HomeMy WebLinkAboutAgend Packet - April 25, 2011 - UB 1
AZUSA
/1011T A '.YATER
AGENDA
REGULAR MEETING OF
AZUSA UTILITY BOARD
AZUSA LIGHT & WATER APRIL 25, 2011
729 N. AZUSA AVENUE 6:30 P.M.
AZUSA,CA 91702
AZUSA UTILITY BOARD
ROBERT GONZALES
CHAIRPERSON
KEITH HANKS JOSEPH R. ROCHA
VICE CHAIRPERSON BOARD MEMBER
URIEL E. MACIAS ANGEL CARRILLO
BOARD MEMBER BOARD MEMBER
6:30 P.M. Convene to Regular Meeting of the Azusa Utility Board
• Call to Order
• Pledge to the Flag
• Roll Call
A. ELECTION OF OFFICERS
1. Election of New Chairperson and Vice Chairperson. Recommendation: Elect by majority vote a new
Chairperson and Vice Chairperson to serve as officers of the Utility Board.
cap- 19F-
Election of Ord01-07.pdf •
Officers.pdf •
•1
001
B. PUBLIC PARTICIPATION
1. (Person/Group shall be allowed to speak without interruption up to five(5) minutes maximum time,
subject to compliance with applicable meeting rules. Questions to the speaker or responses to the
speaker's questions or comments shall be handled after the speaker has completed his/her comments.
Public Participation will be limited to sixty(60) minutes time.)
C. UTILITIES DIRECTOR COMMENTS
D. UTILITY BOARD MEMBER COMMENTS
E. CONSENT CALENDAR
The Consent Calendar adopting the printed recommended action will be enacted with one vote. If Staff or
Councilmembers wish to address any item on the Consent Calendar individually, it will be considered under
SPECIAL CALL ITEMS.
1. Minutes. Recommendation: Approve minutes of regular meeting on January 31, 2011 as written.
UB Min Jan-11.pdf
2. Project W-266A Water Main Replacement Inspection Services Contract. Recommendation:
Approve the award of professional services agreement to SA Associates for inspection services for
Project W-266A, Water Main Replacement Project in Hilltop in Azusa, San Bernardino Road in West
Covina and Los Angeles County, and Workman Avenue in West Covina, in amount not-to-exceed
$58,000.
Insptn Svcs for
W-266A.pdf
3. Sterling Technologies, LLC Blanket Purchase Order Amendment. Recommendation: Approve of
amendment to blanket purchase order number 1111798 with Sterling Technologies, LLC for purchase of
additional water treatment chemicals in amount of$32,000.
BPO Sterling
Tech.pdf
2
002
4. Supervisory Control and Data Acquisition (SCADA) System Contract. Recommendation: Award
a contract to Survalent Technology Incorporated to furnish and install a SCADA system for monitoring
the electric substations in amount not-to-exceed $82,750.
SCA DA-Surva lent.pd
F. SCHEDULED ITEMS
1. Bill Payment Contracts Extension. Recommendation: 1) Approve the extension of contract with
Infosend for two years until February 1, 2013 for bill print/mail and electronic bill presentment/payment
services; and for Paymentus to process pay-by-phone and web payments; and 2) amend the contract
purchase order for Infosend to add $181,000 to cover this period.
Bill Pay
Contracts.pdf
2. Solicitation of Request for Proposals to Evaluate the Azusa Hydroelectric Plant and Conduit.
Recommendation: Authorize staff to solicit proposals from qualified consultants to evaluate the
condition of the Azusa Hydroelectric Plant and Conduit from an acquisition feasibility standpoint.
Azusa Hydro
Project.pdf
3. Refuse Rate Adjustment Public Hearing Notice Authorization. Recommendation: Authorize staff to
print and mail advanced notice of public hearing to be held June 20, 2011 to consider the annual refuse
rate adjustment and "true up."
ILT
Refuse Rate 2011 Refuse Rate Residential.pdf Comae rcial.pdf
Adjrmt.pdf Public Hearing Notice.
4. Water Supply Update and Ratification of Cancellation of Phase II Water Shortage Declaration.
Recommendation: Ratify the City Manager's and Director of Utilities' recommendation to cancel the
Phase II Water Shortage Declaration effective May 1, 2011 due to an improved water supply situation,
while strongly encouraging continuation of water conservation measures by consumers.
94
Wtr Suply
Update.pdf
3 003
5. Local Resource Adequacy Capacity Purchase Agreements for 2012. Recommendation: Approve
two Local Resource Adequacy Capacity purchases totaling 31 Megawatts ($883,200) from NRG and
Calpine; and authorize the Director of Utilities to execute confirmation agreements.
Local RAC Purch.pdf RFP for System&
Local RAC.pdf
G. STAFF REPORTS/COMMUNICATIONS
1. Emergency Repair Work at 543-529 Virginia Ann Drive
Emergency Conduit
Repair.pdf
2. Novinium Cable Rejuvenation Pilot Project Update
Cable
Rejuvenation.pdf
3. Small Business Audit and Retrofit Progam to Include"Keep Your Cool" Services
Keep Your Cool Pgrm
Rpt.pdf
4. 2nd Quarter Budget Reports for Electric and Water Utilities
91- szoir- 191-
2nd Qtr Fin Rpt.pdf Elec 2nd Qtr.pdf Water 2nd Qtr.pdf
H. ADJOURNMENT
1. Adjournment.
"In compliance with the Americans with Disabilities Act, if you need special assistance to participate in a city
meeting, please contact the City Clerk at 626-812-5229. Notification three (3) working days prior to the
meeting or time when special services are needed will assist staff in assuring that reasonable arrangements
can be made to provide access to the meeting."
"In compliance with Government Code Section 54957.5, agenda materials are available for inspection by
members of the public at the following locations: Azusa City Clerk's Office - 213 E. Foothill Boulevard,
Azusa City Library- 729 N. Dalton Avenue, and Azusa Light& Water-729 N. Azusa Avenue,Azusa CA."
4
004
Utility Board Meeting
/f/3
Powier Provider
�� .sorry
•WOr
•rn
improvement
•
April 25, 2011
Chair Robert Gonzales
AZUS
Election of Officers
AMC requires annual election of Chair,
Vice Chair and Secretary (City Clerk)
Not later than 2nd meeting after new
Mayor Pro Tem.
This is first meeting since new Mayor
Pro Tern on March 21 .
All
Consent Agenda
January 31, 2011 minutes
Water Main Replacement Inspection Contract to SA
Associates ($58,000)
Sterling Technologies — Purchase Order Amendment
($32,000)
Award of SCADA Contract to Survalent Technology, Inc.
($82,750)
AZUSA
Bill Payment
Contract Extensions
Al .S.
„ ,`
.4--....,,i
Azusa Utility Board
April 25, 2011
t:----1 4 . I
Background
Light & Water has a need to print/mail bills and
for electronic presentment/payment services
Three years ago, Light & Water conducted a
rigorous review of vendors for these services
As a result, contracts were awarded to InfoSend
and Paymentus
iM
v
Situation
The contracts with Infosend and Paymentus
have expired.
Staff wishes to extend both arrangements for
two years
— Systems & Software contract for CIS upgrade
provides no change for existing interface vendors
— Infosend is very integrated in L&W business that it
would be a large project to replace at this time with
CIS upgrade ongoing
AZUSA
Considerations
Azusa Municipal Code (2-523c) does not require
competitive purchasing procedures for software
purchases.
Performance of Infosend and Paymentus has been
excellent.
Staff does not believe that increased efficiency or cost
savings would result from rebidding
Contract extension for 2 years is recommended at no
change in price terms.
f �
t
AZUSA
Recommendation
It is recommended that the Utility Board:
— Approve extension of agreements with
Infosend and Paymentus for 2 years
(February 1 , 2013)
— Amend Infosend P. O. to add $181K for this
two year period.
A7
Azusa Hydroelectric
Plant and Conduit
JJJJ �Trm
JJJJ
Azusa Utility Board
April 25, 2011 INN
AZUSA
Background
Presently, Pasadena owns the Azusa Hydro Plant
and Conduit
Pasadena has indicated that it would consider a sale
of these facilities to Azusa
Staff believes that it may be possible to develop a
favorable business transaction
The assistance of an impartial third party would be
helpful to assess project condition and value, cost,
benefits and liability of a possible acquisition
AZ L:
History
Conduit and powerhouse (2 MW) built in late
1880's by SCE predecessor
Powerplant replaced in late 1940's to convert
from 50 hertz to 60 cycle power (3 MW).
Pasadena purchased project from SCE in
1933 during construction of the Pine Dam and
Reservoir (now called Morris dam).
AZUSA
.... _ ._...... _
Hydro Powerhouse
, .
.•:. ,
_ . . , . • .
. • ..- ...e.::‘.
N , '
. .'
. ,
•.. •
3
. 1
— * ,
. ..
• ilk P.
.. . , . ,..,
. '--,. '. • 1
..4
. al
. or..,..-
12 AZUSA
Inside Powerhouse 1
. . ,
„:,•
.. ,- -4„.,--„!-, . N IN •
,. .,
aiii •
*
I C, EMI
etie ..... • 1 a
. .
s...
„...._,
, .,„„ . •
• , ,.,7' -•_•4'..
' [434- 1 1 •
,ft• ,.. - g g*
) ,
... , . ..
IFt •r "Ilb )., .• -4.-„,.. : , . •"...~
ix
..i, ii . 4i .01006,.0,•7.,, -:_ 4 4,.
1 J
.. . ..4, _
—• A 7 1, c 4,
Penstock
sw,
7Tir
V •
•
••• •
_ • — •, e1
- •"
•
-
• . „
• • - •-1•
• • .4
•
- -1*.f*.•,:,
•
• _
- - •
14
Azusa Conduit
)
.
.•
.,,K•Sio"; •
Alk
,
/44X.
• ' .
1.1•••••••••••••••••
MAE 1
15
Scope of Work
• Document history,condition and commitments of Project
- Forecast value of power from hydro plant
• Project capital improvements&maintenance of Project
Evaluate replacement of power plant with new unit
• Review electric transmission aspects of Project
• Document assets,agreements,deeds,permits,licenses
and judgments affecting Project
• Summarize economics of Project
16
Recommendation
• Authorize Staff to solicit proposals
for third party assistance to evaluate
a possible acquisition of the Azusa
Hydroelectric Plant and Conduit
17 �!l
Refuse Rate
Adjustments
f' 11>>!•
Azusa Utility Board
March 28, 2011
AZUSA
•
Background
Azusa has an Exclusive Franchise Agreement
with Athens for refuse collection and recycling
services
Each year, rates for services are required to
be adjusted effective July 1
Prop 218 requires that refuse rate changes be
approved at a public hearing with 45 days
advance notice
AZUSA
Adjustment Areas
Consumer Price Index
Puente Hills disposal rates
Amount of waste collected
20
Actual Changes
CPI increased by 1 .8% from Jan 2010 to Jan
2011
Landfill prices were stable at $38.26/ton until
Jan 2011 when Athens qualified for discount
Amount of waste collected
— Single family down 3.45%
— Multi-family down 10.7%
— Commercial down 4.6%
•. ,
Rate Changes
2011-12 Change
Single Family (0.13%)
Multi-Family (10.37%)
Commercial 3.81% to 6.32%
Note: Athens has reviewed and concurs.
AZUSA
Rate Detail
Ju:yJune July-June
2010.2011 2011.2012
2011.2012
SERVICES Current Proposed Change
Tots Monthly Total Month),
Rate Rate 5 S
Residential Barn'Service $22.61 522 58 -C 13.o (50.031
Muttihmi y S n 5':.Pf 517 91 .;C 3,co (52.071
Commercial Bins
Size-3 Cubic Ye+ds
Cray V.eiu. S"'66 5116 74 4 53"'. 55 06
2 Eo V'A-4 S'67.8? 517691 541's 59 08
Week 5224 C? 5237 17 5 67% 513 14
4 Cir y=.4Yeek 5252.C7 5297 27 6 14'. 517 2C
Days-Week 5336.3E 5357 64 6 32`o 5221 25
Sae-2 Cubic Yards
1 Cloy Wet* $9e 71 8102.51 3.55% 53 8'
2 C►ny- eetc 514383 515047 4 62% SE 64
3 Cloys% i. S18&76 $19822 50tie 5546
4 Days.Aht+ei: 5234.68 5247 OC 5 25% 512 32
`•
Dnys'Weift 52793E 5294 52' 5 43% 515 16
Sae•1.6 Cubic Yards
1 Day Wool; 57525. 578 12 3 81'0 52 87
2 Dnys.YdeNc $12662 5113195 4 21% 55 33
23 AZUSA
2011 Residential
Rate Comparison
El Monte 530.11
Claremont $29.63
San Dimas , 329.05
Diamond Bar 52602
Azusa-Cty Areas $16.5.
West Covina 526.35
Glendora 326.31
Covina 323.14
ANNS&(Old Rate) 522.61
Azusa(New Rate) $22.58
Monterey Park " - 322.20
Arcadia 520.79
Duarte 519.57
Upland 313.12
Monrovia 316.79
0. OA, 51030 SAM mat 5255o
Monthly Rate Mo.
24 AZ.USA
2011 Commercial
Rate Comparison
Monterey Park 5105-10
West Covina $100 46
Glendora $15442
San Dimas $133 59
Covina 3145.30
5.Pasadena 3130.52
�\ Duarte 5137.41
tt•����
La Wrote 5196.28
�y ®
et-r' Diamond Bar , $12347
Azusa(New Rate) 5116.74
'`(yl'❑_ Claremont $114 10
Azusa(Old Rate) $111.60
S sow- 34100 560.0 56430 51[0.0 $123.01 512.70 523000 510000 $24500
Monthly Rate
ivv
25 AZUSA,
Recommendation
It is recommended that the Utility
Board set a public hearing for
June 20, 2011 at 7:30 pm to
consider the proposed Refuse
Rate adjustments
�ggg�
26
Water Supply and
Drought Update
Azusa Utility Board
April 25,2011
[
=. ."' a+' .% .,4<ilkt 0%1.Y. VMV,* ____
Background
Water Rule 21 provides for declaration of various drought
phases
On July 1 , 2008, the City Council declared a Phase II
Water Shortage requiring mandatory conservation
measures and a 3 day per limit on landscape watering
Current water supply conditions have dramatically
improved making it appropriate to reevaluate the Phase II
water shortage declaration
Water Shortage " Factors"
Local rainfall levels
State Water Project allocations
San Gabriel and Morris dam levels
Upper Canyon Basin groundwater level
c Main SG Basin groundwater level
A 7 ( ' L- A.
Current Water Supply
Conditions
Rainfall has been above average the past two years
— FY10 rainfall of 20 inches (110% of average)
— FY11 rainfall of 24 inches (130% of average)
Groundwater in the Main San Gabriel Basin is at 230
feet (37 feet higher than last year)
— Watermaster's engineer recommending raising the Safe Yield
from 170,000 AF to 210,000 AF
State Water Project allocation raised from 50% to 80%
Dams (Cogswell, San Gabriel, Morris) are 80% full
Azusa's percolation ponds are full and overflowing
yp tc r RAINFALL AT SAN GABRIEL DAY
7
.or _ _ _
-
_ _
_ .
�' _Tr T IT- C
x"""- F :t;E's`•:-C -'RD'tF:i'ii Sar Y�:It e.E'Fbf EoEB=-
C ^• .u�. ♦ .F rt.S. .a a �t+c.ii F: it YaFi Si:iitea9E kf eSE'_'
RAIiATw 4LiweeY WN�u
r T.-
BALDWIN PARK KEY N81 WATER SURFACE ELEVATION
>N�
C l00
9E
Q iL0
3YI
iY 1MO
Yii,i
Q'.
..•... c.f.rew KK...,a Y],
MAIN SAN GABRIEL BASIN WATERMASTER
®
ti'I ETSON ENGINEERS
SAN GABRIEL DAM RAINFALL AND
E4R.^' PATER RESOURCE BKofKai BALDWIN PARK KEY WELL ELEVATION
AZUSA
4;.-4,1,,
r
-�4c2 k 1 1 F
N
5y�• Pr;
•
Other Considerations
Governor Brown declared the 3 year
drought over on March 30, 2011
The snowpack state-wide is 165% of
normal
a
Recommendation
The City Manager and Utility Director
recommend the following:
—Cancellation of the Phase II water shortage
—Voluntary continuation of sound water use&
efficiency practices by water users
2012 Local Resource
Capacity Procurement
11111
Azusa Utility Board
April 25,2011
Background
In April 2006, the Utility Board adopted a
Resource Adequacy Program for AL&W
Program provides that City procure sufficient
System Capacity for a 15% margin
Per the CAISO, a portion of System Capacity
must be from local "in basin" resources
AZUSA
Local Capacity
Azusa's Local Capacity requirement for
2012 is 35 MW
Current wind and hydro resources
provide 4 MW
Net requirement is 31 MW
- tiv
AZUSA
• .., a V:afF4
RFP
AL&W issued an RFP for capacity
resources on April 12
Five (5) bidders responded
58
RFP Results
System Capacity Local Capacity
MW $/KW-MO Period MW $/KW-MO Period
Sempra 20 1.85 Q3 - - -
20 2.00 1 Month - -
Calpine 20 1,85 Q3 35 , 2.60 CY12
i
20 1.70 May-Oct - , - -
Vernon - - - 25 2.75 CY12
Shell 20 2.80Q3 - - -
NRG 20 6.8 Q3 10 2.00 CY12
- 10 2.50 CY12
- - - 15 2.75 CY12
39 AZUSA
Recommendation
• Staff recommends a combined 31 MW
purchase of Local Capacity from NRG and
Calpine($883,200)
—20 MW from NRG at an average price of$2.25 per
KW-month
— 11 MW from Calpine at$2.60 per KW-month
• Reject all System capacity offers as too high
and continue to monitor the market
40 ,/l •
[Emergency Repair Work
4
- k
Azusa Utility Board
April 25,2011
MP
41 A/C>„
Background
On March 12, a 1980's vintage "direct
buried" electric service line failed along
Virginia Ann Drive
A temporary overhead service was
installed, but not ideal situation
Permanent repair required installation of
underground conduit
42
Action
Emergency P.O. was issued to MJ Star
Lite to install conduit
AMC delegates authority to City Manager
to approve up to $100K in emergency
expenditures
All repair work was completed on April
12.
AZUSA
-'.' 46‘...10-Afv.--4-• ' .r: .44: -..,i:::c!...„
'.� c !"...k.• ( 1:j 4 k4
1
:It.t"` ' r .:< ,� _ ,4 y 1 4 .
IP,..........— ' . ' '1/4 ', :'' ', t4i,tAt • ,.* -it..k. ,
, .
1:
{ p, 1 $ .'. s t
•i 1 t . t. ••• 9 `
ti _•
%
,. ....:
_.
...
` t.r,esti ;L ....
..
` 4.
_ ..
3 +t
r.
5• •
. . i .,_ 1 1, - .:..4
Cable Rejuvenation
Pilot Project
. . .. .
. „.,...
.. . • , 4 i .' - 'it
A ;,, t 4
•.3. ,
R
a w_
Azusa Utility Board
April 25, 2011 ."..".,
.. ;
AZUSA
Background
On September 27, 2010, the Utility Board awarded a
contract to Novinium for cable rejuvenation pilot project
Goal was demonstrate viability and economics of cable
rejuvenation versus conventional replacement
Technology involves injecting low pressure fluid into cable
strand to create a protective barrier
Work began December 13, 2010 at 955 E. Arrow Highway
and finished four days later.
46
Riser Cable Treatment
f
i
t`, t ^'`• ,_
Ie e 311 �... #!"�
47 AZUSA
UG Cables Inside
Vault & Transformer
1'
41.„
...0
l it ,1
ten.
48 AZUS A
Cable Rejuvenation
Tools & Equipment
iNell
•
49 AZUSA
More Tools & Equipment
4
z lir ,, - , t4
..
' 4:T
...z.v...., -t
,,--,,
...
-----.
50
Cable Rejuvenation
i, - /.• 1, - „to\ l A
4,.
'I\ i
A
51
_.
Cable Rejuvenation
\ '•.its <
, ....,,,, ii,,,,, ,
- -.„ r
. ,,f, iiir'''''-- '1' k St - ,,. 1':, „.,..f.., • ' _
1447
AZUSA
Untreated Cable
.% . ... . y
,.... ...
..., ., _
,...
,t . . _..
i
_ ,eer a i, 3 . .
\ .4M 1
,4 1
ereviv
/'V V
AZUSA
r i rc: i u
The Numbers
Original bid contract cost of\o inium cable reins-enation S34.7".5'
h0!ernai cost n: frrrpo ilai‘o:k equipment expense} S17.190.4-
Total Cost S51.912.99
Total footage of 12 kV =2 Str.primary cable that was treated 3.485 feet
Cost'ft of direct buried cable rejuvenation S14.88
Estimated cost of conventional cable reconstruction 5200.000"
Cost ft of conventional cable reconstruction S57.34
Overall savings front utilizing cable rejuvenation at 542.46 ft or
955 East Arrow Highway 5148.087.01
tee.
"Keep Your Cool"
Program
k
k
Azusa Utility Board
.)14111 January 31, 2011
Background
• Light&Water has a Small Business
Audit& Retrofit Program
• Primarily limited to lighting and building
shell improvements
• "Keep Your Cool" Program will allow
expansion of services to small business
qtirl
56 USA
Keep Your Cool
• A turnkey service being utilized in
Northern California with success
• Targets food and beverage industry
-Convenience stores and small groceries
• Refrigerator equipment tune-ups,
refrigerator door seal replacements, and
inside case lighting retrofits
ll=�'
57
A/I�,
Other Measures
Electronically Commutated Motors (ECMs)
Evaporative Fan Controllers
Anti-Sweat Heat (ASH) Controllers
LED Case Lighting
Strip Curtains
Auto Closing Devices
•`3
Other
Program administered through existing
SCPPA joint action agreement
$60K has been budgeted per year for
program
Expect saturation in 2.5 years (about 30
projects)
FY11 Mid-Year
Financial Report
as. 111•11•1100110•11.•
;;
Azusa Utility Board
March 28, 2011
A7tic ,
Background
Staff regularly reviews the financial status of the
Water and Electric funds
All numbers preliminary as City's accounting
process is a continuum
AZUSA
Water
The Water utility started FY11 with a $22M cash
reserve ($25M goal).
Sales dropped 5.2% from prior year and 25% from
FY07 for 2nd quarter
Debt service coverage of 1 .57 is good (1 .25 goal)
Major pipeline replacement project ($1 .3M) planned
for later in fiscal year.
._._, .
Ii . . . _.. .
.•
.._. _,:.:, (onsumftiun and Restuve info ['nor IY Ind 2,,d,..„,. renrnl
1 riled
Consuenrlion-CCF: 7,Ei33.732 4,2f-9.226 5:`0
Cash and]m-estuients:' 5 22,174.446 S 23,253.524 105'0
:.,.h,..1
Retrnurs
&etas Billing Amounts $3'.'L''1363 t 9,,:1141.,.773 53's
Otber Res tinier '.13.000 31079:5 tsft'a •
Inserr<t kerzsne 50MI0(1 -es is ira
Total Revenues S 1fi.5:36365 b 9539.C769 GO
Water Expenses
F7odu:fix: $3.Z03.4l S1,435,J55 45%
f'S:rctased N'nter 312.435 $35,M4 _6`a
'r ansmission and Disinflation :.305 270 I IBB,t'C; 4'74
Customer Acrourain t and Saks'• 3.(1[:145 :,.:44,544 55'6
_.5,dmi istratirs and Engineering 963.]05 30.161: Al`k
Franchise Fres. i9(t.tt3 19020Q 49'-i
Subtotal Expenses $ 14,35-C(1 S r^2(k'L9SO Jar❑
Capital hpendil:aes.Debt Seni.e:
Debt Service Payments} 5412520.170.$ ::60.(7(;; t
CarStal Imrco«rnesa Budget' .,194.9(1B 4:453 0
Capital Projects Funded by Brod (^l5(* [23.5(764 100%
Total Expenses[Less Bond Funding) S 21,O1F.4b: 5 6 V60 ill a
Adjustments
7 rarniers Out' S(1 SO 0'0
Tolal Firendilure.and Trans(en Chrt S:1.048fi6' S 6,480,rdl 40`:
Net Change in Cash'Negative) S <2,532.I0C1 s l,tl%9,L*'1; 5`�
Debt Coverage Ratio' [I1 137
NV
63 AZUSA
•
L. Electric
Beginning reserve balance of $11 .4M ($12.6M
goal) and positive cash of $732K to date
Debt coverage of 7.08 is good
PCA revenue to date of $1 .2M
Sales declined 5.2% from prior year through
second quarter and 9.2% from two years ago
non, hits, Y l iota ljlrl ndrd
CoPmrn,
Ptn.a And Prior lnd 1213E10
Consaaytion-kWh: 253.116,301 126.961,M1 49924
C ash Reserve Prior Frata]leas knd"' MASON $12.172.144 IMS
/Mi4 pet f,AetmalMn Badllet Arw,l thni rearm of
1611 013170 6.04,9
Revenue
Re..alRrltng A:ntt:ru `I313901 917.331:00
Resale Revert:«' r.394,025 11941.3 RI%
r.1d?Lko11.veour R.ve;we 3iCt110 2NAI=.
/were,:LW... 245.715 139160 5'.
ElectricTwat Revenues 433.423.940 921 900443 Su`.
Expenses
IWrd ved Pewee' 5225 3o41^11 0/3333/40 i^9.
Trareaysvo itispe:Jw:F 3.942015 1.9-+&3-'5 49'0
Cpxradora andMrrnerxae 3.30.793 1.417333 4..
Adadrdrua9•re and General' 2,159.815 1.2591+32 36%
Frar.-Tite arta In-lieu-Tah 3,456260 1919113 33%
Subtotal Intense,. 030.3:5.b20 11914`5 98
CgiW Earsndileses1 Debt Service
1.4rtg Tem Deft Service' 9915613 5474.306 50%
Capital Antes and Prole&' 20.5^.:49 334253 16%
Total Evrenditures 441556.3bl 5:6.635.531 50%
Adjustment,
Traraiers Cho 9.430 0 0%
Twat Ivendmurs and T.anstert Oat $41303914 524935031 30'"•
Change u,Cash%Reserve 133.1309:4) 4210 6%
Debt Coverage Ratio° 134 7.09 099034.9
65 AZUSA
2nd Qtr Utility Sales
Water Electric
FY CCF Sales Billings FT kWh Sales Billings
04-05 5,191,531 58,321,053 04-05 133,339,089 514,655,236
05-06 5,236,280 S7,874,961 05-06 129,533,967 514,380345
06-07 5.67.,810 58..815.286 06-07 139,649.981 5 16,052,403
07-08 5,083,893 58,696.748 07-00* 136,375877 515,872,05£
08-09 4,735,337 57,841.814 (788-09 139,176,034 518.2:6,924
09-10 4,503,313 58,513,021 09-10 133,286,521 5 16,22955.5
10-11 4,269,226 59,248.071 10-11 126,364,551 517,834,281
ti
Mi
66 A7I'-
Comments/Questions
filb
air °
iiiii
67 A Z. I_:H A
- _-. -
.. '',7r,:`,',..,.:.'" i '1 'n,',' ' . ',, ' , ' .. -,,,''', ." ', , . -' -' =• :''' ‘,
. , -, ,,
I
.
_
1))1 :
AZ U ISA.
T•.IIT i v. Lff D
ELECTION OF OFFICERS
TO: HONORABLE CHAIRPERSON AND MEMBERS OF TH A SA UTILITY
BOARD
FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIES f;
DATE: APRIL 25, 2010
� s
SUBJECT: ELECTION OF OFFICERS
RECOMMENDATION
It is recommended that the Utility Board elect by majority vote a Chairperson and Vice Chairperson
to serve as officers of the Utility Board.
BACKGROUND
The Utility Board was formed in May 2001 pursuant to ordinance 01 -03 , which was later amended
by ordinance 01 -07 (attached). The Utility Board is composed of City Council Members acting as
Utility Board Members, with the Director of Utilities serving as executive advisor to the Board. The
Utility Board meets monthly on the fourth Monday of each month in the downstairs conference
room at Azusa Light & Water offices to conduct business related to the City's electric and water
utilities.
Section 2-415 of the Azusa Municipal Code requires the Utility Board to elect a Chairperson, Vice
Chairperson, and a Secretary annually no later than the second meeting following appointment of the
Mayor Pro Tem by the City Council. Since new Mayor Pro Tem was selected on March 21 , 2011 ,
the Utility Board must elect by majority vote a Chairperson and Vice Chairperson. The functions of
Secretary are delegated to the City Clerk.
FISCAL IMPACT
There is no fiscal impact of electing officers.
Prepared by: Cary Kalscheuer, Assistant to the Director of Utilities
� .005
ORDINANCE NO.01-07
AN ORDINANCE OF THE CITY OF AZUSA, CALIFORNIA,
AMENDING CHAPTER 2,ARTICLE V,DIVISION 5 OF THE
MUNICIPAL CODE REGARDING THE COMPOSITION,
OFFICERS,POWERS AND DUTIES OF THE UTILITY BOARD
THE CITY COUNCIL OF THE CITY OF AZUSA,CALIFORNIA,DOES
ORDAIN AS FOLLOWS:
SECTION 1. Chapter 2,Article V,Division 5,Section 2-413 of the Azusa
Municipal Code is hereby replaced,in its entirety,with the following:
"Sec.2-413 Composition. The board shall consist of five members. The city
council may choose by a majority vote of the council to appoint its five members
as the ex officio members of the board. All members shall be appointed by a
majority vote of the city council and shall serve pursuant to section 2-32.
Members of the board may be removed pursuant to section 2-32"
SECTION 2. Chapter 2,Article V,Division 5,Section 2-414,of the Azusa
Municipal Code is hereby replaced,in its entirety,with the following:
"Sec. 2-414 Powers and Duties. When the board members are acting in their
capacity as both members of the board and members of the city council,the board,
acting jointly with the city council,shall have the following powers and duties:
1. To establish electric power and water rates,capacity and connection
charges,meter charges and such other fees and charges as may be appropriate and
to generally regulate,control,manage,renew,repair and extend the water system
and the electric power generation and distribution system of the City of Azusa.
2. To make rules and regulations governing the conduct of the board and its
members and the employees of Azusa Light and Water.
3. To control and order the expenditure of all money received from the sale
or use of water and electric power for defraying of expenses,maintenance,repairs,
construction,extension and operation of the water and electric power system and
for any expenses for additions to same.
4. To supply Azusa Light and Water's customers with water and electric
power for any and all purposes and adopt all necessary rules and regulations for
the provision of service.
5. To enter into contracts with any public or private agency for the exchange
RVPUBVFF\618015
• ooh
of water or electric power,provided that any such water or electric power so
exchanged by the city shall be repaid in full to the city within a reasonable period.
6. To hold, lease, acquire and purchase property in the name of the city.
7. To dispose of property surplus to the needs of the water or electric power
systems,provided that any sale, lease or disposal of its assets, including property
used in the generation of electrical energy, other than those unnecessary to the
operation of the water and electric power systems.
8. To engage such legal services as may be required or require the services of
the city attorney."
SECTION 3. Chapter 2,Article V,Division 5, Section 2-415 of the Azusa
Municipal Code is hereby replaced, in its entirety,with the following:
"Sec. 2-415 Chairperson,Vice Chairperson and Secretary The board shall elect
one of its members as chairperson, one as vice chairperson, and one as secretary.
Each of these three (3)board officers shall hold office for one (1) year and until
their successors are appointed. Initially, officers shall be selected no later than the
second meeting of the board following its appointment. Subsequent selection of
officers shall occur no later than the second meeting following the selection of the
mayor pro tern of the city council. The secretary may delegate to the city clerk
duties such as making tape or other recordings of meetings of the board and
developing draft Minutes of such meetings for consideration and possible
approval by the board."
SECTION 4. Chapter 2, Article V,Division 5, Section 2-418 of the Azusa
Municipal Code is hereby replaced, in its entirety, with the following:
"Sec. 2-418 Budget. While the board members are acting in their capacity as
both members of the board and members of the city council,the board shall
initially adopt a budget for Azusa Light and Water within four months of its first
meeting, and thereafter shall annually adopt a budget for Azusa Light and Water,
showing the expected expenses and revenues of the water and electric power
enterprise. The city manager will present the budget to the board for adoption.
The annual budget shall be incorporated into the budget of the city."
SECTION 5. Chapter 2, Article V, Division 5, Section 2-419 of the Azusa
Municipal Code is hereby replaced, in its entirety,with the following:
"Sec. 2-419 Loans. While the board members are acting in their capacity as
both members of the board and members of the city council, the board may
approve and authorize loans to or from the funds subject to its control from or to
RVPUBUFF\61 80 15
407
city funds on a temporary basis."
SECTION 6. Severability. If any section, subsection, sentence, clause, phrase or
portion of this ordinance is for any reason deemed or held to be invalid or unconstitutional by the
decision of any court of competent jurisdiction, such decision shall not affect the validity of the
remaining portion of this ordinance. The city council hereby declares that it would have adopted
this ordinance and each section, subsection, sentence, clause, phrase or portion thereof,
irrespective of the fact that any one or more sections, subsections, sentences, clauses, phrases or
other portions might subsequently be declared invalid or unconstitutional.
SECTION 7. This ordinance shall be in full force and effect thirty (30) days after
its passage.
SECTION 8. A summary of this ordinance shall be published in the manner
required by law.
PASSED, APPROVED AND ADOPTED.. day of October, 2001 .
,P4e
Cristina Cruz-Madrid
Mayor
ATTEST:
dev
-
Vera Mendoza, City Clerk
RVPUBVFF1618015
11 13
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF AZUSA )
I, Vera Mendoza, City Clerk of the City of Azusa, do hereby certify that the
foregoing Ordinance No. 01-07 was duly introduced and placed upon its first reading at a
regular meeting of the City Council on the 17 day of September2001, and that thereafter, said
Ordinance was duly adopted and passed at a regular meeting of the City Council on the i day
of October , 2001, by the following vote, to wit:
AYES: COUNCILMEMBERS: HARDISON,STANFORD,ROCHA,CHAGNON,MADRID
NOES: COUNCILMEMBERS: NONE
ABSENT: COUNCILMEMBERS: NONE
__ ,t/ A7'10,
Vera Mendoza,
City Clerk
APPROVED AS TO FORM:
4 07/1/,Q. 0.1k1/1-1.Lr-
Ci y Attorney
RVPUBVFF\618015
nn1,9
EXCERPTS FROM ORDINANCE 01-03
Sec.2-416 Meetings. The board shall establish a regular time and place of meeting and
shall meet regularly at least once a month or more frequently as workload requires. The regular
place of meeting shall be in the Azusa Light and Water building. At least once every three(3)
months,or more frequently if the board desires,the board may meet in other places and locations
throughout the city for the purpose of encouraging interest and facilitating attendance by people in
the various neighborhoods in the city at the meetings.
Special meetings may be called by the chairperson or by three(3)members of the
board,upon personal notice being given to all members or written notice being mailed to each
member and received at least 36 hours prior to such meeting,unless such notice is waived in writing.
All board meetings,and agendas for such meetings,shall be publicized in advance
by written notice given to newspapers serving the city at least three(3)days prior to regular meetings
and at the same time as members are notified of special meetings. In addition,notice of meetings.
shall be posted regularly at locations normally utilized by the city for such purposes.
All meetings shall be open to the public pursuant to the provisions of the Ralph M.
Brown Act. (Gov.Code§54950 et seq.) The board shall cause to be kept a proper record of its
proceedings. The records and files of the board and its officers shall include,but not be limited to,
all official correspondence,or copies thereof,to and from the board and its members received in their
official capacities and shall be kept open for inspection by the public at reasonable times in the office
of the city clerk.
Sec.2-417 Technological Support.The members o f the b o ard may receive technological
support in the form of hardware,software or reimbursement for telecommunications services used
in connection with serving on the board. Members shall also be reimbursed for any reasonable and
necessary expenses incurred by them in the performance of their duties as members of the board. •
010
t,� 6 ' e
sa:
A.ZUSA
11GMT & 'WATER
CITY OF AZUSA
MINUTES OF THE REGULAR MEETING
OF THE AZUSA UTILITY BOARD/CITY COUNCIL
MONDAY, JANUARY 31, 2011 — 6:31 P.M.
The Utility Board/City Council of the City of Azusa met in regular session, at the above date and time, at the
Azusa Light and Water Conference Room, located at 729 N. Azusa Avenue, Azusa, California.
Chairman Gonzales called the meeting to order. Call to Order
ROLL CALL Roll Call
PRESENT: BOARD MEMBERS: GONZALES, CARRILLO, MACIAS, HANKS, ROCHA
ABSENT: BOARD MEMBERS: NONE
ALSO PRESENT: Also Present
City Attorney Ferre, City Manager Delach, Assistant City Manager Makshanoff, Director of Utilities Morrow,
Assistant to the Director of Utilities Kalscheuer, Assistant Director of Resource Management Lehr, Assistant
Director of Electric Operations Langit, Administrative Services Director— Chief Financial Officer Kreimeier,
Captain Momot, City Clerk Mendoza, Deputy City Clerk Toscano.
PUBLIC PARTICIPATION Pub Part
None. None
UTILITIES DIRECTOR COMMENTS Dir Comments
Director of Utilities Morrow provided an update on CMUA Capitol Day stating that there was talk about the Dir of Utilities
State Budget, SB 23 to increase renewable energy portfolio to 33% by 2020, and the Water Bond ballot Comments
measure. He also provided an update on the court decision Tesoro vs. Los Angeles Department of Water and
Power. City Attorney Ferre also talked about the court decision and outcome.
UTILITY BOARD MEMBER COMMENTS Brd Mbr Cmts
None. None.
The CONSENT CALENDAR consisting of Items D-1 through D-4, were approved by motion of Board Consent Cal
Member Hanks, seconded by Board Member Carrillo and unanimously carried. Appvd
1 . The minutes of the regular meeting of November 22, 2010, were approved as written. (Hanks abstn) Minutes
Q l
2. Approval was given for the selection of MJ Star-Lite Inc. to furnish and install underground electric MJ Star-Lite
conduits across Gladstone Street near intersection at Duggan Avenue in an amount not-to-exceed Electric
$37,048. Conduits
3. Approval was given for the advertisement and solicitation of bids for Project W-266A, Water Main Water Main
Replacement in Hilltop Avenue in Azusa and in San Bernardino road and Workman Avenue in West Hilltop Project
Covina. W-266A
4. Approval was given to approve scope of work of request for proposals(RFP)to prepare the Hsu-Canyon RFP Engr Rpt
Filtration Plant Engineering Report for the California Department of Public Health;and to authorize staff Hsu-Canyon
to solicit proposals from qualified consultants to prepare said Report. Filtration Plnt
SCHEDULED ITEMS Sched Items
California Resource Connections, Incorporated(CRC)Funding Request. CRC Fund
Rqst
Assistant to the Director of Utilities Kalscheuer addressed the item providing a background of California C. Kalscheuer
Resource Connections(CRC)and its involvement with City in environmental programs i.e. River Walk and Comments
Litter Clean-up and Smart Gardening & Backyard Composting Workshop. He detailed the proposal for a
Public Educational Venue.
Ms. Suzanne Avila of California Resource Connections and Mr.Rick Thomas,Landscape Architect,addressed S. Avila
the issue detailing the request for a Memorandum of Understanding and funds to provide and Educational &R. Thomas
Community Garden and Compost Demonstration Site at Memorial Park. They responded to questions posed CRC
by the Board Members. Board Member Carrillo asked that further discussion be held regarding a time frame
for rental of the plots.
Moved by Board Member Carrillo, seconded by Board Member Hanks and unanimously carried to approve MOU w/CRC
Memorandum of Understanding (MOU) with CRC to provide CRC with $39,822 in funding for an Approved
Educational Community Garden and Compost Demonstration Site at Memorial Park,the Director of Utilities Educational
was authorized to execute MOU;and a budget amendment for same amount from Fund 39 to fund the project, Com Garden &
was approved. Compost Demo
Commercial Recycling Program Contract Award. Com Recycle
Assistant to the Director of Utilities Kalscheuer presented the proposal for Commercial Recycling detailing the C. Kalscheuer
background and process utilized and recommendations.He responded to questions posed by Board Members. Comments
Moved by Board Member Hanks, seconded by Board Member Macias and unanimously carried to approve Corn Recycle
selection of proposal by E. Tseng and Associates in amount not-to-exceed $128,450 to provide technical Program
services for the implementation of a commercial recycling program in the City of Azusa and to approve E. Tseng&
budget amendment in same amount from Fund 39 to fund contract award. Associates
Power Supply/Rate Impact Assessment Tool. Pwr Supply
Assistant Director of Resource Management Lehr presented background information stating that a number of Y. Lehr
legislative and regulatory actions pertaining to renewable energy and climate change impact Azusa, CARB Comments
Renewable electricity Standard(RES)and AB 32(Global Warming Solutions Act),he detailed their definition
and impacts to City. He also detailed the purpose of the Assessment Tool to monitor progress in Energy
progress.
Moved by Board Member Hanks,seconded by Board Member Carrillo and unanimously carried to approve the Proposals
scope of work for a Power Supply/Rate Impact Assessment Tool and staff was authorized to solicit proposals. Power Supply
Rate Impact
Assessment
01/31/11 PAGE TWO Tool
012
February 28, 2011 Utility Board Meeting. UB Mtg
2/28/11
Director of Utilities Morrow addressed the item stating that he and Board Member Hanks will be attending the G. Morrow
Annual APPA Legislative Rally during the time of the next Utility Board Meeting and since there is nothing Comments
significant scheduled for that meeting he requested that it be canceled.
Moved by Board Member Carrillo,seconded by Board Member Gonzales and unanimously carried to cancel UB Mtg 2/28
the Utility Board Meeting of February 28, 2011, with the understanding that any item that needs immediate Canceled
action could be placed on the agenda for a Council Meeting in February.
STAFF REPORTS/COMMUNICATIONS Staff Rpts
Director of Electric Operations Langit provided an update on the Revised Service Agreement for Wholesale Revised Svs
Distribution Service between Southern California Edison and Azusa Light and Water. He detailed the item Agmt Edison
stating that the payment methodology has been improved by negotiating a lower fixed charge rate if Azusa
were to elect to finance the substation cost improvements rather than Edison. SCE is proceeding with an
updated FERC filing which allows Azusa to pay capital costs of CAISO substation metering in return for
lower monthly charges into perpetuity.
Moved by Board Member Carrillo, seconded by Board Member Hanks and unanimously carried to adjourn. Adjourn
TIME OF ADJOURNMENT: 7:36 P.M.
SECRETARY
NEXT RESOLUTION NO. 11-05.
01/31/11 PAGE THREE
•
013°
*.J4 .
AL USA
CMI i 5h'4111
CONSENT CALENDAR
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY
BOARD
FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIES
DATE: APRIL 25, 2011
SUBJECT: APPROVAL OF A PROFESSIONAL SERVICES CONTRACT WITH SA
ASSOCIATES TO PERFORM INSPECTION SERVICES ON PROJECT W-
266A WATER MAIN REPLACEMENT IN AZUSA, WEST COVINA
RECOMMENDATION
It is recommended that the Utility Board approve a Professional Services Contract in the amount
of$58,000 to SA Associates to provide inspection services on Project W-266A.
BACKGROUND
A construction contract for Project W-266A, Water Main Replacement in Hilltop Avenue in
Azusa, and San Bernardino Road and Workman Avenue in West Covina has been awarded and
the project will require inspection during construction.
On April 4, 2011, the Azusa City Council approved issuance of a Request for Proposals for
inspection contract. Five (5) qualified and experienced inspection services consultants were
requested to submit proposals for this project and three(3) consultants responded:
SA Associates $58,000.00
Civiltec Engineering $66,800.00
Willdan Engineering $86,240.00
SA Associates, who is low bidder, has inspected past projects for the Water Division and has
performed well.
014
Pipeline Replacement Inspection Services
April 25, 2011
Page 2
FISCAL IMPACT
The fiscal impact of this item is $58,000. A budget item for this project has been approved by the
Utility Board in FY 2010-2011 Capital Budget Account 32-80-000-721-7145/72111A-7145.
Prepared by: Chet Anderson, Asst Dir- Water Operations
015
;ft:
ara
AZUSA
. cbi a k4rt!
CONSENT CALENDAR
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY
BOARD
FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIES
DATE: APRIL 25, 2011
9
SUBJECT: APPROVAL OF AN AMENDMENT TO BLANKET PURCHASE ORDER NO.
111798 TICY STERLING TECHNOLOGIES, LLC FOR PURCHASE OF
ADDITIONAL WATER TREATMENT CHEMICALS
RECOMMENDATION
It is recommended that the Utility Board approve an amendment to Blanket Purchase Order No.
1111798 for an additional amount of$32,000.
BACKGROUND
Azusa Light & Water operates the Joseph F. Hsu Water Filtration Plant to produce potable water
from surface water diverted from the San Gabriel River. The water from the River contains
varying amounts of fine materials including silt and clay (turbidity). The amount of turbidity in
River water varies with rainfall and storm water runoff to the River. This year, due to the wet
winter and heavy rains, River surface water contained higher than usual levels of turbidity which
created a higher demand for the chemicals used to settle the particles out of the water prior to
filtration (pretreatment). With the increase in particles removed from the treated water, a greater
volume of sludge was produced, and additional chemicals are necessary to treat the sludge.
Sterling Technologies, LLC has a previously approved purchase order to provide chemicals to
the Water Filtration Plant. The current amount of their Blanket Purchase Order is $79,500. By
the proposed amendment, it will be increased to $111,500.
FISCAL IMPACT
The fiscal impact of this item is $32,000 which is to be transferred to the Sterling Technologies,
LLC Blanket Purchase Order from available funds in Operating Budget Account No. 32-40-722-
744-6863 (water treatment plant supplies)
Prepared by: Chet Anderson, Assistant Director- Water Operations
016
E
fet
A7U'� A
r.nr t �arra
CONSENT CALENDAR
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY
BOARD
FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIES
DATE: APRIL 25, 2011
SUBJECT: AWARD OF A CONTRACT TO SURVALENT TECHNOLOGY INC. FOR
FURNISHING & INSTALLING A SUPERVISORY CONTROL AND DATA
ACQUISITION (SCADA) FOR MONITORING THE ELECTRIC
SUBSTATIONS.
RECOMMENDATION
It is recommended that the Utility Board award a contract to Survalent Technology in the amount
not to exceed $82,750 for a substation SCADA system.
BACKGROUND
Supervisory Control and Data Acquisition/Monitoring Equipment, commonly referred to as
"SCADA", is a combined system of computers, software, communications equipment and
intelligent electronic control devices which are used by utility personnel to monitor and operate
key equipment within the electric system. Most electric utilities who have owned and operated a
SCADA system consider it essential for efficient and safe electric network operations. Through
SCADA, electric personnel are able to remotely monitor the system and thus gain a rapid
situational awareness on the condition of the electric distribution lines. SCADA systems have
gained widespread use amongst electric utilities nationwide. It is a starting point in implementing
future smarter grid programs.
Under its 10 year Electric System Master Plan, Azusa Light & Water identified the need and
justification for a SCADA system. Recognizing that a SCADA system is an essential business
tool in the operation of a municipal electric utility, the Azusa Utility Board recently authorized
017
SCADA Acquisition
April 25, 2011
Page 2
staff to solicit proposals from companies or vendors who are experienced in the installation and
commissioning of SCADA systems.
Staff issued the SCADA request for proposals (RFP) and received proposals from four (4)
companies. Sealed proposals were opened on March 16, 2011 at the office of the City Clerk and
the results are shown in the table below:
COMPANY PROPOSAL AMOUNT
SURVALENT TECHNOLOGY $82,750
AVISTA REALTIME SYSTEMS (GEiPower) $85,115
GE DIGITAL ENERGY $183,480
SEL INCORPORATED $187,775
Staff reviewed the contents of the proposals submitted by vendors and invited each company to
make a presentation of their proposed SCADA system. As part of the evaluation process, staff
also conducted an informal reference check on the companies' previous projects for other small
municipal electric utilities.
Survalent's SCADA system product offering consist of a Windows SCADA Master System that
communicates to remote terminal units (RTU's) or "Scout Controllers" which combine the
functions of a traditional data concentrator and terminal server. Included is the base SCADA
software consisting of a graphical user interface and database editing software. The entire system
fully furnished and installed comes with vendor provided system training, testing and final
commissioning plus the customary one year warranty and support. A simplified diagram of the
SCADA system as proposed by Survalent is shown on next page for illustration purposes.
018
SCADA Acquisition
April 25, 2011
Page 3
14.171.
s,Aw Moi
•[lrvr+♦
IAN �
... ��� _
Or rr.arnro
31.44a1,M+••A 48/1/0
Mo.[rs♦tw
fsa.ai*WO [1
s. 0N[by Jnr.
1 PWI Oar w,00.r ,..Ma✓-
11.141,0011 Iluftmorm
i..8MMd sY i,.uab. ♦ .
vary
Ort Coned.
Corporal
N � �Y r-111,"^
tis.�...�✓,'+,._.� W urn..
-
41111111111
car Gw.ws-fcma �►
iuDw er irnnasn♦
{ Cmperrtlan 16.1.~
Survalent's competitive costs, product offering, experience and qualifications is well known in
the electric utility industry including their strategic partnership with Hometown Connections, a
utility services subsidiary of the American Public Power Association. In view of the above, and
after a careful consideration of the other proposals that were submitted, staff is recommending
for approval by the Azusa Utility Board the proposal of Survalent Technology which already
includes a 10% contingency allowance.
FISCAL IMPACT
This SCADA project is budgeted this fiscal year as a Capital Improvement Project and budgeted
funds are available.
Survalent's cost proposal excludes the applicable CA use/sales tax and so the final Purchase
Order Contract will include a line item for sales tax in the amount not to exceed $1,463, to cover
the 9.75% tax on material deliverables to Azusa Light & Water.
Prepared by: F. Langit Jr. —Assistant Director of Electric Operations
019
Paw
tAZIGSIT d SA
UA'ATFR
SCHEDULED ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF E AZUSA
UTILITY BOARD
FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIES
DATE: APRIL 25, 2011
SUBJECT: APPROVAL TO EXTEND INFOSEND CONTRACT FOR BILL
PRINT/MAIL, AND ELECTRONIC BILL PRESENTMENT/PAYMENT,
AND PAYMENTUS CONTRACT FOR PROCESSING PAY-BY-PHONE
AND WEB PAYMENTS
RECOMMENDATION
It is recommended that the Azusa Utility Board:
(1) Extend contract purchase orders for two years until February 1, 2013 for Infosend bill
print/mail and electronic bill presentment/payment services, and for Paymentus to
process pay-by-phone and web payments; and
(2) Amend the contract purchase order for Infosend to add $181,000 to cover this period.
(There is no additional cost for Paymentus since customers who use this service pay a
small fee.)
BACKGROUND
Three years ago Customer Service conducted a rigorous review of competing vendors for
these services and selected the most customer-focused, experienced and competitively
priced vendors. To change vendors this year would be a hardship for two reasons: (1)
We are under contract with Systems & Software for our enQuesta Customer Information
System upgrade and according to the contract they will only upgrade with current
interfaces/vendors, which Infosend and Paymentus are; and (2) Infosend is so intricately
020
April 25, 2010
Customer Service Contract Extensions
Page 2
entwined in our business, including online billing and payment with web pages they
wrote and designed, that it would be difficult and take an extreme amount of work at this
time to take on the huge project of exchanging them for another vendor, and through the
rest of the year, we are focusing all our efforts and staff time to make our enQuesta
upgrade a success. Moreover, Azusa Municipal Code 2-523(c) does not require staff to
follow competitive purchasing procedures when purchasing software.
The performance of Infosend and Paymentus under these contracts has been excellent.
Staff does not believe that efficiency and/or cost savings would result from rebidding
these arrangements and is recommending that the current contracts be exercised to
continue services for two additional years.
FISCAL IMPACT
Infosend's monthly charges vary slightly based on the number of bills and payments
processed. Total cost is not-to-exceed $181,000, excluding postage, for the additional
two years ending February 1, 2013. Funds needed for this fiscal year are budgeted for in
Account 31-40-711-903-6493.
Prepared by:
Karen Vanca, Assistant Director-Customer Care & Solutions
02t
AZUSA
r.uT 4 . rrp
SCHEDULED ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE USA UTILITY
BOARD
FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIES
DATE: APRIL 25, 2011
SUBJECT: AUTHORIZE STAFF TO SOLICIT REQUESTS FOR PROPOSALS TO
EVALUATE THE AZUSA HYDROELECTRIC PLANT AND CONDUIT
RECOMMENDATION
It is recommended that the Utility Board authorize staff to solicit proposals from qualified
consultants to evaluate the condition of the Azusa Hydroelectric Plant and Conduit from an
acquisition feasibility standpoint.
BACKGROUND
Presently, the City of Pasadena owns the Azusa Hydroelectric Plant and associated conduit.
Pasadena has indicated they would consider "selling" these facilities to the City of Azusa. Staff
has begun evaluating such a transaction and has expressed preliminary interest in acquiring the
project under appropriate business terms to be determined. Staff believes that it would be helpful
to have the assistance of a third party to evaluate the condition of the project and to assess the
value, benefits, liabilities and costs of a possible acquisition.
The history of this project is interesting. The conduit and powerhouse were built in the late
1890's by the San Gabriel Electric Company (successor to the San Gabriel Power Company,
Pacific Power & Light and eventually Southern California Edison Company in 1917) to provide
hydroelectric energy as a possible power source for an ice-making plant in Azusa. The initial
capacity of the plant was 2,000 KW and by June 30, 1898, power was being transmitted to Los
Angeles where much of it was used by electric railway lines in and around Los Angeles.
The original power plant was the second two-phase plant in the United States, the first being at
Niagara Falls. In the late 1940's a new power plant was constructed south of the old facility to
replace the first plant. This was necessitated because Edison was converting from 50 cycle power -
to 60 cycle power.
022
RFP for Azusa Hydroelectric Project
April 25, 2011
Page 2
In 1912, the City of Pasadena formed its Water Department when it sold bonds to buy some
small independent water companies. Pasadena realized that it needed more water as the city
continued to develop and grow. It was determined that the San Gabriel Canyon would be a
viable source,but a dam and a pipe line to Pasadena would need to be built. Pasadena purchased
various properties and water rights in the canyon so a dam could be built. However, the
reservoir formed by the dam could potentially encroach on the Azusa Conduit, which was owned
by Southern California Edison Company. Edison told Pasadena that if they wanted to build the
dam, they would have to purchase the conduit and powerhouse from them. On January 18, 1930,
the City signed an option with Edison the purchase these properties.
On June 18, 1929, the voters of Pasadena approved the sale of bonds in the amount of
$10,000,000 for the "San Gabriel Project". The ground breaking ceremony for Pine Canyon
Dam was held on April 26, 1932 and the dam was scheduled for completion by January 1934.
Pasadena sold Pine Canyon Dam and Reservoir to MWD on November 23, 1932, and the City of
Pasadena officially purchased the Azusa Hydroelectric Project and Conduit from Southern
California Edison on June 20, 1933. On May 26, 1934, Pine Dam and Reservoir's name was
changed to Morris Dam and Reservoir.
Consideration of a possible acquisition by the City of Azusa of the Azusa Hydroelectric Plant
and Conduit is a relatively complex undertaking that would need to take into consideration many
factors including: the condition of the facilities; the involved permits, licenses and contracts; the
impact on third parties such as other Committee of Nine members; and the value of the
electricity expected to be produced by the hydroelectric plant. Attached is a proposed RFP scope
of work.
FISCAL IMPACT
The fiscal impact of this proposed Engineering Report will be reported in a Staff Agenda Report
to the Utility Board following receipt of proposals in response to the RFP.
Prepared by: George F. Morrow—Director of Utilities
023
AZUSA
*HT b x'41E1.
SCHEDULED ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZ SA UTILITY
BOARD
FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIES
DATE: APRIL 25, 2011
SUBJECT: AUTHORIZATION TO NOTIFY PROPERTY OWNERS OF PUBLIC
HEARING CONCERNING REFUSE RATE ADJUSTMENT ON JUNE 20,
2011
RECOMMENDATION
It is recommended that the Utility Board authorize staff to print and mail a 45-day advanced
notice of public hearing to be held June 20, 2011 to consider the annual refuse rate adjustment
and "true up".
BACKGROUND
The City has an Exclusive Franchise Agreement with Athens Services for refuse collection and
recycling services. Each year rates for such services need to be adjusted effective July 1
pursuant to contract terms and conditions. Our City Attorney has advised that Proposition 218
requires that all refuse rate adjustments be approved at a public hearing with a notice to the
public 45 days in advance of the hearing.
Rate adjustments are made based on changes in: (1) the Consumer Price Index (CPI); (2) per ton
rates at the Puente Hills landfill; and (3) amount of tonnage collected from Azusa residents and
businesses. Rates also include billing charges for residential customers, AB 939 Fees, franchise
fees, and loss factors due to customer non-payment since the contract requires the City to pay
Athens all amounts billed by the Utilities Department.
In general, the CPI from January 2010 to January 2011 increased by 1.8%. However, landfill
rates at Puente Hills remained stable during this last year at $38.26 per ton, and in January 2011
thru April 2011, Athens was able to deliver enough waste to Puente Hills to qualify for volume
discounts, effectively lowering actual costs which are passed on to customers. The lower landfill
024
2011 Refuse Rate Adjustment
April 25, 2011
Page 2
rates for four months combined with 3.45% fewer tons from single family customers this last
year resulted in a reduction of $0.03 per month for single family barrel customers. Multifamily
tonnage declined by 10.7% compared to the prior year. This results in a 10.37% ($2.07) monthly
reduction in per household rates for multifamily bin customers.
Commercial bin tonnage was relatively unchanged from prior year, however, businesses reduced
service levels this last year, from 273,086 cubic yards in FY 2009-10 to 260,669 cubic yards in
FY2010-11. Since the same amount of waste and disposal cost thereof is allocated to 4.6% few
cubic yards, this results in an increase per cubic yard in waste disposal costs. As a result,
commercial rates will increase from 3.8% to 6.3% depending on service level. (See attached
draft public notice which includes proposed rate changes.)
Staff conducted a survey of rates in surrounding cities and finds that Azusa's proposed rate
changes will remain competitive with services provided in neighboring cities. (See attached
survey results.)
Athens Services has reviewed the draft calculations and proposed rate changes and has concurred
with rate calculations. Once rates are approved following the public hearing, a contract
amendment will be executed by the City and Athens effectively implementing the new rates.
More detail will be provided at the public hearing about the proposed rate changes.
FISCAL IMPACT
The cost of printing and mailing the public notice is about $3,280 and such cost will be funded
from AB 939 fund.
Prepared by:
Cary Kalscheuer, Assistant to the Director of Utilities
Liza Cawte, Sr. Administrative Technician
Attachments
Draft Public Notice
Refuse Rate Survey Charts
025
lkir-
a NOTICE OF PUBLIC HEARING W
^_
','44,-_- REFUSE RATE ADJUSTMENT Mi
"`` JUNE 20,2011
AZUSA AZUSA
ucmi a wnEn
NOTICE IS HEREBY GIVEN that pursuant to Article XIIID of the California Constitution,the City Council of the City of Azusa will hold a
PUBLIC HEARING to consider an increase in rates for trash collection and recycling services effective for bills rendered on or after July 1,
2011. This notice is being mailed to the owner of record of each identified parcel subject to the trash rate adjustment.
Said PUBLIC HEARING will be held at the regular meeting of the City Council of the City of Azusa on MONDAY,JUNE 20,2011,at 7:30
P.M.,or as soon as possible thereafter,in the Civic Auditorium,213 E.Foothill Blvd.,Azusa.
The City Council will be considering adoption of a trash collection and recycling rate schedule effective from July 1,2011 through June 30,
2012, as set forth below for typical residential and commercial services. Read below for more information.
July-June July-June
2010-2011 2011-2012
2011.2012
SERVICES Current Proposed Change
Total Monthly Total Monthly
Rate Rate % $
Residential Barrel Service $22.61 $22.58 -0.13% ($0.03)
Multifamily Bin $19.98 $17.91 -10.37% ($2.07)
Commercial Bins
Size•3 Cubic Yards
1 Day/Week $111.68 $116.74 4.53% $5.06
2 Days/Week $167.83 $176.91 5.41% $9.08
3 Days/Week $224.03 $237.17 5.87% $13.14
4 Days/Week $280.07 $297.27 6.14% $17.20
5 Days/Week $336.39 $357.64 6.32% $21.25
Size-2 Cubic Yards
1 Day/Week $98.71 $102.51 3.85% $3.81
2 Days/Week $143.83 $150.47 4.62% $6.64
3 DaysNVeek $188.76 $198.22 5.01% $9.46
4 Days/Week $234.68 $247.00 5.25% $12.32
5 Days/Week $279.36 $294.52 5.43% $15.16
Size•1.5 Cubic Yards
1 Day/Week $75.25 $78.12 3.81% $2.87
2 DaysNVeek $126.62 $131.95 4.21% $5.33
Further details regarding the bases and reasons for the proposed trash rate changes are set forth in a report available at the City Clerk's
office at 213 E.Foothill Boulevard in Azusa which may be reviewed by any interested person. Proceeds from this rate adjustment will be
used to pay Athens Services for trash collection and recycling services. Recycling services include processing all waste collected in Azusa
through a material recovery facility where all glass,plastics,metal and paper products are removed and recycled. Other portions of the
trash rate include City fees,such as 10%franchise fee,AB 939 or Recycling fee,billing fee,and fee to make up for non-payments. These
fees are used by the City to administer the trash hauling contract,comply with the California Integrated Waste Management Act of 1989,
and cover customer service and billing costs.
At the time of the public hearing,the City Council will hear and consider all protests and objections concerning the proposed trash rate
adjustments. Upon conclusion of the hearing,the City Council will consider,and may adopt,the proposed trash rate adjustments. If written
protests against the proposed rate adjustments and fee schedule are not presented by a majority of owners of the identified parcels upon
which the rates and fee schedule are proposed to be imposed,the City Council will be authorized to impose the rates and fee schedule.
Comments or protests to the proposed trash rate adjustments must be delivered in writing to the City Clerk,City of Azusa,213 East Foothill
Boulevard,Azusa,CA 91702,prior to the public hearing on June 20,2011. Written protests may also be submitted at the public hearing so
long as they are received prior to the conclusion of the public hearing. Please include your service address(es)or parcel number(s),your
name and contact telephone number in your written protest.
If you have any questions about this notice or proposed changes to trash rates,please call Customer Service at(626)812-5225. Copies of
the proposed report and resolution for adoption of the trash rate changes are available by calling the above-mentioned telephone nur(U�0�ltg�
at htto://www.ci.azusa.ce.us/index.asox?nid=137. Thank you. • bb
2011 Commercial Rates Survey (3 CY/1x per Week)
,
•
I i
i j
;
Monterey Park $18510
West Covina $161.46
Glendora $154.42
I
San Dimas $153.59
Covina $145.38
V S. Pasadena $138.52
I
Duarte $137.41
11111.1111.111.1111111
La Verne $136.28
I
Diamond Bar $12347
I
Azusa (New Rate) , $116.74
Claremont 114.10 , 1
I j
Azusa (Old Rate) 1 $ 11.68 !
I__
5- $20.00 $40.00 $60.00 $80.00 $100.00 $120.00 $140.00 $160.00 $180.00 $200.00
t
Monthly Rate
c
N
i
2011 Single Family Residential Rates Survey
El Monte
$30.11
Claremont
$29.63
San Dimas
$29.05
Diamond Bar $28o2
zusa-Cty Areas
$26.38
g1.+
V West Covina $26.35
Glendora $26.31
I �
Covina
$25.14
Azusa (Old Rate) $22.61
Azusa (New Rate) I $22.58
Monterey Park 111111111111111111111111111111111111110111 $22.20
Arcadia $20.73
I `
Duarte $19.57
Upland
► $18.82•
Monrovia $18.79
$- $5.00 $10.00 $15.00 $20.00 $25.00 $30.00 $35.00
Monthly Rate
0.0
Piii""4,
T
AL LISA
-CHI 6 WAIFr.
SCHEDULED ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE USA UTILITY
BOARD .
FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIES
DATE: APRIL 25, 2011
SUBJECT: UPDATE ON WATER SUPPLY SITUATION AND RATIFICATION OF
CANCELLATION OF PHASE II WATER SHORTAGE DECLARATION
RECOMMENDATION
It is recommended that the Azusa Utility Board ratify the City Manager's and Director of
Utilities' recommendation to cancel the Phase II Water Shortage declaration effective May 1,
2011 due to an improved water supply situation, while strongly encouraging continuation of
water conservation measures by consumers.
BACKGROUND
The Azusa City Council amended Water Utility Rule No. 21 titled "Water Conservation" on
June 18, 2008 and declared a Phase II Water Shortage effective July 1, 2008. A Phase II Water
Shortage requires water users to implement a variety of mandatory water conservation measures
and limit landscape/turf watering to 3 days a week during certain hours.
Current water supply conditions affecting Azusa Light & Water have dramatically improved
since December 2010. As a result, the Director of Utilities has determined that the basis for
declaring a Phase II Water Shortage no longer exists. Factors considered in making this
assessment include local rainfall levels, State Water Project allocations, runoff into the San
Gabriel and Morris Dams, and ground water levels in the main and upper San Gabriel Valley
basins.
Specifically, the following key factors related to water supply are noted:
• The local area has seen above average rainfall the past two years with FY2009-10 seeing
about 20 inches of rainfall on the Valley floor (110% of average) and FY2010-11 to date
seeing about 24 inches of rainfall (130 percent of average).
• The groundwater level in the Main San Gabriel Basin (measured at Baldwin Park Key
029
Water Supply/Drought Update
April 25, 2011
Page 2
Well) has risen to about 230 feet— an increase of 37 feet from a year ago. The water table
is still rising about one foot a week and is expected to peak at 240 feet.
• The Watermaster's consulting engineer has recommended changing the Operating Safe
Yield of the Basin from 170,000 AF to 210,000 AF for FY2011-12.
• The State Water Project's allocation to contractors has been raised from the 2010 level of
50% to a level of 75% with a possibility of increasing to the 80 to 85% level after Sierra
snowfall is measured.
• The water connection (USG-3) near Morris Dam that delivers water from the State Water
Project and the Colorado River will have available water for the first time in two years.
• Reservoir storage at the Cogswell, San Gabriel and Morris Dams is at 80% of full
capacity (67,000 AF) and might be higher if not for releases being made for flood
control. (Those releases are being diverted to spreading grounds at I-210 and I-605.)
• Azusa's two storage/percolation ponds are full as is the Canyon Basin which is the direct
source of AL&W's pumped groundwater.
In addition, California Governor Brown declared the 3 year drought to be over on March 30,
2011 in light of the significant snowpack levels that provide a third of the State's water. Recent
snowpack measurements put the water content in the statewide snowpack at about 165% of
normal. All of the State's major reservoirs are filled to over 100%of historical average levels.
At the same time that Azusa Light & Water cancels the water shortage declaration, the utility
will recommend that local water users continue to voluntarily follow sound water use/efficiency
practices. Historical precipitation levels in California (especially Southern California) are
extremely variable and history shows that it may be only a year or two before water supplies
become seriously scarce again. This will be communicated to customers through normal Light &
Water channels. (No direct mailing is planned at this time.)
As noted above, the Director of Utilities has determined that the basis for declaring a Phase II
Water Shortage no longer exists. Water Utility Rule 21 provides that prior to making a water
shortage declaration, the Director of Utilities shall communicate this information to the City
Manager and City Council.
FISCAL IMPACT
It is difficult to project the fiscal impact of terminating the drought declaration. Water
consumption levels have declined nearly 25% over the past several years due to successful
efforts by local water customers to conserve. Should customers increase future water purchases,
it may be possible for the water utility to rebuild its reserve levels, increase its water
infrastructure expenditures and reevaluate basic water rate levels.
Prepared by: George F. Morrow—Director of Utilities
030
PIPOISb ,
Vr
FItt-t : F-
1,;,,,,, .;,11:11
:”1
* ,-7.- ' -, r*
;,-
SCHEDULED
EIGHT & WAtER
SCHEDULED ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF:4, USA
UTILITY BOARD
FROM: GEORGE F. MORROW, DIRECTOR OF UTILIT IT
DATE: APRIL 25, 2011
SUBJECT: APPROVAL OF AGREEMENTS WITH NRG AND CALPINE TO
PURCHASE LOCAL RESOURCE ADEQUACY CAPACITY FOR 2012
RECOMMENDATION
It is recommended that the Utility Board approve two Local Resource Adequacy
Capacity purchases totaling 31 Megawatts (MW) from NRG and Calpine and authorize
the Director of Utilities to execute the associated Confirmation Agreements once the
executable copies are prepared.
BACKGROUND
On April 24, 2006, (in response to mandatory planning and operational requirements of
the California Independent System Operator or CAISO), the Azusa Utility Board adopted
a "Resource Adequacy Program" for the City of Azusa. In general the program provides
that the City procure sufficient electric power capacity plus 15% for reserve margin
ahead of time to ensure adequate supply of electricity. It should be noted that all Publicly
Owned Utilities (POU) serving load with the California ISO Balancing Authority Area
adopted similar resource adequacy (RA) programs.
Based on the ISO's annual engineering studies, a portion of the RA capacity has to be
derived from "local" resources — i.e. generating resources interconnected within or near
the Los Angeles Basin. Azusa satisfies a portion of its non-local RA capacity (i.e. system
RA capacity) through capacity associated with Azusa's external resources - San Juan,
Palo Verde, and Hoover; however, local RA capacity has to be obtained/purchased from
parties operating generating resources in the LA basin.
031
Local Resource Adequacy Capacity Purchases
April 25, 2011
Page 2
Azusa's local RA requirement for 2012 is projected to be 35 MW, 4 MW of which can be
satisfied through Azusa's rights in the Garnet Wind Project, the San Dimas Hydroelectric
Plant and the MWD Hydroelectric Project. As a consequence, the 31 MW balance of
local RA requirement must be procured from a third party.
Staff issued a request for proposals for system and local RA capacity products for 2012;
the request for proposal is attached herein. Five (5) entities responded to the RFP with
various terms and conditions. Products offered by the responding entities met the local
and/or system RA capacity attributes sought by staff and outlined in the RFP.
Based on our recent experience, as well as our 2012 outlook, the submitted system RAC
bids are not competitive. Accordingly, we do not recommend transacting for that
particular product at this time. We will continue to monitor the market for better pricing
opportunities.
However, the local RA capacity bids are more in line with our expectations and pricing
outlook for 2012. As a matter of fact, the combined weighted price from the most
competitive local RA capacity bids we are recommending herein for your approval is
some 15% lower than the similar product procured last year for Q3 2011.
Of the five qualified responses, NRG and Calpine provided the lowest combined price for
31 MW of the local RAC product. Accordingly, Staff recommends purchasing 20 MW of
Local Resource Adequacy Capacity from NRG - priced at $2.00/kw-month for the first
10 MW and $2.50/kw-month for the second 10 MW, and 11 MW from Calpine — priced
at $2.60/kw-month. The purchases would be consummated under the Western Systems
Power Pool (WSPP) Agreement which has been previously approved by the Utility
Board. Appropriate Confirmation Agreements to memorialize the transaction will be
prepared and signed by the parties in the near future.
FISCAL IMPACT
The purchase of the aforementioned local Resource Adequacy capacity will cost about
$883,200.
Prepared by: Yarek Lehr, Assistant Director of Resource Management
032
THE CITY OF AZUSA DEPARTMENT OF LIGHT & WATER, CA
Request for Proposals (RFP)
for
System and Local Resource Adequacy Capacity for CY 2012
The City of Azusa Department of Light & Water (Azusa) is hereby soliciting competitive
proposals for System and Local Resource Adequacy Capacity (RAC and LRAC, respectively)
resources that can satisfy the California Independent System Operator's (CAISO) system and/or
local capacity requirement, as applicable, for Load Serving Entities (LSE) in the Los Angeles
Basin. The CAISO Controlled Grid load takeoff point for loads served by the City of Azusa is the
Southern California Edison's Rio Hondo 230 kV substation located in the City of Irwindale, CA.
A.Introduction
1. Azusa seeks competitive proposals from qualified sellers whereby a seller would sell, and
Azusa would purchase RAC and LRAC products as described in Section B of this
transmittal letter.
2. Azusa reserves the right,without qualification and in its sole discretion,to accept or reject
any or all proposals for any reason without explanation to the respondent, or to make the
award to the respondent(s),who's offer(s), in the opinion of Azusa, will provide best
value to Azusa. Determination of best value may include both price and non-price
factors.
B. Description of Product Solicited
The proposed and offered RAC and LRAC products must satisfy all applicable requirements
of the CAISO FERC approved tariff,corresponding CAISO engineering studies,and other
CAISO provisions and requirements as they may be applicable to resources qualified to
supply system and/or local area adequacy capacity,as appropriate, for loads interconnected in
the East Los Angeles Basin.
IMPORTANT NOTE: Any offered and transacted LRAC product shall be deemed to
have also RAC attributes associated and bundled with it.
C.Term
The expected term for RAC procurement is July 1,2012 through September 30, 2012 (Q3,
2012).
The expected term for LRAC procurement is January 1, 2012 through December 31, 2012.
[Potential sellers may specify monthly(ex. July 2012 or July and August 2012), quarterly
(ex. Q3 2012), seasonal (ex. from May through October 2012), or annual (ex. CY 2012)
terms].
1
033
D.Volumes
The expected monthly volumes of RAC to be procured: up to 20 MW
The expected monthly volumes of LRAC to be procured: up to 35 MW
[It is expected that interested parties will submit offers in increments no smaller than 5 MW
and priced in $/kW-month or$/kW-year].
E.Additional or Bundled Products
Although the main goal for this RFP is to procure the RAC and LRAC products, interested
parties may also offer additional bundled products such as associated firm energy,energy call
options,A/S, and other—provided that qualified RAC or LRAC is part of the bundle.
F.Additional Resource Adequacy Considerations
Azusa shall have rights to all available and foreseeable resource adequacy attributes
(associated attributes) from resources procured pursuant to this RFP. Such associated
attributes may include system resource adequacy capacity, zonal resource adequacy capacity,
and any other reliability adequacy capacity attributes that may be required by Azusa's
jurisdictional regulators or system operator(s)
Although Azusa intends to retain the product(s)to be procured under this RFP for its own
use,Azusa shall be deemed to have the right to subsequently sell (resell)all or portions of
products procured as a result of this RFP.
G.Proposal Selection Criteria
1. Azusa, at its sole discretion, shall evaluate responsive proposals and may select proposals,
if any, which provide the most value to Azusa.
2. Any proposal or a set of proposals may be combined with other proposals, at Azusa's sole
discretion.
3. Azusa shall determine at its sole discretion the value of any and/or all proposals.
4. Azusa shall evaluate any proposals in terms of price and non-price attributes.
5. Azusa shall perform an initial screening evaluation to identify and eliminate any proposals
that are not responsive to the RFP, do not meet the minimum requirements set forth in the
RFP, are clearly not economically competitive with other proposals, or are submitted by
respondents that lack appropriate creditworthiness, sufficient financial resources, or
qualifications to provide dependable and reliable services.
6. Azusa reserves the right to reject any, all,or portions of the proposals received for failure
to meet any criteria set forth in this RFP. Azusa also may decline to enter into a power
purchase arrangement with any respondent, terminate negotiations with any respondent,
or abandon this RFP process in its entirety.
7. Those respondents who submit proposals agree to do so without legal recourse against
Azusa, and its directors, officers, employees and agents for rejection of their proposal(s)
or for failure to execute a power purchase agreement for any reason. Azusa shall not be
liable to any respondent or party in law or equity for any reason whatsoever for any acts
or omissions arising out of or in connection with this RFP.
2
034
8. Respondent shall be liable for all its costs and Azusa shall not be responsible for any
respondent's costs incurred to prepare, submit, or negotiate its proposal, a contract or for
any other activity related thereto, except as may be explicitly agreed upon in any power
purchase contract arising from a proposal.
H.RFP Process and Schedule
The following schedule is expected to be followed for this RFP:
Tuesday,April 12, 2011-RFP Issued
Monday April 18, 2011 12:00 PM(Noon)PPT-Deadline to submit proposals
Wednesday,April 20 by 3:00 PM PPT- Selection of recommended proposals(if any)and
notification(s)
Monday,April 25 -Approval of the agreement(s)by Azusa Utility Board/City Council
(tentative)
I.Transacting mechanism
Azusa strongly prefers and expects to transact under the Western Systems Power Pool
(WSPP)Agreement.
To expedite the review process, respondents are strongly encouraged to submit a pro forma
Confirmation Agreement under the WSPP Agreement.
J.Final Acceptance of offers subiect to Azusa City Council approval
Offers selected by Azusa staff shall be deemed formally accepted by Azusa only upon the
Azusa City Council/Utilities Board action to accept such selected offers and directing Azusa
staff to execute the pertinent confirms.
K. Submission Requirements
Proposals should be e-mailed on or before Monday April 18, 2011 12:00 PM(Noon) PPT
to:
Yarek Lehr
Assistant Director of Resource Management
City of Azusa
ylehr@ci.azusa.ca.us
Richard Torres
Power Resources Coordinator
City of Azusa
rtorres@ci.azusa.ca.us
Late or non-responsive proposals may not be considered.
3
035
Important Note:
No contact should be made with Azusa Utility Board,Azusa City Manager's office, or Azusa
Light and Water executive management. Any questions regarding this RFP should be
directed to Mr. Yarek Lehr via e-mail at ylehr@ci.azusa.ca.us or Mr. Rich Tones via email at
rtorres@ci.azusa.ca.us.
4
036
T
111111111111111111111111111111111111111111111M111111111AL 1:34A
INFORMATIONAL
CHr a rts
INFORMATIONAL ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY
BOARD
FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIES
DATE: APRIL 25, 2011
SUBJECT: EMERGENCY CONTRACT REPAIR WORK AT 543-529 VIRGINIA ANN
DRIVE BY MJ STAR LITE, INC. TO INSTALL UNDERGROUND CONDUIT.
BACKGROUND
During the early morning hours on Saturday, March 12, 2011, an old "direct buried" secondary
service cable installed sometime in the 1980's along Virginia Ann Drive failed beyond repair. In
an effort to restore power to the affected residences, Electric Crews put up a temporary service
line while awaiting a permanent fix to be arranged. The secondary service needed to be repaired
as soon as possible and avoid the potential exposure to hazardous conditions.
Azusa Municipal Code (AMC) Section 2-522(a) delegates authority to the City Manager to
approve expenditures up to $100,000, to address emergency situations. And so, staff solicited a
quote from a contractor, MJ Star-Lite, Inc. (who was doing contract work for the Department at
the time) to complete the needed repairs, which included construction of underground secondary
conduit to meet all Light & Water electric construction standards.
The bid amount of $34,875 was approved by the City Manager pursuant to his delegated
authority in the AMC. The ratification of the emergency contractor work was originally
presented to the Utility Board during the March monthly meeting, but the meeting was adjourned
due to lack of quorum.
The emergency repair work got underway and was completed as of April 12, 2011. Given the
extenuating circumstances, this urgent repair work was completed safely and expeditiously.
Interruption of services to the affected residences was kept to a minimum, and during the
conversion process, we did not receive any complaints from the homeowners.
037
Emergency Repair Work/Contract—MJ Star-Lite
April 25, 2011
Page 2
FISCAL IMPACT
The cost for this repair work ($34,875) will be paid from the approved Electric Division
Operating Budget for Distribution Maintenance of Overhead and Underground Lines.
Prepared by:
F. Langit Jr, Assistant Director of Electric Operations
Cary Kalscheuer, Assistant to the Director of Utilities
038
G. a
AZUSA
C.11T R a4'Lfri
INFORMATIONAL ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE • I.A UTILITY
BOARD
FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIES
DATE: APRIL 25, 2011
SUBJECT: PILOT PROJECT UPDATE - NOVINIUM CABLE REJUVENATION
On September 27, 2010, the Utility Board awarded a contract to Novinium Inc. for
"rejuvenation" of existing underground electric cable at 955 East Arrow Highway. One of the
goals of this pilot project is to demonstrate the viability of cable rejuvenation in comparison to
conventional reconstruction of underground lines. Cable rejuvenation utilizes low pressure to
inject a patented fluid (Perficio Injection Fluid) into the cable strand in order to create a barrier
and protect against insulation failure. Thus, cable life is extended by an additional 15 to 20 years.
The cable rejuvenation pilot project at 955 East Arrow Highway commenced on December 13
2010, and the entire cable treatment process was completed in 4 working days. The highlights of
this pilot project are:
Original bid contract cost of Novinium cable rejuvenation $34,722.52
Internal cost incurred(labor&equipment expense) $17,190.47
Total Cost $51,912.99
Total footage of 12 kV #2 Str. primary cable that was treated 3,488 feet
Cost/ft of direct buried cable rejuvenation $14.88
Estimated cost of conventional cable reconstruction $200,000*
Cost/ft of conventional cable reconstruction $57.34
Overall savings from utilizing cable rejuvenation at $42.46/ft or
955 East Arrow Highway $148,087.01
Prepared by: F. Langit Jr., Dan Kjar and Hien K. Vuong
039
1111.3
AZLSA
INFORMATIONAL ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF TH► • SA UTILITY
BOARD
FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIE'
DATE: APRIL 25, 2011
SUBJECT: EXPANSION OF THE SMALL BUSINESS AUDIT AND RETROFIT
PROGRAM TO INCLUDE "KEEP YOUR COOL" SERVICES
BACKGROUND
In 2008, the Public Benefit Small Business Audit and Retrofit program was instituted to provide
auditing and retrofit services to the small business community. To date, the recommendations
and retrofits have been primarily limited to lighting and the building shell. By expanding the
program to include the "Keep Your Cool" services, the program will also target the food and
beverage industry that includes convenience stores and small grocery store customers with
refrigerated cabinets. The in-store refrigeration systems that are currently being overlooked will
be targeted with cost effective measures including, but not limited to, refrigeration equipment
tune-ups, refrigeration cabinet door seal replacement and inside-case lighting retrofits.
Keep Your Cool is a service being utilized in Northern California by various utilities and Azusa
Light and Water will be the first Southern California utility to take advantage of the SCPPA joint
participation agreement. The projected 15% overall saturation rate, or approximately 30 projects,
should be reached within approximately two and a half years at which time the program will be
re-evaluated.
Most qualifying customer will be able to benefit from more than one of these measures.
• Electronically Commutated Motors (ECMs)
• Evaporator Fan Controllers
• Anti-Sweat Heat (ASH) Controls
• LED Case Lighting
• 25 watt T8 Lamps
• Door gaskets
• Strip curtains
• Auto closers
040
Keep Your Cool
April 25, 2011
Page 2
The food and beverage industry breaks down into the following categories:
• Hospitality (restaurants, bars, lodging)
• Grocery (retail and wholesale)
• Convenience and Liquor stores
• Institutions (schools, health care, correctional)
Based on Keep Your Cool's experience with thousands of customers, they should be able to
maximize the cost effective energy savings for the Azusa Light and Water customers.
FISCAL IMPACT
Funds have been budgeted in the amount of$60,000 annually for the expansion of this program
under account number 24-40-739-082-6625/CISBAR-6625. Program saturation is estimated at
two and a half years.
Prepared by: Paul Reid, Business Development/Public Benefit Programs Coordinator
041
Ga !
tax#i a ' aoTpi
€ °
A7USA
.1647 A 'WATER
INFORMATIONAL ITEM
TO: HONORABLE CHAIRPERSON AND MEMBERS OF T ' A. USA UTILITY
BOARD
FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIE
Ad
DATE: APRIL 25, 2011
SUBJECT: SECOND QUARTER BUDGET REPORT FOR WATER AND ELECTRIC
FUNDS FOR FISCAL YEAR 2010-11
Attached reports include unaudited budget information regarding the water and electric funds
through December 31, 2010.
In general, both the water and electric funds have positive net cash flow through the second
quarter of FY 2010-11. This is despite the lowest levels of consumption (sales) during same
period for the past 7 years for both utilities.
Below table shows sales and billing trend for electric utility since FY 04-05 through second
quarter of fiscal year:
2nd Quarter Electric Sales/Billings
FY kWh Sales Billings
04-05 133,339,089 $14,655,236
05-06 129,833,967 $ 14,380,345
06-07 139,649,981 $ 16,052,403
07-08 136,375,872 $ 15,872,058
08-09 139,176,034 $ 18,276,924
09-10 133,286,521 $ 16,229,555
10-11 126,364,551 $ 17,834,281
042
Quarterly Financial Report
APRIL 25, 2011
Page 2
Below table shows sales and billing trend for water utility since FY 04-05 through 2nd quarter of
fiscal year:
2nd Quarter Water Sales/Billings
FY CCF Sales Billings
04-05 5,191,531 $8,321,053
05-06 5,236,280 $7,874,961
06-07 5,677,810 $8,815,286
07-08 5,083,893 $8,696,748
08-09 4,735,337 $7,841,814
09-10 4,503,313 $8,513,021
10-11 4,269,226 $9,248,071
Higher summer month consumption, conservative spending, and previously approved rate
adjustments are mainly why both utilities are in positive territory in terms of cash flow.
The Power Cost Adjustment mechanism adopted by the Utility Board in June 2010 has been
instrumental to the Electric fund. The electric utility reserve policy is $12.6 million and the
estimated reserve was $11.4 million at the end of last FY. Due to the PCA, the electric utility
increased revenues by $1.2 million through December 31, 2010. The PCA, combined with other
factors, enabled an increase in reserves to about $12.2 million through the second quarter.
The Water Utility started off the fiscal year with a $22 million cash reserve. Although the
reserve policy is $25 million, the Water Utility had a net increase in cash of about $1 million
through the 2nd Quarter. However, some water main improvement projects have yet to
commence and so staff anticipates that this excess will be fully encumbered by FY End.
Through December 31, 2010, both the Water and Electric Utilities are meeting minimum debt
service coverage ratios required by long-term debt financing agreements.
Prepared by:
Cary Kalscheuer, Assistant to the Director of Utilities
Elect ric-2ndQtry.pdf Water-2nd-
Qtry.pdf
043
Electric Utility Quarterly Budget Report
2nd Quarter Ended Dec 31, 2010
(UNAUDITED)
f 2nd Qtr Ended
Consumption and Reserve Info Prior FY End Percent
12/31/10
Consumption-kWh: 253,116,501 126,364,551 49.92%
Cash/Reserve Prior Fiscal Year Ends" $11,439,529 $12,172,144 106%
FY 2009-2010 Budget Information Budget Actual Thru Percent of
10-11 12/31110 Budget
Revenue
Retail Billing Amounts(2) $31,515,900 $17,834,280 57%
Resale Revenue(3) 6,364,025 3,190,363 50%
Other Miscellaneous Revenue 303,300 204,002 67%
Interest Income 245,715 139,800 57%
Total Revenues $38,428,940 $21,368,445 56%
Expenses
Purchased Power(3) $25,564,120 $13,333,616 52%
Transmission/Dispatching 3,942,015 1,938,325 49%
Operations and Maintenance 3,302,795 1,477,383 45%
Administrative and General(4) 2,259,810 1,259,832 56%
Franchise and In-Lieu-Tax 3,456,260 1,816,113 53%
Subtotal Expenses $38,525,000 $19,825,268 51%
Capital Expenditures/Debt Service
Long Term Debt Service(5) $948,615 $474,308 50%
Capital Outlays and Projects(6) 2,082,749 336,255 16%
Total Expenditures $41,556,364 $20,635,831 50%
Adjustments
Transfers Out(') 9,450 0 0%
Total Expenditures and Transfers Out $41,565,814 $20,635,831 50%
Change in Cash/Reserve ($3,136,874) $732,615 6%
Debt Coverage Ratio(8) 3.54 7.08
(1)Source:FY 2009-10,CAFR,Unrestricted Cash and Rate Stabilization Fund. Reserve Policy is$12.6 million.
(2)Actuals represent amounts billed based on Customer Information System report thru Dec 31,2010.
(3)Source:Power Resources Division.
(4)Fund 31 actual and encumbrances plus CIS upgrade multipled by 35%for Electric Fund's share.
(5)Based on annual debt service payments for Series B and C,2003 Certificates of Participation.
(6)Capital Outlay Accts and Capital Improvement Project budget figures.
(7)Interest Income is transferred after fiscal year end if there is positive net income.
(8)Total Revenue less Cost for Purch'd Pwr,Trans,O&M, and A&G,divided by debt service. Minimum
debt coverage requirement is 1.10 per bond financing agreements. This is preliminary d/c ratio and it may
vary with Disclosure Report prepared after the audited financial reports are available,around December
2011.
044
Water Utility Quarterly Budget Report
Second Quarter Ended Dec 31,2010
(UNAUDITED)
2nd Qtr
Consumption and Reserve Info Prior FY End Percent
Ended
Consumption-CCF: 7,853,732 4,269,226 54%
Cash and Investments:° $ 22,174,446 $ 23,253,524 105%
FY 2009-2010 Budget Information Budget Actual Thru Percent of
10-11 2nd Qtr Budget
Revenues
Retail Billing Amounts(z) $17,521,365 $ 9,248,071 53%
Other Revenues 515,000 310,795 60%
Interest Income 500,000 223 0%
Total Revenues $ 18,536,365 $ 9,559,089 52%
Expenses
Production $3,203,405 $1,438,488 45%
Purchased Water 3,212,415 835,104 26%
Transmission and Distribution 2,505,270 1,188,025 47%
Customer Accounting and Sales(3) 4,062,145 2,244,544 55%
Administrative and Engineering 983,105 304,612 31%
Franchise Fees 390,665 190,208 49%
Subtotal Expenses $ 14,357,005 $ 6,200,980 43%
Capital Expenditures/Debt Service:
Debt Service Payments(4) $4,520,170 $ 2,260,085 50%
Capital Improvement Budget(5) 2,194,800 42,453 2%
Capital Projects Funded by Bond (23,508) (23,508) 100%
Total Expenses(Less Bond Funding) $ 21,048,467 $ 8,480,011 40%
Adjustments
Transfers Out(b) $0 $0 0%
Total Expenditures and Transfers Out $ 21,048,467 $ 8,480,011 40%
Net Change in Cash(Negative) $ (2,512,102) $ 1,079,078 5%
Debt Coverage Ratio" 1.01 1.57
Notes:
(1)Source:Cash and Investments from FY 09-10 CAFR. Reserve Policy is$25 million.
(2)Based on Customer Information System Billing Amounts through Dec 31,2010.
(3)Customer Service Allocation to Water Fund,including 65%of Cost of CIS Upgrade Project.
(4)Principal and Interest on 2003 COP and 2006 Revenue Bonds thru 2nd quarter of fiscal year.
(5)Approved appropriations for multi-year projects,some of which are carryovers from prior year.
(6)Half of Interest Income may be transferred by policy if there is positive net income. As of 9/30/2010,no
transfers have been made.
(7)Total Revenues less Production,Purch'd Wtr,T&D,Cust Acctg,&A&G divided by Debt Svc Pymnts.
Minimum debt coverage requirement is 1.25 per bond financing agreements.
045