Loading...
HomeMy WebLinkAboutE-6 Staff Report - Notice of Completion, CIP Project 66117HCONSENT ITEM E-6 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL VIA: DON PENMAN, INTERIM CITY MANAGER FROM: DANIEL BOBADILLA, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINEER DATE: DECEMBER 18, 2017 SUBJECT: ACCEPTANCE OF PROJECT COMPLETION AND AUTHORIZATION TO FILE A NOTICE OF COMPLETION FOR THE SIERRA MADRE AVENUE STREET REHABILITATION PROJECT – CIP PROJECT 66117H SUMMARY: On March 6, 2017, the City Council awarded a contract to All American Asphalt for the Sierra Madre Avenue Street Rehabilitation Project No. 66117H. The project was completed on December 7, 2017. The proposed actions will accept the improvements and authorize Staff to file a Notice of Completion for the project. RECOMMENDATION: Staff recommends the City Council take the following actions: 1) Accept the project improvements; and 2)Authorize Staff to file a Notice of Completion for the Sierra Madre Avenue Street Rehabilitation Project No. 66117H. DISCUSSION: The completed project rehabilitated the pavement on Sierra Madre Avenue from Todd Avenue to Azusa Avenue, approximately one mile in length. The rehabilitation method consisted of a 2¾ inch coldmill and pave operation. Additional improvements included 584 lineal feet of curb & gutter, 3,323 lineal feet of red curb painting, 1,389 square feet of sidewalk, thermoplastic striping, and the construction of 1 curb ramp. Rather than using conventional asphalt concrete mix, Staff took an environmentally friendly approach with this project by using rubberized asphalt concrete. This material is a proven durable material with a longer service life. Additional benefits with rubberized asphalt include: APPROVED CITY COUNCIL 12/18/2017 Sierra Madre Ave Street Rehabilitation Project December 18, 2017 Page 2 • Environmentally friendly – Scrap tire rubber is reused and diverted from landfills. Also provides a significant reduction in the production of carbon emissions by requiring less mining for aggregates and less energy to produce asphalt concrete. • Cost effective – The capital cost of rubberized asphalt concrete is approximately 10% less than conventional asphalt concrete. However, considerable savings are achieved when looking at the entire life cycle of a project. Rubberized asphalt has shown to be more durable and resistant to cracking and rutting, translating to lower maintenance costs. • Noise reduction – According to the California Department of Resources Recycling and Recovery, noise tests on rubberized asphalt concrete roads have shown a reduction in noise levels of 40 to 88 percent compared to conventional asphalt concrete. FISCAL IMPACT: Project (66117H) was initially budgeted in FY2016-17 for $1,020,000. A contract for this project was awarded in the amount of $844,470, which included a 10% contingency for potential change orders. The project was funded by Measure R funds and was completed within budget with a total construction cost of $790,782. Prepared By: Fiscal Impact Reviewed By: Daniel Bobadilla, P.E Talika M. Johnson Director of Public Works/City Engineer Director of Finance Reviewed and Approved: Reviewed and Approved: Louie F. Lacasella Don Penman Senior Management Analyst Interim City Manager Attachment: 1) Notice of Completion RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: NAME CITY OF AZUSA STREET ADDRESS 213 E. FOOTHILL BLVD CITY, STATE ZIP AZUSA, CA 91702 SPACE ABOVE THIS LINE FOR RECORDER’S USE NOTICE OF COMPLETION Notice pursuant to Civil Code Section 3039, must be filed within 10 days after completion. Notice is hereby given that: 1.The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described: 2.The full name of the owner is The City of Azusa 3.The full address of the owner is 213 E. Foothill Boulevard, Azusa, CA 91702 4.The nature of the interest or estate of the owner is: In fee. (IF OTHER THAN FEE, STRIKE “IN FEE” AND INSERT, FOR EXAMPLE , “PURCHASER UNDER CONTRACT OF PURCHASE”, OR “LESSEE” 5.The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common, are: NAMES ADDRESSES NONE 6.The full names and full addresses of the predecessors in interest of the undersigned, if the property was transferred subsequent to the commencement of the work or improvements herein referred to: NAMES ADDRESSES NONE 7.A work of improvement on the property hereinafter described was completed on December 7, 2017 . The work done was: Sierra Madre Avenue Street Rehabilitation Project No. 66117H 8.The name of the contractor, if any, for such work of improvement was: All American Asphalt, P.O. Box 2229, Corona, CA 92878 May 15, 2017 (IF NO CONTRACTOR FOR WORK OF IMPROVEMENT AS A WHOLE, INSERT “NONE”) (DATE OF CONTRACT) 9.The property on which said work of improvement was completed is in the City of Azusa, County of Los Angeles, California and as described as follows: Sierra Madre Avenue between Todd Avenue and Azusa Avenue. 10.The street address of said property is None (IF NO STREET ADDRESS HAS BEEN OFFICIALLY ASSIGNED, INSERT “NONE”) Dated: Joseph R. Rocha, Mayor (SIGNATURE OF OWNER OR CORPORATE OFFICER OF OWNER NAMED IN PARAGRAPH 2 OR HIS AGENT) I, the undersigned, say: I am the person who signed the foregoing notice of completion. I have read said notice of completion and know its contents, and the facts stated therein are true of my own knowledge. I declare under penalty of perjury that the foregoing is true and correct. Executed on at (DATE) (CITY, COUNTY, & STATE) (SIGNATURE) Attachment 1