for expanding active recreation and outdoor community events. New and/or expanded memorials for community veterans will further the importance of the Veterans Freedom Park provides the platform for expanded recreational and outdoor community events. Civic buildings and public facilities represent Azusa’s history and contribute to the City’s identity. LAND USE AND URBAN FORM CIVIC DISTRICT2 2-74 City of Azusa | TOD Specific Plan May 2017 SPECIFIC PLAN GUIDING PRINCIPLES - Related to the Civic District TO-6 Establish pedestrian linkages to and from the future Azusa Downtown Gold Line Station to support a walkable station area and function as a community gateway to downtown Azusa. A. Propose extending the welcome plaza from the Azusa Downtown Gold Line Station in the Gold Line District to strengthen pedestrian linkages to the Civic District along Santa Fe Avenue and Alameda Avenue. ED-4 Provide a range of supporting benefits for the local community including a variety of housing, a more walkable environment, and community amenities. A. Emphasize improvements to existing parks and open space to enhance active recreational and outdoor community gathering spaces. B. Celebrate the history of democratic, military, and public service involvement in the community by improving and expanding upon existing memorials. S-2 Maintain and enhance structures identified as having historic value to retain and support the existing historic character of Azusa. A. Focus on maintaining existing civic, cultural, and public institutions to protect the history and identity of Azusa. HC-1 Provide district-specific development standards and design guidelines that enhance architectural quality, improve the overall identity of the Specific Plan Area, and enrich the quality of life through the built environment. A. Tailor the allowable land uses to ensure that new development remains compatible with existing civic and public facilities. B. Minimize changes to existing Development Code requirements to maintain the character and quality of the built environment within the Civic District. HC-3 Emphasize streetscape and landscaping enhancements to improve walking, bicycling, and transit use options. A. Incorporate improved landscaping, streetscape, and pedestrian amenities to facilitate inter-district connectivity and ease of access to the Azusa Downtown Gold Line Station. CP-1 Incorporate Crime Prevention through Environmental Design (CPTED) strategies that contribute to the safety and vitality of residents and visitors of Azusa. A. Encourage positive social interactions and deter potential criminal behavior through the design and development of both public and private spaces (refer to Section 1.7.6). Civic District as a symbolic focal point of Azusa. Enhancing pedestrian connections to the Azusa Downtown Gold Line Station and adjacent Gold Line District, through the incorporation of a new welcome plaza, will enrich the overall character and sense of place representing the Azusa community. 2.8.2 Land Use The Civic District is mostly comprised of existing civic, cultural, and public service buildings and facilities. These existing civic and public service uses provide the central framework for celebrating the community’s history of democratic involvement. While the identity of CIVIC DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-75 May 2017 Veterans Park Memorials honor those past and present members of the community who served their country and their community. the Civic District remains oriented toward public uses, the incorporation of complementary uses adds additional activity and vitality to the District in the future. Minimal changes are proposed to the existing Azusa Development Code relating to the Civic District in order to maintain its existing character. While almost all areas of the District are already developed, any new development may build out to 100% of lot coverage. In addition, the massing of new buildings visible from a public street are required to incorporate a minimum of 5 feet variation in the facade for every 50 feet of wall plane in order to create visual interest and continuity. The Civic District requirements place a greater emphasis on improving existing park and Public facilities provide a central gathering space for holding events to bring together members of the community. open space areas. Future incorporation of a community amphitheater within Veterans Freedom Park will provide a central community gathering place for hosting events for residents and visitors. In addition, closing portions of Alameda Avenue and Santa Fe Avenue will LAND USE AND URBAN FORM CIVIC DISTRICT2 2-76 City of Azusa | TOD Specific Plan May 2017 Figure 2-7: Civic District Æb 8th St Foothill Blvd Azusa DowntownStation Azusa Light & Water CVS Pharmacy Target PublicLibrary SeniorCenter St FrRomDalton AveAlameda AveSan Gabriel AveVeteran'sMemorialPark CityHallAzusa AveSoldano AvePasadena AveSOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 125 25062.5 Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change Foothill Blvd Azusa AveAzusa DowntownStation APU/CitrusCollege Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA District Key Map 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Gold Line District Downtown District Downtown Expansion District No ChangeRoute 66 District Transition District Civic DistrictCivic District Key Map N allow for the creation of a welcome plaza that continues into the adjacent Gold Line District and facilitates inter-district connectivity (refer to Section 3.2.6). Additional opportunities exist for integrating and facilitating connections between adjacent Specific Plan districts through the incorporation of landscaping, streetscape, and pedestrian improvements. CIVIC DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-77 May 2017 LAND USE REGULATION LAND USE REGULATION RECREATION, EDUCATION, AND PUBLIC ASSEMBLY SERVICES ‐ GENERAL Library, Museum P Day Care Center ‐ Child or Adult MUP Live Entertainment UP Public Safety Facility P Meeting Facility, Public or Private MUP TRANSPORTATION, COMMUNICATIONS, AND INFRASTRUCTURE Park, Playground P Parking Facility, Public or Commercial MUP RESIDENTIAL Public Facilities P Senior Citizen Apartment MUP Telecommunications Facility S RETAIL SALES Utility Facilty P Farmers Markets MUP General Retail P Restaurant, Café, Coffee Shop P SERVICES ‐ BUSINESS, FINANCIAL, AND PROFESSIONAL ATM P Banks, Financial Services MUP Business Support Service P Office MUP1 ALLOWABLE USES: Civic District Table 2-6: Civic District Allowable Uses Uses not Identified within the Allowable Use Table are not permitted within the Civic District. P             Permitted Use, Zoning Clearance required Refer to Chapter 88.70 of the Development Code for Definitions               uses permitted on a second or upper floor.               permitted on a second or upper floor. 1             Only Medical Services ‐ Doctor Office use 2             Only Office‐Processing and Office‐Professional      MUP      Minor Use Permit required UP          Use Permit required S             Permit requirement set by Specific Use Regulations PROHIBITED USES LAND USE AND URBAN FORM CIVIC DISTRICT2 2-78 City of Azusa | TOD Specific Plan May 2017 COVERAGE Lot Coverage A. 100% maximum. Landscaping Standards A. Refer to Chapter 88.34 - Landscaping Standards of the Development Code for specific requirements. STANDARDS STANDARDS INTERPRETATION INTERPRETATION Lot Coverage 100% Lot Coverage 2.8.3 Development Standards The following development standards are specific to the Civic District. These standards have been tailored to reflect the desired character and implement the vision of the Civic District. For development standards not included within this section, refer to the City of Azusa Development Code for additional requirements. In addition to the development standards located on the following pages, projects will be evaluated on their adherence to standards provided in Section 2.2.4, Section 3, and the design guidelines and strategies located in Sections 1.7, and 2.5.2. A. SITE PLANNING Site planning and design is key to quality development. The following standards promote orienting buildings toward the street to promote an active street environment and regulations that minimize pedestrian and vehicular conflicts. B. BUILDING PLACEMENT AND ORIENTATION Building placement refers to the physical siting of a structure on a parcel with considerations being given to building orientation, setbacks, and parking. The following standards promote building placement that creates an active public realm, creates a strong continuity of frontages, and contributes to greater utilization of parcels within the Civic District. BUILDING LOCATION PlacementA. Parcels fronting a public street shall orient buildings toward the street. Building Orientation Public Street CIVIC DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-79 May 2017 Primary Entrances Public Str e et Building En t r a n c e s C. BUILDING FORM AND MASSING Building form refers to the shape, configuration, and relationship of a building to its environment. A number of details must be considered when designing a building’s form including building height, plate height, configuration, roof form, facades, articulation, entrances, and window glazing. Building forms should reflect the architectural character of the existing buildings within the Civic District. STANDARDS INTERPRETATION BUILDING MASSING Maximum Wall PlaneA. No building façade visible from a public street shall extend more than 50’ in length without a 5’ minimum variation in the wall plane. Roof FormsA. Gable, shed, and hip tile roof forms shall be integrated into buildings within this district. 45% min. for retail 30% min. for office Window Glazing Public Street WINDOW GLAZING Solid-to-Void Ratio A. 45% minimum transparent glazing of first floor facade for retail uses adjacent to a public street. B. 30% minimum transparent glazing of first floor facade for office uses adjacent to a public street. C. Transparent or translucent glazing is required on the first floor facade of a commercial or retail use facing a public street. D. Opaque, reflective, or dark tinted glass is not permitted. E. Window stickers or exterior window treatments that obstruct interior building views at the street level are prohibited. 50’ ma x . 5’ min. Maximum Wall Plane Public Street F. The bottom of any window or product display window shall not be more than three and one-half feet above the adjacent sidewalk. G. Product display windows shall have a minimum height of four feet and be internally lit. STANDARDS INTERPRETATION BUILDING ENTRANCES Primary Entrances A. Buildings shall have a primary entrance door facing Alameda Avenue and Dalton Avenue. Entrances at building corners may be used to satisfy this requirement. LAND USE AND URBAN FORM2 2-80 City of Azusa | TOD Specific Plan May 2017 THIS PAGE LEFT BLANK City of Azusa AZUSA TOD SPECIFIC PLAN Adopted November 16, 2015 Amended Month Date, 2017 City of Azusa TOD Specific Plan Adopted by: Ordinance No. 2015-O11 Amended by: Ordinance No. XXXX-XXX Prepared for: City of Azusa 213 East Foothill Boulevard Azusa, CA 91702 Funded by: Los Angeles County Metropolitan Transportation Authority Prepared by: RRM Design Group Planning and Urban Design In collaboration with: Fehr & Peers Transportation Planning The Natelson Dale Group Economic, Financial and Market Analysis CONTENTS ACKNOWLEDGMENTS City Council Joseph R. Rocha, Mayor Edward J. Alvarez, Mayor Pro Tem Uriel E. Macias, Council Member Angel A. Carrillo, Council Member Robert Gonzales, Council Member Planning Commission Robert Donnelson Jack Lee Jesse R. Avila, Jr. Anthony Contreras Suzanne Avila City Staff Kurt Christiansen, AICP, Director of Economic and Community Development Edson Ibanez, Assistant Planner Daniel Bobadilla, Interim Public Works Director Collette Morse, AICP, Morse Planning Group, Consulting Staff CONTENTS CONTENTS 1.0 INTRODUCTION ...................................................................1-1 1.1 Purpose ....................................................................................1-1 1.2 Specific Plan Area ..................................................................1-2 1.3 What is a Specific Plan ...........................................................1-3 1.4 Document Organization ........................................................1-4 1.5 Relationship to Other Planning Documents ........................1-5 1.6 Outreach Process ...................................................................1-6 1.7 Vision and Guiding Principles ..............................................1-12 2.0 LAND USE AND URBAN FORM ............................................2-1 2.1 Introduction .............................................................................2-1 2.2 District-Based Approach ........................................................2-3 2.3 Gold Line District ...................................................................2-12 2.4 Downtown District .................................................................2-22 2.5 Downtown Expansion District ..............................................2-36 2.6 Route 66 District ....................................................................2-48 2.7 Transition District ....................................................................2-62 2.8 Civic District ...........................................................................2-73 3.0 MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS ..................................................................3-1 3.1 Introduction .............................................................................3-1 3.2 Pedestrian Access and Improvements ................................3-4 3.3 Circulation and Street Improvements ................................3-10 3.4 Bicycle Access and Improvements ....................................3-27 3.5 Public/Private Transit ............................................................3-30 3.6 Streetscape Furnishings ........................................................3-32 3.7 Gateways and Signage ......................................................3-39 4.0 INFRASTRUCTURE AND PUBLIC UTILITIES ............................4-1 4.1 Introduction .............................................................................4-1 4.2 Potable Water .........................................................................4-1 4.3 Sanitary Sewer .........................................................................4-1 4.4 Storm Drainage .......................................................................4-2 4.5 Dry Utilities ................................................................................4-3 4.6 Community Services ...............................................................4-3 5.0 IMPLEMENTATION STRATEGIES AND FINANCING .............5-1 5.1 Introduction .............................................................................5-1 5.2 How the Specific Plan Can Attract Private Investment and Provide Public Benefits ...................................................5-1SECTIONS CONTENTS CONTENTS CONT. 5.3 Economic Conditions Influencing Development Potentials in the Specific Plan Area ......................................5-2 5.4 Summary of New Development Potentials .........................5-4 5.5 Financial Analysis of Alternative Development Projects at Azusa Opportunity Sites .....................................................5-5 5.6 Creating the Conditions for Attracting Private Investment - City’s Role and Tools ........................................5-6 5.7 Potential Funding Sources and Financing Mechanisms ....5-8 5.8 Implementation Action Plan ...............................................5-12 6.0 ADMINISTRATION ................................................................6-1 6.1 Introduction .............................................................................6-1 6.2 Specific Plan Authority and Adoption .................................6-1 6.3 Specific Plan Amendments ...................................................6-1 6.4 Specific Plan Administration ..................................................6-3 A PARKING MANAGEMENT PLAN ........................................ A-1 B AZUSA OPPORTUNITY SITES ................................................B-1 C FINANCING .........................................................................C-1SECTIONS APPENDICES SECTION 1 INTRODUCTION 1 Document Purpose and Organization INTRODUCTION 1 SECTION 1 CONTENTS 1.1 PURPOSE ..............................................................................1-1 1.2 SPECIFIC PLAN AREA ..........................................................1-2 1.2.1 Context ....................................................................................1-2 1.2.2 City-Owned Property .............................................................1-2 1.3 WHAT IS A SPECIFIC PLAN ..................................................1-3 1.4 DOCUMENT ORGANIZATION .............................................1-4 1.5 RELATIONSHIP TO OTHER PLANNING DOCUMENTS ..........1-5 1.5.1 City of Azusa General Plan ....................................................1-5 1.5.2 City of Azusa Development Code .......................................1-5 1.5.3 Azusa Pacific University Specific Plan ...................................1-5 1.6 OUTREACH PROCESS ..........................................................1-6 1.6.1 Community Outreach ............................................................1-6 1.6.2 Opportunities and Constraints .............................................1-7 1.7 VISION AND GUIDING PRINCIPLES ..................................1-12 1.7.1 Vision ......................................................................................1-12 1.7.2 Guiding Principles .................................................................1-12 1.7.3 Transit-Oriented Development ............................................1-14 1.7.4 Sustainability ..........................................................................1-15 1.7.5 Healthy Communities ...........................................................1-20 1.7.6 Crime Prevention Through Env. Design ..............................1-22 1-1 Specific Plan Area Location Map .....................................1-2 1-2 Specific Plan Area Opportunities and Constraints ........1-10 FIGURESSUBSECTIONS INTRODUCTION 1 City of Azusa | TOD Specific Plan 1-1 May 2017 1.1 PURPOSE The Azusa Transit-Oriented Development (TOD) General Plan/Development Code Update and Specific Plan (herein referred to as the Azusa TOD Specific Plan, or, simply Specific Plan) is a comprehensive document that will implement the vision for the Specific Plan Area as established by the City of Azusa planning process. A Specific Plan is a regulatory tool that local governments use to implement the General Plan and to guide development in a localized area. While the City of Azusa General Plan is the primary guide for growth and development in the community, the Specific Plan is able to focus on the unique characteristics of a specialized area. This Azusa TOD Specific Plan was prepared pursuant to Section 65450 et seq. of the California Government Code. City of Azusa seal at Azusa Avenue and the 210 freeway. INTRODUCTION1 1-2 City of Azusa | TOD Specific Plan May 2017 1.2.1 Context The Specific Plan Area includes two future transit stations. Future development at the Azusa Downtown Gold Line Station (at Alameda Avenue) and the APU/Citrus College Gold Line Station (at Citrus Avenue) is the impetus for this Specific Plan planning process. The Specific Plan Area encompasses approximately 1/4-mile radius from each of these future stations and is bounded by 10th Street to the north, Angeleno Avenue to the west, 5th and 6th Streets to the south, and Citrus Avenue to the east (Figure 1-1). The Specific Plan establishes land use regulations and development guidelines for a total of 350 acres of land that comprise the Specific Plan Area. A central focus of this Specific Plan is the 1.2 SPECIFIC PLAN AREA Azusa Downtown, an area located directly to the south of the Azusa Downtown Gold Line Station between Dalton Avenue and San Gabriel Avenue to the east and west, and 9th Street and Foothill Boulevard to the north and south. 1.2.2 City-Owned Property The Specific Plan Area encompasses several City-owned properties which are designated as Key Opportunity Sites. Economic feasibility of potential development and “highest and best use” for several of the sites are presented in greater detail within Section 5, Implementation Strategies and Financing. Goldline & BNSF Railway 8th St AT & SF Rail w a y Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid Ave9th St Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege Azusa DowntownStation THE PROMENADE Foothill Vista Mobile Home Park Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing PublicLibrary SeniorCenter CitrusCrossing Citrus AveAlameda AveDalton AvePackingHouse 9th St ToCanyonFromCanyon &&&&McKeever AveCrescent Dr 5th St Azusa Veterans WyFoothill Blvd AREAOF NOCHANGE AtlantisGardens Azusa PacificUniversity RosedaleSpecific Plan Area St Francis ofRome School Veteran'sFreedomPark CityHall SlausonPark LeeElementary SlausonMiddleSchool DaltonElementary APU/Citrus College Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Specific Plan Area 0 500 1,000250Feet µ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 City-Owned Opportunity SitesFigure 1-1: Specific Plan Area Location Map City-Owned Opportunity Sites NGold Line Stations INTRODUCTION 1 City of Azusa | TOD Specific Plan 1-3 May 2017 1.3 WHAT IS A SPECIFIC PLAN? A specific plan is a document designed to implement the goals and policies of the General Plan. A specific plan contains detailed development standards and regulations, distribution of land uses, infrastructure requirements, and implementation measures for the development within a designated area. A specific plan is similar in nature to the a development zoning code because it deals with implementation through the use of development regulations. Unlike the Azusa Development Code, specific plans are targeted to specific planning areas. This allows for both greater flexibility and more specificity to focus regulations and standards to achieve specific strategies. These provisions also provide a greater level of assurance to prospective developers and the development community relative to the City’s long-term goals for a specific geographic area. It is important to note that a specific plan only establishes land use zones and development standards. Actual development proposals, building placement, and design of individual projects will come through private investment following the adoption of a specific plan. As required by Section 65450 et seq. of the California Government Code, this Specific Plan is organized into six separate sections. Organization of the Specific Plan into sections not only details the intent and purpose of each section but also provides clarity for the end user. New courtyard housing development within the Specific Plan Area. Downtown Azusa looking north on Azusa Avenue. INTRODUCTION1 1-4 City of Azusa | TOD Specific Plan May 2017 Section 1: Introduction The introduction discusses the purpose and organization of this document and the Specific Plan Area boundary. This section describes the community’s vision for the Specific Plan Area, as a result of public outreach and hearings. In addition, the Azusa TOD Specific Plan’s relationship to the City’s Development Code and other pertinent City documents and policies are discussed in this section. Section 2: Land Use and Urban Form This section sets forth general provisions for development within the Specific Plan Area and details the permitted land uses and development standards for each district. Section 3: Mobility, Complete Streets, and Streetscape Improvements This section provides direction for public improvements for the entire Specific Plan Area. Topics include: public plazas and parks, recommended street trees, lighting, street furnishings, crosswalks, public art, public right-of-way landscaping, and gateway design treatments. This section focuses on pedestrian and vehicular circulation and contains recommendations for the street environment and transit mobility. Section 4: Infrastructure and Public Utilities This section addresses essential infrastructure requirements for future development within the Specific Plan Area, including water, sewer, stormwater, solid waste, schools, police, fire, parks, and library services. 1.4 DOCUMENT ORGANIZATION Section 5: Implementation Strategies and Financing This section provides implementation strategies and direction for achieving the goals set forth within the Azusa TOD Specific Plan. It also examines City-owned key opportunity sites within the Specific Plan Area and provides recommendations for these properties. Section 6: Administration This section describes the authority of the Azusa TOD Specific Plan, project review procedures, and the administrative procedures required for amendments and/or modifications to the Azusa TOD Specific Plan. INTRODUCTION 1 City of Azusa | TOD Specific Plan 1-5 May 2017 1.5.1 City of Azusa General Plan The General Plan is the City’s governance document for guiding decision making and outlines the City’s visions and policies. The Azusa TOD Specific Plan is consistent with the General Plan and provides for more precise implementation of goals, objectives, and policies outlined within the General Plan. 1.5.2 City of Azusa Development Code The City of Azusa Development Code is the primary regulatory document that implements the General Plan. It provides specific goals, policies, programs, and development regulations that are applicable to individual neighborhoods, districts, and corridors that are consistent with the General Plan. This Specific Plan is also a regulatory document which supersedes the Development Code within the Specific Plan boundary. In cases where the Specific Plan conflicts with the Development Code, the Specific Plan will take precedence. Where the Specific Plan is silent on a topic(s), the Development Code will remain in effect. 1.5 RELATIONSHIP TO OTHER PLANNING DOCUMENTS 1.5.3 Azusa Pacific University Specific Plan The Azusa Pacific University (APU) Specific Plan is a comprehensive guide to defining the future physical development and character of the main campus of APU. The APU Specific Plan incorporates comprehensive development plans, development standards, and design guidelines that set forth appropriate uses and provides for aesthetic, cohesive, and quality of future APU campus development. This document will remain the guiding document for the geographic area that falls within its boundary. While portions of the APU West Campus lie within and adjacent to the Azusa TOD Specific Plan Area, the Specific Plan does not impact the plans, standards, and guidelines set forth in the APU Specific Plan. As noted within this Specific Plan, the APU West Campus areas have been designated as ‘Areas of No Change’. City of Azusa General Plan Azusa Pacific University Specific Plan INTRODUCTION1 1-6 City of Azusa | TOD Specific Plan May 2017 1.6 OUTREACH PROCESS 1.6.1 Community Outreach On May 21, 2014, the City of Azusa and RRM Design Group (consultant) hosted a public workshop to solicit community participation, design ideas, and project input regarding the Azusa TOD Specific Plan project. Different segments of the community were represented by residents, business owners, decision makers, and city staff. Project goals and objectives were presented with community members providing input and opinions regarding Azusa’s town character and ideas for potential future projects and development. These ideas were listed on large banners and participants were then given the opportunity to vote up to four times on the ideas most important to them. The “Ideas for the Future” that received the most votes were: • Three-story mixed-use • Outdoor Dining • Remove Landscape Medians – Add Bike Lanes (Foothill Boulevard, Alosta, and Citrus Avenues) • Brand Name Hotel/Conference Facilities • Amphitheater at Veteran’s Park (music) • Healthy Eating Choices • More Decorative Street Lights – More Places • Major Grocery Store • Bicycle Routes • Visitor Center with Historic Emphasis • Historic/Artistic/Entertainment Destination Trail (like Freedom Trail) Maps of the Specific Plan Area with potential opportunities were then laid out on several large tables. Groups of community members were encouraged to gather around and list their ideas or issues concerning the future planning of Azusa in relation to the Specific Plan Area. This collaborative effort was a success and much information was collected. These ideas became the foundation for many of the recommendations contained within this Specific Plan. Participants present their ideas. Overall project presentation to the public. Participants engage in mapping exercise. Issue identification and prioritization exercise. INTRODUCTION 1 City of Azusa | TOD Specific Plan 1-7 May 2017 1.6.2 Opportunities and Constraints Opportunities The Azusa TOD Specific Plan Area contains many opportunities for reinvestment and improvement of the City’s existing urban framework. Opportunities include: • The extension of the Gold Line rail line to the Azusa Downtown and APU/Citrus College stations has been anticipated for a number of years. Targeted improvements and enhancements to complement these new regional transit connections have been gathered through community discussion and public outreach. These efforts were used as a starting point for developing this Specific Plan. • Azusa Avenue (State Route 39) and Foothill Boulevard (Route 66) traverse through, and intersect within, the Specific Plan Area. Both roads provide ease of access for the greater Azusa community to the Specific Plan Area. Azusa Avenue’s connection to Azusa Canyon, Angeles National Forest, and the recently designated San Gabriel Mountains National Monument will continue to draw people into the City. Foothill Boulevard’s historic past and regional connections will also continue to draw a wide customer base to the Specific Plan Area. • Located within the Specific Plan Area, Azusa Pacific University contains a population of approximately 11,000 students. Directly to the east, Citrus College contains a population of approximately 12,000 students. Students attending these nearby colleges represent a large population of potential transit Azusa Downtown Gold Line Station signage - new transit stations will provide improvements and enhancements for the community. Azusa Avenue (State Route 39) is the primary Downtown street and the gateway to the San Gabriel Mountains National Monument. Local college students proximity to the Azusa Downtown Station represents potential for increased business patronage and transit ridership. INTRODUCTION1 1-8 City of Azusa | TOD Specific Plan May 2017 Small and privately owned parcels pose potential difficulties in implementing the overall vision and improvements for the Specific Plan Area. riders and provide a large customer base for local restaurant, retail, and commercial businesses within the Specific Plan Area. • A number of vacant parcels within the Specific Plan Area are owned by the City of Azusa. This Specific Plan has identified these parcels as key opportunity sites for redevelopment around the Azusa Downtown Gold Line Station and Downtown Azusa. • Existing streetscape beautification amenities along Azusa Avenue provide the framework for an enhanced and safer pedestrian experience and will complement future development. This Specific Plan identifies areas where additional streetscape improvement efforts will build upon and improve the existing streetscape environment. Constraints While there are many opportunities present within the Specific Plan Area, there are also a number of constraints that will require sensitivity regarding future design and implementation. Constraints include: • The lack of buildable area around the APU/Citrus College Station will focus new development in and around the Azusa Downtown Station. This increase in development intensity will need to take into consideration adjacency to existing land uses while at the same time remaining complementary to, and representative of, the identity of Azusa. City-owned opportunity sites directly east of Target represent new development possibility for the Specific Plan Area. Lack of buildable parcels near the APU/Citrus College Station will focus new development intensity around the Azusa Downtown Station. INTRODUCTION 1 City of Azusa | TOD Specific Plan 1-9 May 2017 San Gabriel Avenue north of Foothill Boulevard. Azusa Avenue looking south adjacent to the CVS building. San Gabriel Avenue looking north-current configuration limits pedestrian activity and lacks a Downtown character. • Throughout the Specific Plan Area, there are a number of individually owned private parcels with different owners. This fragmentation of properties and ownership may present difficulties for concurrent development and lot consolidation. • Single-family residential development is located within, and adjacent to, the Specific Plan Area in many locations. As new development occurs, sensitivity to existing residential uses will be essential. This Specific Plan recommends good neighbor policies, such as setbacks, landscaping, and screening requirements, to minimize nuisances imposed on residential areas. • The existing Azusa Light and Power and CVS buildings occupy a prominent block within the Specific Plan Area and limit pedestrian connectivity and an active street environment. Future development within the Specific Plan Area is required to be oriented toward and engage the primary street frontage. • Street width, speed, and orientation provide a number of pedestrian constraints along San Gabriel Avenue. These constraints have prohibited integration of this corridor into the downtown framework. Proposed improvements to create a safe and welcoming pedestrian atmosphere may prove difficult without affecting the general function of this arterial road. INTRODUCTION1 1-10 City of Azusa | TOD Specific Plan May 2017 Æb Æb ÉÖGoldline & BNSF Railway 8th Ave AT & SF Ra ilw ay Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusaAveSan GabrielAve10th St Angeleno AveSunset AveOrange AveEnid AveMcKeever Ave9th St Crescent D r Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th StSoldano AvePasadena AveCerritosAveAl os t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege SlausonMiddleSchool Veteran'sFreedomPark THE PROMENADEAzusa VeteraFoothill Vista Mobile Home Park CityHall Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing A3 A2 37 36 DALTONPublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´Alameda AveDalton AveHistoricResource SlausonPark LeeElementary AtlantisGardens PackingHouse STREETSCAPE BEAUTIFICATIONSTREETSCAPE BEAUTIFICATION9th St Azusa PacificUniversity DaltonElementary Temp StreetClosurePaseo Opportunity RosedaleSpecific Plan Area Potential Trail Opportunity ToCanyonFromCanyon &&&&St Francisof Rome School HistoricResource STREETSCAPE BEAUTIFICATION kjPlannedParkingStructure HistoricDepotã ] )ROUTE 66 THEME ÅB ÅBROUTE 66 THEME ÅB ÅBããElevated Access ããSLOWã\SLOWStreetClosure Azusa DowntownStation APU/CitrusCollege Station ) ) ROUTE 66 THEME ÅB ÅBDate: 6/18/2015 DowntownOpportunities Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 SOURCE AND REFERENCE DATABASE MAP FEATURES 0 510 1,020255Feet TOD General Plan/Development Code Update and Specific Plan μ Parcel Boundary CITY OF AZUSA Historic Resource Potential Paseo Streetscape Beautification Opportunity Specific Plan Boundary City Boundary 0.25 Mile Radius From Station Transit SiteÆb TOD Opportunity Sites (City-owned property) TOD Opportunity Sites Rosedale Specific Plan Area University/School Areas University/School Areas Outside Specific Plan Area Ampitheater] Gateway#ÉÖFuture Traffic Control Potential Street Closure Potential Plaza Opportunities) Image from EIR Report - TAHA Inc. 03.22.13 Image from Azusa Metrolink PF - Choate Parking Consultants, Inc. (CPC) 02.22.13Downtown Parking Structure Downtown Transit Plaza Station Plaza Figure 1-2: Specific Plan Area Opportunities and Constraints INTRODUCTION 1 City of Azusa | TOD Specific Plan 1-11 May 2017 Æb ÆbÉÖ Goldline & BNSF Railway 8th Ave AT & SF RailwayAlameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusaAveSan GabrielAve10th St Angeleno AveSunset AveOrange AveEnid AveMcKeever Ave9th St Crescent D r Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th StSoldano AvePasadena AveCerritosAveAl os t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege SlausonMiddleSchool Veteran'sFreedomPark THE PROMENADEAzusa VeteraFoothill Vista Mobile Home Park CityHall Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing A3 A2 37 36DALTONPublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´Alameda AveDalton AveHistoricResource SlausonPark LeeElementary AtlantisGardens PackingHouse STREETSCAPE BEAUTIFICATIONSTREETSCAPE BEAUTIFICATION9th St Azusa PacificUniversity DaltonElementary Temp StreetClosurePaseo Opportunity RosedaleSpecific Plan Area Potential Trail Opportunity ToCanyonFromCanyon &&&&St Francisof Rome School HistoricResource STREETSCAPE BEAUTIFICATION kjPlannedParkingStructure HistoricDepotã ] )ROUTE 66 THEME ÅB ÅBROUTE 66 THEMEÅB ÅBããElevated Access ããSLOWã\SLOWStreetClosure Azusa DowntownStation APU/CitrusCollege Station ) ) ROUTE 66 THEME ÅB ÅBDate: 6/18/2015 DowntownOpportunities Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 SOURCE AND REFERENCE DATABASE MAP FEATURES 0 510 1,020255Feet TOD General Plan/Development Code Update and Specific Plan μ Parcel Boundary CITY OF AZUSA Historic Resource Potential Paseo Streetscape Beautification Opportunity Specific Plan Boundary City Boundary 0.25 Mile Radius From Station Transit SiteÆb TOD Opportunity Sites (City-owned property) TOD Opportunity Sites Rosedale Specific Plan Area University/School Areas University/School Areas Outside Specific Plan Area Ampitheater] Gateway#ÉÖFuture Traffic Control Potential Street Closure Potential Plaza Opportunities) Image from EIR Report - TAHA Inc. 03.22.13 Image from Azusa Metrolink PF - Choate Parking Consultants, Inc. (CPC) 02.22.13Downtown Parking Structure Downtown Transit Plaza Station Plaza Æb Æb ÉÖGoldline & BNSF Railway 8th Ave AT & SF Ra ilw ay Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusaAveSan GabrielAve10th St Angeleno AveSunset AveOrange AveEnid AveMcKeever Ave9th St Crescent D r Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th StSoldano AvePasadena AveCerritosAveAl os t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege SlausonMiddleSchool Veteran'sFreedomPark THE PROMENADEAzusa VeteraFoothill Vista Mobile Home Park CityHall Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing A3 A2 37 36 DALTONPublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´Alameda AveDalton AveHistoricResource SlausonPark LeeElementary AtlantisGardens PackingHouse STREETSCAPE BEAUTIFICATIONSTREETSCAPE BEAUTIFICATION9th St Azusa PacificUniversity DaltonElementary Temp StreetClosurePaseo Opportunity RosedaleSpecific Plan Area Potential Trail Opportunity ToCanyonFromCanyon &&&&St Francisof Rome School HistoricResource STREETSCAPE BEAUTIFICATION kjPlannedParkingStructure HistoricDepotã ] )ROUTE 66 THEME ÅB ÅBROUTE 66 THEME ÅB ÅBããElevated Access ããSLOWã\SLOWStreetClosure Azusa DowntownStation APU/CitrusCollege Station ) ) ROUTE 66 THEME ÅB ÅBDate: 6/18/2015 DowntownOpportunities Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 SOURCE AND REFERENCE DATABASE MAP FEATURES 0 510 1,020255Feet TOD General Plan/Development Code Update and Specific Plan μ Parcel Boundary CITY OF AZUSA Historic Resource Potential Paseo Streetscape Beautification Opportunity Specific Plan Boundary City Boundary 0.25 Mile Radius From Station Transit SiteÆb TOD Opportunity Sites (City-owned property) TOD Opportunity Sites Rosedale Specific Plan Area University/School Areas University/School Areas Outside Specific Plan Area Ampitheater] Gateway#ÉÖFuture Traffic Control Potential Street Closure Potential Plaza Opportunities) Image from EIR Report - TAHA Inc. 03.22.13 Image from Azusa Metrolink PF - Choate Parking Consultants, Inc. (CPC) 02.22.13Downtown Parking Structure Downtown Transit Plaza Station Plaza Æb Æb ÉÖGoldline & BNSF Railway 8th Ave AT & SF R ai lway Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid Ave11th St 11th St Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege SlausonMiddleSchool Veteran'sFreedomPark Alameda AveStation Citrus Ave Stationand Parking THE PROMENADEAzusa Veterans WyFoothill Vista Mobile Home Park CityHall Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing A3 A2 37 36 DALTONPublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´Alameda AveDalton AveSlausonPark LeeElementary AtlantisGardens PackingHouse STREETSCAPE BEAUTIFICATIONSTREETSCAPE BEAUTIFICATION9th St Azusa PacificUniversity DaltonElementary RosedaleSpecific Plan Area Potential Trail Opportunity ToCanyonFromCanyon &&&&St Francisof Rome School STREETSCAPE BEAUTIFICATION PotentialConnection &&&&kjPlannedParkingStructure kj StationParking ROUTE 66 THEME ÅB ÅBROUTE 66 THEME ÅB ÅBããElevated Access ããããHistoricDepot ] Potential Dog Parkã ã^) 9th St Crescent DrMcKeever Ave9th St SLOWSLOWNotes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan TOD Opportunity Sites (City-owned property) CITY OF AZUSA # Opportunities 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Image from Azusa Metrolink PF - Choate Parking Consultants, Inc. (CPC) 02.22.13 Rosedale Specific Plan Area Route 66 Historic Monument/Intersection Improvements^) Ampitheater] University/School Areas University/School Areas Outside Specific Plan Area Streetscape Beautification Opportunity Site Within 1/4 Mile of Station Gateway ÉÖFuture Traffic Control Transit SiteÆb TOD Opportunity Sites Parcel Boundary Specific Plan Boundary City Boundary 0.25 Mile Radius From Station Date: 12/1/2014 Æb Æb ÉÖGoldline & BNSF Railway 8th Ave AT & SF R ai lway Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid Ave11th St 11th St Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege SlausonMiddleSchool Veteran'sFreedomPark Alameda AveStation Citrus Ave Stationand Parking THE PROMENADEAzusa Veterans WyFoothill Vista Mobile Home Park CityHall Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing A3 A2 37 36 DALTONPublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´Alameda AveDalton AveSlausonPark LeeElementary AtlantisGardens PackingHouse STREETSCAPE BEAUTIFICATIONSTREETSCAPE BEAUTIFICATION9th St Azusa PacificUniversity DaltonElementary RosedaleSpecific Plan Area Potential Trail Opportunity ToCanyonFromCanyon &&&&St Francisof Rome School STREETSCAPE BEAUTIFICATION PotentialConnection &&&&kjPlannedParkingStructure kj StationParking ROUTE 66 THEME ÅB ÅBROUTE 66 THEME ÅB ÅBããElevated Access ããããHistoricDepot ] Potential Dog Parkã ã^) 9th St Crescent DrMcKeever Ave9th St SLOWSLOWNotes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan TOD Opportunity Sites (City-owned property) CITY OF AZUSA # Opportunities 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Image from Azusa Metrolink PF - Choate Parking Consultants, Inc. (CPC) 02.22.13 Rosedale Specific Plan Area Route 66 Historic Monument/Intersection Improvements^) Ampitheater] University/School Areas University/School Areas Outside Specific Plan Area Streetscape Beautification Opportunity Site Within 1/4 Mile of Station Gateway ÉÖFuture Traffic Control Transit SiteÆb TOD Opportunity Sites Parcel Boundary Specific Plan Boundary City Boundary 0.25 Mile Radius From Station Date: 12/1/2014 INTRODUCTION1 1-12 City of Azusa | TOD Specific Plan May 2017 1.7.1 Vision The overall Azusa TOD Specific Plan vision, as formulated through this Specific Plan effort, establishes a renewed focus on the future Gold Line light rail transit stations, Azusa’s Downtown, and adjacent residential neighborhoods. An expanded mix of commercial, residential, and entertainment related land uses will assist in creating a vibrant energy and bring a sense of unity to the City of Azusa. Emphasis of this Specific Plan has been placed on the importance of mixed-use and pedestrian-oriented development within the Gold Line Station’s and Azusa’s Downtown areas in order to build upon the existing sense of place that residents, visitors, and workers alike find visually attractive, friendly and safe, and representative of the overall values of the City of Azusa. This Specific Plan envisions the Azusa Downtown Gold Line Station as a gateway destination stop that exudes and exemplifies the physical, historical, and natural characteristics that embody the City of Azusa. Transit-oriented development consisting of a healthy mix of housing, shops, restaurants, offices, and open spaces will provide a pedestrian-friendly environment that supports both the character of the City and transit ridership. 1.7 VISION AND GUIDING PRINCIPLES 1.7.2 Guiding Principles It will take coordinated actions at all levels to create the regulatory and funding framework to allow high-performing and successful transit- oriented development to emerge within the Specific Plan Area. Understanding and support of these guiding principles by a broad array of interests, including real estate developers, neighbors, businesses, planning staff, elected officials, and the local community, is also essential for successful plan implementation. Cooperation among regional partners, in addition to local governmental departments, will help promote a consistent policy direction and present a message of certainty to the private development community. This agency cooperation and policy certainty will aid in lowering investment risk and increasing opportunities for private development. The TOD strategies, development standards, and guidelines contained within this Specific Plan provide ample opportunity to accommodate projected population and employment growth in a manner that will support transit use and walkability. They also encourage economic development and social equity, promote a healthful urban environment, and reduce the environmental impacts of growth. Supporting businesses and amenities within and adjacent to 1/4-mile of the station areas, while not detracting from existing businesses, is key to continued economic viability and potential growth. This Specific Plan lays out the following Guiding Principles for Azusa policy makers to consider and use during plan preparation, project review, and implementation. INTRODUCTION 1 City of Azusa | TOD Specific Plan 1-13 May 2017 GUIDING PRINCIPLES Transit-Oriented Development (refer to Section 1.7.3) TO-1 Provide zoning and land use regulations focused on the TOD opportunities provided by the future Azusa Downtown and APU/Citrus College Gold Line Stations. TO-2 Prioritize TOD opportunities presented by City-owned properties adjacent to the future Azusa Downtown and APU/Citrus College Gold Line Stations. TO-3 Provide district-specific development standards and design guidelines that support and encourage TOD and increase safe, direct, and convenient pedestrian access to transit facilities. TO-4 Increase development potential within the Gold Line District to sufficiently support high frequency, rapid transit service, and to provide a base for a variety of housing, employment, local services, and amenities that support a vibrant station area community. TO-5 Ensure that land uses within the Gold Line District are transit-supportive and provide a mixed-use activity node for visitors and the local community. TO-6 Establish pedestrian linkages to and from the future Azusa Downtown Gold Line Station to support a walkable station area that functions as a community gateway to Downtown Azusa. Economic Development ED-1 Provide zoning and land use regulations to support future market-driven revitalization and investment. ED-2 Articulate strategies for forming public-private partnerships with business and community stakeholders to attract private investment, enhance local equity, and promote reinvestment. ED-3 Provide increased uses, services, and transportation options to support and benefit the local community. ED-4 Provide a range of supporting benefits for the local community, including a variety of housing, a more walkable environment, and community amenities. Sustainability (refer to Section 1.7.4) S-1 Maintain and enhance structures identified as having historic value to retain and support the existing historic character of Azusa. S-2 Integrate sustainable, healthy living practices to benefit visitors and the local community through sustainability and healthy community guidelines. Healthy Communities (refer to Section 1.7.5) HC-1 Provide district-specific development standards and design guidelines that enhance architectural quality, improve the overall identity of the Specific Plan Area, and enrich the quality of life through the built environment. HC-2 Encourage grocery, outdoor dining, and other healthy food related land uses that are easily accessible to the community. HC-3 Emphasize streetscape and landscaping enhancements to improve walking, bicycling, and transit use options. Crime Prevention Through Environmental Design (refer to Section 1.7.6) CP-1 Incorporate Crime Prevention Through Environmental Design (CPTED) strategies that contribute to the safety and vitality of residents and visitors of Azusa. INTRODUCTION1 1-14 City of Azusa | TOD Specific Plan May 2017 1.7.3 Transit-Oriented Development Transit-Oriented Development (TOD) has been defined as a land use strategy intended to promote efficient use of land and transportation infrastructure. TOD strategies promote places of relatively higher development intensity, pedestrian-friendly development, and a mix of land uses located within walking distance of a bus or light rail transit center. In addition to pedestrian and commuter benefits, TOD strategies also represent a planning and real estate development concept that addresses sprawl, environmental issues, and traffic congestion. There are a multitude of community, economic, and environmental goals and benefits related to TOD development strategies. The following goals and benefits should be considered when designing a project within the Specific Plan Area: A. Support transportation alternatives including transit accessibility by bicycles and pedestrians B. Increase transit ridership, supporting broader transportation network efficiencies, and reducing congestion C. Meet increased mobility, environmental, and energy demands placed upon an area’s local transit system D. Reduce automobile ownership, vehicular traffic, and associated parking requirements E. Promote community safety, transit access, and local economic objectives F. Increase walking activity by shifting transit station mode of access from park-and-ride to walking G. Support land use and environmental conservation efforts by minimizing air and water quality impacts H. Enhance the environment through reduced energy consumption and encouraging environmentally friendly travel modes I. Enhance accessibility to jobs and housing for all residents J. Create interesting, vibrant gathering places for residents and visitors alike TOD’s can incorporate a mixed-use or live/work component that increases residential development intensity. Environmental benefits of TOD developments can include reduced energy consumption and minimized air and water quality impacts . INTRODUCTION 1 City of Azusa | TOD Specific Plan 1-15 May 2017 1.7.4 Sustainability Sustainable design refers to design, construction, operation, and maintenance practices that aim to holistically reduce energy use and/or minimize or eliminate the negative impacts of development on the environment and its inhabitants. A sustainable design approach can be defined by a variety of green building processes and practices, the reduction of automobile trips, and the availability of pedestrian-oriented amenities. The primary components that create successful sustainable developments have been identified by the US Green Building Council (USGBC) through their Leadership in Energy and Environmental Design (LEED) programs. The USGBC works to promote buildings and communities that are environmentally responsible, profitable, and healthy places to live, work, and play. While the USGBC LEED Rating System is a more prominent option for residential and non-residential projects, there are many other programs that promote and certify buildings for energy and environmental efficiency. Infill development and locating new development projects adjacent to public transit conserves land, water, energy, and other community resources. Comfortable, well-designed street environments encourage pedestrian activity and the ‘park once’ mentality. LEED for Neighborhood Development (LEED-ND), integrates principles of smart growth, urbanism, and green building for overall neighborhood design. Projects within the Azusa TOD Specific Plan Area will be evaluated based upon the following design criteria as developed for the USGBC LEED-ND process: A. Encourage development within and near existing neighborhoods or public transportation infrastructure to reduce vehicle trips and induce pedestrian activity; B. Promote neighborhoods that are physically connected to each other to foster community and connectedness beyond one individual project; C. Preserve community livability, transportation efficiency, and walkability; D. Design parking to increase the pedestrian orientation of projects and minimize the adverse environmental effects of parking lots by locating parking lots at the side or rear of buildings and leaving building frontages and streetscapes free of parking lots; INTRODUCTION1 1-16 City of Azusa | TOD Specific Plan May 2017 E. Promote appealing and comfortable pedestrian street environments in order to encourage pedestrian activity; F. Encourage the design of projects that incorporate high levels of internal connectivity and the location of projects in existing communities in order to conserve land, promote multi-modal transportation, and promote public health through increased physical activity; G. Provide direct and safe connections, for pedestrians and bicyclists as well as drivers, to local destinations and neighborhood centers. Promote public health by facilitating walking and bicycling; H. Encourage the design and construction of buildings that utilize green building practices; and I. Encourage the design and construction of energy efficient buildings to reduce air, water, land pollution, and environmental impacts from energy production and consumption. J. Incorporate the latest sustainable design features, such as the following where feasible: Solar Panels Solar panels utilize energy harvested from the sun to provide consistent, low maintenance electricity to power buildings and homes. The incorporation of solar panels into a building or parking structure design can significantly reduce overall electricity costs while reducing electricity use generated from non-renewable sources such as coal and natural gas. Typical areas for solar panel placement include roof areas, the top level of parking structures, and carport areas. Consideration should be given to require new buildings proposed within the Specific Plan Area to be solar ready, even if solar panels are not included within a development proposal. Parking lot solar panels provide renewable energy generation while also shading vehicles from the sun. Utilizing green design and building practices before, during, and after construction minimizes environmental impacts and creates safe, healthy living environments for residents in the community. Incorporating bicycle lanes encourages non-motorized transit and promotes public health through increased physical activity options. INTRODUCTION 1 City of Azusa | TOD Specific Plan 1-17 May 2017 Solar Orientation Buildings should address their unique site location and look for opportunities to harness the sun’s energy while reducing direct heat gains. North building faces provide for ample natural light, making the ideal building placement on an east to west axis. Southern sun exposure should be controlled through the use of overhangs, awnings, recessed windows, and trellises. Easterly and westerly sun exposure is typically harder to control and buildings should be appropriately sited to avoid excessive exposure from these directions. Design elements such as massing variation, recessed windows as part of covered balconies or patios, vertical shading devices, awning and/or canopies, clear UV window film, and landscaping should be utilized to control excessive east and west sun exposure. Building Materials With a wide variety of building materials available on the market today, choosing and utilizing sustainable building materials in the construction of new, repurposed, or rehabilitated buildings should play a prominent role in the design and construction process. In choosing sustainable building materials, considerations should be given as to whether the materials are durable, how and from where they are sourced, the ability to provide insulation, embodied energy, and level of toxicity should inform the ultimate material selection palette. Permeable Paving Permeable pavers refer to porous concrete, pavers, and in some cases pathway materials that allow for storm water infiltration to occur to assist in reducing impervious surface runoff. Potential locations within the Specific Plan Area for permeable paving include sidewalks, plazas, pedestrian paseos, parking spaces, and driveways. Permeable paving utilized within the Specific Plan Area should consist of materials Permeable pavement reduces the urban heat island effect while allowing for water to infiltrate into underground aquifers. Orienting buildings appropriately provides ample natural lighting for interior spaces while also reducing heating and cooling costs. Utilizing sustainable building materials such as bamboo for trusses reduces the overall impact of buildings while creating healthy, enjoyable environment for people. INTRODUCTION1 1-18 City of Azusa | TOD Specific Plan May 2017 that are compatible with the historical character and general context of the Azusa area in order to accentuate community buildings, landscapes, and public spaces. Urban Bioswales Urban bioswales represent an evolution in the conventional civil engineering solutions addressing stormwater runoff. Bioswales redesign traditional curbs and gutters to redirect stormwater runoff into planter strips rather than capturing and draining runoff through a series of pipes and diverting it to a remote location. These low impact techniques not only maximize landscape irrigation efficiency but also filter stormwater runoff and enable infiltration and replenishment of groundwater basins. Bioswales should be incorporated into projects within the Specific Plan Area where appropriate. Water Efficient Irrigation Installing water efficient irrigation is an effective way to reduce and conserve water within the Specific Plan Area. Properly designed drip irrigation systems should be utilized to water trees, shrub beds, and areas of groundcover to reduce water evaporation rates. Plants should be properly grouped into separate zones of similar water requirements that are in turn matched with appropriate drip heads and emitters. Automatic system controllers should be incorporated that allow adjustable water scheduling and moisture sensors to account for seasonal variation in weather patterns. Watering schedules should be adjusted to nighttime irrigation periods to reduce evaporation and wind drift rates. Employing efficient irrigation techniques will significantly reduce overall water use for landscaping within the Specific Plan Area. All projects within the Specific Plan Area shall be consistent with the water efficient landscaping requirements of Chapter 88.34 - Landscaping Standards of the Development Code. Drip irrigation systems directly water the base of plants and minimize overall water evapotranspiration rates. Urban bioswales capture and filter runoff from impermeable surfaces before being allowed to flow into sewers. INTRODUCTION 1 City of Azusa | TOD Specific Plan 1-19 May 2017 Integrating electric vehicle charging stations into site planning can aid in reducing reliance on conventional vehicles. Once established, drought tolerant landscaping requires minimal watering and can accentuate unique qualities of a place. Drought Tolerant Landscaping Drought tolerant landscaping includes trees, shrubs, bushes, and other vegetation that require minimal watering and are able to survive through periods of reduced water availability. Incorporating drought tolerant landscaping, especially local plant varietals, can act to accentuate the unique qualities of place and provide people with a greater connection to the natural environment of Azusa. Trees especially are an effective means to provide shade that keep streets, parking areas, and building surfaces cooler thus reducing the effects of the urban heat island effect. In addition, trees intercept and absorb rainwater through their leaves and roots, reducing the volume of stormwater runoff within a localized area. All projects within the Specific Plan Area shall be consistent with the landscape design requirements of Chapter 88.34 - Landscaping Standards of the Development Code. Electric Vehicle Charging Stations Electric vehicle charging stations provide convenient access for residents, businesses, and visitors to plug-in and charge their electric vehicles. Acknowledging that not all daily trips can be made through walking, bicycling, or transit, encouraging use of electric vehicles can assist in reducing the percentage of greenhouse gas emissions produced by conventional vehicle trips. Moreover, electric vehicle use can also eliminate toxic air pollutants coming from conventional vehicle tailpipes and improve upon existing air quality conditions. Incorporation of electric vehicle charging stations should be made available within carports, parking garages, and other parking areas within the Specific Plan Area in easily accessible and identifiable locations. INTRODUCTION1 1-20 City of Azusa | TOD Specific Plan May 2017 1.7.5 Healthy Communities This Healthy Communities section addresses the importance of promoting the health and well- being of individuals and families within the City of Azusa through design and development of the built environment within the Specific Plan Area. Healthy Community strategies seek to address the negative impacts of past suburban sprawl, auto dependence, and the disconnected fragmentation of communities by reversing course and embracing ideas that promote both the physical and mental well-being of the community. Providing for the inclusion of health and well-being metrics within this Specific Plan document will allow for members of the community and those who visit the City to enjoy a variety health-related benefits that improve the community overall while at the same time furthering goals addressed within the City’s General Plan. The Urban Land Institute (ULI) defines a healthy place as one that is ‘designed, built, and programmed to support the physical, mental, and social well-being of the people who live, work, learn, and visit there.’ In order to transform a community into a healthy place, proposed designs and developments within the Specific Plan Area should: A. Offer healthy and affordable housing options, and a variety of safe, comfortable, and convenient transportation choices; B. Provide access to healthy foods, the natural environment, and other amenities that allow people to reach their full potential; C. Be designed thoughtfully, with an eye to making the healthy choice the easy choice, and are built using health-promoting materials; and Local produce vendors and farmers markets adjacent to housing makes eating healthy the easy choice. Community gardens provide residents the opportunity to grow their own foods and increases outdoor, physical activity. Easily accessible public transit facilities located near housing encourages walking and other forms of physical activity while reducing dependence on automobiles. INTRODUCTION 1 City of Azusa | TOD Specific Plan 1-21 May 2017 D. Address unique community issues with innovative and sustainable solutions E. Provide opportunities for public plazas and outdoor spaces to allow for personal interaction and physical activity to occur A major component of the incorporation of Healthy Community strategies into this Specific Plan is related to land use development patterns. Healthy land use patterns have been identified as those that encourage infill development, provide ease of access to goods and services, and encourage compact developments that promote walking, bicycling, and transit use. Moreover, the inclusion of these strategies seeks to protect the City’s environmental resources, promote greater livability through the life-cycle community concept, and improve the overall economic returns of the City. This Specific Plan has embraced the Healthy Communities and the ULI healthy place concepts and promoted the physical, mental, and social well-being of individuals and families through: • Establishing a transit-oriented gateway environment that is pedestrian-friendly and entices transit use; • Promoting a healthy mix of market-rate and affordable housing in vertical mixed- use and stand-alone formats; • Identifying sustainable strategies that encourage the use of health-promoting building materials and creative site planning techniques; • Establishing innovative solutions to address land use compatibility issues; • Encouraging grocery, outdoor dining, and other healthy food related land uses that are easily accessible to the community; and • Emphasizing streetscape and landscaping enhancements to improve walking, bicycling, and transit use options. Emphasizing streetscape enhancements that incorporate on- and off-street bicycle lanes promotes physical activity and increases community mobility. Public plazas and outdoor spaces encourage informal interaction and provide opportunities for physical activity. INTRODUCTION1 1-22 City of Azusa | TOD Specific Plan May 2017 1.7.6 Crime Prevention Through Environmental Design The way in which a community is developed, maintained, and managed ultimately contributes to the safety and vitality of its built environment. Crime Prevention through Environmental Design (CPTED) is a collaborative design process that employs strategies relying upon the ability to influence offender decisions that precede criminal acts. Incorporating CPTED strategies into the design and development of a community is intended to encourage positive social interactions and deter potential criminal behavior. While there are a number of CPTED strategies, the four most common strategies applicable to the Specific Plan Area are: • Natural Surveillance • Natural Access Control • Natural Territorial Reinforcement • Maintenance All new development and/or redevelopment within the Specific Plan Area should incorporate the following CPTED strategies: Natural Surveillance Natural surveillance decreases the threat of potential apprehension by taking steps to increase the perception that people can be seen. This occurs by designing the placement of physical features, activities, and people in a way that maximizes visibility and fosters positive social interaction among users of private and public spaces. Project designs should incorporate the following criteria: A. Place windows overlooking sidewalks, recreational spaces, and parking lots. B. Use the shortest, least sight-limiting fence appropriate for the situation. C. Use transparent weather vestibules at building entrances. D. When establishing lighting locations, avoid poorly placed lights that create blind spots for potential observers and miss critical areas. Ensure potential problem areas are well-lit: pathways, stairs, entrances/exits, parking areas, ATM’s, mailboxes, bus stops, children’s play areas, recreation areas, pools, laundry rooms, storage areas, dumpster and recycling areas, etc. E. Avoid security lighting that is too-bright and creates blinding glare and/or deep shadows, thus hindering the view for potential observers. Using lower intensity lights often requires additional lighting fixtures for adequate coverage. F. Use shielded or cut-off luminaries to control excessive glare. G. Place lighting along pathways and other pedestrian-use areas at proper heights for lighting the faces of people within the space. Natural Access Control Natural access control limits the opportunity for crime by taking steps to clearly differentiate between public space and private space. By selectively placing entrances and exits, fencing, lighting, and landscape to limit access or control flow, natural access control occurs. The following natural access control measures should be incorporated into the project design: A. Use a single, clearly identifiable, point of entry. B. Use structures to divert persons to reception areas. C. Incorporate maze entrances in public restrooms. This avoids the isolation that is produced by an entry room or double door entry system. INTRODUCTION 1 City of Azusa | TOD Specific Plan 1-23 May 2017 D. Use low, thorny bushes beneath ground level windows. E. Eliminate design features that provide access to roofs or upper levels. F. In the front yard, use waist-level, picket-type fencing along residential property lines to control access and encourage surveillance. G. Use a locking gate between front and backyards. H. Use shoulder-level, open-type fencing along lateral residential property lines between side yards and extending to between back yards. They should be sufficiently unencumbered with landscaping to promote social interaction between neighbors. I. Use substantial, high, closed fencing (for example, masonry) between a backyard and a public alley. Natural Territorial Reinforcement Territorial reinforcement promotes social control through increased sense of ownership and definition of space. An environment designed to clearly delineate private space does two things. First, it creates a sense of ownership. Owners have a vested interest and are more likely to challenge intruders or report them to the police. Second, the sense of owned space creates an environment where “strangers” or “intruders” stand out and are more easily identified. By using buildings, fences, pavement, signs, lighting and landscape to express ownership and define public, semi-public and private space, natural territorial reinforcement occurs. A. Maintain premises and landscaping such that it communicates an alert and active presence occupying the space. B. Provide trees in residential areas. Research results indicate that outdoor residential spaces with more trees are seen as significantly more attractive, safer, and more likely to be used than similar spaces without trees. C. Encourage private activities within defined private areas. D. Display security system signage at access points. E. Avoid cyclone fencing and razor-wire fence topping, as it communicates the absence of a physical presence and a reduced risk of being detected. F. Place amenities such as seating in common areas to attract larger numbers of desired users. G. Schedule activities in common areas to increase use, attract people, and increase the perception that areas are controlled. Maintenance Maintenance is an expression of pride and ownership of a property. Deterioration indicates less control by the intended users of a site and indicates a greater tolerance of disorder. The Broken Windows Theory is a valuable tool in understanding the importance of maintenance in deterring crime. Broken Windows Theory proponents support a zero tolerance approach to property maintenance, observing that the presence of a broken window will entice vandals to break more windows in the vicinity. The sooner broken windows are fixed, the less likely it is that such vandalism will occur in the future. INTRODUCTION1 1-24 City of Azusa | TOD Specific Plan May 2017 THIS PAGE LEFT BLANK SECTION 2 LAND USE AND URBAN FORM 2 Development Provisions, Standards, and Guidelines LAND USE AND URBAN FORM 2 2.1 INTRODUCTION ...................................................................2-1 2.1.1 Using this Section ....................................................................2-1 2.2 DISTRICT-BASED APPROACH ..............................................2-3 2.2.1 Introduction .............................................................................2-3 2.2.2 Specific Plan Districts ..............................................................2-4 2.2.3 Areas of No Change ..............................................................2-6 2.2.4 Mixed-Use Development and Good Neighbor/ Buffer Standards .....................................................................2-7 2.2.5 Parking Management Strategies and Standards ...............2-8 2.3 GOLD LINE DISTRICT .........................................................2-12 2.3.1 District Character .................................................................2-12 2.3.2 Land Use ................................................................................2-14 2.3.3 Development Standards .....................................................2-17 2.4 DOWNTOWN DISTRICT ......................................................2-22 2.4.1 District Character .................................................................2-22 2.4.2 Land Use ................................................................................2-24 2.4.3 Development Standards .....................................................2-27 2.4.4 Design Guidelines .................................................................2-33 2.5 DOWNTOWN EXPANSION DISTRICT .................................2-36 2.5.1 District Character .................................................................2-36 2.5.2 Land Use ................................................................................2-38 2.5.3 Development Standards .....................................................2-41 2.5.4 Design Guidelines .................................................................2-46 2.6 ROUTE 66 DISTRICT ............................................................2-48 2.6.1 District Character .................................................................2-48 2.6.2 Land Use ................................................................................2-49 2.6.3 Development Standards .....................................................2-53 2.6.4 Design Guidelines .................................................................2-60 2.7 TRANSITION DISTRICT ........................................................2-62 2.7.1 District Character .................................................................2-62 2.7.2 Land Use ................................................................................2-63 2.7.3 Development Standards .....................................................2-67 2.7.4 Design Guidelines .................................................................2-72 2.8 CIVIC DISTRICT ..................................................................2-73 2.8.1 District Character .................................................................2-73 2.8.2 Land Use ................................................................................2-74 2.8.3 Development Standards .....................................................2-78 SECTION 2 CONTENTS SUBSECTIONS LAND USE AND URBAN FORM2 2-1 Specific Plan Area District Boundaries ..............................2-3 2-2 Gold Line District ................................................................2-15 2-3 Downtown District .............................................................2-25 2-4 Downtown Expansion District ...........................................2-39 2-5 Route 66 District .................................................................2-51 2-6 Transition District ................................................................2-65 2-7 Civic District ........................................................................2-76 2-1 Gold Line District Allowable Uses .....................................2-16 2-2 Downtown District Allowable Uses ..................................2-26 2-3 Downtown Expansion District Allowable Uses ................2-40 2-4 Route 66 District Allowable Uses ......................................2-52 2-5 Transition District Allowable Uses .....................................2-66 2-6 Civic District Allowable Uses .............................................2-77FIGURESTABLES LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-1 May 2017 2.1 INTRODUCTION Section Two provides direction for development within the Specific Plan Area to shape the design character and built environment. It sets forth general provisions for development within the Specific Plan Area and details permitted land uses, development standards, and design guidelines for each of the Specific Plan districts. This was accomplished by combining community outreach input with the provision of regulatory development standards and discretionary design guidelines. These standards, guidelines, and uses are organized by district and are all designed to reinforce the individual district’s desired development pattern, character, and image. These tools will help achieve the overall Azusa TOD Specific Plan vision, and more specifically, provide refined direction for the types of uses that should occur and how these uses are allowed to develop in each district within the Specific Plan Area. 2.1.1 Using this Section In order to ensure the ease of use of this document, this section details the general provisions for development within the Specific Plan Area while also cross referencing additional sections applicable to individual properties. Each Specific Plan District contains common headings including: • District Character - Outlines the overall vision and identity of a specific district. • Land Use - Touches upon prominent land uses envisioned for a district. • Development Standards - Details standards for development that have been tailored to reflect the desired character of a district. SPECIFIC PLAN DISTRICTS • Gold Line • Downtown • Downtown Expansion • Route 66 • Transition • Civic Historic structures provide a sense of place and contribute to the architectural quality of the built environment. Character and identity of Azusa expressed through public art. LAND USE AND URBAN FORM2 2-2 City of Azusa | TOD Specific Plan May 2017 o Site Planning - Promotes an active street environment through standards and regulations that affect the planning of a site. o Building Placement and Orientation - Considers the physical siting of a structure within a district while promoting appropriate connections between a building and the street. o Building Form and Massing - Outlines general building shapes and configuration requirements to foster strong connections between a building and its environment. • District Design Guidelines - In some cases, individual districts have additional guidelines that more specifically direct design of buildings in order to more effectively guide the character and vision for that district. In addition, each Specific Plan District subsection also includes an Allowable Uses table designating the permitted and conditionally permitted uses for each district along with a list of prohibited uses. As outlined above, in addition to regulating the type of land uses allowed, development is further regulated by Development Standards that are critical to the performance of each use, i.e., building height, massing, setback, build-to lines and relationship to street and sidewalk, parking ratios, etc. The development standards guide new development as well as the re-use of existing buildings. The provisions of this section apply to building additions, exterior remodels, relocations, or new construction requiring a building permit within the Specific Plan Area. In addition to the common headings outlined for individual districts, property owners, applicants, and developers should refer to the following sections of this Specific Plan for additional policies and standards that apply to their individual properties. • Section 1.7: Vision and Guiding Principles • Section 1.8: Transit-Oriented Development • Section 1.9: Sustainability • Section 1.10: Healthy Communities • Section 1.11: Crime Prevention through Environmental Design • Section 2.2.5: Parking Management Strategies and Standards • Section 3: Mobility, Complete Streets, and Streetscape Improvements These sections contain guidelines, requirements, and policies that inform the development or redevelopment of a project. As stated in Section One, this Specific Plan supersedes the Development Code within the Specific Plan boundary. Where the Specific Plan is silent on a topic(s), the Development Code will remain in force. LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-3 May 2017 2.2.1 Introduction This Specific Plan presents a district-based zoning approach to accommodate future growth and development intensity adjacent to Azusa’s two new Gold Line transit stations. In a district-based zoning approach, each district has a unique vision and a tailored range of allowable uses and development standards that support the desired future condition. The district-based approach is by nature a “mixed-use” zoning approach where the desired activities and building forms dictate what is conditionally allowed and what is not allowed. This hybrid approach to zoning combines form-based development standards 2.2 DISTRICT-BASED APPROACH with a selection of compatible uses that have been tailored for each Specific Plan District. The development standards constitute the constraints for a project’s building envelope in which new construction or a structural remodel is permitted. In addition, design guidelines are provided in key areas to ensure high-quality design that reflects the district’s character. The intent of this district-based approach for the Specific Plan Area is to establish a regulating document that: • Improves the quality of life through the built environment; Figure 2-1: Specific Plan Area District Boundaries (Enlarged exhibits provided within each District of Sections 2.3-2.8). Goldline & BNSF Railway 8th St AT & SF R a ilway Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid Ave9th St Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege THE PROMENADE Foothill Vista Mobile Home Park Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing PublicLibrary SeniorCenter CitrusCrossing Citrus AveAlameda AveDalton AvePackingHouse 9th St ToCanyonFromCanyon &&&&McKeever AveCrescent Dr 5th St Azusa Veterans WyFoothill Blvd AREA OFNO CHANGE AREA OFNO CHANGE AREA OFNO CHANGE AtlantisGardens AREA OFNO CHANGEAzusa PacificUniversity RosedaleSpecific Plan Area St Francis ofRome School Veteran'sFreedomPark CityHall SlausonPark LeeElementary SlausonMiddleSchool DaltonElementary Azusa DowntownStation APU/Citrus College Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Specific Plan Districts 0 500 1,000250Feet µ Image from EIR Report - TAHA Inc. 03.22.13 Gold Line District Downtown District Downtown Expansion District Date: 5/4/2015 Notes and Sources: 1)Base data from the City of Azusa GIS Dept. 2)Aerial photo from the City of Azusa GIS Dept - 2010 3)Aerial photo of Target area from Google Earth - 04.2013 No ChangeRoute 66 District Transition District Civic District LAND USE AND URBAN FORM2 2-4 City of Azusa | TOD Specific Plan May 2017 • Sets the stage for market-driven revitalization; • Creates an efficient mobility network; • Integrates sustainable and healthy living practices; • Protects historic structures; • Increases pedestrian mobility; • Enhances architectural quality; • Improves the overall identity of the Specific Plan Area; and • Maintains the character and identity of each unique area of Azusa. 2.2.2 Specific Plan Districts Building upon the Azusa General Plan, this Specific Plan focuses in greater detail on the Specific Plan Area by organizing land use and zoning regulations into six (6) unique Specific Plan districts. District boundaries are based upon existing and expected future development and shared characteristics including land use commonalities and proximity to community-wide destinations. The district boundaries are shown in Figure 2-1, Azusa TOD Specific Plan Area District Map. The geographic arrangement of the districts reflect their relationship to the two new Gold Line transit stations, Downtown Azusa, the City’s civic core, and the Foothill Boulevard corridor. Gold Line District The Gold Line District is the new gateway destination to the City of Azusa providing residents, students, and visitors with a lively day and nighttime environment. Inviting plaza spaces and colorful wayfinding signage encourage exploration through the Specific Plan Area. The Gold Line District provides increased density housing opportunities in close proximity to the transit station. The existing Target location adjacent to the Azusa Downtown Gold Line Station. The Azusa Downtown Gold Line Station provides new opportunities within Azusa for residents, businesses, and visitors. LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-5 May 2017 Existing buildings and successful businesses within Downtown provide a foundation for future development opportunities. Vintage signage provides the framework for enhancing the Route 66 environment. Existing commercial along San Gabriel Avenue. Downtown District The Downtown District encompasses the historic heart of the City of Azusa and is envisioned as a lively, walkable, and attractive town center area. The Downtown District’s character and charm are highlighted through new three- and four-story mixed-use buildings that remain appropriately scaled to preserve the historic character of Azusa’s downtown. The Downtown District focuses on the pedestrian experience by providing outdoor dining, retail shops, and community serving businesses located at street- level. Public realm amenities such as benches and pedestrian lighting are incorporated throughout the District enlivening the overall pedestrian experience. Downtown Expansion District The Downtown Expansion District provides an extension of, and is complementary to, the adjacent Downtown District. New stand- alone residential and office uses provide opportunities to live and work within walking distance of downtown shops, restaurants, and transit. Buildings located at the street edge and enhanced streetscape furnishings and design extend the Downtown pedestrian environment into this expansion area. Route 66 District The Route 66 District encompasses a large portion of Foothill Boulevard and offers a modern interpretation of the historic and iconic Route 66. Themed, 1950s styled diners, retail shops, and new hospitality uses create a vibrant, all ages atmosphere along Route 66. New development is oriented onto Foothill Boulevard and Alosta Avenue creating a continuation of the street edge and the street will be renamed “Route 66” to embrace its historic context. Unique, customized business signage and original public art pieces contribute to the District’s lively LAND USE AND URBAN FORM2 2-6 City of Azusa | TOD Specific Plan May 2017 and historic character. Stand-alone residential uses allowed on non-street fronting parcels along Foothill Boulevard provide appropriate buffering for existing single-family neighborhoods. Transition District The Transition District provides a buffering between commercial-oriented districts and established single-family neighborhoods. Existing single-family development within the District may be repurposed into professional office and art studios. A unique and specific overlay within the District allows for a neighborhood specialty market and food hall at the historic Packing House providing fresh produce to the Azusa community. Streetscape improvements along 9th Street enhance pedestrian and bicycle connections to the transit station. Civic District The Civic District is maintained as a central focus of the City, with prominent public buildings and open spaces reinforcing the community identity of Azusa. Any new development remains physically and visually complementary to the existing civic buildings. Enhancement of pedestrian connections within the District provide ease of access to the new Azusa Downtown Gold Line Station and enrich the character, community, and sense of place of “The Canyon City.” 2.2.3 Areas of No Change In some instances, only beautification and street improvements to the corridors are proposed. In these instances, the street right-of-way will be subject to the streetscape improvement standards identified in Section 3 - Mobility, Complete Streets, and Streetscape Improvements and zoning and land use will be guided by existing underlying zoning criteria. Refer to Figure 2-1 for locations of Areas of No Change. City Hall and the auditorium represent Azusa’s character. The historic packing house provides a unique opportunity to enhance the health of the community. LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-7 May 2017 2.2.4 Mixed-Use Development and Good Neighbor/Buffer Standards The Specific Plan Area contains many existing tightly clustered stores, housing, and civic uses all within close proximity of public transit. As new development occurs within the Specific Plan Area, the need to reduce potential impacts on the existing community will be necessary in order to preserve the quality of life that residents have come to enjoy. All new mixed-use development projects shall be required to meet the following standards. In addition, all projects located adjacent to existing low and medium density residential zones will be required to meet the Good Neighbor/Buffer Standards. MIXED-USE DEVELOPMENT STANDARDS A. Buildings shall be sited to reduce odor, noise, light, glare, shadowing, privacy, visual, and other conflicts between commercial and residential uses. B. Landscaping shall be used in addition to other design features to reduce light, privacy, and glare conflicts. C. Loading and service areas for commercial uses shall be properly designated, not located within residential parking areas, and shall not block access ways to residential areas. D. Noise-generating equipment, including but not limited to refrigeration units, air conditioning, and exhaust fans, shall be located away from residential uses and include noise-reducing screens or insulation. E. Parking for residential tenants shall be properly designated and separate from commercial use spaces. F. Commercial uses with residential units either above or attached shall provide ventilation systems to prevent odors from adversely affecting residential units. PARCELS ADJACENT TO LOW AND MEDIUM DENSITY ZONES A. Projects located adjacent to a Low or Medium Density (residential) zone shall be setback 10’ minimum from the residential property line. Those portions of a structure over 35’ tall shall be setback a minimum of 20’ from all abutting Low or Medium Density property lines. B. Loading docks, service areas, repair yards, noise and odor generating operations, and ground-mounted mechanical equipment abutting Low or Medium Density zoned properties are not permitted within 10’ of that property line. In addition, any use described above shall provide an 8’ masonry sound wall and a minimum 5’ landscaped setback along the abutting property lines. C. HVAC systems shall be selected based on noise rating or designed with features to reduce noise, such as parapet walls, equipment enclosures, and/or placement of equipment. D. All exterior lighting shall be focused internally within the property to decrease light pollution onto abutting residential properties. Outdoor lighting shall be shielded in a manner that prevents a direct line between its luminary and any property zoned Low or Medium Density. GOOD NEIGHBOR/BUFFER STANDARDS INTERPRETATION Good Neighbor/Buffer 20’ min. 45’ max.10’ min. LAND USE AND URBAN FORM2 2-8 City of Azusa | TOD Specific Plan May 2017 2.2.5 Parking Management Strategies and Standards As part of this Specific Plan effort, a comprehensive Parking Management Plan was prepared to address current and future parking conditions within the Gold Line, Downtown, Downtown Expansion, and Civic Districts. This technical document assessed the existing on- and off-street parking conditions within the Specific Plan Area while at the same time recommending appropriate parking strategies for potential future conditions based on proposed land uses. The complete version of the Parking Management Plan, including an additional parking strategies matrix, can be found within Appendix A of this document. On-Street Parking Strategies • Time Limits & Restrictions: Time limits are perhaps the simplest way to control the uses of on-street parking. Time-based parking restrictions prohibit parking for certain periods to preserve roadway capacity during peak commuting periods and to save parking resources for particular user groups. In commercial areas, parking time limits are used to discourage long-term parking by employees of the businesses so that the desirable parking spaces are available for customer, allowing a more efficient use and higher turnover rate for desired spaces. Opportunities for application of strategy: Time restrictions are currently in place on San Gabriel Avenue and Azusa Avenue and have promoted parking turnover at on- street parking spaces that are desirable and provide good access to adjacent businesses. Since this strategy is in place at some of the most desirable on-street spaces on San Gabriel Avenue and Azusa Avenue, future application of this strategy should focus on street frontages in which new land uses and businesses are added in Downtown Azusa. Potential focus areas to employ this strategy may include 9th Street, Foothill Boulevard, or 6th Street. • Urban Design/Signage/Traffic Calming: Urban design features can make more distant and likely less desired on-street parking spaces known to commuters and enhance pedestrian connections to those spaces. Good signage can direct parkers quickly and efficiently to available spaces. Sometimes, the solution is as simple as providing information about space location and availability. Supplemental traffic calming strategies that moderate traffic speeds in order to improve the pedestrian environment, can also support parking management strategies. Opportunities for application of strategy: This strategy has been employed on Azusa Avenue where the City has implemented curb extensions, wide sidewalks, diagonal parking, landscaping, lighting, and several pedestrian crossings. Making the environment safer and more inviting for pedestrians can encourage people to walk to destinations within Downtown instead of driving to each Urban design and traffic calming strategies employed along Azusa Avenue. LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-9 May 2017 location. There are several opportunities adjacent to Downtown Azusa to expand upon this strategy. These opportunities include San Gabriel Avenue, Santa Fe Avenue, and the existing paseos or pathways that can be integrated within the Specific Plan Area to better connect streets and activity nodes separated by large parcels or parking areas. In addition to replicating the treatments on Azusa Avenue, other potential measures include providing wayfinding to key assets (parking and transit) and destinations (Civic uses, retail areas), and modifications to the roadway cross-section that slow traffic or make crossing the street easier (i.e., lane reductions, conversion to two-way travel). • Assignment of Parking Location: This strategy involves assigning particular parking users to specific locations to increase the efficiency with which spaces are used. An employer policy could require all-day employees to park in remote facilities to free up close-in on-street parking. Alternatively, the most convenient spaces could be devoted to pick- up and drop off functions. Opportunities for application of strategy: Within Downtown Azusa potential applications include creating a pick-up/drop- off area for popular destinations or assigning parking locations to employees who might otherwise occupy non-time restricted spaces within close proximity to their place of employment. While this is listed as an on- street parking strategy, it can also be used in off-street parking, such as the Target parking lot, to prevent employees from occupying the most desirable parking spaces. Off-Street Parking Strategies • Access Control: Strategies to control access to off-street parking include signage that limits who can use parking facilities and for what purposes; chaining off parking entrances until stores open later in the morning can prevent transit commuters from poaching parking; use of gate arm access controls to prevent non- shoppers from using the facility. Opportunities for application of strategy: This parking management strategy is currently applied at the Azusa Police Department where only police vehicles can access the parking area. This strategy may be a appropriate to employ at the new Metro Gold Line parking structure within the Gold Line District. This strategy may also be applied at City-owned parking lots where the City off-street parking spaces must be retained. In an effort to make this parking available to the public patronizing the Downtown area, the City could implement access control strategies, complemented with a nominal parking fee, that could allow for parking validation by local businesses to ensure usage by business patrons. • On-Site Enforcement: On-site enforcement strategies can include security personnel giving warnings, post notices, and if necessary, arrange for towing. Simple information and enforcement programs can be very effective in preventing parking poaching. Opportunities for application of strategy: Parking enforcement is an important strategy to consider, particularly if there is a lack of turnover at time restricted parking spaces or if parking is beginning to encroach into areas not intended for parking. While the parking utilization data described within Appendix A does not indicate this is currently a significant LAND USE AND URBAN FORM2 2-10 City of Azusa | TOD Specific Plan May 2017 issue, there may be events or periods when there is a particularly high demand for parking at certain locations with time restrictions. If parking locations are difficult to access or if it is hard to find a parking space, people searching for parking may elect to park in residential areas or risk exceeding time limits to ensure convenient parking. Additionally, with the arrival of the Gold Line, some private and public land uses with a large number of off-street parking (i.e., Target, CVS, City Hall) may experience parking poaching by transit patrons that can be addressed through additional enforcement. • Time Limits & Restrictions: Time limits for spaces can be adjusted to reflect the specific purpose for the parking. The limits can be established on a differential basis to direct all day parkers to underutilized spaces. Time- based restrictions can prohibit parking for certain periods to reserve parking resources for a particular user group. Opportunities for application of strategy: Opportunities for application of this strategy exist in the large parking lots at locations such as Target and the future Metro Gold Line Station parking structure. Azusa may consider providing short-term and long-term parking spaces at the most appropriate locations based on where patrons may ultimately be destined. • Signage/ITS/Design: Signage is key to efficient and effective use of available parking resources. Intelligent Transportation Systems (ITS) can help guide drivers to available parking. ITS has been effectively used both district wide and in large parking structures to provide “live” information about available spaces at each level and in different public parking facilities throughout a district. Opportunities for application of strategy: As the construction of new parking structures within Downtown Azusa occurs, requiring this strategy to be incorporated will ensure accurate and effective parking information is available to users. This real time information can include signs indicating the number of spaces available on each level of a parking structure, and may also include lights that can be used to display whether a parking space is available or occupied. As previously discussed, wayfinding signage should also be considered in conjunction with this strategy to communicate to transit users or business patrons the locations of designated parking and popular destinations. • Shared Parking: Shared parking is the use of a parking space to serve two or more individual land uses without conflict or encroachment. The ability to share parking spaces is the result of two conditions: Variations in the accumulation of vehicles by hour, by day, or by season at the individual land uses; and City-owned parking lot along San Gabriel Avenue provides an opportunity to incorporate shared parking strategies for current and future land uses. LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-11 May 2017 PARKING RATIOS Non-Residential-Residential A. Retail: 1.5 spaces/1,000 sf B. Restaurant: 1.5 spaces/1,000 sf Outdoor Dining: 0 spaces required for up to 12 seats C. Office: 2 spaces/1,000 sf D. Bank: 1 space/1,000 sf E. Theater: 1 space/200 sf in a mixed-use project; may require a parking analysis to determine total spaces needed by use. Residential*A. Studio/1 Bedroom: 1 space/unit B. 2/2+ Bedrooms: 1.5 spaces/unit *Projects with only residential uses are required to provide 1 guest parking space for every 6 residential units. Mixed-use projects containing residential uses are not required to provide guest parking spaces. Parking Ratios for land uses not specifically identified, handicapped space requirements, and space dimensions shall be required to meet the parking standards of Chapter 88.36 - Parking and Loading of the Development Code. Parking Standards for the Specific Plan Area PARKING RATIOS A. Refer to Chapter 88.36 - Parking and Loading of the Development Code for land use specific parking standards. Gold Line, Downtown, Downtown Expansion, and Civic Districts Route 66 and Transition Districts relationships among the land uses that result in visiting multiple land uses on the same auto trip. Opportunities for application of strategy: With the relatively low parking utilization currently experienced in the Downtown area, shared parking presents an opportunity to increase effective parking supply without needing to construct additional parking or increase specific land use parking requirements. Areas where this strategy could be employed include the Target parking lot and the block bounded by Foothill Boulevard, 6th Street, San Gabriel Avenue, and Azusa Avenue. Target experiences relatively low parking utilization (approximately 25% utilized at peak hour) and may be willing to allow the use of a portion of their parking lot by other uses that have different peak parking time periods. For example, if a land use adjacent to Target, such as a coffee shop, wanted to open but couldn’t provide enough parking on-site, they could enter into an agreement with Target to utilize some portion their parking until a select closing time, so that Target could maintain a lower parking supply during off- peak hours (early in the day) and offer a larger parking supply during their peak utilization period. The other location mentioned above contains a variety of land uses and has a number of city-owned off-street spaces available to patrons. Provided the mix of uses is reviewed to ensure that different land uses have adequate amounts of parking and different peak parking utilization rates, a lower number of parking spaces could be provided by future land uses when proposed. LAND USE AND URBAN FORM GOLD LINE DISTRICT2 2-12 City of Azusa | TOD Specific Plan May 2017 2.3.1 District Character The Gold Line District is envisioned as the new community gateway to the City of Azusa, catering to residents and visitors commuting to and from work and families visiting Azusa for the weekend. An influx of daily transit users entering and exiting the Azusa Downtown Gold Line Station 2.3 GOLD LINE DISTRICT will be greeted by an inviting welcome plaza and colorful wayfinding signage, encouraging exploration into the surrounding Specific Plan districts. New, mixed-use developments reflecting the character of Azusa will cater to the pedestrian by incorporating an active and articulated front facade and increased intensity, Potential Welcome Plaza adjacent to the Azusa Downtown Gold Line Station. Plazas adjacent to transit stops provide enjoyable spaces to wait for your connecting route or for a traveling friend. Outdoor dining opportunities provide an active public realm and areas for people watching. GOLD LINE DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-13 May 2017 SPECIFIC PLAN GUIDING PRINCIPLES - Related to the Gold Line District TO-4 Increase development potential within the Gold Line District to sufficiently support high frequency, rapid transit service, and to provide a base for a variety of housing, employment, local services, and amenities that support a vibrant station area community. A. Emphasize mixed-use buildings around the Azusa Downtown Gold Line Station to increase the amount and variety of housing choices within the City. B. Enhance transit options and connectivity to regional job centers in the greater Los Angeles area. TO-5 Ensure that land uses within the Gold Line District are transit-supportive and provide a mixed-use activity node for visitors and the local community. A. Create a transit-oriented destination that caters to commuter, resident, student, and visitor needs in the morning and evening. TO-6 Establish pedestrian linkages to and from the future Azusa Downtown Gold Line Station to support a walkable station area that functions as a community gateway to Downtown Azusa. A. Establish a new community gateway to the City of Azusa from the Azusa Downtown Gold Line Station. B. Incorporate a welcome plaza and gathering space adjacent to the Azusa Downtown Gold Line Station (refer to Section 3.7). C. Improve walkability, pedestrian access, and bicycling opportunities through the incorporation of native landscaping, plazas, and streetscape designs. ED-4 Provide a range of supporting benefits for the local community, including a variety of housing, a more walkable environment, and community amenities. A Increase opportunities for the inclusion of public plazas, courtyards, and outdoor dining through tailored development standards. S-2 Maintain and enhance structures identified as having historic value to retain and support the existing historic character of Azusa. A. Maintain historic architectural character of structures located at 700 Azusa Avenue and 130 Santa Fe Avenue as shown in Figure 2-2. CP-1 Incorporate Crime Prevention through Environmental Design (CPTED) strategies that contribute to the safety and vitality of residents and visitors of Azusa. A. Encourage positive social interactions and deter potential criminal behavior through the design and development of both public and private spaces (refer to Section 1.7.6). while allowing for the greatest building heights within the Specific Plan Area. Coffeehouses, retail shops, and cafés with outdoor dining will be located at street-level along Azusa Avenue, enlivening the district environment and providing commuters and residents access to early morning coffee and after work dining opportunities. Structured parking, located above ground and hidden from public view, will provide commuters a safe place to park their vehicles and will provide convenient access to the nearby Azusa Downtown Gold Line Station. LAND USE AND URBAN FORM GOLD LINE DISTRICT2 2-14 City of Azusa | TOD Specific Plan May 2017 Walkable and pedestrian-friendly streets contribute to a lively public realm. Mixed-use development with residential units located above restaurants and retail provide a 24/7 downtown environment. 2.3.2 Land Use City-owned opportunity sites (see Figure 2-2) within the Gold Line District provide the underlying framework for creating a vibrant and attractive transit-oriented experience focused on the pedestrian. Vertical mixed-use development incorporating new housing options within the City are focused on both the north and south side of the Azusa Downtown Gold Line Station along Azusa Avenue and Alameda Avenue. Buildings, up to 60 feet in height, engage the street with appropriate frontages emphasizing and framing the public realm. While zero-foot setbacks are encouraged for new development, setbacks up to a maximum of 15 feet are allowed, provided plaza, courtyard, outdoor dining, and/or enhanced pedestrian connections are incorporated within the setback area. A wide variety of allowed land uses within the District include grocery, restaurant, retail, and recreation. Financial, professional, and general office uses offer expanded business opportunities in Azusa within close proximity to public transit. Streetscape improvements along Utilizing setback areas as functional space contributes to an active, pedestrian-friendly street scene. GOLD LINE DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-15 May 2017 Figure 2-2: Gold Line District Æb 8th St Foothill Blvd Azusa DowntownStation Azusa Light & Water CVS Pharmacy Target PublicLibrary SeniorCenter 9th St St Francis ofRome SchoolDalton AveAlameda AveSan Gabriel AveVeteran'sMemorialPark CityHallAzusa AveSoldano AvePasadena AvePackingHouse HistoricResource HistoricDepot SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 150 30075Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change City-Owned Opportunity Site City-Owned Opportunity Site N Foothill Blvd Azusa AveAzusa DowntownStation APU/CitrusCollege Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA District Key Map 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Gold Line District Downtown District Downtown Expansion District No ChangeRoute 66 District Transition District Civic District Gold Line District Key Map N 9th Street aid in appropriately transitioning nearby residential neighborhoods into the Gold Line District and provide improved access and safety for walking, running, and bicycling into and through adjacent districts. As a component of the new transit station, a multi-story parking structure will be constructed. This structure will be screened on the Azusa Avenue streetfront with shops and restaurants. The amount of parking to be provided will support parking strategies such as shared parking agreements or parking reductions as outlined in Section 2.2.5. City-Owned Opportunity Sites Historic Resources LAND USE AND URBAN FORM GOLD LINE DISTRICT2 2-16 City of Azusa | TOD Specific Plan May 2017 LAND USE REGULATION LAND USE REGULATION RECREATION, EDUCATION, AND PUBLIC ASSEMBLY SERVICES ‐ BUSINESS, FINANCIAL, AND PROFESSIONAL Conference/Convention Facility P ATM P Health/Fitness Facility P Banks, Financial Services P Live Entertainment UP Business Support Services P School ‐ Specialized Training UP Medical Office/Service P1 Studio‐Art, Dance, Martial Arts, Music, Etc.P Office P2 RESIDENTIAL SERVICES ‐ GENERAL Caretaker/Manager Unit P Day Care Center ‐ Child or Adult MUP Home Occupation P Lodging ‐ Bed & Breakfast Inn (B&B)P Live/Work Unit MUP Lodging ‐ Hotel or Motel P Multifamily P Personal Services P Residential Accessory Use or Structure P TRANSPORTATION, COMMUNICATIONS, AND INFRASTRUCTURE Residential Care (seven or more clients)MUP Parking Facility, Public or Commercial MUP Senior Citizen Apartment P Telecommunications Facility S RETAIL SALES Transit Station or Terminal P Bar/Tavern UP Utility Facilty P Farmers Markets MUP Furniture, Furnishings and Appliance Store P General Retail P     Alcoholic Beverage Sales UP     Floor Area Under 20,000 sf P     Floor Area Over 20,000 sf UP     Operating between 9:00 pm and 7:00 am MUP Groceries, Specialty Foods P Neighborhood Market P Night Club UP Outdoor Displays and Sales MUP Restaurant, Café, Coffee Shop P ALLOWABLE USES: Gold Line District P             Permitted Use, Zoning Clearance required Refer to Chapter 88.70 of the Development Code for Definitions               uses permitted on a second or upper floor.               permitted on a second or upper floor. 1             Only Medical Services ‐ Doctor Office use 2             Only Office‐Processing and Office‐Professional      MUP      Minor Use Permit required UP          Use Permit required S             Permit requirement set by Specific Use Regulations Table 2-1: Gold Line District Allowable Uses A. Commercial Recreation Facility-Indoor B. Organizational House C. Residential Care (six or fewer clients) D. Auto and Vehicle Sales/Rental E. Building and Landscape Materials Sales BUILDING USE Ground Floor Uses A. Ground floor uses fronting Azusa Avenue, Foothill Boulevard, or Alameda Avenue shall be non-residential except for lobby, gym, and other pedestrian-oriented uses. F. Drive-Through Retail or Service G. Mortuary, Funeral Home H. Repair Service I. Vehicle Services Note: A combination of any of the permitted uses may be provided within a horizontal or vertical mixed-use project provided the Ground Floor Use Standard (provided below) and Mixed-Use Standards provided on Page 2-7 are adhered to. PROHIBITED USES STANDARDS INTERPRETATION Building Use Retail & Restaurant Residential & Commercial Public S t r e e t GOLD LINE DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-17 May 2017 COVERAGE Lot Coverage A. 100% maximum. STANDARDS INTERPRETATION Lot Coverage 100% Lot Coverage 2.3.3 Development Standards The following development standards are specific to the Gold Line District. These standards have been tailored to reflect the desired character and implement the vision of the Gold Line District. They provide the framework for the creation of a safe, vibrant, and pedestrian-friendly environment in and around the Azusa Downtown Gold Line Station. In addition to the development standards located on the following pages, projects will be evaluated on their adherence to standards provided in Section 2.2.4, Section 3, and the design guidelines and strategies located in Sections 1.7 and 2.2.5. A. SITE PLANNING Site planning and design is key to quality development. The following standards promote orienting buildings toward the street, to promote an active street environment and regulations that minimize pedestrian and vehicular conflicts. Residential Open Space 25 sf/unit min. of Common Open Space 100 sf/unit min. of Private Open Space RESIDENTIAL OPEN SPACE Residential Private Open Space A. Private open space shall be provided at a minimum of 100 sf per unit with a minimum dimension of 6’ in any direction. Residential Common Open Space A. Common open space shall be provided at a minimum of 25 sf per unit with a minimum of 10’ in any direction. B. Common open space shall be purposefully designed as active or passive recreational facilities. C. Rooftop open space may satisfy this requirement, provided it is available for use by all residents. LAND USE AND URBAN FORM GOLD LINE DISTRICT2 2-18 City of Azusa | TOD Specific Plan May 2017 SERVICE AND DELIVERY AREAS Loading and Service Areas A. Loading docks and service bays shall be located a minimum of 20’ from any public street. B. Trash and recycling enclosures shall not be located adjacent to a public street. STANDARDS INTERPRETATION Service and Delivery Areas Service Loading 20’ min.Parking Public Stre e t Reciprocal Access Building Building 7’-6” min.7’-6” min.7’-6” min.Azusa Avenue Line of Sight RECIPROCAL ACCESS Ingress and Egress A. Reciprocal ingress and egress access with adjacent properties shall be provided for parcels fronting Azusa Avenue and Alameda Avenue. This requirement may be waived with City approval due to the following circumstances: • The location of existing structures or infrastructure • Lack of agreement between adjacent owners • Other extreme hardship VEHICULAR LINE OF SIGHT Clear Zones A. The clear zone shall consist of an isosceles right triangle with 7’6” sides on the driveway and street. B. The clear zone shall not be occupied by a ground floor building footprint, site features, or landscaping that is taller than 3’. GOLD LINE DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-19 May 2017 B. BUILDING PLACEMENT AND ORIENTATION Building placement refers to the physical siting of a structure on a parcel with considerations being given to building orientation, setbacks, and parking. The following standards promote building placement that creates an active public realm, creates a strong continuity of frontages, and contributes to greater utilization of parcels within the Gold Line District. 10’ m i n 15 ’ m a x 0’ Rear Setback 0’ Side Setback 0’ Street Setback BUILDING SETBACKS Street A. 0’ minimum. B. 15’ maximum to building. Setback area shall include plaza, courtyard, outdoor dining, or enhanced pedestrian connection. C. 10’ minimum landscape setback where surface parking areas are located adjacent to a public street. Side A. 0’ minimum. Rear A. 0’ minimum. STANDARDS INTERPRETATION Dining Setbacks Parking Setbacks Public StreetPublic StreetParki n g BUILDING LOCATION Placement A. Parcels fronting a public street shall orient buildings toward the street. Building Placement Public Street LAND USE AND URBAN FORM GOLD LINE DISTRICT2 2-20 City of Azusa | TOD Specific Plan May 2017 STANDARDS INTERPRETATION Primary Entrances Public Str e etBuilding E ntr a n c e s BUILDING ENTRANCES Primary Entrances A. Buildings shall have a primary entrance door facing Azusa Avenue, Alameda Avenue, and San Gabriel Avenue. Entrances at building corners may be used to satisfy this requirement. BUILDING HEIGHT Minimum Height A. 25’ minimum. BUILDING Maximum Height A. 60’ maximum. Building Height 60’ max25’ minC. BUILDING FORM AND MASSING Building form refers to the shape, configuration, and relationship of a building to its environment. A number of details must be considered when designing a building’s form including building height, plate height, configuration, roof form, facades, articulation, entrances, and window glazing. Building forms should encourage a pedestrian- friendly environment by including amenities, facade articulation, and street level building openings. Building Plate Height 14’ min.Floor StructureT.O.P. BUILDING ARTICULATION Plate Height A. Ground floor plate height shall be a minimum of 14’ along all streets. Historic Resources A. Buildings identified as having historical significance (Refer to Figure 2-2), shall retain their original character and building articulation. STANDARDS INTERPRETATION Architectural projections/features may exceed the height limits of this District up to 10 feet, subject to Economic and Community Development Director approval. Projections/features should be architecturally compatible and aesthetically pleasing or be screened from view. Neon signage, historic graphics, and/or other non-business or project specific related screening methods may be considered appropriate, subject to Economic and Community Development Director approval. GOLD LINE DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-21 May 2017 STANDARDS INTERPRETATION BUILDING MASSING Maximum Wall Plane A. No building façade visible from any public street shall extend more than 50’ in length without a 5’ minimum variation in the wall plane. Side and Rear Wall Planes A. Side and rear wall planes shall address site context through continuation of architectural features, fenestration, and/or building materials. Roofline Variation A. Building rooflines shall vary in height every 50’ in wall plane length. 50’ ma x . 50’ max.50’ max.50’ max. 5’ min. Maximum Wall Plane Roofline Variation Public Street Public Street 45% min. for retail 30% min. for office Window Glazing Public Street WINDOW GLAZING Solid-to-Void Ratio A. 45% minimum transparent glazing of first floor facade for retail uses adjacent to a public street. B. 30% minimum transparent glazing of first floor facade for office uses adjacent to a public street. C. Transparent or translucent glazing is required on the first floor facade of a commercial or retail use facing a public street. D. Opaque, reflective, or dark tinted glass is not permitted. E. Window stickers or exterior window treatments that obstruct interior building views at the street level are prohibited. F. The bottom of any window or product display window shall not be more than three and one- half feet above the adjacent sidewalk. G. Product display windows shall have a minimum height of four feet and be internally lit. LAND USE AND URBAN FORM DOWNTOWN DISTRICT2 2-22 City of Azusa | TOD Specific Plan May 2017 2.4.1 District Character Azusa’s Downtown District is the historic “Main Street” of the City, providing an attractive and inviting destination for friends, students, and families to gather. Capitalizing on the expanded pedestrian activity from the Azusa Downtown Gold Line Station, new outdoor dining, retail, and 2.4 DOWNTOWN DISTRICT Potential Downtown District plaza at the Southeast Corner of Azusa Avenue and Foothill Boulevard. commercial businesses will be juxtaposed next to wide, pedestrian-friendly sidewalks, enlivening the pedestrian environment and supporting day and nighttime activity within the district. Unique, historic qualities of the Downtown will be complemented by new, mixed-use developments that remain appropriately scaled Paseos provide internal connections between blocks and allow for outdoor dining and other pedestrian-friendly activities to occur. Continuous arcades and retail frontages engaging the sidewalk and enliven and contribute to the overall pedestrian experience. DOWNTOWN DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-23 May 2017 SPECIFIC PLAN GUIDING PRINCIPLES - Related to the Downtown District TO-3 Provide district-specific development standards and design guidelines that support and encourage TOD and increase safe, direct, and convenient pedestrian access to transit facilities. A. Create an active and vibrant street scene along Azusa Avenue and Foothill Boulevard to welcome visitors and enhance pedestrian connections to the adjacent Gold Line District and Azusa Downtown Gold Line Station. TO-6 Establish pedestrian linkages to and from the future Azusa Downtown Gold Line Station to support a walkable station area that functions as a community gateway to Downtown Azusa. A. Emphasize pedestrian mobility through the incorporation of public realm improvements, including landscaping, street furnishings, and wayfinding signage (refer to Section 3.6). ED-4 Provide a range of supporting benefits for the local community, including a variety of housing, a more walkable environment, and community amenities. A. Provide opportunities for a variety of new housing types within walking distance of the Azusa Downtown Gold Line Station. S-1 Maintain and enhance structures identified as having historic value to retain and support the existing historic character of Azusa. A. Maintain historic architectural character of structure located at 250 Foothill Boulevard as shown in Figure 2-3. HC-1 Provide district-specific development standards and design guidelines that enhance architectural quality, improve the overall identity of the Specific Plan Area, and enrich the quality of life through the built environment. A. Encourage buildings to be built to the back of sidewalks and engage the public realm. B. Require ground floor retail/commercial uses that are oriented toward Azusa Avenue and San Gabriel Avenue. C. Permit residential and office uses above and behind ground floor commercial (mixed-use) to promote a live, work, play environment. D. Encourage family-oriented activities and services through allowable, district specific land uses. CP-1 Incorporate Crime Prevention through Environmental Design (CPTED) strategies that contribute to the safety and vitality of residents and visitors of Azusa. A. Encourage positive social interactions and deter potential criminal behavior through the design and development of both public and private spaces (refer to Section 1.7.6). to accentuate the quaint nature of downtown through second and third-story setbacks. Public realm amenities incorporated throughout the district, such as plazas and paseos, will contribute to and enhance the overall active and walkable environment of the Downtown District. The close proximity of the district to the Azusa Downtown Gold Line Station will provide visitors and residents of nearby communities with ease of access to downtown shops and services without the need for an automobile. While the Downtown District provides opportunities for new growth and development within the Downtown, these developments will be reflective of the character and identity of “The Canyon City.” LAND USE AND URBAN FORM DOWNTOWN DISTRICT2 2-24 City of Azusa | TOD Specific Plan May 2017 Mixed-use developments provide opportunities for residents to live, work, and play within their neighborhood. Wide, pedestrian-friendly sidewalks activate the public realm by providing spaces for outdoor dining and informal gathering. Continuous building wall planes provide visual intrigue and entice exploration increasing overall walkability. 2.4.2 Land Use Incorporating new mixed-use developments up to 50 feet in height within the Downtown District strengthens and supports new and existing retail, office, and residential land uses within short walking distance of nearby residential neighborhoods and the Azusa Downtown Gold Line Station. Maximum building setbacks of 15 feet along Azusa Avenue promotes space dedicated to outdoor dining at cafes and restaurants and expanded sidewalks. Indoor commercial recreation facilities offer family- oriented entertainment activities while art, dance, and music studios provide residents multiple platforms for creative and cultural expression. Professional and medical offices support new job growth and career opportunities within the City while at the same time create a baseline of pedestrian activity throughout the Downtown District. Specific development opportunities within the District lie to the east and west of the Foothill Boulevard and Azusa Avenue intersection. This portion of the District sees high vehicular traffic DOWNTOWN DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-25 May 2017 Foothill Blvd Azusa AveAzusa DowntownStation APU/CitrusCollege Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA District Key Map 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Gold Line District Downtown District Downtown Expansion District No ChangeRoute 66 District Transition District Civic District Figure 2-3: Downtown District Foothill Blvd Angeleno AveSan Gabriel Ave6th St Pasadena Ave5th St CVS Pharmacy AT&T Verizon Post Office Park Alameda AveDalton AveSlausonParkSoldano AveAzusa AveCityHall HistoricResource SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 150 30075Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change City-Owned Opportunity Site Downtown District Key Map N on a daily basis and presents a dynamic palette for streetscape and pedestrian circulation improvements, including a new plaza at the southeast corner of the intersection (refer to Section 3.2). City-owned parcels located at the southeast corner of the intersection are viewed as essential to creating and implementing the desired land use mix for the Downtown District while at the same time strengthening the visual and physical connections to adjoining Specific Plan districts. In addition, building articulation standards and guidelines reinforce the historic character of the downtown. City-Owned Opportunity Sites Historic Resources LAND USE AND URBAN FORM DOWNTOWN DISTRICT2 2-26 City of Azusa | TOD Specific Plan May 2017 Table 2-2: Downtown District Allowable Uses BUILDING USE Ground Floor Uses A. Ground floor uses fronting Azusa Avenue, Foothill Boulevard, and Alameda Avenue shall be non-residential except for lobby, gym, and other pedestrian oriented uses. STANDARDS PROHIBITED USES INTERPRETATION Building Use Retail & Restaurant Residential & Commercial Public S t r e e t Note: A combination of any of the permitted uses may be provided within a horizontal or vertical mixed-use project provided the Ground Floor Use Standard (provided below) and Mixed-Use Standards provided on Page 2-7 are adhered to. A. Auto Vehicle Sales and Rental B. Building and Landscape Materials Sales C. Drive-Through Facility D. Public Safety Facility E. Mortuary, Funeral Home F. Repair Service G. Vehicle Service H. Utility Facility P             Permitted Use, Zoning Clearance required Refer to Chapter 88.70 of the Development Code for Definitions               uses permitted on a second or upper floor.               permitted on a second or upper floor. 1             Only Medical Services ‐ Doctor Office use 2             Only Office‐Processing and Office‐Professional      MUP      Minor Use Permit required UP          Use Permit required S             Permit requirement set by Specific Use Regulations LAND USE REGULATION LAND USE REGULATION RECREATION, EDUCATION, AND PUBLIC ASSEMBLY RETAIL SALES CONT. Commercial Recreation Facility‐Indoor MUP Groceries, Specialty Foods P Conference/Convention Facility UP Neighborhood Market P Health/Fitness Facility P Night Club MUP Live Entertainment MUP Outdoor Displays and Sales MUP Park, Playground P Restaurant, Café, Coffee Shop P School‐Specialized Education/Training UP SERVICES ‐ BUSINESS, FINANCIAL, AND PROFESSIONAL Studio‐Art, Dance, Martial Arts, Music, Etc.P ATM P Theater MUP Banks, Financial Services P RESIDENTIAL Business Support Services P Caretaker/Manager Unit P Medical Office/Service P1 Courtyard Housing P Office P2 Duplex/Triplex/Fourplex P SERVICES ‐ GENERAL Home Occupation P Day Care Center ‐ Child or Adult MUP Live/Work Unit MUP Lodging ‐ Bed & Breakfast Inn (B&B)P Multifamily P Lodging ‐ Hotel or Motel P Organizational House P Personal Services P Residential Care (seven or more clients)P TRANSPORTATION, COMMUNICATIONS, AND INFRASTRUCTURE Senior Citizen Apartment P Broadcasting Studio P RETAIL SALES Parking Facility, Public or Commercial MUP Bar/Tavern UP Telecommunications Facility S Farmers Markets MUP Furniture, Furnishings and Appliance store P General Retail P     Alcoholic Beverage Sales UP     Floor Area Under 20,000 sf P     Floor Area Over 20,000 sf UP     Operating between 9:00 pm and 7:00 am MUP ALLOWABLE USES: Downtown District DOWNTOWN DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-27 May 2017 COVERAGE Lot Coverage A. 100% maximum. Landscaping Standards A. Refer to Chapter 88.34 - Landscaping Standards of the Development Code for specific requirements. STANDARDS INTERPRETATION Lot Coverage 100% Lot Coverage 2.4.3 Development Standards The following development standards are specific to the Downtown District. These standards have been tailored to reflect the desired character and implement the vision of the Downtown District. They provide the framework for the creation of a safe, vibrant, and pedestrian-friendly downtown environment. In addition to the development standards located on the following pages, projects will be evaluated on their adherence to standards provided in Section 2.2.4, Section 3, and the design guidelines and strategies located in Sections 1.7, 2.2.5, and 2.4.4. A. SITE PLANNING Site planning and design is key to quality development. The following standards promote orienting buildings toward the street, to promote an active street environment and regulations that minimize pedestrian and vehicular conflicts. Residential Open Space 25 sf/unit min. of Common Open Space 100 sf/unit min. of Private Open Space RESIDENTIAL OPEN SPACE Residential Private Open Space A. Private open space shall be provided at a minimum of 100 sf per unit with a minimum dimension of 6’ in any direction. Residential Common Open Space A. Common open space shall be provided at a minimum of 25 sf per unit with a minimum of 10’ in any direction. B. Common open space shall be purposefully designed as active or passive recreational facilities. C. Rooftop open space may satisfy this requirement, provided it is available for use by all residents. LAND USE AND URBAN FORM DOWNTOWN DISTRICT2 2-28 City of Azusa | TOD Specific Plan May 2017 SERVICE AND DELIVERY AREAS Loading and Service Areas A. Loading docks and service bays shall be located a minimum of 20’ from any public street. B. Trash and recycling enclosures shall not be located adjacent to a public street. STANDARDS INTERPRETATION Service and Delivery Areas Service Loading 20’ min.Parking Public Stre e t Reciprocal Access Building Building 7’-6” min.7’-6” min.7’-6” min.Azusa Avenue Line of Sight RECIPROCAL ACCESS Ingress and Egress A. Reciprocal ingress and egress access with adjacent properties shall be provided for parcels fronting Azusa Avenue and Foothill Boulevard. This requirement may be waived with City approval due to the following circumstances: • The location of existing structures or infrastructure • Lack of agreement between adjacent owners • Other extreme hardship VEHICULAR LINE OF SIGHT Clear Zones A. The clear zone shall consist of an isosceles right triangle with 7’6” sides on the driveway and street. B. The clear zone shall not be occupied by a ground floor building footprint, site features, or landscaping that is taller than 3’. DOWNTOWN DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-29 May 2017 B. BUILDING PLACEMENT AND ORIENTATION Building placement refers to the physical siting of a structure on a parcel with considerations being given to building articulation, setbacks, and parking. The following standards promote building placement that creates an active public realm, creates a strong continuity of frontages, and contributes to greater utilization of parcels within the Downtown District. 15 ’ m a x 0’ Rear Setback 0’ Side Setback 0’ Street Setback BUILDING SETBACKS Ground-Level A. 0’ minimum to street, side, and rear. B. 15’ maximum to building. Setback area shall include plaza, courtyard, outdoor dining, or enhanced pedestrian connection. Upper Floors A. 8’ minimum setback required for those portions of a building exceeding three stories. Parking A. 10’ minimum landscape setback where surface parking areas are located adjacent to a public street. STANDARDS INTERPRETATION Ground-Level Setbacks Upper Floors Setback Public Street10’ m i n Parking Setbacks Public StreetParki n g 8’ min Upper Floor Public Street LAND USE AND URBAN FORM DOWNTOWN DISTRICT2 2-30 City of Azusa | TOD Specific Plan May 2017 BUILDING LOCATION Placement A. Parcels fronting a public street shall orient buildings toward the street. B. Parking is not permitted adjacent to Azusa Avenue or Foothill Boulevard. STANDARDS INTERPRETATION Building Placement Primary Entrances Azusa A v e n u eBuilding E ntr a n c e s Azusa Avenue BUILDING ENTRANCES Primary Entrances A. Buildings shall have a primary entrance door facing Azusa Avenue. Entrances at building corners may be used to satisfy this requirement. BUILDING HEIGHT Minimum Height A. 25’ minimum. Maximum Height A. 50’ maximum. Building Height 50’ max25’ minC. BUILDING FORM AND MASSING Building form refers to the shape, configuration, and relationship of a building to its environment. A number of details must be considered when designing a building’s form including building height, plate height, configuration, roof form, facades, articulation, entrances, and window glazing. Building forms should encourage a pedestrian- friendly environment by including amenities, facade articulation, and street level building openings. STANDARDS INTERPRETATION Architectural projections/features may exceed the height limits of this District up to 10 feet, subject to Economic and Community Development Director approval. Projections/features should be architecturally compatible and aesthetically pleasing or be screened from view. Neon signage, historic graphics, and/or other non-business or project specific related screening methods may be considered appropriate, subject to Economic and Community Development Director approval. DOWNTOWN DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-31 May 2017 STANDARDS INTERPRETATION BUILDING ARTICULATION Plate Height A. Ground floor plate height shall be a minimum of 14’ along all streets. Historic Resources A. Buildings identified as having historical significance (Refer to Figure 2-3), shall retain their original character and building articulation. BUILDING MASSING Maximum Wall Plane A. No building façade visible from any public street shall extend more than 50’ in length without a 5’ minimum variation in the wall plane. Side and Rear Wall Planes A. Side and rear wall planes shall address site context through continuation of architectural features, fenestration, and/or building materials. Roofline Variation A. Building rooflines shall vary in height every 50’ in wall plane length.50’ max.50’ max.50’ max. Roofline Variation Public Street Building Plate Height 14’ min.Floor StructureT.O.P. 50’ ma x . 5’ min. Maximum Wall Plane Public Street LAND USE AND URBAN FORM2 2-32 City of Azusa | TOD Specific Plan May 2017 WINDOW GLAZING Solid-to-Void Ratio A. 45% minimum transparent glazing of first floor facade for retail uses adjacent to Azusa Avenue. B. 30% minimum transparent glazing of first floor facade for office uses adjacent to Azusa Avenue. C. Transparent or translucent glazing is required on the first floor facade of a commercial or retail use facing a public street. D. Opaque, reflective, or dark tinted glass is not permitted. E. Window stickers or exterior window treatments that obstruct interior building views at the street level are prohibited. F. The bottom of any window or product display window shall not be more than three and one- half feet above the adjacent sidewalk. G. Product display windows shall have a minimum height of four feet and be internally lit. 45% min. for retail 30% min. for office Window Glazing Public Street STANDARDS INTERPRETATION 2 City of Azusa | TOD Specific Plan 2-33 May 2017 DOWNTOWN DISTRICT LAND USE AND URBAN FORM 2.4.4 Downtown District Design Guidelines 1. Architectural character of a building should build upon and maintain the traditional downtown image with an emphasis on historic architectural styles, building types, materials, and details. 2. Downtown streets should support an active and engaging pedestrian environment. Human scale should be created through the use of building articulation including elements such as awnings, arches, trellises, arbors, pergolas, and other architectural elements. These elements should be integrated into the building design to avoid the look of “tacked on” architectural features. 3. Existing historic or older structures with architectural details or ornamentation should be retained, restored, or replicated whenever possible. 4. Building entrances and storefronts should be incorporated with one of more of the following design elements: Ê A change in wall/window plane Ê Wall articulation around the door and projecting beyond the door Ê Placement of art or decorative detailing at the entry Ê A projecting element above the entrance 5. Clear glass is required on the street level to create interesting interior shop views for pedestrians. Heat gain can be limited by incorporating awnings, recessed storefronts, or user controlled interior shading device. 6. Locate windows and entrances adjacent to street and public spaces to improve public safety and security and provide “eyes on the street”. 7. Awnings should not be wrapped around buildings in continuous bands. Awnings should only be placed on top of doors, on top of windows, or within vertical elements when the façade of a building is divided into distinct structural bays. Emphasizing historic architectural styles of a place can maintain and build upon the existing community character. Clear storefront glass at street level creates visual interest for the pedestrian. LAND USE AND URBAN FORM DOWNTOWN DISTRICT2 2-34 City of Azusa | TOD Specific Plan May 2017 8. Property owners should not propose installing awnings unless they are prepared to maintain and regularly replace the awnings every eight to ten years. 9. Building materials and finishes should be true to the structure’s architectural style. 10. Material changes should occur at intersecting planes to appear substantial and integral to the façade. Material or color changes at the outside corners of structures give an impression of thinness and artificiality and should be avoided. 11. Parapets should have sufficient articulation of detail, such as precast treatments, continuous banding, or projecting cornices, lentils, caps, corner details, or variety in pitch (sculpted). 12. Parapets should not appear “tacked on” and should convey a sense of permanence. If the interior side of a parapet is visible from pedestrian view, it should be finished with the same materials and a similar level of detail as the front façade. 13. Traditional building widths generally do not exceed 25 feet wide to 30 feet wide at the ground level, irrespective of a building’s total width. Continuation of this familiar, human-scaled rhythm is encouraged in new construction. Infill buildings that are much wider than the existing facades should be broken down into a series of appropriately proportioned structural bays or components. Commercial street façade rhythm helps to visually tie the Downtown streets together. 14. A 360-degree architectural design philosophy, the full articulation of all building facades, should be incorporated into all new buildings and remodels. This includes variation in massing, roof forms, and wall planes, as well as surface articulation. Acknowledging sensitivity to budget, it is expected that the highest level of articulation will occur on the front facade and facades visible from public streets. However, similar and complementary massing, materials, and details should be incorporated into side and rear facades. Architectural elements should be continued to address the side and rear of buildings, where appropriate. Large building massings should be broken up through facade articulation and material changes. LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-35 May 2017 Landscape trellises soften vertical wall planes and provide visual interest to side and rear of buildings. Plazas and pocket parks incorporating fountains, art, and seating add to the pedestrian experience of a place. 15. Blank walls shall be avoided. Architectural elements such as windows, overhangs, trellises, arcades, projections, awnings, insets, materials, textures, and colors should be incorporated into every building facade. 16. Murals, espaliers/trellises, and/or vines may be placed on portions of large expanses of rear and side building walls to soften the wall and create interest. 17. Plazas, courtyards, pocket parks, and outdoor cafes should be designed in an inviting manner that encourages pedestrian use through the incorporation of trellises, fountains, art, seating, and shade trees. 18. Focal points should be created and incorporated into sites to establish a sense of place and orientation. Fountains, plazas, and artwork can be used to create focal points. 19. Public art is encouraged as an on-site amenity for all projects. 20. Buildings in highly visible locations, such as the intersection of Azusa and San Gabriel Avenues and Foothill Boulevard should incorporate architectural elements such as a small plaza, clock tower, varying roof lines, fountain, and/or public art. 21. Signs integrated into the building design provide a personal quality that contributes to the ambiance of the commercial complex or streetscape, especially the more unique signs. The following guidelines should be considered when developing private signage. Ê Signs that reflect the type of business through design, shape, or graphic form are encouraged. Ê The method of attaching the sign to the building should be integrated into the overall sign design. Ê Signs should not cover up windows or important architectural features. LAND USE AND URBAN FORM DOWNTOWN EXPANSION DISTRICT2 2-36 City of Azusa | TOD Specific Plan May 2017 2.5.1 District Character The Downtown Expansion District will extend and complement the adjacent Downtown District environment by including new residential, retail, and office land uses, while transitioning new development to enhance inter-district connectivity to the Route 66 and Civic Districts. Two and three-story, mixed-use buildings 2.5 DOWNTOWN EXPANSION DISTRICT City-owned opportunity sites east of Dalton Avenue. Wide sidewalks with parkway landscaping create a pleasant and safe environment for pedestrians. Neighborhood services at street level allow for convenient access for residents living in, and adjacent to, mixed-use developments. along Alameda Avenue, Dalton Avenue, and San Gabriel Avenue will afford residents the opportunity to live within short walking distances of coffeehouses, restaurants, shops, and the Azusa Downtown Gold Line Station. Local, neighborhood-serving businesses within the Downtown Expansion District will cater to the everyday needs of residents, with office spaces DOWNTOWN EXPANSION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-37 May 2017 SPECIFIC PLAN GUIDING PRINCIPLES - Related to the Downtown Expansion District TO-3 Provide district-specific development standards and design guidelines that support and encourage TOD and increase safe, direct, and convenient pedestrian access to transit facilities. A. Enhance connection to the Azusa Downtown Gold Line Station and adjacent districts through the incorporation of development standards and streetscape improvements that improve pedestrian safety and accessibility. ED-3 Provide increased uses, services, and transportation options to support and benefit the local community. A. Incorporate a wide variety of land uses, including retail, office, and residential. ED-4 Provide a range of supporting benefits for the local community including a variety of housing, a more walkable environment, and community amenities. A. Promote a variety of new housing options to benefit the community, including mixed-use and stand- alone residential. B. Encourage a more walkable environment through development standards that are meant to enhance the pedestrian experience. HC-1 Provide district-specific development standards and design guidelines that enhance architectural quality, improve the overall identity of the Specific Plan Area, and enrich the quality of life through the built environment. A. Enhance architectural quality through building placement, orientation, and guidelines. HC-3 Emphasize streetscape and landscaping enhancements to improve walking, bicycling, and transit use options. A. Improve pedestrian connectivity to the Downtown, Civic, and Route 66 Districts through the continuation of landscaping, streetscape, and sidewalk improvements. CP-1 Incorporate Crime Prevention through Environmental Design (CPTED) strategies that contribute to the safety and vitality of residents and visitors of Azusa. A. Encourage positive social interactions and deter potential criminal behavior through the design and development of both public and private spaces (refer to Section 1.7.6). expanding future business and job opportunities for Azusa residents. While similar to the Downtown District in character, the Downtown Expansion District will alternatively, allow for stand-alone residential and appropriately scaled live-work and mixed-use developments that will be oriented to provide local, neighborhood services, and convenient access to the Azusa Downtown Gold Line Station. Extension of the Downtown District landscaping, streetscape amenities, and wide sidewalks along San Gabriel Avenue and Alameda Avenue will provide additional layers of visual and physical linkages and provide opportunities to expand the Downtown Area. LAND USE AND URBAN FORM DOWNTOWN EXPANSION DISTRICT2 2-38 City of Azusa | TOD Specific Plan May 2017 Height transitioning and good-neighbor setback policies minimize shadowing, privacy issues, and other nuisances on existing residential uses. Pedestrian-oriented streets provide an attractive environment for walking, bicycling, and other non-motorized mobility methods. 2.5.2 Land Use A complementary mix of retail, office, and residential uses are envisioned within the Downtown Expansion District to provide easily accessible neighborhood-oriented services for the Azusa community. Stand-alone residential uses, such as duplexes and townhomes, provide additional housing opportunities within close walking and bicycling proximity to Downtown and the Azusa Downtown Gold Line Station. A major focus of this District is enhancing overall walkability. Pedestrian enhancements and streetscape beautification have been emphasized in order to entice non-motorized mobility through and into adjacent districts (refer to Section 3.2). Front setback development standards allow for a maximum of up to 15 feet. This encourages new development to incorporate plaza and/or outdoor dining spaces to create a social, visually attractive, and pedestrian-oriented public realm within the Downtown Expansion District. New residential housing expand options for existing and future residents of Azusa. DOWNTOWN EXPANSION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-39 May 2017 Figure 2-4: Downtown Expansion District Foothill Blvd Azusa AveAzusa DowntownStation APU/CitrusCollege Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA District Key Map 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Gold Line District Downtown District Downtown Expansion District No ChangeRoute 66 District Transition District Civic District way Foothill Blvd Sunset AveAngeleno AveSan Gabriel Ave6th St Pasadena AveAzusa Light & Water CVS Pharmacy AT&T Verizon Post Office Park PublicLibrary SeniorCenter Alameda AveDalton AveSt Francis ofRome School SlausonParkSoldano AveAzusa AveCityHall Soldano AvePasadena AveSOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 160 32080Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change City-Owned Opportunity Site City-Owned Opportunity Site Downtown Expansion District Key Map N City-owned properties along Dalton Avenue and San Gabriel Avenue provide opportunities for mixed-use development and will encourage additional private investment throughout the Downtown Expansion District. Land uses, building heights, and development intensities are intended to complement, not detract from, uses within adjacent districts through scaled height transitioning. Development standards outline the framework for focusing new development along street frontages with up to 100% lot coverage allowed. Maximum building heights for this District are allowed up to 45 feet and incorporate specific good-neighbor policies to minimize potential impacts on existing single-family residences. City-Owned Opportunity Sites LAND USE AND URBAN FORM DOWNTOWN EXPANSION DISTRICT2 2-40 City of Azusa | TOD Specific Plan May 2017 LAND USE REGULATION LAND USE REGULATION RECREATION, EDUCATION, AND PUBLIC ASSEMBLY RETAIL SALES CONT. Commercial Recreation Facility‐Indoor MUP Neighborhood Market P Conference/Convention Facility UP Night Club UP Health/Fitness Facility P Outdoor Displays and Sales MUP Live Entertainment MUP Restaurant, Café, Coffee Shop P Park, Playground P SERVICES ‐ BUSINESS, FINANCIAL, AND PROFESSIONAL School‐Specialized Education/Training UP ATM P Studio‐Art, Dance, Martial Arts, Music, Etc.P Banks, Financial Services P RESIDENTIAL Business Support Services P Caretaker/Manager Unit P Medical Office/Service P1 Courtyard Housing P Office P2 Duplex/Triplex/Fourplex P SERVICES ‐ GENERAL Home Occupation P Day Care Center ‐ Child or Adult MUP Live/Work Unit MUP Lodging ‐ Bed & Breakfast Inn (B&B)P Multifamily P Lodging ‐ Hotel or Motel P Organizational House P Massage Parlor SP* Residential Care (seven or more clients)P Personal Services P Senior Citizen Apartment P TRANSPORTATION, COMMUNICATIONS, AND INFRASTRUCTURE Townhouse, Rowhouse P Parking Facility, Public or Commercial MUP RETAIL SALES Public Facilities UP Bar/Tavern UP Telecommunications Facility S Farmers Markets MUP Furniture, Furnishings and Appliance Store P General Retail P     Alcoholic Beverage Sales UP     Floor Area Under 20,000 sf MUP     Floor Area Over 20,000 sf UP     Operating between 9:00 pm and 7:00 am MUP     Groceries, Specialty Foods P ALLOWABLE USES: Downtown Expansion District Table 2-3: Downtown Expansion District Allowable Uses BUILDING USE Ground Floor Uses A. Ground floor uses fronting Foothill Boulevard or San Gabriel Avenue shall be non-residential except for lobby, gym, and other pedestrian oriented uses. STANDARDS INTERPRETATION E. Public Safety Facility F. Mortuary, Funeral Home G. Repair Service H. Vehicle Service I. Utility Facility Building Use Commercial Residential & Commercial Public S t r e e t                Municipal Code. P             Permitted Use, Zoning Clearance required Refer to Chapter 88.70 of the Development Code for Definitions               uses permitted on a second or upper floor.               permitted on a second or upper floor. 1             Only Medical Services ‐ Doctor Office use 2             Only Office‐Processing and Office‐Professional      MUP      Minor Use Permit required SP*         Special Permit required ‐ see Chapter 88.48 of City  UP          Use Permit required S             Permit requirement set by Specific Use Regulations Note: A combination of any of the permitted uses may be provided within a horizontal or vertical mixed-use project provided the Ground Floor Use Standard (provided below) and Mixed-Use Standards provided on Page 2-7 are adhered to. PROHIBITED USES A. Residential Care (six or fewer clients) B. Auto Vehicle Sales and Rental C. Building and Landscape Materials Sales D. Drive-Through Facility DOWNTOWN EXPANSION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-41 May 2017 COVERAGE Lot Coverage A. 100% maximum. Landscaping Standards A. Refer to Chapter 88.34 - Landscaping Standards of the Development Code for specific requirements. STANDARDS INTERPRETATION Lot Coverage 100% Lot Coverage 2.5.3 Development Standards The following development standards are specific to the Downtown Expansion District. These standards have been tailored to reflect the desired character and implement the vision of the Downtown Expansion District. They provide the framework for the creation of a safe, vibrant, and pedestrian-friendly environment that enhances inter-district connectivity within the Specific Plan Area. In addition to the development standards located on the following pages, projects will be evaluated on their adherence to standards provided in Section 2.2.4, Section 3, and the design guidelines and strategies located in Sections 1.7, 2.2.5, and 2.5.4. A. SITE PLANNING Site planning and design is key to quality development. The following standards promote orienting buildings toward the street to promote an active street environment and regulations that minimize pedestrian and vehicular conflicts. Residential Open Space 25 sf/unit min. of Common Open Space 125 sf/unit min. of Private Open Space RESIDENTIAL OPEN SPACE Residential Private Open Space A. Private open space shall be provided at a minimum of 125 sf per unit with a minimum dimension of 6’ in any direction. Residential Common Open Space A. Common open space shall be provided at a minimum of 25 sf per unit with a minimum of 10’ in any direction. B. Common open space shall be purposefully designed as active or passive recreational facilities. C. Rooftop open space may satisfy this requirement, provided it is available for use by all residents. LAND USE AND URBAN FORM DOWNTOWN EXPANSION DISTRICT2 2-42 City of Azusa | TOD Specific Plan May 2017 SERVICE AND DELIVERY AREAS Loading and Service Areas A. Loading docks and service bays shall be located a minimum of 20’ from San Gabriel Avenue, Alameda Avenue, and Dalton Avenue. B. Trash and recycling enclosures shall not be located adjacent to a public street. STANDARDS INTERPRETATION Service and Delivery Areas Service Loading 20’ min.Parking Public Stre e t 7’-6” min.7’-6” min.7’-6” min.Public Street Line of SightVEHICULAR LINE OF SIGHT Clear Zones A. The clear zone shall consist of an isosceles right triangle with 7’6” sides on the driveway and street. B. The clear zone shall not be occupied by a ground floor building footprint, site features, or landscaping that is taller than 3’. DOWNTOWN EXPANSION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-43 May 2017 10’ m i n 15 ’ m a x 0’ Rear Setback 0’ Side Setback 0’ Street Setback BUILDING SETBACKS Street A. 0’ minimum. B. 15’ maximum to building. Setback area shall include plaza, courtyard, outdoor dining, or enhanced pedestrian connection. C. 10’ minimum landscape setback where surface parking areas are located adjacent to a public street. Side A. 0’ minimum. Rear A. 0’ minimum. STANDARDS INTERPRETATION Dining Setbacks Parking Setbacks Public StreetPublic StreetParki n g B. BUILDING PLACEMENT AND ORIENTATION Building placement refers to the physical siting of a structure on a parcel with considerations being given to building orientation, setbacks, and parking. The following standards promote building placement that creates an active public realm, creates a strong continuity of frontages, and contributes to greater utilization of parcels within the Downtown Expansion District. BUILDING LOCATION Placement A. Parcels fronting a San Gabriel Avenue, Alameda Avenue, and Dalton Avenue shall orient buildings toward the street. B. Parking is not permitted adjacent to Foothill Boulevard, San Gabriel Avenue, Alameda Avenue, and Dalton Avenue. Building Placement Public Street LAND USE AND URBAN FORM DOWNTOWN EXPANSION DISTRICT2 2-44 City of Azusa | TOD Specific Plan May 2017 BUILDING ARTICULATION Plate Height A. Ground floor plate height shall be a minimum of 14’. STANDARDS INTERPRETATION Primary Entrances Public Str e etBuilding E ntr a n c e s BUILDING ENTRANCES Primary Entrances A. Buildings shall have a primary entrance door facing San Gabriel Avenue, Alameda Avenue, and Dalton Avenue. Entrances at building corners may be used to satisfy this requirement. BUILDING HEIGHT Minimum Height A. 25’ minimum. Maximum Height A. 45’ maximum. Building Height 45’ max25’ minC. BUILDING FORM AND MASSING Building form refers to the shape, configuration, and relationship of a building to its environment. A number of details must be considered when designing a building’s form including building height, plate height, configuration, roof form, facades, articulation, entrances, and window glazing. Building forms should encourage a pedestrian- friendly environment by including amenities, facade articulation, and street level building openings. STANDARDS INTERPRETATION Building Plate Height 14’ min.Floor StructureT.O.P. Architectural projections/features may exceed the height limits of this District up to 10 feet, subject to Economic and Community Development Director approval. Projections/features should be architecturally compatible and aesthetically pleasing or be screened from view. Neon signage, historic graphics, and/or other non-business or project specific related screening methods may be considered appropriate, subject to Economic and Community Development Director approval. DOWNTOWN EXPANSION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-45 May 2017 STANDARDS INTERPRETATION BUILDING MASSING Maximum Wall Plane A. No building façade visible from any public street shall extend more than 50’ in length without a 5’ minimum variation in the wall plane. Roofline Variation B. Building rooflines shall vary in height every 50’ in wall plane length. Maximum Wall Plane WINDOW GLAZING Solid-to-Void Ratio A. 45% minimum transparent glazing of first floor facade for retail uses adjacent to a public street. B. 30% minimum transparent glazing of first floor facade for office uses adjacent to a public street. C. Transparent or translucent glazing is required on the first floor facade of a commercial or retail use facing a public street. D. Opaque, reflective, or dark tinted glass is not permitted. E. Window stickers or exterior window treatments that obstruct interior building views at the street level are prohibited. F. The bottom of any window or product display window shall not be more than three and one- half feet above the adjacent sidewalk. 50’ max.50’ max.50’ max. Roofline Variation Public Street 50’ max . 5’ min. Public Street 45% min. for retail 30% min. for office Window Glazing Public Street G. Product display windows shall have a minimum height of four feet and be internally lit. LAND USE AND URBAN FORM DOWNTOWN EXPANSION DISTRICT2 2-46 City of Azusa | TOD Specific Plan May 2017 2.5.4 Downtown Expansion District Design Guidelines All of the design guidelines provided in Section 2.4.4, Downtown Design Guidelines should be adhered to for buildings within the Downtown Expansion District. In addition, the following guidelines apply to stand- alone residential within this District. 1. A variety of one-, two-, and three-bedroom dwelling units should be provided to encourage a variety of product types. Units should be mixed throughout the development. 2. Units should front primary streets to provide eyes on the street, create pedestrian environments, and support the character of Downtown. 3. Dwellings should incorporate porches, trellises, landscaping, and other features to extend the living area toward the street and soften the transition between the street and the dwelling. 4. The site area adjacent to the street should not be dominated with parking. Parking should be concentrated in areas behind buildings, and away from the street when possible. 5. The design of multi-family developments should consider compatibility with the surrounding neighborhood by mimicking existing architectural styles, colors, and rhythm. 6. Monolithic structures should be avoided. Buildings designs should include a combination of the following techniques: Ê Variation in the wall plane (projecting and recessed elements). Ê Variation in wall height. Ê Roofs located at different levels. Ê Combinations of one-, one and one-half, and two-story units should be used to create visual interest and variation in the massing and building height. Residential units engage the street. Building designs that incorporate variations in wall planes, heights, and roof levels create visual interest at street-level. DOWNTOWN EXPANSION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-47 May 2017 Recessed upper stories reduce the overall massing and scale of a building. 7. Architectural features such as porches, balconies, chimneys, door placement, window proportions, dormers, wood detailing, fencing, siding, and color scheme should be used to complement the overall building design, site and neighborhood context. 8. Where appropriate, the upper stories of new multi-family buildings should be stepped back to reduce the scale of facades that face the street, courtyards, or open space areas. 9. Roofs should reflect a residential appearance through roof pitch and material selection. 10. Roofs covering the entire building such as hips and gables should be used rather than mansard roofs. 11. Locate windows and entrances adjacent to street and public spaces to improve public safety and security and provide “eyes on the street”. 12. Windows should be articulated with accent trim, sills, kickers, shutters, window flower boxes, balconies, awnings, or trellises authentic to the architectural style of the building. 13. Property owners should not propose installing awnings unless they are prepared to maintain and regularly replace the awnings every eight to ten years. 14. Windows on walls adjacent to a neighbor’s home should be offset to prevent direct views into neighbor’s windows, with specific attention to new second floor windows that look into windows, pools, spas, etc. on adjacent properties. Consider using clerestory windows or translucent glass to interrupt direct sight lines to neighbor’s windows and livable outdoor spaces. 15. If decorative shutters are installed, they should be proportional to the window and complement the architectural style of the building. LAND USE AND URBAN FORM ROUTE 66 DISTRICT 2-48 City of Azusa | TOD Specific Plan May 2017 2 Route 66-themed signage and public art aid in defining the unique character and identity of the Route 66 District. 2.6.1 District Character The Route 66 District will reflect a bold and modern interpretation of the historic and iconic Route 66 of the past. The portions of Foothill Boulevard and Alosta Avenue that traverse Azusa will be renamed “Route 66” to embrace and draw attention to its historic context. 2.6 ROUTE 66 DISTRICT While balancing the requirements of the automobile with the needs of the pedestrian, new development in this district will front onto Foothill Boulevard and Alosta Avenue, creating an active street environment with special signage and setback requirements. Thematic, 1950s-style diners and drive-thru restaurants, retail shops, Modern interpretations of the classic Route 66 diner reinvigorate the environment of the historic route. Route 66-themed signage provides visual intrigue and a unique identity for businesses and the community. ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-49 May 2017 SPECIFIC PLAN GUIDING PRINCIPLES - Related to the Route 66 District TO-3 Provide district-specific development standards and design guidelines that support and encourage TOD and increase safe, direct, and convenient pedestrian access to transit facilities. A. Enhance pedestrian street crossings, streetscapes, and landscaping to facilitate safe and convenient access to the Azusa Downtown and APU/Citrus College Gold Line Stations. ED-1 Provide zoning and land use regulations to support future market-driven revitalization and investment. A. Establish a Route 66-themed overlay zone with new development incentives for public art and signage along Foothill Boulevard and Alosta Avenue. ED-3 Provide increased uses, services, and transportation options to support and benefit the local community. A. Encourage mixed-use, commercial, hospitality, and other land uses to expand the variety of recreation, retail, and services within the community. ED-4 Provide a range of supporting benefits for the local community including a variety of housing, a more walkable environment, and community amenities. A. Allow for mixed-use and stand-alone residential uses in order to expand housing variety within the local community. HC-1 Provide district-specific development standards and design guidelines that enhance architectural quality, improve the overall identity of the Specific Plan Area, and enrich the quality of life through the built environment. A. Include good-neighbor development standards and guidelines to ensure new development remains compatible and minimizes impacts on adjacent residential neighborhoods. CP-1 Incorporate Crime Prevention through Environmental Design (CPTED) strategies that contribute to the safety and vitality of residents and visitors of Azusa. A. Encourage positive social interactions and deter potential criminal behavior through the design and development of both public and private spaces (refer to Section 1.7.6). and opportunities for new hospitality uses will populate Route 66, creating a fun and inviting environment for all ages. Stand-alone residences will be sited off Foothill Boulevard, allowing for appropriate buffering into adjacent neighborhood areas. Quirky, customized architectural elements are encouraged to create vibrant and colorful landmarks, paying homage to the historic route. Incentives will encourage developers and businesses to incorporate Route 66-themed public art and signage along the Foothill Boulevard and Alosta Avenue street frontages, creating a unique atmosphere and identity within the Route 66 District. 2.6.2 Land Use A wide array of commercial, retail, hospitality, and mixed-use residential uses are allowed within the Route 66 District focused along Foothill Boulevard and Alosta Avenue and are intended to reinvigorate this portion of the historic route. New development within the Route 66 District is permitted up to 40 feet in height, with hospitality uses allowed up to 50 feet. Maximum lot coverage is allowed up to 80%, with the remaining 20% required to be appropriately landscaped to accent the Route 66 District context. A Route 66 Overlay identifies LAND USE AND URBAN FORM ROUTE 66 DISTRICT 2-50 City of Azusa | TOD Specific Plan May 2017 2 Diners, creative signage, and landscape create a pleasant and thematic Route 66 street scene. parcels within the District that may take advantage of new height and setback incentives for incorporating Route 66-themed public art and/or signage along the Foothill Boulevard and Alosta Avenue street edge. Route 66 District proximity to existing low and medium density residential neighborhoods is addressed through the inclusion of good neighbor policies. These policies require new development to incorporate additional screening, setback, siting, and other site planning techniques to minimize light, noise, and other impacts within the community. A major component of the Route 66 District includes significant improvements to the streetscape along Foothill Boulevard and Alosta Avenue to provide a pleasant pedestrian experience while still accommodating the automobile, public transit, and other non- motorized transit options (refer to Section 3.2 and 3.3.5). Additional landscaping within the Route 66 District is required for new development where surface parking areas are to be located adjacent to public streets, requiring 15 feet minimum from the street edge. Route 66-themed public art creates visual interest and brings a vibrant energy to the historic route’s street frontage. ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-51 May 2017 AT & SF R ail w a y Foothill Blvd Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Light & Water CVS Pharmacy AT&T Verizon Post Office Park AzusaAveSOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 150 30075Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change 8th St 6th St Pasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveAPaUni C Foothill Vista Mobile Home Park Lindley-ScottHouse Palm StAPUHousing iorter Citrus Citrus AveFoothill Blvd AREA OFNO CHANGE AtlantisGardens AREA OFNO CHANGE Azusa PacificUniversity St Francis ofRome School SlausonPark LeeElementarySoldano AveSoldano AvePasadena AveSOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 250 500125Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change Foothill Blvd Azusa AveAzusa DowntownStation APU/CitrusCollege Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA District Key Map 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Gold Line District Downtown District Downtown Expansion District No ChangeRoute 66 District Transition District Civic District Route 66 District Key Map Western Portion Eastern Portion Figure 2-5: Route 66 District N Route 66 Overlay The Route 66 Overlay incentivizes private development to assist in implementing the District’s desired character. Parcels fronting onto Foothill Boulevard and Alosta Avenue (as noted in Figure 2-5: Route 66 District) have the opportunity to incorporate Route 66-themed public art and/or signage along the street edge in exchange for height and setback incentives. Appropriate examples of Route 66-themed public art and signage include restored classic cars, gas pumps, electric car chargers, unique and/or vintage signage, etc. Route 66 Overlay Parcels PROJECTS WITHIN ROUTE 66 OVERLAY A. Shall adhere to the guidelines presented in Section 2.6.4. B. Shall incorporate themed streetscape furnishings presented in Section 3.6.3. C. May take advantage of height, setback, and signage incentives provided on the following pages. LAND USE AND URBAN FORM ROUTE 66 DISTRICT 2-52 City of Azusa | TOD Specific Plan May 2017 2 LAND USE REGULATION LAND USE REGULATION RECREATION, EDUCATION, AND PUBLIC ASSEMBLY RETAIL SALES CONT. Commercial Recreation Facility‐Indoor P Groceries, Specialty Foods P Commercial Recreation Facility‐Outdoor MUP Neighborhood Market P Conference/Convention Facility P Night Club UP Health/Fitness Facility P Outdoor Displays and Sales MUP Library, Museum P Restaurant, Café, Coffee Shop P Live Entertainment MUP SERVICES ‐ BUSINESS, FINANCIAL, AND PROFESSIONAL Park, Playground P ATM P School‐College, University UP Banks, Financial Services P School‐Specialized Education/Training UP Buisness Support Service P Studio‐Art, Dance, Martial Arts, Music, Etc.P Medical Office/Service P1 RESIDENTIAL Office P2 Caretaker/Manager Unit P SERVICES ‐ GENERAL Courtyard Housing P Day Care Center ‐ Child or Adult MUP Duplex/Triplex/Fourplex P Lodging ‐ Bed & Breakfast Inn (B&B)P Home Occupation P Lodging ‐ Hotel or Motel P Live/Work Unit P Mortuary, Funeral Home MUP Multifamily P Personal Services P Organizational House UP Public Safety Facility P Residential Accessory Use or Structure P Repair Service ‐ Equipment, Large Appliance,  Etc.P Residential Care (six or fewer clients)P TRANSPORTATION, COMMUNICATIONS, AND INFRASTRUCTURE Residential Care (seven or more clients)P Parking Facility, Public or Commercial MUP Senior Citizen Apartment P Public Facilities P Townhouse, Rowhouse P Telecommunications Facility S RETAIL SALES Utility Facilty P Bar/Tavern UP Building and Landscape Materials Sales ‐  Indoor MUP Drive‐Thru Facilities P Farmers Markets MUP Furniture, Furnishings and Appliance Store P General Retail P     Alcoholic Beverage Sales UP     Floor Area Under 20,000 sf P     Floor Area Over 20,000 sf MUP     Operating between 9:00 pm and 7:00 am MUP ALLOWABLE USES: Route 66 District P             Permitted Use, Zoning Clearance required Refer to Chapter 88.70 of the Development Code for Definitions               uses permitted on a second or upper floor.               permitted on a second or upper floor. 1             Only Medical Services ‐ Doctor Office use 2             Only Office‐Processing and Office‐Professional      MUP      Minor Use Permit required UP          Use Permit required S             Permit requirement set by Specific Use Regulations Table 2-4: Route 66 District Allowable Uses A. Single-Family Dwellings - adjacent to Foothill Boulevard and Alosta Avenue. B. Auto Vehicle Sales and Rentals C. Vehicle ServiceNote: A combination of any of the permitted uses may be provided within a horizontal or vertical mixed-use project provided the Ground Floor Use Standard (provided below) and Mixed-Use Standards provided on Page 2-7 are adhered to. PROHIBITED USES ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-53 May 2017 2.6.3 Development Standards The following development standards are specific to the Route 66 District. These standards have been tailored to reflect the desired character and implement the vision of the Route 66 District. They provide the framework for the creation of a unique Route 66-themed automobile and pedestrian-oriented district environment. In addition to the development standards located on the following pages, projects will be evaluated on their adherence to standards provided in Section 2.2.4, Section 3, and the design guidelines and strategies located in Sections 1.7, 2.5.2, and 2.5.3. A. SITE PLANNING Site planning and design is key to quality development. The following standards promote orienting buildings toward the street to promote an active street environment and regulations that minimize pedestrian and vehicular conflicts. COVERAGE Lot Coverage A. 80% maximum. Landscaping Coverage A. 20% maximum. B. Areas dedicated to the installation of public art within the Route 66 Overlay may be counted to satisfy this requirement. Landscaping Standards A. Refer to Chapter 88.34 - Landscaping Standards of the Development Code for specific requirements. STANDARDS INTERPRETATION Lot Coverage Landscaping Coverage 80% Lot Coverage 20% Landscape Coverage BUILDING USE Ground Floor Uses A. Ground floor uses fronting Foothill Boulevard and Alosta Avenue shall be non-residential except for lobby, gym, and other pedestrian oriented uses. Building Use Retail & Commercial Residential & Office Public S t r e e t LAND USE AND URBAN FORM ROUTE 66 DISTRICT 2-54 City of Azusa | TOD Specific Plan May 2017 2 SERVICE AND DELIVERY AREAS Loading and Service Areas A. Loading docks and service bays shall be located a minimum of 15’ from Foothill Boulevard and Alosta Avenue. B. Trash and recycling enclosures shall not be located adjacent to a public street. STANDARDS INTERPRETATION Service and Delivery Areas Service Loading 15’ min.Parking Public Stre e t 7’-6” min.7’-6” min.7’-6” min.Public Street Line of SightVEHICULAR LINE OF SIGHT Clear Zones A. The clear zone shall consist of an isosceles right triangle with 7’6” sides on the driveway and street. B. The clear zone shall not be occupied by a ground floor building footprint, site features, or landscaping that is taller than 3’. Residential Open Space 30 sf/unit min. of Common Open Space 150 sf/unit min. of Private Open Space RESIDENTIAL OPEN SPACE Residential Private Open Space A. Private open space shall be provided at a minimum of 150 sf per unit with a minimum dimension of 10’x10’. Residential Common Open Space A. Common open space shall be provided at a minimum of 30 sf per unit with a minimum of 10’ in any direction. B. Common open space shall be purposefully designed as active or passive recreational facilities. C. Rooftop open space may satisfy this requirement, provided it is available for use by all residents. ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-55 May 2017 STANDARDS INTERPRETATION Single/Double-Vehicle Access Double-Vehicle Access Reciprocal Access Building Building RECIPROCAL ACCESS Ingress and Egress A. Reciprocal ingress and egress access with adjacent properties shall be provided for parcels fronting Foothill Boulevard and Alosta Avenue. This requirement may be waived with City approval due to the following circumstances: • The location of existing structures or infrastructure • Lack of agreement between adjacent owners • Other extreme hardship VEHICULAR ACCESS Single-Vehicle Access A. A maximum of one (1) vehicle point shall be provided from a public street for parcels with less than 100 linear feet of street frontage and/ or a parcel less than 15,000 sf. Double-Vehicle Access A. A maximum of two (2) vehicle access points shall be provided from a public street for parcels with more than 100 linear feet of street frontage. B. Access points shall be separated a minimum of 80’ in consultation with the Director of Public Works. C. Additional access points may be permitted from secondary streets with Economic and Community Development Director approval. D. Unused vehicle access points shall be closed and reconstructed per City standard. >100’ <100’ Public Street LAND USE AND URBAN FORM ROUTE 66 DISTRICT 2-56 City of Azusa | TOD Specific Plan May 2017 2 BUILDING LOCATION Placement A. Parcels fronting Foothill Boulevard and Alosta Avenue shall orient buildings toward the street. Building Placement Public Street 15’ m i n BUILDING SETBACKS Street A. 15’ minimum to building. B. 20’ minimum landscape setback where surface parking areas are located adjacent to a public street. Side A. 0’ minimum. Rear A. 0’ minimum. Route 66 Themed Public Art Incentive A. Development dedicating 5% of the front setback area to Route 66 themed public art within the Route 66 Overlay may reduce the minimum street setback requirements by 5’. B. An additional 5’ of building height is permitted (10’ for hospitality use) if 10% of the front setback area is dedicated to Route 66 themed public art within the Route 66 Overlay. C. Public art shall comply with Chapter 88.39 - Art in Public Places of the Development Code and shall be installed prior to occupancy. STANDARDS INTERPRETATION Building Setbacks Parking Setbacks Public StreetParki n g B. BUILDING PLACEMENT AND ORIENTATION Building placement refers to the physical siting of a structure on a parcel with considerations being given to building orientation, setbacks, and parking. The following standards promote building placement that creates an active public realm, creates a strong continuity of frontages, and contributes to greater utilization of parcels within the Route 66 District.15’ min.0’ min. Rear & Side SetbackPub l i c S t r e e t ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-57 May 2017 STANDARDS Primary Entrances Public Stree tBuilding Entrance s BUILDING ENTRANCES Primary Entrances A. Buildings shall have a primary entrance door facing the public street. Entrances at building corners may be used to satisfy this requirement. BUILDING HEIGHT Minimum Height A. 20’ minimum. Architectural projections/features may exceed the height limits of this District up to 10 feet, subject to Economic and Community Development Director approval. Projections/features should be architecturally compatible and aesthetically pleasing or be screened from view. Neon signage, historic graphics, and/or other non-business or project specific related screening methods may be considered appropriate, subject to Economic and Community Development Director approval. Route 66 Themed Public Art Incentive A. Development dedicating 5% of the required front setback area to Route 66 themed public art within the Route 66 Overlay area may increase the maximum allowed building height by 5’ (10’ for hospitality uses), subject to Economic and Community Development Director approval. Building Height 40’ max; 50’ max for hospitality uses20’ min.C. BUILDING FORM AND MASSING Building form refers to the shape, configuration, and relationship of a building to its environment. A number of details must be considered when designing a building’s form including building height, plate height, configuration, roof form, facades, articulation, entrances, and window glazing. Building forms should encourage a pedestrian-friendly environment by including amenities, facade articulation, and street level building openings. STANDARDS INTERPRETATION Public Stree t INTERPRETATION Maximum Height A. 40’ maximum; 50’ maximum for hospitality uses. B. Building height may be increased 10’ (20’ for hospitality use) if 10% of the required front setback area is dedicated to Route 66 themed public art within the Route 66 Overlay area, subject to Economic and Community Development Director approval. C. Public art shall comply with Chapter 88.39 - Art in Public Places of the Development Code and shall be installed prior to occupancy. LAND USE AND URBAN FORM ROUTE 66 DISTRICT 2-58 City of Azusa | TOD Specific Plan May 2017 2 STANDARDS INTERPRETATION Building Plate Height 14’ min.Floor StructureT.O.P. BUILDING ARTICULATION Plate Height A. Ground floor plate height shall be a minimum of 14’. BUILDING MASSING Maximum Wall Plane A. No building façade visible from a public street shall extend more than 50’ in length without a 5’ minimum variation in the wall plane. 50 ft. max. 5 ft. min. Building Massing Public Street 45% min. for retail 30% min. for office Window Glazing Public Street WINDOW GLAZING Solid-to-Void RatioA. 45% minimum transparent glazing of first floor facade for retail uses adjacent to a public street. B. 30% minimum transparent glazing of first floor facade for office uses adjacent to a public street. C. Transparent or translucent glazing is required on the first floor facade of a commercial or retail use facing a public street. D. Opaque, reflective, or dark tinted glass is not permitted. E. Window stickers or exterior window treatments that obstruct interior building views at the street level are prohibited. F. The bottom of any window or product display window shall not be more than three and one-half feet above the adjacent sidewalk. G. Product display windows shall have a minimum height of four feet and be internally lit. ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-59 May 2017 FREESTANDING/MONUMENT SIGNAGE Neon tube/LED freestanding/monument signage is required for those parcels fronting onto Foothill Boulevard (Route 66) within the Route 66 District. Freestanding/monument signage shall comply with the following requirements in addition to those outlined in Section 88.38 of the Azusa Sign Ordinance. MAXIMUM SIGN AREA The total sign area on a parcel shall comply with the following requirements. All other signage not identified within the Route 66 District shall comply with the requirements of Chapter 88.38 of the Azusa Sign Ordinance. 1. Maximum sign area per parcel. The total sign area on a parcel shall comply with the following requirements: A. 1.25 sf for each linear ft. of primary building frontage. B. 0.5 additional sf for each linear foot of secondary building frontage. C. Each use is allowed a total sign area of at least 25 sf regardless of frontage length. D. The total sign area per use shall not exceed 125 sf, without Master Sign Plan approval. 2. Maximum sign area per building frontage. The total area of all signs on a single structure frontage shall not exceed the total linear feet of that frontage. ROUTE 66 THEMED SIGNAGE In order to facilitate and further expand on the desired character of the Route 66 District, specific signage requirements, beyond those required under the City of Azusa’s Sign Ordinance (Chapter 88.38), have been provided below. In particular, expanded sign area and neon tube/LED lighting requirements are permitted in exchange for the design and installation of freestanding/monument signage that reflects the culture, character, form, and style historically present on Route 66 be incorporated into the project signage program. The standards provided below are subject to the approval of a Sign Permit or Master Sign Plan, in compliance with Chapter 88.38. 3. Site with 4 or more tenants. An additional freestanding identification sign of 0.35 sf for each linear ft. of total primary structure frontage, up to 125 sf maximum. USE OF EXPOSED NEON TUBING The use of neon (exposed gaseous light tubing) and LED signage is required within the Route 66 District and shall meet the following requirements: A. Neon signs and linear tubing shall be UL (Underwriters Laboratories) listed with a maximum 20 amps for each circuit; B. Neon manufacturer shall be registered with Underwriters Laboratories; C. Neon tubing shall not exceed 13 millimeters in diameter; D. Neon lighting adjacent to residential uses shall not exceed 1/2 foot candle measured at the property line; E. When used as an architectural element, neon tubing shall be used only to reinforce specific architectural elements of the structure and shall be concealed from view through the use of parapets, cornices, ledges or similar devices; and F. Neon signs, together with other permitted window signs, shall not occupy more than 25% of the total window area, and shall be used to enhance the business name, not a specific brand or product. LAND USE AND URBAN FORM2 2-60 City of Azusa | TOD Specific Plan May 2017 ROUTE 66 DISTRICT 2.6.4 Route 66 District Design Guidelines In the early 1900s, Route 66 served motorists making a long east/west trip. Consequently small stores, gas stations, cafes, and motels began to pop up along the route. Building designs were creative to capture the attention and desires of motorists and made of local materials such as wood, brick, and stucco. Early hotels were organized as cabins or individual structures and often were characterized by labels such as the “Colonial Clapboard,” “Western Bungalow,” “Craftsman Bungalow,” “Spanish Colonial,” or “Spanish Pueblo.” With the establishment of indoor plumbing, a more unified architectural style was desired and motel builders adopted the “Streamline Moderne” architecture. These unique attributes provide the foundation for Route 66 architecture. Designers are encouraged to embrace this whimsical and creative approach to architecture and signage along the corridor and conform to the following guidelines: 1. Design features should be incorporated to capture the essence of Streamline Modern or Art Deco, such as curved canopies and walls, thin horizontal canopies over sidewalks, elements with oblique angles, or creative roof forms. 2. “Off the shelf” or “chain” corporate architecture and generic designs are not recommended for new development. Each project should strive to achieve the unique theme of the corridor. 3. Signs in a 1950s theme are encouraged. Consider the use of neon, pylons, signs with angular geometric configurations, and signs with animated displays. Roof signs and pole-mounted may also be considered, if provided as a part of Master Sign Plan application. In addition, the corridor is composed of larger parcels with extensive street frontage. As such, the following guidelines shall be considered in the design of any project within this district. 4. 360-Degree architecture is the concept of designing a building where all sides of the building have been detailed to complement the primary street elevation in architecture, massing, and materials. Buildings should be aesthetically pleasing from all angles. Massing design should include: Ê Variation in the wall plane (project and recess) Ê Variation in wall height Ê Roofs located at different levels Ê Surface detailing should not serve as a substitute for distinctive massing 5. Building scale should be reduced through the proper use of window patterns, structural bays, roof overhangs, siding, awnings, moldings, fixtures, and other details. 6. Locate windows and entrances adjacent to street and public spaces to improve public safety and security and provide “eyes on the street”. 7. The ground level should be distinguished from the upper levels of a building, especially where a building orients to the street and/or defines public space. Design elements such as separate storefronts, display windows, shop entrances, awnings and overhangs should be incorporated to add interest and give a human dimension to street- level building facades. 8. Pedestrian-level exterior walls should have elements of building depth and character. Emphasize windows, trellises, roof overhangs, Example of streamlined modern style architecture. ROUTE 66 DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-61 May 2017 recessed or projected stories, columns, balconies, wainscots, and awnings. 9. Property owners should not propose installing awnings unless they are prepared to maintain and regularly replace the awnings every eight to ten years. 10. Parapets should have sufficient articulation of detail, such as precast treatments, continuous banding, or projecting cornices, lentils, caps, corner details, or variety in pitch (sculpted). 11. Parapets should not appear “tacked on” and should convey a sense of permanence. 12. If the interior side of a parapet is visible from pedestrian view, it should be finished with the same materials and a similar level of detail as the front façade. 13. Parking lots should be well landscaped to help reduce heat buildup and soften the perceived negative impact of large paved areas. 14. Parking lot trees are intended to provide a broad shade canopy for the majority of the parking spaces. Utilize shade trees that have a canopy of 25 feet to 35 feet at maturity. 15. Parking lots should be well lit to provide safety, convenience, and promote evening use. Use pedestrian-scale lighting to avoid excessively tall stadium style lighting. 16. Any outdoor equipment, whether on a roof, side of a structure, or on the ground should be appropriately screened from view and should not be placed adjacent to the street. The method of screening should be architecturally integrated with the adjacent structure in terms of materials, color, shape and size. 17. Service, utility, and loading areas should be carefully designed, located, and integrated into the site plan. They should be located and designed for easy access by service vehicles, for convenient access by each tenant, and located to minimize circulation conflicts Thematic, Route 66 themed signage. Buildings should be placed to engage the street and designed with a creative architectural style. with other site uses. These critical functional elements should not detract from the public viewshed area or create a nuisance for adjacent property owners. 18. Roof access should be provided from the interior of the building. Exterior roof access ladders are strongly discouraged. 19. The trash/recycle enclosure should be consistent with the design and materials with the project and building architecture. LAND USE AND URBAN FORM TRANSITION DISTRICT2 2-62 City of Azusa | TOD Specific Plan May 2017 2.7.1 District Character The Transition District will maintain a residentially-oriented environment that provides an appropriately scaled buffer for existing single- family residential neighborhoods, adjacent to areas of higher intensity within the Specific Plan Area. Professional office and creative studio cottages will repurpose existing single- 2.7 TRANSITION DISTRICT Local neighborhood market and food hall located at the historic Packing House off 9th Street and Soldano Avenue. family residences, maintaining the residential character of the district, while creating new job opportunities within the community. New, detached courtyard and attached townhome residential developments will enhance the housing variety within the City and enable convenient access to dining, service, retail, and public transit. A Neighborhood Market/Food Repurposing single-family residences into professional office cottages maintains the residential character of a neighborhood. Attached townhomes with front porches expand housing options and create semi-private spaces to engage the neighborhood. TRANSITION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-63 May 2017 SPECIFIC PLAN GUIDING PRINCIPLES - Related to the Transition District ED-1 Provide zoning and land use regulations to support future market-driven revitalization and investment. A. Incorporate development standards that promote desired architectural features and conditions. ED-3 Provide increased uses, services, and transportation options to support and benefit the local community. A. Provide opportunities for expansion of small, home businesses through allowable land uses. ED-4 Provide a range of supporting benefits for the local community including a variety of housing, a more walkable environment, and community amenities. A. Maintain residential character and orientation, while encouraging additional stand-alone housing variety within the community. HC-1 Provide district-specific development standards and design guidelines that enhance architectural quality, improve the overall identity of the Specific Plan Area, and enrich the quality of life through the built environment. A. Include standards that require new development to remain appropriately scaled and compatible with existing residential neighborhoods. B. Encourage protection and reuse of existing single-family residences through allowable land use opportunities for office, art and dance studios, live-work, and other residentially compatible uses. HC-2 Encourage grocery, outdoor dining, and other healthy food related land uses that are easily accessible to the community. A. Incentivize repurposing of the historic packing house location into a neighborhood market and food hall making unique foods and healthy produce easily accessible to the community through a Specialty Market/Food Hall Overlay. HC-3 Emphasize streetscape and landscaping enhancements to improve walking, bicycling, and transit use options. A. Enhance pedestrian connectivity to other districts within the Specific Plan Area through landscaping, mobility, and streetscape improvements. CP-1 Incorporate Crime Prevention through Environmental Design (CPTED) strategies that contribute to the safety and vitality of residents and visitors of Azusa. A. Encourage positive social interactions and deter potential criminal behavior through the design and development of both public and private spaces (refer to Section 1.7.6). Hall Overlay to the historic Packing House, at the corner of 9th Street and Soldano Avenue, will allow for a neighborhood specialty market and food hall, creating a regional destination for unique and healthy foods, as well as a local gathering space that facilitates community interaction. Bicycle lanes and streetscape improvements within the district will enhance pedestrian and bicycle mobility and create a pleasant and enjoyable experience when traveling to the historic Packing House, the Azusa Downtown Gold Line Station, or nearby districts. 2.7.2 Land Use Expanding the housing variety within the Transition District creates additional housing opportunities near the Azusa Downtown Gold Line Station. New courtyard, townhome, and LAND USE AND URBAN FORM TRANSITION DISTRICT2 2-64 City of Azusa | TOD Specific Plan May 2017 IMAGE PLACEHOLDER Recent landscaping and streetscape enhancements within the Rosedale development may inspire improvements to 9th Street. Food halls and specialty markets create community gathering spaces that provide convenient access to unique, healthy foods. duplex residential development within this District supports the commercial, retail, and restaurant uses within adjacent Specific Plan districts. Office, dance and martial arts studios, and day care center uses repurpose existing single-family residences in order to protect and maintain the residential character of the Transition District. Lot coverage for new development within the Transition District is restricted to 80% maximum of the total lot area. The remaining 20% is required to be landscaped in order to beautify and enhance the District’s character. Maximum building heights for new development are limited to 35 feet within this District in order to remain compatible with existing building heights. Street setbacks are required to be a minimum of 10 feet, although porches may encroach 5 feet within the required street setback. Lack of appropriate buffers and transitioning of higher intensity uses can negatively affect neighboring properties. Landscaping improvements are encouraged to form a gradual change in character from surrounding Specific Plan districts. Bicycle lanes and streetscape enhancements along 9th Street, San Gabriel Avenue, Soldano Avenue, and Alameda Avenue improve non-motorized mobility and beautify the Transition District TRANSITION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-65 May 2017 Figure 2-6: Transition District Foothill Blvd Azusa AveAzusa DowntownStation APU/CitrusCollege Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA District Key Map 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Gold Line District Downtown District Downtown Expansion District No ChangeRoute 66 District Transition District Civic District Æb Goldline & BNSF Railway 8th St AT & SF R ail w a y Foothill Blvd Foothill Blvd Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel Ave6th St Pasadena AveCerritosAve5th St Azusa DowntownStation Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Target Park PublicLibrary SeniorCenter Alameda AveDalton Ave9th St 5th St AREA OFNO CHANGE AtlantisGardens Azusa PacificUniversity Sp St Francis ofRome School SlausonPark LeeElementarySoldano AveDalton AveAlameda AveAzusa AveSan Gabriel AveVeteran'sMemorialPark CityHallAzusa AveSoldano AvePasadena AvePackingHouse SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 280 560140Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change Transition District Key Map Azusa Foothill Citrus Association Packing House NSpecialty Market/Food Hall Overlay environment. Recent enhancements along 10th Street provide a local example for informing future 9th Street improvements. A. SPECIALTY MARKET/FOOD HALL OVERLAY The former Azusa Foothill Citrus Association Packing House is located at 9th Street and Soldano Avenue (see Figure 2-6). The Specialty Market/Food Hall Overlay encourages the protection and repurposing of the historic structure. A specialty market and food hall is envisioned as a unique culinary and ethnic food hall that sells local products and fresh produce to the community while creating a regional destination for visitors. Refer to Page 2-71 for detailed Specialty Market/Food Hall incentives. LAND USE AND URBAN FORM TRANSITION DISTRICT2 2-66 City of Azusa | TOD Specific Plan May 2017 Table 2-5: Transition District Allowable Uses A. Commercial Recreation Facility-Indoor B. Conference/Convention Facility C. Health/Fitness Facility D. Library/Museum E. School-Specialized Education/Training F. Alcoholic Beverage Sales G. Auto Vehicle Sales and Rental H. Bar/Tavern I. Drive-Through Facility J. Furniture, Furnishings, and Appliance Store K. General Retail L. Night Club M. Lodging - Hotel or Motel N. Mortuary, Funeral Home O. Public Safety Facility P. Repair Service Q. Vehicle Service R. Public Facility S. Telecommunications Facility T. Transit Station or Terminal U. Utility Facility P             Permitted Use, Zoning Clearance required Refer to Chapter 88.70 of the Development Code for Definitions               uses permitted on a second or upper floor.               permitted on a second or upper floor. 1             Only Medical Services ‐ Doctor Office use 2             Only Office‐Processing and Office‐Professional      MUP      Minor Use Permit required UP          Use Permit required S             Permit requirement set by Specific Use Regulations Note: A combination of any of the permitted uses may be provided within a horizontal or vertical mixed-use project provided the Ground Floor Use Standard (provided below) and Mixed-Use Standards provided on Page 2-7 are adhered to. PROHIBITED USES LAND USE REGULATION LAND USE REGULATION RECREATION, EDUCATION, AND PUBLIC ASSEMBLY SERVICES ‐ BUSINESS, FINANCIAL, AND PROFESSIONAL Museum P ATM P Park, Playground P Banks, Financial Services P Studio‐Art, Dance, Martial Arts, Music, Etc.P Business Support Service P RESIDENTIAL Medical Office/Service P1 Caretaker/Manager Unit P Office P2 Courtyard Housing P SERVICES ‐ GENERAL Duplex/Triplex/Fourplex P Day Care Center ‐ Child or Adult MUP Home Occupation P Lodging ‐ Bed & Breakfast Inn (B&B)P Live/Work Unit MUP Personal Services P Mixed‐Use P Organizational House MUP Residential Accessory Use or Structure P Residential Care (six or fewer clients)P Senior Citizen Apartment P Single‐Family Dwelling P Multifamily P RETAIL SALES Neighborhood Market P Restaurant, Café, Coffee Shop P Specialty Market P ALLOWABLE USES: Transition District TRANSITION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-67 May 2017 COVERAGE Lot Coverage A. 80% maximum. COVERAGE Landscaping Coverage A. 20% maximum. Landscaping Standards A. Refer to Chapter 88.34 - Landscaping Standards of the Development Code for specific requirements. STANDARDS INTERPRETATION Lot Coverage Landscaping Coverage 2.7.3 Development Standards The following development standards are specific to the Transition District. These standards have been tailored to reflect the desired character and implement the vision of the Transition District. They provide the framework for the creation of a safe, vibrant, and pedestrian-friendly environment that maintains the residential orientation of the District. In addition to the development standards located on the following pages, projects will be evaluated on their adherence to standards provided in Section 2.2.4, Section 3, and the design guidelines and strategies located in Sections 1.7, 2.5.2, and 2.7.4. A. SITE PLANNING Site planning and design is key to quality development. The following standards promote orienting buildings toward the street to promote an active street environment and regulations that minimize pedestrian and vehicular conflicts. 80% Lot Coverage 20% Landscape Coverage LAND USE AND URBAN FORM TRANSITION DISTRICT2 2-68 City of Azusa | TOD Specific Plan May 2017 SERVICE AND DELIVERY AREAS Loading and Service Areas A. Loading docks and service bays shall be located a minimum of 15’ from any public street. B. Trash and recycling enclosures shall not be located adjacent to a public street. STANDARDS INTERPRETATION Service and Delivery Areas Service Loading 15’ min.Parking Public Stre e t 7’-6” min.7’-6” min.7’-6” min.Public Street Line of SightVEHICULAR LINE OF SIGHT Clear Zones A. The clear zone shall consist of an isosceles right triangle with 7’6” sides on the driveway and street. B. The clear zone shall not be occupied by a ground floor building footprint, site features, or landscaping that is taller than 3’. Residential Open Space 40 sf/unit min. of Common Open Space 200 sf/unit min. of Private Open Space RESIDENTIAL OPEN SPACE Residential Private Open Space A. Private open space shall be provided at 200 sf per unit minimum and a minimum dimension of 10’x10’. Residential Common Open Space A. Common open space shall be provided at a minimum of 40 sf per unit with a minimum of 10’ in any direction. B. Common open space shall be purposefully designed as active or passive recreational facilities. C. Rooftop open space may satisfy this requirement, provided it is available for use by all residents. TRANSITION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-69 May 2017 10’ m i n BUILDING SETBACKS Street A. 10’ minimum to building. Porches may encroach 5’ into the required street setback. B. 10’ minimum landscape setback where surface parking areas are located adjacent to a public street. Side A. 5’ minimum. Rear A. 10’ minimum. STANDARDS INTERPRETATION Building Setbacks Parking Setbacks Public StreetParki n g B. BUILDING PLACEMENT AND ORIENTATION Building placement refers to the physical siting of a structure on a parcel with considerations being given to building orientation, setbacks, and parking. The following standards promote building placement that creates an active public realm, creates a strong continuity of frontages, and contributes to greater utilization of parcels within the Transition District. 10’ m i n .5’ min.10 ’ m i n .Public StreetBUILDING LOCATION Placement A. Parcels fronting a public street shall orient buildings toward the street. Building Placement Public Street LAND USE AND URBAN FORM TRANSITION DISTRICT2 2-70 City of Azusa | TOD Specific Plan May 2017 BUILDING ARTICULATION Plate Height A. Ground floor plate height shall be a minimum of 14’. STANDARDS INTERPRETATION Primary Entrances Public Str e et Building En t r a n c e s BUILDING ENTRANCES Primary Entrances A. Buildings shall have a primary entrance door facing the public street. Entrances at building corners may be used to satisfy this requirement. BUILDING HEIGHT Maximum Height A. 35’ maximum. Building Height C. BUILDING FORM AND MASSING Building form refers to the shape, configuration, and relationship of a building to its environment. A number of details must be considered when designing a building’s form including building height, plate height, configuration, roof form, facades, articulation, entrances, and window glazing. Building forms should encourage a pedestrian- friendly environment by including amenities, facade articulation, and street level building openings. STANDARDS INTERPRETATION 35’ maxBuilding Plate Height 14’ min.Floor StructureT.O.P. TRANSITION DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-71 May 2017 STANDARDS INTERPRETATION Window Glazing Public Stre e t WINDOW GLAZING Solid-to-Void Ratio A. Transparent or translucent glazing is required on the first floor facade of a commercial or retail use facing a public street. B. Opaque, reflective, or dark tinted glass is not permitted. C. Window stickers or exterior window treatments that obstruct interior building views at the street level are prohibited. D. The bottom of any window or product display window shall not be more than three and one- half feet above the adjacent sidewalk. E. Product display windows shall have a minimum height of four feet and be internally lit. SPECIALTY MARKET/FOOD HALL OVERLAY INCENTIVES A. Lot Coverage: 100% maximum B. Landscape Coverage: 0% C. 0’ minimum setback on all sides. D. Parking Ratio: 1 space/1,000 sf E. Loading and unloading is not permitted off of 9th Street. F. Historic architectural character shall be maintained. SPECIALTY MARKET/FOOD HALL OVERLAY INCENTIVES LAND USE AND URBAN FORM TRANSITION DISTRICT2 2-72 City of Azusa | TOD Specific Plan May 2017 2.7.4 Transition District Design Guidelines 1. Architectural character of a building should build upon and maintain the traditional neighborhood character with an emphasis on historic architectural styles, building type, materials and details. 2. 360-Degree architecture is the concept of designing a building where all sides of the building have been detailed to complement the primary street elevation in architecture, massing, and materials. Buildings should be aesthetically pleasing from all angles. 3. Continuity among buildings contributes to neighborhood identity. The intent of the Transition District is to provide a physical and visual buffer between more intense districts and established single-family development. As the area develops, buildings within this District should complement the form, scale, and proportion (relationship of height and width) of adjacent buildings within the District and should acknowledge the historic character of the neighborhood. 4. Conversions of residential structures to commercial use shall retain the residential character of the existing building and existing architectural moldings, ornamentation, and other interesting detailing should be retained and repaired or replaced to match the original detail. 5. The main entrance to a building or residential unit should be clearly identifiable and unique. These elements should be integrated into the building design to avoid the look of “tacked on” architectural features. One or more of the following methods should be incorporated in the entrance design: Ê A change in wall plane Ê Wall articulation around the door and projecting beyond the door Ê Placement of decorative detailing at the entry Ê A projecting element above the entrance Ê A change in material or detailing Ê Implementation of architectural elements such as flanked columns or decorative fixtures Ê Recessed doors, archways, or cased openings Ê A portico or formal porch projecting from or set into the surface Ê Changes in the roof line 6. Locate windows and entrances adjacent to street and public spaces to improve public safety and security and provide “eyes on the street”. 7. Porches, stoops, and balconies are encouraged to complement and enhance overall building design. 8. Covered porches or patios at the first floor level oriented toward the front and/or side yard should be a minimum of 6’ in depth, and shapes, sizes, and setbacks should vary from house to house. 9. Siding should wrap around the outside corners of the building to the fence line at a minimum. The use of siding on the entire building is recommended. 10. Fencing and wall materials should be compatible with the building and should be used to reinforce the architectural theme of the building. CIVIC DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-73 May 2017 2.8.1 District Character The Civic District will remain the focal point of community involvement and identity in Azusa through the historic buildings, public facilities, and memorials that provide special functional and symbolic importance. Limited changes to the Azusa Development Code will ensure that any new development remains both physically 2.8 CIVIC DISTRICT City of Azusa City Hall. and visually complementary to the existing City Hall, library, senior center, police station, and other public buildings. Veteran’s Freedom Park and other open spaces within the Civic District will provide opportunities for expanding active recreation and outdoor community events. New and/or expanded memorials for community veterans will further the importance of the Veterans Freedom Park provides the platform for expanded recreational and outdoor community events. Civic buildings and public facilities represent Azusa’s history and contribute to the City’s identity. LAND USE AND URBAN FORM CIVIC DISTRICT2 2-74 City of Azusa | TOD Specific Plan May 2017 SPECIFIC PLAN GUIDING PRINCIPLES - Related to the Civic District TO-6 Establish pedestrian linkages to and from the future Azusa Downtown Gold Line Station to support a walkable station area and function as a community gateway to downtown Azusa. A. Propose extending the welcome plaza from the Azusa Downtown Gold Line Station in the Gold Line District to strengthen pedestrian linkages to the Civic District along Santa Fe Avenue and Alameda Avenue. ED-4 Provide a range of supporting benefits for the local community including a variety of housing, a more walkable environment, and community amenities. A. Emphasize improvements to existing parks and open space to enhance active recreational and outdoor community gathering spaces. B. Celebrate the history of democratic, military, and public service involvement in the community by improving and expanding upon existing memorials. S-2 Maintain and enhance structures identified as having historic value to retain and support the existing historic character of Azusa. A. Focus on maintaining existing civic, cultural, and public institutions to protect the history and identity of Azusa. HC-1 Provide district-specific development standards and design guidelines that enhance architectural quality, improve the overall identity of the Specific Plan Area, and enrich the quality of life through the built environment. A. Tailor the allowable land uses to ensure that new development remains compatible with existing civic and public facilities. B. Minimize changes to existing Development Code requirements to maintain the character and quality of the built environment within the Civic District. HC-3 Emphasize streetscape and landscaping enhancements to improve walking, bicycling, and transit use options. A. Incorporate improved landscaping, streetscape, and pedestrian amenities to facilitate inter-district connectivity and ease of access to the Azusa Downtown Gold Line Station. CP-1 Incorporate Crime Prevention through Environmental Design (CPTED) strategies that contribute to the safety and vitality of residents and visitors of Azusa. A. Encourage positive social interactions and deter potential criminal behavior through the design and development of both public and private spaces (refer to Section 1.7.6). Civic District as a symbolic focal point of Azusa. Enhancing pedestrian connections to the Azusa Downtown Gold Line Station and adjacent Gold Line District, through the incorporation of a new welcome plaza, will enrich the overall character and sense of place representing the Azusa community. 2.8.2 Land Use The Civic District is mostly comprised of existing civic, cultural, and public service buildings and facilities. These existing civic and public service uses provide the central framework for celebrating the community’s history of democratic involvement. While the identity of CIVIC DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-75 May 2017 Veterans Park Memorials honor those past and present members of the community who served their country and their community. the Civic District remains oriented toward public uses, the incorporation of complementary uses adds additional activity and vitality to the District in the future. Minimal changes are proposed to the existing Azusa Development Code relating to the Civic District in order to maintain its existing character. While almost all areas of the District are already developed, any new development may build out to 100% of lot coverage. In addition, the massing of new buildings visible from a public street are required to incorporate a minimum of 5 feet variation in the facade for every 50 feet of wall plane in order to create visual interest and continuity. The Civic District requirements place a greater emphasis on improving existing park and Public facilities provide a central gathering space for holding events to bring together members of the community. open space areas. Future incorporation of a community amphitheater within Veterans Freedom Park will provide a central community gathering place for hosting events for residents and visitors. In addition, closing portions of Alameda Avenue and Santa Fe Avenue will LAND USE AND URBAN FORM CIVIC DISTRICT2 2-76 City of Azusa | TOD Specific Plan May 2017 Figure 2-7: Civic District Æb 8th St Foothill Blvd Azusa DowntownStation Azusa Light & Water CVS Pharmacy Target PublicLibrary SeniorCenter St FrRomDalton AveAlameda AveSan Gabriel AveVeteran'sMemorialPark CityHallAzusa AveSoldano AvePasadena AveSOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Districts 0 125 25062.5 Feet μCivic District Downtown District Downtown Expansion District Transition District Corridor District Gold Line District Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 No Change Foothill Blvd Azusa AveAzusa DowntownStation APU/CitrusCollege Station SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA District Key Map 0 500 1,000250Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Gold Line District Downtown District Downtown Expansion District No ChangeRoute 66 District Transition District Civic DistrictCivic District Key Map N allow for the creation of a welcome plaza that continues into the adjacent Gold Line District and facilitates inter-district connectivity (refer to Section 3.2.6). Additional opportunities exist for integrating and facilitating connections between adjacent Specific Plan districts through the incorporation of landscaping, streetscape, and pedestrian improvements. CIVIC DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-77 May 2017 LAND USE REGULATION LAND USE REGULATION RECREATION, EDUCATION, AND PUBLIC ASSEMBLY SERVICES ‐ GENERAL Library, Museum P Day Care Center ‐ Child or Adult MUP Live Entertainment UP Public Safety Facility P Meeting Facility, Public or Private MUP TRANSPORTATION, COMMUNICATIONS, AND INFRASTRUCTURE Park, Playground P Parking Facility, Public or Commercial MUP RESIDENTIAL Public Facilities P Senior Citizen Apartment MUP Telecommunications Facility S RETAIL SALES Utility Facilty P Farmers Markets MUP General Retail P Restaurant, Café, Coffee Shop P SERVICES ‐ BUSINESS, FINANCIAL, AND PROFESSIONAL ATM P Banks, Financial Services MUP Business Support Service P Office MUP1 ALLOWABLE USES: Civic District Table 2-6: Civic District Allowable Uses Uses not Identified within the Allowable Use Table are not permitted within the Civic District. P             Permitted Use, Zoning Clearance required Refer to Chapter 88.70 of the Development Code for Definitions               uses permitted on a second or upper floor.               permitted on a second or upper floor. 1             Only Medical Services ‐ Doctor Office use 2             Only Office‐Processing and Office‐Professional      MUP      Minor Use Permit required UP          Use Permit required S             Permit requirement set by Specific Use Regulations PROHIBITED USES LAND USE AND URBAN FORM CIVIC DISTRICT2 2-78 City of Azusa | TOD Specific Plan May 2017 COVERAGE Lot Coverage A. 100% maximum. Landscaping Standards A. Refer to Chapter 88.34 - Landscaping Standards of the Development Code for specific requirements. STANDARDS STANDARDS INTERPRETATION INTERPRETATION Lot Coverage 100% Lot Coverage 2.8.3 Development Standards The following development standards are specific to the Civic District. These standards have been tailored to reflect the desired character and implement the vision of the Civic District. For development standards not included within this section, refer to the City of Azusa Development Code for additional requirements. In addition to the development standards located on the following pages, projects will be evaluated on their adherence to standards provided in Section 2.2.4, Section 3, and the design guidelines and strategies located in Sections 1.7, and 2.5.2. A. SITE PLANNING Site planning and design is key to quality development. The following standards promote orienting buildings toward the street to promote an active street environment and regulations that minimize pedestrian and vehicular conflicts. B. BUILDING PLACEMENT AND ORIENTATION Building placement refers to the physical siting of a structure on a parcel with considerations being given to building orientation, setbacks, and parking. The following standards promote building placement that creates an active public realm, creates a strong continuity of frontages, and contributes to greater utilization of parcels within the Civic District. BUILDING LOCATION PlacementA. Parcels fronting a public street shall orient buildings toward the street. Building Orientation Public Street CIVIC DISTRICT LAND USE AND URBAN FORM 2 City of Azusa | TOD Specific Plan 2-79 May 2017 Primary Entrances Public Str e et Building En t r a n c e s C. BUILDING FORM AND MASSING Building form refers to the shape, configuration, and relationship of a building to its environment. A number of details must be considered when designing a building’s form including building height, plate height, configuration, roof form, facades, articulation, entrances, and window glazing. Building forms should reflect the architectural character of the existing buildings within the Civic District. STANDARDS INTERPRETATION BUILDING MASSING Maximum Wall PlaneA. No building façade visible from a public street shall extend more than 50’ in length without a 5’ minimum variation in the wall plane. Roof FormsA. Gable, shed, and hip tile roof forms shall be integrated into buildings within this district. 45% min. for retail 30% min. for office Window Glazing Public Street WINDOW GLAZING Solid-to-Void Ratio A. 45% minimum transparent glazing of first floor facade for retail uses adjacent to a public street. B. 30% minimum transparent glazing of first floor facade for office uses adjacent to a public street. C. Transparent or translucent glazing is required on the first floor facade of a commercial or retail use facing a public street. D. Opaque, reflective, or dark tinted glass is not permitted. E. Window stickers or exterior window treatments that obstruct interior building views at the street level are prohibited. 50’ ma x . 5’ min. Maximum Wall Plane Public Street F. The bottom of any window or product display window shall not be more than three and one-half feet above the adjacent sidewalk. G. Product display windows shall have a minimum height of four feet and be internally lit. STANDARDS INTERPRETATION BUILDING ENTRANCES Primary Entrances A. Buildings shall have a primary entrance door facing Alameda Avenue and Dalton Avenue. Entrances at building corners may be used to satisfy this requirement. LAND USE AND URBAN FORM2 2-80 City of Azusa | TOD Specific Plan May 2017 THIS PAGE LEFT BLANK SECTION 3 MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 Direction for Public Realm Improvements MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 SECTION 3 CONTENTS 3.1 INTRODUCTION ........................................................3-1 3.2 PEDESTRIAN ACCESS AND IMPROVEMENTS ...........3-4 3.2.1 Sidewalks and Landscaping ....................................3-4 3.2.2 Paseos .........................................................................3-5 3.2.3 Crossings .....................................................................3-6 3.2.4 Plazas and Public Spaces ........................................3-8 3.3 CIRCULATION AND STREET IMPROVEMENTS ........3-10 3.3.1 Azusa Avenue ..........................................................3-11 3.3.2 San Gabriel Avenue ................................................3-14 3.3.3 Alameda Avenue ....................................................3-17 3.3.4 9th Street ..................................................................3-20 3.3.5 Foothill Boulevard ....................................................3-23 3.4 BICYCLE ACCESS AND IMPROVEMENTS ..............3-27 3.5 PUBLIC/PRIVATE TRANSIT .......................................3-30 3.6 STREETSCAPE FURNISHINGS ..................................3-32 3.6.1 Specific Plan Area Improvements .........................3-32 3.6.2 Downtown Streetscape Improvements ................3-33 3.6.3 Route 66 Streetscape Improvements ....................3-35 3.6.4 APU/Citrus Avenue Station and College Connection Streetscape Improvements ..............3-37 3.7 GATEWAYS AND SIGNAGE ...................................3-39SUBSECTIONS MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-1 Streetscape and Beautification Map ...............................3-2 3-2 Paseo Opportunity between San Gabriel Avenue and Azusa Avenue ......................................................................3-5 3-3 Example of Signalized Intersection Improvements at San Gabriel Avenue and Foothill Boulevard ....................3-7 3-4 Example of Unsignalized Intersection Improvements at Dalton Avenue and Foothill Boulevard ............................3-7 3-5 Plaza and Public Space Opportunities .............................3-9 3-6 Circulation Map.................................................................3-10 3-7 Azusa Avenue Cross Sections ..........................................3-12 3-8 San Gabriel Avenue Cross Sections ................................3-15 3-9 Temporary Street Closure Opportunities ........................3-18 3-10 Alameda Avenue Cross Sections ..................................3-18 3-11 9th Street Cross Sections .................................................3-21 3-12 Foothill Boulevard Cross Sections ...................................3-24 3-13 Bicycle Map .....................................................................3-28 3-14 Public Transit Map ...........................................................3-31 3-1 Azusa Avenue Tree Palette ..............................................3-13 3-2 San Gabriel Avenue Tree Palette ....................................3-16 3-3 Alameda Avenue Tree Palette ........................................3-19 3-4 9th Street Tree Palette.......................................................3-22 3-5 Foothill Boulevard Tree Palette ........................................3-25FIGURESTABLES MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-1 May 2017 owners, and residents with the needs of motorists to move safely and efficiently along the area’s roadways. The volume and speed of traffic, wide streets, and expansive parking lots can discourage pedestrian activity. Traffic information and recommendations contained in this section rely in large part on the traffic impact analysis for the Specific Plan prepared by Fehr and Peers. In addition to the completed traffic impact analysis, the City of Azusa in coordination with Caltrans, will also evaluate individual project applications based on the policies listed below. • The City of Azusa will ensure that future development applicants who expect to meet the project applicability thresholds listed in Section 6.4, Page 6-4, will consult with Caltrans during the scoping of the required Transportation Impact Study (TIS). • The City of Azusa will ensure that TIS analysis methods for state facilities apply the latest version of Caltrans guidance for a Traffic Impact Study (TIS) or equivalent state of the practice methods and guidance (e.g. HCM 2010, California Highway Design Manual, CAMUTCD). As part of the Gold Line Phase II light rail extension, the City will be home to two new stations: the Azusa Downtown Station and the APU/Citrus Avenue Station. These stations serve as a natural foundation for Transit- Oriented Development to occur within a 1/4- mile of the stations. This section of the Specific Plan discusses the role of mobility to support the vision and goals for the planning area (Section 1.7). It presents recommendations and guidelines for the main thoroughfares in the Specific Plan Area (Azusa Avenue, San Gabriel Avenue, Foothill Boulevard and their cross streets), including traffic calming, bicycle facilities, pedestrian transit, and parking improvements. Streetscape beautification within the Specific Plan Area is one of the primary goals of the Specific Plan. Existing streetscape conditions include gaps in the sidewalk network, a lack of human-scale along some street frontages, and wide expanse of asphalt dominated by automobile through traffic. This section includes recommendations and guidelines for improving the streetscape to create a more pedestrian-oriented environment by reducing the dominance of the roadway and bringing about a distinct identity around the transit stations, within the Downtown and along the Foothill Boulevard/Alosta Avenue corridor. The existing automobile-dominated street pattern developed in the past presents a number of challenges when trying to create a pedestrian-friendly environment. A major challenge to improving the Specific Plan Area will be to strike a balance between the needs of pedestrians, shoppers, employees, business 3.1 INTRODUCTION Metro Rail in South Pasadena. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-2 City of Azusa | TOD Specific Plan May 2017 ÉÖyawliaR FSNB & enildloG 8th St AT & S F R ai lway Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveOrange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege SlausonMiddleSchool Veteran'sFreedomPark Azusa DowntownStation THE PROMENADEAzusa VeteraFoothill Vista Mobile Home Park CityHall Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing PublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´Alameda AveDalton AveSlausonPark LeeElementary AtlantisGardens PackingHouse STREETSCAPE BEAUTIFICATION STREETSCAPE BEAUTIFICATION 9th St Azusa PacificUniversity DaltonElementary RosedaleSpecific Plan Area Potential Trail Opportunity ToCanyonFromCanyon &&&&St Francisof Rome School STREETSCAPE BEAUTIFICATION EMEHT 66 ETUOR ÅB ÅBEMEHT 66 ETUOR ÅB ÅBãããã^) 9th St Crescent D rMcKeever Ave9th St SLOWSLOWAPU/CitrusCollege Station AREAOF NOCHANGE AREA OFNO CHANGE AREA OFNO CHANGE AREA OFNO CHANGE AREA OFNO CHANGE H M E E T 6 6 E T U O R ÅB ÅBÆb Æb Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific PlanCITY OF AZUSA Streetscape Beautification Opportunites 0 500 1,000250Feet µGateway ÉÖFuture Traffic Control Transit Site Specific Plan Boundary City Boundary Date: 6/18/2015Downtown Streetscape Beautification Route 66 Streetscape Beautification Citrus Station Streetscape BeautificationParcel Boundary Æb Route 66 Intersection Improvements^) Signalized Intersection Improvements Unsignalized Intersection Improvements TTIOOOOBBÅÅÅÅF TETETTSSS PPEPE ÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉUO 6666 CCAA OOONNOONN CICCAAEAAAACCAAAA BBBE BBÅÅÅÅÅBÅÅ BÅÅÅÅÅÅÅFigure 3-1: Streetscape and Beautification Map MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-3 May 2017ÉÖyawliaR FSNB & enildloG 8th St AT & S F R ailwayAlameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveOrange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege SlausonMiddleSchool Veteran'sFreedomPark Azusa DowntownStation THE PROMENADEAzusa VeteraFoothill Vista Mobile Home Park CityHall Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing PublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´Alameda AveDalton AveSlausonPark LeeElementary AtlantisGardens PackingHouse STREETSCAPE BEAUTIFICATION STREETSCAPE BEAUTIFICATION 9th St Azusa PacificUniversity DaltonElementary RosedaleSpecific Plan Area Potential Trail Opportunity ToCanyonFromCanyon &&&&St Francisof Rome School STREETSCAPE BEAUTIFICATIONEMEHT 66 ETUOR ÅB ÅBEMEHT 66 ETUORÅB ÅBãããã^) 9th St Crescent D rMcKeever Ave9th St SLOWSLOWAPU/CitrusCollege Station AREAOF NOCHANGE AREA OFNO CHANGE AREA OFNO CHANGE AREA OFNO CHANGE AREA OFNO CHANGE H ME ET 66 ETUOR ÅB ÅBÆb Æb Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific PlanCITY OF AZUSA Streetscape Beautification Opportunites 0 500 1,000250Feet µGateway ÉÖFuture Traffic Control TransitSite Specific Plan Boundary City Boundary Date: 6/18/2015Downtown Streetscape Beautification Route 66 Streetscape Beautification Citrus Station Streetscape BeautificationParcel Boundary ÆbRoute 66Intersection Improvements^) Signalized Intersection Improvements Unsignalized Intersection Improvements TTIOOOOBBÅÅÅÅF TETETTSSSPPEPE ÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉUO6666 CCAAOOONNOONN CICCAAEAAAACCAAAABBBE BBÅÅÅÅÅBÅÅ BÅÅÅÅÅÅÅÉÖyawliaR FSNB & enildloG 8th St AT & S F R ai lway Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveOrange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege SlausonMiddleSchool Veteran'sFreedomPark Azusa DowntownStation THE PROMENADEAzusa VeteraFoothill Vista Mobile Home Park CityHall Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing PublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´Alameda AveDalton AveSlausonPark LeeElementary AtlantisGardens PackingHouse STREETSCAPE BEAUTIFICATION STREETSCAPE BEAUTIFICATION 9th St Azusa PacificUniversity DaltonElementary RosedaleSpecific Plan Area Potential Trail Opportunity ToCanyonFromCanyon &&&&St Francisof Rome School STREETSCAPE BEAUTIFICATION EMEHT 66 ETUOR ÅB ÅBEMEHT 66 ETUOR ÅB ÅBãããã^) 9th St Crescent D rMcKeever Ave9th St SLOWSLOWAPU/CitrusCollege Station AREAOF NOCHANGE AREA OFNO CHANGE AREA OFNO CHANGE AREA OFNO CHANGE AREA OFNO CHANGE H M E E T 6 6 E T U O R ÅB ÅBÆb Æb Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific PlanCITY OF AZUSA Streetscape Beautification Opportunites 0 500 1,000250Feet µGateway ÉÖFuture Traffic Control Transit Site Specific Plan Boundary City Boundary Date: 6/18/2015Downtown Streetscape Beautification Route 66 Streetscape Beautification Citrus Station Streetscape BeautificationParcel Boundary Æb Route 66 Intersection Improvements^) Signalized Intersection Improvements Unsignalized Intersection Improvements TTIOOOOBBÅÅÅÅF TETETTSSS PPEPE ÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉUO 6666 CCAA OOONNOONN CICCAAEAAAACCAAAA BBBE BBÅÅÅÅÅBÅÅ BÅÅÅÅÅÅÅÉÖyawliaR FSNB & enildloG 8th St AT & S F R ailwayAlameda AveDalton AveSoldano AvePasadena Ave10th St Foothill BlvdFoothill BlvdAzusa AveSan Gabriel Ave10th StAngeleno AveSunset AveOrange AveEnid AveOrange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege SlausonMiddleSchool Veteran'sFreedomPark Azusa DowntownStation THE PROMENADEAzusa VeteraFoothill Vista Mobile Home Park CityHall Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing PublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´Alameda AveDalton AveSlausonPark LeeElementary AtlantisGardens PackingHouse STREETSCAPE BEAUTIFICATION STREETSCAPE BEAUTIFICATION 9th St Azusa PacificUniversity DaltonElementary RosedaleSpecific Plan Area Potential Trail Opportunity ToCanyonFromCanyon&&&&St Francisof Rome School STREETSCAPE BEAUTIFICATIONEMEHT 66 ETUORÅB ÅBEMEHT 66 ETUORÅB ÅBãããã^) 9th St Crescent D rMcKeever Ave9th St SLOWSLOWAPU/CitrusCollege Station AREAOF NOCHANGE AREA OFNO CHANGE AREA OFNO CHANGE AREA OFNO CHANGE AREA OFNO CHANGE H ME ET 66 ETUOR ÅB ÅBÆb Æb Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific PlanCITY OF AZUSA Streetscape BeautificationOpportunites 0 500 1,000250Feet µGateway ÉÖFuture Traffic Control TransitSite Specific Plan Boundary City Boundary Date: 6/18/2015Downtown Streetscape Beautification Route 66 Streetscape Beautification Citrus Station Streetscape BeautificationParcel Boundary ÆbRoute 66Intersection Improvements^) Signalized Intersection Improvements Unsignalized Intersection Improvements TTIOOOOBBÅÅÅÅF TETETTSSSPPEPE ÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉUO6666 CCAAOOONNOONN CICCAAEAAAACCAAAABBBEBBÅÅÅÅÅBÅÅ BÅÅÅÅÅÅÅ MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-4 City of Azusa | TOD Specific Plan May 2017 3.2 PEDESTRIAN ACCESS AND IMPROVEMENTS Enhancing the pedestrian experience is one of the primary goals of this Specific Plan. Street trees, landscaping, consistent street furnishings, parking access from side streets and paseos, and safe street crossings all contribute to an appealing street scene and pedestrian-friendly environment. Development within the Specific Plan should conform to the following guidelines and recommendations. 3.2.1 Sidewalks and Landscaping Pedestrian facilities are provided throughout the Specific Plan Area with sidewalks present on local streets. Sidewalks are generally comfortable for pedestrian circulation along Azusa Avenue with landscaping, seating, adequate clear sidewalk area, ADA compliant curb ramps, and active ground floor uses, but additional improvements are necessary on surrounding streets. The maintenance of existing sidewalks should be addressed throughout the Specific Plan Area. Hazardous irregularities in the paving need to be repaired and maintained to City standards. As new development occurs, sidewalk installation and improvements will be included in areas where gaps and deficiencies exist. Well maintained and unobstructed sidewalks provide a safe and enjoyable pedestrian experience. Landscape planters provide space for shade trees and plants to soften the street. SIDEWALK AND LANDSCAPING GUIDELINES A. Sidewalk areas should be enhanced through the incorporation of planter pots, plaza landscaping, and building setback landscaping. B. Containers and/or box planters may be used to enhance sidewalks, plazas, and courtyards. C. Parking lots should be screened with a landscaped wall or a landscaped buffer. D. Entries should be well signed and be shared with adjacent businesses where possible. E. In addition to a landscaped buffer or parkway, a consistent treatment of trees planted in tree grates or parkways should be incorporated to unify the streetscape and beautify the area (refer to specific street tree recommendations located within this Section for Azusa Avenue, San Gabriel Avenue, Alameda Avenue, 9th Street, and Foothill Boulevard). F. Maintain a minimum four foot sidewalk clearance and minimize the encroachment of public right-of-way infrastructure (e.g. light poles, signs) through site specific designs within this pedestrian zone. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-5 May 2017 PASEO GUIDELINES Existing paseo along Azusa Avenue within Downtown. Landscaped paseos provide visual intrigue between buildings. 3.2.2 Paseos Paseos provide an opportunity for improved pedestrian circulation within the Specific Plan Area while at the same time enhancing community character and creating distinctive urban spaces. Development within the Specific Plan should conform to the following guidelines and recommendations. A. Paseos should be incorporated into the design of large consolidated lots to enhance connectivity between alleys and primary streets. B. Paseos should be enhanced with landscaping, special paving treatment, signage, gateway treatment, lighting, and public art. A. A pedestrian walkway connecting San Gabriel Avenue to east of Azusa Avenue should be incorporated through the parking lot between CVS and Azusa Light and Water (see Figure 3-2). Æb Æb ÉÖGoldline & BNSF Railway 8th Ave AT & SF Ra ilw ay Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveOrange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege SlausonMiddleSchool Veteran'sFreedomPark Azusa DowntownStation APU/CitrusCollege Station THE PROMENADEAzusa VeteraFoothill Vista Mobile Home Park CityHall Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing A3A2 37 36 DALTONPublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´Alameda AveDalton AveSlausonPark LeeElementary AtlantisGardens PackingHouse STREETSCAPE BEAUTIFICATIONSTREETSCAPE BEAUTIFICATION9th St Azusa PacificUniversity DaltonElementary RosedaleSpecific Plan Area Potential Trail Opportunity ToCanyonFromCanyon &&&&St Francisof Rome School STREETSCAPE BEAUTIFICATION PotentialConnection &&&&kjPlannedParkingStructure kj StationParking ROUTE 66 THEME ÅB ÅBROUTE 66 THEME ÅB ÅBããElevated Access ããããHistoricDepot ] ^) 9th St Crescent DrMcKeever Ave9th St SLOWSLOW) ) HistoricResource HistoricResource Paseo Opportunity Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan TOD Opportunity Sites (City-owned property) CITY OF AZUSA # Opportunities 0 490 980245Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Image from Azusa Metrolink PF - Choate Parking Consultants, Inc. (CPC) 02.22.13 Rosedale Specific Plan Area Route 66 Historic Monument/Intersection Improvements^) Potential Ampitheater]Streetscape Beautification Opportunity Site Within 1/4 Mile of Rail Station Gateway ÉÖFuture Traffic Control Transit SiteÆb TOD Opportunity Sites Parcel Boundary Specific Plan Boundary City Boundary 0.25 Mile Radius From Station Date: 6/18/2015 Potential Plazas) University/School Areas University/School Areas Outside Specific Plan Historic Resources Potential Plaza Potential Paseo Figure 3-2: Paseo opportunity between San Gabriel Avenue and Azusa Avenue. PASEO IMPROVEMENT RECOMMENDATION MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-6 City of Azusa | TOD Specific Plan May 2017 3.2.3 Crossings A change in roadway materials provides a psychological clue to distinguish the pedestrian realm from the automotive realm. Accent paving contributes to the overall appeal of an intersection and should be located at corners on sidewalks and in crosswalks of major intersections. Development within the Specific Plan should conform to the following guidelines and recommendations. A. Crosswalks at all intersections should have consistent paving treatments to improve the visual appeal of the street, help designate distinct activity centers, and separate pedestrians from vehicles. B. The texture and tolerances of accent paving should consider universal design standards to accommodate the elderly, bicyclists, children in strollers and people with disabilities. Paving materials, for example, should not have deep grooves between pavers that may cause discomfort for someone with a fragile spine or poor mobility. C. Curb bulbouts should be installed to improve the horizontal clearance within the sidewalk zone and allow for streetscape amenities and a landscaped parkway with street trees. Reducing the curb-to-curb width of the roadway will also reduce the travel distance for pedestrians that are crossing at intersections. Existing crosswalk with paving treatment across from the future Azusa Downtown Gold Line Station on Azusa Avenue. CROSSING GUIDELINES A. Selected uncontrolled crossings or mid- block crossings along multi-lane roadways should be considered for enhancement based on the existing roadway volumes, speed limit, number of travel lanes to be crossed, and the presence of a median or other enhancement such as pedestrian actuated crossing beacons. B. Additional locations of signalized and unsignalized intersection improvements throughout the Specific Plan Area can be found in Figure 3-13. The following enhancements should be incorporated at selected signalized and unsignalized crosswalks as indicated in Figure 3-3 and Figure 3-4. CROSSING IMPROVEMENT RECOMMENDATIONS MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-7 May 2017 Figure 3-4: Example of Unsignalized Intersection Improvements at Dalton Avenue and Foothill Boulevard (refer to Figure 3-1).\\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIPrototypical Unsignalized Intersection Recommendations Foothill & Dalton Figure X Foothill BlvdDalton Ave1 3 2 5 4 1 2 3 4 5 Stripe crosswalks with high visibility pattern Curb extensions Yield to pedestrians signage Yield limit lines Rectangular Rapid Flashing Beacons\\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIPrototypical Unsignalized Intersection Recommendations Foothill & Dalton Figure X Foothill BlvdDalton Ave1 3 2 5 4 1 2 3 4 5 Stripe crosswalks with high visibility pattern Curb extensions Yield to pedestrians signage Yield limit lines Rectangular Rapid Flashing Beacons C. North-south marked crossings across Foothill Boulevard (at Angeleno Avenue, Dalton Avenue, and Soldano Avenue) should be enhanced with the following criteria (refer to Figure 3-3, Figure 3-4, and Figure 3-1 Streetscape Beautification Map: • Enhance median to provide pedestrian refuge area four- to six-feet-wide, or • Install curb extensions to shorten crossings and improve visibility, in conjunction with the provision of a pedestrian crossing beacon. • Consider converting to a high-visibility crosswalk pattern based on pedestrian activity in downtown and to reflect the crossing is uncontrolled. • Install advanced limit lines indicating where motorists should stop when a pedestrian is crossing the street. • Maintain or update crossings to include the most recent Manual on Uniform Traffic Control Devices (MUTCD) pedestrian crossing signage standards. D. If Azusa Avenue is converted to a two-way street, additional enhancements should be included to address the change in roadway conditions.\\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIPrototypical Signalized Intersection Recommendations Foothill & San Gabriel Figure X Foothill Blvd San Gabriel Ave5 1 3 2 4 1 2 3 4 5 Stripe crosswalks with parallel lines Curb extensions with directional curb ramps and landscaping Medians, where possible Protected left-turn phasing, where possible Stop bars Figure 3-3: Example of Signalized Intersection Improvements at San Gabriel Avenue and Foothill Boulevard (refer to Figure 3-1).\\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIPrototypical Signalized Intersection Recommendations Foothill & San Gabriel Figure X Foothill Blvd San Gabriel Ave5 1 3 2 4 1 2 3 4 5 Stripe crosswalks with parallel lines Curb extensions with directional curb ramps and landscaping Medians, where possible Protected left-turn phasing, where possible Stop bars CROSSING IMPROVEMENT RECOMMENDATIONS MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-8 City of Azusa | TOD Specific Plan May 2017 3.2.4 Plazas and Public Spaces Plazas and public spaces help enliven the pedestrian environment by creating places for community events, personal interaction, and outdoor recreation. The Specific Plan Area presents a number of opportunities for the incorporation of new plazas and public spaces for the benefit and enjoyment of residents and visitors of Azusa. The existing Veterans Freedom Park, located north of City Hall, provides the foundation for expanding public spaces adjacent to Downtown and the Azusa Downtown Station. Closing or limiting vehicular traffic along Alameda Avenue could be utilized for pedestrian-oriented interventions. Alternatively, this portion of Alameda Avenue could be temporarily closed for community events, festivals, farmer’s markets, or parades with removable bollards placed at Foothill Boulevard to close off the street during events. Amphitheater’s create focal points for community gatherings.Temporary closure of Alameda Avenue can allow community events like Winter Family Fiesta to grow and occur adjacent to Downtown. Foothill Boulevard and Azusa Avenue represent a major intersection of activity within the Specific Plan Area. This intersection provides an opportunity for creating a plaza and/or public space that anchors and accentuates the Downtown pedestrian environment. With the extension of the Gold Line to Azusa, it is expected that the number of people frequenting Downtown will increase. Introducing a Welcome Plaza adjacent to the Azusa Downtown Station will encourage visitors to explore Downtown and patronize local businesses. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-9 May 2017 The prominence of the Foothill Boulevard and Azusa Avenue intersection provides an opportunity to create a public plaza. A. A portion of Alameda Avenue north of Foothill Boulevard and east of Santa Fe Avenue should be temporarily closed on an ongoing basis to create a linear plaza connecting Veteran’s Memorial Park and the City Library with the Azusa Downtown Station (see Figure 3-5). B. Incorporate an amphitheater into the design of Veterans Freedom Park (see Figure 3-5). C. Provide a future plaza/public space for the Downtown area at the southeast corner of Foothill Boulevard and Azusa Avenue (see Figure 3-5). D. Create a Welcome Plaza adjacent to the Azusa Downtown Station along Santa Fe Avenue (see Figure 3-5). PLAZA IMPROVEMENT RECOMMENDATIONS Figure 3-5: Plaza and Public Space Opportunities Æb Æb ÉÖGoldline & BNSF Railway 8th Ave AT & SF Railway Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveOrange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege SlausonMiddleSchool Veteran'sFreedomPark Azusa DowntownStation APU/CitrusCollege Station THE PROMENADEAzusa VeteraFoothill Vista Mobile Home Park CityHall Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing A3A2 37 36 DALTONPublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´Alameda AveDalton AveSlausonPark LeeElementary AtlantisGardens PackingHouse STREETSCAPE BEAUTIFICATIONSTREETSCAPE BEAUTIFICATION9th St Azusa PacificUniversity DaltonElementary RosedaleSpecific Plan Area Potential Trail Opportunity ToCanyonFromCanyon &&&&St Francisof Rome School STREETSCAPE BEAUTIFICATION PotentialConnection &&&&kjPlannedParkingStructure kj StationParking ROUTE 66 THEME ÅB ÅBROUTE 66 THEME ÅB ÅBããElevated Access ããããHistoricDepot ] ^) 9th St Crescent DrMcKeever Ave9th St SLOWSLOW) ) HistoricResource HistoricResource Paseo Opportunity Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan TOD Opportunity Sites (City-owned property) CITY OF AZUSA # Opportunities 0 490 980245Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Image from Azusa Metrolink PF - Choate Parking Consultants, Inc. (CPC) 02.22.13 Rosedale Specific Plan Area Route 66 Historic Monument/Intersection Improvements^) Potential Ampitheater]Streetscape Beautification Opportunity Site Within 1/4 Mile of Rail Station Gateway ÉÖFuture Traffic Control Transit SiteÆb TOD Opportunity Sites Parcel Boundary Specific Plan Boundary City Boundary 0.25 Mile Radius From Station Date: 6/18/2015 Potential Plazas) University/School Areas University/School Areas Outside Specific Plan Historic Resources Potential Plaza Potential Paseo C B A D MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-10 City of Azusa | TOD Specific Plan May 2017 3.3 CIRCULATION AND STREET IMPROVEMENTS Azusa Avenue at Interstate 210. Major streets serving the Specific Plan Area include Foothill Boulevard and 9th Street in the east-west direction, and Azusa Avenue, San Gabriel Avenue, and Alameda Avenue in the north-south direction. Azusa Avenue and San Gabriel Avenue currently operate as a one-way couplet, Azusa Avenue to the north and San Gabriel Avenue to the south. Interstate 210 (I-210) lies about 0.9 miles to the south and west of the Specific Plan Area. The characteristics and improvements recommended to select arterials serving the Specific Plan Area are listed on the following pages and illustrated in Figure 3-6. Figure 3-6: Circulation Map Æb Æb 9th St Goldline & BNSF Railway 8th Ave AT & SF R ail w a y Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveMcKeever Ave11th St 11th St 9th St Crescent Dr Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Dalton AveAlameda AveSoldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd LeeElementary AzusaPacificUniversity CitrusCollege Azusa PacificUniversity RosedaleSpecific Plan Area SlausonMiddleSchool SlausonPark DaltonElem. Veteran'sFreedomPark THE PROMENADEAzusa Veterans WyFoothill Vista Mobile Home Park CityHall Azusa Light & Water AT&T Verizon Post Office Lindley-ScottHouse Target St Francis of RomeSchool Park AtlantisGardens Palm StAPUHousing PackingHouse PublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´¯°±²¯°³´¯°±²¯°±²¯°³´¯°³´¯°³´AzusaDowntownStation AzusaDowntownStation APU/Citrus CollegeStationAPU/Citrus CollegeStation Date: 5/8/2014 Base Map Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept. SOURCE AND REFERENCE DATA TOD General Plan/Development Code Update and Specific Plan µ CITY OF AZUSA Specific Plan Boundary City Boundary 0.25 Mile Radial From Station Parcel Boundary Transit Site Æ b No Through Access Crosswalk *On-street parking exists throughout the study area Foothill Transit 185 Foothill Transit 187 Foothill Transit 280 Foothill Transit 281 Foothill Transit 494 Stop Sign Potential Bike/Ped Connection Signalized Intersection Significant Intersection Number of Auto Travel Lanes# Existing Circulation Figure 1 0 390 780195Feet San Gabriel River Trail From Canyon To Canyon ROUTE 66 Under Construction No Through Access Potential Trail Opportunity 605 210 10& 57 4 2 2 2 2 4 Paseo Opportunity 2 Æb Æb 9th St Goldline & BNSF Railway 8th Ave AT & SF R ail w a y Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveMcKeever Ave11th St 11th St 9th St Crescent D r Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Dalton AveAlameda AveSoldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd LeeElementary AzusaPacificUniversity CitrusCollege Azusa PacificUniversity RosedaleSpecific Plan Area SlausonMiddleSchool SlausonPark DaltonElem. Veteran'sFreedomPark THE PROMENADEAzusa Veterans WyFoothill Vista Mobile Home Park CityHall Azusa Light & Water AT&T Verizon Post Office Lindley-ScottHouse Target St Francis of RomeSchool Park AtlantisGardens Palm StAPUHousing PackingHouse PublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´¯°±²¯°³´¯°±²¯°±²¯°³´¯°³´¯°³´AzusaDowntownStation AzusaDowntownStation APU/Citrus CollegeStationAPU/Citrus CollegeStation Date: 5/8/2014 Base Map Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept. SOURCE AND REFERENCE DATA TOD General Plan/Development Code Update and Specific Plan µ CITY OF AZUSA Specific Plan Boundary City Boundary 0.25 Mile Radial From Station Parcel Boundary Transit Site Æ b No Through Access Crosswalk *On-street parking exists throughout the study area Foothill Transit 185 Foothill Transit 187 Foothill Transit 280 Foothill Transit 281 Foothill Transit 494 Stop Sign Potential Bike/Ped Connection Signalized Intersection Significant Intersection Number of Auto Travel Lanes# Existing Circulation Figure 1 0 390 780195Feet San Gabriel River Trail From Canyon To Canyon ROUTE 66 Under Construction No Through Access Potential Trail Opportunity 605 210 10& 57 4 2 2 2 2 4 Paseo Opportunity 2 MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-11 May 2017 Goldline & BNSF Railway 8th St AT & SF R ail w a y Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveOrange AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege THE PROMENADE Foothill Vista Mobile Home Park Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing PublicLibrary SeniorCenter CitrusCrossing Citrus AveAlameda AveDalton AvePackingHouse 9th St ToCanyonFromCanyon &&&&McKeever AveCrescent Dr 5th St Azusa Veterans WyFoothill Blvd AREAOF NOCHANGE AtlantisGardens Azusa PacificUniversity RosedaleSpecific Plan Area St Francis ofRome School Veteran'sFreedomPark CityHall SlausonPark LeeElementary SlausonMiddleSchool DaltonElementary APU/CitrusCollege Station Azusa DowntownStation SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Area 0 490 980245Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 3.3.1 Azusa Avenue Azusa Avenue is envisioned as the main north- south connection from the Azusa Downtown Gold Line Station, Downtown Azusa, and Azusa Canyon. It is currently a secondary arterial serving one-way northbound circulation immediately west of the proposed Azusa Downtown Gold Line Station. It provides two- lanes with parallel parking between 9th and 10th Streets. Angled parking is provided intermittently from 9th Street to 6th Street. The speed limit on Azusa is 25 mph. Existing streetscape improvements include bulbouts at intersections and special paving treatment at crosswalks along Azusa Avenue within the Specific Plan Area. Street trees, landscaping, and street furnishings are incorporated from 6th Street up to 9th Street. While the existing streetscape is aesthetically pleasing and pedestrian-friendly, it lacks opportunities for bicycles and limits vehicular access to local businesses. Converting Azusa Existing conditions on Azusa Avenue north of the railroad tracks.Downtown streetscape south of Foothill Boulevard. Azusa Avenue Key Map MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-12 City of Azusa | TOD Specific Plan May 2017 Figure 3-7: Azusa Avenue Cross Sections 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING CONDITION EXISTING CONDITION EXISTING CONDITION North of Train Tracks North of Train TracksBetween Train Tracks & Foothill Blvd Between Train Tracks & Foothill Blvd South of Foothill Blvd South of Foothill Blvd SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET Between Azusa Ave & Alameda Ave - 62’ Between Alameda Ave & Dalton Ave - 40’Between Alameda Ave & Dalton Ave - 40’ Between Soldano Ave & Pasadena Ave - 36’ Between Azusa Ave & Alameda Ave - 52’Between Azusa Ave & Alameda Ave - 52’ Between Soldano Ave & Pasadena Ave - 36’ A ZUSA AVENUE | 55’ CURB-TO-CURB ROW North of Train Tracks Between Train Tracks & Foothill Blvd South of Foothill Blvd AZUSA AVENUE | 55’ CURB-TO-CURB ROW PROPOSED TWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREET PROPOSED Between Azusa Ave & Alameda Ave - 62’ Between Train Tracks & Foothill Blvd South of Foothill Blvd \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING CONDITION EXISTING CONDITION EXISTING CONDITION Nor th of Train Tracks North of Train TracksBetween Train Tracks & Foothill Blvd Between Train Tracks & Foothill Blvd South of Foothill Blvd South of Foothill Blvd SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET Between Azusa Ave & Alameda Ave - 62’ Between Alameda Ave & Dalton Ave - 40’Between Alameda Ave & Dalton Ave - 40’ Between Soldano Ave & Pasadena Ave - 36’ Between Azusa Ave & Alameda Ave - 52’Between Azusa Ave & Alameda Ave - 52’ Between Soldano Ave & Pasadena Ave - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW North of Train Tracks Between Train Tracks & Foothill Blvd South of Foothill Blvd AZUSA AVENUE | 55’ CURB-TO-CURB ROW PROPOSED TWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREET PROPOSED Between Azusa Ave & Alameda Ave - 62’ Between Train Tracks & Foothill Blvd South of Foothill Blvd \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer A. Convert Azusa Avenue from a one-way couplet to a two-way, undivided street. Reconfiguration should include one travel lane in each direction with angled or parallel on-street parking. A two-way circulation network will aid in slowing vehicular traffic within the Specific Plan Area due to friction from two-way circulation while also improving vehicular access to local businesses and the Azusa Downtown Gold Line Station. B. Physical curb lines should remain intact requiring minimal improvements necessary to implement this concept. C. Reorient signage and pavement markings along Azusa Avenue to facilitate safe, two- way circulation.Mid-block bulbouts and crosswalk provide safe pedestrian crossing south of Foothill Boulevard. AZUSA AVE IMPROVEMENT RECOMMENDATIONSAvenue to a two-way street will improve visibility of businesses, enhance access to regional travel facilities, and improve the overall pedestrian environment. These benefits along Azusa Avenue can be accommodated without the need for changing the existing curb line of the street. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-13 May 2017 Azusa Avenue Streetscape Palette With the majority of Azusa Avenue maintaining existing, unified streetscape improvements, limited enhancements are envisioned for this street. Streetscape improvements should include: A. Bulbouts at the 9th Street and Foothill Boulevard intersections. B. New wayfinding signage to direct vehicles and pedestrians to and from the Azusa Downtown Gold Line Station, Downtown, and future parking areas. For those portions of Azusa Avenue passing through the Gold Line, Downtown, or Transition Districts, street improvements should be installed in conformance with Section 3.2, Section 3.6, and Section 3.7 related to: • Sidewalks and Landscaping • Paseos • Crossings • Plazas and Public Spaces • Streetscape Furnishings • Gateways and Signage Street trees installed along Azusa Avenue shall be selected from the list provided in Table 3-1. Preferred trees are indicated in Bold type. BOTANICAL NAME COMMON NAME TYP. HEIGHT TYP. SPREAD TYPE COMMENTS AZUSA AVELagerstroemia indica ‘Purple Tower’ Crape Myrtle 25 20 deciduous designated street tree Tristania laurina Water Gum 20 10 evergreen street tree Cercis canadensis ‘Oklahoma’ Eastern Redbud 35 30 deciduous accent tree Cercis canadensis ‘Forest Pansy’ Eastern Redbud 35 30 deciduous designated accent tree Hymenosporum flavum Sweetshade 40 20 evergreen street tree Calodendron capense Cape Chestnut 40 40 semi accent tree Table 3-1: Azusa Avenue Tree Palette STREETSCAPE IMPROVEMENT RECOMMENDATIONS MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-14 City of Azusa | TOD Specific Plan May 2017 San Gabriel Avenue Key Map 3.3.2 San Gabriel Avenue San Gabriel Avenue is a collector street serving one-way southbound circulation one block west of the future Azusa Downtown Station. It provides four-lanes of through traffic and parallel parking currently from 10th Street to 6th Street, with the exception of some angled parking on the east side of the street between 9th Street and the railroad tracks. The speed limit on San Gabriel Avenue is 35 mph. Streetscape improvements along San Gabriel Avenue include bulbouts at some intersections and mid-block crossings. Unique crosswalk pavings have been incorporated at the Foothill Boulevard intersection. Mature oak trees line the street from 9th Street to 6th Street. A goal of this Specific Plan is to expand the Downtown area, create a pedestrian-friendly environment along San Gabriel Avenue, and provide an enhanced bicycle network. This will Existing conditions on San Gabriel Avenue south of Foothill Boulevard.Existing conditions on San Gabriel Avenue at 6th Street. Goldline & BNSF Railway 8th St AT & SF R ail w a y Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveOrange AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege THE PROMENADE Foothill Vista Mobile Home Park Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing PublicLibrary SeniorCenter CitrusCrossing Citrus AveAlameda AveDalton AvePackingHouse 9th St ToCanyonFromCanyon &&&&McKeever AveCrescent Dr 5th St Azusa Veterans WyFoothill Blvd AREAOF NOCHANGE AtlantisGardens Azusa PacificUniversity RosedaleSpecific Plan Area St Francis ofRome School Veteran'sFreedomPark CityHall SlausonPark LeeElementary SlausonMiddleSchool DaltonElementary APU/CitrusCollege Station Azusa DowntownStation SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Area 0 490 980245Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-15 May 2017 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD 66’ CURB-TO-CURB ROW EXISTING CONDITION EXISTING CONDITION EXISTING CONDITION Nor th of Train Tracks North of Train Tracks Between Train Tracks & Foothill Blvd Between Train Tracks & Foothill Blvd South of Foothill Blvd South of Foothill Blvd SAN GABRIEL BOULEVARD 66’ EX. CURB-TO-CURB ROW TWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET Between Azusa Ave & Alameda Ave - 62’ Between Alameda Ave & Dalton Ave - 40’Between Alameda Ave & Dalton Ave - 40’ Between Soldano Ave & Pasadena Ave - 36’ Between Azusa Ave & Alameda Ave - 52’Between Azusa Ave & Alameda Ave - 52’ Between Soldano Ave & Pasadena Ave - 36’ A ZUSA AVENUE | 55’ CURB-TO-CURB ROW North of Train Tracks Between Train Tracks & Foothill Blvd South of Foothill Blvd AZUSA AVENUE | 55’ CURB-TO-CURB ROW PROPOSED TWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREET PROPOSED Between Azusa Ave & Alameda Ave - 62’ Between Train Tracks & Foothill Blvd South of Foothill Blvd \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD 66’ CURB-TO-CURB ROW EXISTING CONDITION EXISTING CONDITION EXISTING CONDITION Nor th of Train Tracks North of Train Tracks Between Train Tracks & Foothill Blvd Between Train Tracks & Foothill Blvd South of Foothill Blvd South of Foothill Blvd SAN GABRIEL BOULEVARD 66’ EX. CURB-TO-CURB ROW TWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET Between Azusa Ave & Alameda Ave - 62’ Between Alameda Ave & Dalton Ave - 40’Between Alameda Ave & Dalton Ave - 40’ Between Soldano Ave & Pasadena Ave - 36’ Between Azusa Ave & Alameda Ave - 52’Between Azusa Ave & Alameda Ave - 52’ Between Soldano Ave & Pasadena Ave - 36’ A ZUSA AVENUE | 55’ CURB-TO-CURB ROW Nor th of Train Tracks Between Train Tracks & Foothill Blvd South of Foothill Blvd AZUSA AVENUE | 55’ CURB-TO-CURB ROW PROPOSED TWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREET PROPOSED Between Azusa Ave & Alameda Ave - 62’ Between Train Tracks & Foothill Blvd South of Foothill Blvd \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer Figure 3-8: San Gabriel Avenue Cross Sections 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD 66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD 66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROW TWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD 66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD 66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROW TWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer Bulbout with landscaping on San Gabriel Avenue. be accomplished through a modification of the vehicular circulation pattern to two-way travel. Modifying the circulation to two-way travel will improve visibility of new and existing businesses, enhance access to regional travel facilities, and improve the overall pedestrian environment. A focal point of this proposal is the integration of new on-street bike lanes along San Gabriel Avenue, a first in Azusa, that will enhance access to the Azusa Downtown Station and the San Gabriel River Trail. SAN GABRIEL AVE IMPROVEMENT RECOMMENDATIONS A. New Class II bicycle lanes should be installed to conform with the General Plan, see Bicycle Map, Figure 3-13. B. Consistent with General Plan Policy 4.2, convert San Gabriel Avenue from a one-way couplet to a two-way street. Reconfiguration should include one travel lane in each direction, a median turn-lane, on-street parking, and bicycle lanes (refer to Figure 3-13). C. A two-way circulation network will help slow vehicular traffic in the area due to friction from two-way circulation and reduced directional capacity and improve vehicular access to local businesses and Azusa Canyon. D. Physical curb lines should remain in tact to minimize improvements, however, signage and pavement markings will need to be reoriented for two-way circulation. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-16 City of Azusa | TOD Specific Plan May 2017 San Gabriel Avenue Streetscape Palette San Gabriel Avenue provides a number of opportunities for improving upon the existing streetscape palette. Streetscape improvements should include: Street improvements should be installed in conformance with Section 3.2, Section 3.6, and Section 3.7 related to: • Sidewalks and Landscaping • Paseos • Crossings • Plazas and Public Spaces • Streetscape Furnishings • Gateways and Signage Street trees installed along San Gabriel Avenue shall be selected from the list provided in Table 3-2. Preferred trees are indicated in Bold type. BOTANICAL NAME COMMON NAME TYP. HEIGHT TYP. SPREAD TYPE COMMENTS SAN GABRIEL AVECercis canadensis Eastern Redbud 35 30 deciduous accent tree Hymenosporum flavum Sweetshade 40 20 evergreen street tree Quercus agrifolia Coast Live Oak 70 80 evergreen designated street tree Quercus virginiana Southern Live Oak 60 50 evergreen street tree Table 3-2: San Gabriel Avenue Tree Palette STREETSCAPE IMPROVEMENT RECOMMENDATIONS A. Bulbout and mid-block crossings should be incorporated at the 9th Street and Foothill Boulevard intersections. B. Crosswalks should be enhanced with special paving treatment or striping. C. Landscaping and street furnishings should be provided along the street and at bulbouts to enhance the pedestrian zone. D. Wayfinding signage should be provided to direct vehicles and pedestrians to the Azusa Downtown Gold Line Station and the Downtown where appropriate. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-17 May 2017 Alameda Avenue Key Map 3.3.3 Alameda Avenue Alameda Avenue is a north-south collector street within the Specific Plan Area with no through access to north of the railroad tracks due to abandonment of the right-of-way. Alameda Avenue provides two-lanes with parallel parking north of the railroad tracks and two-lanes with angled parking from the railroad tracks south to 6th Street. The speed limit is 25 mph. Roadway improvements installed along Alameda Avenue include bulbouts and landscaped medians. Decorative pavings have been incorporated within crosswalks at the intersection with Foothill Boulevard as well as at midblock crossings between the railroad tracks and Foothill Boulevard. Due to the roadway abandonment, an opportunity for temporary closure for special Existing conditions on Alameda Avenue south of railroad tracks. Goldline & BNSF Railway 8th St AT & SF R ail w a y Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveOrange AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege THE PROMENADE Foothill Vista Mobile Home Park Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing PublicLibrary SeniorCenter CitrusCrossing Citrus AveAlameda AveDalton AvePackingHouse 9th St ToCanyonFromCanyon &&&&McKeever AveCrescent Dr 5th St Azusa Veterans WyFoothill Blvd AREAOF NOCHANGE AtlantisGardens Azusa PacificUniversity RosedaleSpecific Plan Area St Francis ofRome School Veteran'sFreedomPark CityHall SlausonPark LeeElementary SlausonMiddleSchool DaltonElementary APU/CitrusCollege Station Azusa DowntownStation SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Area 0 490 980245Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Example of a bicycle sharrow integrated into an existing roadway. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-18 City of Azusa | TOD Specific Plan May 2017 Figure 3-10: Alameda Avenue Cross Sections Figure 3-9: Temporary Street Closure Opportunities 19’19’14’14’ 8’8’25’25’ 8’8’14’14’14’ Median 10’10’ 8’8’14’14’14’ Median 10’10’ 14’14’ Median 13’16’15’ ALAMEDA AVENUE 66’ CURB-TO-CURB ROW EXISTING CONDITION North of Train Tracks South of Train Tracks 19’19’9’9’ 8’8’20’20’ ALAMEDA AVENUE 66’ CURB-TO-CURB ROW PROPOSED North of Train Tracks South of Train Tracks FOOTHILL BOULEVARD 72’ - 78’ CURB-TO-CURB ROW PROPOSED BIKE ROUTE Between Alosta Ave & Angeleno Ave FOOTHILL BOULEVARD 72’ - 78’ CURB-TO-CURB ROW EXISTING CONDITION Between Alosta Ave & Angeleno Ave Between Alosta Ave & Citrus Ave- 72’\\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure 1 Auto Pedestrian Bicycle Landscaping 5’5’ 5’5’ 19’19’14’14’ 8’8’25’25’ 8’8’14’14’14’ Median 10’10’ 8’8’14’14’14’ Median 10’10’ 14’14’ Median 13’16’15’ ALAMEDA AVENUE 66’ CURB-TO-CURB ROW EXISTING CONDITION North of Train Tracks South of Train Tracks 19’19’9’9’ 8’8’20’20’ ALAMEDA AVENUE 66’ CURB-TO-CURB ROW PROPOSED North of Train Tracks South of Train Tracks FOOTHILL BOULEVARD 72’ - 78’ CURB-TO-CURB ROW PROPOSED BIKE ROUTE Between Alosta Ave & Angeleno Ave FOOTHILL BOULEVARD 72’ - 78’ CURB-TO-CURB ROW EXISTING CONDITION Between Alosta Ave & Angeleno Ave Between Alosta Ave & Citrus Ave- 72’\\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure 1 Auto Pedestrian Bicycle Landscaping 5’5’ 5’5’ Temporary street closures create space for community events. 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer ALAMEDA AVE IMPROVEMENT RECOMMENDATIONS 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer events exists along Alameda Avenue between Veterans Park and Foothill Boulevard. If Alameda Avenue is temporarily closed for events, removable bollards should be installed at the intersection of Foothill Boulevard and Alameda Avenue. This concept is further described in Section 3.2.4. Æb Æb ÉÖGoldline & BNSF Railway 8th Ave AT & SF Ra ilw ay Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveOrange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege SlausonMiddleSchool Veteran'sFreedomPark Azusa DowntownStation APU/CitrusCollege Station THE PROMENADEAzusa VeteraFoothill Vista Mobile Home Park CityHall Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing A3A2 37 36 DALTONPublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´Alameda AveDalton AveSlausonPark LeeElementary AtlantisGardens PackingHouse STREETSCAPE BEAUTIFICATIONSTREETSCAPE BEAUTIFICATION9th St Azusa PacificUniversity DaltonElementary RosedaleSpecific Plan Area Potential Trail Opportunity ToCanyonFromCanyon &&&&St Francisof Rome School STREETSCAPE BEAUTIFICATION PotentialConnection &&&&kjPlannedParkingStructure kj StationParking ROUTE 66 THEME ÅB ÅBROUTE 66 THEME ÅB ÅBããElevated Access ããããHistoricDepot ] ^) 9th St Crescent DrMcKeever Ave9th St SLOWSLOW) ) HistoricResource HistoricResource Paseo Opportunity Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan TOD Opportunity Sites (City-owned property) CITY OF AZUSA # Opportunities 0 490 980245Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Image from Azusa Metrolink PF - Choate Parking Consultants, Inc. (CPC) 02.22.13 Rosedale Specific Plan Area Route 66 Historic Monument/Intersection Improvements^) Potential Ampitheater]Streetscape Beautification Opportunity Site Within 1/4 Mile of Rail Station Gateway ÉÖFuture Traffic Control Transit SiteÆb TOD Opportunity Sites Parcel Boundary Specific Plan Boundary City Boundary 0.25 Mile Radius From Station Date: 6/18/2015 Potential Plazas) University/School Areas University/School Areas Outside Specific Plan Historic Resources Potential Plaza Potential Paseo Temporary Street Closure A. New Class II bicycle lanes should be installed to conform with the General Plan, see Bicycle Map, Figure 3-13. B. Wayfinding signage should be provided for the Azusa Downtown Gold Line Station, City Hall, Veteran’s Freedom Park, Azusa Library, and the Police Station. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-19 May 2017 Alameda Avenue Streetscape Palette A. Streetscape improvements should include bulbouts and mid-block crossings at the Foothill Boulevard and 9th Street intersections as outlined in Section 3.2.3. B. Crosswalks should be enhanced with special paving treatment or striping along Alameda Avenue. C. Provide mid-block crossings between Foothill Boulevard and 6th Street and 5th Street. D. Landscaping and street furnishings should be provided along the street and at bulbouts to enhance the pedestrian zone. E. Planters should be incorporated within parking zones to increase landscape areas and provide a buffer along the sidewalk for pedestrians. Streetscape improvements should be installed in conformance with Section 3.2, Section 3.6, and Section 3.7 related to: • Sidewalks and Landscaping • Paseos • Crossings • Plazas and Public Spaces • Streetscape Furnishings • Gateways and Signage Street trees installed along Alameda Avenue shall be selected from the list provided in Table 3-3. Preferred trees are indicated in Bold type. BOTANICAL NAME COMMON NAME TYP. HEIGHT TYP. SPREAD TYPE COMMENTS ALAMEDA AVEArecastrum romanzoffianum Queen Palm 50 20 evergreen street tree Callistemon citrinus Lemon Bottlebrush 25 20 evergreen street tree Lagerstroemia indica Crape Myrtle 25 20 deciduous street tree, median tree, mildew resistant only Washingtonia filifera California Fan Palm 60 10 palm street tree Cinnamomum camphora Camphor Tree 50 60 evergreen designated street tree Table 3-3: Alameda Avenue Tree Palette STREETSCAPE IMPROVEMENT RECOMMENDATIONS MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-20 City of Azusa | TOD Specific Plan May 2017 9th Street Key Map 3.3.4 9th Street 9th Street is a two-lane collector street with parallel parking on both sides within the Specific Plan Area. It is the main route that connects the Azusa Downtown Station with the APU/Citrus Avenue Station north of the railroad tracks. The speed limit is 25 mph. Minimal streetscape improvements exist along 9th Street, with patches of street trees and parkway landscaping existing on portions of both sides of the street. More recent improvements between San Gabriel Avenue and Azusa Avenue include trash cans, lighting, benches, landscaping, and trees in tree wells. 9th Street is envisioned to become a primary link between the future transit stations and neighboring residential areas. Improved sidewalks and sharrows will improve access for both pedestrians and bicyclists. Goldline & BNSF Railway 8th St AT & SF R ail w a y Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveOrange AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege THE PROMENADE Foothill Vista Mobile Home Park Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing PublicLibrary SeniorCenter CitrusCrossing Citrus AveAlameda AveDalton AvePackingHouse 9th St ToCanyonFromCanyon &&&&McKeever AveCrescent Dr 5th St Azusa Veterans WyFoothill Blvd AREAOF NOCHANGE AtlantisGardens Azusa PacificUniversity RosedaleSpecific Plan Area St Francis ofRome School Veteran'sFreedomPark CityHall SlausonPark LeeElementary SlausonMiddleSchool DaltonElementary APU/CitrusCollege Station Azusa DowntownStation SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Area 0 490 980245Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 Existing conditions on 9th Street at San Gabriel Avenue.Existing conditions on 9th Street at Azusa Avenue. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-21 May 2017 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD 66’ CURB-TO-CURB ROW EXISTING CONDITION EXISTING CONDITION EXISTING CONDITION Nor th of Train Tracks North of Train Tracks Between Train Tracks & Foothill Blvd Between Train Tracks & Foothill Blvd South of Foothill Blvd South of Foothill Blvd SAN GABRIEL BOULEVARD 66’ EX. CURB-TO-CURB ROW TWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET Between Azusa Ave & Alameda Ave - 62’ Between Alameda Ave & Dalton Ave - 40’Between Alameda Ave & Dalton Ave - 40’ Between Soldano Ave & Pasadena Ave - 36’ Between Azusa Ave & Alameda Ave - 52’Between Azusa Ave & Alameda Ave - 52’ Between Soldano Ave & Pasadena Ave - 36’ A ZUSA AVENUE | 55’ CURB-TO-CURB ROW Nor th of Train Tracks Between Train Tracks & Foothill Blvd South of Foothill Blvd AZUSA AVENUE | 55’ CURB-TO-CURB ROW PROPOSED TWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREET PROPOSED Between Azusa Ave & Alameda Ave - 62’ Between Train Tracks & Foothill Blvd South of Foothill Blvd \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD 66’ CURB-TO-CURB ROW EXISTING CONDITION EXISTING CONDITION EXISTING CONDITION North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Blvd Between Train Tracks & Foothill Blvd South of Foothill Blvd South of Foothill Blvd SAN GABRIEL BOULEVARD 66’ EX. CURB-TO-CURB ROW TWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET Between Azusa Ave & Alameda Ave - 62’ Between Alameda Ave & Dalton Ave - 40’Between Alameda Ave & Dalton Ave - 40’ Between Soldano Ave & Pasadena Ave - 36’ Between Azusa Ave & Alameda Ave - 52’Between Azusa Ave & Alameda Ave - 52’ Between Soldano Ave & Pasadena Ave - 36’ A ZUSA AVENUE | 55’ CURB-TO-CURB ROW Nor th of Train Tracks Between Train Tracks & Foothill Blvd South of Foothill Blvd AZUSA AVENUE | 55’ CURB-TO-CURB ROW PROPOSED TWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREET PROPOSED Between Azusa Ave & Alameda Ave - 62’ Between Train Tracks & Foothill Blvd South of Foothill Blvd \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer Figure 3-11: 9th Street Cross Sections 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 9TH ST IMPROVEMENT RECOMMENDATIONS Landscape buffers and street trees provide separation from the sidewalk for a walkable street within residential areas. A. New Class II and Class III bicycle lanes should be installed to conform with the General Plan, see Bicycle Map, Figure 3-13. B. Streetscape elements along 9th Street in the Rosedale Specific Plan Area should be continued into the Specific Plan Area, including street trees, landscaped parkways, sidewalk widths, lighting, and street furnishings. Note: Based on a preliminary review of planned bicycle facilities in the General Plan, installation of designated bicycle lanes may be constrained by the existing roadway configuration on 9th Street and therefore may require cross-section modifications to allow for bicycle lanes. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-22 City of Azusa | TOD Specific Plan May 2017 BOTANICAL NAME COMMON NAME TYP. HEIGHT TYP. SPREAD TYPE COMMENTS 9TH STLagerstroemia indica ‘White Flower’Crape Myrtle 25 20 deciduous designated street tree, mildew resistant only Robinia p. ‘Purple Robe’Purple Robe Locust 60 30 deciduous designated street tree within the Rosedale Development Table 3-4: 9th Street Tree Palette 9th Street Streetscape Palette A. Streetscape improvements should include bulbouts at the 9th Street and San Gabriel Avenue intersection as outlined in Section 3.2.3. B. Crosswalks should be enhanced with special paving treatment or striping. C. Landscaping and street furnishings should be provided along the street and at bulbouts to enhance the pedestrian zone. D. Wayfinding signage directing vehicles and pedestrians to the Azusa Downtown Gold Line Station and the Downtown should be provided. E. A median should be incorporated between Azusa Avenue and Alameda Avenue. F. Parkways and landscaped buffers should be provided to enhance the streetscape and reflect the character of the Gold Line District and Transition District. Street improvements should be installed in conformance with Section 3.2, Section 3.6, and Section 3.7 related to: • Sidewalks and Landscaping • Paseos • Crossings • Plazas and Public Spaces • Streetscape Furnishings • Gateways and Signage Street trees installed along 9th Street shall be selected from the list provided in Table 3-4. Preferred trees are indicated in Bold type. STREETSCAPE IMPROVEMENT RECOMMENDATIONS MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-23 May 2017 Foothill Boulevard Key Map 3.3.5 Foothill Boulevard Foothill Boulevard is the principal east-west arterial within the Specific Plan Area and is a part of the historic Route 66. It is a four-lane divided arterial with parallel on-street parking. The speed limit on Foothill Boulevard within the Specific Plan Area is 35 mph. Streetscape improvements along Foothill Boulevard include a variety of trash cans, benches, and bus stops. A number of tree species are located along Foothill Boulevard, with additional tree varietals and landscaping located within existing medians. Crosswalks with unique pavings are located at the San Gabriel Avenue, Azusa Avenue, Alameda Avenue, and Dalton Avenue intersections. The vision for Foothill Boulevard and Alosta Avenue is to recapture the essence of its historic Route 66 past and create a pedestrian- friendly link between Azusa Pacific University, Citrus College, and the Downtown. Special development standards located in Chapter 2 Existing conditions on Foothill Boulevard at Azusa Avenue.Existing crosswalk on Foothill Boulevard at San Gabriel Avenue. Goldline & BNSF Railway 8th St AT & SF R ail w a y Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveOrange AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Soldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd AzusaPacificUniversity CitrusCollege THE PROMENADE Foothill Vista Mobile Home Park Azusa Light & Water CVS Pharmacy AT&T Verizon Post Office Lindley-ScottHouse Target Park Palm StAPUHousing PublicLibrary SeniorCenter CitrusCrossing Citrus AveAlameda AveDalton AvePackingHouse 9th St ToCanyonFromCanyon &&&&McKeever AveCrescent Dr 5th St Azusa Veterans WyFoothill Blvd AREAOF NOCHANGE AtlantisGardens Azusa PacificUniversity RosedaleSpecific Plan Area St Francis ofRome School Veteran'sFreedomPark CityHall SlausonPark LeeElementary SlausonMiddleSchool DaltonElementary APU/CitrusCollege Station Azusa DowntownStation SOURCE AND REFERENCE DATABASE MAP FEATURES TOD General Plan/Development Code Update and Specific Plan Specific Plan Boundary City Boundary Parcel Boundary Transit Site CITY OF AZUSA Æb Specific Plan Area 0 490 980245Feet μ Image from EIR Report - TAHA Inc. 03.22.13 Date: 5/4/2015 Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept - 2010 3) Aerial photo of Target area from Google Earth - 04.2013 MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-24 City of Azusa | TOD Specific Plan May 2017 Figure 3-12: Foothill Boulevard Cross Sections 19’19’14’14’ 8’8’25’25’ 8’8’14’14’14’ Median 10’10’ 8’8’14’14’14’ Median 10’10’ 14’14’ Median 13’16’15’ ALAMEDA AVENUE 66’ CURB-TO-CURB ROW EXISTING CONDITION North of Train Tracks South of Train Tracks 19’19’9’9’ 8’8’20’20’ ALAMEDA AVENUE 66’ CURB-TO-CURB ROW PROPOSED North of Train Tracks South of Train Tracks FOOTHILL BOULEVARD 72’ - 78’ CURB-TO-CURB ROW PROPOSED BIKE ROUTE Between Alosta Ave & Angeleno Ave FOOTHILL BOULEVARD 72’ - 78’ CURB-TO-CURB ROW EXISTING CONDITION Between Alosta Ave & Angeleno Ave Between Alosta Ave & Citrus Ave- 72’\\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure 1 AutoPedestrian Bicycle Landscaping 5’5’ 5’5’ 19’19’14’14’ 8’8’25’25’ 8’8’14’14’14’ Median 10’10’ 8’8’14’14’14’ Median 10’10’ 14’14’ Median 13’16’15’ ALAMEDA AVENUE 66’ CURB-TO-CURB ROW EXISTING CONDITION North of Train Tracks South of Train Tracks 19’19’9’9’ 8’8’20’20’ ALAMEDA AVENUE 66’ CURB-TO-CURB ROW PROPOSED North of Train Tracks South of Train Tracks FOOTHILL BOULEVARD 72’ - 78’ CURB-TO-CURB ROW PROPOSED BIKE ROUTE Between Alosta Ave & Angeleno Ave FOOTHILL BOULEVARD 72’ - 78’ CURB-TO-CURB ROW EXISTING CONDITION Between Alosta Ave & Angeleno Ave Between Alosta Ave & Citrus Ave- 72’\\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure 1 Auto Pedestrian Bicycle Landscaping 5’5’ 5’5’ 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROW TWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROW TWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROW TWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer 8’ 8’6’ 12’ 14’14’ 14’ 12’12’ 12’12’ 8’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’ 8’8’11’12’11’5’5’3’3’8’12’12’12’ 22’ 8’8’ 8’8’ 23’23’ 8’8’18’18’8’8’10’10’ 12’12’ 8’8’12’12’ 8’8’10’10’ 8’8’10’10’ 22’9’12’12’22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 22’9’12’12’ 8’8’5’+3’+3’5’10’10’10’ 5’5’3’3’ SAN GABRIEL BOULEVARD66’ CURB-TO-CURB ROWEXISTING/NO BUILD North of Train Tracks North of Train Tracks Between Train Tracks & Foothill Between Train Tracks & Foothill South of Foothill South of Foothill SAN GABRIEL BOULEVARD66’ EX. CURB-TO-CURB ROWTWO-WAY (ROAD DIET) BUFFERED BIKE LANES 9th STREET EXISTING/NO BUILD Between Azusa & Alameda - 62’ Between Alameda & Dalton - 40’Between Alameda & Dalton - 40’ Between Soldano & Pasadena - 36’ Between Azusa & Alameda - 52’Between Azusa & Alameda - 52’ Between Soldano & Pasadena - 36’ AZUSA AVENUE | 55’ CURB-TO-CURB ROW EXISTING/NO BUILD North of Train Tracks Between Train Tracks & Foothill South of Foothill AZUSA AVENUE | 55’ CURB-TO-CURB ROWTWO-WAY FRONT-IN PARKING North of Train Tracks 9TH STREETPROPOSED Between Azusa & Alameda - 62’ Between Train Tracks & Foothill South of Foothill \\fpla1\data\Jobs\Active\2600s\2670_Azusa TOD\Graphics\AIExisting & Proposed Roadway Configurations Figure X Auto Pedestrian Bicycle LandscapingPainted Buffer FOOTHILL BLVD IMPROVEMENT RECOMMENDATIONS incentivize creative signage and whimsical public art within expanded setbacks. Themed street furnishings and improvements are described within Section 3.6.3 to reinforce this overarching vision. A. Rename portions of Foothill Boulevard and Alosta Avenue located within the Specific Plan Area to Historic Route 66. B. A new 10’ marked sharrow should be installed to conform with the General Plan designated bicycle route, see Bicycle Map, Figure 3-13. C. Public and private signage, thematic street furnishings, and unique architecture should be installed along the corridor. D. Public art should be incorporated into the streetscape to celebrate the history of Route 66. Wide sidewalk on Foothill Boulevard, east of Alosta Avenue connect Azusa Pacific and Citrus College. Future conditions on Foothill Boulevard should integrate bicycle lanes for multi-modal access. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-25 May 2017 Foothill Boulevard Streetscape Palette A. Install additional improvements including bulbouts at numerous intersections along Foothill Boulevard as identified in Section 3.2.3. B. Identify gaps within the street tree canopy along Foothill Boulevard and fill with appropriate street trees placed within tree wells. C. Incorporate additional landscaped medians along Foothill Boulevard, where appropriate. D. Wayfinding signage should be provided to direct vehicles and pedestrians to the Azusa Downtown Gold Line Station and the Downtown. E. Streetlight poles should be equipped with an additional hanging or cantilevered fixture for colored banners to capture the historic Route 66 theme, or other events, and to add an aesthetic element to the Specific Plan Area. Street improvements should be installed in conformance with Section 3.2, Section 3.6, and Section 3.7 related to: • Sidewalks and Landscaping • Paseos • Crossings • Plazas and Public Spaces • Streetscape Furnishings Gateways and Signage Street trees installed along Foothill Boulevard shall be selected from the list provided in Table 3-5. Preferred trees are indicated in Bold type. BOTANICAL NAME COMMON NAME TYP. HEIGHT TYP. SPREAD TYPE COMMENTS FOOTHILL BLVDLagerstroemia indica Crape Myrtle 25 20 deciduous median tree, Pyrus c. ‘Redspire’Redspire Pear 35 25 deciduous median tree Brachychiton populneus Bottle Tree 50 40 evergreen designated street tree between San Gabriel and Cerritos Geijera parviflora Australian Willow 40 25 evergreen designated street tree Zelkova serrata Sawleaf Zelkova 40 40 deciduous median tree Table 3-5: Foothill Boulevard Tree Palette STREETSCAPE IMPROVEMENT RECOMMENDATIONS MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-26 City of Azusa | TOD Specific Plan May 2017 Medians Landscaped medians are currently installed along Foothill Boulevard between Angeleno Avenue and Cerritos Avenue. New landscaped medians should be installed along Foothill Boulevard between Cerritos Avenue and Citrus Avenue, where feasible. Medians shall be continuous and restrict left turns from collector streets. Medians should beautify the corridor and increase existing level of service conditions for collector streets that have been recommended for traffic signals. Medians should be planted with attractive landscaping supported by adequate drainage and irrigation systems. Medians also control vehicle- turning movements, increase traffic safety and demarcate pedestrian crossings and walkways. The landscape area provides a place for Specific Plan Area-specific directional signage, Route 66 iconography (where appropriate), and gateway monuments announcing key intersections while at the same time introducing aesthetically appealing color and greenery to the corridor. Medians should use a variety of tree species to prevent a “monoculture” of tree types and landscape character throughout the corridor. Plant species for the medians should consist of drought tolerant shrubs and ground covers. Stamped concrete or low-maintenance succulents should be used in the narrow portion of the medians at left turning pockets. Landscaped medians assist in beautifying a street or corridor. Drought tolerant landscaping reduces water use and overall maintenance. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-27 May 2017 3.4 BICYCLE ACCESS AND IMPROVEMENTS Class I Bicycle Path Class II Bicycle Path Class III Bicycle Path Within the Specific Plan Area, bicycle facilities are not currently provided. While the City of Azusa General Plan outlines planned bicycle facilities, this Specific Plan places additional emphasis on development of these bicycle facilities through the incorporation of the following recommended improvements: Path/Trail (Class I) A. Incorporate a bicycle path/trail near the APU/Citrus Avenue Gold Line Station along Azusa Veterans Way to connect with Sierra Madre Avenue. B. Create a neighborhood trail along 9th Street west of Angeleno Avenue along the inactive rail right-of-way between Angeleno Avenue and McKeever Avenue. Lane (Class II) A. Install bicycle lanes along San Gabriel Avenue, Alameda Avenue, and segments of 9th Street, Alosta Avenue, Cerritos Avenue, and Citrus Avenue within the Specific Plan Area. Signed Route (Class III) A. Introduce bicycle lanes on 5th Street, Palm Street, Foothill Boulevard, Citrus Avenue, Alosta Avenue, and segments of 9th Street within the Specific Plan Area. BICYCLE IMPROVEMENT RECOMMENDATIONS MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-28 City of Azusa | TOD Specific Plan May 2017 Figure 3-13: Bicycle Map Æb Æb APU/Citrus CollegeStation9th St Goldline & BNSF Railway 8th Ave AT & SF R ail w a y Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveMcKeever Ave11th St 11th St 9th St Crescent D r Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Dalton AveAlameda AveSoldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd LeeElementary AzusaPacificUniversity CitrusCollege Azusa PacificUniversity RosedaleSpecific Plan Area SlausonPark DaltonElem. Veteran'sFreedomPark AzusaDowntownStation AzusaDowntownStation THE PROMENADEAzusa Veterans WyFoothill Vista Mobile Home Park CityHall AzusaLight & Water AT&T Verizon PostOffice Lindley-ScottHouse Target St Francis of RomeSchool Park AtlantisGardens Palm StAPUHousing PackingHouse PublicLibrary SeniorCenter CitrusCrossing Citrus AveAPU/Citrus CollegeStation Date: 5/8/2014 Base Map Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept. SOURCE AND REFERENCE DATA TOD General Plan/Development Code Update and Specific Plan µ CITY OF AZUSA Specific Plan Boundary City Boundary 0.25 Mile Radial From Station Parcel Boundary Transit Site Proposed Bike Routes Proposed Bike Lanes Æb Signalized Intersection Improvements Unsignalized Intersection Improvements Potential Bike/Ped Connection Proposed Bicycle & Intersection Improvements Figure 1 0 390 780195Feet Potential Trail Opportunity Azusa Ave: Two-Way w/ Front-in Angled Parking Ped/Bike Access to Ped/Bike Access to Citrus College San Gabriel Ave: Two-Way w/ Three Lanes & Bike Lanes MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-29 May 2017 Æb Æb APU/Citrus CollegeStation9th St Goldline & BNSF Railway 8th Ave AT & SF R ail w a yAlameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveMcKeever Ave11th St11th St 9th St Crescent D r Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Dalton AveAlameda AveSoldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd LeeElementary AzusaPacificUniversity CitrusCollege Azusa PacificUniversity RosedaleSpecific Plan Area SlausonPark DaltonElem. Veteran'sFreedomPark AzusaDowntownStation AzusaDowntownStation THE PROMENADEAzusa Veterans WyFoothill Vista Mobile Home Park CityHall AzusaLight & Water AT&T Verizon PostOffice Lindley-ScottHouse Target St Francis of RomeSchool Park AtlantisGardens Palm StAPUHousing PackingHouse PublicLibrary SeniorCenter CitrusCrossing Citrus AveAPU/Citrus CollegeStation Date: 5/8/2014 Base Map Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept. SOURCE AND REFERENCE DATA TOD General Plan/Development Code Update and Specific Plan µ CITY OF AZUSA Specific Plan Boundary City Boundary 0.25 Mile Radial From Station Parcel Boundary Transit SiteProposed Bike Routes Proposed Bike Lanes Æb Signalized Intersection Improvements Unsignalized Intersection ImprovementsPotential Bike/Ped Connection Proposed Bicycle & Intersection Improvements Figure 1 0 390 780195Feet Potential Trail Opportunity Azusa Ave: Two-Way w/ Front-in Angled Parking Ped/Bike Access to Ped/Bike Access to Citrus College San Gabriel Ave: Two-Way w/ Three Lanes & Bike Lanes Æb Æb APU/Citrus CollegeStation9th St Goldline & BNSF Railway 8th Ave AT & SF R ail w a y Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveMcKeever Ave11th St 11th St 9th St Crescent D r Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Dalton AveAlameda AveSoldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd LeeElementary AzusaPacificUniversity CitrusCollege Azusa PacificUniversity RosedaleSpecific Plan Area SlausonPark DaltonElem. Veteran'sFreedomPark AzusaDowntownStation AzusaDowntownStation THE PROMENADEAzusa Veterans WyFoothill Vista Mobile Home Park CityHall AzusaLight & Water AT&T Verizon PostOffice Lindley-ScottHouse Target St Francis of RomeSchool Park AtlantisGardens Palm StAPUHousing PackingHouse PublicLibrary SeniorCenter CitrusCrossing Citrus AveAPU/Citrus CollegeStation Date: 5/8/2014 Base Map Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept. SOURCE AND REFERENCE DATA TOD General Plan/Development Code Update and Specific Plan µ CITY OF AZUSA Specific Plan Boundary City Boundary 0.25 Mile Radial From Station Parcel Boundary Transit Site Proposed Bike Routes Proposed Bike Lanes Æb Signalized Intersection Improvements Unsignalized Intersection Improvements Potential Bike/Ped Connection Proposed Bicycle & Intersection Improvements Figure 1 0 390 780195Feet Potential Trail Opportunity Azusa Ave: Two-Way w/ Front-in Angled Parking Ped/Bike Access to Ped/Bike Access to Citrus College San Gabriel Ave: Two-Way w/ Three Lanes & Bike Lanes Æb Æb APU/Citrus CollegeStation9th St Goldline & BNSF Railway 8th Ave AT & SF R ail w a yAlameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveMcKeever Ave11th St11th St 9th St Crescent D r Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Dalton AveAlameda AveSoldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd LeeElementary AzusaPacificUniversity CitrusCollege Azusa PacificUniversity RosedaleSpecific Plan Area SlausonPark DaltonElem. Veteran'sFreedomPark AzusaDowntownStation AzusaDowntownStation THE PROMENADEAzusa Veterans WyFoothill Vista Mobile Home Park CityHall AzusaLight & Water AT&T Verizon PostOffice Lindley-ScottHouse Target St Francis of RomeSchool Park AtlantisGardens Palm StAPUHousing PackingHouse PublicLibrary SeniorCenter CitrusCrossing Citrus AveAPU/Citrus CollegeStation Date: 5/8/2014 Base Map Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept. SOURCE AND REFERENCE DATA TOD General Plan/Development Code Update and Specific Plan µ CITY OF AZUSA Specific Plan Boundary City Boundary 0.25 Mile Radial From Station Parcel Boundary Transit SiteProposed Bike Routes Proposed Bike Lanes Æb Signalized Intersection Improvements Unsignalized Intersection ImprovementsPotential Bike/Ped Connection Proposed Bicycle & Intersection Improvements Figure 1 0 390 780195Feet Potential Trail Opportunity Azusa Ave: Two-Way w/ Front-in Angled Parking Ped/Bike Access to Ped/Bike Access to Citrus College San Gabriel Ave: Two-Way w/ Three Lanes & Bike Lanes MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-30 City of Azusa | TOD Specific Plan May 2017 3.5 PUBLIC/PRIVATE TRANSIT The Specific Plan Area is served by Foothill Transit, Glendora Mini Bus, and the Azusa Pacific University Trolley. Foothill Transit bus routes are shown in Figure 3-14. Below is a list of the bus and rail routes that currently provide service to and around the Specific Plan Area: • Foothill Transit Line 185 - Line 185 connects Azusa, West Covina, and Hacienda Heights via Irwindale. In the Specific Plan Area, this line runs along Foothill Boulevard ending at San Gabriel Avenue. • Foothill Transit Line 187 - Line 187 connects Montclair, Claremont, Glendora, and Pasadena via Foothill Boulevard. • Foothill Transit Line 280 - Line 280 connects Azusa to Puente Hills via Azusa Avenue. • Foothill Transit Line 281 - Line 281 connects Glendora, West Covina, and Puente Hills Mall via Citrus Avenue. • Foothill Transit Line 494 - Line 494 connects San Dimas, Glendora, Monrovia, and El Monte via Foothill Boulevard. • Glendora Mini Bus - This bus offers curb-to-curb transportation services upon reservation for senior citizens and permanently disabled persons of Glendora. The bus transfers riders to the Lone Hill Shopping Center, the Metrolink station in Covina, and Citrus College. • Azusa Pacific University Trolley - This trolley service provides a connection between the east and west Azusa Pacific University campuses. Two Gold Line Foothill Extension transit stops, the Azusa Downtown Station and APU/Citrus Avenue Station, will increase access to regional transit from Azusa. The Gold Line will connect to Pasadena, East Los Angeles, and Downtown Los Angeles and allow for dedicated transit service between these areas. Providing improved local public and private transit services to these new stations will ensure an appropriate level of consistency and access for future transit riders. The City should coordinate with Foothill Transit to consider the following route modifications: A. Bus routes should be modified to improve connectivity from the new transit stops with the surrounding universities and community colleges. For example, the routes of Foothill Transit Lines 185, 187, and 280 should be altered to directly serve the planned Azusa Downtown Station and associated parking structure. B. Similarly, the route for Transit Line 281 should be modified along Citrus Avenue to connect with the planned APU/Citrus Avenue Station. C. Foothill Transit Line 494 travels along Foothill Boulevard connecting Downtown Azusa, Citrus College, and Azusa Pacific University; however, this bus line only operates during peak hours and has 30-minute headways. Foothill Transit Line 187 also connects these destinations along Foothill Boulevard. PUBLIC TRANSIT RECOMMENDATIONS MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-31 May 2017 Foothill Transit stop on Azusa Avenue north of the railroad tracks. The City should coordinate with APU to consider the following route modifications: A. Expand the existing trolley service to Downtown and the new transit stations. A circulator would likely provide greater service frequency than existing bus lines or the Gold Line, but would also require additional funding and resources for operations and coordination between participating local entities. Figure 3-14: Public Transit Map Æb Æb 9th St Goldline & BNSF Railway 8th Ave AT & SF R ail w a y Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveMcKeever Ave11th St 11th St 9th St Crescent D r Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Dalton AveAlameda AveSoldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd LeeElementary AzusaPacificUniversity CitrusCollege Azusa PacificUniversity RosedaleSpecific Plan Area SlausonMiddleSchool SlausonPark DaltonElem. Veteran'sFreedomPark THE PROMENADEAzusa Veterans WyFoothill Vista Mobile Home Park CityHall Azusa Light & Water AT&T Verizon Post Office Lindley-ScottHouse Target St Francis of RomeSchool Park AtlantisGardens Palm StAPUHousing PackingHouse PublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´¯°±²¯°³´¯°±²¯°±²¯°³´¯°³´¯°³´AzusaDowntownStation AzusaDowntownStation APU/Citrus CollegeStationAPU/Citrus CollegeStation Date: 5/8/2014 Base Map Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept. SOURCE AND REFERENCE DATA TOD General Plan/Development Code Update and Specific Plan µ CITY OF AZUSA Specific Plan Boundary City Boundary 0.25 Mile Radial From Station Parcel Boundary Transit Site Æ b Foothill Transit 185 Foothill Transit 187 Foothill Transit 280 Foothill Transit 281 Foothill Transit 494 Existing Transit Figure 1 Route Recommendations to be Considered 0 390 780195Feet Æb Æb 9th St Goldline & BNSF Railway 8th Ave AT & SF R ail w a y Alameda AveDalton AveSoldano AvePasadena Ave10th St Foothill Blvd Foothill BlvdAzusa AveSan Gabriel Ave10th St Angeleno AveSunset AveOrange AveEnid AveMcKeever Ave11th St 11th St 9th St Crescent D r Orange AveLemon AveSunset AveAngeleno Ave6th St San Gabriel AveAzusa Ave6th St Dalton AveAlameda AveSoldano AvePasadena AveCerritosAveAl o s t a A v e 5th St Citrus AveFoothill Blvd LeeElementary AzusaPacificUniversity CitrusCollege Azusa PacificUniversity RosedaleSpecific Plan Area SlausonMiddleSchool SlausonPark DaltonElem. Veteran'sFreedomPark Alameda AveStation Citrus AveStation THE PROMENADEAzusa Veterans WyFoothill Vista Mobile Home Park CityHall Azusa Light & Water AT&T Verizon Post Office Lindley-ScottHouse Target St Francis of RomeSchool Park AtlantisGardens Palm StAPUHousing PackingHouse PublicLibrary SeniorCenter CitrusCrossing Citrus Ave¯°±²¯°³´¯°±²¯°³´¯°±²¯°±²¯°³´¯°³´¯°³´Date: 5/8/2014 Base Map Notes and Sources: 1) Base data from the City of Azusa GIS Dept. 2) Aerial photo from the City of Azusa GIS Dept. SOURCE AND REFERENCE DATA TOD General Plan/Development Code Update and Specific Plan µ CITY OF AZUSA Specific Plan Boundary City Boundary 0.25 Mile Radial From Station Parcel Boundary Transit Site Æ b Foothill Transit 185 Foothill Transit 187 Foothill Transit 280 Foothill Transit 281 Foothill Transit 494 Existing Transit Figure 1 Dashed Lines Represent Routes Prior to Construction Rerouting 0 390 780195Feet PRIVATE TRANSIT RECOMMENDATIONS MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-32 City of Azusa | TOD Specific Plan May 2017 Streetscape furnishings are elements that tie together the landscaping, sidewalk treatments, and character of an individual area while collectively creating a pleasant environment for pedestrians. The Specific Plan Area as well as three individual areas have been identified for varying degrees of streetscape improvements. Individual areas for improvements include the Downtown, Route 66, and APU/Citrus Avenue Station and College Connection areas (see Figure 3-1). When street furnishing improvements are combined with an appealing palette of street trees and landscaping, the desired result will be a unified Specific Plan Area with individual and identifiable themed areas that accentuate the character of the individual districts. 3.6.1 Specific Plan Area Improvements The following streetscape elements have been identified for incorporation throughout the Specific Plan Area. Bus Shelters The Specific Plan Area has a variety of bus shelter designs, both old and new. Many bus shelters have red tile roofs and are painted to match a variety of street furnishings, while others exhibit more modern designs. Any new and existing bus stops should be upgraded with a consistent style throughout the Specific Plan Area. Manufacturer/Model - Match existing City standard. Public Art The display of public art is another way to help create a dynamic street scene and unique sense of place. Public facilities should integrate public art into building design, site design, and public gathering spaces. Any public art installations are 3.6 STREETSCAPE FURNISHINGS subject to Chapter 88.39 - Art in Public Places Program of the Azusa Development Code. Additional Site Furnishings Additional site furnishings such as newspaper racks and drinking fountains aid in creating an appealing environment and pleasant experience for pedestrians. Existing bus shelter within the Specific Plan Area. STREETSCAPE FURNISHINGS GUIDELINES All streetscape furnishing improvements should be selected with durability, cost, and vandal proofing in mind. These improvements should be implemented as a cooperative effort between the City and private development within the Specific Plan Area. A. Newspaper racks should be consolidated in activity centers and placed within multi- rack displays that are complementary to other street furnishings. B. Drinking fountains should be located in public gathering areas. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-33 May 2017 New benches and trash can receptacles enhance the existing street furnishings palette. Tree grates expand the usable sidewalk space while beautifying the street environment. 3.6.2 Downtown Streetscape Improvements The furnishings described below should be provided within the public right-of-way along Azusa Avenue, San Gabriel Avenue, Alameda Avenue, Dalton Avenue, and 9th Street within the Downtown area of the Specific Plan. All street furnishings, utility boxes, poles, etc. located along these streets should be painted “blurple” to reinforce the Downtown identity. Benches and Trash Receptacles Benches provide areas for resting or socializing and trash receptacles contribute to the maintenance and beautification of the Downtown area. Benches should be placed every 100 feet to 300 feet apart to provide convenient and attractive resting places along the street. Benches will be clustered with trash receptacles and other key furnishing elements. Manufacturer/Model - Match existing City standard. Tree Grates In order to expand the area of usable space within the pedestrian realm and create a distinct sense of place, tree grates should be used around street trees. Some of the existing trees within the Downtown area have outgrown their concrete tree grates, which become displaced as the tree grows. New tree grates should be cast iron and should be safe for pedestrian use as a walking surface. Cast iron tree grates should have break-outs to allow trees to grow without damaging the tree grate themselves. Tree grates may include light openings for uplighting. Manufacturer - Iron Age Designs Model - Oblio tree grate 4’ sq. Lighting Lighting elements unify the Downtown and provide higher light levels to promote a safer environment while enhancing the overall pedestrian experience in the area. There are two types of lighting needed for the Downtown area: street lighting and pedestrian lighting. Bollards should be MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-34 City of Azusa | TOD Specific Plan May 2017 used to define public plazas and walkways to delineate pedestrian zones from vehicle traffic at intersections, and to create a refuge for pedestrians near alleys. Pedestrian Lighting Manufacturer/Model - Match existing Light & Water Department standard. Bollards Manufacturer/Model - Match existing City standard. Bike Racks Bicycle parking is an important element in the promotion of alternative forms of travel in the planning area. Bicycle racks should be located near transit stops and popular destinations within the Downtown area. A standard for bicycle rack placement should be developed by the Public Works Department to establish safe clearance from curb lines, street trees, street furnishings and building storefronts. Existing pedestrian lighting along Azusa Avenue.Convenient bicycle racks promote and encourage bicycle use. Enclosed bicycle parking facilities should be used in areas where bicycles may need to be stored for longer periods of time. Bike lockers should be incorporated in mixed-used residential developments and at the two Gold Line transit stations. Manufacturer/Model - Match existing City standard. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-35 May 2017 3.6.3 Route 66 Streetscape Improvements Historically, Route 66 was predominantly automobile-dominated, lined with bright neon signs of businesses enticing motorists to stop and enjoy themselves along their journey into Downtown Azusa. New improvements to the Route 66 corridor within the Specific Plan Area can help link the visual character of the corridor with its past, providing a theme and element of nostalgia for Foothill Boulevard and Alosta Avenue (see Figure 3-1). Both streets should remain characteristic of the Route 66 highway culture. The use of Route 66 iconography, cast concrete, and steel will create a distinct sense of place and character for this portion of the Specific Plan Area, specifically the Foothill Commercial Centers. An example of a Route 66 thermoplastic logo. An example of Route 66 themed public art. A. New benches and trash receptacles along Foothill Boulevard and Alosta Avenue should incorporate Route 66 themed character or iconography to complement other streetscape improvements. B. All new bicycle parking along Foothill Boulevard should integrate racks that portray a resemblance to Route 66 history and/or themes. C. To further unify the Specific Plan Area, a Route 66 sign should be placed directly in the middle of lanes at all major intersections on Foothill Boulevard and Alosta Avenue. An example of the thermoplastic logo is shown to the left. D. Route 66 iconography that reflects the highway culture of historic Route 66 should be integrated as public art located in plazas, courtyards, and at major intersections. Where feasible, private developers should integrate Route 66 themes into project developments to increase a unified theme throughout the corridor and create a sense of identity. ROUTE 66 RECOMMENDATIONS MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-36 City of Azusa | TOD Specific Plan May 2017 Route 66 themed bicycle rack. Route 66 themed bench. Route 66 themed trash and recycle bins.Route 66 themed pedestrian light. ROUTE 66 THEMED STREET FURNISHING EXAMPLES MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-37 May 2017 3.6.4 APU/Citrus Avenue Station and College Connection Streetscape Improvements With large student populations, the location of both Azusa University and Citrus College within and adjacent to the Specific Plan Area demands special attention to ensure safe, convenient, and ease of access to Downtown and the nearby APU/Citrus Avenue Station. Streetscape improvements below are focused on improving the connectivity between both colleges along Foothill Boulevard east of Alosta Avenue and along Citrus Avenue north to the APU/Citrus Avenue Station (see Figure 3-1). Streetscape improvements can improve connectivity along the heavily traversed Foothill Boulevard section between APU and Citrus College. The location of the new APU/Citrus Avenue Station at the north end of Citrus Avenue. A. New benches and trash receptacles along Foothill Boulevard, east of Alosta Avenue, and along Citrus Avenue should portray a resemblance to the Azusa Pacific University benches and trash receptacles. B. Any new bicycle parking along Foothill Boulevard, east of Alosta Avenue, and along Citrus Avenue shall integrate racks that portray a resemblance to the Azusa Pacific University bicycle racks. Installation of bicycle racks should be coordinated with Azusa Pacific University and Citrus College. C. New pedestrian lighting should be incorporated along Foothill Boulevard, east of Alosta Avenue, and along Citrus Avenue to facilitate safe access in between Azusa Pacific Universities two campus, Citrus College, and the APU/ Citrus Avenue Station. Installation of pedestrian lighting should be coordinated with Azusa Pacific University and Citrus College in order to ensure consistency in design and theme. COLLEGE AREA RECOMMENDATIONS MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-38 City of Azusa | TOD Specific Plan May 2017 COLLEGE CONNECTION THEMED STREET FURNISHING EXAMPLES Bicycle rack resembling APU design and theme. Trash can resembling APU design and theme. Benches resembling APU design and theme. Pedestrian-friendly lighting. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-39 May 2017 3.7 GATEWAYS AND SIGNAGE Gateway treatments and signage will help create an identity for the Downtown and Route 66 corridor and announce this area as a special, unique place within the City. Gateways to Downtown Specific Plan or Route 66 Theme To create a unique identity and establish unity throughout the Specific Plan Area, a logo or themed sign program should be developed; the chosen sign or logo should be repeated throughout the Specific Plan Area. One opportunity may be to express the unique heritage of the area through the use of the traditional Route 66 logo and iconography. A. Develop a Specific Plan Area logo or themed sign program that is representative of and associated with Azusa. B. A Route 66 logo should be utilized along Foothill Boulevard and Alosta Avenue to uniquely distinguish this area within the Specific Plan. C. Incorporate the existing City logo into the Downtown area. Gateways and Entry Treatments Gateways are intended to identify primary entrances into the City of Azusa. The primary entries into the Specific Plan Area are on Foothill Boulevard, Azusa Avenue, Citrus Avenue, and Alosta Avenue. To emphasize entry into the City and Specific Plan Area, the following policies apply: A. A specific design theme and sign program should be created and will include a logo, gateways and entry treatments, directional signs (vehicular and pedestrian-oriented), directional and identification signs for parking, and banners. B. Signs should be colorful, lit for increased visibility, landscaped, and placed permanently at the back of the sidewalk or within raised medians. C. Gateway locations should have a unique and easily identifiable appearance with specific landscaping, lighting, and/or special signage. D. Monuments or signs should have the city logo and a greeting that is unique to the City. ENTRY RECOMMENDATIONS SPECIFIC PLAN RECOMMENDATIONS Monument signs should be strategically placed to identify entry into Azusa and/or the Specific Plan Area. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-40 City of Azusa | TOD Specific Plan May 2017 Four gateways have been identified within the Specific Plan Area: one at the 9th Street and San Gabriel intersection, one at the Foothill Boulevard and Angeleno Avenue intersection, one at Foothill Boulevard and Dalton Avenue intersection, and a primary gateway at the Foothill Boulevard and Azusa Avenue intersection. Each of these entries should include one or more of the following recommended improvements. A. The new Specific Plan or existing City logo. B. Low-rise monument signs surrounded by groundcover, shrubs, and trees, consisting of precast concrete signs with embossed letters and natural river rock pilasters with concrete caps. C. Enriched, textured and/or interlocking paving at intersections. D. Sensitive lighting treatment. Wayfinding Directional Signs A common directional sign design shall be developed to contain directional arrows and labeling to denote key points of interest and public information, such as parking facilities and transit locations. Directional signs should be smaller than the City gateways but constructed of similar materials. A. Directional signs should be located at key locations around the Downtown periphery. B. Signs should be well lit, landscaped, and prominently placed to increase visibility for motorists. C. Signs should be placed permanently at the back of the sidewalk or within raised medians. D. Signs should be well proportioned and accented with landscaping. The sign scale should be in proportion to adjacent buildings and landscaped areas. Plantings at maturity should not obscure safe vehicular sight lines. E. Signs should incorporate complementary colors, materials, and lettering fonts. GATEWAY RECOMMENDATIONS DIRECTIONAL SIGN GUIDELINES Unique, city-specific directional signage assists visitors with locating City landmarks. MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS 3 City of Azusa | TOD Specific Plan 3-41 May 2017 Downtown Identity Banners Banners are an immediate and inexpensive way to promote the overriding Route 66 theme or the individuality of the Downtown. This type of beautification effort can enhance the aesthetic environment, unify the appearance of the streetscape and introduce color and a sense of excitement to an area. Banners can provide an opportunity to communicate and promote annual cultural and civic events and provide an alternative to typical seasonal holiday displays. The placement of banners on pedestrian lighting poles shall be expanded beyond Azusa Avenue throughout the rest of the Downtown, Downtown Expansion, Gold Line, and Civic Districts. In addition, banners should be guided by the following guidelines: A. Signs should be safe, neat, and compatible with the area. B. Lettering should be clear, precise, and simple, with minimal graphics to avoid distracting motorists and creating traffic hazards. C. When appropriate, the City or Route 66 logo should be an integral part of the sign design to reinforce the unique character of the area. Directional Kiosks Directional kiosks are often located adjacent to and in conjunction with transit stations or within downtown areas to inform and guide people to their intended destinations. With the arrival of the Gold Line to Azusa, it is anticipated that people unfamiliar with the layout of the Specific Banners provide special event, honorary, or seasonal events to residents and visitors. Plan Area will be assisted by the incorporation of directional kiosks, whether to the Azusa Downtown Gold Line Station or nearby parking areas. Directional kiosks should have the following guidelines: A. A unique directional kiosk should be developed to complement the overall sign program and streetscape theme. B. Once developed, directional kiosks should be the same size, shape, and color palette. C. Specific Plan Area maps, city events information, and local business advertising space should be incorporated within the design of the kiosks. BANNER GUIDELINES KIOSK GUIDELINES MOBILITY, COMPLETE STREETS, AND STREETSCAPE IMPROVEMENTS3 3-42 City of Azusa | TOD Specific Plan May 2017 THIS PAGE LEFT BLANK SECTION 4 INFRASTRUCTURE AND PUBLIC FACILITIES 4 Essential Infrastructure Requirements for Future Development INFRASTRUCTURE AND PUBLIC UTILITIES 4 SECTION 4 CONTENTS 4.1 INTRODUCTION ...................................................................4-1 4.2 POTABLE WATER ..................................................................4-1 4.2.1 Existing Potable Water Conditions ........................................4-1 4.2.2 Proposed Potable Water System Improvements ................4-1 4.3 SANITARY SEWER ................................................................4-1 4.3.1 Existing Sanitary Sewer Conditions ........................................4-1 4.3.2 Proposed Sanitary Sewer System Improvements ................4-2 4.4 STORM DRAINAGE ..............................................................4-2 4.4.1 Existing Storm Drainage Conditions ......................................4-2 4.4.2 Proposed Storm Drainage System Improvements ..............4-2 4.5 DRY UTILITIES .......................................................................4-3 4.5.1 Telecommunications ..............................................................4-3 4.5.2 Cable Service .........................................................................4-3 4.5.3 Electricity Service ....................................................................4-3 4.5.4 Natural Gas .............................................................................4-3 4.6 COMMUNITY SERVICES ......................................................4-3 4.6.1 Police Protection and Emergency Services ........................4-3 4.6.2 Fire Protection ........................................................................4-4 4.6.3 Schools ....................................................................................4-5 4.6.4 Libraries ...................................................................................4-5 4.6.5 Parks and Recreation ............................................................4-5 4.6.6 Solid Waste .............................................................................4-6SUBSECTIONS INFRASTRUCTURE AND PUBLIC UTILITIES 4 City of Azusa | TOD Specific Plan 4-1 May 2017 4.1 INTRODUCTION Infrastructure and public facilities are essential to the success of the Azusa TOD Specific Plan. They convey water, wastewater, storm drainage, and dry utilities which support the Specific Plan’s objectives and guiding principles. This section describes existing and proposed infrastructure and public facilities which support the Specific Plan Area. 4.2 POTABLE WATER 4.2.1 Existing Potable Water Conditions Potable Water is provided by Azusa Light and Water, which utilizes a combination of groundwater from the Main San Gabriel Basin and surface water from the San Gabriel River and imported water purchased from Metropolitan Water District (MWD). ALW is the largest municipally owned water utility in the San Gabriel Valley, and serves approximately 110,000 residents, with an expected annual population growth of one percent. ALW’s service area encompasses about 8,900 acres in the San Gabriel Valley and provides service to the entire City of Azusa and portions of the cities of Glendora, Covina, West Covina, Irwindale, and unincorporated Los Angeles County. The City is currently updating its Water Master Plan. The Specific Plan Area is almost entirely located within Pressure Zone 715 which has water pressures ranging from 34 psi to 47 psi. Several streets within the Plan Area have mains less than 8 inches in diameter and proposed development will be required to upsize the mains to 8 inches along their frontage. Proposed developments are required to analyze their project to ensure adequate fire flows. 4.2.2 Proposed Potable Water System Improvements The proposed Specific Plan land uses will increase water demand by 1% over existing conditions and do not require any system wide improvements. Potable water improvements will be required on a project-by-project basis. As part of the development process, projects are required to analyze water demands and impacts on the existing system and submit proposed improvements to Azusa Light and Water for review and approval. Identified capacity improvements will be conditioned as part of the development approval process. Projects will be required to pay connection fees to offset their impacts. 4.3 SANITARY SEWER 4.3.1 Existing Sanitary Sewer Conditions The City of Azusa provides sewer service within the Specific Plan Area. Sanitary sewer is collected in the City’s collection system which conveys flows to mains owned by Los Angeles County Sanitation District (LACSD). Sewer is treated at LACSD’s San Jose Creek Water Reclamation Plant located adjacent to the City of Industry. The existing sewer lines include a gravity collection system comprised of approximately 80 miles of trunk sewer lines and 1,647 four foot manholes. Wastewater collected in the City’s trunk sewer lines flows south to the Los Angeles County Sanitation District’s San Jose Creek Water Reclamation Plant (SJCWRP). INFRASTRUCTURE AND PUBLIC UTILITIES4 4-2 City of Azusa | TOD Specific Plan May 2017 The City’s Sewer System Master Plan was prepared by Lee & Ro, Inc. in 2010. The Master Plan has not identified any hydraulic deficiencies within the Specific Plan Area. The City’s Capital Improvement Program has identified several existing pipes within the Specific Plan Area to be rehabilitated with Cured In-Place Pipe (CIPP) reconstruction. 4.3.2 Proposed Sanitary Sewer System Improvements The proposed Specific Plan land uses will increase sewer loading by less than 1% over existing conditions. No system wide improvements have been identified. As part of the development process projects will be required to pay sewer connection fees to offset their impacts for both conveyance and treatment. 4.4 STORM DRAINAGE 4.4.1 Existing Storm Drainage Conditions The Flood Control Division (Division) of Los Angeles County Department of Public Works (LACDPW) is responsible for operating and maintaining major flood control facilities located throughout the County. The facilities include approximately 15 major dams, 450 miles of open channels, 2,500 miles of underground storm drains, 70,000 miles of street drains, 280 sediment entrapment basins, 218 concrete stream bed stabilization structures, 33 pumping plants, and other support facilities located throughout the County. The Division only maintains those flood control facilities that are part of the County-maintained flood control system and provides no review, management, or on-going maintenance of private facilities. The City of Azusa Department of Public Works maintains and operates a limited number of drainage facilities within the City. The existing storm drain and flood control systems contain most of the storm runoff within the system. The National Pollutant Discharge Elimination System (NPDES), regulated by the USEPA, is the primary regulation for storm water pollutant sources in the County and the cities within the County. The Standard Urban Storm Water Mitigation Plan (SUSMP) was developed as part of the municipal storm water program to address storm water pollution from new development and redevelopment by the private sector. The SUSMP contains a list of minimum required Best Management Practices that must be used for a designated project. 4.4.2 Proposed Storm Drainage System Improvements The proposed Specific Plan land uses do not require any storm drainage improvements within the Plan Area. Each proposed project will be required to submit a Hydrology/Hydraulic Report, Storm Water Pollution Prevention Plan (SWPPP), and Standard Urban Stormwater Management Plan (SUSMP), if applicable, and provide appropriate on-site mitigation measures. The SUSMP must comply with the Los Angeles Regional Water Quality Control Board requirements which include identifying receiving water, potential pollutants, describing site characteristics, minimizing impervious area, maximizing impervious area, and retaining and infiltrating runoff where applicable. Proposed development will be required to comply with the Regional Water Quality Control Board MS4 Permit including mitigating storm water runoff to pre-development rates and providing acceptable water quality treatment. INFRASTRUCTURE AND PUBLIC UTILITIES 4 City of Azusa | TOD Specific Plan 4-3 May 2017 4.5 DRY UTILITIES All Dry Utilities within the Specific Plan Area shall be consistent with the development standards of Chapter 88.46 - Telecommunications Facilities of the Development Code. 4.5.1 Telecommunications Verizon provides telecommunications in the Specific Plan Area. The existing system is anticipated to meet the demands of the proposed land uses. 4.5.2 Cable Service Charter Communications provides cable television in the Specific Plan Area. The existing system is anticipated to meet the demands of the proposed land uses. 4.5.3 Electricity Service Azusa Light and Water provides electric service in the Specific Plan Area. The existing transmission and distribution system is anticipated to meet the demands of the proposed land uses. The City has an Undergrounding Policy (reference) and all new electric services are required to be underground. Additionally, projects are reviewed to determine if existing overhead lines adjacent to the project must be underground as a condition of development. 4.5.4 Natural Gas The Southern California Gas Company provides natural gas service to the Project Area. SoCal Gas has confirmed that there are facilities in the area and service would be provided in accordance with SoCal Gas’ policies and extension rules on file with the California Public Utilities Commission at the time contractual arrangements are made (project-by-project basis). 4.6 COMMUNITY SERVICES 4.6.1 Police Protection and Emergency Services The Azusa Police Department (Department) is responsible for providing general law enforcement to the City and enforcing the local, state, and federal laws. The Department is comprised of 63 sworn police officers. Officers’ duties can include street patrol, traffic enforcement, and responding to emergency calls. The Department operates one station, located at 725 North Alameda Avenue, within the Project Area, and does not have plans for new facilities or expansion of the existing station. The station can accommodate a total of 146 sworn and non-sworn police officers and related equipment, and could accommodate a projected citywide buildout population of approximately 63,500 residents. The Department’s target officer to population ratio is 1.27 sworn officers for each 1,000 residents. Based on the City’s 2014 population of 48,385 residents, the officer to resident ratio is 1:768, well within the targeted ratio. The Department does not currently maintain target response times for response calls; however, the Department currently has response times of 3.03 and 4.5 minutes for priority one and non-priority one calls, respectively. The Department’s goal is to keep response times to less than five minutes. INFRASTRUCTURE AND PUBLIC UTILITIES4 4-4 City of Azusa | TOD Specific Plan May 2017 The City has an Emergency Operations Center (EOC), and the EOC emergency management group organizes the City’s approach to emergency management into four phases: 1) mitigation, 2) planning and analysis, 3) response, and 4) recovery. The EOC is made up of City employees, with the Chief of Police and Captain of the Fire Department at the helm. The City partners with county, state and federal organizations to respond to emergency events, as well as having mutual aid agreements with other agencies also located in Los Angeles County’s Disaster Management Area D. In January of 2014, the Colby Fire was an unplanned emergency event that activated the EOC, and cost the City almost $7 million dollars in damages. Memorial Park was set up as an evacuation center in anticipation for voluntary and mandatory evacuations. Heavy spring rains, associated with land and mud slides, also required EOC activation in 2014. Potential development allowed under the Project would result in additional, but less-than-significant, demands on existing police and emergency services, as disclosed in the EIR, for both short-term construction activities of proposed projects in the Project Area and the long-term services that would be provided to future development. To further reduce impacts, the EIR requires that development projects incorporate safety measures (e.g., alarm systems, security lighting, other on-site security measures, and crime prevention through environmental design policies), subject to the review and approval of the Planning and Police Departments. The Department reviews all development plans to ensure that police and emergency services are adequate to serve the project. 4.6.2 Fire Protection Fire protection services are provided to the City by the Los Angeles County Fire Department (LACFD) and include fire, rescue, and hazardous materials prevention and emergency services. The LACFD uses national guidelines for response time targets, which consist of five minutes for the first arriving unit for fires and basic life support, and eight minutes for advanced life support (paramedic) in urban areas. In 2013 the LACFD’s average emergency response time for the City was four minutes and 52 seconds. LACFD Fire Stations 32 and 97 currently serve the Project Area. Fire Station 32 is located in the Project Area at 605 North Angeleno Avenue. Fire Station 32 would be the first responders to emergency calls. Fire Station 97 is located at 18453 East Sierra Madre Avenue, approximately 2.6 miles north of the Project Area, and would also respond to calls as needed. Potential development allowed under the Project would result in additional, but less-than-significant, demands on existing fire protection services, as disclosed in the EIR. Development projects are required to comply with all City and LACFD codes and regulations regarding access requirements for commercial and residential areas and design standards for fire prevention (e.g., emergency plans and evacuation routes), including the payment of development fees to offset impacts on fire protection services. To further reduce impacts, the EIR requires that development projects incorporate fire protection improvements in their designs, including access requirements and modernization of any existing equipment and/or systems. Further, LACFD reviews all development plans to ensure that fire and emergency/medical services are adequate to serve the project. INFRASTRUCTURE AND PUBLIC UTILITIES 4 City of Azusa | TOD Specific Plan 4-5 May 2017 4.6.3 Schools Azusa Unified School District (District) provides elementary, middle, and high school education services to City residents. The District includes 11 elementary schools (including Alice Ellington School which will be a Kindergarten thru 8th grade school as of the 2015-16 school year), three middle schools, and three high schools. Enrollment in the District in the 2014-15 school year is 4,554 students in elementary school, 2,163 in middle school, and 2,942 in high school for a total enrollment of 9,659. 4.6.4 Libraries The City operates the Azusa Public Library (Library) located at 729 North Dalton Avenue, located within the Project Area. The 18,500 square foot facility was built in 1959 and has not been expanded. Expansion and remodeling plans are in preliminary stages but necessary funding sources have not been established. The Library maintains 104,829 resources including books, periodicals, and audio resources in English and Spanish. Currently the Library does not maintain a service level ratio based on the number of resources to residents, however based on the 2014 population of 48,385 residents the City currently maintains a ratio of 2.16 resources per resident, which is slightly under the State median of 2.26 resources per resident. The Library maintains 16 public desktop computers and 15 lap tops. Due to budget constraints the Library staff is understaffed, comprised of 7 full-time and 17 part-time staff members. The Library offers a variety of services including English as a Second Language (ESL) instruction, a grant funded adult literacy program, computer classes and computer and Wi-Fi access, passport and notary services, children programs, tutoring, and summer reading programs. The Library’s bookmobile has been in operation for over five years and provides service to City residents that do not live near the Library. In addition, the bookmobile visits four schools in the City every week. Residents are able to check out and return books at bookmobile events. From 2013 to 2014 the bookmobile hosted over 6,000 events at schools, parks, and community events. Potential development allowed under the Project would result in additional, but less-than-significant, demands on existing Library services, as disclosed in the EIR. The majority of the Library’s budget is derived from the City’s General Fund and tax revenue. New businesses and residents associated with future development within the Project Area would increase City revenue and contribute to the City’s General Fund, and the Library. Further, individual projects would be required to evaluate impacts to the Library on a case-by-case basis during the development review process. 4.6.5 Parks and Recreation The City’s Parks and Facilities Division is responsible for maintenance of 52 acres of park and a 13-man, seven- day-a-week operation. The City has approximately 12,000 parkway, median islands and City park trees. These trees have been placed on a five-year trim cycle. There are 16 parks located throughout the City, ranging in size from as small as Edwards Park at 0.20 acres and as large as Northside Park at 15.09 acres. INFRASTRUCTURE AND PUBLIC UTILITIES4 4-6 City of Azusa | TOD Specific Plan May 2017 The parks range in amenities and types with features such as walking paths, bike trails, playground equipment, barbecues and picnic tables, restrooms, park benches, play fields, ball courts, a skate park, Frisbee course, Fitness Par Course, and aquatics facilities. Some park facilities are available for rentals for special events, such as the Memorial Park North Recreation Center, and Gladstone, Northside, Pioneer, Slauson, Veterans Freedom, and Zacatecas Parks. In 2011, the City opened the Memorial Park Community Garden where plots are available for rent. Veterans Freedom Park is the only City park located within the Project Area. Northside Park is about 0.25 miles northwest of the Project Area Memorial and Slauson Parks are located just south of the Project Area. Memorial Park is located just south of Slauson Middle School and Slauson Park is located northeast of the intersection of Pasadena Avenue and 5th Street. 4.6.6 Solid Waste Athens Disposal Company (ADC) provides solid waste disposal services for the City. Solid waste is collected by ADC and taken to the City of Industry materials recovery facility (MRF) where it is sorted. Paper, glass, plastics, and metals are recovered and recycled at the MRF, and the remaining solid waste is hauled to one of several solid waste sites serving the City. In 2013, the City disposed of approximately 36,700 tons of solid waste, about 2,800 tons (8%) of which was generated within the Azusa TOD Specific Plan (Project) area. A majority of this waste is disposed of at Class III or unclassified landfills, which do not accept hazardous waste. However, there are three landfills, located within Kern and Kings Counties, which accept hazardous waste generated within the City. Potential development allowed under the Project would result in additional, but less-than-significant, solid waste generation, as disclosed in the Azusa TOD Specific Plan Environmental Impact Report (EIR). Future development within the Project Area would be required to recycle/divert 50% of construction waste and the remainder would be disposed of in a Class III landfill or a mixed debris recycling facility which recycles 50% of all waste received. Long-term generation associated with operations of future development would generate a maximum of about 490 tons per year (17% increase), assuming the State-required 60% diversion rate. The City is also working to reduce the amount of solid waste disposed of in general through recycling, grasscycling and xeriscaping programs and providing free composting and green waste receptacles. The City also participates in Los Angeles County’s Recycling market Development Zone program, which combines recycling with economic development to fuel new businesses, expand existing ones, create jobs, and divert waste from landfills. Hazardous materials would be disposed of at one of the hazardous material facilities Kern and Kings Counties. Further, individual projects would be required to evaluate construction and operational solid waste impacts on a case-by-case basis. SECTION 5 5 Strategies and Direction for Implementing This Specific Plan IMPLEMENTATION STRATEGIES AND FINANCING IMPLEMENTATION STRATEGIES AND FINANCING 5 SECTION 5 CONTENTS 5.1 INTRODUCTION ........................................................5-1 5.2 HOW THE SPECIFIC PLAN CAN ATTRACT PRIVATE INVESTMENT AND PROVIDE PUBLIC BENEFITS ........5-1 5.3 ECONOMIC CONDITIONS INFLUENCING DEVELOPMENT POTENTIALS IN THE SPECIFIC PLAN AREA ...............................................................5-2 5.3.1 Advantageous Factors .............................................5-2 5.3.2 Challenging Factors ..................................................5-3 5.4 SUMMARY OF NEW DEVELOPMENT POTENTIALS ....5-4 5.5 FINANCIAL ANALYSIS OF ALTERNATIVE DEVELOPMENT PROJECTS AT AZUSA OPPORTUNITY SITES ........................................................................5-5 5.6 CREATING THE CONDITIONS FOR ATTRACTING PRIVATE INVESTMENT - CITY’S ROLE AND TOOLS ...5-6 5.6.1 Zoning .........................................................................5-6 5.6.2 Streamlined Permitting and Entitlement .................5-6 5.6.3 Management of Entitlements ..................................5-6 5.6.4 Tools to Encourage Rehabilitation and Creative Reuse of Commercial Properties .............................5-7 5.6.5 Marketing Partnerships .............................................5-7 5.6.6 Branding .....................................................................5-7 5.6.7 Marketing and Other Information-Compilation Options .......................................................................5-7 5.6.8 Coordination with Other Organizations .................5-8 5.7 POTENTIAL FUNDING SOURCES AND FINANCING MECHANISMS ..........................................................5-8 5.7.1 Business Improvement Districts .................................5-8 5.7.2 Enhanced Infrastructure Financing Districts ...........5-9 5.8 IMPLEMENTATION ACTION PLAN ..........................5-12SUBSECTIONS 5-1 Summary of Market Demand Forecasts ...........................5-4 5-2 Implementation Action Plan ............................................5-12 TABLES IMPLEMENTATION STRATEGIES AND FINANCING 5 City of Azusa | TOD Specific Plan 5-1 November 16, 2015 5.1 INTRODUCTION This section outlines the implementation program for the Azusa TOD Specific Plan Areas. The implementation program includes the following components: • An overview of the ways the Specific Plan can attract economic investment and public improvements; • A review of key existing economic conditions influencing current and future development potentials in the Specific Plan Area; • A summary of the types of new development that are likely to be successful in the Specific Plan Area; • Financial analyses of alternative development projects at two key/representative opportunity sites within the Specific Plan Area; • A description of various economic development “tools” or implementation approaches available to the City of Azusa to achieve the Specific Plan objectives; and • A review of potential funding sources/mechanisms for implementation of key Specific Plan initiatives. Note: Within this section there are numerous strategies and other entries that are universally applicable to many different communities. The way in which they are ultimately adapted to Azusa will be somewhat unique, however, which will depend on numerous specific conditions including for example available resources, the interrelationship of various programs, preferences of the applicable stakeholder groups, and other considerations. 5.2 HOW THE SPECIFIC PLAN CAN ATTRACT PRIVATE INVESTMENT AND PROVIDE PUBLIC BENEFITS An effective specific plan typically involves both the public and private sectors. Whereas development of the land uses envisioned for a plan area is often “kick started” by various public sector initiatives, the ultimate goal of this type of planning effort is to attract desired private investment. Broadly speaking, there are two major ways that a municipality can facilitate private development: 1. By creating a “conducive development environment” that is consistent with prevailing market demand for various land uses. This may include the following types of actions or policies: • Zoning, design guidelines, etc. that are responsive to market needs at the individual establishment level, while maintaining the overall character of the plan area that preserves and enhances its general marketability; • Information about the concepts, intent, etc. of the specific plan area to prospective investors/ tenants; • Streamlined permitting and entitlement processes (i.e., minimizing the need for discretionary approval processes, environmental impact analysis, etc.); • Area-wide infrastructure investments, including parking facilities and street improvements; • Area-wide “amenity” investments, including landscape and streetscape improvements; • Marketing programs to enhance the area’s identity and recognition among consumers; and • Clearinghouse roles (e.g., coordination of funding resources and dissemination of information related to investment in the Plan area). IMPLEMENTATION STRATEGIES AND FINANCING5 5-2 City of Azusa | TOD Specific Plan May 2017 2. By providing focused development support to area businesses, property owners, and key development projects. This can involve the following types of initiatives: • Financially structuring shared infrastructure improvements that increase the productivity of the area, in ways that are advantageous to development, such as shared parking (including, in this case, the potential opportunity to utilized surplus parking within the planned MTA parking structure); • Investing in specific infrastructure improvements in the specific plan area; and • Providing loans and/or grants for various business and property improvement purposes such as building façade renovations. Each of these potential implementation items is described in greater detail in Sections 5.6 and 5.7 of this chapter. 5.3 ECONOMIC CONDITIONS INFLUENCING DEVELOPMENT POTENTIALS IN THE SPECIFIC PLAN AREA An effective specific plan needs to be based on a realistic understanding of the market conditions affecting the specific plan area. Simply changing zoning on a map will not attract development unless there is an underlying market demand for a particular land use. On the other hand, if there is immediate demand for a desirable land use that is not permitted under existing zoning, a change in zoning can bring about very significant results. Moreover, appropriate zoning changes can be made more effective if coupled with policies that address other existing barriers to development (e.g., insufficient infrastructure). A summary of the major favorable and challenging conditions affecting development potentials in the Specific Plan Area is provided below. 5.3.1 Advantageous Factors Azusa in general and the Specific Plan Area overall are advantaged by the following geographic and socioeconomic factors: • Substantial frontage along the I-210 freeway (with this factor affecting Azusa’s profile in general, but not specifically applying to the Plan Area); • The two Azusa Gold Line stations and the TOD opportunities that are the focus of the Specific Plan; • The potential to utilize surplus parking (within the planned MTA Downtown Station parking structure) as a means of incentivizing private development in the Downtown area; • City-owned parcels in the Downtown and adjacent districts, although these have limited flexibility in terms of providing an incentive for development; • The presence of Azusa Pacific University, which positively affects the City’s overall image and also has the potential to create direct demand for various types of private development; • Being adjacent to the Angeles National Forest, and foothills areas that represent amenity-based development opportunities; and • In comparison to other TOD areas along the Gold Line, being moderately competitive in terms of surrounding home values, commuters who use buses, and the size of the surrounding population base. IMPLEMENTATION STRATEGIES AND FINANCING 5 City of Azusa | TOD Specific Plan 5-3 November 16, 2015 5.3.2 Challenging Factors The City and Specific Plan Area also face several notable challenges: • Competing downtown areas, such as Monrovia’s, are currently higher-profile destinations for such activities as dining and nightlife, with established market positions. • Azusa has little existing multi-family housing, which is the type of housing most likely to occur in a TOD area. This can present certain challenges in terms of having to “pioneer” this type of use in the community, from both a market-acceptance and community-acceptance perspective. • Azusa generally lacks regional-serving Class A office space and therefore is not an established center for the types of professional firms that typically locate in premium office space. • Portions of the Specific Plan Area are in significant need of revitalization and/or new development. • The Specific Plan Area is largely built out and even if prevailing property values are relatively high, most parcels are already developed with existing uses that were viable given the land prices under which they were originally developed. This situation will tend to limit the financial feasibility of redeveloping these parcels with lower-density land uses. That is, in most cases, new development would need to be relatively high density in order for the ultimate value of the development to justify the costs associated with buying and clearing land that is currently occupied with other uses. While there may be some currently underutilized sites that are exceptions to this observation, it probably applies as a good rule thumb for defining the types of opportunities that are likely to exist for most parcels. • In areas where high land values challenge the financial feasibility of redevelopment (or new development), the cost of providing adequate parking is often a “deal breaker” for infill development or redevelopment, especially if structured parking is required. The potential opportunity for the City to utilize surplus parking in the planned MTA structure may mitigate this challenge to some degree. However, that potential opportunity would generally be limited to projects in immediate proximity of the planned Azusa Downtown Station. The above conditions suggest the following major conclusions about the types of opportunities that are likely to apply to existing or future development in the Specific Plan Area: 1. Most new development will likely need to be relatively high density given prevailing land values (and the related cost of assembling viable development sites); 2. Parking solutions for mixed-use need to be as creative as possible, and these concepts are addressed elsewhere in the Specific Plan. 3. The area could benefit from an overall branding effort to achieve place recognition and effective leveraging of the area’s location strengths (as noted above under “advantageous factors”). 4. The preceding points all suggest that the City is well served by a flexible approach that anticipates the above issues and is responsive to the accompanying needs and market demands. IMPLEMENTATION STRATEGIES AND FINANCING5 5-4 City of Azusa | TOD Specific Plan May 2017 5.4 SUMMARY OF NEW DEVELOPMENT POTENTIALS As part of the background research for this Specific Plan, The Natelson Dale Group, Inc. (TNDG) prepared a market study to identify long-range demand for various types of development in the Specific Plan Area. Key findings from the demand analysis are summarized in Table 5-1 below. Table 5‐1. Summary of Market Demand Forecasts    Downtown APU/Citrus      Notes    Station Station Balance  Citywide  Land Use Area Area Of City Total          Forecast assumes that multi‐family will be 40% of  new housing in the conservative scenario and 50%  in the high scenario (on the assumption that the  higher level of development would most likely  occur in multi‐family).  Multi‐family dwelling units        ‐‐ Conservative Scenario 560 240 800  ‐‐ High Scenario 840 360 1,200                     Detailed tables in the demand study show the  breakdown of demand by retail sales category. Retail (square feet) 183,000 167,000 226,000 576,000                       Conservative scenario reflects a continuation of  historic trends; high scenario assumes that City  captures a higher share of San Gabriel Valley office  demand.  Office (square feet)          ‐‐ Conservative Scenario 45,000 18,000 27,000 90,000  ‐‐ High Scenario 75,000 30,000 45,000 150,000              Hotel (rooms) 95‐150 rooms  110  rooms  205‐260  rooms  A hotel currently proposed for a site along the 210  Freeway will absorb demand for approximately  110 rooms, leaving net demand of 95‐150 rooms  for an additional hotel project.   Source: The Natelson Dale Group, Inc. (TNDG)    Table 5-1: Summary of Market Demand Forecasts IMPLEMENTATION STRATEGIES AND FINANCING 5 City of Azusa | TOD Specific Plan 5-5 November 16, 2015 5.5 FINANCIAL ANALYSIS OF ALTERNATIVE DEVELOPMENT PROJECTS AT AZUSA OPPORTUNITY SITES The real estate market analyses prepared by TNDG for the Azusa TOD subareas, plus an investigation of local real estate financial conditions, provide background information on the feasibility of development in the Specific Plan Area. The Natelson Dale Group Inc. (TNDG) in coordination with RRM Design Group developed a Financial Analysis (Appendix B) with the intent of providing the City of Azusa with an overview of the financial feasibility of alternative real estate development projects at specific sites in the downtown area (Site 36 is in the Specific Plan Downtown District, the Dalton site in the Downtown Expansion District), based on prototypes generated by RRM. Four separate scenarios were evaluated, involving retail, office, and residential uses in various configurations and combinations. The analysis indicated that all of the theoretical development scenarios were financially feasible; although the scenarios that included office space were less likely to be feasible the higher the proportion of office space in the project. Among all the scenarios higher density projects also had a higher level of profitability. Although TNDG prepared this analysis using assumptions that appeared to be reasonable at the time, the sensitivity of these kinds of models to varying factors, changes in market conditions over time, and different opinions and assumptions that developers and other analysts bring to exercises of this kind, all suggest that this analysis be used by the city as an internal project review tool, which can be easily altered by staff as conditions warrant. The model is likely to have the most value to the City as a way to compare alternate project types, as well as review submitted projects. The feasibility of new commercial development would generally be significantly enhanced if configured as mixed-use projects with multi-family residential. In the process of designing and developing mixed-use projects, care is necessary in defining the expectations for ground-floor retail, which must synchronize with other area retail and other uses, and issues to be addressed will include mix, demand in relation to supply, and the like. The downtown area districts in which opportunity sites are concentrated could benefit from a “designer in residence” program where owners of neighboring existing developed property could get conceptual guidance on how to upgrade properties within an overall somewhat unified vision. See Appendix B for an expanded discussion on the Financial Analysis of Alternative Development Projects. IMPLEMENTATION STRATEGIES AND FINANCING5 5-6 City of Azusa | TOD Specific Plan May 2017 5.6 CREATING THE CONDITIONS FOR ATTRACTING PRIVATE INVESTMENT - CITY’S ROLE AND TOOLS 5.6.1 Zoning From an economic perspective, two key issues need to be addressed as it relates to zoning within the Specific Plan Area: 1. Allowable densities need to be high enough to facilitate market-driven redevelopment of selected parcels given the relatively high land values in the Specific Plan Area. 2. Zoning should allow the flexibility to develop desirable land uses for which the future market is uncertain. The development standards and allowable uses contained within Chapter 2 strive to accomplish this. 5.6.2 Streamlined Permitting and Entitlement A key advantage to adopting a Specific Plan is that it provides a vehicle for expedited approval of development proposals that are consistent with the community vision established by the Specific Plan. Developers consistently cite this type of provision as a key factor in selecting the communities where they will pursue projects. In this regard, it is essential that the adopted plan remove to the maximum degree possible the need for discretionary approvals for projects that fall within the development “envelope” established by the Specific Plan. The program-level environmental impact report (EIR) being prepared as part of this Specific Plan process will provide a significant incentive in this regard. 5.6.3 Management of Entitlements The structure of the Specific Plan helps maximize attractiveness of the area for development and other investment by aligning development potential and desired development with “given” entitlements, thereby minimizing the need for property owners/developers to seek additional entitlements. At the same time, the Land Use and Urban Form section of the Plan provides the regulatory framework and design guidelines to create unique and identifiable districts within the Specific Plan Area. Setting clear development frameworks and minimizing the need for additional entitlements also gives the area a marketing advantage. Any future adjustments to entitlement conditions can adhere to the spirit of keeping the development process as streamlined as possible. Another aspect of managing entitlements is the matter of having a “finite allotment of the entitlements” available for Specific Plan Area-area properties, which would accomplish three things: 1. Recognize practical limits in the demand for different land uses in the area, 2. Keep the development at a manageable level and type mix, and 3. Incentivize early (timely) redevelopment of individual sites. This concept may seem counterproductive with respect to the discussion above about the desirability of maximizing entitlements in the area. However, the two notions can be complementary, as development timing is the critical factor. IMPLEMENTATION STRATEGIES AND FINANCING 5 City of Azusa | TOD Specific Plan 5-7 November 16, 2015 5.6.4 Tools to Encourage Rehabilitation and Creative Reuse of Commercial Properties For appropriate properties, the City could have programs in place to encourage rehabilitation and creative use/reuse of commercial sites, such as dedicated grant/loan programs using CDBG or other funds. Within the Plan Area, existing commercial uses are frequently found located in small individual properties and/or spaces that may be somewhat inefficient in terms of their relationship to the street and to parking, and their overall adaptability to various uses. However, these kinds of conditions also lend the area a character that is somewhat unique within the overall trade area. These spaces can be attractive to creative entrepreneurs in all fields of endeavor. 5.6.5 Marketing Partnerships The City could implement the marketing options discussed below, and other branding and information- compilation activities, in careful coordination with the Azusa Chamber of Commerce, and any other appropriate development partners. 5.6.6 Branding As a starting point for future marketing initiatives for the Specific Plan Area, the City could conduct a branding exercise or similar process by which to designate the Specific Plan Area with a marketing-friendly name. 5.6.7 Marketing and Other Information-Compilation Options The City could undertake, or support through partnership with appropriate entities, any or all of the following options: 1. Develop materials for and/or conduct workshops around the theme of, “why developing/occupying the Specific Plan Area is good business.” Companion materials for living in the area could also be produced. Topics within these materials include: descriptions of how the area is value-planned, general and specific ways in which the City functions as a key partner in developing the area, benefits potentially available to developers, businesses, etc. from sources in addition to the City, and advantages to various uses from a market point of view. 2. Produce a high-quality newsletter devoted to the Plan Area, issued on a regular schedule, that contains information of interest to both the property owners, businesses, and residents, and to outsiders, including people who are not familiar with the area and may have an interest in investing in it. 3. Produce an annual report of development activity in the Plan Area, including development-related data such as absorption, occupancy, mix of business types, noteworthy development news, etc. The content and format of such a report can be modeled on those produced periodically by real estate brokerage firms. This kind of information could also serve as one focus of compiling monitoring/evaluation information. Marketing of the Specific Plan Area could be accomplished in recognition of the fact that Generation Y (Millennials) apparent preferences for higher density development will work in the area’s favor. (While a preference for higher density development has been noted under current conditions, additional investigations of Millennials has noted that these preferences may lead to a higher turnover rate as they transition onto different housing types). IMPLEMENTATION STRATEGIES AND FINANCING5 5-8 City of Azusa | TOD Specific Plan May 2017 5.6.8 Coordination with Other Organizations Given the many options for coordinating marketing and related activities supporting implementation, the City could review its overall position relative to economic development planning and marketing in order for this action to be optimized. Role of SCAG with respect to Azusa. As a member of the Southern California Association of Governments (SCAG), the City has access to the following benefits outlined on the SCAG website: • Assisting in locating and securing grant funding from federal and state agencies • Providing methodologies, tools and training programs to help members implement approved regional plans • Receiving priority responses on requests for data, publication or other planning support • Requesting the creation of customized maps for use on the City’s website • Access jurisdictional data analyses, forecasting data and additional GIS resources. Currently, SCAG provides links to the City’s main website as well as an ‘Area Profile’ for Azusa, which was is dated May of 2015. The document provides an overview of demographic, employment, housing, transportation, retail sales, education, and other regional highlights. 5.7 POTENTIAL FUNDING SOURCES AND FINANCING MECHANISMS A series of financing tools potentially available to the City, from federal, state, and organizational sources, and from mechanisms that the City could implement, are detailed in Appendix C, Financing, in this document. A few selected examples are discussed in this section. Funding mechanisms generally have at least some strategic dimension. The sustainability orientation of the Specific Plan is compatible with federal programs that have been aligned toward this overall objective, including the Partnership for Sustainable Communities, a consortium of the U.S. Department of Transportation, the U.S. Department of Housing and Urban Development, and the U.S. Environmental Protection Agency. 5.7.1 Business Improvement Districts The Business Improvement District (BID) mechanism can be used to help fund specific improvements in specific areas, and also strategically to foster the functional interrelationships of districts addressed within the Specific Plan. For example, by making all or a group of the various districts that comprise the Specific Plan Area a single BID, property and business owners are more likely to identify common interests, solutions, etc. than if the common BID area did not exist. The BID mechanism is also an example of how financing methods must be carefully coordinated with property and business owners in order for them to be understood and accepted. The more the occupants of the BID area see themselves as part of a unified, strategically planned and organized whole, the greater the likelihood that a funding mechanism with direct costs tied to them will be accepted. IMPLEMENTATION STRATEGIES AND FINANCING 5 City of Azusa | TOD Specific Plan 5-9 November 16, 2015 5.7.2 Enhanced Infrastructure Financing Districts Senate Bill No. 628, creating enhanced infrastructure financing districts (EIFDs) took effect on January 1, 2015. EIFDs are designed to fund infrastructure development and community revitalization, through issuing bonds, establishing a public financing authority, and adopting an infrastructure financing plan. EIFDs include a provision for using tax increment financing. A broad range of community development and revitalization projects can be funded through this mechanism. A. OVERVIEW Along with the EIFD, the bill allows a city/county to adopt an infrastructure financing plan and issue bonds upon approval of 55% of the voters. As excerpted from the Bill’s text, the bond funds would be used to “finance public facilities or other specified projects of community-wide significance, including, but not limited to, brownfield restoration and other environmental mitigation; the development of projects on a former military base; the repayment of the transfer of funds to a military base reuse authority; the acquisition, construction, or rehabilitation of housing for persons of low and moderate income for rent or purchase; the acquisition, construction, or repair of industrial structures for private use; transit priority projects; and projects to implement a sustainable communities strategy.” Prior to the adoption of an EIFD and infrastructure financing plan, the bill requires the legislative body to establish a public financing authority, which would be comprised of members of the legislative body of the participating entities and of the public. In addition, the bill would require the adoption of a “resolution of intention” that, among others would include the following: • District boundaries • Description of the proposed public facilities/development that would be financed or assisted by the EIFD • Need for the EIFT and goals to achieve The infrastructure financing plan, along with agreement from affected taxing agencies, would provide the mechanism to fund infrastructure projects through tax increment financing. Specifically, the bill authorizes the creation of an EIFD for up to 45 years from the date on which the issuance of bonds is approved. In addition, the bill would authorize a city, county, or special district that contains territory within an EIFD to loan moneys for projects/activities that are listed in the infrastructure financing plan. Finally, the city/county, through its infrastructure financing plan, could choose to allocate any portion of its net available revenue to the EIFD. B. WHAT IS ALLOWED As excerpted from the Bill’s text, an EIFD can finance only public capital facilities or other specified projects of community-wide significance that provide significant benefits to the district or the surrounding community, including, but not limited to, all of the following: 1. Highways, interchanges, ramps and bridges, arterial streets, parking facilities, and transit facilities. 2. Sewage treatment and water reclamation plants and interceptor pipes. IMPLEMENTATION STRATEGIES AND FINANCING5 5-10 City of Azusa | TOD Specific Plan May 2017 3. Facilities for the collection and treatment of water for urban uses. 4. Flood control levees and dams, retention basins, and drainage channels. 5. Child care facilities. 6. Libraries. 7. Parks, recreational facilities, and open space. 8. Facilities for the transfer and disposal of solid waste, including transfer stations and vehicles. 9. Brownfield restoration and other environmental mitigation. 10. The development of projects on a former military base. 11. The repayment of the transfer of funds to a military base reuse authority pursuant to Section 67851 that occurred on or after the creation of the district. 12. The acquisition, construction, or rehabilitation of housing for persons of low and moderate income, as defined in Section 50093 of the Health and Safety Code, for rent or purchase. 13. Acquisition, construction, or repair of industrial structures for private use 14. Transit priority projects, as defined in Section 21155 of the Public Resources Code, that are located within a transit priority project area. 15. Projects that implement a sustainable communities strategy, when the State Air Resources Board, pursuant to Chapter 2.5 (commencing with Section 65080) of Division 2 of Title 7, has accepted a metropolitan planning organization’s determination that the sustainable communities strategy or the alternative planning strategy would, if implemented, achieve the greenhouse gas emission reduction targets. 1 https://leginfo.legislature.ca.gov/faces/billVotesClient.xhtml. C. WHAT IS NOT ALLOWED Restrictions include the following: 1. An EIFD can only be created after the City/County after the specified conditions related to the wind down of the former redevelopment agency (if one was created by the city/county) have been satisfied. 2. Cannot divert property tax revenue from schools or from any non-consenting tax entity – any taxing entity contributing tax increment must consent and opt into the EIFD. 3. A district may not finance routine maintenance, repair work, or the costs of an ongoing operation or providing services of any kind. IMPLEMENTATION STRATEGIES AND FINANCING 5 May 2017 City of Azusa | TOD Specific Plan 5-11 Differences between EIFD and IFD  Category EIFD IFD      Created Adopt infrastructure financing plan –  city/county legislative body 2/3 vote of the electorate  Issue of bonds based on  tax increment financing 55% vote of the electorate 2/3 vote of the electorate  Eligible projects Broader range – e.g., transit, lmi  housing, sustainable communities  strategies, environmental  remediation, etc., in addition  traditional infrastructure projects  Public capital facilities (more  limited)  Financing authority Can dedicate more revenue sources   to the funding of infrastructure – e.g.,  can devote portions of their periodic  distributions from the  Redevelopment Property Tax Trust  Fund, funds received from the Mello‐ Roos Community Facilities Act of  1982 and funds from the Benefit  Assessment Act of 1982, among  others  More limited  Longevity 45 years from date bonds are issued  or loans are approved  30 years from initial formation  Eminent Domain Can exercise eminent domain powers  under the Polanco Redevelopment  Act associated with the cleanup of  environmentally impacted properties  Not available  Source: Holland & Knight. http://www.hklaw.com/Publications/Enhanced‐Infrastructure‐Financing‐ Districts‐SB‐628‐Beall‐11‐12‐2014/ (accessed on 5/20/15)  1 EIFD = Enhanced Infrastructure Financing District 2 IFD = Infrastructure Financing District 1 2 IMPLEMENTATION STRATEGIES AND FINANCING5 5-12 City of Azusa | TOD Specific Plan May 2017 5.8 IMPLEMENTATION ACTION PLAN The vision and goals presented in the Specific Plan are supported by the following Implementation Action Plan. The Implementation Action Plan provides a summary of Specific Plan recommendations and is presented in a table format providing a clear listing of the major actions needed for implementation. The table also identifies the responsible agency or party, suggested timing of the actions, and a list of potential funding sources to assist in implementing each action. It should be noted that all actions listed in Table 5-2 below must be authorized and initiated by the City Council and/or Community Development Department by policy decision. Timing Lead v REGULATORY ACTIONS Notice Property Owners: Create a summary of changes that the  resulting Specific Plan has on Property and Business Owners and work  with the Chamber to distribute the information.  1 CD General Fund/PBID Now IMPLEMENTATION ACTION PLAN      Responsibility Potential Funding Sources                General Fund CD = Community Development,   ED = Economic Development,  R= Recreation, PW=Public Works,  CE = Code Enforcement Con= Consultant Priority: 1 =  Short Range  (1st year) 2 =  Mid‐Range (2‐5  years) 3 = Long‐ Range (5+  years)           Adoption of Specific Plan and EIR: Adoption of the Specific Plan is the  catalyst for Downtown Azusa and the areas surrounding the future  stations redevelopment; recommended land uses and intensities,  development standards, design guidelines and other proactive  policies designed to spur economic investment and visual  enhancement of the area. CD Timing Lead v IMPLEMENTATION ACTION PLAN      Responsibility Potential Funding Sources                CD = Community Development,   ED = Economic Development,  R= Recreation, PW=Public Works,  CE = Code Enforcement Con= Consultant Priority: 1 =  Short Range  (1st year) 2 =  Mid‐Range (2‐5  years) 3 = Long‐ Range (5+  years)           IMPROVEMENT PROJECTS San Gabriel Street Improvements (Section 3.3.2): Survey, design development, and improvement plans as coordinated  with adjoining private development. Azusa Street Improvements (Section 3.3.1): Survey, design development, and improvement plans as coordinated  with adjoining private development. Foothill Street Improvements (Section 3.3.5): Survey, design development, and improvement plans as coordinated  with adjoining private development. Alameda Street Improvements (Section 3.3.3): Survey, design development, and improvement plans as coordinated  with adjoining private development. 9th Street Improvements (Section 3.3.4): Survey, design development, and improvement plans as coordinated  with adjoining private development. Prepare Gateway Monuments at San Gabriel/9th,  Angeleno/Foothill, Dalton/Foothill, and Azusa/5th: Survey, design development, and selected improvement plans as  coordinated with adjoining private development. Paseo: Prepare conceptual design for paseo described in Section 3.2.2  and coordinate with property owners. 2 PW PBID/General Fund Public Plaza:  Prepare conceptual design for the Welcome Plaza as  described in Section 3.2.4, quantify site requirements, determine  infrastructure needs, define precise site location, and review and  assist in preparing design and development plans.  3 PW EIFD/Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Intersection Beautification at Foothill/Azusa:  Survey, design  development, and selected improvement plans. 2 PW Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Ampitheater Concept at Veterans Freedom Park: Survey, design  development, and selected improvement plans. 3 R Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Crosswalk Improvements at Signalized and Unsignalized  Intersections as identified in Figures 3‐3 and 3‐4: Survey, design  development, and selected improvement plans. 2 PW Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Alameda Temporary Street Closure Improvements between Foothill  and Railway (Section 3.3.3): Survey, design development, and  selected improvement plans. 1 CD/PW Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Trail at Angeleno Ave and 9th Street: Survey, design development,  and selected improvement plans. 3 R Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Downtown Streetscape Theme Improvements: Install streetscape  furnishings as described in Section 3.6.2. 1 PW Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees APU/Citrus Station Streetscape Theme Improvements: Install  streetscape furnishings as described in Section 3.6.4. 3 PW Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Route 66 Streetscape Theme Improvements: Install streetscape  furnishings as described in Section 3.6.3. 2 PW Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees EIFD/Developer Agreements/Prop. A/  Prop. C/Measure R/ STPL Fund/Gas  Tax/PBID/CDBG 1    PW  1/2 PW EIFD/Developer Agreements/Prop. A/  Prop. C/Measure R/STPL Fund/Gas Tax/  PBID/CDBG 3 PW  2/3 PW EIFD/Developer Agreements/Prop. A/  Prop. C/Measure R/STPL Fund/Gas Tax/  PBID/CDBG 3 PW EIFD/Developer Agreements/Prop. A/  Prop. C/Measure R/STPL Fund/Gas Tax/  PBID/CDBG 1 CD PBID/General Fund EIFD/Developer Agreements/Prop. A/  Prop. C/Measure R/STPL Fund/Gas Tax/  PBID/CDBG Table 5-2: Implementation Action Plan IMPLEMENTATION STRATEGIES AND FINANCING 5 City of Azusa | TOD Specific Plan 5-13 May 2017 Timing Lead vIMPLEMENTATION ACTION PLAN     Responsibility Potential Funding Sources               CD = Community Development,  ED = Economic Development, R= Recreation,PW=Public Works, CE = Code EnforcementCon= ConsultantPriority: 1 = Short Range (1st year) 2 = Mid‐Range (2‐5 years) 3 = Long‐Range (5+ years)          IMPROVEMENT PROJECTSSan Gabriel Street Improvements (Section 3.3.2):Survey, design development, and improvement plans as coordinated with adjoining private development.Azusa Street Improvements (Section 3.3.1):Survey, design development, and improvement plans as coordinated  with adjoining private development. Foothill Street Improvements (Section 3.3.5): Survey, design development, and improvement plans as coordinated  with adjoining private development. Alameda Street Improvements (Section 3.3.3): Survey, design development, and improvement plans as coordinated  with adjoining private development. 9th Street Improvements (Section 3.3.4): Survey, design development, and improvement plans as coordinated  with adjoining private development. Prepare Gateway Monuments at San Gabriel/9th,  Angeleno/Foothill, Dalton/Foothill, and Azusa/5th: Survey, design development, and selected improvement plans as  coordinated with adjoining private development. Paseo: Prepare conceptual design for paseo described in Section 3.2.2  and coordinate with property owners. 2 PW PBID/General Fund Public Plaza:  Prepare conceptual design for the Welcome Plaza as  described in Section 3.2.4, quantify site requirements, determine  infrastructure needs, define precise site location, and review and  assist in preparing design and development plans.  3 PW EIFD/Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Intersection Beautification at Foothill/Azusa:  Survey, design  development, and selected improvement plans. 2 PW Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Ampitheater Concept at Veterans Freedom Park: Survey, design  development, and selected improvement plans. 3 R Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Crosswalk Improvements at Signalized and Unsignalized  Intersections as identified in Figures 3‐3 and 3‐4: Survey, design  development, and selected improvement plans. 2 PW Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Alameda Temporary Street Closure Improvements between Foothill  and Railway (Section 3.3.3): Survey, design development, and  selected improvement plans. 1 CD/PW Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Trail at Angeleno Ave and 9th Street: Survey, design development,  and selected improvement plans. 3 R Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Downtown Streetscape Theme Improvements: Install streetscape  furnishings as described in Section 3.6.2. 1 PW Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees APU/Citrus Station Streetscape Theme Improvements: Install  streetscape furnishings as described in Section 3.6.4. 3 PW Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees Route 66 Streetscape Theme Improvements: Install streetscape  furnishings as described in Section 3.6.3. 2 PW Developer Agreements/Donors  (Community Foundation)/General  Fund/Quimby (Park In‐Lieu) Fees EIFD/Developer Agreements/Prop. A/ Prop. C/Measure R/ STPL Fund/Gas Tax/PBID/CDBG1    PW 1/2 PW EIFD/Developer Agreements/Prop. A/ Prop. C/Measure R/STPL Fund/Gas Tax/  PBID/CDBG 3 PW  2/3 PW EIFD/Developer Agreements/Prop. A/  Prop. C/Measure R/STPL Fund/Gas Tax/  PBID/CDBG 3 PW EIFD/Developer Agreements/Prop. A/  Prop. C/Measure R/STPL Fund/Gas Tax/  PBID/CDBG 1 CD PBID/General Fund EIFD/Developer Agreements/Prop. A/  Prop. C/Measure R/STPL Fund/Gas Tax/  PBID/CDBG Timing Lead v IMPLEMENTATION ACTION PLAN      Responsibility Potential Funding Sources                CD = Community Development,   ED = Economic Development,  R= Recreation, PW=Public Works,  CE = Code Enforcement Con= Consultant Priority: 1 =  Short Range  (1st year) 2 =  Mid‐Range (2‐5  years) 3 = Long‐ Range (5+  years)           PROGRAMS, STUDIES AND INITIATIVES Public Art: Develop and implement a public art program including  guidelines for inclusion of public art in new development projects and  art in new public improvement projects. 2 CD Developer Agreements/Grants/PBID/ BID Route 66 Public Art Incentive Program: Educate property owners and  implement a Route 66 public art program highlighting the historic  corridor. 2 CD Developer Agreements/Grants/PBID/ BID Sign and Wayfinding Program: Prepare a way‐finding directional sign  program for the Downtown and Route 66 areas. 1 CD Grants/PBID/BID Downtown Trolley Service: City should coordinate with Azusa Pacific  University to expand service to Downtown and the Gold Line stations  within the Specific Plan Area. 2 CD General Fund/Measure R/BID/PBID Implement Parking Management Plan: Review recommended  parking strategies for the Specific Plan Area and determine  appropriate on‐ and off‐street parking strategies for implementation. 1 CD Measure R/Prop. A/ Prop. C/STPL Funds Timing Lead v IMPLEMENTATION ACTION PLAN      Responsibility Potential Funding Sources                CD = Community Development,   ED = Economic Development,  R= Recreation, PW=Public Works,  CE = Code Enforcement Con= Consultant Priority: 1 =  Short Range  (1st year) 2 =  Mid‐Range (2‐5  years) 3 = Long‐ Range (5+  years)           Foothill Boulevard Naming: Coordinate with Irwindale, Duarte, and  Glendora to change the name of Foothill Boulevard to Historic Route  66. 1 PW General Fund Timing Lead v IMPLEMENTATION ACTION PLAN      Responsibility Potential Funding Sources                CD = Community Development,   ED = Economic Development,  R= Recreation, PW=Public Works,  CE = Code Enforcement Con= Consultant Priority: 1 =  Short Range  (1st year) 2 =  Mid‐Range (2‐5  years) 3 = Long‐ Range (5+  years)           Foothill Boulevard Naming: Coordinate with Irwindale, Duarte, and  Glendora to change the name of Foothill Boulevard to Historic Route  66. 1 PW General Fund IMPLEMENTATION STRATEGIES AND FINANCING5 5-14 City of Azusa | TOD Specific Plan May 2017 THIS PAGE LEFT BLANK SECTION 6 ADMINISTRATION 6 Authority, Processing Requirements, and Administrative Procedures ADMINISTRATION 6 SECTION 6 CONTENTS 6.1 INTRODUCTION ...................................................................6-1 6.2 SPECIFIC PLAN AUTHORITY AND ADOPTION ....................6-1 6.3 SPECIFIC PLAN AMENDMENTS ...........................................6-1 6.3.1 Amendment Process ..............................................................6-1 6.3.2 Amendment Approval ...........................................................6-2 6.4 SPECIFIC PLAN ADMINISTRATION ......................................6-3 6.4.1 Interpretation ..........................................................................6-3 6.4.2 Severability ..............................................................................6-3 6.4.3 Administration Process ...........................................................6-3 6.4.4 Allowable Land Uses ..............................................................6-4 6.4.5 Nonconformity ........................................................................6-4 SUBSECTIONS ADMINISTRATION 6 City of Azusa | TOD Specific Plan 6-1 May 2017 6.1 INTRODUCTION This section describes Specific Plan authority, the administrative procedures required for amendments and/ or modifications to the Azusa TOD Specific Plan, and processing requirements. 6.2 SPECIFIC PLAN AUTHORITY AND ADOPTION All specific plans must comply with California Government Code Sections 65450 through 65457. These provisions require that a specific plan be consistent with the adopted General Plan for the jurisdiction in which the specific plan area is located. In turn, all subsequent development proposals, such as tentative subdivision maps, site plans, improvement plans, and all public works projects, must be consistent with the adopted specific plan. Pursuant to California Government Code Section 65453, a specific plan may be adopted by resolution or by ordinance. Specific plans adopted by ordinance effectively become a set of zoning regulations that provide specific direction to the type and intensity of uses permitted and may also define design expectations and standards. The Azusa TOD Specific Plan is a regulatory document adopted by ordinance. In any instance where the Azusa TOD Specific Plan conflicts with the requirements of the Azusa Development Code, the Azusa TOD Specific Plan provisions shall take precedence. Where the Azusa TOD Specific Plan is silent on a topic, the Development Code requirements remain in effect. 6.3 SPECIFIC PLAN AMENDMENTS The Azusa TOD Specific Plan may need to be revised over time to accommodate modifications in the City’s needs or changing economic conditions. California Government Code Section 65453 states that a specific plan “may be amended as often as deemed necessary by the legislative body.” Amendments to the Azusa TOD Specific Plan may be proposed as long as the proposed amendments are compatible and consistent with the purpose and goals of the Azusa TOD Specific Plan and the Azusa General Plan. This section explains the Azusa TOD Specific Plan amendment processes and approval procedures. 6.3.1 Amendment Process Amendments to the Azusa TOD Specific Plan may be initiated by a developer, an individual, or by the City. Proposed amendments to the Azusa TOD Specific Plan must be accompanied by all applicable City application forms, required City fees, and information listed below documenting the proposed amendment: • A detailed explanation that explains and confirms that the proposed amendment is compatible and consistent with the Azusa TOD Specific Plan guiding principles and vision. CALIFORNIA GOVERNMENT CODE SECTION 65453 ... a Specific Plan “may be amended as often as deemed necessary by the legislative body.” ADMINISTRATION6 6-2 City of Azusa | TOD Specific Plan May 2017 • Detailed information to document the proposed change. This information should include revised text and revised diagrams, where relevant, depicting the requested amendment. • A significant amount of forethought and resources were invested in the preparation of the Azusa TOD Specific Plan. Therefore, any amendment proposal must clearly document the need for any changes. To this end, the applicant should indicate the economic, social, and technical issues that generate the need for the proposed amendment. • The applicant must provide an analysis of the proposed amendment’s impacts relative to the adopted Environmental Impact Report (SCH# 2015021018). (Note: Only applicable if deemed necessary by the Community Development Director in accordance with State CEQA Guidelines.) City staff shall review all of the application materials listed above for completeness. If the application is determined complete, and determined to be a “major amendment”, city staff shall then schedule any required hearing(s) and provide a staff report for presentation to the Planning Commission and City Council. Staff may also request further clarification of application materials, if deemed necessary. The staff report will analyze the proposed amendment to ensure consistency with the Azusa General Plan. It will also determine whether there is a need to amend the Azusa TOD Specific Plan as supported by the conclusions of the application materials and make a recommendation to the Planning Commission and City Council. 6.3.2 Amendment Approval Findings Approval procedures shall ensure that proposed amendments are compatible and consistent with the objectives and vision of the Azusa TOD Specific Plan and the Azusa General Plan. Amendments may be approved only if all of the following findings are made: A. The proposed amendment is consistent with the Azusa TOD Specific Plan; B. The proposed amendment is consistent with the Azusa General Plan; C. The proposed amendment would not be detrimental to the public interest, health, safety, convenience, or welfare of the City, and; D. The proposed amendment ensures development of desirable character which will be harmonious with existing and proposed development in the surrounding neighborhood. Determination of Minor and Major Amendments The Community Development Director is responsible for making the determination as to whether an amendment to the Azusa TOD Specific Plan is “minor” (administrative) or “major” (requires review by Planning Commission and City Council) within 30 days of any submittal of a request to amend the Azusa TOD Specific Plan. The Community Development Director may authorize or deny a minor amendment. Whereas, a major amendment must be processed as a Specific Plan Amendment with review by the Planning Commission and City Council. Minor amendments must be determined to be in substantial conformance with the Azusa TOD Specific Plan and do not include any of the changes described for major amendments. Where the Azusa TOD Specific Plan ADMINISTRATION 6 City of Azusa | TOD Specific Plan 6-3 May 2017 requires or allows for a determination by the Community Development Director, it is not to be considered a minor amendment and as such no application or fee is required. Major amendments are those that require resolution from the Planning Commission and City Council. Examples of major amendments include the following: A. The introduction of a new land use category not contemplated in the Azusa TOD Specific Plan. B. Changes in the Specific Plan District designation from that shown in the Azusa TOD Specific Plan. C. Significant changes to the circulation system. D. Changes or additions to the development standards or design guidelines which would materially alter the stated intent of the Azusa TOD Specific Plan. E. Any changes (not able to be mitigated) that would result in new significant adverse environmental impacts not previously considered in the CEQA compliance documentation for the Azusa TOD Specific Plan. Appeals Appeals on decisions rendered by the Community Development Director may be filed with the Community Development Department and considered by the City’s legislative bodies pursuant to Chapter 88.56 (Appeals) of the Azusa Development Code. 6.4 SPECIFIC PLAN ADMINISTRATION 6.4.1 Interpretation The Community Development Director is assigned the responsibility and authority to interpret the Azusa TOD Specific Plan. Whenever the Community Development Director makes an official interpretation of this Specific Plan, the interpretation shall be made in writing explaining the interpretation and the general circumstances surrounding the need for the interpretation. Any interpretation by the Community Development Director may be appealed. The Community Development Director may refer interpretation of the Specific Plan to the Planning Commission for a decision at a public meeting. 6.4.2 Severability If any section, subsection, sentence, clause, phrase or portion of this Specific Plan, or any future amendments or additions hereto, is for any reason found to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remainder of this Specific Plan document or any future amendments or additions hereto. The City hereby declares that it would have adopted these requirements and each sentence, subsection, clause, phrase or portion or any future amendments or additions thereto, irrespective of the fact that any one or more section, subsections, clauses, phrases, portions or any future amendments or additions thereto may be declared invalid or unconstitutional. 6.4.3 Administration Process All development applications within the Specific Plan Area shall follow established City procedures such as those for zone variances, conditional use permits, development permits and subdivisions. All development ADMINISTRATION6 6-4 City of Azusa | TOD Specific Plan May 2017 applications within the Specific Plan Area will be evaluated for compliance with Specific Plan regulations and guidelines. Appeals are regulated pursuant to compliance with Chapter 88.56 (Appeals) of the Azusa Development Code. In addition, in order to allow for greater coordination between project applicants, the City, and Caltrans, the following thresholds will be utilized to evaluate development applications for projects located within the Specific Plan Area that may have the potential to impacts nearby freeways as a result of development. Policies utilized to evaluate individual project applications can be found Section 3.1, Page 3-1. • Any development in the City of Azusa that is projected to assign 50 or more vehicle trips (passenger car equivalent trips) during peak hours to a state highway/freeway. • Any development that assigns 10 or more trips (passenger car equivalent trips) during peak hours to a state highway off-ramp or the left-turn lane leading to the on-ramp. • The City of Azusa will work closely with Caltrans to identify potential cumulative traffic impacts and mitigation measures on State facilities for future development projects that might potentially impact State facilities. 6.4.4 Allowable Land Uses Allowable land uses are identified in Section 2, Land Use and Urban Form and are listed within each Specific Plan District subsection. A land use that is not listed in an Allowable Land Use table is not allowed except where the Community Development Director may find that a use may be permitted due to its consistency with the purpose/intent of the zoning district and similarity to other uses listed in compliance with Chapter 88.10.070 (Rules of Interpretation) of the Azusa Development Code. 6.4.5 Nonconformity Chapter 88.54 (Nonconforming Uses, Structures, and Parcels) of the Azusa Development Code shall be used for any nonconforming uses, structures or parcels within the Specific Plan Area. Land uses and structures existing as of the adoption date of this Specific Plan may continue to remain in accordance with the Azusa Development Code (Chapter 88.54). APPENDIX PARKING MANAGEMENT PLAN A PARKING STRATEGIES FOR THE SPECIFIC PLAN AREA PARKING MANAGEMENT PLANA City of Azusa | TOD Specific Plan May 2017 THIS PAGE LEFT BLANK PARKING MANAGEMENT PLAN A City of Azusa | TOD Specific Plan May 2017 THIS PAGE LEFT BLANK APPENDIX AZUSA OPPORTUNITY SITES B FINANCIAL ANALYSIS OF ALTERNATIVE DEVELOPMENT PROJECTS City of Azusa | TOD Specific Plan May 2017 BAZUSA OPPORTUNITY SITES THIS PAGE LEFT BLANK City of Azusa | TOD Specific Plan May 2017 AZUSA OPPORTUNITY SITESB FINANCIAL ANALYSIS OF ALTERNATIVE DEVELOPMENT PROJECTS AT AZUSA OPPORTUNITY SITES The real estate market analyses prepared by TNDG for the Azusa TOD subareas, plus an investigation of local real estate financial conditions, provide background information on the feasibility of development in the Specific Plan Area. Key aspects of project feasibility, for certain case study projects, are summarized in Table B-1. The following sections of the Financial Analysis describe the structure, content, assumptions, and other technical details for the companion electronic spreadsheet entitled “Azusa Development Scenario Models” (presented here as Appendix B). The spreadsheet was prepared by the Natelson Dale Group Inc. (TNDG) in coordination with RRM Design Group with the intent of providing the City of Azusa with an overview of the financial feasibility of alternative real estate development projects at specific sites in the downtown area (Site 36 is in the Specific Plan Downtown District, the Dalton site in the Downtown Expansion District), based on prototypes generated by RRM. Four separate scenarios were evaluated, involving retail, office, and residential uses in various configurations and combinations. Model Structure and Subject Matter Appendix Table B-1 summarizes the results of the individual pro forma models (Tables B-3 to B-6). Table B-2 is the table of common input factors applied in the four separate pro forma models. Tables B-3 to B-6 are the pro forma models for the four projects. Alternative development programs were prepared for two distinct sites: Site 36 (3 alternatives) and the Dalton site. The parking configuration associated with each development alternative, and associated construction costs per space, are shown on Table B-7. The three site 36 scenarios included a requirement for incorporating 54 existing parking spaces. Modeling Assumptions, Limitations, and Other Considerations The Table B-2 input factors (e.g. rental rate, construction cost, etc. by use type) common to all of the development alternatives are linked to the detailed pro forma models on Tables B-3 to B-6. No attempt was made to differentiate these values among the different projects, given the projects’ overall similarities (for example, the varying number of stories and building sizes among the alternatives would not necessarily require different types of construction systems, although parking systems did differ and the variations in related costs were accounted for within the modeling) and the fact that the analysis process is intended to be relatively general in nature. City of Azusa | TOD Specific Plan May 2017 BAZUSA OPPORTUNITY SITES Table 5‐2. Summary of Analysis of Project Feasibility, Selected Sites and Project Configurations Area/   Scenario Land Use Land Area Gross bldg. area # Stories  Total Cost, Hard & Soft Net Operating Income Capitalized Value Capitalized/ Sale Value Less Costs Floor Area RatioMaximum Theoretical Land Value/SF Land Value (/SF) Allowing Return on Hard (& Soft) Costs of:                               15% Site 36‐1                                 Retail   38,889  $7,613,891$1,058,846$20,168,500 $12,554,609  $125.31       Office    38,889  $9,043,057$679,896$10,878,336 $1,835,279  $18.32       Residential   60,000  $13,018,630$902,880$18,057,600 $5,038,970  $50.30       TOTAL 100,188 137,7784$29,675,578$2,641,622$49,104,436 $19,428,8581.38  $193.92$149.49                                  Site 36‐2                           15%   Retail   38,889  $9,564,018$1,058,846$20,168,500 $0  $105.85       Office    38,889  $10,993,185$714,533$11,432,533 $439,348  $4.39       Residential   60,000  $16,163,806$902,880$18,057,600 $1,893,794  $18.90       TOTAL 100,188 137,7784$36,721,009$2,676,260$49,658,633 $12,937,6241.38  $129.13$74.16                                 Site 36‐3                           15%   Retail   24,444  $4,818,629$665,561$12,677,343 $7,858,714  $78.44       Office    24,444  $5,716,962$427,363$6,837,811 $1,120,849  $11.19       Residential   36,000  $7,834,333$541,728$10,834,560 $3,000,227  $29.95       TOTAL 100,188 84,8894$18,369,924$1,634,652$30,349,714 $11,979,7900.85  $119.57$92.07                                 Dalton                           15%   Retail*   13,333  $2,581,250$363,033$6,914,914 $4,333,664  $71.06       Residential   57,333  $12,427,447$862,752$17,255,040 $4,827,593  $79.16       Total 60,984 70,6673$15,008,697$1,225,785$24,169,954 $9,161,2571.16  $150.22$113.31  Source:Table B-1: Summary of Analysis of Project Feasibility, Selected Sites and Project Configurations City of Azusa | TOD Specific Plan May 2017 AZUSA OPPORTUNITY SITESB The input values applied in the models assume projects that are successfully competitive within the broader market area in and around Downtown Azusa. The rationale for this assumption is that, ultimately, developers would not propose projects if they did not believe they were going to be successful within the market area, which means they would have had to have taken into account the competitive conditions for the relevant trade areas involved. Within this concept, office use presented the greatest challenge, because of depressed market conditions in this segment that have persisted for many years with no clear indication of when the office market might be considered truly healthy. Modeling processes applied in this analysis assumed some improvement over current obtainable office rental rates (the rate used reflects historical levels to which the market could potentially recover), but office uses still remained the most unprofitable of all uses analyzed, as discussed further below. There are fundamental issues that could keep suburban office market conditions tight for the foreseeable future. Briefly, the location of office space is not as sensitive to market conditions (e.g. traffic volumes and visual accessibility) as the location of retail, for example. Similarly, office users are not as likely to be concerned about who their fellow tenants are, within any particular building or area, as are retail tenants. The result is that the “competitive space” in which office development occurs is not as predictable, and this issue is more pronounced in suburban areas in contrast to, for example, a central city location. The analysis concept embodied in the pro formas is that the development costs, excluding land, when subtracted from the value (theoretical sale price) of the project upon completion and stabilized occupancy, represent the theoretical value of the land that the project occupies. Development costs include hard construction costs and a factor for soft costs associated with the development process. The value of the project is estimated by dividing the net operating income that the project would generate (space rental income, less a vacancy factor, less an operating expense factor) by a capitalization rate (cap rate) that is associated with that particular type of use and also with the region within which the project is located, to the extent it is possible to obtain such geographic-specific information. Secondary data sources were used to generate estimates of cost, income, operating factors, and cap rates. Cost estimates were derived in part from RS Means online estimating tools (selecting options that reflected union wages and a Southern California location). Rental rates and other real estate market data were derived from a combination of local real estate listings and published real estate reports from major brokerage companies. The pro forma results are particularly sensitive to the cap rate factors applied. Although the factors used in the model are compatible with current market conditions, it should be noted that these factors are now and have been for a number of years particularly favorable to sellers of real estate, at least in part due to the relatively low rates of return available to investors from other financial instruments. (The lower the cap rate the higher the theoretical selling price, because the cap rate represents the rate of return from the project that an investor is willing to accept.) Within the pro forma models, the theoretical land value derived as described above is divided by the land area to yield a theoretical land price per square foot. In order to add additional consideration for a project’s profitability, a factor was applied to the projects’ development costs (excluding land), in the summary table City of Azusa | TOD Specific Plan May 2017 BAZUSA OPPORTUNITY SITES on Table B-1 above, to represent a minimum return on that portion of the project investment. (In practice, developers would likely look at the total project cost, including land, and the difference between that total cost and a theoretical sale price, as a way of evaluating a project. The approach applied within this model simplifies the analysis given that land value is itself derived from the pro forma.) The resulting land price per square foot allowing for the return on costs can then be compared to an estimate of the raw land value for property within the downtown area. Although information to derive such an estimate was very limited, TNDG has applied the assumption that the land could be worth at least $65 per square foot. This “threshold” amount can then be compared to the theoretical land value (including the factor for minimum return on costs) derived from the analysis. Any project in which the pro forma analysis yielded a land value less than the threshold amount would be conceptually infeasible. Analysis Results The analysis indicated that all of the theoretical development scenarios were financially feasible; although the scenarios that included office space were less likely to be feasible the higher the proportion of office space in the project. Among all the scenarios higher density projects also had a higher level of profitability. Although TNDG prepared this analysis using assumptions that appeared to be reasonable at the time, the sensitivity of these kinds of models to varying factors, changes in market conditions over time, and different opinions and assumptions that developers and other analysts bring to exercises of this kind, all suggest that this analysis be used by the city as an internal project review tool, which can be easily altered by staff as conditions warrant. The model is likely to have the most value to the City as a way to compare alternate project types, as well as review submitted projects. Notes on Maximizing Key Opportunity Sites The feasibility of new commercial development would generally be significantly enhanced if configured as mixed-use projects with multi-family residential. In the process of designing and developing mixed-use projects, care is necessary in defining the expectations for ground-floor retail, which must synchronize with other area retail and other uses, and issues to be addressed will include mix, demand in relation to supply, and the like. The downtown-area districts in which opportunity sites are concentrated could benefit from a “designer in residence” program where owners of neighboring existing developed property could get conceptual guidance on how to upgrade properties within an overall somewhat unified vision. City of Azusa | TOD Specific Plan May 2017 B AZUSA OPPORTUNITY SITES TABLE B ‐2. AZUSA INPUT T ABLE     Land Use Type Retail Office  Residential,  Rental Hotel All Uses                 COST FACTORS  Shell cost/SF   $128.00         Sales Price/SF ‐ with land cost  factor added               Tenant Improvements Cost /SF    $40.00         Shell and Tenant Improvements  Building Cost Total $140.00 $168.00 $160.00 $190.00     Site/offsite development factor            5% Factor for unenclosed  balconies, etc. [added for  Azusa], as % of shell/TI cost       5%      Total Bldg. (incl. contractor &  A/E fees, site/offsite factor) $147.00 $176.40 $176.00 $199.50     Soft Cost Factor 25%25%20%20%     FINANCIAL FACTORS  Leasing Rates (SF/Mo.) $2.75 $2.40 $2.00       Cost of sales transactions                Sales profit margins (after cost  of sales transactions and  allowance for land costs*)                Room Rates         $100.00     Covered Space Leasing  Rates/Month (Office)*    $95.00         Vacancy Factor 5%5%5%25%     Operating/leasing Expense  Factor 3.5%29.0%20.0%45.0%     Capitalization Rate** 5.25%6.25%5.00%7.25%     Assumed min. rate of return on  hard costs           15% Minimum Threshold $65.00 $65.00 $65.00 $65.00     Source: CBRE Cap Rate Survey 2nd half 2014: Los Angeles Suburban markets. Figures used are generally 25 basis  points below the high end of the given value range  City of Azusa | TOD Specific Plan May 2017 BAZUSA OPPORTUNITY SITES TABLE B‐3. PRO FORMA SCENARIO SITE 36‐1  SCENARIO   Scenario Site 36‐1         Land Area 100,188         Land Use Type Retail Office  Residential TOTAL  COST FACTORS  Gross bldg area 38,889 38,889 60,000 137,778 Avg unit size     1,100     Total Building Cost $5,716,667 $6,860,000 $10,560,000 $23,136,667 Number of Parking Spaces 107.0 107.0 82.5 297 Parking type Surface Surface Surface Surface  Parking Cost/Space $3,500 $3,500 $3,500 $3,500 Total Parking Cost $374,446 $374,446 $288,858 $1,037,750 Net Rentable SF @ 35,000 35,000 49,500 119,500 Sub‐Total Hard Costs $6,091,113 $7,234,446 $10,848,858 $24,174,417 Soft Costs $1,522,778 $1,808,611 $2,169,772 $5,501,161 Total Cost, Hard & Soft $7,613,891 $9,043,057 $13,018,630 $29,675,578 FINANCIAL FACTORS   Gross leasing income $1,155,000 $1,008,000 $1,188,000 $3,351,000 % of workers paying for covered  parking          Gross Parking Income (annual)           Net Rental Income $1,097,250 $957,600 $1,128,600 $3,183,450 Net Operating Income $1,058,846 $679,896 $902,880 $2,641,622 Capitalized Value $20,168,500 $10,878,336 $18,057,600 $49,104,436 Capitalized Value Less Costs ‐  Implied Land Value $12,554,609 $1,835,279 $5,038,970 $19,428,858 Land Value/SF $125.31 $18.32 $50.30 $193.92 SITE DESIGN, OTHER FACTORS   Number of Stories       4 Gross Building Area 38,889 38,889 60,000 137,778 Floor Area Ratio       1.38 Percentage of Net Rentable Area 29%29%41% 100% Source: TNDG     City of Azusa | TOD Specific Plan May 2017 AZUSA OPPORTUNITY SITESB T ABLE B‐4. PRO F ORMA SCENARIO S ITE 36‐2 SCENARIO  Scenario Site 36‐2      Land Area 100,188       Land Use Type Retail Office Residential TOTAL  COST FACTORS  Gross bldg area 38,889 38,889 60,000 137,778 Avg unit size 1,100  Total Building Cost $5,716,667 $6,860,000 $10,560,000 $23,136,667 Number of Parking Spaces 107.0 107.0 82.5 297 Parking type 2‐level struct.2‐level struct.2‐level struct. 2‐level struct. Parking Cost/Space $18,083 $18,083 $18,083 $18,083 Total Parking Cost $1,934,548 $1,934,548 $1,492,366 $5,361,461 Net Rentable SF @ 35,000 35,000 49,500 119,500 Sub‐Total Hard Costs $7,651,215 $8,794,548 $12,052,366 $28,498,128 Soft Costs $1,912,804 $2,198,637 $4,111,441 $8,222,881 Total Cost, Hard & Soft $9,564,018 $10,993,185 $16,163,806 $36,721,009 FINANCIAL FACTORS  Gross leasing income $1,155,000 $1,008,000 $1,188,000 $3,351,000 % of workers paying for covered  parking  40%  Gross Parking Income (annual) $48,785   Net Rental Income $1,097,250 $1,006,385 $1,128,600 $3,232,235 Net Operating Income $1,058,846 $714,533 $902,880 $2,676,260 Capitalized Value $20,168,500 $11,432,533 $18,057,600 $49,658,633 Capitalized Value Less Costs ‐  Implied Land Value  $10,604,482 $439,348 $1,893,794 $12,937,624 Land Value/SF $105.85 $4.39 $18.90 $129.13 SITE DESIGN, OTHER FACTORS  Number of Stories  4 Gross Building Area 38,889 38,889 60,000 137,778 Floor Area Ratio  1.38 Percentage of Net Rentable Area 29%29%41% 100% Source: TNDG  City of Azusa | TOD Specific Plan May 2017 BAZUSA OPPORTUNITY SITES T ABLE B‐5. PRO F ORMA SCENARIO S ITE 36‐3 SCENARIO  Scenario Site 36‐3       Land Area 100,188       Land Use Type Retail Office Residential TOTAL  COST FACTORS  Gross bldg area 24,444 24,444 36,000 84,889 Avg unit size   Total Building Cost $3,593,333 $4,312,000 $6,336,000 $14,241,333 Number of Parking Spaces 74.7 74.7 55.0 205 Parking type Surface Surface Surface Surface Parking Cost/Space $3,500 $3,500 $3,500 $3,500 Total Parking Cost $261,570 $261,570 $192,610 $715,750 Net Rentable SF @ 22,000 22,000 29,700 73,700 Sub‐Total Hard Costs $3,854,903 $4,573,570 $6,528,610 $14,957,083 Soft Costs $963,726 $1,143,392 $1,305,722 $3,412,840 Total Cost, Hard & Soft $4,818,629 $5,716,962 $7,834,333 $18,369,924 FINANCIAL FACTORS Gross leasing income $726,000 $633,600 $712,800 $2,072,400 % of workers paying for covered  parking    Gross Parking Income (annual)   Net Rental Income $689,700 $601,920 $677,160 $1,968,780 Net Operating Income $665,561 $427,363 $541,728 $1,634,652 Capitalized Value $12,677,343 $6,837,811 $10,834,560 $30,349,714 Capitalized Value Less Costs ‐  Implied Land Value  $7,858,714 $1,120,849 $3,000,227 $11,979,790 Land Value/SF $78.44 $11.19 $29.95 $119.57 SITE DESIGN, OTHER FACTORS Number of Stories  4 Gross Building Area 24,444 24,444 36,000 84,889 Floor Area Ratio  0.85 Percentage of Net Rentable Area 30%30%40% 100% Source: TNDG     City of Azusa | TOD Specific Plan May 2017 AZUSA OPPORTUNITY SITESB TABLE B‐6. PRO FORMA SCENARIO DALTON  SCENARIO  Scenario Dalton     Land Area 60,984     Land Use Type Retail* Residential Total  COST FACTORS  Gross bldg area 13,333 57,333 70,667 Avg unit size   Total Building Cost $1,960,000 $10,090,667 $12,050,667 Number of Parking Spaces 30 65 95 Parking type Surface Comb Comb Parking Cost/Space $3,500  $3,921 Total Parking Cost $105,000 $265,539 $370,539 Net Rentable SF @ 12,000 47,300 59,300 Sub‐Total Hard Costs $2,065,000 $10,356,206 $12,421,206 Soft Costs $516,250 $2,071,241 $2,587,491 Total Cost, Hard & Soft $2,581,250 $12,427,447 $15,008,697 FINANCIAL FACTORS  Gross leasing income $396,000 $1,135,200 $1,531,200 % of workers paying for covered  parking    Gross Parking Income (annual)  $0 Net Rental Income $376,200 $1,078,440 $1,454,640 Net Operating Income $363,033 $862,752 $1,225,785 Capitalized Value $6,914,914 $17,255,040 $24,169,954 Capitalized Value Less Costs ‐  Implied Land Value  $4,333,664 $4,827,593 $9,161,257 Land Value/SF $71.06 $79.16 $150.22 SITE DESIGN, OTHER FACTORS  Number of Stories  3 Gross Building Area 13,333 57,333 70,667 Floor Area Ratio  1.16 Percentage of Net Rentable Area 20%80% 100% Source: TNDG  City of Azusa | TOD Specific Plan May 2017 BAZUSA OPPORTUNITY SITES TABLE B ‐7. PARKING COST SCHEDULE  Surface Podium above‐grade below grade Tuck‐under Result (wtd avg  cost/space)  Scenario $3,500 $16,400 $19,765 $27,335 $5,500  36‐1 100%   $3,500 36‐2  50% 50% $18,083 36‐3 100%   $3,500 Dalton 79%  21% $3,921 Source: TNDG    APPENDIX FINANCING C POTENTIAL FUNDING SOURCES AND FINANCIAL MECHANISMS City of Azusa | TOD Specific Plan May 2017 CFINANCINGB THIS PAGE LEFT BLANK