February 4, 1974
TO: CITY COUNCIL AND CITY ADMINISTRATOR
FROM: DIRECTOR OF PUBLIC WORKS
RE: WATER RATE STUDY FOR AZUSA MUNICIPAL WATER DIVISION
THE NEED TO INCREASE RATES
The legal action adjudicating our underground water basin has finally been completed and all
producers of ground water in the basin have been perscribed certain extraction rights. Unfortunately,
the basis for perscribing these rights was the actual water extracted by each producer during a time
period when the City of Azusa had rather low extractions. The result of this is that the city will
be extracting from the ground water basin a good deal more water than it has the rights to. We may
extract all the water we need, however, we must pay for our overextractions at the rate of $40.00
per acre feet so that Feather River water may be brought in to recharge the basin. It is estimated
that the city will have to pay in the neighborhood of $70,000 to $100,000 per year for over-
extractions in the years to come. In order to make up this cost it will be necessary to raise the
water rates.
Due to the energy crisis, electrical energy and natural gas costs have risen. Our water is pumped
from the ground and distributed to our customers partially by the use of electric motors and partially
by the use of natural gas-fired internal combustion engines. These increased energy costs are also
contributing to the need for a water rate increase.
COST OF WATER PRODUCTION
The cost of producing and distributing water to all of our customers during the next several years
has been computed and these costs are discussed as follows.
The average cost of producing and distributing water for all users is 17 per hundred cubic feet.
The city bears a cost of approximately 25 per hundred cubic feet for the very minimum water users
and a cost of approximately 9 per hundred cubic feet for the very large water users such as American
Cyanamid Company, Miller Brewery and the golf course.
Included in this report are exhibits which show the water rates charged by the majority of the other
purveyors in the basin, as well as the water rates presently charged by the City of Azusa, and the
water rates recommended by this report.
GOLF COURSE WATER
The city presently supplies the golf course with water at a rate of 5. 19 cents per hundred cubic
feet. This cost is based on an agreement between the city and the golf course which provides
-2-
that the golf course will be charged the city's actual cost plus 6% profit. The rate was
adjusted the last time in early 1970. Because of the additional costs for replenishment
water, increased power costs, and the natural inflationary trend, the rate should now be
recalculated. Exhibit B of this report indicates that a rate of 10o per hundred cubic feet
would more accurately reflect the terms of the agreement.
The water rates charged by cities and private water companies to other golf courses in the
surrounding area are given in the table below. It is apparent from this data that even with
the increased golf course water rate, our price is the lowest charged in the area.
Figures are for 100 cubic feet of water
City Owned Private County
Alhambra 10o
Pasadena 19. 10 21 . 10 24. 10 (outside of city)
Arcadia 18o 18o
Montebello 18o
Azusa (Presently) 5. 190
Azusa (Proposed) 10c
RECOMMENDATION: It is the recommendation of the Director of Public Works that the
City Council revise the existing water rate resolution to reflect the following costs:
SERVICE CHARGE:
For 5/8" or 3/4" Meter $ 3.00
For 1 " Meter 3.50
For 1-1/2" Meter 6.00
For 2" Meter 8.50
For 3" Meter 15.50
For 4" Meter 25.00
For 6" Meter 45.00
For 8" Meter 70.00
For 10" Meter 95.00
For 12" Meter 120.00
QUANTITY RATES:
First 1,000 Cu. Ft. included with Service Charge
Next 9,000 Cu. Ft., per 100 Cu. Ft. $ .24
Next 90,000 Cu. Ft., per 100 Cu. Ft. . 16
Next 990,000 Cu. Ft., per 100 Cu. Ft. . 14
Over 1,000,000 Cu. Ft., per 100 Cu. Ft. . 10
Golf Course rate, per 100 Cu. Ft. . 10
Respectfully submitted,
MICHAEL W. WELLS,
Director of Public Works
MWW:dm
Attach.
EXHIBIT "A"
CITY OF AZUSA
WATER RATE STUDY
BASIC WATER PRODUCTION COST DATA
BASIC DATA
Azusa Perscriptive Right * 3996 Acre Feet
Azusa Ag. Perscriptive Right * 1893 Acre Feet
Total Perscriptive Right * 5889 Acre Feet
1972 Water Production 7787 Acre Feet
1973 Water Production 7429 Acre Feet
Average of two years 7608 Acre Feet
Cost of ground water replenishment $ 40.00 per Acre Feet
Estimated yearly replenishment - 7608 - 5889 = 1719 Acre Feet
Cost of replenishment - 1719 x $40 = $68,760.00
Average cost per acre feet = $6$,760 = $9.04 per Acre Feet
7b08
Cost of Power
Cost of Power (1973) $ 16,427
20% increase effective in 1974 3,285
Cost per acre feet = $19,712 = $2.59 per Acre Feet
7608
* Based on safe ground water yield for basin in fiscal year 1974-1975.
EXHIBIT "B"
GOLF COURSE WATER
COST ANALYSIS
BASIC DATA
1 . Agreement dated March 1964
2. Annual use 180,000 hundreds of cubic feet, 413.22 acre feet
3. Average cost of replenishment
based on 7608 acre feet per year = $ 9.04 per acre feet
4. Cost of power = $2.59 per acre feet
Estimated cost of customer accounting $ 69,000
General administrative expense 68,000
Depreciation 70,000
TOTAL $ 207,000
Cost per customer = $207,000 = $ 41 .40
5000 customers
Cost per acre feet = $41 .40 = $ 0. 10 per acre feet
413.22
Maintenance of source of supply $ 26,000
Maintenance of transmission and distribution system - - 85,000
TOTAL $ 111,000
Cost per acre feet = 111.000 $ 29.18
7608
TOTAL COSTS
Power costs $ 2.59 per acre feet
Replenishment costs 9.04 per acre feet
Accounting & administration 0. 10 per acre feet
Maintenance 29. 18 per acre feet
In lieu of taxes 1 .60 per acre feet
$ 42.51 per acre feet
Exhibit '°B" Page 2
Cost of water per 100 cubic feet = $ .098
6% profit per agreement = .006
TOTAL $ . 104
Recommended Golf Course water rate $ 0. 10 per hundred cu. ft.
EXHIBIT "C"
CITY'S WATER COST FOR LARGE USERS
Cost of Power — - - $ 2.59 per acre feet
Replenishment Costs 9.04 per acre feet
Maintenance 29.18 per acre feet
In lieu of taxes 1 .60 per acre feet
Accounting, administration and depreciation
$41 .40 per customer
275.48 . 15 per acre feet
(Based on 10,000 hundred cubic feet per month)
TOTAL $ 42.56 per acre feet
Cost per 100 cubic feet = $ .09
CITY'S AVERAGE COST FOR WATER FOR TOTAL USERS
Water Division Budget $ 500,000
Water Production per year - - - - 7608
Cost per acre feet $ 65.72 per acre feet
Replenishment Cost 9.04 per acre feet
$ 74.76 per acre feet
Cost per 100 cubic feet T 17 per hundred cubic feet
EXHIBIT " D" Z
UJ Q w v d
o Z Z
Z Z j> Q >- w >-
QQ w w
N d U m Z 5 N-' cwn Z < z
Q Z
a v) Q v=i 0 �? N N N0
w
Q Q a. Q O U 0
MINIMUM 1 .95 3J5 3.00 2.65 2.'s 3.00 2„15 3.00 2.50 3.00 2.65 2,.15 2.50 2.60
100'S CU. FT.
ti
1
2
3
4
5
algom
6 _ `
7
8
9 p N p —
10
20
30 h
40 N _
50 _
60
70 _ N
c\!
1!°'
80N
90 N "'- N -
N
100
200
300 _
400 N
500 N `� a
600 — N
700
800 m
900
1000
2000 •
3000 h
4000
5000
6000
7000
8000
9000
10000
20000
- . . r