HomeMy WebLinkAboutE-6 Staff Report - Award Alosta Ave SubdrainCONSENT ITEM
E-6
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
VIA: DON PENMAN, INTERIM CITY MANAGER
FROM: DANIEL BOBADILLA, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
DATE: FEBRUARY 5, 2018
SUBJECT: AWARD A CONTRACT FOR THE ALOSTA AVENUE SUBDRAIN PROJECT –
CIP 66515A
SUMMARY:
On December 4, 2017, the City Council authorized Staff to solicit a Notice of Inviting Bids for the
Alosta Avenue Subdrain Project. Sealed bids were received on January 9, 2018. The proposed actions
will award the contract to All American Asphalt to install a subdrain on Alosta Avenue.
RECOMMENDATION:
Staff recommends the City Council take the following actions:
1)Award a contract in the amount of $52,435, and approve a 10% contingency for potential
change orders as needed, to All American Asphalt for the Alosta Avenue Subdrain Project; and
2)Authorize the Interim City Manager to execute a contract, in a form acceptable to the City
Attorney, on behalf of the City.
DISCUSSION:
A section of distressed pavement has been observed along the eastbound lane of Alosta Avenue just
east of Rockvale Avenue. The roadway shows distress in the form of excessive cracking over an
approximately 100-foot long area, generally within the right (southern) lane. The existing cracks
within the asphalt have water seeping out of them after rainfall events, and localized pumping of the
pavement is observed when traffic passes over these areas. The proposed subdrain installation will
serve to capture excess water in the subgrade and convey flows to a nearby catch basin.
APPROVED
CITY COUNCIL
2/5/2018
Alosta Avenue Subdrain Project
February 5, 2018
Page 2
Sealed bids were received and opened on January 9, 2018. The results are as follows:
No. Company Location Total Bid
1 All American Asphalt Corona, CA $52,435
2 Palp, Incorporated, DBA Excel Paving Company Anaheim, CA $63,028
3 Mike Prlich and Sons, Incorporated Baldwin Park, CA $64,960
4 Aramexx Construction Claremont, CA $76,889
5 GRBCon, Incorporated Baldwin Park, CA $99,919
The lowest, responsive bid was submitted by All American Asphalt, a general engineering construction
company which has been in business for over 47 years and has recently completed projects of similar
scope in several Southern California cities.
ENVIRONMENTAL CLEARANCE:
This action is categorically exempt from the requirements of the California Environmentally Quality
Act (CEQA) pursuant to Section 15301(c) Existing highways, streets, sidewalks, and gutters. Staff is
directed to file a Notice of Exemption with the Los Angeles County Clerk’s Office upon project
approval.
FISCAL IMPACT:
The recommended actions will award the contract to All American Asphalt in the amount of $52,435
and further authorize Staff to amend the contract by 10% for potential change orders for a total not-to-
exceed contract amount of $57,679. The cost of the project was included in the CIP Carry Over budget
under project 66515A.
Prepared by: Reviewed and Approved:
Phillip Flores Daniel Bobadilla
Engineering Assistant Director of Public Works/City Engineer
Fiscal Impact Reviewed by: Reviewed and Approved:
Talika M. Johnson Louie F. Lacasella
Director of Finance Senior Management Analyst
Reviewed and Approved:
Don Penman
Interim City Manager
Attachment:
1) Contract with All American Asphalt
CONTRACT
- 1 -
CONTRACT
THIS CONTRACT is made this _____ day of __________, 2018, in the County of Los
Angeles, State of California, by and between the City of Azusa, hereinafter called City, and All
American Asphalt, hereinafter called Contractor. The City and the Contractor for the
considerations stated herein agree as follows:
ARTICLE 1. SCOPE OF WORK. The Contractor shall perform all Work within the time
stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services,
and transportation to complete all of the Work required in strict compliance with the Contract
Documents as specified in Article 5 below for the following Project:
ALOSTA AVENUE SUBDRAIN PROJECT
PROJECT NO: 66515A
The Contractor and its surety shall be liable to the City for any damages arising as a result of the
Contractor’s failure to comply with this obligation.
ARTICLE 2. TIME FOR COMPLETION. The Work shall be commenced on the date stated
in the City’s Notice to Proceed. The Contractor is advised that the City has an aggressive
schedule for this project. The Contractor shall complete all Work required by the Contract
Documents within 20 working days from the commencement date stated in the Notice to
Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is
adequate and reasonable to complete the Work.
ARTICLE 3. CONTRACT PRICE. The City shall pay to the Contractor as full compensation
for the performance of the Contract, subject to any additions or deductions as provided in the
Contract Documents, and including all applicable taxes and costs, the sum of Fifty-Two
Thousand Four Hundred Thirty-Five Dollars and Zero Cents ($52,435.00). Payment shall be
made as set forth in the General Conditions.
ARTICLE 4. LIQUIDATED DAMAGES. In accordance with Government Code section
53069.85, it is agreed that the Contractor will pay the City the sum of $300 for each and every
calendar day of delay beyond the time prescribed in the Contract Documents for finishing the
Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the
Contractor agrees the City may deduct that amount from any money due or that may become due
the Contractor under the Contract. This Article does not exclude recovery of other damages
specified in the Contract Documents.
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents”
include the following:
Notice Inviting Bids
Instructions to Bidders
Bid Form
Contractor’s Certificate Regarding Workers’ Compensation
Bid Bond
Attachment 1
CONTRACT
- 2 -
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Affidavit form
Contract
Performance Bond
Payment Bond
General Conditions
Special Conditions
Technical Specifications
Addenda
Plans and Drawings
Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract
The Contactor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. This Contract shall
supersede any prior agreement of the parties.
ARTICLE 6. PROVISIONS REQUIRED BY LAW. Each and every provision of law
required to be included in these Contract Documents shall be deemed to be included in these
Contract Documents. The Contractor shall comply with all requirements of the California Labor
Code applicable to this Project.
ARTICLE 7. INDEMNIFICATION. Contractor shall provide indemnification as set forth in
the General Conditions.
ARTICLE 8. PREVAILING WAGES. Contractor shall be required to pay the prevailing rate
of wages in accordance with the Labor Code which such rates shall be made available at Azusa
City Hall or may be obtained online at http//www.dir.ca.gov/dlsr and which must be posted at the
job site.
ARTICLE 9. DECLARATION OF POLITICAL CONTRIBUTIONS. Consultant shall,
throughout the term of this Agreement, submit to City an annual statement in writing declaring
any political contributions of money, in-kind services, or loan made to any member of the city
council within the previous twelve-month period by the Consultant and all of Consultant's
employees, including any employee(s) that Consultant intends to assign to perform the Services
described in this Agreement.
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named
parties, on the day and year above written.
CONTRACT
- 3 -
All American Asphalt
___________________________________
Contractor
___________________________________
Name And Title
___________________________________
Signature Of Contractor
License No. _________________________
City Of Azusa
________________________________
Joseph R. Rocha
Mayor
________________________________
Don Penman, Interim City Manager
________________________________
Jeffrey Lawrence Cornejo Jr.
City Clerk
Approved As To Form:
________________________________
Best Best & Krieger Llp
City Attorney
PERFORMANCE BOND
- 4 -
PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the City of Azusa (hereinafter referred to as “City”) has awarded to All
American Asphalt, (hereinafter referred to as the “Contractor”) an agreement for ALOSTA
AVENUE SUBDRAIN PROJECT (hereinafter referred to as the “Project”).
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project (hereinafter referred to as “Contract Documents”), the terms
and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof
and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, _________________________________________, the undersigned
Contractor and _____________________________________________ as Surety, a corporation
organized and duly authorized to transact business under the laws of the State of California, are
held and firmly bound unto the City in the sum of FIFTY-TWO THOUSAND FOUR
HUNDRED THIRTY-FIVE AND ZERO CENTS ($52,435.00)., said sum being not less than
one hundred percent (100%) of the total amount of the Contract, for which amount well and truly
to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns,
jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs,
executors, administrators, successors or assigns, shall in all things stand to and abide by, and
well and truly keep and perform the covenants, conditions and agreements in the Contract
Documents and any alteration thereof made as therein provided, on its part, to be kept and
performed at the time and in the manner therein specified, and in all respects according to their
intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of
all materials and workmanship; and shall indemnify and save harmless the City, its officers and
agents, as stipulated in said Contract Documents, then this obligation shall become null and void;
otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefore,
there shall be included costs and reasonable expenses and fees including reasonable attorney’s
fees, incurred by City in enforcing such obligation.
As a condition precedent to the satisfactory completion of the Contract Documents, unless
otherwise provided for in the Contract Documents, the above obligation shall hold good for a
period of one (1) year after the acceptance of the work by City, during which time if Contractor
shall fail to make full, complete, and satisfactory repair and replacements and totally protect the
City from loss or damage resulting from or caused by defective materials or faulty workmanship.
The obligations of Surety hereunder shall continue so long as any obligation of Contractor
remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations
under the Contract, law or equity, including, but not limited to, California Code of Civil
Procedure section 337.15.
PERFORMANCE BOND
- 5 -
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract
Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall
promptly, at the City’s option:
(1) Take over and complete the Project in accordance with all terms and conditions in
the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and
conditions in the Contract Documents and upon determination by Surety of the
lowest responsive and responsible bidder, arrange for a Contract between such
bidder, the Surety and the City, and make available as work progresses sufficient
funds to pay the cost of completion of the Project, less the balance of the contract
price, including other costs and damages for which Surety may be liable. The
term “balance of the contract price” as used in this paragraph shall mean the total
amount payable to Contractor by the City under the Contract and any
modification thereto, less any amount previously paid by the City to the
Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with California
law and make available as work progresses sufficient funds to pay the cost of
completion of the Project, less the balance of the contract price, including other
costs and damages for which Surety may be liable. The term “balance of the
contract price” as used in this paragraph shall mean the total amount payable to
Contractor by the City under the Contract and any modification thereto, less any
amount previously paid by the City to the Contractor and any other set offs
pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be
proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from
Contractor for completion of the Project if the CITY, when declaring the Contractor in default,
notifies Surety of the City’s objection to Contractor’s further participation in the completion of
the Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract Documents or to the Project to be performed
thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of
any such change, extension of time, alteration or addition to the terms of the Contract Documents
or to the Project.
[Remainder of Page Left Intentionally Blank.]
PERFORMANCE BOND
- 6 -
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________, 2018.
_________________________________________
CONTRACTOR/PRINCIPAL
_________________________________________
Name
By_______________________________________
SURETY:
By: ______________________________________
Attorney-In-Fact
The rate of premium on this bond is ____________ per thousand. The total amount of premium
charges, $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________
___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________
Representative for service of
process in California, if different ___________________________________________
from above)
___________________________________________
(Telephone number of Surety and ___________________________________________
Agent or Representative for service
of process in California
PERFORMANCE BOND
- 7 -
STATE OF CALIFORNIA
COUNTY OF
On before me, (here insert
name and title of the officer), personally appeared , who proved
to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to
the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under penalty of perjury under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature __________________________________
(Seal)
NOTE: A copy of the Power-of-Attorney to local representatives of the bonding company must
be attached hereto.
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Azusa (hereinafter designated as the “City”), by action taken or a resolution passed February 5, 2018 has awarded to All American Asphalt hereinafter designated as the “Principal,” a contract for the work described as follows: ALOSTA AVENUE SUBDRAIN PROJECT (the “Project”); and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of Fifty-Two Thousand Four Hundred Thirty-Five Dollars and Zero Cents ($52,435.00) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 3181 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.
This bond shall inure to the benefit of any of the persons named in Section 3181 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond
and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 3110 or 3112 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned.
IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed unoriginal thereof, have been duly executed by the Principal and Surety above named, on the _____ day of ______________________ 2018 the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.
(Corporate Seal of Principal,
if corporation) Principal (Property Name of Contractor)
By
(Signature of Contractor)
(Seal of Surety)
Surety
By
Attorney in Fact
(Attached Attorney-In-Fact
Certificate and Required
Acknowledgements)
*Note: Appropriate Notarial Acknowledgments of Execution by Contractor and
+surety and a power of Attorney MUST BE ATTACHED.