Loading...
HomeMy WebLinkAboutD-1 Staff Report - PH Fees and Charges StudySCHEDULED ITEM D-1 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL VIA: TROY L. BUTZLAFF, ICMA-CM, CITY MANAGER FROM: SUSAN PARAGAS, FINANCE DIRECTOR DATE: JANUARY 19, 2016 SUBJECT: PROPOSED COMPREHENSIVE USER FEES AND CHARGES SCHEDULE SUMMARY: California Government Code § 66000 et.seq., allows public agencies to impose fees to recover the costs of providing various public services to the community. The last time the City performed a comprehensive fee study was back in 2010. In order to validate the current cost of providing various city services and determine the appropriate fee level and recovery rates, ClearSource Financial Consulting was awarded a contract and has completed a Comprehensive Fees and Charges Study. This action will approve and adopt Resolution No. 2016-C5, approving and adopting the revised schedule of fees and charges for certain development project fees and services charges, and Resolution No. 2016- C6, approving and adopting a revised user fee schedule for various municipal activities and services. RECOMMENDATION: Staff recommends that the City Council take the following actions: 1)Open the Public Hearing, receive public testimony, close the Public Hearing; 2)Receive the presentation of the Comprehensive User and Regulatory Fee Study. 3)Approve and adopt Resolution No. 2016-C5, regarding development project services fees, to be effective 60 days after adoption, and approve and adopt Resolution No. 2016-C6, regarding various municipal activities and services, to be effective immediately upon adoption. 4)Approve and authorize Staff to continue to adjust fees on an annual basis using inflationary index and methods outlined in the attached fee study report; new schedules are to be approved and adopted by Council. 5)Approve and authorize Staff to conduct future fee studies on a regular basis to ensure the City is at the appropriate recovery rate. DISCUSSION: On July 7, 2015, the City Council authorized Staff to issue a Request for Proposals (RFP) for a Comprehensive User Fees and Charges Study (“Fee Study”). On September 24, 2015, the City APPROVED COUNCIL MEETING 1/19/2016 The children's swim fees will not be amended and will remain at $0.50 User Fees and Charges January 19, 2016 Page 2 of 3 Manager entered into a contract with ClearSource Financial Consulting (“ClearSource”) to execute the scope of work outlined in the RFP. California law provides guidance regarding the amounts the City may charge for fee-related services and activities. Specifically, in order to avoid being considered taxes, the fees charged shall not exceed the estimated reasonable cost of providing the services, activities, or materials for which fees are charged. The goals of the Fee Study were to: a) conduct a comprehensive review of the City’s fees; b) identify the total cost of providing fee-related services; c) recommend appropriate fees and charges with appropriate subsidy percentages; if applicable; and d) provide the City with a report that identifies the correct fee amounts based on the cost of providing the service and the direct and indirect overhead costs. The Fee Study specifically examined the following categories of fees: • Planning Fees, such as entitlement review and other review for compliance with the zoning code • Engineering Fees, such as encroachment and public improvement review • Utility Fees, such as requests for new water or light account, or meter installation requests • Community Improvement Fees, such as request for real property record review • Police Fees, such as alarm permit fees • Recreation Fees, such as swimming and other sports program related fees • Facility Rental Fees, such as requests for rental of meetings spaces, or picnic shelters • Transportation Fees, such as Dial-a-Ride services • Library Fees, such as materials rental and replacement fees • GIS Fees, such as hard-copy map production • Administrative Fees, such as requests for public records The fees examined in this study specifically excluded utility rates, development impact fees, and special assessments, all of which fall under distinct analytical and procedural requirements different from the body of user/regulatory fees analyzed in this effort. Additionally, this study excluded most of the fines and penalties that may be imposed by the City for violations to its requirements or code. Although the City includes several classes of these fees, charges, assessments, taxes, and fines in its “Schedule of Fees and Charges,” the purpose of inclusion is solely to serve as a repository of information. Their inclusion in the schedule of fees is not intended to imply that they are user and regulatory fees or they are being considered for adoption or update by the City Council at this time. The updated schedule of fees and charges has a total of 1,034 fee items. In order to achieve the targeted cost recovery levels, the following general changes are proposed: • Planning fees are proposed to increase roughly 21%. • Public Works engineering fees are proposed to increase roughly 12%. • Community Improvement fees for real property reporting are proposed to increase roughly 24%. • Rental fees for non-resident renters of City facilities are proposed to be increased by $25.00. • Children’s day swim fee is proposed to be increased from $0.50 to $1.00 per day • Swimming lesson and picnic shelter rental fees are proposed to be increased by $1. User Fees and Charges January 19, 2016 Page 3 of 3 • Fines for overdue library materials are proposed to increase by $0.05 per day. For these specific fee recommendations and other recommended adjustments to the fee schedule, please refer to the attached report for detail. Several categories of user and regulatory fees were not examined or revised as part of the current fee study. These fees were originally approved by City Council on July 27, 2015. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. In addition to recommending changes in existing fees, the Fee Study is proposing seven (7) new fees. These fees include: • Credit Card Processing Fee - 2% • Water Improvement Plan Review Fee - $200 • Electric Improvement Plan Review Fee - $200 • Utility Will Serve Letter - $25 • Street Light Banner Pole Installation/Removal Fee - $72 • Best Management Practices Review Fee - $292 • Time Extension Review Fee - $73 There are 1,034 total fees, charges, fee-related items, taxes, fines, etc. in the proposed fee schedule. Of the total fees: • 854 items (83%) are proposed to remain unchanged. • 145 items (14%) are proposed to increase. • 28 items (3%) are proposed to decrease. FISCAL IMPACT: The adoption of the proposed fee schedule is anticipated to generate an additional $97,000 of General Fund revenue. Prepared by: Reviewed and Approved: Richard T. Lam Susan Paragas Budget Analyst Director of Finance Reviewed and Approved: Troy L. Butzlaff, ICMA-CM City Manager Attachments: 1) Resolution 2016-C5 – Establishing and Revising Certain Development Project Fees and Charges 2) Resolution 2016-C6 – Establishing and Revising a User Fee Schedule for Various Municipal Activities and Services 3) Appendix A - ClearSource User and Regulatory Fee Study Report ATTACHMENT 1 RESOLUTION NO. 2016-C5 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, APPROVING AND ADOPTING A REVISED SCHEDULE FOR CERTAIN DEVELOPMENT PROJECT FEES AND SERVICE CHARGES WHEREAS, under the police power granted by Article XI, Section 7 of the California Constitution, the City of Azusa is authorized to impose fees, charges and rates for certain municipal services; and WHEREAS, in addition to the authority granted by the California Constitution, Chapter 8 (commencing with section 66016) of Division 1 of Title 7 of the California Government Code establishes a procedure for adopting fees or service charges for development projects; and WHEREAS, pursuant to Resolution No. 2015-C38, adopted on July 27, 2015, the City currently imposes development related fees upon applicants to recover the costs of staff time, inspection, copying costs and other expenses related to the review and processing of applications for property development; and WHEREAS, many of the City’s current fees charged for development services no longer reflect the actual cost of providing such services; and WHEREAS, Government Code sections 66016 and 66018 provide that the City may adopt new development fees or increase existing fees after providing notice and holding a public hearing; and WHEREAS, notice of a public hearing on the establishment of new and revised fees was published in accordance with provisions of section 6062a of the California Government Code; and WHEREAS, notice of public hearing was mailed to all interested parties who filed a written request for a mailed notice with the City, or a waiver of notice was obtained; and WHEREAS, on January 19, 2016, at the time and place specified in the published and mailed notices, the City Council held a public hearing as required by law to allow oral or written presentations prior to levying new development fees or service charges and prior to approving an increase in existing development fees or service charges; and WHEREAS, at least ten (10) days prior to the commencement of the hearing, there was made available to the public a report containing the cost, or estimated cost, of providing the service for which the fee or service charge will be levied, and the revenue sources for providing such services; and WHEREAS, based upon evidence provided, the City Council hereby determines that the development services fees set forth in the Schedule of Fees and Charges attached hereto and incorporated herein by reference will not exceed the estimated reasonable cost of providing the property development services for which the fee is charged; and WHEREAS, the proposed fees are statutorily and categorically exempt from the requirements of the California Environmental Quality Act since these fees fit within the statutory exemptions for local agency decisions involving the adoption and collection of rates, tolls and other charges, pursuant to Public Resources Code Section 21 080(b) (8) and Section 15273 of the California Environmental Quality Act Guidelines. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Azusa, California does hereby find, determine and declare as follows: SECTION 1. Adoption of Schedule of Fees. The City Council hereby approves and adopts the Schedule of Fees and Charges attached hereto as Exhibit “A” and incorporated herein by reference. SECTION 2. Repeal of Prior Resolution. Resolution No. 2015-C38 is hereby repealed in its entirety. SECTION 3. Findings. The City Council finds that the fees and charges set forth in the Schedule attached as Exhibit “A”: (1) have a reasonable relationship with the City’s costs in providing those services; and (2) are necessary to enable the City to continue providing the services to which they relate. SECTION 4. Effective Date. This Resolution shall become effective sixty (60) days from its adoption. PASSED, APPROVED and ADOPTED this 19th day of January, 2016 . Joseph Romero Rocha Mayor ATTEST: _______________________________________ Jeffrey L. Cornejo, Jr. City Clerk I HEREBY CERTIFY that the foregoing Resolution No. 2016-C5 was duly adopted by the City Council of the City of Azusa at a regular meeting thereof on the 19th day of January 2016, by the following vote of City Council Members. AYES: COUNCIL MEMBERS: NOES: COUNCIL MEMBERS: ABSTAIN: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS: Jeffrey L. Cornejo, Jr. City Clerk I HEREBY CERTIFY that the foregoing Resolution No. 2016-C5 was duly adopted by the City Council of the City of Azusa at a regular meeting thereof on the 19th day of January 2016, by the following vote of City Council Members. AYES: COUNCIL MEMBERS: NOES: COUNCIL MEMBERS: ABSTAIN: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS; JEFFREY LAWRENCE CORNEJO, JR., CITY CLERK EXHIBIT “A” SCHEDULE OF FEES AND CHARGES (ATTACHED) ATTACHMENT 2 RESOLUTION NO. 2016-C6 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, APPROVING AND ADOPTING A REVISED SCHEDULE OF FEES AND CHARGES FOR VARIOUS MUNICIPAL ACTIVITIES AND SERVICES WHEREAS, under the police power granted by Article XI, Section 7 of the California Constitution, the City of Azusa is authorized to impose reasonable service fees for a variety municipal benefits and services; and WHEREAS, the City Council of the City of Azusa previously determined that the users of these services should be charged fees to recover the City's expenses for providing these services; and WHEREAS, the City Council previously adopted Resolution No. 2015-C39, which established fees for various municipal activities and services; and WHEREAS, the City Council has determined that in order to continue providing effective services for the public welfare, it is necessary to adopt a revised Schedule of Fees and Charges which sets forth fees for City services; and WHEREAS, based upon evidence provided, the City Council hereby determines that the proposed fees cover, but do not exceed, the reasonable cost of providing the services for which the fee is charged; and WHEREAS, the City Council has determined that the proposed Schedule of Fees and Charges is statutorily and categorically exempt from the requirements of the California Environmental Quality Act since citing these fees fit within the statutory exemptions for local agency decisions involving the adoption and collection of rates, tolls and other charges, pursuant to Public Resources Code Section 21080(b)(8) and Section 15273 of the California Environmental Quality Act Guidelines. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Azusa, California does hereby find, determine and declare as follows: SECTION 1. Adoption of Schedule of Fees and Charges. The City Council approves and adopts the Schedule of Fees and Charges (the “Schedule”), which is attached hereto as Exhibit “A” and incorporated herein by reference. SECTION 2. Findings. The City Council finds that the fees and charges set forth in the Schedule attached as Exhibit “A”: (1) have a reasonable relationship with the City’s costs in providing and maintaining those services and facilities; and (2) are necessary to enable the City to continue providing and maintaining the services and facilities to which they relate. SECTION 3. Repeal of Prior Resolution. Resolution No. 2015-C39 is hereby repealed in its entirety. -2- SECTION 4. Effective Date. This Resolution shall become effective upon its adoption. PASSED, APPROVED and ADOPTED this 19th day of January, 2016 . Joseph Romero Rocha Mayor ATTEST: _______________________________________ Jeffrey L. Cornejo, Jr. City Clerk I HEREBY CERTIFY that the foregoing Resolution No. 2016-C6 was duly adopted by the City Council of the City of Azusa at a regular meeting thereof on the 19th day of January 2016, by the following vote of City Council Members. AYES: COUNCIL MEMBERS: NOES: COUNCIL MEMBERS: ABSTAIN: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS: Jeffrey L. Cornejo, Jr. City Clerk -3- EXHIBIT “A” SCHEDULE OF FEES AND CHARGES (ATTACHED) EXHIBIT A City of Azusa User and Regulatory Fee Study - December 2015 - Table of Contents Executive Summary ....................................................................................................................................... 1 Study Overview ............................................................................................................................................. 8 Legislative Guidance ...................................................................................................................................... 9 Study Methodology and Data Sources ........................................................................................................ 11 Recommendations ...................................................................................................................................... 13 Appendices .................................................................................................................................................. 14 1 Executive Summary Brief Overview of User and Regulatory Fees and Focus of the Study The City derives its annual revenue from a number of sources. These include, but are not limited to, property taxes, sales taxes, user taxes, grants, franchise fees, rents, and user and regulatory fees. User and regulatory fees are intended to cover all, or a portion of, the costs incurred by the City for providing fee-related services and activities that are not otherwise provided to those not paying the fee. California law provides guidance regarding the amounts the City may charge for fee-related services and activities. Specifically, in order to avoid being considered taxes, the fees charged shall not exceed the estimated reasonable cost of providing the services, activities, or materials for which fees are charged. The focus of this study is to identify the City’s cost of providing various fee-related services and activities and to establish an updated schedule of fees that corresponds to the services provided by the City, reflects targeted cost recovery levels, and complies with applicable laws. Implementing a Pattern of Routinely Reviewing and Adjusting Fees The City’s prior fee study was conducted in 2010. The current City management team desires to implement a practice of annual review and adjustment of fees. Implementing a practice of annually reviewing and adjusting fees provides multiple benefits, including: • Keeping pace with general cost inflation. • Avoiding fee spikes that are more likely to occur when municipalities leave fees unchanged for a multi-year period. • Providing fee payors, City staff, and City policymakers with a pattern of consistency that provides information for forecasting and decision-making purposes. • Encouraging generational equity among fee payers by avoiding long-term stagnation of fees followed by significant fee increases. • Increasing the availability of General Fund revenues to be used for services and activities available to all Azusa residents and businesses, such as public safety services. Additionally, the City should periodically perform full cost of service studies to ensure that fees charged do not exceed the City’s cost of providing services. Cost of service studies are not an annual requirement. They are most beneficial when routinely performed, or when performed to reflect: changes in costs due to significant organizational changes; anticipated or known changes in development or use patterns; modification of local policies or goals, or; changes in legal requirements. 2 Fee Categories that Were Examined in this Study This study specifically examined the following categories of fees: • Planning Fees, such as entitlement review and other review for compliance with the zoning code • Engineering Fees, such as encroachment and public improvement review • Utility Fees, such as requests for new water or light account, or meter installation requests • Community Improvement Fees, such as request for real property record review • Police Fees, such as alarm permit fees • Recreation Fees, such as swimming and other sports program related fees • Facility Rental Fees, such as requests for rental of meetings spaces, or picnic shelters • Transportation Fees, such as Dial-a-Ride services • Library Fees, such as materials rental and replacement fees • GIS Fees, such as hard-copy map production • Administrative Fees, such as requests for public records Fee/Fine Categories that Were Not Examined in this Study This study specifically excluded examination of the following categories of fees or fines: • Building Fees, such as new construction or tenant improvement plan review and inspection. The City anticipates that these fees will be examined at the conclusion of the Rosedale development project. The project is nearing completion, consequently fees are likely to be examined within the next several years. • Business License Fees and Taxes, the majority of the City’s business license related collections are considered taxes, solely for the purpose of revenue generation, and are not subject to the cost of service limitations of this study. The City may elect to examine its cost of service based business license fees at a later date. • Fire Safety Fees, the City contracts for fire suppression and prevention services. The majority of the City’s fee related fire engineering and inspection services are linked to building activities and review associated with business license requests, consequently it is anticipated that fire fees will be reviewed to correspond with review of building and/or business license fees. • Development Impact Fees, Taxes, and Fines. These items are subject to different approval thresholds or are not subject to the same cost of service limitations as the fees examined as part of this study. Consequently, although these fees/fines may appear in the fee schedule they are specifically excluded from the scope of this study. They are incorporated only to provide a more comprehensive schedule of fees, charges, taxes, and fines imposed by the City. 3 Overview of Primary Changes for City Council Consideration The following provides a brief summary of primary changes the City Council is being asked to consider. All fee amounts proposed for adoption are included in the Appendix of this report. Additionally, the Appendix provides cost of service information to support the fee amounts proposed for modification: Proposed Changes to Fees • Increase in Planning, Engineering, and Community Improvement fees. The fees are proposed to increase due to a recalibration of the cost of service. With few exceptions the proposed fees target full cost recovery. In order to achieve the targeted cost recovery levels, the following general changes are proposed: o Planning fees are proposed to increase roughly 21%. o Public Works engineering fees are proposed to increase roughly 12%. o Community Improvement fees for real property reporting are proposed to increase roughly 24%. If the City elects to leave fees unchanged, or increase fees by an amount other than full cost recovery, the difference between the adopted fee amount and the cost of service will be required to be funded from a source other than fee payment. Typically, the General Fund is the source of funding for any shortfall between fee amount and cost of service. • Increase in rental fees for non-resident renters of City facilities. Rental fees for non-resident users of City facilities are proposed to increase. These include fees for use of picnic shelters, meeting rooms, gathering areas, gymnasiums, and pools. Generally non-resident fees are proposed to double. For example if a non-resident fee is currently $25, the proposed fee is $50. • Addition of 2% credit card processing fee. Financial institutions charge transaction fees for payments made to the City via credit card. Consequently, if a credit card is used to pay a City fee or charge, the City only receives a portion of the amount charged. The addition of the credit card processing fee is intended to allow the City to recover more of the intended charge when a credit card is used for payment. • Adjustment of Police Department citation sign-off fee to include fee for sign-offs of Azusa Police Department issued citations. The City’s current fee structure for equipment-related citation sign- offs assumes a $15 charge for Azusa PD sign-off of citations issued by another police department. For citations issued by Azusa PD there is currently no charge. The proposed fee is adjusted to $15 for all equipment related citation sign-offs performed by Azusa PD at station headquarters. This is consistent with the practice of several neighboring agencies. The $15 fee still recovers only a fraction of the actual cost of requiring a field officer to return to headquarters, review the citation and vehicle, and return to regular duties ($15 fee assumes roughly 33% cost recovery). 4 • Increase children’s day swim fee from $0.50 to $1.00 per day. The proposed day swim fee would be consistent with fees imposed by several neighboring agencies. Additionally, students will continue to be able to earn discounted swim rates. The City’s aquatics program is a highly subsidized service (anticipated cost recovery is roughly 20%). Slight increases in the majority of swimming related fees are intended to help the City maintain the City’s aquatic program while enhancing cost recovery via minor, incremental adjustments to fees. The maximum proposed fee increase is $1 or roughly 3%. • Increase swimming lesson and picnic shelter rental fees by $1. The City’s overall cost recovery is less than 45%, in aggregate, for recreation specific services. Slight increases in several categories of fees are intended to help the City improve fiscal sustainability. Even after increase, the proposed fee amounts are typically in-line or less than amounts charged by neighboring agencies for similar services. • Eliminate $1.50 new release DVD rental fee for materials checked out from library. The City’s Library works diligently to provide access to all its materials without fees. Instead, the City encourages users to make resources available to other users by requiring return of materials in a specified period of time. If materials are not returned, daily fines are imposed for overdue materials. Elimination of the DVD rental fee would make hard copy books, audio books, and visual media available free of charge. It is typical for neighboring agencies to offer DVD check-out services free of charge. • Increase fines for overdue library materials by $0.05 per day. The Library encourages users to make resources available to other users by requiring return of materials in a specified period of time. If materials are not returned, daily fines are imposed for overdue materials. The proposed fee increase would result in fines that are consistent with those imposed by neighboring agencies, including the LA County Public Library. • Implement new fee for streetlight pole banner review and installation. The proposed fee is $72. The proposed fee is in-line with amounts charged by neighboring agencies. • Implement fees for Utility review of improvement plans and Will Serve Letters. These fees are intended to recover costs for services performed by the utilities without a corresponding fee for service. Formally adopting fees for these services will allow Water and Light personnel to begin recovering the costs of performing these services. 5 Revenue Impact of Proposed Fee Changes If the City elects to adopt the proposed fee increases, roughly $97,000 in additional revenue is anticipated assuming usage patterns remain at current levels. A general breakdown of current and proposed revenues follows: Fee Description Est. Revenue from Current Fees1 Est. Revenue After Fee Updates Est. Revenue Change Est. Percent Change Planning $228K $275K $47K 21% Engineering $195K $219K $24K 12% Community Services $51K $63K $12K 24% Credit Card Transaction $0K $10K $10K n/a Aquatics $60K $62K $2K 3% Library $16K $18K $2K 13% Total $550K $647K $97K *Amounts shown are rounded, for presentation purposes. Amounts exclude Police citation sign-off revenue since historical revenue data was not available. Amount excludes Water Utility revenue (non-General Fund). Examination of Existing General Fund Subsidies for Divisions with Significant Fee Changes Proposed If the City elects to leave fees unchanged, or increase fees by an amount other than full cost recovery, the difference between the adopted fee amount and the cost of service will be required to be funded from a source other than fee payment. Typically, the General Fund is the source of funding for any shortfall between fee amount and cost of service. • Planning Fees. The City’s current fees are set at roughly $47,000 less than the cost of providing fee-related services. The proposed fees generally target full cost recovery. Consequently, the City could eliminate this subsidy with adoption of the proposed fee changes. • Engineering Fees. The City’s current fees are set at roughly $24,000 less than the cost of providing fee-related services. The proposed fees generally target full cost recovery. Consequently, the City could eliminate this subsidy with adoption of the proposed fee changes. • Community Improvement Real Property Report Fees. The City’s current fees are set at roughly $12,000 less than the cost of providing these fee-related services. The proposed fees target full cost recovery. Consequently, the City could eliminate this subsidy with adoption of the proposed fee changes. The Community Improvement function provides many additional services to enforce compliance with the City’s Municipal Code. While the department works to recover these costs, often times they are not recovered directly from fees (similar to Police activities). The current overall estimated expenditures for the department are roughly $500,000. These expenditures are offset by $200,000 in revenues. 1 Source: Combination of historical revenues and feedback received from City staff. 6 • Recreation and Facility Rental Fees. The City’s Recreation and Family Services Department provides services to the community, including maintenance of City parks, administration of recreational programs and classes, administration of senior programs including nutrition services, and administration of the Woman’s Club. Certain services provided, such as park maintenance or senior support services, are expected to be primarily funded from general fund or other resources. However, costs of certain services are often intended to be funded in whole or in part by revenue from persons benefitting from the activities provided. Examples of services that generally target some level of cost recovery from fees include adult team sports, recreation classes, and swimming program activities. The following provides details regarding current subsidy levels for several of the department’s core activities, and overall cost recovery for the entire department. o Classes. Classes are primarily provided by contractors. The City enters into a revenue sharing agreement with contract service providers. The City generally recovers the full cost of providing these services. o Adult Sports. The City generally recovers the full cost of providing these services. o Youth Sports. The City recovers roughly 68% of the costs of administering its youth sports programs. Estimated revenue is $55,000 per year. Estimated expenses are $80,000. The General Fund subsidy is roughly $25,000. However, no increases to youth sports fees are proposed as part of this study. In order to eliminate this subsidy, the City would have to increase fees by roughly 46%. For example a $45 fee would increase to $66. o Day Camp. The City recovers roughly 42% of the costs of administering its day camp program. Estimated revenue is $45,000 per year. Estimated expenses are $107,000. The General Fund subsidy is roughly $62,000. However, no increases to day camp fees are proposed as part of this study. In order to eliminate this subsidy, the City would have to increase fees by roughly 140%. For example a $90 fee would increase to $214. o Aquatics. Anticipated cost recovery is 20% of the costs of administering the aquatics program. Anticipated revenue is $60,000 per year. Estimated expenses are $300,000. The General Fund subsidy is roughly $240,000. Minor increases ($1) are proposed to swimming lesson fees. Additionally, daily swim fees for children are proposed to increase by ($0.50). In order to eliminate the aquatics program subsidy, the City would have to increase fees by roughly 400%. For example a $30 fee would increase to $151. o Overall Recovery for Recreation and Family Services Department. The City recovers roughly 21% of the costs of administering the entire department, including recreation, park maintenance, woman’s club, and senior services. Estimated revenue is $715,000 per year. Estimated expenses are $3,385,000. The amount required to be funded from General Fund or other resources is roughly $2,670,000. 7 Summary of Proposed Changes to the Fee Schedule Appendix B provides a detailed schedule identifying all current and proposed fees, and the corresponding fee change amount proposed, if any. A summary of the changes follows: • Total fees, charges, fee-related items, taxes, fines, etc. included in the schedule. There are 1,034 total fees, charges, fee-related items, taxes, fines, etc. in the proposed fee schedule. As discussed, several categories of these items were not examined as part of this study and are presumed to not be subject to City Council modification as part of this update. The amounts are included in the fee schedule and this narrative for purposed of documentation only. Of the 1,034 items: o 854 items (83%) are proposed to remain unchanged. o 145 items (14%) are proposed to increase. o 28 items (3%) are proposed to decrease. o 7 items (<1%) have been added to the fee schedule. Items added to the proposed fee schedule, include: • Credit card processing fee – 2% • Water improvement plan review fee - $200 • Electric improvement plan review fee - $200 • Utility will-serve letters - $25 • Street light banner installation/removal fee - $72 • Best management practices review fee - $292 • Time extension review fee - $73 Additionally, several items have been removed from the proposed fee schedule. They include: • Request for cassette or video tape recording of records – this service is no longer provided. Information is now provided via email, CD, or DVD. • Request for annual code updates – this service is no longer provided. Information is now available via the City’s website. • Tax Clearance Processing – This service is no longer provided. 8 Study Overview The primary tasks of the fee study were to: • Conduct a review of the City’s fees. • Identify the total cost of providing fee-related services. • Compare service costs with existing recovery levels. • Recommend appropriate fees and charges with appropriate subsidy percentage, if applicable. • Prepare a report that identifies services examined, full cost, current cost recovery, and recommended cost recovery, including identification of direct, indirect, and overhead costs. • Present findings to City staff, and make necessary adjustments as requested. • Provide the City with an electronic copy of the study, fee schedule, and cost documentation, in a format that can be updated to accommodate changes in the organization or changes in cost. All study tasks have been completed: • Fee Review, Cost of Service Analysis, and Fee Recommendations – The appendices of this report detail the fee review, cost of service calculations, and recommended fees and subsidy percentages. • Review Draft Findings and Make Necessary Adjustments – Multiple reviews have been conducted with staff to ensure that outcomes and recommendations reflect the City’s current practices and objectives. • Provide electronic copies of study materials – Electronic materials have been presented to City staff. The files can be edited and updated by City staff to accommodate future changes in the organization or changes in costs or fees. 9 Legislative Guidance The objectives of the study, the methodologies used to complete the study, and the proposed schedule of fees were significantly influenced by Article 13C of the California Constitution and Section 66014 of the California Government Code. Article 13C states that the local government bears the burden of proving by a preponderance of the evidence that a levy, charge, or other exaction is not a tax, that the amount is no more than necessary to cover the reasonable costs of the governmental activity, and that the manner in which those costs are allocated to a payor bear a fair or reasonable relationship to the payor's burdens on, or benefits received from, the governmental activity. Additionally, Article 13C identifies the following as items that are not defined as taxes: 1) A charge imposed for a specific benefit conferred or privilege granted directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of conferring the benefit or granting the privilege. 2) A charge imposed for a specific government service or product provided directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of providing the service or product. 3) A charge imposed for the reasonable regulatory costs to a local government for issuing licenses and permits, performing investigations, inspections, and audits, enforcing agricultural marketing orders, and the administrative enforcement and adjudication thereof. 4) A charge imposed for entrance to or use of local government property, or the purchase, rental, or lease of local government property. 5) A fine, penalty, or other monetary charge imposed by the judicial branch of government or a local government, as a result of a violation of law. 6) A charge imposed as a condition of property development. 7) Assessments and property-related fees imposed in accordance with the provisions of Article XIII D. Section 66014(a) of the California Government Code includes the following, “Notwithstanding any other provision of law, when a local agency charges fees for zoning variances; zoning changes; use permits; building inspections; building permits; …the processing of maps under the provisions of the Subdivision Map Act…; or planning services…; those fees may not exceed the estimated reasonable cost of providing the service for which the fee is charged, unless a question regarding the amount of the fee charged in excess of the estimated reasonable cost of providing the services or materials is submitted to, and approved by, a popular vote of two-thirds of those electors voting on the issue. 10 The outcomes and recommendations of the study are intended to comply with applicable federal, state, and local laws including providing confirmation that the proposed fees (“charges”) recommended as a result of this study are not taxes as defined in Article 13C of the California Constitution and that the proposed fees are no more than necessary to the cover the reasonable costs of the City’s activities and services addressed in the fees. Additionally, this report is intended to show that the manner in which the costs are allocated to a payor bear a fair and reasonable relationship to the payor’s burdens on, or benefits received from the activities and services provided by the City. 11 Study Methodology and Data Sources The study calculated the estimated reasonable cost of providing fee-related services and activities (services). The majority of these services are commonly identified as development review services. Broad categories of development review services include, project entitlement review, review of requests for land dedications, parcel mergers, lot line adjustments, encroachment in the public right-of-way, and building permitting, plan review, and inspection services. Additionally, the City collects fees for recreation programs, administrative services, and rental of City facilities. Generally, the estimated reasonable cost of providing the fee-related services and activities examined in the study can be calculated as the product of the estimated labor time required to process a typical request for service and the composite fully-burdened hourly labor rate of the division responsible for providing services. The estimated reasonable cost of service also includes costs or fees imposed by outside agencies or contract service providers used by the City to provide the requested services. A combination of sources were used to complete the analysis and develop the findings and recommendations of this study. The data sources included, but were not limited to: • Adopted budgets, actual expenditure history, and personnel salary and benefit information. • Historical project volume and revenues from fees. • Current schedule of fees for each department. • Citywide cost allocation model. • On-site and telephone interviews with City staff and contract service providers. • Information contained in the California Constitution and the California Government Code. The following page provides a summary of the steps utilized to complete this study.2 2 Alternative methods are typically used to develop fees for public information services and fees not subject to cost of service limitation such as facility rentals, and punitive fines. 12 Summary of methodology used to calculate estimated costs of service and cost recovery levels Step One Identify annual hours spent providing fee services for each division → This information is developed and tested using a combination of interviews, questionnaires, historical project information, and historical revenue information. Step Two Identify annual cost of providing fee services for each division → This information is developed and tested using a combination of information found in the City’s adopted budget, expenditure history, and the overhead cost plan. Step Three Calculate the estimated hourly rate using information from Steps 1 and 2 → Annual cost ÷ Annual hours = Hourly rate Step Four Estimate labor time required to process individual request for service → This information is developed and tested using a combination of interviews, questionnaires, commonly- used measures, and information developed in Step 1. Step Five Calculate estimated cost of service using information from Steps 3 and 4 → Hourly rate * Labor hours = Cost of service Step Six Calculate current cost recovery level for a specific service → Current fee ÷ Cost of service = Current Cost recovery Step Seven Use laws, industry standards, goals and policies, and historical trends to determine targeted cost recovery → Proposed fee ÷ Cost of service = Targeted Cost Recovery Step Eight Test to confirm forecast revenue from fees will not exceed program costs → Use historical permit volume and proposed fees to forecast anticipated revenue from fees. Forecast revenues should not exceed program costs. 13 Recommendations The fees included as part of this study are set at the direction of the City Council. Consequently, the City Council may adopt fees and modify them at a future date as costs of service change, city policies or goals change, project volumes change, service recipient feedback is received, and annual revenue impact of fees is confirmed. If the City decides to adopt modified fees it should: • Ensure that City staff begin fee collections using updated fee schedules once the adopted fees are effective. The effective date for development related fees must be at least 60 days following adoption of updated fees. The effective date for all other fees may be upon adoption of the updated fees. • Actively monitor and bill for deposit-based fees • Monitor feedback and permit statistics - Monitor permit and application volumes and homeowner/contractor feedback to determine if fee modifications are resulting in any unanticipated changes in project frequency and to increase the level of detail available for revenue forecasting. • Continue to adjust fees on an annual basis using inflationary index with floor and ceiling amounts for most fee changes - The proposed recurring fee adjustment process targets annual adjustment by the change in a regional consumer price index (CPI) with a minimum increase of 2% and a maximum increase of 5% for most fee categories. The minimum increase of 2% is intended to mirror the City’s labor cost inflation. The City’s labor costs typically increase annually, even when there is little to no change in the CPI. Any fee modifications should still be reviewed and adopted by the City Council. • Conduct future fee studies on regular basis – Since the City intends to update fees annually by the change in CPI (most likely October to October), it should conduct future fee studies periodically to confirm that fee levels remain at, or below, legal limits. • Use Master Fee Schedule, rather than Municipal Code to document actual fee amounts – In order to minimize updates to the City’s Municipal Code, any Ordinances adopted that refer to the user and regulatory fees examined as part of this study should reference fee amounts “established by resolution adopted by the city council from time to time” or similar language. Referencing the fee schedule rather than placing actual fee amounts in an Ordinance, allows the City to adjust fees periodically without modifying the City’s Municipal Code. 14 Appendices The appendices provide detailed analytical findings from the study, including the amount of cost, or estimated cost, required to provide the services for which the fee or service charge is levied and the revenue sources anticipated to provide the service, including General Fund revenues. For any fees targeted to recover less than 100% of the estimated reasonable cost of service, it is anticipated that General Fund revenues of the City will fund the difference between the targeted recovery level and 100% recovery of the estimated cost of service. Additionally, the appendices include the Schedule of Fees proposed for adoption by the City Council. Appendix Table of Contents Contents Appendix Pages Appendix A - Master Fee Schedule App A - 1 - 43 Appendix B - Schedule Identifying Current and Proposed Fees and Amount of Proposed Fee Changes App B - 1 - 43 Appendix C - Cost of Service and Cost Recovery Analysis App C - 1 - 39 Planning 2 - 8 Public Works Engineering 9 - 16 Water and Light 17 - 22 Community Improvement 23 - 26 Police 27 - 29 Parks and Recreation 30 - 34 Library 35 - 36 Estimated Citywide Overhead 37 - 39 Appendix D - Fee Comparison App D - 1 - 6 Appendix A - Master Fee Schedule CITY OF AZUSA SCHEDULE OF FEES AND CHARGES Proposed for Adoption January 19, 2016 City of Azusa Schedule of Fees and Charges 2 Table of Contents No. Description Pages 1 Building and Safety 3 - 16 2 Planning 17 - 18 3 Engineering 19 - 20 4 Utilities 21 - 24 5 Community Improvement 25 6 Fire Safety 26 7 Police 27 - 30 8 Adult Businesses 31 9 Business License 32 10 Recreation 33 - 37 11 Women's Club, Senior Center, and North Recreation Center 38 - 39 12 Transportation 40 13 Library 41 14 GIS Maps 42 15 Administrative Processing 43 3 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Cost Per Proposed 1/19/2016 Cost Per Svc Area No. Item # Description S.F. Avg. S.F. Avg. Notes 1 S-1 Building Valuation Apartment Houses: Type I Or II F.R. $137.67 $137.67 [a] 2 Good $169.49 $169.49 [a] 3 Type V - Masonry (Or Type III) $112.37 $112.37 [a] 4 Good $137.67 $137.67 [a] 5 Type V - Wood Frame $99.02 $99.02 [a] 6 Good $127.27 $127.27 [a] 7 Type I - Basement Garage $58.05 $58.05 [a] 8 Auditoriums: Type I Or II F.R. $162.66 $162.66 [a] 9 Type II - 1 Hour $117.80 $117.80 [a] 10 Type II - N $111.44 $111.44 [a] 11 Type III - 1 Hour $123.86 $123.86 [a] 12 Type III - N $117.49 $117.49 [a] 13 Type V - 1 Hour $118.43 $118.43 [a] 14 Type V - N $110.50 $110.50 [a] 15 Banks: Type I Or II F.R. $229.87 $229.87 [a] 16 Type II - 1 Hour $169.33 $169.33 [a] 17 Type II - N $163.90 $163.90 [a] 18 Type III - 1 Hour $186.87 $186.87 [a] 19 Type III - N $180.20 $180.20 [a] 20 Type V - 1 Hour $169.33 $169.33 [a] 21 Type V - N $162.19 $162.19 [a] 22 Bowling Alleys: Type II - 1 Hour $79.15 $79.15 [a] 23 Type II - N $73.88 $73.88 [a] 24 Type III - 1 Hour $86.14 $86.14 [a] 25 Type III - N $80.55 $80.55 [a] 26 Type V - 1 Hour $58.05 $58.05 [a] 27 Churches: Type I Or II F.R. $153.96 $153.96 [a] 28 Type II - 1 Hour $115.63 $115.63 [a] 29 Type II - N $109.89 $109.89 [a] 30 Type III - 1 Hour $125.72 $125.72 [a] 31 Type III - N $120.13 $120.13 [a] 32 Type V - 1 Hour $117.49 $117.49 [a] 33 34 Type V - N Convalescent Hospitals: Type I Or II F.R. $110.50 $216.05 $110.50 $216.05 [a] [a] 35 Type II - 1 Hour $149.93 $149.93 [a] 36 Type III - 1 Hour $153.65 $153.65 [a] 37 Type V - 1 Hour $144.81 $144.81 [a] 38 Dwellings: Type V - Masonry $117.49 $117.49 [a] 39 Good $150.39 $150.39 [a] 4 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Cost Per Proposed 1/19/2016 Cost Per Svc Area No. Item # Description S.F. Avg. S.F. Avg. Notes 40 Type V - Wood Frame $104.46 $104.46 [a] 41 42 Good Basements - Semi-Finished $143.42 $31.20 $143.42 $31.20 [a] [a] 43 Good $36.00 $36.00 [a] 44 Unfinished $22.66 $22.66 [a] 45 Good $27.47 $27.47 [a] 46 Fire Station: Type I Or II F.R. $177.56 $177.56 [a] 47 Type II - 1 Hour $116.87 $116.87 [a] 48 Type II - N $110.20 $110.20 [a] 49 Type III - 1 Hour $127.89 $127.89 [a] 50 Type III - N $122.46 $122.46 [a] 51 Type V - 1 Hour $119.98 $119.98 [a] 52 Type V - N $113.77 $113.77 [a] 53 Homes For The Elderly: Type I Or II F.R. $160.95 $160.95 [a] 54 Type II - 1 Hour $130.69 $130.69 [a] 55 Type II - N $125.10 $125.10 [a] 56 Type III - 1 Hour $136.12 $136.12 [a] 57 Type III - N $130.53 $130.53 [a] 58 Type V - 1 Hour $131.46 $131.46 [a] 59 Type V - N $126.96 $126.96 [a] 60 Hospitals: Type I Or II F.R. $253.30 $253.30 [a] 61 Type III - 1 Hour $209.69 $209.69 [a] 62 Type V - 1 Hour $200.06 $200.06 [a] 63 Hotels And Motels: Type I Or II F.R. $156.76 $156.76 [a] 64 Type III - 1 Hour $135.81 $135.81 [a] 65 Type III - N $129.44 $129.44 [a] 66 Type V - 1 Hour $118.27 $118.27 [a] 67 Type V - N $115.94 $115.94 [a] 68 Industrial Plants: Type I Or II F.R. $88.31 $88.31 [a] 69 Type II - 1 Hour $61.46 $61.46 [a] 70 Type II - N $56.50 $56.50 [a] 71 Type III - 1 Hour $67.67 $67.67 [a] 72 Type III - N $63.79 $63.79 [a] 73 Tilt-Up $46.56 $46.56 [a] 74 Type V - 1 Hour $63.79 $63.79 [a] 75 Type V - N $58.36 $58.36 [a] 76 Jails: Type I Or II F.R. $246.94 $246.94 [a] 77 Type III - 1 Hour $225.83 $225.83 [a] 78 Type V - 1 Hour $169.33 $169.33 [a] Libraries: 5 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Cost Per Proposed 1/19/2016 Cost Per Svc Area No. Item # Description S.F. Avg. S.F. Avg. Notes 79 Type I Or II F.R. $180.66 $180.66 [a] 80 Type II - 1 Hour $132.24 $132.24 [a] 81 Type II - N $125.72 $125.72 [a] 82 Type III - 1 Hour $139.69 $139.69 [a] 83 Type III - N $132.70 $132.70 [a] 84 Type V - 1 Hour $131.15 $131.15 [a] 85 Type V - N $125.72 $125.72 [a] 86 Medical Offices: Type I Or II F.R. $185.47 $185.47 [a] 87 Type II - 1 Hour $143.10 $143.10 [a] 88 Type II - N $135.96 $135.96 [a] 89 Type III - 1 Hour $155.21 $155.21 [a] 90 Type III - N $144.50 $144.50 [a] 91 Type V - 1 Hour $140.00 $140.00 [a] 92 Type V - N $135.03 $135.03 [a] 93 Offices Type I Or II F.R. $165.76 $165.76 [a] 94 Type II - 1 Hour $110.97 $110.97 [a] 95 Type II - N $105.70 $105.70 [a] 96 Type III - 1 Hour $119.82 $119.82 [a] 97 Type III - N $114.54 $114.54 [a] 98 Type V - 1 Hour $112.22 $112.22 [a] 99 Type V - N $105.70 $105.70 [a] 100 Private Garages: Wood Frame $37.72 $37.72 [a] 101 Masonry $42.53 $42.53 [a] 102 Open Carports $25.76 $25.76 [a] 103 Public Buildings: Type I Or II F.R. $191.53 $191.53 [a] 104 Type II - 1 Hour $155.21 $155.21 [a] 105 Type II - N $148.38 $148.38 [a] 106 Type III - 1 Hour $161.11 $161.11 [a] 107 Type III - N $155.52 $155.52 [a] 108 Type V - 1 Hour $147.45 $147.45 [a] 109 Type V - N $142.17 $142.17 [a] 110 Public Garages: Type I Or II F.R. $75.90 $75.90 [a] 111 Type I Or II Open Parking $56.96 $56.96 [a] 112 Type II - N $43.46 $43.46 [a] 113 Type III - 1 Hour $57.43 $57.43 [a] 114 Type III - N $51.06 $51.06 [a] 115 Type V - 1 Hour $52.31 $52.31 [a] 116 Restaurants Type III - 1 Hour $151.17 $151.17 [a] 117 Type III - N $146.05 $146.05 [a] 118 Type V - 1 Hour $138.45 $138.45 [a] 119 Type V - N $133.01 $133.01 [a] 6 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Cost Per Proposed 1/19/2016 Cost Per Svc Area No. Item # Description S.F. Avg. S.F. Avg. Notes 120 Schools: Type I Or II F.R. $172.59 $172.59 [a] 121 Type II - 1 Hour $117.80 $117.80 [a] 122 Type III - 1 Hour $126.03 $126.03 [a] 123 Type III - N $121.22 $121.22 [a] 124 Type V - 1 Hour $118.11 $118.11 [a] 125 Type V - N $112.68 $112.68 [a] 126 Service Stations: Type II - N $104.30 $104.30 [a] 127 Type III - 1 Hour $108.80 $108.80 [a] 128 Type V - 1 Hour $92.66 $92.66 [a] 129 Canopies $43.46 $43.46 [a] 130 Stores: Type I Or II F.R. $127.89 $127.89 [a] 131 Type II - 1 Hour $78.23 $78.23 [a] 132 Type II - N $76.52 $76.52 [a] 133 Type III - 1 Hour $95.14 $95.14 [a] 134 Type III - N $89.24 $89.24 [a] 135 Type V - 1 Hour $80.09 $80.09 [a] 136 Type V - N $74.03 $74.03 [a] 137 Town Homes: Type V - Masonry $134.43 $134.43 [a] 138 Type V - Wood Frame $128.19 $128.19 [a] 139 Garage- Wood Frame $52.31 $52.31 [a] 140 Garage- Masonry $58.05 $58.05 [a] 141 Theaters: Type I Or II F.R. $170.42 $170.42 [a] 142 Type III - 1 Hour $124.17 $124.17 [a] 143 Type III - N $118.27 $118.27 [a] 144 Type V - 1 Hour $116.87 $116.87 [a] 145 Type V - N $110.51 $110.51 [a] 146 Warehouses: Type I Or II F.R. $76.67 $76.67 [a] 147 Type I Or V - 1 Hour $45.48 $45.48 [a] 148 Type I Or V - N $42.68 $42.68 [a] 149 Type III - 1 Hour $51.53 $51.53 [a] 150 Type III - N $49.05 $49.05 [a] 151 Equipment: Air Conditioning Commercial $6.52 $6.52 [a] 152 Residential $5.43 $5.43 [a] 153 Sprinkler Systems $4.04 $4.04 [a] 154 Other Valuations Reroof Asphalt And Comp - per square foot of material $249.73 $249.73 [a] 155 Built-up - per square foot of material $264.42 $264.42 [a] 156 Light-weight tile - per square foot of material $683.08 $683.08 [a] 7 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Cost Per Proposed 1/19/2016 Cost Per Svc Area No. Item # Description S.F. Avg. S.F. Avg. Notes 157 Concrete Tile Or Slate Tile - per square foot of material $822.63 $822.63 [a] 158 Metal Shingles - per square foot of material $520.02 $520.02 [a] 159 Wood Shake - per square foot of material $315.83 $315.83 [a] 160 Wood Shingle - per square foot of material $304.08 $304.08 [a] 161 Rolled Roofing - minimum 300 Sq.Ft. allowed on patio covers only $1,468.98 $1,468.98 [a] 162 Tear off and re-sheath - per square foot of material $146.90 $146.90 [a] Tenant Improvements 163 General Commercial $38.19 $38.19 [a] 164 Restaurants $44.07 $44.07 [a] 165 Medical Offices $45.54 $45.54 [a] Retaining Walls- Concrete Block 166 6" $11.39 $11.39 [a] 167 8" $12.61 $12.61 [a] 168 12" $15.46 $15.46 [a] 169 Masonry Fireplace - Minimum Valuation $4,656.67 $4,656.67 [a] 170 Foundation Permits - Based On 1/3 The Overall Valuation Of The Bldg Permit These Figures Shall Be Used When The Applicant Does Not Have A Valuation, Or If The Valuation Given Is Obviously Low. 171 Factory Built Fireplace- Minimum Valuation $1,552.71 $1,552.71 [a] Signs 1 Side: 172 a) Painted $60.23 $60.23 [a] 173 b) Electrical $116.05 $116.05 [a] 2 Sides: 174 a) Painted $70.51 $70.51 [a] 175 b) Electrical $146.90 $146.90 [a] Pole /Lineal Foot plus square foot of sign: 176 a) 3" 0 $49.95 $49.95 [a] 177 b) 4" 0 $70.51 $70.51 [a] 178 c) 6" 0 $91.08 $91.08 [a] 179 d) 8" 0 $113.11 $113.11 [a] 180 e) 10" 0 $133.68 $133.68 [a] 181 f) 12" 0 $152.77 $152.77 [a] Photovoltaic Systems 182 Permit And plan check fees for photovoltaic systems shall be assessed at 45% of the fee generated by the declared valuation and the per unit electrical item cost 183 Residential 15 kW Or Less=$500 or 45% of the fee generated by the declared valuation, whichever is less. 184 Residential more than 15 kW=$500 + 15 Per kW over 15 or 45% of the fee generated by the declared valuation, whichever is less. 185 Commercial 50 kW or less = $1,000 or 45% of the fee generated by the declared valuation, whichever is less. 186 Commercial more than 50 kw - 250 kw = $500 + $7 per kW above 50 kW or 45% of the fee generated by the declared valuation, whichever is less. $500 or 45% of the fee by the declared valuation $500 or 45% of the fee by the declared valuation $1,000 or 45% of the fee by the declared valuation $500 + $7 per kW above 50 kW or 45% of the fee generated by the declared valuation [a] [a] [a] [a] 8 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Cost Per Proposed 1/19/2016 Cost Per Svc Area 187 Commercial more than 250 kW = $2,400 + 5 kW above 250 kW or 45% of the fee generated by the declared valuation, whichever is less. $2,400 + $5 Per kW above 250 kW or 45% of the fee generated by the declared valuation [a] Swimming Pools Valuation based on actual construction cost. Permit fees same as building permits. No. Item # Description S.F. Avg. S.F. Avg. Notes 188 Minimum Valuation: Spas $19,390.55 $19,390.55 [a] 189 Minimum Valuation 190 Prefabricated $3,878.11 $3,878.11 [a] 191 Gunite $7,785.60 $7,785.60 [a] Surcharge Fees 192 # Optical Records System - Per Permit $15.00 $15.00 [a] 193 # General Plan Maintenance - 10% Permit Surcharge To Recover 50% Of Costs 194 # Permit Automation Fee $30.00 $30.00 [a] 9 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Cost Per Proposed 1/19/2016 Cost Per Svc Area S-2 195 # Building Permit Fees Permit Issuance Total Valuation $90.00 $90.00 [a] 196 [a] 197 [a] 198 [a] 199 [a] 200 [a] 201 [a] 202 [a] 203 [a] 204 [a] 205 [a] 206 [a] 207 [a] 208 [a] 209 No. Item # Description S.F. Avg. S.F. Avg. Notes $1.00 to $500.00 $36.47 $36.47 $501.00 to $2,000.00 For the 1st $500.00 plus $3.33 for ea. additional $100.00, or fraction thereof, to and including $2,000.00 $36.47 $36.47 $2,001.00 to $25,000.00 For the 1st $2,000.00 plus $15.28 for ea. additional $1,000.00, or fraction thereof, to and including $25,000.00 $107.48 $107.48 $25,001.00 to $50,000.00 For the 1st $25,000.00 plus $11.02 for ea. additional $1,000.00, or fraction thereof, to and including $50,000.00 $607.25 $607.25 $50,001.00 to $100,000.00 For the 1st $50,000.00 plus $7.64 for ea. additional $1,000.00, or fraction thereof, to and including $100,000.00 $999.15 $999.15 $100,001.00 to $ 500,000.00 For the 1st $100,000.00 plus $6.11 for ea. additional $1,000.00, or fraction thereof, to and including $500,000.00 $1,542.38 $1,542.38 $500,001.00 to $1,000,000.00 For the 1st $500,000.00 plus $5.18 for ea. additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $5,019.05 $5,019.05 $1,000,001.00 and up For the 1st $1,000,000.00 plus $3.44 for ea. additional $1,000.00, or fraction thereof $8,705.25 $8,705.25 Other Inspections And Fees: $72.95 $72.95 1. Inspections Outside Of Normal Business Hours (Per Hour) (Minimum Charge - Two Hours) [a] 2. Reinspection Fees Accessed Under Provisions Of Section 305.8 (Per Hour) $72.95 $72.95 [a] 3. Inspections For Which No Fee Is Specifically Indicated (Per Hour) (Minimum $72.95 $72.95 Charge - One-Half Hour) [a] 4. Additional Plan Review Required By Changes, Additions Or Revisions To $72.95 $72.95 Plans (Per Hour) (Minimum Charge - One-Half Hour) [a] 5. For Use Of Outside Consultants For Plan Checking And Inspections, Or Both Actual costs Actual costs [b] [b] [b] [a] Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employee involved. [b] Actual costs include administrative and overhead costs. City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Cost Per Proposed 1/19/2016 Cost Per Svc Area 10 No. Item # Description S.F. Avg. S.F. Avg. Notes S-3 Electrical Permit Fees 210 Area Fee Rate - Single Family Dwellings (Rate X Area/Sq Ft) $0.11 $0.11 [a] Unit Fee Schedule (Note: Does Not Include Permit Issuance Fee) Receptacle, Switch and Lighting, or other. For receptacle, switch lighting, smoke detectors, or other outlets, at which current is used or controlled except services, feeders and meter: 211 First 20, each $1.75 $1.75 [a] 212 Additional outlets, each $1.16 $1.16 [a] (Note: For multi-outlet assemblies, each 5 ft. or fraction may be considered as 1 outlet.) Lighting Fixtures 213 For lighting fixtures, sockets, or other lamp holding devices: 214 First 20, each $1.75 $1.75 [a] 215 Additional fixtures, each $1.16 $1.16 [a] 216 For pole or platform mounted lighting fixtures, each $1.75 $1.75 [a] 217 For theatrical-type lighting fixtures or assemblies, each $1.75 $1.75 [a] Residential Appliances 218 For fixed residential appliances or receptacle outlets for same, including wall- mounts, electric ovens, counter-mounted cooking tops, electric ranges, self- contained room, console, or through-wall air conditioners, space heaters, food waste grinders, dishwasher (Note: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus) $8.15 $8.15 [a] Temporary Power Service 219 For a temporary service power pole or pedestal, including all pole or pedestal mounted receptacle outlets and appurtenances, each $34.92 $34.92 [a] 220 For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative lighting, Christmas tree sales lots, firework stands, sales booths, additional pole, etc., each $16.29 $16.29 [a] Non-Residential Appliances 221 For residential appliances and self-contained, factory-wired, non-residential appliances not exceeding one (1) horsepower (HP), kilowatt (KW), Or kilovolt- ampere (KVA) in rating, including medical and dental devices, food, beverage, and ice cream cabinets $9.31 $9.31 [a] Power Apparatus For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, as follows: Rating in horsepower (HP), kilowatts (KW), kilovolt-amperes (KVA), Or kilovolt- amperes-reactive (KVAR) 222 Up to and including 1, each $9.31 $9.31 [a] 223 Over 1 and not over 10, each $16.29 $16.29 [a] 224 Over 10 and not over 50, each $41.91 $41.91 [a] 225 Over 50 and not over 100, each $83.81 $83.81 [a] 226 Over 100, each $139.69 $139.69 [a] City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Cost Per Proposed 1/19/2016 Cost Per Svc Area 11 No. Item # Description S.F. Avg. S.F. Avg. Notes Note: 1. For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined rating may be used. Note: 2. These fees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment. Busways 227 For trolley and plug-in type busways, each 100 feet or fraction thereof $23.28 $23.28 [a] (Note: an additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-In type busways.) Signs, Outline Lighting, And Marquees 228 For signs, outline lighting systems, or marquees supplied from one branch circuit, each $34.92 $34.92 [a] 229 For additional branch circuits within the same sign outline lighting system, or marquee, each $11.63 $11.63 [a] Services, Switchboards, Switchboard Sections, Motor Control Centers And Panelboards 230 For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less & not over 200 amperes In rating, each. $34.92 $34.92 [a] 231 For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less and not over 200 amperes 1,000 amperes in rating, each $69.85 $69.85 [a] 232 For services, switchboards, switchboard sections, motor control centers and panelboards over 600 volts or over 1,000 amperes in rating, each $162.97 $162.97 [a] Miscellaneous Apparatus, Conduits And Conductors 233 For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth $34.92 $34.92 [a] (Note: This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment. Private Swimming Pools 234 For new private, residential, inground swimming pools for single, or multi- family occupancies, including a complete system of necessary branch circuit wiring, bonding, grounding underwater lighting, water pumping and other similar electrical equipment $69.85 $69.85 [a] 235 For other types of swimming pools, therapeutic whirlpools, spas, hot tubs and alterations to existing swimming pools, each $46.57 $46.57 [a] Carnivals And Circuses Carnivals, circuses and other traveling shows or exhibitions utilizing transportable-type rides, booths, displays and attractions. 236 For electrical generators and electrical driven rides, each $34.92 $34.92 [a] 237 For mechanically driven rides and walk-through attractions or displays having electric lighting, each $13.97 $13.97 [a] 238 For a system of area and booth lighting, each $13.97 $13.97 [a] 239 For permanently installed rides, booths, displays, and attractions $13.97 $13.97 [a] Other Inspections For Inspection Of Electrical Equipment For Which No Fee Is Herein Set Forth, The Fee Shall Be Determined By The Building Official City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Cost Per Proposed 1/19/2016 Cost Per Svc Area 12 No. Item # Description S.F. Avg. S.F. Avg. Notes S-4 Plumbing Fees 240 Each plumbing fixture or trap or set of fixtures on one trap (including drainage, vent, water piping and backflow prevention devices therefore) $13.97 $13.97 [a] 241 Each permanent type dishwasher whether individually trapped or not $13.97 $13.97 [a] 242 Each industrial waste pretreatment interceptor including its trap & vent, except kitchen type grease interceptors functioning as fixtures traps $13.97 $13.97 [a] 243 Each swimming pool drainage trap & receptor whether connected to a building drain or building sewer (water supply for pool not included) $13.97 $13.97 [a] 244 Each gas piping system of 1 to 5 outlets or alteration or retest of existing gas piping system $13.97 $13.97 [a] 245 Each additional outlet over five $3.50 $3.50 [a] 246 Each gas pressure regulator other than appliance regulators $4.66 $4.66 [a] 247 Each water heater and/or vent $13.97 $13.97 [a] 248 Each solar potable water heating system, including water heater/vent $46.57 $46.57 [a] 249 For repair or alteration of drainage and/or vent piping $13.97 $13.97 [a] 250 Each piece of water-treating equipment and/or water piping installed without accompanying plumbing $13.97 $13.97 [a] 251 Lawn sprinkler systems on 1 meter including backflow prevention devices $13.97 $13.97 [a] 252 Backflow prevention devices on unprotected water supplied, pools, tanks, vats, etc. (including incidental water piping) 1 to 5 $13.97 $13.97 [a] 253 Any swimming pool piping associated with the construction, remodeling or repair of a swimming pool, spa and hot tub $38.80 $38.80 [a] 254 Each additional device over five (5) $3.50 $3.50 [a] 255 Each building drain installed without accompanying plumbing $13.97 $13.97 [a] 256 For connection of a house sewer to a public sewer or the extension of a house lateral onto a lot for future use $39.57 $39.57 [a] 257 For each house sewer manhole $39.57 $39.57 [a] 258 Each installation of a section of house sewer for future use $25.60 $25.60 [a] 259 For the connection of each additional bldg. or work to house sewer $25.60 $25.60 [a] 260 For the connection of a house sewer to a private sewage disposal system $25.60 $25.60 [a] 261 For each private sewage disposal system (septic tank & seepage pit or pits and/or drainfield) $81.48 $81.48 [a] 262 For each cesspool, overflow seepage pit, percolation test pit, swimming pool drywell, or drainfield extension or replacement $39.57 $39.57 [a] 263 For disconnection, abandonment, alteration or repair of any house sewer or private sewage disposal system or part thereof $25.60 $25.60 [a] 264 # Annual inspection of fat, oil and grease $160.00 $160.00 [a] City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Cost Per Proposed 1/19/2016 Cost Per Svc Area 13 No. Item # Description S.F. Avg. S.F. Avg. Notes S-5 Mechanical Permit Fees 265 Installation, alteration or relocation of each refrigeration compressor or absorption unit, & each fuel burning furnace, heater, boiler, and vented decorative appliance including vents attached thereto: Up to & including 100,000 BTU $23.28 $23.28 [a] 266 More than 100,000 BTU to & including 1,000,000 BTU $46.57 $46.57 [a] 267 More than 1,000,000 BTU $116.40 $116.40 [a] 268 For each air inlet & air outlet served by any air conditioning system $4.08 $4.08 [a] 269 For each 1,000 sq.ft. or fraction thereof of conditioned area $32.60 $32.60 [a] Note: when a permit is applied for and the total number of air inlets & air outlets is unknown, the fees shall be based on the sq.ft. of conditioned area. 270 For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit $11.63 $11.63 [a] For the installation or alteration of each air handling unit for air conditioning including ducts attached thereto: 271 Up to & including 2,000 CFM - each unit up to 10 $11.63 $11.63 [a] 272 Each unit over 10 $3.50 $3.50 [a] 273 More than 2,000 CFM to and including 10,000 CFM $34.95 $34.95 [a] 274 More than 10,000 CFM $58.20 $58.20 [a] 275 Note: this fee shall not apply to an air handling unit which is a portion of a factory assembled air conditioned appliance for which a permit is required elsewhere in this code. For each evaporative cooler other than portable type $18.63 $18.63 [a] 276 For required ventilation fans which serve a single register: 277 Each fan up to 10 $13.97 $13.97 [a] 278 Each fan over 10 $4.66 $4.66 [a] 279 For each required ventilation system which is not a portion of any air conditioning system for which a permit is required elsewhere in this code $27.94 $27.94 [a] 280 For the installation or each commercial kitchen hood or spray booth served by mechanical exhaust, including the fans and ducts attached thereto $58.20 $58.20 [a] 281 For the installation of each fire damper $9.31 $9.31 [a] 282 Alteration of existing duct system where a permit is not required elsewhere $23.28 $23.28 [a] Note: 1) for refrigeration system rating one horsepower, one ton, or 12,000 BTU per hour shall mean the same quantity note: 2) for steam boilers rated in boiler horsepower, one horsepower shall equal 50,000 BTU per hour City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Cost Per Proposed 1/19/2016 Cost Per Svc Area 14 No. Item # Description S.F. Avg. S.F. Avg. Notes Plan Check Fees 283 # Building Plan Check Fee - 85% Of Permit Fee - $15.00 Minimum: [a] 284 # Electric Plan Check Fee - 80% Of Permit Fee - $15.00 Minimum: [a] 285 # Energy Plan Check Fee - 10% Of Building Permit Fee: [a] 286 # Mechanical Plan Check Fee - 80% Of Permit Fee - $15.00 Minimum: [a] 287 # Plumbing Plan Check Fee - 80% Of Permit Fee - $15.00 Minimum: [a] # = Fees not automatically adjusted for CPI change. [a] Building and Safety Fees were originally approved by City Council on July 27, 2015. These fees were not examined as part of the FY 15/16 fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. 15 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Svc Area No. Item # Description Fee/Unit Fee/Unit Notes 1 S-045 Grading Plan Check Fee Variable Variable [a] <100 CY - $865 100 - 1,000 CY - $865 Plus $14 Per 100 CY 1,000 - 10,000 CY - $991 Plus $74 Per 1,000 CY 10,000 - 50,000 CY - $1,657 Plus $17 Per 1,000 CY 50,000+ CY - $2,337 Plus $231 Per 10,000 CY 2 S-046 Grading Inspection Variable Variable [a] <100 CY - $345 100 -1,000 CY - $345 Plus $48 Per 100 CY 1,000 - 10,000 CY - $777 Plus $72 Per 1,000 CY 10,000 - 50,000 CY - $1,425 Plus $87 Per 1,000 CY 50,000+ CY - $4,905 Plus $570 Per 10,000 CY 3 Grading Permit Fee - Based On Cubic Yards $170 $170 [a] 4 Permit Fee For Changes To Original Permit: < $20,000 $108 $108 [a] $20,001 to $50,000 $108 $108 [a] $50,001 to $75,000 $147 $147 [a] $75,001 to $100,000 $224 $224 [a] $100,001 to $200,000 $294 $294 [a] $200,000 to $500,000 $379 $379 [a] $500,001 and up $464 $464 [a] 5 Special Site Inspection: $85 $85 [a] Commercial (Minimum 2 Hours) $170 $170 [a] Residential (Minimum 2 Hour) $170 $170 [a] Residential (Non-Habitable Space) (Minimum 2 Hours) $162 $162 [a] 6 # Production Lot Plan Check - Per Lot $202 $202 [a] 7 Occupancy Inspection Fee: 0-1 To 15,000 Sq Ft (1/2 Hour Of Technical Staff Time) $45 $45 [a] 15,000 Sq.Ft. On (1 Hour Of Technical Staff Time) $85 $85 [a] 8 Bonds For Sign(s) (Refundable) $256 $256 [a] 9 Demolition Permit Fee (Minimum 1 Hour) $99 $99 [a] 10 Deputy Inspection Registration Fee (Deputy) $45 $45 [a] 11 Emergency Inspection Fee (Minimum 1 Hours) $139 $139 [a] 12 Hearing Officer Actual Cost Actual Cost [a] 13 Pre-Plan Check Submittal (Minimum 2 Hours) $177 $177 [a] 14 Reinspection Fee (Minimum 1 Hour) $93 $93 [a] 15 Room Addition Plan Check Fee (Minimum 2 Hours) $177 $177 [a] 16 Trailer Coach $170 $170 [a] 17 Trash Enclosure - $10 for additional enclosure $69 $69 [a] 18 Relocation Of Buildings: 0 to 2,000 sq.ft. $401 $401 [a] 2,001 to 5,000 sq.ft. $752 $752 [a] 5,001 sq.ft. and up $1,084 $1,084 [a] 19 Plan Checking Fee: Staff rates assessed against deposit. Executive Staff - per hour $154 $154 [a] Professional Staff - per hour $110 $110 [a] 16 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Svc Area 20 Technical Staff (Plan Checker/Inspector) - per hour On-Site Improvement Inspections: $2,000 deposit required for parking lot paving and miscellaneous testing Professional Staff - Per Hour Rates applied against deposit Technical Staff - Per Hour Rates applied against deposit Standard Plan Check Fee: $93 $93 [a] $110 $110 [a] $93 $93 [a] 21 No. Item # Description Fee/Unit Fee/Unit Notes Professional Staff - Per Hour $110 $110 [a] Technical Staff - Per Hour $93 $93 [a] # = Fees not automatically adjusted for CPI change. [a] Building and Safety Fees were originally approved by City Council on July 27, 2015. These fees were not examined as part of the current fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. 17 City of Azusa Schedule of Fees and Charges (Development-Related) PLANNING Approved Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Fee Type Notes 1 S-001 Zoning Clearance $49 $78 flat fee [a] 2 S-002 Design Review - Minor (over the counter) $1,274 $1,849 flat fee [a] 3 S-003 # Staff Level Design Review: a) Modifications to Existing Structures $350 $350 flat fee [a] b) All Others $3,402 $4,148 flat fee [a] 4 S-004 # Design Review - Major $10,000 $10,000 deposit [a],[b] 5 S-005 Major Use Permit $4,759 $5,414 flat fee [a] 6 S-005A Minor Use Permit $782 $1,031 flat fee [a] 7 S-006 Use Permit Modifications: a) Modifications To Major UP $2,226 $2,720 flat fee flat fee [a] b) Modifications To Minor UP $558 $570 flat fee [a] 8 S-008 Variance - Minor $897 $1,395 flat fee [a] 9 S-009 # Variance a) Involving Single-Family Structure 940 $1,000 flat fee [a] b) All Others $4,491 $5,198 flat fee [a] 10 S-010 # Zone Change $5,000 $5,000 deposit [a],[b] 11 S-011 # Development Code Amendment $5,000 $5,000 deposit [a],[b] 12 S-012 # Development Agreement a) Development Agreement Deposit $10,000 $10,000 deposit [a],[b] # b) Annual Monitoring Deposit $5,000 $5,000 deposit [a],[b] 13 S-013 # General Plan Amendment $15,000 $15,000 deposit [a],[b] 14 S-014 # Specific Plan $10,000 $10,000 deposit [a],[b] 15 S-015 # Specific Plan Amendment $5,000 $5,000 deposit [a],[b] 16 S-016 Tentative Parcel Map $6,275 $7,608 flat fee [a] 17 S-017 Tentative Tract Map: a) 5-20 Lots $6,794 $7,936 flat fee [a] b) 20-50 Lots $8,157 $9,250 flat fee [a] c) 50-100 Lots $11,281 $12,462 flat fee [a] d) 100+ Lots $12,681 $13,922 flat fee [a] 18 S-018 Reversion To Acreage $2,139 $2,577 flat fee [a] 19 S-019 Lot Merger $1,373 $1,608 flat fee [a] 20 S-020 Environmental Categorical Exemption Rev. $218 $310 flat fee [a] 20 S-021 Environmental Initial Study $4,026 $4,602 flat fee [a] 21 S-023 # Mitigated Negative Declaration $10,000 $10,000 deposit [a],[b] 22 S-023 # Environmental Impact Report Preparation $10,000 $10,000 deposit [a],[b] 23 S-023 # Environmental Impact Report Review $10,000 $10,000 deposit [a],[b] 24 S-024 # Mitigation Monitoring - CEQA Monitoring $5,000 $5,000 deposit [a],[b] 25 S-025 # Annexation $10,000 $10,000 deposit [a],[b] 26 S-026 Condominium Conversion Map: a) Map Fee $5,077 $6,053 flat fee [a] b) Plus Consultant Fee Actual Cost Actual Cost flat fee [a] 27 S-027 Minor Sign Review $49 $78 flat fee [a] 28 S-028 Major Sign Review $514 $853 flat fee [a] 29 S-029 Zoning Letter: a) Single Family Residential $136 $155 flat fee [a] b) Other $311 $465 flat fee [a] 30 S-030 Temporary Occupancy Review $519 $539 flat fee [a] 31 S-031 Temporary Use Permit 18 City of Azusa Schedule of Fees and Charges (Development-Related) PLANNING Approved Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Fee Type Notes a) Temporary Use Permit Fee $486 $500 flat fee [a] b) Azusa Based Non-Profit Organizations $364 $375 flat fee [a],[c] 32 S-032 Continuance Processing $508 $620 flat fee [a] 33 S-033 Time Extension Review - Staff $350 $465 flat fee [a] 34 S-034 Time Extension Review - Planning Commission $782 $1,046 flat fee [a] 35 S-035 # Appeal To Planning Commission $1,739 $500 flat fee [a] 36 S-036 # Appeal To City Council $2,768 $1,000 flat fee [a] 37 S-15 Preliminary Plan Review $1,482 $1,675 flat fee [a],[d] 38 S-15A Nonconforming Use Time Extension $769 $775 flat fee [a] 39 S-037 Certificate Of Compliance $1,187 $1,368 flat fee [a] 40 S-038 Street Name Processing W/O Map $1,187 $1,329 flat fee [a] 41 S-039 Street Re-Name Processing $1,635 $1,794 flat fee [a] 42 S-040 Building Address Processing W/O Map $678 $864 flat fee [a] 43 S-041 Building Re-Address Processing $399 $620 flat fee [a] 44 S-041A Com Dev Newspaper Publication $235 Actual Cost flat fee [a] 45 S-044 Special Building Inspection (2 Hour Minimum) $120 $155 flat fee [a] [a] Fee change, if any, based on findings and recommendations of current fee study. [b] Charges to be billed at fully-burdened hourly rates, including costs of outside service providers, if any. All costs recovered. [c] Azusa-based non-profit organizations receive a 25% discount from standard TUP fee. [d] Fee is per meeting. 50% of the fee for the first meeting is applied against future Planning/Engineering fee for the project. # = Fees not automatically adjusted for CPI change. 19 City of Azusa Schedule of Fees and Charges (Development-Related) ENGINEERING Approved Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit * 1/19/2016 Fee/Unit * Fee Type Notes 1 S-047 Public/Private Improvement Plan Check: # a) $0-$100,000 Valuation (% of est construction cost) 3% 3% flat fee [a] # b) Next $400,000 Valuation (% of est construction cost) 2.5% 2.5% flat fee [a] # c) > $500,000 Valuation (% of est construction cost) 2.0% 2.0% flat fee [a] 2 S-048 Public/Private Improvement Inspection: # a) $0-$100,000 Valuation (% of est construction cost) 5% 5% flat fee [a] # b) Next $400,000 Valuation (% of est construction cost) 3.5% 3.5% flat fee [a] # c) > $500,000 Valuation (% of est construction cost) 2.0% 2.0% flat fee [a] 3 S-049 Final Parcel Map $1,173 $1,049 flat fee [a] 4 S-050 Final Tract Map a) 5 - 10 Lots $1,852 $2,372 flat fee [a] b) 11 - 25 Lots $2,923 $3,540 flat fee [a] c) 26 - 50 Lots $3,877 $5,000 flat fee [a] d) 51 - 100 Lots $5,948 $7,336 flat fee [a] e) 101 - 150 Lots $6,876 $8,212 flat fee [a] f) > 150 Lots $8,341 $9,964 flat fee [a] 5 S-051 Easement Check $327 $329 flat fee [a] 6 S-052 Monument Inspection: a) First Monument $226 $292 flat fee [a] b) Each Additional Monument $226 $73 flat fee [a] 7 S-053 Bond Processing $95 $146 flat fee [a] 8 S-055 Lot Line Adjustment $1,318 $1,676 flat fee [a] 9 Street Light Banner Installation/Removal $0 $72 flat fee [a] 10 S-056 # Street/Right-of-Way Abandonment $2,000 $2,000 deposit [a],[b] 11 S-056A SUSMP/LID Plan Review $1,750 $1,907 flat fee [a] 12 S-056B SWPPP Plan Review $1,630 $1,752 flat fee [a] 13 S-056B BMP Review n/a $292 flat fee [a] 14 S-056C Hydrology/Drainage Plan Review $1,500 $1,752 flat fee [a],[c] 15 S-056C Soils Review $1,500 $292 flat fee [a],[c] 16 S-056C Traffic Study Review $1,500 $730 flat fee [a],[c] 17 S-057 Sidewalk/Curb/Gutter Encroachment a) Up to 75 LF $519 $438 flat fee [a] b) Each Add'l 75 LF $169 $146 flat fee [a] 18 S-057A Street Cut Encroachment a) Up to 100 SF $519 $438 flat fee [a] b) Each Add'l 100 SF $224 $146 flat fee [a] 19 S-057B Driveway Approach $519 $365 flat fee [a] 20 S-058 Obstruction Permit $93 $146 flat fee [a] 21 S-059 Transportation Permits (Oversized And/Or Overweight Trucks): # a) Single Trip/Rider $18 $16 flat fee [a],[d] # b) Annual Permit $99 $90 flat fee [a],[d] 22 S-060 # House Moving Permit $1,028 $2,000 deposit [b],[e] 23 S-060A Industrial Waste Permit City of Azusa Schedule of Fees and Charges (Development-Related) ENGINEERING Approved Proposed 20 No. Svc Area Item # Description 2015-2016 Fee/Unit * 1/19/2016 Fee/Unit * Fee Type Notes a) New/Modified $678 $1,022 flat fee [a] b) Renewal $224 $292 flat fee [a] 24 S-060B Fats,Oils And Grease Program a) New $448 $511 flat fee [a] b) Annual $169 $219 flat fee [a] 25 S-061 Sewer Saddle $317 $438 flat fee [a] 26 Sewer Dye Test 27 Sewer Blockage Check See Utility Fees See Utility Fees [f] [f] * All amounts shown are base fees. Applicants are also be responsible for any consultant or other agency fees (e.g. LA County) incurred. [a] Fee change, if any, based on findings and recommendations of current fee study. [b] Charges to be billed at fully-burdened hourly rates, including costs of outside service providers, if any. All costs recovered. [c] Previous fee was deposit. Amount has been converted to flat fee. [d] Fee set to match CalTrans. [e] Previous fee was flat fee. Amount has been converted to deposit. [f] These fees were not examined as part of the current fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. # = Fees not automatically adjusted for CPI change. 28 S-062 # Blueprint/Map Copy Service, Per Sheet (or actual outside costs) $21 $20 flat fee [a] 29 # Project Plans/Specifications - Plus $10 If Mailed $52 $50 flat fee [a] 30 Verification of Conditions $161 $161 flat fee [f] 31 Agreement And/Or Improvement Security, Each $213 $213 flat fee [f] 32 Extension Time For Improvement Agreement, Each $291 $291 flat fee [f] 33 Submittals in Excess of Three a) Fourth Submittal $402 $402 flat fee [f] b) Sixth Submittal $1,409 $1,409 flat fee [f] c) Eighth And Each Subsequent Submittal $1,680 $1,680 flat fee [f] 34 Minor Land Division - Lot Split $595 $595 flat fee [a] 35 Recording Fee: # a) First Sheet $8 $8 flat fee [f] # b) Additional Sheets, Each $2 $2 flat fee [f] 36 LDMA Surcharge (County Maps Only): # a) Tract Map $401 $401 flat fee [f] # b) Parcel Map $135 $135 flat fee [f] 37 # Expedited Plan Review $937 - $1,344 1.5x fee flat fee [a] 38 # Consultant (Invoice + 36% Overhead) Invoice + 36% O'H Invoice + 30% O'H flat fee [a] 39 S-6.5 Code Compliance Fee $37 $37 flat fee [f] 40 S-7 # Landscape Design Standards (Over The Counter Sales) $6 $6 flat fee [f] 41 S-18 City-Provided Tree Planting - One 15 Gallon Tree $109 $109 flat fee [f] 42 City-Provided Tree Planting - One 24" Box Tree $188 $188 flat fee [f] 43 Time Extension n/a $73 flat fee [a] 44 S-6.3 Engineering Hourly Rate for in-House Staff varies $146 flat fee [a] City of Azusa Schedule of Fees and Charges (Development-Related) UTILITIES Approved Proposed 21 No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Fee Type Notes Utility Services 1 S-105 New Utility Account Setup: # a) Connect Fee $45 $45 flat fee [a] # b) Same Day Connection (7:00am-3:00pm) $35 $35 flat fee [a] # c) Same Day Connection (3:00pm-5:30pm) $85 $85 flat fee [a] # d) Fri 7am-8pm (Elec, Wtr, or Both) $105 $105 flat fee [a] # e) Sat, Sun Or Holiday 7am-8pm (Elec, Wtr, or Both) $205 $205 flat fee [a] # f) Positive Identification Check - $1.25 $1.25 $1.25 flat fee [a] 2 S-106 Utility Delinquent Turn Off/On: # a) 7am-3pm $35 $35 flat fee [a] # b) 3pm-5:30pm $85 $85 flat fee [a] # c) Fri 7am-8pm (Elec, Wtr, or Both) $105 $105 flat fee [a] # d) Sat, Sun or Holiday 7am-8pm (Elec, Wtr, or Both) $205 $205 flat fee [a] e) Late Payment Penalty, The Greater Amount Of Either: # i) Base Penalty Fee $7.50 $7.50 flat fee [a] # ii) Percent Of Total Outstanding Balance 5% 5% flat fee [a] 3 S-107 Theft Of Water/Light Investigation: # a) Investigation Fee $250 $500 flat fee [a] # b) Damages And Estimated Usage Actual Cost Actual Cost flat fee [a] 4 S-108 Water Pressure Test: # a) 1st Test Free Per Calendar Year $0 $0 flat fee [a] # b) Additional Test $165 $165 flat fee [a],[b] # c) Main Line $165 $400 flat fee [a] 5 S-109 # Water Meter Test (Fully Allocated Hourly Rate) Bill Hourly Bill Hourly per hour [a] 6 S-110 Water Quality Test: # a) Test Fee $125 $125 flat fee [a] # b) Plus Lab Costs Actual Cost Actual Cost flat fee [a] 7 S-111 # Flow Test $275 $300 flat fee [a] 8 S-112 Temporary Meter Rental Services: # a) Meter Fee (Per Each Meter) $130 $130 flat fee [a] # b) Deposit $1,000 $1,000 deposit [a] 9 S-113 New Water Meter Installation: # a) Installation Fee $200 $250 flat fee [a] b) Plus Material Costs Actual Cost Actual Cost deposit [a] 10 S-131D Water Meter Fee # a) 3/4" $272 $272 flat fee [a] # b) 1" $343 $343 flat fee [a] # c) 1.5" $485 $485 flat fee [a] # d) 2" $556 $556 flat fee [a] # e) > 2" Dev/Owner Req'd to Procure Dev/Owner Req'd to Procure deposit [a] 11 S-131E # Jumper Fee (per service) $100 $100 flat fee [a] 12 S-114 New Water Service Installation: # a) 3/4" - 1" $3,000 $3,500 deposit [a] # b) 2" $3,200 $4,000 deposit [a] # c) 4" $7,432 $7,500 deposit [a] City of Azusa Schedule of Fees and Charges (Development-Related) UTILITIES Approved Proposed 22 No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Fee Type Notes # d) 6" $9,382 $9,500 deposit [a] 13 S-131H Hot Tap Fee: # a) 1" $275 $300 flat fee [a] # b) 2" $280 $300 flat fee [a] # c) 4" $350 $350 flat fee [a] # d) 6" $400 $400 flat fee [a] # e) 8" $450 $450 flat fee [a] # f) 10" $450 $450 flat fee [a] # g) 12" $525 $525 flat fee [a] 14 S-131C Fire Service Installation: # a) 4" $5,055 $7,500 deposit [a] # b) 6" $7,077 $9,500 deposit [a] # c) 8" $8,088 $10,500 deposit [a] # d) 10" $10,110 $11,500 deposit [a] # e) 12" $12,132 $12,500 deposit [a] 15 S-131B # Water Disconnection From The Mainline (Deposit) $3,200 $3,200 deposit [a] 16 S-131F # Fire Hydrant Relocation / Inspection Fee $1,500 $1,500 flat fee [a] 17 S-131G Traffic Incident Hit Hydrant Impact Fee: # a) Impact Fee $1,500 $1,500 flat fee [a] # b) Additional Cost Of Repair & Water Loss Actual Cost Actual Cost flat fee [a] 18 S-115 # New Backflow Device Inspection Review $340 $340 flat fee [a] 19 S-116 # Annual Backflow Device Inspection Review $80 $80 flat fee [a] 20 Water Plan Check $0 $200 flat fee [a] 21 Water Improvement Inspection (per hour) $125 $125 per hour [a] 22 Will-Serve Letter $0 $25 flat fee [a] 23 S-117 # Water Service No change to various rates based on service size and usage Various Various variable [d] 24 S-118 Sewer Blockage Check: # a) Minimum Charge $500 $500 deposit [a] # b) Fully Allocated Hourly Rates Bill Hourly Bill Hourly deposit [a] # c) Charge If City Causes Blockage $0 $0 flat fee [a] 25 S-119 # Sewer Dye Test $115 $115 flat fee [d] 26 S-120 Emergency Sewage Spill Response: # a) Spill Response Actual Cost Actual Cost deposit [a] # b) Fully Allocated Hourly Rate For All Responding Personnel Bill Hourly Bill Hourly deposit [a] # c) Charge If City Causes Spill $0 $0 flat fee [a] 27 S-121 Wastewater Service: Various Various variable [d] 28 Electric Plan Check $0 $200 flat fee [a] 29 S-122 Electric Meter Test: [b] # a) First Test Per Calendar Year $0 $0 flat fee [a] # b) Residential $160 $160 flat fee [a] # c) Commercial $370 $370 flat fee [a] # d) Industrial $440 $440 flat fee [a] City of Azusa Schedule of Fees and Charges (Development-Related) UTILITIES Approved Proposed 23 No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Fee Type Notes 30 S-123 # Total Electrical Service Re-Install: a) Re-Install Fee $740 $740 deposit [a] # b) Additional Materials Actual Cost Actual Cost deposit [a] 31 S-124 # Additional Electric Span Install: a) Install Fee $725 $725 deposit [a] # b) Plus Materials Actual Cost Actual Cost deposit [a] 32 S-125 # Temporary Electric Installation: a) Install $740 $740 deposit [a] # b) Additional Material Costs Actual Cost Actual Cost deposit [a] 33 S-126 # Temp Single Phase Transformer Installation: a) Installation Fee (Minimum) $3,098 $3,098 deposit [a] # b) Additional Material Costs Actual Cost Actual Cost deposit [a] 34 S-127 # Temp Three Phase Transformer Installation: a) Installation Fee (Minimum) $6,200 $6,200 deposit [a] # b) Additional Material Costs Actual Cost Actual Cost deposit [a] 35 S-128 # Electric Line Extension/Upgrade: a) Extension/Upgrade Actual Cost Actual Cost deposit [a] # b) Fully Allocated Hourly Rates Bill Hourly Bill Hourly deposit [a] 36 S-129 Electric Services Various Various variable [c],[d] 37 S-130 # Banner Installation $580 $580 flat fee [d] 38 S-131 # After Hours Standby/Call Out (2 Hour Minimum Bill Hourly Bill Hourly deposit [a] 39 S-131A # Inspection Rate (Per Hour) Bill Hourly Bill Hourly deposit [a] 40 S-131 # # Water System Development Fees: a) Residential i) Per Acre $11,668.64 $11,668.64 flat fee [d] # ii) Per Dwelling Unit $1,944.86 $1,944.86 flat fee [d] b) Multi-Family Residential # i) Per Acre $19,930.90 $19,930.90 flat fee [d] # # ii) Per Dwelling Unit c) Commercial i) Per Acre $1,245.70 $8,943.81 $1,245.70 $8,943.81 flat fee flat fee [d] [d] # # ii) Per SF d) Industrial i) Per Acre $0.89 $9,625.35 $0.89 $9,625.35 flat fee flat fee [d] [d] # ii) Per SF $0.38 $0.38 flat fee [d] e) School # i) Per Acre $7,538.09 $7,538.09 flat fee [d] f) Park # i) Per Acre $3,449.62 $3,449.62 flat fee [d] 41 S-131 # # Water System Annexation Fees: a) Residential i) Per Acre $5,038.97 $5,038.97 flat fee [d] # ii) Per Dwelling Unit $847.42 $847.42 flat fee [d] b) Multi-Family Residential # i) Per Acre $8,684.31 $8,684.31 flat fee [d] # ii) Per Dwelling Unit $542.78 $542.78 flat fee [d] City of Azusa Schedule of Fees and Charges (Development-Related) UTILITIES Approved Proposed 24 Svc Area 2015-2016 1/19/2016 Fee No. Item # Description Fee/Unit Fee/Unit Type Notes [d] [d] [d] [d] # = Fees not automatically adjusted for CPI change. [a] Fee change, if any, based on findings and recommendations of current fee study. [b] Test fee refunded if there is a system problem. [c] Rate varies depending on type of services and usage, time of year, and time of day. [d] Development fees, annexation fees, usage rates, etc. were originally approved by City Council on July 27, 2015. These fees were not examined as part of the FY 15/16 fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. c) Commercial # i) Per Acre $3,896.54 $3,896.54 flat fee # ii) Per SF $0.38 $0.38 flat fee d) Industrial # i) Per Acre $4,194.05 $4,194.05 flat fee # ii) Per SF $0.16 $0.16 flat fee e) School # i) Per Acre $3,284.47 $3,284.47 flat fee [d] f) Park # i) Per Acre $1,503.31 $1,503.31 flat fee [d] 25 City of Azusa Schedule of Fees and Charges (Development-Related) COMMUNITY IMPROVEMENT Approved Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Notes 1 S-063 Real Property Records Report a) Condominium/Townhouses $54 $98 [a] b) Vacant/Unimproved Land $175 $197 [a] c) Single Family Dwellings d) Multi-Family Dwelling i) Per Parcel, First Unit $175 $175 $197 $197 [a] [a] ii) Each Add'l Unit $10 $11 [a] e) Commercial Properties $175 $197 [a] 2 S-064 Residential Rental Housing Registration And Inspection: a) Per Parcel - Includes First Unit $114 $114 [a] i) Additional Unit $7 $7 [a] b) Reinspection $85 $85 [a] 3 S-032.5 Weed Abatement Inspection (Processing and Referring) $329 $329 [a] 4 S-95.1 # Recovery and Storage of Abandoned Shopping Carts $12 $12 [a] 5 S-066 # Appeal/Hearing $110 $110 [a],[b] 6 S-065 # Lien Release a) Substandard $100 $100 [c] # b) Admin Fine $80 $80 [c] 7 S-066C # Code Enforcement Fines a) First Offense $100 $100 [b],[c] # b) Second Offense $250 $250 [b],[c] # c) Third Offense $500 $500 [b],[c] [a] Fee change, if any, based on findings and recommendations of current fee study. [b] FY 15/16 adopted fee schedule inadvertently identified antiquated amounts. Correct amounts are shown. [c] Administrative citation and fine amounts were not examined as part of the FY 15/16 fee study. No modifications to these amounts are considered as part of the proposed January 19, 2016 fee updates. # = Fees not automatically adjusted for CPI change. 26 City of Azusa Schedule of Fees and Charges (Development-Related) FIRE SAFETY Approved Proposed Svc Area 2015-2016 1/19/2016 No. Item # Description Fee/Unit Fee/Unit Notes S-1.1 Fire Safety (Per Hour) 1 Fire Plan Check $105 $105 [a] 2 Fire Alarm System $105 $105 [a] 3 Fire Extinguisher Service $105 $105 [a] 4 Flammable Storage $105 $105 [a] 5 Hood System $105 $105 [a] 6 Spray Booths $105 $105 [a] 7 Subdivision Plan Checking $105 $105 [a] Fire Permit Fees 8 Occupancy Inspection - Per Hour $105 $105 [a] 9 Christmas Tree Lot Inspection - Per Hour $105 $105 [a] 10 Circus/Carnival Inspection - Minimum 2 Hours $210 $210 [a] 11 Flammable Liquid Tank Site Inspection - Minimum 3 Hours $314 $314 [a] 12 Liquid Petroleum Gasses - Per Hour $105 $105 [a] 13 Magnesium Working - Minimum 2 Hours $210 $210 [a] 14 Motor Vehicle Repair Garages - Per Hour $105 $105 [a] 15 Oxygen System Installation - Minimum 2 Hours $210 $210 [a] 16 Storage/Handling Flammable Liquids - Minimum 2 Hours $210 $210 [a] 17 Underground Tank Installation - Minimum 4 Hours $420 $420 [a] 18 Underground Tank Removal - Minimum 3 Hours $314 $314 [a] 19 Fireworks Stands - Minimum ½ Hour $53 $53 [a] 20 Metal Foundry - Minimum 2 Hours $210 $210 [a] 21 Places Of Assembly - Minimum 2 Hours $210 $210 [a] 22 Pyrotechnical Special Effects - Per Hour $105 $105 [a] 23 Public Rifle/Gun Ranges - Minimum 2 Hours $210 $210 [a] 24 Tire Storage Areas In Excess Of 1,000 Cu. Ft. - Per Hour $105 $105 [a] 25 Automobile Dismantling/Storage Yards - Minimum 2 Hours $210 $210 [a] 26 27 Commercial Woodworking Facilities With Dust Collection Systems Greater Than 25 Gallons - Minimum 2 Hours Educational/Daycare Centers - Minimum 3 Hours $210 $314 $210 $314 [a] [a] Miscellaneous Fire Fees (Per Hour) 28 Residential Inspection Per Sec. 13146.2 Of H&S Code $105 $105 [a] 29 Engine Company Standby $105 $105 [a] 30 Hazardous Materials Response $105 $105 [a] 31 Special Inspections $105 $105 [a] 32 Weed Abatement (Processing & Referral) $105 $105 [a] [a] Fire Safety Fees were originally approved by City Council on July 27, 2015. These fees were not examined as part of the FY 15/16 fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. 27 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) POLICE Approved 2015-2016 Proposed 1/19/2016 Svc Area No. Item # Description Fee/Unit Fee/Unit Notes 1 S-067 # Noise Disturbance Response Full Cost Recovery After 2nd Response Variable Variable [a] Alarm Users Alarm Fees 2 S-068 Alarm Registration and Renewal # a) Registration and Renewal $25 $25 [a],[b] # b) Senior Residential 65+, Permanently Disabled, or Low Income $12 $12 [a],[b] 3 # Appeal Fee, per request $25 $25 [a] Alarm Fines 4 # Registration Late Charge $25 $25 [a] 5 # Alarm Fee Late Charge - All fees and fines late $25 $25 [a] 6 # Reinstatement Fee $100 $100 [a] 7 # Automatic Dialing Device $100 $100 [a] 8 # Audible Alarm Violation $100 $100 [a] 9 Burglar False Alarm Response - Registered Alarm: [c] # a) First Response (fee may be waived with online school attendance) $50 $50 [a] # b) Second Response $75 $75 [a] # c) Third Response $125 $125 [a] # d) Fourth Response $175 $175 [a] # e) Fifth Response $225 $225 [a] # f) Six or More $275 $275 [a] 10 Burglar False Alarm Response - Non-registered Alarm Site: [c] # a) First Response $150 $150 [a] # b) Second Response $175 $175 [a] # c) Third Response $225 $225 [a] # d) Fourth Response $275 $275 [a] # e) Fifth Response $325 $325 [a] # f) Six or More $375 $375 [a] 11 Robbery/Panic False Alarm Response (Resid/Comm) Permit Holder [c] # a) Per Response $100 $100 [a] 12 Robbery/Panic False Alarm Response (Resid/Comm) Non-Permit Holder [c] # a) First Response $150 $150 [a] # b) Second Response $175 $175 [a] # c) Third Response $225 $225 [a] # d) Fourth Response $275 $275 [a] # e) Fifth Response $325 $325 [a] # f) Six or More $375 $375 [a] 13 Operating Suspended Alarm System # a) One $200 $200 [a] # b) Two or More $300 $300 [a] Alarm Company Alarm Fines 14 # Failure to Report New Install $50 $50 [a] 15 # Failure to Report Disconnect $50 $50 [a] 16 # False Alarm Caused by Alarm Company $100 $100 [a] 17 # Employee False Statement $200 $200 [a] 18 # Failure to Use Enhanced Call Verification Procedures $100 $100 [a] 19 # All Late Charges $25 $25 [a] 28 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) POLICE Approved 2015-2016 Proposed 1/19/2016 Svc Area No. Item # Description Fee/Unit Fee/Unit Notes 20 # Suspension Reinstatement Fee and Mailing Costs $200 $200 [a] a) Additional Fee Per Customer, if Contacted $10 $10 [a] Alarm Fee 21 # Appeal Fee, per request $25 $25 [a] 22 S-069 # DUI Accident Response Investigation Charge At Fully Allocated Hourly Rates. Not to exceed $12,000 per incident by State Law. Variable Variable [a] 23 S-070 Equipment Citation Verification # a) Citation Issued by Azusa PD $0 $15 [a] # b) Citation Issued by Other PD $15 $15 [a] 24 S-071 Vehicle VIN Verification $44 $44 [a] 25 S-072 Public Safety At Special Events: a) Officer - Per Hour $135 $135 [a] b) Reserve Officer $38 $38 [a] 26 S-072A # Booking Services $135 $135 [a] 27 S-073 Entertainment Permit: a) Temporary $301 $301 [d] b) Regular $1,204 $1,204 [d] c) Renewal $1,204 $1,204 [d] 28 S-074 Dance Permit: a) One Time $48 $48 [d] b) Annual $48 $48 [d] 29 S-074A Pawn Shop Permit $1,495 $1,495 [d] 30 S-074B Massage Parlor Permit $553 $553 [d] 31 S-074C Carnival Worker Permit $153 $153 [d] 32 S-075 Vehicle Impound Fees # a) Standard Release $150 $150 [d] # b) DUI Release $400 $400 [d] 33 S-076 # Repossessed Vehicle Release $16 $15 [a],[e] 34 S-077 # Police Records Check/Clear Letter $27 $25 [a] 35 S-078 # Immigration Letters $27 $25 [a] 36 S-079 # Public Safety Application Background Check n/a n/a [a] 37 S-081 # Photograph Service Fee (Cost of CD is included) $10 $10 [c] 38 S-082 Video/Audio Tape/Cd Reproduction: # a) Dispatch Tape (911 Tape) $110 $110 [d] # b) Video/Audio Reproduction $85 $85 [d] 39 S-083 Police Incident/Crime Report Copy: # a) Document <4 Pages In Length $0.00 $0.00 [a] # b) First Sheet (>4 Page Document) $0.60 $0.65 [a] # c) Each Additional Sheet (>4 Page Document) $0.20 $0.20 [a] 40 S-084 Special Computer Search - Per Hour $93 $93 [a] 41 S-085 Civil Subpoena Processing # a) Subpoena Processing Fee (Per Request) $20 $20 [a] # b) Additional Reproduction Cost Actual Cost Actual Cost [a] # c) Additional Deposit + Travel (Per Day, Regulated Fee) $275 $275 [a],[c] 29 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) POLICE Approved 2015-2016 Proposed 1/19/2016 Svc Area No. Item # Description Fee/Unit Fee/Unit Notes 42 S-086 Duces Tecum Subpoena Processing # a) Subpoena Processing Fee (Per Request) $15 $15 [a] # b) Additional Reproduction Cost Actual Cost Actual Cost [a],[c] 43 S-087 Animal Regulation: # a) Dog License - Unaltered- 1 Year License $60 $60 [a] # b) Dog License - Altered - 1 Year License $20 $20 [a] # c) Senior Rate - 1 Pet Altered $7.50 $7.50 [a] # d) Duplicate $10 $10 [a] # e) Delinquency Charge Equal to License Fee Equal to License Fee [a] # f) Field Enforcement (licensing initiated in the field) $40 $40 [a] Voluntary Cat Licenses # a) One Year - Altered $5 $5 [a] # b) One Year - Unaltered $10 $10 [a] # c) Microchip - With Licensing Of Altered Pet Free Free [a] S-020 Vehicle Code Enforcement 44 # Improper Display Of License Plates (CVC 5200(a)) $48 $48 [d] 45 # Improper Display Of Tabs (CVC 5204(a)) $73 $73 [d] 46 # Blkg. Driveway/Garage Entrance (CVC 22500(e) $48 $48 [d] 47 # No Parking On Sidewalk (CVC 22500(f)) $50 $50 [d] 48 # No Parking Alongside Pkd. Veh./Dbl.Pkg. (CVC 22500(h)) $38 $38 [d] 49 # Blkg. Disabled Access Ramp (CVC 22500(I)) $263 $263 [d] 50 # Fire Accessway/Fire Lane (CVC 22500.1) $68 $68 [d] 51 # Parking 18 Inches Form Curb/Wrong Way (CVC 22502(a), AMC 74-441) $48 $48 [d] 52 # Parking In Disabled Zone (CVC 22507.8(a)) $343 $343 [d] 53 # Blk./Obstruct Disabled Zone (CVC 22507.8(b)) $338 $338 [d] 54 # Parking On Disabled Crosshatch (CVC 22507.8(c)(2)) $338 $338 [d] 55 # Fire Hydrant (CVC 22514) $48 $48 [d] S-021 Parking Enforcement 56 # Parking In Excess Of 72 Hours (AMC 74-438(a)) $38 $38 [d] 57 # Parking For Purpose Of Sale (AMC 74-439(1)) $63 $63 [d] 58 # Not Parked Within Painted Lines (AMC 74-443) $28 $28 [d] 59 # Red Curb (AMC 74-449(a)(1)) $51 $51 [d] 60 # No Parking In Alley (AMC 74-450) $52 $52 [d] 61 # 18” From Curb Or Facing Wrong Way (AMC 74-441, CVC 22502(a)) $51 $51 [d] 62 # Prohibited By Signs / Markings (AMC 74-446) $51 $51 [d] 63 # Limited Or Prohibited Parking (AMC 74-453) $51 $51 [d] 64 # Parking on Private Property Without Consent (AMC 74-463 (b)) $38 $38 [d] 65 # Commercial Veh. Over 10,000 Lbs. +/Over 60 Minutes (AMC 74-466) $85 $85 [d] 66 # Detached Trailer On Street (AMC 74-466 (B)) $68 $68 [d] 67 # Parking On Front Yard Prohibited (AMC 74-468) $38 $38 [d] 68 S-022 # General Code Enforcement Actual Cost Actual Cost [d] 69 # Impound & Collision Tow Service-Per Hr. (Minimum 1 Hr.) Variable Variable [d] 70 Storage Fees - Per Day # a) Automobiles And Light Trucks Variable Variable [d] # b) Trucks Over 1 Ton Variable Variable [d] # c) Semi-Truck And Trailer Variable Variable [d] # d) Motorcycle Variable Variable [d] City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) POLICE Approved 2015-2016 Proposed 1/19/2016 Svc Area 30 No. Item # Description Fee/Unit Fee/Unit Notes 71 S-025 # Accident Report Investigation. Fee Set By State Law. $20 $20 [d] 72 S-027 # Alarm Monitoring Service Actual Cost Actual Cost [d] 73 S-028 # Jail $104 $104 [d] 74 S-032.1 # Court Order Custody Reimbursement Fee Per 24-Hour Period Or Fraction Thereof $104 $104 [d] 75 S-032.4 # Paramedic Service Actual Cost Actual Cost [d] 76 S-032.5 Traffic Collision Report # a) Injury $25 $25 [d] # b) Non-Injury $12 $12 [d] 77 Comm Srvc Officer Special Event Fees (Per Hour) $96 $96 [d] 78 Police Aide Special Event Fees (Per Hour) $23 $23 [d] [a] Fee change, if any, based on findings and recommendations of current fee study. [b] FY 15/16 adopted fee schedule inadvertently identified renewal fee as $16. Correct amount is shown. [c] FY 15/16 adopted fee schedule inadvertently identified antiquated amounts. Correct amounts are shown. [d] Items were originally approved by City Council on July 27, 2015. These items were not examined as part of the FY 15/16 fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. [e] Fee set by State. # = Fees not automatically adjusted for CPI change. City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) 31 ADULT BUSINESSES Approved Proposed Svc Area 2015-2016 1/19/2016 No. Item Description Fee/Unit Fee/Unit Notes Business Licenses 1 Adult-oriented business license: # a) License Fee See Business License See Business License [a] # b) Partial Payment Of Fees - Additional Charge $16 $16 [a] 2 Adult Business License Application Fee: # a) Application Fee $190 $190 [a] # b) Partial Payment Of Fees - Additional Charge $16 $16 [a] 3 Initial Business License Fee: # a) Initial License Fee See Business License See Business License [a] # b) Partial Payment Of Fees - Additional Charge $16 $16 [a] 4 Annual Renewal Fee: # a) Renewal Fee $39 $39 [a] # b) Partial Payment Of Fees - Additional Charge $16 $16 [a] 5 Adult Business License Appeal Fee: # a) License Appeal Fee $2,537 $2,537 [a] # b) Partial Payment Of Fees - Additional Charge $16 $16 [a] 6 # Live Entertainer License Actual time spent at hourly rate of involved City staff, charged against $2,500 initial deposit Actual time spent at hourly rate of involved City staff, charged against $2,500 initial deposit [a] 7 # Figure Model License Actual time spent at hourly rate of involved City staff, charged against $2,500 initial deposit Actual time spent at hourly rate of involved City staff, charged against $2,500 initial deposit [a] 8 # Live Entertainer/Figure Model License Renewal Actual time spent at hourly rate of involved City staff, charged against $2,500 initial deposit Actual time spent at hourly rate of involved City staff, charged against $2,500 initial deposit [a] Planning 1 # Interim Adult Use Planning Permit Actual time spent at hourly rate of involved City staff, charged against $5,000 initial deposit Actual time spent at hourly rate of involved City staff, charged against $5,000 initial deposit [a] 2 # Final Adult Use Planning Permit Actual time spent at hourly rate of involved City staff, charged against $5,000 initial deposit Actual time spent at hourly rate of involved City staff, charged against $5,000 initial deposit [a] 3 # Extension Of Amortization Actual time spent at hourly rate of involved City staff, charged against $5,000 initial deposit Actual time spent at hourly rate of involved City staff, charged against $5,000 initial deposit [a] [a] Business license related taxes, permitting and licensing fees were originally approved by City Council on July 27, 2015. These fees were not examined as part of the FY 15/16 fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. 32 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) BUSINESS LICENSES Approved Proposed Svc Area 2015-2016 1/19/2016 No. Item # Description Fee/Unit Fee/Unit Notes 1 S-133 Application Fee - New Business # a) Outside Contractor $56 $56 [a] # b) Reinstate Outside Contractor $43 $43 [a] # c) Rental Business $56 $56 [a] # d) All Others $187 $187 [a] 2 # First Offense Administrative Penalty For Business License Related Violations $250 $250 [a] 3 S-134 # Home Occupation Permit $93 $93 [a] 4 S-135 # New Taxi/Tow Truck Permit $574 $574 [a] 5 S-136 # Massage Parlor Technician Permit $1,105 $1,105 [a] # Massage Business Operators Permit $2,159 $2,159 [a] # Massage Facility Inspection $266 $266 [a] 6 S-137 # Application Fee - Renewal $23 $23 [a] 7 # Field Collection Fee On Delinquent Accounts $28 $28 [a] 8 # Partial Payment Of Fees - Additional Charge $15 $15 [a] 9 S-138 # Business License Duplicates $14 $14 [a] 10 S-139 # Printouts Of Business License Lists $22 $22 [a] 11 S-140 Solicitor Permit-All # a) 1st Solicitation $62 $62 [a] # b) Each Additional Permit $41 $41 [a] 12 S-141 # Yard Sale Permit Not required Not required [a],[b] 13 S-142 # Bingo Permit $50 $50 [a] 14 S-143 # Fireworks Stand Permit $355 $355 [a] 15 S-96 # Filming Or Other Use Of City Facilities - Per Day 25% Discount for Azusa-based nonprofit organizations $1,342 $1,342 [a] 16 # Filming On Private Property $300 $300 [a] 17 S-97 # Registration Fee For Non-Profit Businesses Within A Commercial Building (i.e. banks, schools, etc.) $44 $44 [a] [a] Business license related taxes, permitting and licensing fees were originally approved by City Council on July 27, 2015. These fees were not examined as part of the FY 15/16 fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. [b] Ordinance No. 07-05, Approved By Council On 05/07/07 # = Fees not automatically adjusted for CPI change. 33 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) RECREATION Approved 2015-2016 Proposed 1/19/2016 Svc Area No. Item # Description Fee/Unit Fee/Unit Notes 1 S-33 Aquatics Program Swimming Lessons: a) Children/Group i) 25 Minutes $30 $31 [a] ii) 40 Minutes $40 $41 [a] b) Children/Private c) Adult/Group i) 25 Minutes $30 $30 $31 $31 [a] [a] ii) 40 Minutes $40 $41 [a] d) Adult/Private $30 $31 [a] 2 Swimming Team: a) 1st Session (Includes Shirts And Swim Cap) i) First Child (Same Family) $65 $65 [a] ii) Additional Child (Same Family) $55 $55 [a] b) 2nd Session i) First Child (Same Family) $55 $55 [a] ii) Additional Child (Same Family) $45 $45 [a] 3 Water Exercise - Adults $40 $40 [a] 4 Lifeguard Training Class $125 $125 [a] 5 Aqua Zumba $20 $20 [a] 6 S-34 # Recreation Swimming - Day Swim: a) 12 Years Old & Under Includes Slide $0.50 $1 [a] # b) Teens - Up To 17 Years Includes Slide $2 $2 [a] # c) Seniors - 50 years And Older $1 $1 [a] # d) Adults - 18 Years And Older Includes Slide $2 $2 [a] # e) Lap Swim - Adult 18 And Over $2 $2 [a] # f) Lap Swim - Seniors $0.50 $0.50 [a] 7 Recreation Swimming - Season Pass: a) Children - 12 Years Old & Under $30 $31 [a] b) Teens - Up To 17 Years $40 $41 [a] c) Seniors - 50 Years And Older $40 $41 [a] d) Adults - 18 Years And Older $50 $51 [a] 8 S-35 Swimming Pool Rental (2 Hours): a) 1-100 People $350 $350 [a] b) 101-250 People $450 $450 [a] c) 251-350 People $550 $550 [a] d) Swimming Pool Rental Deposit (Refundable) $200 $200 [a] e) Additional - Water Slide $100 $100 [a] f) Water Slide Rental Deposit (Refundable) $50 $50 [a] g) Non- Resident Fee (Additional) $0 $150 [a] 9 10 S-36 S-38 # Leisure Classes Adult Sports Programs Adult Baseball: a) Weeknights varies $450 varies $450 [a] * [a] b) Weekends $500 $500 [a] 11 Adult Softball $300 $300 [a] 12 Adult Basketball $350 $350 [a] 34 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) RECREATION Approved 2015-2016 Proposed 1/19/2016 Svc Area No. Item # Description Fee/Unit Fee/Unit Notes 13 Adult Volleyball $185 $185 [a] 14 Golf Tournament $125 $125 [a] 15 Adult Flag Football $300 $300 [a] 16 Adult Futsal (Indoor Soccer) $185 $185 [a] 17 Adult Kickball $185 $185 [a] 18 S-41 Youth Sports Programs Pony Baseball: a) Regular Fee $75 $75 * [a] b) Additional Child - Same Family $65 $65 [a] 19 Winter Pony Baseball: a) Regular Fee $45 $45 [a] b) Additional Child - Same Family $40 $40 [a] 20 Mighty-Mite Baseball (T-Ball/Coach Pitch): a) Regular Fee $45 $45 [a] b) Additional Child - Same Family $40 $40 [a] 21 Mighty-Mite Basketball: a) Regular Fee $45 $45 [a] b) Additional Child - Same Family $40 $40 [a] 22 Mighty-Mite Flag Football: a) Regular Fee $45 $45 [a] b) Additional Child - Same Family $40 $40 [a] 23 Mighty-Mite Soccer: a) Regular Fee $45 $45 [a] b) Additional Child - Same Family $40 $40 [a] 24 Flag Football (T-Shirt Uniforms): a) New $30 $30 [a] b) Returning $25 $25 [a] c) Additional Child - Same Family - New $25 $25 [a] d) Additional Child - Same Family - Returning $20 $20 [a] 25 Basketball (T-Shirt Uniforms): a) New $30 $30 [a] b) Returning $25 $25 [a] c) Additional Child - Same Family - New $25 $25 [a] d) Additional Child - Same Family - Returning $20 $20 [a] 26 Summer Basketball (Include Uniform): a) Regular Fee $50 $50 [a] b) Additional Child - Same Family $45 $45 [a] 27 Volleyball (T-Shirt Uniforms): a) New $35 $35 [a] b) Returning $30 $30 [a] c) Additional Child - Same Family - New $30 $30 [a] d) Additional Child - Same Family - Returning $25 $25 [a] 28 Soccer (T-Shirt Uniforms): a) New $30 $30 [a] b) Returning $25 $25 [a] c) Additional Child - Same Family - New $25 $25 [a] d) Additional Child - Same Family - Returning $20 $20 [a] 35 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) RECREATION Approved 2015-2016 Proposed 1/19/2016 Svc Area No. Item # Description Fee/Unit Fee/Unit Notes 29 S-41.1 Athletic Field Rental Ball Diamond Rental: * a) Drag, Line And Water Field-Prepared $25 $25 [a] b) Staff, Scorekeeping - Per Hour $15 $15 [a] c) Use Of Scoreboards $15 $15 [a] d) Field Rental-No Lights $30 $30 [a] e) Field Rental-With Lights $40 $40 [a] f) Use Of Bases $15 $15 [a] g) Deposit For Use Of Bases $200 $200 [a] h) Use Of Strike Zone Mat $15 $15 [a] i) Non-Resident Fee (Except Memorial Park) (Additional) $25 $50 [a] 30 Athletic Field Charge (Green Space): a) Memorial Park - Per Hour (Lights Not Included) $60 $60 [a] b) Northside South Field Area - (Lights Not Included) $60 $60 [a] c) Zacatecas Park $60 $60 [a] d) Gladstone Park (Lights Not Included) $30 $30 [a] e) Lights Included $60 $60 [a] f) Non-Resident Fee (Except Memorial Park) (Additional) $25 $50 [a] S-43 Golden Days Special Events 31 2K/5K Run/Walk: a) Youth i) Pre-Registration $5 $5 [a] ii) Day Of The Event $10 $10 [a] b) Adult i) Pre-Registration $15 $15 [a] ii) Day Of The Event $20 $20 [a] 32 S-44 Children's Day Camp: a) Registration Fee (One-Time) $20 $20 [a] b) New $90 $90 [a] c) New - 2nd Child In Same Family $88 $88 [a] d) Returning $80 $80 [a] e) Returning - 2nd Child In Same Family $78 $78 [a] 33 Summer Day Camp: a) Registration Fee (One-Time) $20 $20 [a] b) New $20 $20 [a] c) Returning $18 $18 [a] 34 S-47 Recreation Special Events Trunk or Treat Food/Novelty vendor $25 $25 [a] 35 Tournament Of Champions Finals At APU Events Center: a) Adults $3 $3 [a] b) Student $2 $2 [a] c) Child (3-11) $1 $1 [a] 36 Volleyball Clinic $25 $25 [a] 37 Junior Olympic Track (Per School) $100 $100 [a] 38 Cinco De Mayo Food Vendor $75 $75 [a] 39 Winter Fiesta Food Vendor $75 $75 [a] 40 Memorial Park Facilities Rental Memorial Park Facilities: 36 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) RECREATION Approved 2015-2016 Proposed 1/19/2016 Svc Area No. Item # Description Fee/Unit Fee/Unit Notes a) Meeting Room i) Normal Hours $30 $30 [a] ii) Outside Normal Hours $40 $40 [a] iii) Non-Resident Fee (Additional) $50 $100 [a] b) Gym or Main Room i) Normal Hours $40 $40 [a] ii) Outside Normal Hours $60 $60 [a] iii) Non-Resident Fee (Additional) $125 $175 [a] c) Kitchen i) Resident $50 $50 [a] ii) Non-Resident $25 $50 [a] d) Cleaning $50 $50 [a] 41 Cinco De Mayo (Novelty And Craft Vendor Fees) $40 $40 [a] 42 Holiday Crafts (Vendors Fees) $40 $40 [a] 43 Bounce House Application Usage $20 $20 [a] 44 Non-Resident Fee (Additional) $20 $40 [a] 45 Picnic Shelter Rental Picnic Shelter Application Rental (Gladstone Park): a) Section # 1 $25 $26 [a] b) Section # 2 $25 $26 [a] c) Section # 3 $25 $26 [a] d) Non-Resident Fee (Additional) $25 $50 [a] 46 Picnic Shelter Application Rental (Memorial Park): a) Single Shelter (Section # 2,3,4 & 5) $25 $26 [a] b) Double Shelter (Section # 1& 6) $35 $36 [a] c) Non-Resident Fee (Additional) $25 $50 [a] 47 Picnic Shelter Application Rental (Northside Park): a) S-Leg Section # 1 $25 $26 [a] b) S-Leg Section # 2 $25 $26 [a] c) S-Leg Section # 3 $25 $26 [a] d) S-Leg Section # 4 $25 $26 [a] e) S-Leg Section # 5 (Includes Serving Table) $35 $36 [a] f) Non-Resident Fee (Additional) $25 $50 [a] 48 Picnic Shelter Application Rental (Pioneer Park): a) NE Section # 1 (Double Shelter) $35 $36 [a] b) NE Section # 2 $25 $26 [a] c) NE Section # 3 $25 $26 [a] d) Gazebo Shelter #4 $45 $46 [a] e) Non-Resident Fee (Additional) $25 $50 [a] 49 Picnic Shelter Application Rental (Zacatecas Park): a) NE Section # 1 Double Shelter $35 $36 [a] b) NW Section # 2 $25 $26 [a] c) SE Section # 3 Double Shelter $35 $36 [a] d) SW Section # 4 $25 $26 [a] e) NE Section # 5 Double Shelter $35 $36 [a] f) Non-Resident Fee (Additional) $25 $50 [a] 50 Picnic Shelter Application Rental (Slauson Park): 37 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) RECREATION Approved 2015-2016 Proposed 1/19/2016 Svc Area No. Item # Description Fee/Unit Fee/Unit Notes a) Section #1 $25 $26 [a] b) Section #2 $25 $26 [a] c) Section #3 $25 $26 [a] d) Section #4 $25 $26 [a] e) Non-Resident Fee (Additional) $25 $50 [a] 51 Picnic Shelter Application Rental (Veterans Freedom Park): a) Gazebo #1 $25 $26 [a] b) Gazebo #2 $25 $26 [a] c) Non-Resident Fee (Additional) $25 $50 [a] 52 Picnic Shelter Application Rental (Rancho Park): a) Section #1 $25 $26 [a] b) Non-Resident Fee (Additional) $25 $50 [a] 53 Picnic Shelter Application Rental (Alisal Park): a) Section #1 $35 $36 [a] b) Section #2 $35 $36 [a] c) Non-Resident Fee (Additional) $25 $50 [a] * Additional fees may apply for use of game officials. Amounts vary. [a] Fee change, if any, based on findings and recommendations of current fee study. # = Fees not automatically adjusted for CPI change. 38 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) WOMAN'S CLUB, SENIOR CENTER AND NORTH RECREATION CENTER (NRC) Approved 2015-2016 Proposed 1/19/2016 Svc Area No. Item # Description Fee/Unit Fee/Unit Notes 1 S-48 # Woman's Club Rental To Public Coordinated By Contractor: a) Weekdays Meetings - 8 A.M. - 5 P.M. (Add'l Hours $75 Each) $250 $250 [a] # b) Friday Evening Event $300 $300 [a] # c) Saturday Afternoon Event (Until 5P.M.) $400 $400 [a] # d) Saturday Evening $800 $800 [a] # # # e) Sunday Event (Anytime) f) Event Liability Insurance g) Security Deposit (Refundable, Deposit To Hold Date) $400 Varies $300 $400 Varies $300 [a] [a] [a] # h) Patio Wedding Ceremony (Fee Split Between City And Contractor) $300 $300 [a] # i) Additional Time > 5 Hours (Per Hour, Split Between City And Contractor) $250 $250 [a] # j) Teen Party (Anytime): $700 $700 [a] # k) Cleaning Fee $100 $100 [a] # l) Decorating Fee Outside Normal Hours Of Operation (Per Hour) $15 $15 [a] 2 # Woman's Club-For Azusa Based Non-Profit Organizations: a) Building Rental (Per Hour Including Setup And Clean Up Time) $50 $50 [a] # b) Kitchen (Flat Fee) $75 $75 [a] # c) Damage Deposit $500 $500 [a] # d) Staffing (Per Hour) $15 $15 [a] # # # e) Cleaning Fee f) Event Liability Insurance g) Alcohol Liability Insurance $100 Varies $200 $100 Varies $200 [a] [a] [a] 3 # Gazebo At City Hall $300 $300 [a] 4 S-48.2 # Senior Lunch Program (Suggested) Donation $2 $2 [a] 5 Rental Of Memorial Park North Recreation Center: a) Small Class Rooms: (Per Hour) # i) Non-Profit $30 $30 [a] # ii) For Profit $50 $50 [a] b) Large Room: (Per Hour) # i) Non-Profit $60 $60 [a] # ii) For Profit $75 $75 [a] c) Kitchen: (Per Hour) # i) Non-Profit $50 $50 [a] # ii) For Profit $75 $75 [a] d) Staffing: (Per Hour) # i) Non-Profit $30 $30 [a] # ii) For Profit $30 $30 [a] # e) Cleaning Fee (Maximum Fee) $225 $225 [a] # f) Security Deposit: (Refundable Deposit) $300 $300 [a] # g) Non-Resident Fee (Flat Rate) (Additional) $50 $100 [a] # h) Event Liability Insurance Varies Varies [a] # i) Decorating Fee Outside Normal Hours Of Operation (Per Hour) $15 $15 [a] 6 S-48.3 # Rental Of Senior Center: a) Small Class Rooms: (Per Hour) # i) Non-Profit $30 $30 [a] # ii) For Profit $50 $50 [a] 39 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) WOMAN'S CLUB, SENIOR CENTER AND NORTH RECREATION CENTER (NRC) Approved 2015-2016 Proposed 1/19/2016 Svc Area b) Large Room: (Per Hour) No. Item # Description Fee/Unit Fee/Unit Notes # i) Non-Profit $50 $50 [a] # ii) For Profit $90 $90 [a] # c) Kitchen: (Flat Fee) i) Non-Profit $50 $50 [a] # ii) For Profit $75 $75 [a] d) Staffing: (After Hours Only, Minimal Per Hour) # i) Non-Profit $30 $30 [a] # ii) For Profit $30 $30 [a] # e) Cleaning Fee (Maximum) $225 $225 [a] # f) Security Deposit: (Refundable Deposit) $300 $300 [a] # g) Non-Resident Fee (Flat Fee) (Additional) $50 $100 [a] # h) Decorating Fee Outside Normal Hours Of Operation (Per Hour) $15 $15 [a] [a] Fee change, if any, based on findings and recommendations of current fee study. # = Fees not automatically adjusted for CPI change. City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) TRANSPORTATION Approved 2015-2016 Proposed 1/19/2016 Svc Area 40 No. Item # Description Fee/Unit Fee/Unit Notes Monthly Foothill Transit Passes 1 Senior/Disabled: # a) Regular Rate $22 $22 [a] # b) Discounted Rate $19 $19 [a] 2 Student K-12: # a) Regular Rate $33 $33 [a] # b) Discounted Rate $27.75 $27.75 [a] 3 Local Lines: # a) Regular Rate $70 $70 [a] # b) Discounted Rate $56 $56 [a] 4 Silver Streak: # a) Regular Rate $105 $105 [a] # b) Discounted Rate $85 $85 [a] 5 Commuter Express: # a) Regular Rate $170 $170 [a] # b) Discounted Rate $150 $150 [a] Dial-A-Ride Transit (one-way) 6 Medical and Social Services: # a) Azusa, Covina, Duarte, Glendora $0.50 $0.50 [a] # b) Baldwin Park, Monrovia, San Dimas, West Covina $1.50 $1.50 [a] 7 # Non-Medical Appointments Limited to City Limits $0.50 $0.50 [a] 8 # Senior Lunch Program $0.25 $0.25 [a] Metrolink Monthly Passes 9 # City residents save $25 on monthly pass Variable Variable [a],[b] 10 # Employees of Azusa Businesses receive $15 or a match of the amount offered by employer up to a limit of $25 Variable Variable [a],[b] Access 11 # Base Books (10 Coupons Per Book) $27.50 $27.50 [a] 12 # Plus Books (10 Coupons Per Book) $7.50 $7.50 [a] * Discounted Passes Are Available To Eligible Users And On A First Come-First Serve Basis. [a] Fee change, if any, based on findings and recommendations of current fee study. [b] Varies Depending On Point Of Origin And Destination. # = Fees not automatically adjusted for CPI change. City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) LIBRARY Approved 2015-2016 Proposed 1/19/2016 Svc Area 41 No. Item # Description Fee/Unit Fee/Unit Notes 1 S-097 # Inter-Library Loan Processing: a) Processing Fee $2 $2 [a] b) Plus Postage Actual Cost Actual Cost [a] 2 S-099 # Lost Library Card Processing $3 $3 [a] 3 S-100 # Processing Overdue Material: a) Per Item Per Day - Adult $0.25 $0.30 [a] # b) Per Item Per Day - Child $0.10 $0.15 [a] 4 S-101 # Lost/Damage Library Material Processing: a) Processing Fee (plus the cost of the item) $15 $15 [a] # b) Missing AV Case (Audio Book, DVD, & CD) $1 $1 [a] # c) Missing Bar Code $1 $1 [a] # d) Missing Pamphlet- AV Materials & Books $1 $1 [a] 5 S-102 # Passport Application (Rate Set by Fed. Govt.) $25 $25 [a] 6 S-103 # DVD Rental Per Item (For Two Days) $1.50 $0 [a] 7 S-104 Rental Of Library Auditorium: a) For Profit # i) During Business Hours - Per Hour (Min. 3 Hours) $25 $25 [a] # ii) Outside Business Hours - Per Hour (Min. 3 Hours) $25 $35 [a] # # b) Non-Profit Organizations - Outside Azusa i) During Business Hours - Per Hour (Min. 3 Hours) ii) ) Outside Business Hours Per Hour (Min. 3 Hours) $15 Variable $15 Variable [a] [a] # c) Resident Non-Profit & Government (Minimum 3 Hours) No Charge No Charge [a] 8 S-104B # Library Fax Service: a) Domestic - Per Page $2 $2 [a] # b) International - First Page $4 $4 [a] # c) International - Additional Page $1 $1 [a] 9 # Library Cards No Charge No Charge [a] 10 # Personal Computer Usage: a) First 2 Hours No Charge No Charge [a] # b) Excess Of 2 Hours $2 $2 [a] # c) Guest Pass (Non Library Cardholders) $2 $2 [a] 11 S-53 # Photocopy Charges Per Page: a) Black & White Copies $0.15 $0.15 [a] # b) Color Copies $0.25 $0.25 [a] 12 S-54 # Merchandise Sales: a) USB Drives Actual Cost Variable [a] # # b) Canvas Bags c) Ear Buds Actual Cost Actual Cost Variable Variable [a] [a] [a] Fee change, if any, based on findings and recommendations of current fee study. # = Fees not automatically adjusted for CPI change. 42 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) GIS MAPS Approved 2015-2016 Proposed 1/19/2016 Svc Area No. Item # Description Fee/Unit Fee/Unit Notes S-16.1 Paper Map Products 1 City Map Books $13 $13 [a] 2 A Size Plot; 8.5 X 11 $13 $13 [a] 3 A Size Plot: 8.5 X 11 With Photo $20 $20 [a] 4 B Size Plot: 11 X 17 $13 $13 [a] 5 B Size Plot: 11 X 17 With Photo $21 $21 [a] 6 C Size Plot: 17 X 22 $32 $32 [a] 7 C Size Plot: 17 X 22 With Photo $44 $44 [a] 8 D Size Plot: 34 X 22 $63 $63 [a] 9 D Size Plot: 34 X 22 With Photo $83 $83 [a] 10 E Size Plot: 34 X 46 $101 $101 [a] 11 E Size Plot: 34 X 46 With Photo $165 $165 [a] 12 Zoning Citywide Book (11 X 17 Sheets) $63 $63 [a] 13 City General Plan Land Use Or Zoning Map (3 X 5 Ft.) $32 $32 [a] 14 City General Plan Land Use Or Zoning Map (6 X 6 Ft.) $63 $63 [a] 15 Hourly Charge For Custom Mapping Work $83 $93 [a] 16 # Public Notice Radius Maps And Labels $240 $240 [a] [a] Fee change, if any, based on findings and recommendations of current fee study. # = Fees not automatically adjusted for CPI change. 43 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) ADMINISTRATIVE PROCESSING FEES Approved 2015-2016 Proposed 1/19/2016 Svc Area No. Item # Description Fee/Unit Fee/Unit Notes 1 Credit Card Processing Fee 0% 2% [a],[b] 2 S-144 # Returned Check Processing - 1st and 2nd Check a) First Check $48 $35 [a],[c] # b) Each Additional Check $48 $25 [a],[c] 3 S-145 # Re-Issuance Of Lost Checks $65 $65 [a] 4 S-146 # Document Reproduction: a) Document <4 Pages In Length $0 $0 [a] # b) First Sheet (>4 Page Document) $0.66 $0.65 [a] # c) Each Additional Sheet (>4 Page Document) $0.20 $0.20 [a] # d) Per Sheet Charge for Certain Documents Specified in Gov't Code $0.10 $0.10 [a],[c] 5 S-146.1 # Documents Reproduced on CD/DVD $5 $5 [a] 6 S-147 # Document Certification $32 $15 [a] 7 S-149 # Candidate Processing $25 $25 [a],[c] 8 S-149A # Initiative Processing $200 $200 [a],[c] 9 S-150 # Notary Service For Each Signature Taken $10 $10 [a],[c] 10 S-150A # Project Specifications And Plans: a) Base Fee $52 $50 [a] # b) Additional Mailing Fee (If Mailed) $10 $10 [a] 11 S-88.1 # Processing Of Payroll Garnishments Per Transactions $0 $0 [a],[d] 12 S-93 # Records Research Service: a) Document And Supplies Actual Cost Actual Cost [a] b) Per Hour Fee (1/4 Hour Increments) $25 $26 [a] 13 S-94 Bond Issuance And Administration - (Includes Extra $50 Per Hour) $387 $387 [e] 14 S-48.1 # Rental Of Civic Center Auditorium: a) During City's Normal Business Hours Until 4:00pm (Per Hour) $53 $50 [a] # b) After 4:00pm, Weekends Or Holidays (Per Hour) $106 $100 [a] # c) Non-Resident Groups - Additional Fee Per Event $51 $100 [a] # d) Discount For Azusa-Based Non-Profit Organizations 25% 25% [a] [a] Fee change, if any, based on findings and recommendations of current fee study. [b] Fee applies to all payments made directly to the City, via credit card. (Example scenario - For $100 fee, paid via credit card, the total amount charged will be $102 (2% of $100). [c] Fees Set By State. [d] Fees set by court order. [e] Fee originally approved by City Council on July 27, 2015. Fee not examined as part of the FY 15/16 fee study. No modification to fee is considered as part of the proposed January 19, 2016 fee updates. # = Fees not automatically adjusted for CPI change. Appendix B - Schedule Identifying Current and Proposed Fees and Amount of Proposed Fee Changes CITY OF AZUSA SCHEDULE IDENTIFYING CURRENT AND PROPOSED FEES AND AMOUNT OF PROPOSED FEE CHANGE Proposed for Adoption January 19, 2016 City of Azusa Schedule of Fees and Charges 2 Table of Contents No. Description Pages 1 Building and Safety 3 - 16 2 Planning 17 - 18 3 Engineering 19 - 20 4 Utilities 21 - 24 5 Community Improvement 25 6 Fire Safety 26 7 Police 27 - 30 8 Adult Businesses 31 9 Business License 32 10 Recreation 33 - 37 11 Women's Club, Senior Center, and North Recreation Center 38 - 39 12 Transportation 40 13 Library 41 14 GIS Maps 42 15 Administrative Processing 43 3 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Proposed No. Svc Area Item # Description Cost Per S.F. Avg. Cost Per S.F. Avg. Increase (Decrease) Notes 1 S-1 Building Valuation Apartment Houses: Type I Or II F.R. $137.67 $137.67 $0.00 [a] 2 Good $169.49 $169.49 $0.00 [a] 3 Type V - Masonry (Or Type III) $112.37 $112.37 $0.00 [a] 4 Good $137.67 $137.67 $0.00 [a] 5 Type V - Wood Frame $99.02 $99.02 $0.00 [a] 6 Good $127.27 $127.27 $0.00 [a] 7 Type I - Basement Garage $58.05 $58.05 $0.00 [a] 8 Auditoriums: Type I Or II F.R. $162.66 $162.66 $0.00 [a] 9 Type II - 1 Hour $117.80 $117.80 $0.00 [a] 10 Type II - N $111.44 $111.44 $0.00 [a] 11 Type III - 1 Hour $123.86 $123.86 $0.00 [a] 12 Type III - N $117.49 $117.49 $0.00 [a] 13 Type V - 1 Hour $118.43 $118.43 $0.00 [a] 14 Type V - N $110.50 $110.50 $0.00 [a] 15 Banks: Type I Or II F.R. $229.87 $229.87 $0.00 [a] 16 Type II - 1 Hour $169.33 $169.33 $0.00 [a] 17 Type II - N $163.90 $163.90 $0.00 [a] 18 Type III - 1 Hour $186.87 $186.87 $0.00 [a] 19 Type III - N $180.20 $180.20 $0.00 [a] 20 Type V - 1 Hour $169.33 $169.33 $0.00 [a] 21 Type V - N $162.19 $162.19 $0.00 [a] 22 Bowling Alleys: Type II - 1 Hour $79.15 $79.15 $0.00 [a] 23 Type II - N $73.88 $73.88 $0.00 [a] 24 Type III - 1 Hour $86.14 $86.14 $0.00 [a] 25 Type III - N $80.55 $80.55 $0.00 [a] 26 Type V - 1 Hour $58.05 $58.05 $0.00 [a] 27 Churches: Type I Or II F.R. $153.96 $153.96 $0.00 [a] 28 Type II - 1 Hour $115.63 $115.63 $0.00 [a] 29 Type II - N $109.89 $109.89 $0.00 [a] 30 Type III - 1 Hour $125.72 $125.72 $0.00 [a] 31 Type III - N $120.13 $120.13 $0.00 [a] 32 Type V - 1 Hour $117.49 $117.49 $0.00 [a] 33 34 Type V - N Convalescent Hospitals: Type I Or II F.R. $110.50 $216.05 $110.50 $216.05 $0.00 $0.00 [a] [a] 35 Type II - 1 Hour $149.93 $149.93 $0.00 [a] 36 Type III - 1 Hour $153.65 $153.65 $0.00 [a] 37 Type V - 1 Hour $144.81 $144.81 $0.00 [a] 38 Dwellings: Type V - Masonry $117.49 $117.49 $0.00 [a] 39 Good $150.39 $150.39 $0.00 [a] 4 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Proposed No. Svc Area Item # Description Cost Per S.F. Avg. Cost Per S.F. Avg. Increase (Decrease) Notes 40 Type V - Wood Frame $104.46 $104.46 $0.00 [a] 41 Good $143.42 $143.42 $0.00 [a] Basements - 42 Semi-Finished $31.20 $31.20 $0.00 [a] 43 Good $36.00 $36.00 $0.00 [a] 44 Unfinished $22.66 $22.66 $0.00 [a] 45 Good $27.47 $27.47 $0.00 [a] 46 Fire Station: Type I Or II F.R. $177.56 $177.56 $0.00 [a] 47 Type II - 1 Hour $116.87 $116.87 $0.00 [a] 48 Type II - N $110.20 $110.20 $0.00 [a] 49 Type III - 1 Hour $127.89 $127.89 $0.00 [a] 50 Type III - N $122.46 $122.46 $0.00 [a] 51 Type V - 1 Hour $119.98 $119.98 $0.00 [a] 52 Type V - N $113.77 $113.77 $0.00 [a] 53 Homes For The Elderly: Type I Or II F.R. $160.95 $160.95 $0.00 [a] 54 Type II - 1 Hour $130.69 $130.69 $0.00 [a] 55 Type II - N $125.10 $125.10 $0.00 [a] 56 Type III - 1 Hour $136.12 $136.12 $0.00 [a] 57 Type III - N $130.53 $130.53 $0.00 [a] 58 Type V - 1 Hour $131.46 $131.46 $0.00 [a] 59 Type V - N $126.96 $126.96 $0.00 [a] 60 Hospitals: Type I Or II F.R. $253.30 $253.30 $0.00 [a] 61 Type III - 1 Hour $209.69 $209.69 $0.00 [a] 62 Type V - 1 Hour $200.06 $200.06 $0.00 [a] 63 Hotels And Motels: Type I Or II F.R. $156.76 $156.76 $0.00 [a] 64 Type III - 1 Hour $135.81 $135.81 $0.00 [a] 65 Type III - N $129.44 $129.44 $0.00 [a] 66 Type V - 1 Hour $118.27 $118.27 $0.00 [a] 67 Type V - N $115.94 $115.94 $0.00 [a] 68 Industrial Plants: Type I Or II F.R. $88.31 $88.31 $0.00 [a] 69 Type II - 1 Hour $61.46 $61.46 $0.00 [a] 70 Type II - N $56.50 $56.50 $0.00 [a] 71 Type III - 1 Hour $67.67 $67.67 $0.00 [a] 72 Type III - N $63.79 $63.79 $0.00 [a] 73 Tilt-Up $46.56 $46.56 $0.00 [a] 74 Type V - 1 Hour $63.79 $63.79 $0.00 [a] 75 Type V - N $58.36 $58.36 $0.00 [a] 76 Jails: Type I Or II F.R. $246.94 $246.94 $0.00 [a] 77 Type III - 1 Hour $225.83 $225.83 $0.00 [a] 78 Type V - 1 Hour $169.33 $169.33 $0.00 [a] Libraries: 5 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Proposed No. Svc Area Item # Description Cost Per S.F. Avg. Cost Per S.F. Avg. Increase (Decrease) Notes 79 Type I Or II F.R. $180.66 $180.66 $0.00 [a] 80 Type II - 1 Hour $132.24 $132.24 $0.00 [a] 81 Type II - N $125.72 $125.72 $0.00 [a] 82 Type III - 1 Hour $139.69 $139.69 $0.00 [a] 83 Type III - N $132.70 $132.70 $0.00 [a] 84 Type V - 1 Hour $131.15 $131.15 $0.00 [a] 85 Type V - N $125.72 $125.72 $0.00 [a] 86 Medical Offices: Type I Or II F.R. $185.47 $185.47 $0.00 [a] 87 Type II - 1 Hour $143.10 $143.10 $0.00 [a] 88 Type II - N $135.96 $135.96 $0.00 [a] 89 Type III - 1 Hour $155.21 $155.21 $0.00 [a] 90 Type III - N $144.50 $144.50 $0.00 [a] 91 Type V - 1 Hour $140.00 $140.00 $0.00 [a] 92 Type V - N $135.03 $135.03 $0.00 [a] 93 Offices Type I Or II F.R. $165.76 $165.76 $0.00 [a] 94 Type II - 1 Hour $110.97 $110.97 $0.00 [a] 95 Type II - N $105.70 $105.70 $0.00 [a] 96 Type III - 1 Hour $119.82 $119.82 $0.00 [a] 97 Type III - N $114.54 $114.54 $0.00 [a] 98 Type V - 1 Hour $112.22 $112.22 $0.00 [a] 99 Type V - N $105.70 $105.70 $0.00 [a] 100 Private Garages: Wood Frame $37.72 $37.72 $0.00 [a] 101 Masonry $42.53 $42.53 $0.00 [a] 102 Open Carports $25.76 $25.76 $0.00 [a] 103 Public Buildings: Type I Or II F.R. $191.53 $191.53 $0.00 [a] 104 Type II - 1 Hour $155.21 $155.21 $0.00 [a] 105 Type II - N $148.38 $148.38 $0.00 [a] 106 Type III - 1 Hour $161.11 $161.11 $0.00 [a] 107 Type III - N $155.52 $155.52 $0.00 [a] 108 Type V - 1 Hour $147.45 $147.45 $0.00 [a] 109 Type V - N $142.17 $142.17 $0.00 [a] 110 Public Garages: Type I Or II F.R. $75.90 $75.90 $0.00 [a] 111 Type I Or II Open Parking $56.96 $56.96 $0.00 [a] 112 Type II - N $43.46 $43.46 $0.00 [a] 113 Type III - 1 Hour $57.43 $57.43 $0.00 [a] 114 Type III - N $51.06 $51.06 $0.00 [a] 115 Type V - 1 Hour $52.31 $52.31 $0.00 [a] 116 Restaurants Type III - 1 Hour $151.17 $151.17 $0.00 [a] 117 Type III - N $146.05 $146.05 $0.00 [a] 118 Type V - 1 Hour $138.45 $138.45 $0.00 [a] 119 Type V - N $133.01 $133.01 $0.00 [a] 6 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Proposed No. Svc Area Item # Description Cost Per S.F. Avg. Cost Per S.F. Avg. Increase (Decrease) Notes 120 Schools: Type I Or II F.R. $172.59 $172.59 $0.00 [a] 121 Type II - 1 Hour $117.80 $117.80 $0.00 [a] 122 Type III - 1 Hour $126.03 $126.03 $0.00 [a] 123 Type III - N $121.22 $121.22 $0.00 [a] 124 Type V - 1 Hour $118.11 $118.11 $0.00 [a] 125 Type V - N $112.68 $112.68 $0.00 [a] 126 Service Stations: Type II - N $104.30 $104.30 $0.00 [a] 127 Type III - 1 Hour $108.80 $108.80 $0.00 [a] 128 Type V - 1 Hour $92.66 $92.66 $0.00 [a] 129 Canopies $43.46 $43.46 $0.00 [a] 130 Stores: Type I Or II F.R. $127.89 $127.89 $0.00 [a] 131 Type II - 1 Hour $78.23 $78.23 $0.00 [a] 132 Type II - N $76.52 $76.52 $0.00 [a] 133 Type III - 1 Hour $95.14 $95.14 $0.00 [a] 134 Type III - N $89.24 $89.24 $0.00 [a] 135 Type V - 1 Hour $80.09 $80.09 $0.00 [a] 136 Type V - N $74.03 $74.03 $0.00 [a] 137 Town Homes: Type V - Masonry $134.43 $134.43 $0.00 [a] 138 Type V - Wood Frame $128.19 $128.19 $0.00 [a] 139 Garage- Wood Frame $52.31 $52.31 $0.00 [a] 140 Garage- Masonry $58.05 $58.05 $0.00 [a] 141 Theaters: Type I Or II F.R. $170.42 $170.42 $0.00 [a] 142 Type III - 1 Hour $124.17 $124.17 $0.00 [a] 143 Type III - N $118.27 $118.27 $0.00 [a] 144 Type V - 1 Hour $116.87 $116.87 $0.00 [a] 145 Type V - N $110.51 $110.51 $0.00 [a] 146 Warehouses: Type I Or II F.R. $76.67 $76.67 $0.00 [a] 147 Type I Or V - 1 Hour $45.48 $45.48 $0.00 [a] 148 Type I Or V - N $42.68 $42.68 $0.00 [a] 149 Type III - 1 Hour $51.53 $51.53 $0.00 [a] 150 Type III - N $49.05 $49.05 $0.00 [a] 151 Equipment: Air Conditioning Commercial $6.52 $6.52 $0.00 [a] 152 Residential $5.43 $5.43 $0.00 [a] 153 Sprinkler Systems $4.04 $4.04 $0.00 [a] 154 Other Valuations Reroof Asphalt And Comp - per square foot of material $249.73 $249.73 $0.00 [a] 155 Built-up - per square foot of material $264.42 $264.42 $0.00 [a] 156 Light-weight tile - per square foot of material $683.08 $683.08 $0.00 [a] 7 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Proposed No. Svc Area Item # Description Cost Per S.F. Avg. Cost Per S.F. Avg. Increase (Decrease) Notes 157 Concrete Tile Or Slate Tile - per square foot of material $822.63 $822.63 $0.00 [a] 158 Metal Shingles - per square foot of material $520.02 $520.02 $0.00 [a] 159 Wood Shake - per square foot of material $315.83 $315.83 $0.00 [a] 160 Wood Shingle - per square foot of material $304.08 $304.08 $0.00 [a] 161 Rolled Roofing - minimum 300 Sq.Ft. allowed on patio covers only $1,468.98 $1,468.98 $0.00 [a] 162 Tear off and re-sheath - per square foot of material $146.90 $146.90 $0.00 [a] Tenant Improvements 163 General Commercial $38.19 $38.19 $0.00 [a] 164 Restaurants $44.07 $44.07 $0.00 [a] 165 Medical Offices $45.54 $45.54 $0.00 [a] Retaining Walls- Concrete Block 166 6" $11.39 $11.39 $0.00 [a] 167 8" $12.61 $12.61 $0.00 [a] 168 12" $15.46 $15.46 $0.00 [a] 169 Masonry Fireplace - Minimum Valuation $4,656.67 $4,656.67 $0.00 [a] 170 Foundation Permits - Based On 1/3 The Overall Valuation Of The Bldg Permit These Figures Shall Be Used When The Applicant Does Not Have A Valuation, Or If The Valuation Given Is Obviously Low. 171 Factory Built Fireplace- Minimum Valuation $1,552.71 $1,552.71 $0.00 [a] Signs 1 Side: 172 a) Painted $60.23 $60.23 $0.00 [a] 173 b) Electrical $116.05 $116.05 $0.00 [a] 2 Sides: 174 a) Painted $70.51 $70.51 $0.00 [a] 175 b) Electrical $146.90 $146.90 $0.00 [a] Pole /Lineal Foot plus square foot of sign: 176 a) 3" 0 $49.95 $49.95 $0.00 [a] 177 b) 4" 0 $70.51 $70.51 $0.00 [a] 178 c) 6" 0 $91.08 $91.08 $0.00 [a] 179 d) 8" 0 $113.11 $113.11 $0.00 [a] 180 e) 10" 0 $133.68 $133.68 $0.00 [a] 181 f) 12" 0 $152.77 $152.77 $0.00 [a] Photovoltaic Systems 182 Permit And plan check fees for photovoltaic systems shall be assessed at 45% of the fee generated by the declared valuation and the per unit electrical item cost 183 Residential 15 kW Or Less=$500 or 45% of the fee generated by the declared valuation, whichever is less. 184 Residential more than 15 kW=$500 + 15 Per kW over 15 or 45% of the fee generated by the declared valuation, whichever is less. 185 Commercial 50 kW or less = $1,000 or 45% of the fee generated by the declared valuation, whichever is less. 186 Commercial more than 50 kw - 250 kw = $500 + $7 per kW above 50 kW or 45% of the fee generated by the declared valuation, whichever is less. $500 or 45% of the fee by the declared valuation $500 or 45% of the fee by the declared valuation $1,000 or 45% of the fee by the declared valuation $500 + $7 per kW above 50 kW or 45% of the fee generated by the declared valuation $0.00 [a] $0.00 [a] $0.00 [a] $0.00 [a] 8 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Proposed Svc Area Cost Per Cost Per Increase No. Item # Description S.F. Avg. S.F. Avg. (Decrease) Notes 187 Commercial more than 250 kW = $2,400 + 5 kW above 250 kW or 45% of the fee generated by the declared valuation, whichever is less. $2,400 + $5 Per kW above 250 kW or 45% of the fee generated by the declared valuation $0.00 [a] Swimming Pools Valuation based on actual construction cost. Permit fees same as building permits. 188 Minimum Valuation: $19,390.55 $19,390.55 $0.00 [a] Spas 189 Minimum Valuation 190 Prefabricated $3,878.11 $3,878.11 $0.00 [a] 191 Gunite $7,785.60 $7,785.60 $0.00 [a] Surcharge Fees 192 # Optical Records System - Per Permit $15.00 $15.00 $0.00 [a] 193 # General Plan Maintenance - 10% Permit Surcharge To Recover 50% Of Costs 194 # Permit Automation Fee $30.00 $30.00 $0.00 [a] 9 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Proposed No. Svc Area Item # Description Cost Per S.F. Avg. Cost Per S.F. Avg. Increase (Decrease) Notes 195 S-2 # Building Permit Fees Permit Issuance $90.00 $90.00 $0.00 [a] Total Valuation 196 $0.00 [a] 197 $0.00 [a] 198 $0.00 [a] 199 $0.00 [a] 200 $0.00 [a] 201 $0.00 [a] 202 $0.00 [a] 203 $0.00 [a] 204 $0.00 [a] 205 $0.00 [a] 206 $0.00 [a] 207 $0.00 [a] 208 $0.00 [a] 209 $1.00 to $500.00 $36.47 $36.47 $501.00 to $2,000.00 For the 1st $500.00 plus $3.33 for ea. additional $100.00, or fraction thereof, to and including $2,000.00 $36.47 $36.47 $2,001.00 to $25,000.00 For the 1st $2,000.00 plus $15.28 for ea. additional $1,000.00, or fraction thereof, to and including $25,000.00 $107.48 $107.48 $25,001.00 to $50,000.00 For the 1st $25,000.00 plus $11.02 for ea. additional $1,000.00, or fraction thereof, to and including $50,000.00 $607.25 $607.25 $50,001.00 to $100,000.00 For the 1st $50,000.00 plus $7.64 for ea. additional $1,000.00, or fraction thereof, to and including $100,000.00 $999.15 $999.15 $100,001.00 to $ 500,000.00 For the 1st $100,000.00 plus $6.11 for ea. additional $1,000.00, or fraction thereof, to and including $500,000.00 $1,542.38 $1,542.38 $500,001.00 to $1,000,000.00 For the 1st $500,000.00 plus $5.18 for ea. additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $5,019.05 $5,019.05 $1,000,001.00 and up For the 1st $1,000,000.00 plus $3.44 for ea. additional $1,000.00, or fraction thereof $8,705.25 $8,705.25 Other Inspections And Fees: $72.95 $72.95 1. Inspections Outside Of Normal Business Hours (Per Hour) (Minimum Charge - Two Hours) [a] 2. Reinspection Fees Accessed Under Provisions Of Section 305.8 (Per $72.95 $72.95 Hour) [a] 3. Inspections For Which No Fee Is Specifically Indicated (Per Hour) $72.95 $72.95 (Minimum Charge - One-Half Hour) [a] 4. Additional Plan Review Required By Changes, Additions Or Revisions $72.95 $72.95 To Plans (Per Hour) (Minimum Charge - One-Half Hour) [a] 5. For Use Of Outside Consultants For Plan Checking And Inspections, Actual costs Actual costs Or Both [b] [b] [b] [a] Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employee involved. [b] Actual costs include administrative and overhead costs. City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Proposed 10 No. Svc Area Item # Description Cost Per S.F. Avg. Cost Per S.F. Avg. Increase (Decrease) Notes S-3 Electrical Permit Fees 210 Area Fee Rate - Single Family Dwellings (Rate X Area/Sq Ft) $0.11 $0.11 $0.00 [a] Unit Fee Schedule (Note: Does Not Include Permit Issuance Fee) Receptacle, Switch and Lighting, or other. For receptacle, switch lighting, smoke detectors, or other outlets, at which current is used or controlled except services, feeders and meter: 211 First 20, each $1.75 $1.75 $0.00 [a] 212 Additional outlets, each $1.16 $1.16 $0.00 [a] (Note: For multi-outlet assemblies, each 5 ft. or fraction may be considered as 1 outlet.) Lighting Fixtures 213 For lighting fixtures, sockets, or other lamp holding devices: 214 First 20, each $1.75 $1.75 $0.00 [a] 215 Additional fixtures, each $1.16 $1.16 $0.00 [a] 216 For pole or platform mounted lighting fixtures, each $1.75 $1.75 $0.00 [a] 217 For theatrical-type lighting fixtures or assemblies, each $1.75 $1.75 $0.00 [a] Residential Appliances 218 For fixed residential appliances or receptacle outlets for same, including wall-mounts, electric ovens, counter-mounted cooking tops, electric ranges, self-contained room, console, or through-wall air conditioners, space heaters, food waste grinders, dishwasher $8.15 $8.15 $0.00 [a] (Note: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus) Temporary Power Service 219 For a temporary service power pole or pedestal, including all pole or pedestal mounted receptacle outlets and appurtenances, each $34.92 $34.92 $0.00 [a] 220 For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative lighting, Christmas tree sales lots, firework stands, sales booths, additional pole, etc., each $16.29 $16.29 $0.00 [a] Non-Residential Appliances 221 For residential appliances and self-contained, factory-wired, non- residential appliances not exceeding one (1) horsepower (HP), kilowatt (KW), Or kilovolt-ampere (KVA) in rating, including medical and dental devices, food, beverage, and ice cream cabinets $9.31 $9.31 $0.00 [a] Power Apparatus For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, as follows: Rating in horsepower (HP), kilowatts (KW), kilovolt-amperes (KVA), Or kilovolt-amperes-reactive (KVAR) 222 Up to and including 1, each $9.31 $9.31 $0.00 [a] 223 Over 1 and not over 10, each $16.29 $16.29 $0.00 [a] 224 Over 10 and not over 50, each $41.91 $41.91 $0.00 [a] 225 Over 50 and not over 100, each $83.81 $83.81 $0.00 [a] City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Proposed 11 No. Svc Area Item # Description Cost Per S.F. Avg. Cost Per S.F. Avg. Increase (Decrease) Notes 226 Over 100, each $139.69 $139.69 $0.00 [a] Note: 1. For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined rating may be used. Note: 2. These fees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment. Busways 227 For trolley and plug-in type busways, each 100 feet or fraction thereof $23.28 $23.28 $0.00 [a] (Note: an additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-In type busways.) Signs, Outline Lighting, And Marquees 228 For signs, outline lighting systems, or marquees supplied from one branch circuit, each $34.92 $34.92 $0.00 [a] 229 For additional branch circuits within the same sign outline lighting system, or marquee, each $11.63 $11.63 $0.00 [a] Services, Switchboards, Switchboard Sections, Motor Control Centers And Panelboards 230 For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less & not over 200 amperes In rating, each. $34.92 $34.92 $0.00 [a] 231 For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less and not over 200 amperes 1,000 amperes in rating, each $69.85 $69.85 $0.00 [a] 232 For services, switchboards, switchboard sections, motor control centers and panelboards over 600 volts or over 1,000 amperes in rating, each $162.97 $162.97 $0.00 [a] Miscellaneous Apparatus, Conduits And Conductors 233 For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth $34.92 $34.92 $0.00 [a] (Note: This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment. Private Swimming Pools 234 For new private, residential, inground swimming pools for single, or multi-family occupancies, including a complete system of necessary branch circuit wiring, bonding, grounding underwater lighting, water pumping and other similar electrical equipment $69.85 $69.85 $0.00 [a] 235 For other types of swimming pools, therapeutic whirlpools, spas, hot tubs and alterations to existing swimming pools, each $46.57 $46.57 $0.00 [a] Carnivals And Circuses Carnivals, circuses and other traveling shows or exhibitions utilizing transportable-type rides, booths, displays and attractions. 236 For electrical generators and electrical driven rides, each $34.92 $34.92 $0.00 [a] 237 For mechanically driven rides and walk-through attractions or displays having electric lighting, each $13.97 $13.97 $0.00 [a] 238 For a system of area and booth lighting, each $13.97 $13.97 $0.00 [a] City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Proposed 12 No. Svc Area Item # Description Cost Per S.F. Avg. Cost Per S.F. Avg. Increase (Decrease) Notes 239 For permanently installed rides, booths, displays, and attractions $13.97 $13.97 $0.00 [a] Other Inspections For Inspection Of Electrical Equipment For Which No Fee Is Herein Set Forth, The Fee Shall Be Determined By The Building Official S-4 Plumbing Fees 240 Each plumbing fixture or trap or set of fixtures on one trap (including drainage, vent, water piping and backflow prevention devices therefore) $13.97 $13.97 $0.00 [a] 241 Each permanent type dishwasher whether individually trapped or not $13.97 $13.97 $0.00 [a] 242 Each industrial waste pretreatment interceptor including its trap & vent, except kitchen type grease interceptors functioning as fixtures traps $13.97 $13.97 $0.00 [a] 243 Each swimming pool drainage trap & receptor whether connected to a building drain or building sewer (water supply for pool not included) $13.97 $13.97 $0.00 [a] 244 Each gas piping system of 1 to 5 outlets or alteration or retest of existing gas piping system $13.97 $13.97 $0.00 [a] 245 Each additional outlet over five $3.50 $3.50 $0.00 [a] 246 Each gas pressure regulator other than appliance regulators $4.66 $4.66 $0.00 [a] 247 Each water heater and/or vent $13.97 $13.97 $0.00 [a] 248 Each solar potable water heating system, including water heater/vent $46.57 $46.57 $0.00 [a] 249 For repair or alteration of drainage and/or vent piping $13.97 $13.97 $0.00 [a] 250 Each piece of water-treating equipment and/or water piping installed without accompanying plumbing $13.97 $13.97 $0.00 [a] 251 Lawn sprinkler systems on 1 meter including backflow prevention devices $13.97 $13.97 $0.00 [a] 252 Backflow prevention devices on unprotected water supplied, pools, tanks, vats, etc. (including incidental water piping) 1 to 5 $13.97 $13.97 $0.00 [a] 253 Any swimming pool piping associated with the construction, remodeling or repair of a swimming pool, spa and hot tub $38.80 $38.80 $0.00 [a] 254 Each additional device over five (5) $3.50 $3.50 $0.00 [a] 255 Each building drain installed without accompanying plumbing $13.97 $13.97 $0.00 [a] 256 For connection of a house sewer to a public sewer or the extension of a house lateral onto a lot for future use $39.57 $39.57 $0.00 [a] 257 For each house sewer manhole $39.57 $39.57 $0.00 [a] 258 Each installation of a section of house sewer for future use $25.60 $25.60 $0.00 [a] 259 For the connection of each additional bldg. or work to house sewer $25.60 $25.60 $0.00 [a] 260 For the connection of a house sewer to a private sewage disposal $25.60 $25.60 $0.00 [a] 261 For each private sewage disposal system (septic tank & seepage pit or pits and/or drainfield) $81.48 $81.48 $0.00 [a] 262 For each cesspool, overflow seepage pit, percolation test pit, swimming pool drywell, or drainfield extension or replacement $39.57 $39.57 $0.00 [a] 263 For disconnection, abandonment, alteration or repair of any house sewer or private sewage disposal system or part thereof $25.60 $25.60 $0.00 [a] 264 # Annual inspection of fat, oil and grease $160.00 $160.00 $0.00 [a] City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Proposed 13 S-5 Mechanical Permit Fees Installation, alteration or relocation of each refrigeration compressor or absorption unit, & each fuel burning furnace, heater, boiler, and vented decorative appliance including vents attached thereto: 265 Up to & including 100,000 BTU $23.28 $23.28 $0.00 [a] 266 More than 100,000 BTU to & including 1,000,000 BTU $46.57 $46.57 $0.00 [a] 267 More than 1,000,000 BTU $116.40 $116.40 $0.00 [a] 268 For each air inlet & air outlet served by any air conditioning system $4.08 $4.08 $0.00 [a] 269 For each 1,000 sq.ft. or fraction thereof of conditioned area $32.60 $32.60 $0.00 [a] Note: when a permit is applied for and the total number of air inlets & air outlets is unknown, the fees shall be based on the sq.ft. of conditioned area. 270 For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit $11.63 $11.63 $0.00 [a] For the installation or alteration of each air handling unit for air conditioning including ducts attached thereto: 271 Up to & including 2,000 CFM - each unit up to 10 $11.63 $11.63 $0.00 [a] 272 Each unit over 10 $3.50 $3.50 $0.00 [a] 273 More than 2,000 CFM to and including 10,000 CFM $34.95 $34.95 $0.00 [a] 274 More than 10,000 CFM $58.20 $58.20 $0.00 [a] 275 Note: this fee shall not apply to an air handling unit which is a portion of a factory assembled air conditioned appliance for which a permit is required elsewhere in this code. For each evaporative cooler other than portable type $18.63 $18.63 $0.00 [a] 276 For required ventilation fans which serve a single register: 277 Each fan up to 10 $13.97 $13.97 $0.00 [a] 278 Each fan over 10 $4.66 $4.66 $0.00 [a] 279 For each required ventilation system which is not a portion of any air conditioning system for which a permit is required elsewhere in this code $27.94 $27.94 $0.00 [a] 280 For the installation or each commercial kitchen hood or spray booth served by mechanical exhaust, including the fans and ducts attached thereto $58.20 $58.20 $0.00 [a] 281 For the installation of each fire damper $9.31 $9.31 $0.00 [a] 282 Alteration of existing duct system where a permit is not required elsewhere $23.28 $23.28 $0.00 [a] Note: 1) for refrigeration system rating one horsepower, one ton, or 12,000 BTU per hour shall mean the same quantity note: 2) for steam boilers rated in boiler horsepower, one horsepower shall equal 50,000 BTU per hour Svc Area Cost Per Cost Per Increase No. Item # Description S.F. Avg. S.F. Avg. (Decrease) Notes City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved 2015-2016 Proposed 1/19/2016 Proposed 14 No. Svc Area Item # Description Cost Per S.F. Avg. Cost Per S.F. Avg. Increase (Decrease) Notes Plan Check Fees 283 # Building Plan Check Fee - 85% Of Permit Fee - $15.00 Minimum: $0.00 [a] 284 # Electric Plan Check Fee - 80% Of Permit Fee - $15.00 Minimum: $0.00 [a] 285 # Energy Plan Check Fee - 10% Of Building Permit Fee: $0.00 [a] 286 # Mechanical Plan Check Fee - 80% Of Permit Fee - $15.00 Minimum: $0.00 [a] 287 # Plumbing Plan Check Fee - 80% Of Permit Fee - $15.00 Minimum: $0.00 [a] # = Fees not automatically adjusted for CPI change. [a] Building and Safety Fees were originally approved by City Council on July 27, 2015. These fees were not examined as part of the FY 15/16 fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. 15 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved Proposed Proposed Svc Area 2015-2016 1/19/2016 Increase No. Item # Description Fee/Unit Fee/Unit (Decrease) Notes 1 S-045 Grading Plan Check Fee Variable Variable $0 [a] <100 CY - $865 100 - 1,000 CY - $865 Plus $14 Per 100 CY 1,000 - 10,000 CY - $991 Plus $74 Per 1,000 CY 10,000 - 50,000 CY - $1,657 Plus $17 Per 1,000 CY 50,000+ CY - $2,337 Plus $231 Per 10,000 CY 2 S-046 Grading Inspection Variable Variable $0 [a] <100 CY - $345 100 -1,000 CY - $345 Plus $48 Per 100 CY 1,000 - 10,000 CY - $777 Plus $72 Per 1,000 CY 10,000 - 50,000 CY - $1,425 Plus $87 Per 1,000 CY 50,000+ CY - $4,905 Plus $570 Per 10,000 CY 3 Grading Permit Fee - Based On Cubic Yards $170 $170 $0 [a] 4 Permit Fee For Changes To Original Permit: < $20,000 $108 $108 $0 [a] $20,001 to $50,000 $108 $108 $0 [a] $50,001 to $75,000 $147 $147 $0 [a] $75,001 to $100,000 $224 $224 $0 [a] $100,001 to $200,000 $294 $294 $0 [a] $200,000 to $500,000 $379 $379 $0 [a] $500,001 and up $464 $464 $0 [a] 5 Special Site Inspection: $85 $85 $0 [a] Commercial (Minimum 2 Hours) $170 $170 $0 [a] Residential (Minimum 2 Hour) $170 $170 $0 [a] Residential (Non-Habitable Space) (Minimum 2 Hours) $162 $162 $0 [a] 6 # Production Lot Plan Check - Per Lot $202 $202 $0 [a] 7 Occupancy Inspection Fee: 0-1 To 15,000 Sq Ft (1/2 Hour Of Technical Staff Time) $45 $45 $0 [a] 15,000 Sq.Ft. On (1 Hour Of Technical Staff Time) $85 $85 $0 [a] 8 Bonds For Sign(s) (Refundable) $256 $256 $0 [a] 9 Demolition Permit Fee (Minimum 1 Hour) $99 $99 $0 [a] 10 Deputy Inspection Registration Fee (Deputy) $45 $45 $0 [a] 11 Emergency Inspection Fee (Minimum 1 Hours) $139 $139 $0 [a] 12 Hearing Officer Actual Cost Actual Cost $0 [a] 13 Pre-Plan Check Submittal (Minimum 2 Hours) $177 $177 $0 [a] 14 Reinspection Fee (Minimum 1 Hour) $93 $93 $0 [a] 15 Room Addition Plan Check Fee (Minimum 2 Hours) $177 $177 $0 [a] 16 Trailer Coach $170 $170 $0 [a] 17 Trash Enclosure - $10 for additional enclosure $69 $69 $0 [a] 18 Relocation Of Buildings: 0 to 2,000 sq.ft. $401 $401 $0 [a] 2,001 to 5,000 sq.ft. $752 $752 $0 [a] 5,001 sq.ft. and up $1,084 $1,084 $0 [a] 19 Plan Checking Fee: Staff rates assessed against deposit. Executive Staff - per hour $154 $154 $0 [a] Professional Staff - per hour $110 $110 $0 [a] 16 City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Approved Proposed Proposed Svc Area 2015-2016 1/19/2016 Increase No. Item # Description Fee/Unit Fee/Unit (Decrease) Notes Technical Staff (Plan Checker/Inspector) - per hour $93 $93 $0 [a] 20 On-Site Improvement Inspections: $2,000 deposit required for parking lot paving and miscellaneous testing Professional Staff - Per Hour $110 $110 $0 [a] Rates applied against deposit Technical Staff - Per Hour $93 $93 $0 [a] Rates applied against deposit 21 Standard Plan Check Fee: Professional Staff - Per Hour $110 $110 $0 [a] Technical Staff - Per Hour $93 $93 $0 [a] # = Fees not automatically adjusted for CPI change. [a] Building and Safety Fees were originally approved by City Council on July 27, 2015. These fees were not examined as part of the current fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. 17 City of Azusa Schedule of Fees and Charges (Development-Related) PLANNING Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Fee Type Increase (Decrease) Notes 1 S-001 Zoning Clearance $49 $78 flat fee $28 [a] 2 S-002 Design Review - Minor (over the counter) $1,274 $1,849 flat fee $575 [a] 3 S-003 # Staff Level Design Review: a) Modifications to Existing Structures $350 $350 flat fee $0 [a] b) All Others $3,402 $4,148 flat fee $746 [a] 4 S-004 # Design Review - Major $10,000 $10,000 deposit $0 [a],[b] 5 S-005 Major Use Permit $4,759 $5,414 flat fee $655 [a] 6 S-005A Minor Use Permit $782 $1,031 flat fee $249 [a] 7 S-006 Use Permit Modifications: a) Modifications To Major UP $2,226 $2,720 flat fee flat fee $494 [a] b) Modifications To Minor UP $558 $570 flat fee $12 [a] 8 S-008 Variance - Minor $897 $1,395 flat fee $498 [a] 9 S-009 # Variance a) Involving Single-Family Structure 940 $1,000 flat fee $60 [a] b) All Others $4,491 $5,198 flat fee $707 [a] 10 S-010 # Zone Change $5,000 $5,000 deposit $0 [a],[b] 11 S-011 # Development Code Amendment $5,000 $5,000 deposit $0 [a],[b] 12 S-012 # Development Agreement a) Development Agreement Deposit $10,000 $10,000 deposit $0 [a],[b] # b) Annual Monitoring Deposit $5,000 $5,000 deposit $0 [a],[b] 13 S-013 # General Plan Amendment $15,000 $15,000 deposit $0 [a],[b] 14 S-014 # Specific Plan $10,000 $10,000 deposit $0 [a],[b] 15 S-015 # Specific Plan Amendment $5,000 $5,000 deposit $0 [a],[b] 16 S-016 Tentative Parcel Map $6,275 $7,608 flat fee $1,333 [a] 17 S-017 Tentative Tract Map: a) 5-20 Lots $6,794 $7,936 flat fee $1,142 [a] b) 20-50 Lots $8,157 $9,250 flat fee $1,093 [a] c) 50-100 Lots $11,281 $12,462 flat fee $1,181 [a] d) 100+ Lots $12,681 $13,922 flat fee $1,241 [a] 18 S-018 Reversion To Acreage $2,139 $2,577 flat fee $438 [a] 19 S-019 Lot Merger $1,373 $1,608 flat fee $235 [a] 20 S-020 Environmental Categorical Exemption Rev. $218 $310 flat fee $92 [a] 20 S-021 Environmental Initial Study $4,026 $4,602 flat fee $576 [a] 21 S-023 # Mitigated Negative Declaration $10,000 $10,000 deposit $0 [a],[b] 22 S-023 # Environmental Impact Report Preparation $10,000 $10,000 deposit $0 [a],[b] 23 S-023 # Environmental Impact Report Review $10,000 $10,000 deposit $0 [a],[b] 24 S-024 # Mitigation Monitoring - CEQA Monitoring $5,000 $5,000 deposit $0 [a],[b] 25 S-025 # Annexation $10,000 $10,000 deposit $0 [a],[b] 26 S-026 Condominium Conversion Map: a) Map Fee $5,077 $6,053 flat fee $976 [a] b) Plus Consultant Fee Actual Cost Actual Cost flat fee $0 [a] 27 S-027 Minor Sign Review $49 $78 flat fee $29 [a] 28 S-028 Major Sign Review $514 $853 flat fee $339 [a] 29 S-029 Zoning Letter: a) Single Family Residential $136 $155 flat fee $19 [a] b) Other $311 $465 flat fee $154 [a] 30 S-030 Temporary Occupancy Review $519 $539 flat fee $20 [a] 31 S-031 Temporary Use Permit 18 City of Azusa Schedule of Fees and Charges (Development-Related) PLANNING Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Fee Type Increase (Decrease) Notes a) Temporary Use Permit Fee $486 $500 flat fee $14 [a] b) Azusa Based Non-Profit Organizations $364 $375 flat fee $11 [a],[c] 32 S-032 Continuance Processing $508 $620 flat fee $112 [a] 33 S-033 Time Extension Review - Staff $350 $465 flat fee $115 [a] 34 S-034 Time Extension Review - Planning Comm'sn $782 $1,046 flat fee $264 [a] 35 S-035 # Appeal To Planning Commission $1,739 $500 flat fee ($1,239) [a] 36 S-036 # Appeal To City Council $2,768 $1,000 flat fee ($1,768) [a] 37 S-15 Preliminary Plan Review $1,482 $1,675 flat fee $193 [a],[d] 38 S-15A Nonconforming Use Time Extension $769 $775 flat fee $6 [a] 39 S-037 Certificate Of Compliance $1,187 $1,368 flat fee $181 [a] 40 S-038 Street Name Processing W/O Map $1,187 $1,329 flat fee $142 [a] 41 S-039 Street Re-Name Processing $1,635 $1,794 flat fee $159 [a] 42 S-040 Building Address Processing W/O Map $678 $864 flat fee $186 [a] 43 S-041 Building Re-Address Processing $399 $620 flat fee $221 [a] 44 S-041A Com Dev Newspaper Publication $235 Actual Cost flat fee varies [a] 45 S-044 Special Building Inspection (2 Hour Min.) $120 $155 flat fee $35 [a] [a] Fee change, if any, based on findings and recommendations of current fee study. [b] Charges to be billed at fully-burdened hourly rates, including costs of outside service providers, if any. All costs recovered. [c] Azusa-based non-profit organizations receive a 25% discount from standard TUP fee. [d] Fee is per meeting. 50% of the fee for the first meeting is applied against future Planning/Engineering fee for the project. # = Fees not automatically adjusted for CPI change. 19 City of Azusa Schedule of Fees and Charges (Development-Related) ENGINEERING Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit * 1/19/2016 Fee/Unit * Fee Type Increase (Decrease) Notes 1 S-047 Public/Private Improvement Plan Check: # a) $0-$100K Valuation (% of est cost) 3% 3% flat fee 0% [a] # b) Next $400K Valuation (% of est cost) 2.5% 2.5% flat fee 0% [a] # c) > $500K Valuation (% of est cost) 2.0% 2.0% flat fee 0% [a] 2 S-048 Public/Private Improvement Inspection: # a) $0-$100K Valuation (% of est cost) 5% 5% flat fee 0% [a] # b) Next $400K Valuation (% of est cost) 3.5% 3.5% flat fee 0% [a] # c) > $500K Valuation (% of est cost) 2.0% 2.0% flat fee 0% [a] 3 S-049 Final Parcel Map $1,173 $1,049 flat fee ($124) [a] 4 S-050 Final Tract Map a) 5 - 10 Lots $1,852 $2,372 flat fee $520 [a] b) 11 - 25 Lots $2,923 $3,540 flat fee $617 [a] c) 26 - 50 Lots $3,877 $5,000 flat fee $1,123 [a] d) 51 - 100 Lots $5,948 $7,336 flat fee $1,388 [a] e) 101 - 150 Lots $6,876 $8,212 flat fee $1,336 [a] f) > 150 Lots $8,341 $9,964 flat fee $1,623 [a] 5 S-051 Easement Check $327 $329 flat fee $2 [a] 6 S-052 Monument Inspection: a) First Monument $226 $292 flat fee $66 [a] b) Each Additional Monument $226 $73 flat fee ($153) [a] 7 S-053 Bond Processing $95 $146 flat fee $51 [a] 8 S-055 Lot Line Adjustment $1,318 $1,676 flat fee $358 [a] 9 Street Light Banner Installation/Removal $0 $72 flat fee $72 [a] 10 S-056 # Street/Right-of-Way Abandonment $2,000 $2,000 deposit $0 [a],[b] 11 S-056A SUSMP/LID Plan Review $1,750 $1,907 flat fee $157 [a] 12 S-056B SWPPP Plan Review $1,630 $1,752 flat fee $122 [a] 13 S-056B BMP Review n/a $292 flat fee n/a [a] 14 S-056C Hydrology/Drainage Plan Review $1,500 $1,752 flat fee $252 [a],[c] 15 S-056C Soils Review $1,500 $292 flat fee ($1,208) [a],[c] 16 S-056C Traffic Study Review $1,500 $730 flat fee ($770) [a],[c] 17 S-057 Sidewalk/Curb/Gutter Encroachment a) Up to 75 LF $519 $438 flat fee ($81) [a] b) Each Add'l 75 LF $169 $146 flat fee ($23) [a] 18 S-057A Street Cut Encroachment a) Up to 100 SF $519 $438 flat fee ($81) [a] b) Each Add'l 100 SF $224 $146 flat fee ($78) [a] 19 S-057B Driveway Approach $519 $365 flat fee ($154) [a] 20 S-058 Obstruction Permit $93 $146 flat fee $53 [a] 21 S-059 Transportation Permits (Oversized And/Or Overweight Trucks): # a) Single Trip/Rider $18 $16 flat fee ($2) [a],[d] # b) Annual Permit $99 $90 flat fee ($9) [a],[d] 22 S-060 # House Moving Permit $1,028 $2,000 deposit $972 [b],[e] City of Azusa Schedule of Fees and Charges (Development-Related) ENGINEERING Approved Proposed Proposed 20 No. Svc Area Item # Description 2015-2016 Fee/Unit * 1/19/2016 Fee/Unit * Fee Type Increase (Decrease) Notes 23 S-060A Industrial Waste Permit a) New/Modified $678 $1,022 flat fee $344 [a] b) Renewal $224 $292 flat fee $68 [a] 24 S-060B Fats,Oils And Grease Program a) New $448 $511 flat fee $63 [a] b) Annual $169 $219 flat fee $50 [a] 25 S-061 Sewer Saddle $317 $438 flat fee $121 [a] 26 Sewer Dye Test 27 Sewer Blockage Check See Utility Fees See Utility Fees [f] [f] * All amounts shown are base fees. Applicants are also be responsible for any consultant or other agency fees (e.g. LA County) incurred. [a] Fee change, if any, based on findings and recommendations of current fee study. [b] Charges to be billed at fully-burdened hourly rates, including costs of outside service providers, if any. All costs recovered. [c] Previous fee was deposit. Amount has been converted to flat fee. [d] Fee set to match CalTrans. [e] Previous fee was flat fee. Amount has been converted to deposit. [f] These fees were not examined as part of the current fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. # = Fees not automatically adjusted for CPI change. 28 S-062 # Blueprint/Map Copy Service, Per Sheet (or actual outside costs) $21 $20 flat fee ($1) [a] 29 # Project Plans/Specifications - Plus $10 If Mailed $52 $50 flat fee ($2) [a] 30 Verification of Conditions $161 $161 flat fee $0 [f] 31 Agreement And/Or Improvement Security, Each $213 $213 flat fee $0 [f] 32 Extension Time For Improvement Agreement, Each $291 $291 flat fee $0 [f] 33 Submittals in Excess of Three a) Fourth Submittal $402 $402 flat fee $0 [f] b) Sixth Submittal $1,409 $1,409 flat fee $0 [f] c) Eighth And Each Subsequent Submittal $1,680 $1,680 flat fee $0 [f] 34 Minor Land Division - Lot Split $595 $595 flat fee $0 [a] 35 Recording Fee: # a) First Sheet $8 $8 flat fee $0 [f] # b) Additional Sheets, Each $2 $2 flat fee $0 [f] 36 LDMA Surcharge (County Maps Only): # a) Tract Map $401 $401 flat fee $0 [f] # b) Parcel Map $135 $135 flat fee $0 [f] 37 # Expedited Plan Review $937 - $1,344 1.5x fee flat fee n/a [a] 38 # Consultant (Invoice + 36% Overhead) Invoice + 36% O'H Invoice + 30% O'H flat fee -6% [a] 39 S-6.5 Code Compliance Fee $37 $37 flat fee $0 [f] 40 S-7 # Landscape Design Standards (OTC Sales) $6 $6 flat fee $0 [f] 41 S-18 City-Provided Tree Planting - One 15 Gal Tree $109 $109 flat fee $0 [f] 42 City-Provided Tree Plant'g - One 24" Box Tree $188 $188 flat fee $0 [f] 43 Time Extension n/a $73 flat fee n/a [a] 44 S-6.3 Engineering Hourly Rate for in-House Staff varies $146 flat fee n/a [a] City of Azusa Schedule of Fees and Charges (Development-Related) UTILITIES Approved Proposed Proposed 21 No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Fee Type Increase (Decrease) Notes Utility Services 1 S-105 New Utility Account Setup: # a) Connect Fee $45 $45 flat fee $0 [a] # b) Same Day Connection (7:00am-3:00pm) $35 $35 flat fee $0 [a] # c) Same Day Connection (3:00pm-5:30pm) $85 $85 flat fee $0 [a] # d) Fri 7am-8pm (Elec, Wtr, or Both) $105 $105 flat fee $0 [a] # e) Sat, Sun Or Holiday 7am-8pm (Elec, Wtr, or Both) $205 $205 flat fee $0 [a] # f) Positive Identification Check - $1.25 $1.25 $1.25 flat fee $0.00 [a] 2 S-106 Utility Delinquent Turn Off/On: # a) 7am-3pm $35 $35 flat fee $0 [a] # b) 3pm-5:30pm $85 $85 flat fee $0 [a] # c) Fri 7am-8pm (Elec, Wtr, or Both) $105 $105 flat fee $0 [a] # d) Sat, Sun or Holiday 7am-8pm (Elec, Wtr, or Both) $205 $205 flat fee $0 [a] e) Late Payment Penalty, The Greater Amount Of Either: # i) Base Penalty Fee $7.50 $7.50 flat fee $0.00 [a] # ii) Percent Of Total Outstanding Balance 5% 5% flat fee 0% [a] 3 S-107 Theft Of Water/Light Investigation: # a) Investigation Fee $250 $500 flat fee $250 [a] # b) Damages And Estimated Usage Actual Cost Actual Cost flat fee $0 [a] 4 S-108 Water Pressure Test: # a) 1st Test Free Per Calendar Year $0 $0 flat fee $0 [a] # b) Additional Test $165 $165 flat fee $0 [a],[b] # c) Main Line $165 $400 flat fee $235 [a] 5 S-109 # Water Meter Test (Fully Allocated Hrly Rate) Bill Hourly Bill Hourly deposit $0 [a] 6 S-110 Water Quality Test: # a) Test Fee $125 $125 flat fee $0 [a] # b) Plus Lab Costs Actual Cost Actual Cost flat fee $0 [a] 7 S-111 # Flow Test $275 $300 flat fee $25 [a] 8 S-112 Temporary Meter Rental Services: # a) Meter Fee (Per Each Meter) $130 $130 flat fee $0 [a] # b) Deposit $1,000 $1,000 deposit $0 [a] 9 S-113 New Water Meter Installation: # a) Installation Fee $200 $250 flat fee $50 [a] b) Plus Material Costs Actual Cost Actual Cost deposit $0 [a] 10 S-131D Water Meter Fee # a) 3/4" $272 $272 flat fee $0 [a] # b) 1" $343 $343 flat fee $0 [a] # c) 1.5" $485 $485 flat fee $0 [a] # d) 2" $556 $556 flat fee $0 [a] # e) > 2" Dev/Owner Req'd to Procure Dev/Owner Req'd to Procure deposit $0 [a] 11 S-131E # Jumper Fee (per service) $100 $100 flat fee $0 [a] City of Azusa Schedule of Fees and Charges (Development-Related) UTILITIES Approved Proposed Proposed 22 No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Fee Type Increase (Decrease) Notes 12 S-114 New Water Service Installation: # a) 3/4" - 1" $3,000 $3,500 deposit $500 [a] # b) 2" $3,200 $4,000 deposit $800 [a] # c) 4" $7,432 $7,500 deposit $68 [a] # d) 6" $9,382 $9,500 deposit $118 [a] 13 S-131H Hot Tap Fee: # a) 1" $275 $300 flat fee $25 [a] # b) 2" $280 $300 flat fee $20 [a] # c) 4" $350 $350 flat fee $0 [a] # d) 6" $400 $400 flat fee $0 [a] # e) 8" $450 $450 flat fee $0 [a] # f) 10" $450 $450 flat fee $0 [a] # g) 12" $525 $525 flat fee $0 [a] 14 S-131C Fire Service Installation: # a) 4" $5,055 $7,500 deposit $2,445 [a] # b) 6" $7,077 $9,500 deposit $2,423 [a] # c) 8" $8,088 $10,500 deposit $2,412 [a] # d) 10" $10,110 $11,500 deposit $1,390 [a] # e) 12" $12,132 $12,500 deposit $368 [a] 15 S-131B # Water Disconnection From The Mainline $3,200 $3,200 deposit $0 [a] 16 S-131F # Fire Hydrant Relocation / Inspection Fee $1,500 $1,500 flat fee $0 [a] 17 S-131G Traffic Incident Hit Hydrant Impact Fee: # a) Impact Fee $1,500 $1,500 flat fee $0 [a] # b) Additional Cost Of Repair & Water Loss Actual Cost Actual Cost flat fee $0 [a] 18 S-115 # New Backflow Device Inspection Review $340 $340 flat fee $0 [a] 19 S-116 # Annual Backflow Device Inspection Review $80 $80 flat fee $0 [a] 20 Water Plan Check $0 $200 flat fee $200 [a] 21 Water Improvement Inspection (per hour) $125 $125 per hour $0 [a] 22 Will-Serve Letter $0 $25 flat fee $25 [a] 23 S-117 # Water Service No change to various rates based on service Various Various variable $0 [d] 24 S-118 Sewer Blockage Check: # a) Minimum Charge $500 $500 deposit $0 [a] # b) Fully Allocated Hourly Rates Bill Hourly Bill Hourly deposit $0 [a] # c) Charge If City Causes Blockage $0 $0 flat fee $0 [a] 25 S-119 # Sewer Dye Test $115 $115 flat fee $0 [d] 26 S-120 Emergency Sewage Spill Response: # a) Spill Response Actual Cost Actual Cost deposit $0 [a] # b) Fully Allocated Hourly Rate For All Responding Personnel Bill Hourly Bill Hourly deposit $0 [a] # c) Charge If City Causes Spill $0 $0 flat fee $0 [a] 27 S-121 Wastewater Service: Various Various variable $0 [d] 28 Electric Plan Check $0 $200 flat fee $200 [a] 29 S-122 Electric Meter Test: [b] # a) First Test Per Calendar Year $0 $0 flat fee $0 [a] # b) Residential $160 $160 flat fee $0 [a] # c) Commercial $370 $370 flat fee $0 [a] City of Azusa Schedule of Fees and Charges (Development-Related) UTILITIES Approved Proposed Proposed 23 No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Fee Type Increase (Decrease) Notes # d) Industrial $440 $440 flat fee $0 [a] 30 S-123 Total Electrical Service Re-Install: # a) Re-Install Fee $740 $740 deposit $0 [a] # b) Additional Materials Actual Cost Actual Cost deposit $0 [a] 31 S-124 Additional Electric Span Install: # a) Install Fee $725 $725 deposit $0 [a] # b) Plus Materials Actual Cost Actual Cost deposit $0 [a] 32 S-125 Temporary Electric Installation: # a) Install $740 $740 deposit $0 [a] # b) Additional Material Costs Actual Cost Actual Cost deposit $0 [a] 33 S-126 Temp Single Phase Transformer Installation: # a) Installation Fee (Minimum) $3,098 $3,098 deposit $0 [a] # b) Additional Material Costs Actual Cost Actual Cost deposit $0 [a] 34 S-127 Temp Three Phase Transformer Installation: # a) Installation Fee (Minimum) $6,200 $6,200 deposit $0 [a] # b) Additional Material Costs Actual Cost Actual Cost deposit $0 [a] 35 S-128 Electric Line Extension/Upgrade: # a) Extension/Upgrade Actual Cost Actual Cost deposit $0 [a] # b) Fully Allocated Hourly Rates Bill Hourly Bill Hourly deposit $0 [a] 36 S-129 Electric Services Various Various variable $0 [c],[d] 37 S-130 # Banner Installation $580 $580 flat fee $0 [d] 38 S-131 # After Hours Standby/Call Out (2 Hour Min.) Bill Hourly Bill Hourly deposit $0 [a] 39 S-131A # Inspection Rate (Per Hour) Bill Hourly Bill Hourly deposit $0 [a] 40 S-131 # # Water System Development Fees: a) Residential i) Per Acre $11,668.64 $11,668.64 flat fee $0 [d] # ii) Per Dwelling Unit $1,944.86 $1,944.86 flat fee $0 [d] b) Multi-Family Residential # i) Per Acre $19,930.90 $19,930.90 flat fee $0 [d] # # ii) Per Dwelling Unit c) Commercial i) Per Acre $1,245.70 $8,943.81 $1,245.70 $8,943.81 flat fee flat fee $0 $0 [d] [d] # # ii) Per SF d) Industrial i) Per Acre $0.89 $9,625.35 $0.89 $9,625.35 flat fee flat fee $0 $0 [d] [d] # ii) Per SF $0.38 $0.38 flat fee $0 [d] e) School # i) Per Acre $7,538.09 $7,538.09 flat fee $0 [d] f) Park # i) Per Acre $3,449.62 $3,449.62 flat fee $0 [d] 41 S-131 # # Water System Annexation Fees: a) Residential i) Per Acre $5,038.97 $5,038.97 flat fee $0 [d] # ii) Per Dwelling Unit $847.42 $847.42 flat fee $0 [d] b) Multi-Family Residential # i) Per Acre $8,684.31 $8,684.31 flat fee $0 [d] # ii) Per Dwelling Unit $542.78 $542.78 flat fee $0 [d] City of Azusa Schedule of Fees and Charges (Development-Related) UTILITIES Approved Proposed Proposed 24 Svc Area 2015-2016 1/19/2016 Fee Increase No. Item # Description Fee/Unit Fee/Unit Type (Decrease) Notes [d] [d] [d] [d] # = Fees not automatically adjusted for CPI change. [a] Fee change, if any, based on findings and recommendations of current fee study. [b] Test fee refunded if there is a system problem. [c] Rate varies depending on type of services and usage, time of year, and time of day. [d] Development fees, annexation fees, usage rates, etc. were originally approved by City Council on July 27, 2015. These fees were not examined as part of the FY 15/16 fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. c) Commercial i) Per Acre $3,896.54 $3,896.54 flat fee $0 ii) Per SF d) Industrial i) Per Acre $0.38 $4,194.05 $0.38 $4,194.05 flat fee flat fee $0 $0 ii) Per SF $0.16 $0.16 flat fee $0 e) School # i) Per Acre $3,284.47 $3,284.47 flat fee $0 [d] f) Park # i) Per Acre $1,503.31 $1,503.31 flat fee $0 [d] 25 City of Azusa Schedule of Fees and Charges (Development-Related) COMMUNITY IMPROVEMENT Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes 1 S-063 Real Property Records Report a) Condominium/Townhouses $54 $98 $44 [a] b) Vacant/Unimproved Land $175 $197 $22 [a] c) Single Family Dwellings d) Multi-Family Dwelling i) Per Parcel, First Unit $175 $175 $197 $197 $22 $22 [a] [a] ii) Each Add'l Unit $10 $11 $1 [a] e) Commercial Properties $175 $197 $22 [a] 2 S-064 Residential Rental Housing Registration And Inspection: a) Per Parcel - Includes First Unit $114 $114 $0 [a] i) Additional Unit $7 $7 $0 [a] b) Reinspection $85 $85 $0 [a] 3 S-032.5 Weed Abatement Inspection (Processing and Referring) $329 $329 $0 [a] 4 S-95.1 # Recovery and Storage of Abandoned Shopping Carts $12 $12 $0 [a] 5 S-066 # Appeal/Hearing $110 $110 $0 [a],[b] 6 S-065 # Lien Release a) Substandard $100 $100 $0 [c] # b) Admin Fine $80 $80 $0 [c] 7 S-066C # Code Enforcement Fines a) First Offense $100 $100 $0 [b],[c] # b) Second Offense $250 $250 $0 [b],[c] # c) Third Offense $500 $500 $0 [b],[c] [a] Fee change, if any, based on findings and recommendations of current fee study. [b] FY 15/16 adopted fee schedule inadvertently identified antiquated amounts. Correct amounts are shown. [c] Administrative citation and fine amounts were not examined as part of the FY 15/16 fee study. No modifications to these amounts are considered as part of the proposed January 19, 2016 fee updates. # = Fees not automatically adjusted for CPI change. 26 City of Azusa Schedule of Fees and Charges (Development-Related) FIRE SAFETY Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes S-1.1 Fire Safety (Per Hour) 1 Fire Plan Check $105 $105 $0 [a] 2 Fire Alarm System $105 $105 $0 [a] 3 Fire Extinguisher Service $105 $105 $0 [a] 4 Flammable Storage $105 $105 $0 [a] 5 Hood System $105 $105 $0 [a] 6 Spray Booths $105 $105 $0 [a] 7 Subdivision Plan Checking $105 $105 $0 [a] Fire Permit Fees 8 Occupancy Inspection - Per Hour $105 $105 $0 [a] 9 Christmas Tree Lot Inspection - Per Hour $105 $105 $0 [a] 10 Circus/Carnival Inspection - Minimum 2 Hours $210 $210 $0 [a] 11 Flammable Liquid Tank Site Inspection - Minimum 3 Hours $314 $314 $0 [a] 12 Liquid Petroleum Gasses - Per Hour $105 $105 $0 [a] 13 Magnesium Working - Minimum 2 Hours $210 $210 $0 [a] 14 Motor Vehicle Repair Garages - Per Hour $105 $105 $0 [a] 15 Oxygen System Installation - Minimum 2 Hours $210 $210 $0 [a] 16 Storage/Handling Flammable Liquids - Minimum 2 Hours $210 $210 $0 [a] 17 Underground Tank Installation - Minimum 4 Hours $420 $420 $0 [a] 18 Underground Tank Removal - Minimum 3 Hours $314 $314 $0 [a] 19 Fireworks Stands - Minimum ½ Hour $53 $53 $0 [a] 20 Metal Foundry - Minimum 2 Hours $210 $210 $0 [a] 21 Places Of Assembly - Minimum 2 Hours $210 $210 $0 [a] 22 Pyrotechnical Special Effects - Per Hour $105 $105 $0 [a] 23 Public Rifle/Gun Ranges - Minimum 2 Hours $210 $210 $0 [a] 24 Tire Storage Areas In Excess Of 1,000 Cu. Ft. - Per Hour $105 $105 $0 [a] 25 Automobile Dismantling/Storage Yards - Minimum 2 Hours $210 $210 $0 [a] 26 27 Commercial Woodworking Facilities With Dust Collection Systems Greater Than 25 Gallons - Minimum 2 Hours Educational/Daycare Centers - Minimum 3 Hours $210 $314 $210 $314 $0 $0 [a] [a] Miscellaneous Fire Fees (Per Hour) 28 Residential Inspection Per Sec. 13146.2 Of H&S Code $105 $105 $0 [a] 29 Engine Company Standby $105 $105 $0 [a] 30 Hazardous Materials Response $105 $105 $0 [a] 31 Special Inspections $105 $105 $0 [a] 32 Weed Abatement (Processing & Referral) $105 $105 $0 [a] [a] Fire Safety Fees were originally approved by City Council on July 27, 2015. These fees were not examined as part of the FY 15/16 fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. 27 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) POLICE Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes 1 S-067 # Noise Disturbance Response Full Cost Recovery After 2nd Response Variable Variable $0 [a] Alarm Users Alarm Fees 2 S-068 Alarm Registration and Renewal # a) Registration and Renewal $25 $25 $0 [a],[b] # b) Senior Residential 65+, Permanently Disabled, or Low Income $12 $12 $0 [a],[b] 3 # Appeal Fee, per request $25 $25 $0 [a] Alarm Fines 4 # Registration Late Charge $25 $25 $0 [a] 5 # Alarm Fee Late Charge - All fees and fines late $25 $25 $0 [a] 6 # Reinstatement Fee $100 $100 $0 [a] 7 # Automatic Dialing Device $100 $100 $0 [a] 8 # Audible Alarm Violation $100 $100 $0 [a] 9 Burglar False Alarm Response - Registered Alarm: [c] # a) First Response (fee may be waived with online school attendance) $50 $50 $0 [a] # b) Second Response $75 $75 $0 [a] # c) Third Response $125 $125 $0 [a] # d) Fourth Response $175 $175 $0 [a] # e) Fifth Response $225 $225 $0 [a] # f) Six or More $275 $275 $0 [a] 10 Burglar False Alarm Response - Non-registered Alarm Site: [c] # a) First Response $150 $150 $0 [a] # b) Second Response $175 $175 $0 [a] # c) Third Response $225 $225 $0 [a] # d) Fourth Response $275 $275 $0 [a] # e) Fifth Response $325 $325 $0 [a] # f) Six or More $375 $375 $0 [a] 11 Robbery/Panic False Alarm Response (Resid/Comm) Permit Holder [c] # a) Per Response $100 $100 $0 [a] 12 Robbery/Panic False Alarm Response (Resid/Comm) Non- Permit Holder [c] # a) First Response $150 $150 $0 [a] # b) Second Response $175 $175 $0 [a] # c) Third Response $225 $225 $0 [a] # d) Fourth Response $275 $275 $0 [a] # e) Fifth Response $325 $325 $0 [a] # f) Six or More $375 $375 $0 [a] 13 Operating Suspended Alarm System # a) One $200 $200 $0 [a] # b) Two or More $300 $300 $0 [a] Alarm Company Alarm Fines 14 # Failure to Report New Install $50 $50 $0 [a] 15 # Failure to Report Disconnect $50 $50 $0 [a] 28 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) POLICE Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes 16 # False Alarm Caused by Alarm Company $100 $100 $0 [a] 17 # Employee False Statement $200 $200 $0 [a] 18 # Failure to Use Enhanced Call Verification Procedures $100 $100 $0 [a] 19 # All Late Charges $25 $25 $0 [a] 20 # Suspension Reinstatement Fee and Mailing Costs $200 $200 $0 [a] a) Additional Fee Per Customer, if Contacted $10 $10 $0 [a] Alarm Fee 21 # Appeal Fee, per request $25 $25 $0 [a] 22 S-069 # DUI Accident Response Investigation Charge At Fully Allocated Hourly Rates. Not to exceed $12,000 per incident by State Law. Variable Variable $0 [a] 23 S-070 Equipment Citation Verification # a) Citation Issued by Azusa PD $0 $15 $15 [a] # b) Citation Issued by Other PD $15 $15 $0 [a] 24 S-071 Vehicle VIN Verification $44 $44 $0 [a] 25 S-072 Public Safety At Special Events: a) Officer - Per Hour $135 $135 $0 [a] b) Reserve Officer $38 $38 $0 [a] 26 S-072A # Booking Services $135 $135 $0 [a] 27 S-073 Entertainment Permit: a) Temporary $301 $301 $0 [d] b) Regular $1,204 $1,204 $0 [d] c) Renewal $1,204 $1,204 $0 [d] 28 S-074 Dance Permit: a) One Time $48 $48 $0 [d] b) Annual $48 $48 $0 [d] 29 S-074A Pawn Shop Permit $1,495 $1,495 $0 [d] 30 S-074B Massage Parlor Permit $553 $553 $0 [d] 31 S-074C Carnival Worker Permit $153 $153 $0 [d] 32 S-075 Vehicle Impound Fees # a) Standard Release $150 $150 $0 [d] # b) DUI Release $400 $400 $0 [d] 33 S-076 # Repossessed Vehicle Release $16 $15 ($1) [a],[e] 34 S-077 # Police Records Check/Clear Letter $27 $25 ($2) [a] 35 S-078 # Immigration Letters $27 $25 ($2) [a] 36 S-079 # Public Safety Application Background Check n/a n/a $0 [a] 37 S-081 # Photograph Service Fee (Cost of CD is included) $10 $10 $0 [c] 38 S-082 Video/Audio Tape/Cd Reproduction: # a) Dispatch Tape (911 Tape) $110 $110 $0 [d] # b) Video/Audio Reproduction $85 $85 $0 [d] 39 S-083 Police Incident/Crime Report Copy: # a) Document <4 Pages In Length $0.00 $0.00 $0.00 [a] # b) First Sheet (>4 Page Document) $0.60 $0.65 $0.05 [a] # c) Each Additional Sheet (>4 Page Document) $0.20 $0.20 $0.00 [a] 40 S-084 Special Computer Search - Per Hour $93 $93 $0 [a] 29 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) POLICE Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes 41 S-085 Civil Subpoena Processing # a) Subpoena Processing Fee (Per Request) $20 $20 $0 [a] # b) Additional Reproduction Cost Actual Cost Actual Cost $0 [a] # c) Additional Deposit + Travel (Per Day, Regulated Fee) $275 $275 $0 [a],[c] 42 S-086 Duces Tecum Subpoena Processing # a) Subpoena Processing Fee (Per Request) $15 $15 $0 [a] # b) Additional Reproduction Cost Actual Cost Actual Cost $0 [a],[c] 43 S-087 Animal Regulation: # a) Dog License - Unaltered- 1 Year License $60 $60 $0 [a] # b) Dog License - Altered - 1 Year License $20 $20 $0 [a] # c) Senior Rate - 1 Pet Altered $7.50 $7.50 $0.00 [a] # d) Duplicate $10 $10 $0 [a] # e) Delinquency Charge Equal to License Fee Equal to License Fee $0 [a] # f) Field Enforcement (licensing initiated in the field) $40 $40 $0 [a] Voluntary Cat Licenses # a) One Year - Altered $5 $5 $0 [a] # b) One Year - Unaltered $10 $10 $0 [a] # c) Microchip - With Licensing Of Altered Pet Free Free $0 [a] S-020 Vehicle Code Enforcement 44 # Improper Display Of License Plates (CVC 5200(a)) $48 $48 $0 [d] 45 # Improper Display Of Tabs (CVC 5204(a)) $73 $73 $0 [d] 46 # Blkg. Driveway/Garage Entrance (CVC 22500(e) $48 $48 $0 [d] 47 # No Parking On Sidewalk (CVC 22500(f)) $50 $50 $0 [d] 48 # No Parking Alongside Pkd. Veh./Dbl.Pkg. (CVC 22500(h)) $38 $38 $0 [d] 49 # Blkg. Disabled Access Ramp (CVC 22500(I)) $263 $263 $0 [d] 50 # Fire Accessway/Fire Lane (CVC 22500.1) $68 $68 $0 [d] 51 # Parking 18 Inches Form Curb/Wrong Way (CVC 22502(a), AMC 74-441) $48 $48 $0 [d] 52 # Parking In Disabled Zone (CVC 22507.8(a)) $343 $343 $0 [d] 53 # Blk./Obstruct Disabled Zone (CVC 22507.8(b)) $338 $338 $0 [d] 54 # Parking On Disabled Crosshatch (CVC 22507.8(c)(2)) $338 $338 $0 [d] 55 # Fire Hydrant (CVC 22514) $48 $48 $0 [d] S-021 Parking Enforcement 56 # Parking In Excess Of 72 Hours (AMC 74-438(a)) $38 $38 $0 [d] 57 # Parking For Purpose Of Sale (AMC 74-439(1)) $63 $63 $0 [d] 58 # Not Parked Within Painted Lines (AMC 74-443) $28 $28 $0 [d] 59 # Red Curb (AMC 74-449(a)(1)) $51 $51 $0 [d] 60 # No Parking In Alley (AMC 74-450) $52 $52 $0 [d] 61 # 18” From Curb Or Facing Wrong Way (AMC 74-441, CVC 22502(a)) $51 $51 $0 [d] 62 # Prohibited By Signs / Markings (AMC 74-446) $51 $51 $0 [d] 63 # Limited Or Prohibited Parking (AMC 74-453) $51 $51 $0 [d] 64 # Parking on Private Property Without Consent (AMC 74-463 (b)) $38 $38 $0 [d] 65 # Commercial Veh. Over 10,000 Lbs. +/Over 60 Minutes (AMC 74-466) $85 $85 $0 [d] 66 # Detached Trailer On Street (AMC 74-466 (B)) $68 $68 $0 [d] City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) POLICE Approved Proposed Proposed 30 No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes 67 # Parking On Front Yard Prohibited (AMC 74-468) $38 $38 $0 [d] 68 S-022 # General Code Enforcement Actual Cost Actual Cost $0 [d] 69 # Impound & Collision Tow Service-Per Hr. (Minimum 1 Hr.) Variable Variable $0 [d] 70 Storage Fees - Per Day # a) Automobiles And Light Trucks Variable Variable $0 [d] # b) Trucks Over 1 Ton Variable Variable $0 [d] # c) Semi-Truck And Trailer Variable Variable $0 [d] # d) Motorcycle Variable Variable $0 [d] 71 S-025 # Accident Report Investigation. Fee Set By State Law. $20 $20 $0 [d] 72 S-027 # Alarm Monitoring Service Actual Cost Actual Cost $0 [d] 73 S-028 # Jail $104 $104 $0 [d] 74 S-032.1 # Court Order Custody Reimbursement Fee Per 24-Hour Period Or Fraction Thereof $104 $104 $0 [d] 75 S-032.4 # Paramedic Service Actual Cost Actual Cost $0 [d] 76 S-032.5 Traffic Collision Report # a) Injury $25 $25 $0 [d] # b) Non-Injury $12 $12 $0 [d] 77 Comm Srvc Officer Special Event Fees (Per Hour) $96 $96 $0 [d] 78 Police Aide Special Event Fees (Per Hour) $23 $23 $0 [d] [a] Fee change, if any, based on findings and recommendations of current fee study. [b] FY 15/16 adopted fee schedule inadvertently identified renewal fee as $16. Correct amount is shown. [c] FY 15/16 adopted fee schedule inadvertently identified antiquated amounts. Correct amounts are shown. [d] Items were originally approved by City Council on July 27, 2015. These items were not examined as part of the FY 15/16 fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. [e] Fee set by State. # = Fees not automatically adjusted for CPI change. City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) ADULT BUSINESSES 31 No. Svc Area Item Description Approved 2015-2016 Fee/Unit Proposed 1/19/2016 Fee/Unit Proposed Increase (Decrease) Notes Business Licenses 1 Adult-oriented business license: # a) License Fee See Business License See Business License $0 [a] # b) Partial Pmt of Fees - Add'l Charge $16 $16 $0 [a] 2 Adult Business License Application Fee: # a) Application Fee $190 $190 $0 [a] # b) Partial Pmt of Fees - Add'l Charge $16 $16 $0 [a] 3 Initial Business License Fee: # a) Initial License Fee See Business License See Business License $0 [a] # b) Partial Pmt of Fees - Add'l Charge $16 $16 $0 [a] 4 Annual Renewal Fee: # a) Renewal Fee $39 $39 $0 [a] # b) Partial Pmt of Fees - Add'l Charge $16 $16 $0 [a] 5 Adult Business License Appeal Fee: # a) License Appeal Fee $2,537 $2,537 $0 [a] # b) Partial Pmt of Fees - Add'l Charge $16 $16 $0 [a] 6 # Live Entertainer License Actual time spent at hourly rate of involved City staff, charged against $2,500 initial deposit Actual time spent at hourly rate of involved City staff, charged against $2,500 initial deposit $0 [a] 7 # Figure Model License Actual time spent at hourly rate of involved City staff, charged against $2,500 initial deposit Actual time spent at hourly rate of involved City staff, charged against $2,500 initial deposit $0 [a] 8 # Live Entertainer/Figure Model License Renewal Actual time spent at hourly rate of involved City staff, charged against $2,500 initial deposit Actual time spent at hourly rate of involved City staff, charged against $2,500 initial deposit $0 [a] Planning 1 # Interim Adult Use Planning Permit Actual time spent at hourly rate of involved City staff, charged against $5,000 initial deposit Actual time spent at hourly rate of involved City staff, charged against $5,000 initial deposit $0 [a] 2 # Final Adult Use Planning Permit Actual time spent at hourly rate of involved City staff, charged against $5,000 initial deposit Actual time spent at hourly rate of involved City staff, charged against $5,000 initial deposit $0 [a] 3 # Extension of Amortization Actual time spent at hourly rate of involved City staff, charged against $5,000 initial deposit Actual time spent at hourly rate of involved City staff, charged against $5,000 initial deposit $0 [a] [a] Business license related taxes, permitting and licensing fees were originally approved by City Council on July 27, 2015. These fees were not examined as part of the FY 15/16 fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. 32 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) BUSINESS LICENSES Approved Proposed Proposed Svc Area 2015-2016 1/19/2016 Increase No. Item # Description Fee/Unit Fee/Unit (Decrease) Notes 1 S-133 Application Fee - New Business # a) Outside Contractor $56 $56 $0 [a] # b) Reinstate Outside Contractor $43 $43 $0 [a] # c) Rental Business $56 $56 $0 [a] # d) All Others $187 $187 $0 [a] 2 # First Offense Administrative Penalty For Business License Related Violations $250 $250 $0 [a] 3 S-134 # Home Occupation Permit $93 $93 $0 [a] 4 S-135 # New Taxi/Tow Truck Permit $574 $574 $0 [a] 5 S-136 # Massage Parlor Technician Permit $1,105 $1,105 $0 [a] # Massage Business Operators Permit $2,159 $2,159 $0 [a] # Massage Facility Inspection $266 $266 $0 [a] 6 S-137 # Application Fee - Renewal $23 $23 $0 [a] 7 # Field Collection Fee On Delinquent Accounts $28 $28 $0 [a] 8 # Partial Payment Of Fees - Additional Charge $15 $15 $0 [a] 9 S-138 # Business License Duplicates $14 $14 $0 [a] 10 S-139 # Printouts Of Business License Lists $22 $22 $0 [a] 11 S-140 Solicitor Permit-All # a) 1st Solicitation $62 $62 $0 [a] # b) Each Additional Permit $41 $41 $0 [a] 12 S-141 # Yard Sale Permit Not required Not required $0 [a],[b] 13 S-142 # Bingo Permit $50 $50 $0 [a] 14 S-143 # Fireworks Stand Permit $355 $355 $0 [a] 15 S-96 # Filming Or Other Use Of City Facilities - Per Day 25% Discount for Azusa-based nonprofit organizations $1,342 $1,342 $0 [a] 16 # Filming On Private Property $300 $300 $0 [a] 17 S-97 # Registration Fee For Non-Profit Businesses Within A Commercial Building (i.e. banks, schools, etc.) $44 $44 $0 [a] [a] Business license related taxes, permitting and licensing fees were originally approved by City Council on July 27, 2015. These fees were not examined as part of the FY 15/16 fee study. No modifications to these fees are considered as part of the proposed January 19, 2016 fee updates. [b] Ordinance No. 07-05, Approved By Council On 05/07/07 # = Fees not automatically adjusted for CPI change. 33 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) RECREATION Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes 1 S-33 Aquatics Program Swimming Lessons: a) Children/Group i) 25 Minutes $30 $31 $1 [a] ii) 40 Minutes $40 $41 $1 [a] b) Children/Private c) Adult/Group i) 25 Minutes $30 $30 $31 $31 $1 $1 [a] [a] ii) 40 Minutes $40 $41 $1 [a] d) Adult/Private $30 $31 $1 [a] 2 Swimming Team: a) 1st Session (Includes Shirts And Swim Cap) i) First Child (Same Family) $65 $65 $0 [a] ii) Additional Child (Same Family) $55 $55 $0 [a] b) 2nd Session i) First Child (Same Family) $55 $55 $0 [a] ii) Additional Child (Same Family) $45 $45 $0 [a] 3 Water Exercise - Adults $40 $40 $0 [a] 4 Lifeguard Training Class $125 $125 $0 [a] 5 Aqua Zumba $20 $20 $0 [a] 6 S-34 # Recreation Swimming - Day Swim: a) 12 Years Old & Under Includes Slide $0.50 $1 $0.50 [a] # b) Teens - Up To 17 Years Includes Slide $2 $2 $0 [a] # c) Seniors - 50 years And Older $1 $1 $0 [a] # d) Adults - 18 Years And Older Includes Slide $2 $2 $0 [a] # e) Lap Swim - Adult 18 And Over $2 $2 $0 [a] # f) Lap Swim - Seniors $0.50 $0.50 $0.00 [a] 7 Recreation Swimming - Season Pass: a) Children - 12 Years Old & Under $30 $31 $1 [a] b) Teens - Up To 17 Years $40 $41 $1 [a] c) Seniors - 50 Years And Older $40 $41 $1 [a] d) Adults - 18 Years And Older $50 $51 $1 [a] 8 S-35 Swimming Pool Rental (2 Hours): a) 1-100 People $350 $350 $0 [a] b) 101-250 People $450 $450 $0 [a] c) 251-350 People $550 $550 $0 [a] d) Swimming Pool Rental Deposit (Refundable) $200 $200 $0 [a] e) Additional - Water Slide $100 $100 $0 [a] f) Water Slide Rental Deposit (Refundable) $50 $50 $0 [a] g) Non- Resident Fee (Additional) $0 $150 $150 [a] 9 10 S-36 S-38 # Leisure Classes Adult Sports Programs Adult Baseball: a) Weeknights varies $450 varies $450 $0 $0 [a] * [a] b) Weekends $500 $500 $0 [a] 11 Adult Softball $300 $300 $0 [a] 12 Adult Basketball $350 $350 $0 [a] 34 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) RECREATION Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes 13 Adult Volleyball $185 $185 $0 [a] 14 Golf Tournament $125 $125 $0 [a] 15 Adult Flag Football $300 $300 $0 [a] 16 Adult Futsal (Indoor Soccer) $185 $185 $0 [a] 17 Adult Kickball $185 $185 $0 [a] 18 S-41 Youth Sports Programs Pony Baseball: a) Regular Fee $75 $75 $0 * [a] b) Additional Child - Same Family $65 $65 $0 [a] 19 Winter Pony Baseball: a) Regular Fee $45 $45 $0 [a] b) Additional Child - Same Family $40 $40 $0 [a] 20 Mighty-Mite Baseball (T-Ball/Coach Pitch): a) Regular Fee $45 $45 $0 [a] b) Additional Child - Same Family $40 $40 $0 [a] 21 Mighty-Mite Basketball: a) Regular Fee $45 $45 $0 [a] b) Additional Child - Same Family $40 $40 $0 [a] 22 Mighty-Mite Flag Football: a) Regular Fee $45 $45 $0 [a] b) Additional Child - Same Family $40 $40 $0 [a] 23 Mighty-Mite Soccer: a) Regular Fee $45 $45 $0 [a] b) Additional Child - Same Family $40 $40 $0 [a] 24 Flag Football (T-Shirt Uniforms): a) New $30 $30 $0 [a] b) Returning $25 $25 $0 [a] c) Additional Child - Same Family - New $25 $25 $0 [a] d) Additional Child - Same Family - Returning $20 $20 $0 [a] 25 Basketball (T-Shirt Uniforms): a) New $30 $30 $0 [a] b) Returning $25 $25 $0 [a] c) Additional Child - Same Family - New $25 $25 $0 [a] d) Additional Child - Same Family - Returning $20 $20 $0 [a] 26 Summer Basketball (Include Uniform): a) Regular Fee $50 $50 $0 [a] b) Additional Child - Same Family $45 $45 $0 [a] 27 Volleyball (T-Shirt Uniforms): a) New $35 $35 $0 [a] b) Returning $30 $30 $0 [a] c) Additional Child - Same Family - New $30 $30 $0 [a] d) Additional Child - Same Family - Returning $25 $25 $0 [a] 28 Soccer (T-Shirt Uniforms): a) New $30 $30 $0 [a] b) Returning $25 $25 $0 [a] c) Additional Child - Same Family - New $25 $25 $0 [a] d) Additional Child - Same Family - Returning $20 $20 $0 [a] 35 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) RECREATION Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes 29 S-41.1 Athletic Field Rental Ball Diamond Rental: * a) Drag, Line And Water Field-Prepared $25 $25 $0 [a] b) Staff, Scorekeeping - Per Hour $15 $15 $0 [a] c) Use Of Scoreboards $15 $15 $0 [a] d) Field Rental-No Lights $30 $30 $0 [a] e) Field Rental-With Lights $40 $40 $0 [a] f) Use Of Bases $15 $15 $0 [a] g) Deposit For Use Of Bases $200 $200 $0 [a] h) Use Of Strike Zone Mat $15 $15 $0 [a] i) Non-Resident Fee (Except Memorial Park) (Additional) $25 $50 $25 [a] 30 Athletic Field Charge (Green Space): a) Memorial Park - Per Hour (Lights Not Included) $60 $60 $0 [a] b) Northside South Field Area - (Lights Not Included) $60 $60 $0 [a] c) Zacatecas Park $60 $60 $0 [a] d) Gladstone Park (Lights Not Included) $30 $30 $0 [a] e) Lights Included $60 $60 $0 [a] f) Non-Resident Fee (Except Memorial Park) (Additional) $25 $50 $25 [a] S-43 Golden Days Special Events 31 2K/5K Run/Walk: a) Youth i) Pre-Registration $5 $5 $0 [a] ii) Day Of The Event $10 $10 $0 [a] b) Adult i) Pre-Registration $15 $15 $0 [a] ii) Day Of The Event $20 $20 $0 [a] 32 S-44 Children's Day Camp: a) Registration Fee (One-Time) $20 $20 $0 [a] b) New $90 $90 $0 [a] c) New - 2nd Child In Same Family $88 $88 $0 [a] d) Returning $80 $80 $0 [a] e) Returning - 2nd Child In Same Family $78 $78 $0 [a] 33 Summer Day Camp: a) Registration Fee (One-Time) $20 $20 $0 [a] b) New $20 $20 $0 [a] c) Returning $18 $18 $0 [a] 34 S-47 Recreation Special Events Trunk or Treat Food/Novelty vendor $25 $25 $0 [a] 35 Tournament Of Champions Finals At APU Events Center: a) Adults $3 $3 $0 [a] b) Student $2 $2 $0 [a] c) Child (3-11) $1 $1 $0 [a] 36 Volleyball Clinic $25 $25 $0 [a] 37 Junior Olympic Track (Per School) $100 $100 $0 [a] 38 Cinco De Mayo Food Vendor $75 $75 $0 [a] 39 Winter Fiesta Food Vendor $75 $75 $0 [a] 40 Memorial Park Facilities Rental Memorial Park Facilities: 36 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) RECREATION Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes a) Meeting Room i) Normal Hours $30 $30 $0 [a] ii) Outside Normal Hours $40 $40 $0 [a] iii) Non-Resident Fee (Additional) $50 $100 $50 [a] b) Gym or Main Room i) Normal Hours $40 $40 $0 [a] ii) Outside Normal Hours $60 $60 $0 [a] iii) Non-Resident Fee (Additional) $125 $175 $50 [a] c) Kitchen i) Resident $50 $50 $0 [a] ii) Non-Resident $25 $50 $25 [a] d) Cleaning $50 $50 $0 [a] 41 Cinco De Mayo (Novelty And Craft Vendor Fees) $40 $40 $0 [a] 42 Holiday Crafts (Vendors Fees) $40 $40 $0 [a] 43 Bounce House Application Usage $20 $20 $0 [a] 44 Non-Resident Fee (Additional) $20 $40 $20 [a] 45 Picnic Shelter Rental Picnic Shelter Application Rental (Gladstone Park): a) Section # 1 $25 $26 $1 [a] b) Section # 2 $25 $26 $1 [a] c) Section # 3 $25 $26 $1 [a] d) Non-Resident Fee (Additional) $25 $50 $25 [a] 46 Picnic Shelter Application Rental (Memorial Park): a) Single Shelter (Section # 2,3,4 & 5) $25 $26 $1 [a] b) Double Shelter (Section # 1& 6) $35 $36 $1 [a] c) Non-Resident Fee (Additional) $25 $50 $25 [a] 47 Picnic Shelter Application Rental (Northside Park): a) S-Leg Section # 1 $25 $26 $1 [a] b) S-Leg Section # 2 $25 $26 $1 [a] c) S-Leg Section # 3 $25 $26 $1 [a] d) S-Leg Section # 4 $25 $26 $1 [a] e) S-Leg Section # 5 (Includes Serving Table) $35 $36 $1 [a] f) Non-Resident Fee (Additional) $25 $50 $25 [a] 48 Picnic Shelter Application Rental (Pioneer Park): a) NE Section # 1 (Double Shelter) $35 $36 $1 [a] b) NE Section # 2 $25 $26 $1 [a] c) NE Section # 3 $25 $26 $1 [a] d) Gazebo Shelter #4 $45 $46 $1 [a] e) Non-Resident Fee (Additional) $25 $50 $25 [a] 49 Picnic Shelter Application Rental (Zacatecas Park): a) NE Section # 1 Double Shelter $35 $36 $1 [a] b) NW Section # 2 $25 $26 $1 [a] c) SE Section # 3 Double Shelter $35 $36 $1 [a] d) SW Section # 4 $25 $26 $1 [a] e) NE Section # 5 Double Shelter $35 $36 $1 [a] f) Non-Resident Fee (Additional) $25 $50 $25 [a] 50 Picnic Shelter Application Rental (Slauson Park): 37 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) RECREATION Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes a) Section #1 $25 $26 $1 [a] b) Section #2 $25 $26 $1 [a] c) Section #3 $25 $26 $1 [a] d) Section #4 $25 $26 $1 [a] e) Non-Resident Fee (Additional) $25 $50 $25 [a] 51 Picnic Shelter Application Rental (Veterans Freedom Park): a) Gazebo #1 $25 $26 $1 [a] b) Gazebo #2 $25 $26 $1 [a] c) Non-Resident Fee (Additional) $25 $50 $25 [a] 52 Picnic Shelter Application Rental (Rancho Park): a) Section #1 $25 $26 $1 [a] b) Non-Resident Fee (Additional) $25 $50 $25 [a] 53 Picnic Shelter Application Rental (Alisal Park): a) Section #1 $35 $36 $1 [a] b) Section #2 $35 $36 $1 [a] c) Non-Resident Fee (Additional) $25 $50 $25 [a] * Additional fees may apply for use of game officials. Amounts vary. [a] Fee change, if any, based on findings and recommendations of current fee study. # = Fees not automatically adjusted for CPI change. 38 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) WOMAN'S CLUB, SENIOR CENTER AND NORTH RECREATION CENTER (NRC) Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes 1 S-48 Woman's Club Rental To Public Coordinated By Contractor: # # a) Weekdays Meetings - 8 A.M. - 5 P.M. (Add'l Hours $75 Each) b) Friday Evening Event $250 $300 $250 $300 $0 $0 [a] [a] # c) Saturday Afternoon Event (Until 5P.M.) $400 $400 $0 [a] # d) Saturday Evening $800 $800 $0 [a] # e) Sunday Event (Anytime) $400 $400 $0 [a] # f) Event Liability Insurance Varies Varies $0 [a] # g) Security Deposit (Refundable, Deposit To Hold Date) $300 $300 $0 [a] # # h) Patio Wedding Ceremony (Fee Split Between City And Contractor) i) Additional Time > 5 Hours (Per Hour, Split Between City $300 $250 $300 $250 $0 $0 [a] [a] # And Contractor) j) Teen Party (Anytime): $700 $700 $0 [a] # k) Cleaning Fee $100 $100 $0 [a] 2 # l) Decorating Fee Outside Normal Hours Of Operation (Per Hour) Woman's Club-For Azusa Based Non-Profit Organizations: $15 $15 $0 [a] # # a) Building Rental (Per Hour Including Setup And Clean Up Time) b) Kitchen (Flat Fee) $50 $75 $50 $75 $0 $0 [a] [a] # c) Damage Deposit $500 $500 $0 [a] # d) Staffing (Per Hour) $15 $15 $0 [a] # e) Cleaning Fee $100 $100 $0 [a] # f) Event Liability Insurance Varies Varies $0 [a] # g) Alcohol Liability Insurance $200 $200 $0 [a] 3 # Gazebo At City Hall $300 $300 $0 [a] 4 S-48.2 # Senior Lunch Program (Suggested) Donation $2 $2 $0 [a] 5 Rental Of Memorial Park North Recreation Center: a) Small Class Rooms: (Per Hour) # i) Non-Profit $30 $30 $0 [a] # ii) For Profit $50 $50 $0 [a] b) Large Room: (Per Hour) # i) Non-Profit $60 $60 $0 [a] # ii) For Profit $75 $75 $0 [a] c) Kitchen: (Per Hour) # i) Non-Profit $50 $50 $0 [a] # ii) For Profit $75 $75 $0 [a] d) Staffing: (Per Hour) # i) Non-Profit $30 $30 $0 [a] # ii) For Profit $30 $30 $0 [a] # e) Cleaning Fee (Maximum Fee) $225 $225 $0 [a] # f) Security Deposit: (Refundable Deposit) $300 $300 $0 [a] # g) Non-Resident Fee (Flat Rate) (Additional) $50 $100 $50 [a] # h) Event Liability Insurance Varies Varies $0 [a] 6 S-48.3 # # i) Decorating Fee Outside Normal Hours Of Operation (Per Hour) Rental Of Senior Center: $15 $15 $0 [a] 39 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) WOMAN'S CLUB, SENIOR CENTER AND NORTH RECREATION CENTER (NRC) Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes a) Small Class Rooms: (Per Hour) # i) Non-Profit $30 $30 $0 [a] # ii) For Profit $50 $50 $0 [a] b) Large Room: (Per Hour) # i) Non-Profit $50 $50 $0 [a] # ii) For Profit $90 $90 $0 [a] c) Kitchen: (Flat Fee) # i) Non-Profit $50 $50 $0 [a] # ii) For Profit $75 $75 $0 [a] d) Staffing: (After Hours Only, Minimal Per Hour) # i) Non-Profit $30 $30 $0 [a] # ii) For Profit $30 $30 $0 [a] # e) Cleaning Fee (Maximum) $225 $225 $0 [a] f $300 $300 $0 [a] g $50 $100 $50 [a] h H $15 $15 $0 [a] [a] Fee change, if any, based on findings and recommendations of current fee study. # = Fees not automatically adjusted for CPI change. City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) TRANSPORTATION Approved Proposed Proposed 40 No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes Monthly Foothill Transit Passes 1 Senior/Disabled: # a) Regular Rate $22 $22 $0 [a] # b) Discounted Rate $19 $19 $0 [a] 2 Student K-12: # a) Regular Rate $33 $33 $0 [a] # b) Discounted Rate $27.75 $27.75 $0 [a] 3 Local Lines: # a) Regular Rate $70 $70 $0 [a] # b) Discounted Rate $56 $56 $0 [a] 4 Silver Streak: # a) Regular Rate $105 $105 $0 [a] # b) Discounted Rate $85 $85 $0 [a] 5 Commuter Express: # a) Regular Rate $170 $170 $0 [a] # b) Discounted Rate $150 $150 $0 [a] Dial-A-Ride Transit (one-way) 6 Medical and Social Services: # a) Azusa, Covina, Duarte, Glendora $0.50 $0.50 $0 [a] # b) Baldwin Park, Monrovia, San Dimas, West Covina $1.50 $1.50 $0 [a] 7 # Non-Medical Appointments Limited to City Limits $0.50 $0.50 $0 [a] 8 # Senior Lunch Program $0.25 $0.25 $0 [a] Metrolink Monthly Passes 9 # City residents save $25 on monthly pass Variable Variable $0 [a],[b] 10 # Employees of Azusa Businesses receive $15 or a match of the amount offered by employer up to a limit of $25 Variable Variable $0 [a],[b] Access 11 # Base Books (10 Coupons Per Book) $27.50 $27.50 $0 [a] 12 # Plus Books (10 Coupons Per Book) $7.50 $7.50 $0 [a] * Discounted Passes Are Available To Eligible Users And On A First Come-First Serve Basis. [a] Fee change, if any, based on findings and recommendations of current fee study. [b] Varies Depending On Point Of Origin And Destination. # = Fees not automatically adjusted for CPI change. City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) LIBRARY Approved Proposed Proposed 41 No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes 1 S-097 # Inter-Library Loan Processing: a) Processing Fee $2 $2 $0 [a] b) Plus Postage Actual Cost Actual Cost $0 [a] 2 S-099 # Lost Library Card Processing $3 $3 $0 [a] 3 S-100 # Processing Overdue Material: a) Per Item Per Day - Adult $0.25 $0.30 $0.05 [a] # b) Per Item Per Day - Child $0.10 $0.15 $0.05 [a] 4 S-101 # Lost/Damage Library Material Processing: a) Processing Fee (plus the cost of the item) $15 $15 $0 [a] # b) Missing AV Case (Audio Book, DVD, & CD) $1 $1 $0 [a] # c) Missing Bar Code $1 $1 $0 [a] # d) Missing Pamphlet- AV Materials & Books $1 $1 $0 [a] 5 S-102 # Passport Application (Rate Set by Fed. Govt.) $25 $25 $0 [a] 6 S-103 # DVD Rental Per Item (For Two Days) $1.50 $0 ($1.50) [a] 7 S-104 Rental Of Library Auditorium: a) For Profit # i) During Business Hours - Per Hour (Min. 3 Hours) $25 $25 $0 [a] # ii) Outside Business Hours - Per Hour (Min. 3 Hours) $25 $35 $10 [a] b) Non-Profit Organizations - Outside Azusa # i) During Business Hours - Per Hour (Min. 3 Hours) $15 $15 $0 [a] # ii) Outside Business Hours Per Hour (Min. 3 Hours) Variable Variable $0 [a] # c) Resident Non-Profit & Government (Minimum 3 Hours) No Charge No Charge $0 [a] 8 S-104B # Library Fax Service: a) Domestic - Per Page $2 $2 $0 [a] # b) International - First Page $4 $4 $0 [a] # c) International - Additional Page $1 $1 $0 [a] 9 # Library Cards No Charge No Charge $0 [a] 10 # Personal Computer Usage: a) First 2 Hours No Charge No Charge $0 [a] # b) Excess Of 2 Hours $2 $2 $0 [a] # c) Guest Pass (Non Library Cardholders) $2 $2 $0 [a] 11 S-53 # Photocopy Charges Per Page: a) Black & White Copies $0.15 $0.15 $0 [a] # b) Color Copies $0.25 $0.25 $0 [a] 12 S-54 # Merchandise Sales: a) USB Drives Actual Cost Variable $0 [a] # b) Canvas Bags Actual Cost Variable $0 [a] # c) Ear Buds Actual Cost Variable $0 [a] [a] Fee change, if any, based on findings and recommendations of current fee study. # = Fees not automatically adjusted for CPI change. 42 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) GIS MAPS Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes S-16.1 Paper Map Products 1 City Map Books $13 $13 $0 [a] 2 A Size Plot; 8.5 X 11 $13 $13 $0 [a] 3 A Size Plot: 8.5 X 11 With Photo $20 $20 $0 [a] 4 B Size Plot: 11 X 17 $13 $13 $0 [a] 5 B Size Plot: 11 X 17 With Photo $21 $21 $0 [a] 6 C Size Plot: 17 X 22 $32 $32 $0 [a] 7 C Size Plot: 17 X 22 With Photo $44 $44 $0 [a] 8 D Size Plot: 34 X 22 $63 $63 $0 [a] 9 D Size Plot: 34 X 22 With Photo $83 $83 $0 [a] 10 E Size Plot: 34 X 46 $101 $101 $0 [a] 11 E Size Plot: 34 X 46 With Photo $165 $165 $0 [a] 12 Zoning Citywide Book (11 X 17 Sheets) $63 $63 $0 [a] 13 City General Plan Land Use Or Zoning Map (3 X 5 Ft.) $32 $32 $0 [a] 14 City General Plan Land Use Or Zoning Map (6 X 6 Ft.) $63 $63 $0 [a] 15 Hourly Charge For Custom Mapping Work $83 $93 $10 [a] 16 # Public Notice Radius Maps And Labels $240 $240 $0 [a] [a] Fee change, if any, based on findings and recommendations of current fee study. # = Fees not automatically adjusted for CPI change. 43 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) ADMINISTRATIVE PROCESSING COSTS Approved Proposed Proposed No. Svc Area Item # Description 2015-2016 Fee/Unit 1/19/2016 Fee/Unit Increase (Decrease) Notes 1 Credit Card Processing Fee 0% 2% 2% [a],[b] 2 S-144 Returned Check Processing - 1st and 2nd Check # a) First Check $48 $35 ($13) [a],[c] # b) Each Additional Check $48 $25 ($23) [a],[c] 3 S-145 # Re-Issuance Of Lost Checks $65 $65 $0 [a] 4 S-146 Document Reproduction: # a) Document <4 Pages In Length $0 $0 $0 [a] # b) First Sheet (>4 Page Document) $0.66 $0.65 ($0.01) [a] # c) Each Additional Sheet (>4 Page Document) $0.20 $0.20 $0.00 [a] # d) Per Sheet Charge for Certain Documents Specified in Gov't Code $0.10 $0.10 $0.00 [a],[c] 5 S-146.1 # Documents Reproduced on CD/DVD $5 $5 $0 [a] 6 S-147 # Document Certification $32 $15 ($17) [a] 7 S-149 # Candidate Processing $25 $25 ($0) [a],[c] 8 S-149A # Initiative Processing $200 $200 $0 [a],[c] 9 S-150 # Notary Service For Each Signature Taken $10 $10 ($0) [a],[c] 10 S-150A Project Specifications And Plans: # a) Base Fee $52 $50 ($2) [a] # b) Additional Mailing Fee (If Mailed) $10 $10 $0 [a] 11 S-88.1 # Processing Of Payroll Garnishments Per Transactions $0 $0 $0 [a],[d] 12 S-93 Records Research Service: # a) Document And Supplies Actual Cost Actual Cost $0 [a] b) Per Hour Fee (1/4 Hour Increments) $25 $26 $1 [a] 13 14 S-94 S-48.1 Bond Issuance And Administration - (Includes Extra $50 Per Hour) Rental Of Civic Center Auditorium: $387 $387 $0 [e] # # a) During City's Normal Business Hours Until 4:00pm (Per Hour) b) After 4:00pm, Weekends Or Holidays (Per Hour) $53 $106 $50 $100 ($3) ($6) [a] [a] # c) Non-Resident Groups - Additional Fee Per Event $51 $100 $49 [a] # d) Discount For Azusa-Based Non-Profit Organizations 25% 25% $0 [a] [a] Fee change, if any, based on findings and recommendations of current fee study. [b] Fee applies to all payments made directly to the City, via credit card. (Example scenario - For $100 fee, paid via credit card, the total amount charged will be $102 (2% of $100). [c] Fees Set By State. [d] Fees set by court order. [e] Fee originally approved by City Council on July 27, 2015. Fee not examined as part of the FY 15/16 fee study. No modification to fee is considered as part of the proposed January 19, 2016 fee updates. # = Fees not automatically adjusted for CPI change. Appendix C - Cost of Service and Cost Recovery Analysis 1 2 Cost of Service Calculations - Planning 3 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Input cells shaded in gray Community Development Department - Planning Allocation of Annual Labor Effort Position Economic & Comm Dev Director Associate Planner Assistant Planner Total Calculation of Productive Hours 4,888 Annual Hours - Standard 728 2,080 2,080 Annual Hours - Paid Overtime - - - - Less: Annual Leave 126 360 360 846 Productive Hours 602 1,720 1,720 4,042 Indirect Activities and Services General Administration and Management 416 88 88 592 Certification and Training 14 40 40 94 Non-Private Development Activities 16 56 56 128 Long-Range Planning 32 88 88 208 Development Related Punitive Code Enforcement 32 88 88 208 Public Info and Assist 40 264 264 568 Total Indirect Activities and Services Work Hours 550 624 624 1,798 Direct Private Development Activities 52 1,096 1,096 2,244 Salary $ 56,025 $ 83,685 $ 59,550 $ 199,260 Benefits $ 30,250 $ 37,675 $ 34,695 $ 102,620 Total $ 86,275 $ 121,360 $ 94,245 $ 301,880 Indirect Activities and Services 69% 5% 5% 23% General Administration and Management Certification and Training 2% 2% 2% 2% Non-Private Development Activities 3% 3% 3% 3% Long-Range Planning 5% 5% 5% 5% Development Related Punitive Code Enforcement 5% 5% 5% 5% Public Info and Assist 7% 15% 15% 13% Total Indirect Activities and Services Work Hours 91% 36% 36% 52% Direct Private Development Activities 9% 64% 64% 48% Source: Labor allocation based on FY 15/16 Adopted Budget and verbal feedback received from Community Development Director on October 21, 2015. Estimated leave assumes 120 hours holiday, 120 hours vacation, 120 hours sick. Actual leave amounts vary based on length of employment with city and employee classification. Amounts are intended to serve as reasonable estimates. 4 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Input cells shaded in gray Community Development Department - Planning Fully-Burdened Hourly Rate Calculation Labor Expenditures [a] Description Total Notes Salaries Benefits $ 199,260 $ 102,620 Total - Labor Expenditures $ 301,880 Recurring Non-Labor Expenditures [b] Description FY 2015/16 Budget Adjustment Subtotal Notes Dues & Subscriptions Meetings & Conferences Mileage Reimbursement Professional Services/Other Commission Meetings Expense Books Publications/Other Office Supplies Printing, Binding & Duplicating Supplies/Special Advertising Expense Maint & Repair/Equipment Maint/Office Furniture & Equip Lease Payments Utilities/Telephone $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 2,000 5,200 500 75,000 3,000 250 200 1,000 400 500 5,000 100 500 500 300 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - - - (50,000) - - - - - - (5,000) - - - - $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 2,000 5,200 500 25,000 3,000 250 200 1,000 400 500 - 100 500 500 300 [c] [d] Total $ 94,450 $ (55,000) $ 39,450 Citywide Overhead Description Est. C'wide Overhead Notes Estimated Citywide Overhead $ 80,639 [e] Total $ 80,639 Total Allocable Expenditures Description Amount Notes Labor Non-Labor Estimated Citywide Overhead $ 301,880 $ 39,450 $ 80,639 Total $ 421,969 Calculation of Fully-Burdened Hourly Rate Annual Allocation Citywide Targeted Recovery from Amount Recoverable Targeted Description [a] Labor Non-Labor Overhead Total Fees from Fees Hourly Rate General Administration and Management 23% $ 70,650 $ 9,233 $ 18,872 $ 98,754 82% $ 81,437 $ 36 Certification and Training 2% $ 7,020 $ 917 $ 1,875 $ 9,813 100% $ 9,813 $ 4 Non-Private Development Activities 3% $ 9,313 $ 1,217 $ 2,488 $ 13,017 0% $ - $ - Long-Range Planning 5% $ 15,617 $ 2,041 $ 4,172 $ 21,829 0% $ - $ - Development Related Punitive Code Enforcement 5% $ 15,617 $ 2,041 $ 4,172 $ 21,829 0% $ - $ - Public Info and Assist 13% $ 38,825 $ 5,074 $ 10,371 $ 54,270 100% $ 54,270 $ 24 Direct Private Development Activities 48% $ 144,838 $ 18,928 $ 38,689 $ 202,455 100% $ 202,455 $ 90 Total 100% $ 301,880 $ 39,450 $ 80,639 $ 421,969 82% $ 347,976 $ 155 Direct Hours 2,244 [a] See worksheet labeled "Community Development Department - Planning: Allocation of Annual Labor Effort". [b] Source: Fiscal Year 2015/16 adopted budget. [c] Excludes estimated expenses for economic development consultant. [d] Excludes estimated advertising expenses for City-initiated projects. [e] See worksheet labeled "Estimated Citywide Overhead". 5 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Community Development Department - Planning Calculation of the Estimated Cost of Service Input cells shaded in gray Estimated Fully-Burdened Hourly Rate $ 155 $ 146 $ 136 $ 166 $ 151 n/a Estimated Labor Hours Planning PW Eng Water Electric All Other Total $ 78 $ - $ - $ - $ - $ 78 $ 1,046 $ 803 $ - $ - $ - $ 1,849 $ 446 $ 475 $ 34 $ 83 $ - $ 1,037 $ 1,783 $ 1,898 $ 136 $ 332 $ - $ 4,148 $ 5,386 $ 4,672 $ 1,355 $ 1,329 $ 604 $ 13,347 $ 4,224 $ 511 $ 271 $ 332 $ 76 $ 5,414 $ 775 $ 256 $ - $ - $ - $ 1,031 $ 2,209 $ 511 $ - $ - $ - $ 2,720 $ 388 $ 183 $ - $ - $ - $ 570 $ 1,395 $ - $ - $ - $ - $ 1,395 $ 4,146 $ 584 $ 136 $ 332 $ - $ 5,198 $ 4,146 $ 584 $ 136 $ 332 $ - $ 5,198 $ 4,805 $ 292 $ 136 $ 332 $ - $ 5,565 $ 4,805 $ 292 $ 136 $ 332 $ - $ 5,565 $ 8,293 $ 292 $ - $ - $ - $ 8,585 varies $ - $ 7,285 $ 6,570 $ 542 $ 498 $ - $ 14,896 $ 6,510 $ 2,482 $ 542 $ 1,495 $ - $ 11,029 $ 4,960 $ 1,314 $ 542 $ 498 $ - $ 7,315 $ 2,790 $ 4,818 $ - $ - $ - $ 7,608 $ 3,410 $ 4,526 $ - $ - $ - $ 7,936 $ 3,410 $ 5,840 $ - $ - $ - $ 9,250 $ 3,410 $ 9,052 $ - $ - $ - $ 12,462 $ 3,410 $ 10,512 $ - $ - $ - $ 13,922 $ 1,628 $ 949 $ - $ - $ - $ 2,577 $ 659 $ 949 $ - $ - $ - $ 1,608 $ 310 $ - $ - $ - $ - $ 310 $ 2,558 $ 2,044 $ - $ - $ - $ 4,602 $ 8,525 $ 3,504 $ - $ - $ - $ 12,029 varies $ - $ 8,525 $ 3,504 $ - $ - $ - $ 12,029 varies $ - $ 6,820 $ 876 $ 542 $ 997 $ 151 $ 9,386 $ 4,689 $ 730 $ 136 $ 498 $ - $ 6,053 $ 78 $ - $ - $ - $ - $ 78 $ 853 $ - $ - $ - $ - $ 853 $ 155 $ - $ - $ - $ - $ 155 $ 465 $ - $ - $ - $ - $ 465 $ 388 $ - $ - $ - $ 151 $ 539 $ 543 $ - $ - $ - $ 151 $ 694 $ 543 $ - $ - $ - $ 151 $ 694 $ 620 $ - $ - $ - $ - $ 620 Estimated Labor Hours Planning PW Eng Water Electric All Other Total 0.50 6.75 2.88 11.50 34.75 27.25 5.00 14.25 2.50 9.00 26.75 26.75 31.00 31.00 53.50 - 5.50 3.25 13.00 32.00 3.50 1.75 3.50 1.25 - 4.00 4.00 2.00 2.00 2.00 - - 0.25 1.00 10.00 2.00 - - - - 1.00 1.00 1.00 1.00 - - - 0.50 2.00 8.00 2.00 - - - - 2.00 2.00 2.00 2.00 - - - - - 4.00 0.50 - - - - - - - - - 0.50 12.25 6.88 27.50 88.75 35.25 6.75 17.75 3.75 9.00 33.75 33.75 36.00 36.00 55.50 - 99.00 72.00 48.00 51.00 53.00 62.00 84.00 94.00 17.00 10.75 2.00 30.50 79.00 - 79.00 - 61.00 39.25 0.50 5.50 1.00 3.00 3.50 4.50 4.50 4.00 varies 47.00 45.00 4.00 3.00 - 42.00 17.00 4.00 9.00 - 32.00 9.00 4.00 3.00 - 18.00 33.00 - - - 22.00 31.00 - - - 22.00 40.00 - - - 22.00 62.00 - - - 22.00 72.00 - - - 10.50 6.50 - - - 4.25 6.50 - - - 2.00 - - - - 16.50 14.00 - - - 55.00 24.00 - - - varies 55.00 24.00 - - - varies 44.00 6.00 4.00 6.00 1.00 30.25 5.00 1.00 3.00 - 0.50 - - - - 5.50 - - - - 1.00 - - - - 3.00 - - - - 2.50 - - - 1.00 3.50 - - - 1.00 3.50 - - - 1.00 4.00 - - - - Fee Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 S-001 S-002 S-003 S-003 S-003 S-004 S-005 S-005A S-006 S-006 S-008 S-009 S-009 S-009 S-010 S-011 S-012 S-012 S-013 S-014 S-015 S-016 S-017 S-017 S-017 S-017 S-017 S-018 S-019 S-020 S-021 S-023 S-023 S-023 S-024 S-025 S-026 S-027 S-028 S-029 S-029 S-029 S-030 S-031 S-031 S-031 S-032 Zoning Clearance Design Review - Minor (over the counter) Design Review - Staff Level a) Modifications to Existing Structures b) All Others Design Review - Major (deposit) Use Permit - Major Use Permit - Minor Use Permit - Modifications to Major UP Use Permit - Modifications to Minor UP Variance - Minor Variance a) Involving Single-Family Structure b) All Others Zone Change Development Code Amendment Development Agreement Development Agrmt - Annual Monitoring General Plan Amendment Specific Plan Specific Plan - Amendment Tentative Parcel Map Tentative Tract Map a) 5-20 Lots b) 21-50 Lots c) 51-100 Lots d) 100+ Lots Reversion to Acreage Lot Merger Environmental Categorical Exemption Environmental Initial Study Mitigated Negative Declaration Environment Impact Report Preparation Environmental Impact Report Review Mitigation Monitoring - CEQA Monitoring Annexation Condominium Conversion Map Sign Review - Minor Sign Review - Major Zoning Letter a) Single Family Residential b) Other Temporary Occupancy Review Temporary Use Permit a) Temporary Use Permit b) Azusa-based non-profit organizations Continuance Processing 6 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Community Development Department - Planning Calculation of the Estimated Cost of Service Input cells shaded in gray Estimated Revenue Information Est Volume FY1415 Est Rev at Current Fee Est Rev at Proposed Fee 124 $6,106 $9,610 22 $28,028 $40,684 - $0 $0 8 $27,216 $33,186 4 $40,000 $40,000 5 $23,795 $27,068 22 $17,212 $22,671 2 $4,452 $5,440 - $0 $0 1 $897 $1,395 1 $940 $1,000 4 $17,964 $20,792 1 $6,275 $7,608 1 $6,794 $7,936 $0 $0 1 $11,281 $12,462 $0 $0 $0 $0 2 $2,746 $3,216 51 $11,118 $15,810 1 $4,026 $4,602 $0 $0 62 $3,053 $4,805 $0 $0 $0 $0 4 $1,244 $1,860 $0 $0 5 $2,430 $2,500 5 $1,822 $1,875 - $0 $0 Cost Recovery Information Current Fee Fee Type Estimated Cost of Service Current Cost Recovery Proposed Fee Fee Type Proposed Cost Recovery Notes $49 flat fee $78 64% $78 flat fee 100% [a] $1,274 flat fee $1,849 69% $1,849 flat fee 100% $350 flat fee $1,037 34% $350 flat fee 34% $3,402 flat fee $4,148 82% $4,148 flat fee 100% $10,000 deposit $13,347 varies $10,000 deposit 100% $4,759 flat fee $5,414 88% $5,414 flat fee 100% $782 flat fee $1,031 76% $1,031 flat fee 100% $2,226 flat fee $2,720 82% $2,720 flat fee 100% $558 flat fee $570 98% $570 flat fee 100% $897 flat fee $1,395 64% $1,395 flat fee 100% $940 flat fee $5,198 18% $1,000 flat fee 19% $4,491 flat fee $5,198 86% $5,198 flat fee 100% $5,000 deposit $5,565 varies $5,000 deposit 100% $5,000 deposit $5,565 varies $5,000 deposit 100% $10,000 deposit $8,585 varies $10,000 deposit 100% $5,000 deposit varies varies $5,000 deposit 100% $15,000 deposit $14,896 varies $15,000 deposit 100% $10,000 deposit $11,029 varies $10,000 deposit 100% $5,000 deposit varies varies $5,000 deposit 100% $6,275 flat fee $7,608 82% $7,608 flat fee 100% $6,794 flat fee $7,936 86% $7,936 flat fee 100% $8,157 flat fee $9,250 88% $9,250 flat fee 100% $11,281 flat fee $12,462 91% $12,462 flat fee 100% $12,681 flat fee $13,922 91% $13,922 flat fee 100% $2,139 flat fee $2,577 83% $2,577 flat fee 100% $1,373 flat fee $1,608 85% $1,608 flat fee 100% $218 flat fee $310 70% $310 flat fee 100% $4,026 flat fee $4,602 87% $4,602 flat fee 100% $10,000 deposit $12,029 varies $10,000 deposit 100% $10,000 deposit varies varies $10,000 deposit 100% $10,000 deposit $12,029 varies $10,000 deposit 100% $5,000 deposit varies varies $5,000 deposit 100% $10,000 deposit varies varies $10,000 deposit 100% $5,077 flat fee $6,053 84% $6,053 flat fee 100% $49 flat fee $78 64% $78 flat fee 100% $514 flat fee $853 60% $853 flat fee 100% $136 flat fee $155 88% $155 flat fee 100% $311 flat fee $465 67% $465 flat fee 100% $519 flat fee $539 96% $539 flat fee 100% $486 flat fee $694 70% $500 flat fee 72% $364 flat fee $694 53% $375 flat fee 54% [b] $508 flat fee $620 82% $620 flat fee 100% Fee Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 S-001 S-002 S-003 S-003 S-003 S-004 S-005 S-005A S-006 S-006 S-008 S-009 S-009 S-009 S-010 S-011 S-012 S-012 S-013 S-014 S-015 S-016 S-017 S-017 S-017 S-017 S-017 S-018 S-019 S-020 S-021 S-023 S-023 S-023 S-024 S-025 S-026 S-027 S-028 S-029 S-029 S-029 S-030 S-031 S-031 S-031 S-032 Zoning Clearance Design Review - Minor (over the counter) Design Review - Staff Level a) Modifications to Existing Structures b) All Others Design Review - Major (deposit) Use Permit - Major Use Permit - Minor Use Permit - Modifications to Major UP Use Permit - Modifications to Minor UP Variance - Minor Variance a) Involving Single-Family Structure b) All Others Zone Change Development Code Amendment Development Agreement Development Agrmt - Annual Monitoring General Plan Amendment Specific Plan Specific Plan - Amendment Tentative Parcel Map Tentative Tract Map a) 5-20 Lots b) 21-50 Lots c) 51-100 Lots d) 100+ Lots Reversion to Acreage Lot Merger Environmental Categorical Exemption Environmental Initial Study Mitigated Negative Declaration Environment Impact Report Preparation Environmental Impact Report Review Mitigation Monitoring - CEQA Monitoring Annexation Condominium Conversion Map Sign Review - Minor Sign Review - Major Zoning Letter a) Single Family Residential b) Other Temporary Occupancy Review Temporary Use Permit a) Temporary Use Permit b) Azusa-based non-profit organizations Continuance Processing 7 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Community Development Department - Planning Calculation of the Estimated Cost of Service Input cells shaded in gray [a] Time varies depending on proposed modifications. Amount shown assumes 25% of estimated time for review of new structure. [b] Azusa-based non-profit organizations receive a 25% discount from standard TUP fee. [c] Fee is per meeting. 50% of the fee for the first meeting is applied against future Planning/Engineering fee for the project. Estimated Fully-Burdened Hourly Rate $ 155 $ 146 $ 136 $ 166 $ 151 n/a Estimated Labor Hours Planning PW Eng Water Electric All Other Total $ 465 $ - $ - $ - $ - $ 465 $ 1,046 $ - $ - $ - $ - $ 1,046 $ 1,628 $ 292 $ - $ - $ - $ 1,920 $ 2,325 $ 584 $ - $ - $ - $ 2,909 $ 930 $ 292 $ 136 $ 166 $ 151 $ 1,675 $ 775 $ - $ - $ - $ - $ 775 $ 930 $ 438 $ - $ - $ - $ 1,368 $ 891 $ 438 $ - $ - $ - $ 1,329 $ 1,356 $ 438 $ - $ - $ - $ 1,794 $ 426 $ 438 $ - $ - $ - $ 864 $ 620 $ - $ - $ - $ - $ 620 varies $ - $ 155 $ - $ - $ - $ - $ 155 Estimated Labor Hours Planning PW Eng Water Electric All Other Total 3.00 - - - - 3.00 6.75 - - - - 6.75 10.50 2.00 - - - 12.50 15.00 4.00 - - - 19.00 6.00 2.00 1.00 1.00 1.00 11.00 5.00 - - - - 5.00 6.00 3.00 - - - 9.00 5.75 3.00 - - - 8.75 8.75 3.00 - - - 11.75 2.75 3.00 - - - 5.75 4.00 - - - - 4.00 varies - 1.00 - - - - 1.00 Fee Description 36 S-033 Time Extension Review - Staff 37 S-034 Time Extension Review - PC 38 S-035 Appeal - Planning Commission 39 S-036 Appeal - City Council 40 S-15 Preliminary Plan Review (per meeting) 41 S-15A Nonconforming Use Time Extension 42 S-037 Certificate of Compliance 43 S-038 Street Name Processing W/O Map 44 S-039 Street Re-Name Processing 45 S-040 Building Address Processing W/O Map 46 S-041 Building Re-Address Processing 47 S-0141A Com Dev Newspaper Publication 48 S-044 Special Bldg Inspection - per hr (2 hr min.) 8 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Community Development Department - Planning Calculation of the Estimated Cost of Service Input cells shaded in gray [a] Time varies depending on proposed modifications. Amount sho [b] Azusa-based non-profit organizations receive a 25% discount fr [c] Fee is per meeting. 50% of the fee for the first meeting is applie Estimated Revenue Information Est Volume FY1415 Est Rev at Current Fee Est Rev at Proposed Fee - - 1 - 3 - - - - - 3 13 - $0 $0 $1,739 $0 $4,446 $0 $0 $0 $0 $0 $1,198 $3,058 $0 $0 $0 $500 $0 $5,024 $0 $0 $0 $0 $0 $1,860 $3,000 $0 Total $227,841 $274,903 Cost Recovery Information Current Fee Fee Type Estimated Cost of Service Current Cost Recovery Proposed Fee Fee Type Proposed Cost Recovery Notes $350 flat fee $465 75% $465 flat fee 100% [c] $782 flat fee $1,046 75% $1,046 flat fee 100% $1,739 flat fee $1,920 91% $500 flat fee 26% $2,768 flat fee $2,909 95% $1,000 flat fee 34% $1,482 flat fee $1,675 88% $1,675 flat fee 100% $769 flat fee $775 99% $775 flat fee 100% $1,187 flat fee $1,368 87% $1,368 flat fee 100% $1,187 flat fee $1,329 89% $1,329 flat fee 100% $1,635 flat fee $1,794 91% $1,794 flat fee 100% $678 flat fee $864 78% $864 flat fee 100% $399 flat fee $620 64% $620 flat fee 100% $235 flat fee varies varies actual cost flat fee 100% $120 flat fee $155 77% $155 flat fee 100% Fee Description 36 S-033 Time Extension Review - Staff 37 S-034 Time Extension Review - PC 38 S-035 Appeal - Planning Commission 39 S-036 Appeal - City Council 40 S-15 Preliminary Plan Review (per meeting) 41 S-15A Nonconforming Use Time Extension 42 S-037 Certificate of Compliance 43 S-038 Street Name Processing W/O Map 44 S-039 Street Re-Name Processing 45 S-040 Building Address Processing W/O Map 46 S-041 Building Re-Address Processing 47 S-0141A Com Dev Newspaper Publication 48 S-044 Special Bldg Inspection - per hr (2 hr min.) 9 Cost of Service Calculations - Public Works Engineering 10 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Input cells shaded in gray Public Works Department - Engineering Allocation of Annual Labor Effort Position Public Works Director Engineering Assistant II Engineering Assistant Public Works Inspector Total Calculation of Productive Hours 8,320 Annual Hours - Standard 2,080 2,080 2,080 2,080 Annual Hours - Paid Overtime - - - - - Less: Annual Leave 360 360 360 360 1,440 Productive Hours 1,720 1,720 1,720 1,720 6,880 Allocation of Hours (Public v. Private Development) Non-Private Development Related (e.g. CIP) Private Development Related Total 65% 35% 30% 10% 35% 65% 70% 90% 100% 100% 100% 100% Allocation of Productive Hours 1,118 602 516 172 2,408 Non-Private Development Related (e.g. CIP) Private Development Related 602 1,118 1,204 1,548 4,472 Total 1,720 1,720 1,720 1,720 6,880 Personnel Expenditures $ 350,345 Salary $ 145,955 $ 71,800 $ 60,770 $ 71,820 Benefits $ 82,792 $ 37,712 $ 32,021 $ 34,750 $ 187,275 Total $ 228,747 $ 109,512 $ 92,791 $ 106,570 $ 537,620 Allocation of Personnel Expenditures $ 94,871 $ 25,130 $ 18,231 $ 7,182 $ 145,414 Non-Private Development Related (e.g. CIP) Salary Benefits $ 53,815 $ 13,199 $ 9,606 $ 3,475 $ 80,095 Total $ 148,686 $ 38,329 $ 27,837 $ 10,657 $ 225,509 Private Development Related Salary $ 51,084 $ 46,670 $ 42,539 $ 64,638 $ 204,931 Benefits $ 28,977 $ 24,513 $ 22,415 $ 31,275 $ 107,180 Total $ 80,061 $ 71,183 $ 64,954 $ 95,913 $ 312,111 Allocation of Private Development Related Services 860 Indirect Activities and Services General Administration and Management 344 172 172 172 Certification and Training 40 40 40 40 160 Long-Range Planning - - - - - Development Related Punitive Code Enforcement 40 40 40 40 160 Public Info and Assist 40 40 40 40 160 Total Indirect Activities and Services Work Hours 464 292 292 292 1,340 Direct Private Development Activities 138 826 912 1,256 3,132 Indirect Activities and Services 57% 15% 14% 11% 25% General Administration and Management Certification and Training 7% 4% 3% 3% 4% Long-Range Planning 0% 0% 0% 0% 0% Development Related Punitive Code Enforcement 7% 4% 3% 3% 4% Public Info and Assist 7% 4% 3% 3% 4% Total Indirect Activities and Services Work Hours 77% 26% 24% 19% 37% Direct Private Development Activities 23% 74% 76% 81% 63% Source: Labor allocation based on FY 15/16 Adopted Budget and verbal feedback received from Public Works Director on October 7, 2015 and November 23, 2015. Estimated leave assumes 120 hours holiday, 120 hours vacation, 120 hours sick. Actual leave amounts vary based on length of employment with city and employee classification. Amounts are intended to serve as reasonable estimates. 11 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Input cells shaded in gray Public Works Department - Engineering Fully-Burdened Hourly Rate Calculation Private Development Related Labor Expenditures [a] Description Total Notes Salaries Benefits $ 204,931 $ 107,180 Total - Labor Expenditures $ 312,111 Recurring Non-Labor Expenditures [b] Description FY 2015/16 Budget Adjust ment Subtotal Notes Uniforms & Laundry Training Schools Dues & Subscriptions Meetings & Conferences Commission Meetings Expense Office Supplies Printing, Binding & Duplicating Fuel and Oil Supplies/Special Utilities/Other Utilities/Electricity Utilities/Telephone $ $ $ $ $ $ $ $ $ $ $ $ 420 2,000 500 600 1,500 2,500 800 3,000 7,500 25,000 6,000 1,400 $ $ $ $ $ $ $ $ $ $ $ $ - - - - - - - - - - - - $ $ $ $ $ $ $ $ $ $ $ $ 420 2,000 500 600 1,500 2,500 800 3,000 7,500 25,000 6,000 1,400 Total $ 51,220 $ - $ 51,220 Citywide Overhead Description Est. C'wide Overhead Notes Estimated Citywide Overhead $ 120,101 [c] Total $ 120,101 Total Allocable Expenditures Description Amount Notes Labor Non-Labor Estimated Citywide Overhead $ 312,111 $ 51,220 $ 120,101 Total $ 483,432 Calculation of Fully-Burdened Hourly Rate for Private Development-Related Services and Activities Description Annual Allocation [a] Labor Non-Labor Citywide Overhead Total Targeted Recovery from Fees Amount Recoverable from Fees Targeted Hourly Rate General Administration and Management 25% $ 76,637 $ 12,577 $ 29,490 $ 118,703 95% $ 112,401 $ 36 Certification and Training 4% $ 12,503 $ 2,052 $ 4,811 $ 19,366 100% $ 19,366 $ 6 Long-Range Planning 0% $ - $ - $ - $ - 0% $ - $ - Development Related Punitive Code Enforcement 4% $ 12,503 $ 2,052 $ 4,811 $ 19,366 0% $ - $ - Public Info and Assist 4% $ 12,503 $ 2,052 $ 4,811 $ 19,366 100% $ 19,366 $ 6 Direct Private Development Activities 63% $ 197,966 $ 32,488 $ 76,177 $ 306,631 100% $ 306,631 $ 98 Total 100% $ 312,111 $ 51,220 $ 120,101 $ 483,432 95% $ 457,763 $ 146 Direct Hours 3,132 [a] See worksheet labeled "Public Works Department - Engineering: Allocation of Annual Labor Effort". [b] Source: Fiscal Year 2015/16 adopted budget. [c] See worksheet labeled "Estimated Citywide Overhead". 12 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Input cells shaded in gray Public Works - Street Maintenance Fully-Burdened Hourly Rate Calculation Calculation of Estimated Fully-Burdened Hourly Rates by Functional Division Description Est. Personnel Expenses (1.0 FTE) Est. Non-Labor and C'wide OH (1.0 FTE) Total Est Expenses (1.0 FTE) Est. Productive Hours (1.0 FTE) Est. % of Time Spent on Indirect Activities Est. Direct Hours (1.0 FTE) Est Fully- Burdened Hourly Rate Notes Street Maintenance Worker III $ 93,733 $ 28,120 $ 121,853 1,720 10% 1,548 $ 79 [a] [a] Source: FY 15/16 personnel expenses provided by City Management Analyst. Amount shown includes salary and benefit amounts. [b] Hourly rate will be used to calculate street light pole banner installation and removal fees. 13 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Community Development Department - Engineering Calculation of the Estimated Cost of Service Input cells shaded in gray Estimated Fully-Burdened Hourly Rate $ 146 $ 155 $ 136 $ 166 $ 79 n/a Estimated Labor Hours PW Eng Planning Water Electric Street Maint Total $ - varies varies $ - varies $ - varies $ - varies $ - varies $ - $ 584 $ 465 $ - $ - $ - $ 1,049 $ 1,752 $ 620 $ - $ - $ - $ 2,372 $ 2,920 $ 620 $ - $ - $ - $ 3,540 $ 4,380 $ 620 $ - $ - $ - $ 5,000 $ 6,716 $ 620 $ - $ - $ - $ 7,336 $ 7,592 $ 620 $ - $ - $ - $ 8,212 $ 9,344 $ 620 $ - $ - $ - $ 9,964 $ 329 $ - $ - $ - $ - $ 329 $ 292 $ - $ - $ - $ - $ 292 $ 73 $ - $ - $ - $ - $ 73 $ 146 $ - $ - $ - $ - $ 146 $ 1,095 $ 581 $ - $ - $ - $ 1,676 $ - $ - $ - $ - $ 72 $ 72 $ 1,898 $ 310 $ - $ - $ - $ 2,208 $ 1,752 $ 155 $ - $ - $ - $ 1,907 $ 1,752 $ - $ - $ - $ - $ 1,752 $ 292 $ - $ - $ - $ - $ 292 $ 1,752 $ - $ - $ - $ - $ 1,752 $ 292 $ - $ - $ - $ - $ 292 $ 730 $ - $ - $ - $ - $ 730 $ 438 $ - $ - $ - $ - $ 438 $ 146 $ - $ - $ - $ - $ 146 $ 438 $ - $ - $ - $ - $ 438 $ 146 $ - $ - $ - $ - $ 146 $ 365 $ - $ - $ - $ - $ 365 $ 146 $ - $ - $ - $ - $ 146 n/a - fee set by State $ - n/a - fee set by State $ - varies $ - $ 1,022 $ - $ - $ - $ - $ 1,022 $ 292 $ - $ - $ - $ - $ 292 $ 511 $ - $ - $ - $ - $ 511 $ 219 $ - $ - $ - $ - $ 219 Estimated Labor Hours PW Eng Planning Water Electric Street Maint Total - varies varies - varies - varies - varies - varies - 4.00 3.00 - - - 7.00 12.00 4.00 - - - 16.00 20.00 4.00 - - - 24.00 30.00 4.00 - - - 34.00 46.00 4.00 - - - 50.00 52.00 4.00 - - - 56.00 64.00 4.00 - - - 68.00 2.25 - - - - 2.25 2.00 - - - - 2.00 0.50 - - - - 0.50 1.00 - - - - 1.00 7.50 3.75 - - - 11.25 - - - - 0.92 0.92 13.00 2.00 - - - 15.00 12.00 1.00 - - - 13.00 12.00 - - - - 12.00 2.00 - - - - 2.00 12.00 - - - - 12.00 2.00 - - - - 2.00 5.00 - - - - 5.00 3.00 - - - - 3.00 1.00 - - - - 1.00 3.00 - - - - 3.00 1.00 - - - - 1.00 2.50 - - - - 2.50 1.00 - - - - 1.00 n/a - fee set by State - n/a - fee set by State - varies - 7.00 - - - - 7.00 2.00 - - - - 2.00 3.50 - - - - 3.50 1.50 - - - - 1.50 Fee Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 S-047 S-047 S-047 S-047 S-048 S-048 S-048 S-048 S-049 S-050 S-050 S-050 S-050 S-050 S-050 S-050 S-051 S-052 S-052 S-052 S-053 S-054 S-055 S-056 S-056A S-056B S-056B S-056C S-056C S-056C S-056D S-057 S-057 S-057 S-057A S-057A S-057A S-057B S-058 S-059 S-059 S-059 S-060 S-060A S-060A S-060A S-060B S-060B S-060B Public/Private Improvement - Plan Check a) $0 - $100K b) $100K - $500K c) $500K Public/Private Improvement - Inspection a) $0 - $100K b) $100K - $500K c) $500K Final Parcel Map (a) Final Tract Map a) 5 - 10 Lots b) 11 - 25 Lots c) 26 - 50 Lots d) 51 - 100 Lots e) 101 - 150 Lots f) > 150 Lots Easement Check Monument Inspection a) First monument b) Each additional Bond Processing Tax Clearance Processing Lot Line Adjustment Street Light Pole Banners Street/Right-of-Way Abandonment SUSMP/LID Plan Review SWPPP Plan Review BMP Review Hydrology/Drainage Plan Review Soils Review Traffic Study Review Drainage Plan Review Sidewalk/Curb/Gutter Encroachment a) Up to 75 LF b) Each Add'l 75 LF Street Cut Encroachment a) Up to 100 SF b) Each Add'l 100 SF Driveway Approach Obstruction Permit Oversized Load Permit a) Single Trip b) Annual House Moving Permit Industrial Waste Permit a) New/Modified b) Renewal Fats, Oils, Grease Program a) New b) Renewal 14 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Community Development Department - Engineering Calculation of the Estimated Cost of Service Input cells shaded in gray Estimated Revenue Information Est Volume FY1415 [a] Est Rev at Current Fee Est Rev at Proposed Fee 5 varies varies 4 varies varies 2 varies varies 5 varies varies 4 varies varies 2 varies varies 2 $2,346 $2,098 3 $5,556 $7,116 2 $5,846 $7,080 1 $3,877 $5,000 1 $5,948 $7,336 1 $6,876 $8,212 1 $8,341 $9,964 2 $654 $657 8 $1,808 $2,336 2 $452 $146 8 $760 $1,168 4 $5,272 $6,705 $0 $0 2 $4,000 $4,000 10 $17,500 $19,070 10 $16,300 $17,520 25 $0 $7,300 10 10 10 12 $6,228 $5,256 2 $338 $292 45 $23,355 $19,710 15 $3,365 $2,190 25 $12,975 $9,125 40 $3,720 $5,840 136 $2,466 $2,168 136 $13,425 $12,195 - $0 varies 5 $3,392 $5,110 15 $3,365 $4,380 5 $2,240 $2,555 200 $33,800 $43,800 Cost Recovery Information Current Fee Fee Type Estimated Cost of Service Current Cost Recovery Proposed Fee Fee Type Proposed Cost Recovery Notes 3.0% flat fee varies 112% 3.0% flat fee 100% 2.5% flat fee varies 2.5% flat fee 100% 2.0% flat fee varies 2.0% flat fee 100% 5.0% flat fee varies 5.0% flat fee 100% 3.5% flat fee varies 3.5% flat fee 100% 2.0% flat fee varies 2.0% flat fee 100% $1,173 flat fee $1,049 $1,049 flat fee 100% $1,852 flat fee $2,372 78% $2,372 flat fee 100% $2,923 flat fee $3,540 83% $3,540 flat fee 100% $3,877 flat fee $5,000 78% $5,000 flat fee 100% $5,948 flat fee $7,336 81% $7,336 flat fee 100% $6,876 flat fee $8,212 84% $8,212 flat fee 100% $8,341 flat fee $9,964 84% $9,964 flat fee 100% $327 flat fee $329 100% $329 flat fee 100% $226 flat fee $292 77% $292 flat fee 100% $226 flat fee $73 310% $73 flat fee 100% $95 flat fee $146 65% $146 flat fee 100% $1,318 flat fee $1,676 79% $1,676 flat fee 100% $0 flat fee $72 0% $72 flat fee 100% $2,000 deposit $2,208 91% $2,000 deposit 91% $1,750 flat fee $1,907 92% $1,907 flat fee 100% $1,630 flat fee $1,752 93% $1,752 flat fee 100% n/a flat fee $292 n/a $292 flat fee 100% $1,500 deposit $1,752 varies $1,752 deposit 100% $1,500 deposit $292 varies $292 deposit 100% $1,500 deposit $730 varies $730 deposit 100% $519 flat fee $438 118% $438 flat fee 100% $169 flat fee $146 116% $146 flat fee 100% $519 flat fee $438 118% $438 flat fee 100% $224 flat fee $146 154% $146 flat fee 100% $519 flat fee $365 142% $365 flat fee 100% $93 flat fee $146 64% $146 flat fee 100% $18 flat fee $0 n/a $16 flat fee n/a $99 flat fee $0 n/a $90 flat fee n/a $1,028 flat fee varies varies $2,000 deposit 100% $678 flat fee $1,022 66% $1,022 flat fee 100% $224 flat fee $292 77% $292 flat fee 100% $448 flat fee $511 88% $511 flat fee 100% $169 flat fee $219 77% $219 flat fee 100% Fee Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 S-047 S-047 S-047 S-047 S-048 S-048 S-048 S-048 S-049 S-050 S-050 S-050 S-050 S-050 S-050 S-050 S-051 S-052 S-052 S-052 S-053 S-054 S-055 S-056 S-056A S-056B S-056B S-056C S-056C S-056C S-056D S-057 S-057 S-057 S-057A S-057A S-057A S-057B S-058 S-059 S-059 S-059 S-060 S-060A S-060A S-060A S-060B S-060B S-060B Public/Private Improvement - Plan Check a) $0 - $100K b) $100K - $500K c) $500K Public/Private Improvement - Inspection a) $0 - $100K b) $100K - $500K c) $500K Final Parcel Map (a) Final Tract Map a) 5 - 10 Lots b) 11 - 25 Lots c) 26 - 50 Lots d) 51 - 100 Lots e) 101 - 150 Lots f) > 150 Lots Easement Check Monument Inspection a) First monument b) Each additional Bond Processing Tax Clearance Processing Lot Line Adjustment Street Light Pole Banners Street/Right-of-Way Abandonment SUSMP/LID Plan Review SWPPP Plan Review BMP Review Hydrology/Drainage Plan Review Soils Review Traffic Study Review Drainage Plan Review Sidewalk/Curb/Gutter Encroachment a) Up to 75 LF b) Each Add'l 75 LF Street Cut Encroachment a) Up to 100 SF b) Each Add'l 100 SF Driveway Approach Obstruction Permit Oversized Load Permit a) Single Trip b) Annual House Moving Permit Industrial Waste Permit a) New/Modified b) Renewal Fats, Oils, Grease Program a) New b) Renewal 15 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Community Development Department - Engineering Calculation of the Estimated Cost of Service Input cells shaded in gray * All amounts shown are base fees. Applicants will also be responsible for any consultant or other agency fees (e.g. County of Los Angeles) incurred. [a] Fee not examined. Estimated Fully-Burdened Hourly Rate $ 146 $ 155 $ 136 $ 166 $ 79 n/a Estimated Labor Hours PW Eng Planning Water Electric Street Maint Total $ 438 $ - $ - $ - $ - $ 438 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 73 $ - $ - $ - $ - $ 73 Estimated Labor Hours PW Eng Planning Water Electric Street Maint Total 3.00 - - - - 3.00 - - - - - - - - - - - - - - - - - 0.50 - - - - 0.50 Fee Description 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 S-061 S-062 S-6.5 S-7 S-18 S-18 Sewer Saddle Installation Review Blueprint/Map Copy Service, per sheet Project Plans and Specs (plus $10 if mailed) Verification of Conditions Agrmnt and/or Imprvmt Security, each Extension Time for Imprvmt Agrmt, each Submittals in Excess of Three a) Fouth Submittal b) Sixth Submittal c) Eighth Submittal Minor Land Division - Lot Split Recording Fee a) First Sheet b) Each Additional Sheet LDMA Surcharge (County Maps Only) a) Tract Map b) Parcel Map Expedited Plan Review Consultant Code Compliance Fee Landscape Design Standards (OTC) City-provided Tree Planting - One 15 gal tree City-provided Tree Planting - One 24" box tree Time Extension 16 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Community Development Department - Engineering Calculation of the Estimated Cost of Service Input cells shaded in gray * All amounts shown are base fees. Applicants will also be respons [a] Fee not examined. Cost Recovery Information Current Fee Fee Type Estimated Cost of Service Current Cost Recovery Proposed Fee Fee Type Proposed Cost Recovery Notes $317 flat fee $438 72% $438 flat fee 100% [a] $21 flat fee $20 flat fee $52 flat fee $50 flat fee [a] $161 flat fee $161 flat fee [a] $213 flat fee $213 flat fee [a] $291 flat fee $291 flat fee [a] $402 flat fee $402 flat fee [a] $1,409 flat fee $1,409 flat fee [a] $1,680 flat fee $1,680 flat fee [a] $595 flat fee $595 flat fee [a] $8 flat fee $8 flat fee [a] $2 flat fee $2 flat fee [a] $401 flat fee $401 flat fee [a] $135 flat fee $135 flat fee [a] varies flat fee 1.5x fee flat fee Invoice + 36% flat fee Invoice + 30% flat fee OH OH $37 flat fee $37 flat fee [a] $6 flat fee $6 flat fee [a] $109 flat fee $109 flat fee [a] $188 flat fee $188 flat fee [a] n/a varies $73 n/a $73 varies 100% Fee Description 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 S-061 S-062 S-6.5 S-7 S-18 S-18 Sewer Saddle Installation Review Blueprint/Map Copy Service, per sheet Project Plans and Specs (plus $10 if mailed) Verification of Conditions Agrmnt and/or Imprvmt Security, each Extension Time for Imprvmt Agrmt, each Submittals in Excess of Three a) Fouth Submittal b) Sixth Submittal c) Eighth Submittal Minor Land Division - Lot Split Recording Fee a) First Sheet b) Each Additional Sheet LDMA Surcharge (County Maps Only) a) Tract Map b) Parcel Map Expedited Plan Review Consultant Code Compliance Fee Landscape Design Standards (OTC) City-provided Tree Planting - One 15 gal tree City-provided Tree Planting - One 24" box tree Time Extension Estimated Revenue Information Est Volume FY1415 [a] Est Rev at Current Fee Est Rev at Proposed Fee 1 $317 $438 Total $194,522 $218,767 17 Cost of Service Calculation - Water and Light (Utilities) 18 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Input cells shaded in gray Light and Water Depatments Fully-Burdened Hourly Rate Calculation Calculation of Estimated Fully-Burdened Hourly Rates by Functional Division Description Est. Personnel Expenses (1.0 FTE) Est. Non-Labor and C'wide OH (1.0 FTE) Total Est Expenses (1.0 FTE) Est. Productive Hours (1.0 FTE) Est. % of Time Spent on Indirect Activities Est. Direct Hours (1.0 FTE) Est Fully- Burdened Hourly Rate Notes Customer Care and Solutions - Records and Collections $ 103,363 $ 31,009 $ 134,372 1,720 10% 1,548 $ 87 [a] Customer Care and Solutions - Field Services $ 111,398 $ 33,419 $ 144,817 1,720 10% 1,548 $ 94 [b] Water - Production, Transmission, and Distribution $ 111,729 $ 33,519 $ 145,248 1,720 25% 1,290 $ 113 [c] Engineer $ 134,500 $ 40,350 $ 174,850 1,720 25% 1,290 $ 136 [d] Electrical - Distribution $ 164,849 $ 49,455 $ 214,304 1,720 25% 1,290 $ 166 [e] [a] Source: FY 15/16 budgeted payroll data for 10 full-time employees classified as Customer Service Representative III. Amount shown represents average salary and benefit amounts. [b] Source: FY 15/16 budgeted payroll data for 2 full-time employees classified as Field Service Representative. Amount shown represents average salary and benefit amounts. [c] Source: FY 15/16 budgeted payroll data for 12 full-time employees classified as Water Distribution Crew Supervisor; Welder/Water Dist Worker I; Water Dist Equip Operator; Water Dist Worker I; Water Dist Worker II; Water Dist Worker III. Used two employees for each job category. Amount shown represents average salary and benefit amounts. [d] Source: FY 15/16 budgeted payroll data for Water System Engineer and Engineering Associate. Amount shown represents average salary and benefit amounts. [e] Source: FY 15/16 budgeted payroll data for 6 full-time employees classified as Electric Crew Supervisor; Line Mechanic. Used three employees for each job category. Amount shown represents average salary and benefit amounts. 19 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Input cells shaded in gray Light and Water Departments Calculation of the Estimated Cost of Service Estimated Fully-Burdened Hourly Rate $ 87 $ 94 $ 113 $ 136 $ 166 n/a Estimated Cost of Service Cust Care Records Collect'n Cust Care Field Svcs Wtr P/T/D Eng'r Electric Distr Line Total $ - $ - $ - $ - $ - $ - $ 36 $ 23 $ - $ - $ - $ 60 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 29 $ 47 $ - $ - $ - $ 75 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 29 $ 54 $ 676 $ 136 $ - $ 894 $ - $ - $ - $ - $ - $ - $ 43 $ 94 $ - $ - $ - $ 137 $ - $ - $ 563 $ 136 $ - $ 699 $ - $ - $ 676 $ - $ - $ 676 $ - $ - $ - $ - $ - $ - $ - $ - $ 225 $ - $ - $ 225 $ - $ - $ - $ - $ - $ - $ - $ 47 $ 281 $ - $ - $ 328 $ - $ - $ - $ - $ - $ - n/a - rental of property $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 281 $ - $ - $ 281 $ - $ - $ - $ - $ - $ - $ - $ - $ 113 $ - $ - $ 113 $ - $ - $ 1,802 $ 136 $ - $ 1,937 $ - $ - $ 1,802 $ 136 $ - $ 1,937 $ - $ - $ 2,252 $ 136 $ - $ 2,387 $ - $ - $ 2,252 $ 136 $ - $ 2,387 $ - $ - $ 338 $ - $ - $ 338 $ - $ - $ 338 $ - $ - $ 338 $ - $ - $ 394 $ - $ - $ 394 $ - $ - $ 394 $ - $ - $ 394 $ - $ - $ 450 $ - $ - $ 450 $ - $ - $ 450 $ - $ - $ 450 $ - $ - $ 563 $ - $ - $ 563 $ - $ - $ 4,504 $ 271 $ - $ 4,775 $ - $ - $ 4,504 $ 271 $ - $ 4,775 $ - $ - $ 5,630 $ 271 $ - $ 5,901 $ - $ - $ 6,756 $ 271 $ - $ 7,027 $ - $ - $ 7,882 $ 271 $ - $ 8,153 $ - $ - $ 338 $ - $ - $ 338 Estimated Labor Hours Cust Care Records Collect'n Cust Care Field Svcs Wtr P/T/D Eng'r Electric Distr Line / Techs Total 0.42 0.25 6.00 1.00 - 0.67 - - - - - 0.33 0.50 0.83 - - - - 0.33 0.58 7.91 - 0.50 1.00 1.50 5.00 1.00 6.00 6.00 6.00 2.00 2.00 - 0.50 2.50 3.00 n/a - rental of property - 2.50 1.00 - - 2.50 1.00 - 1.00 16.00 17.00 16.00 1.00 17.00 20.00 1.00 21.00 20.00 1.00 21.00 3.00 3.00 3.00 3.00 3.50 3.50 3.50 3.50 4.00 4.00 4.00 4.00 5.00 5.00 40.00 2.00 42.00 40.00 2.00 42.00 50.00 2.00 52.00 60.00 2.00 62.00 70.00 2.00 72.00 3.00 3.00 Fee Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 S-105 S-106 S-107 S-108 S-109 S-110 S-111 S-112 S-113 S-114 S-131C S-115 New Utility Account Set-up a) Connect Fee - Apt. Owners b) Connect Fee - All Others c) Same Day Connection (7am-3pm) d) Same Day Connection (3pm-5:30pm) e) Friday (7am-8pm) Elec, Wtr, or both f) Sat, Sun, or Holiday (7am-8pm) Elec, Wtr, or both g) Positive Identification Check Utility Delinquent Turn Off/On a) 7am-3pm b) 3pm-5:30pm c) Friday (7am-8pm) Elec, Wtr, or both d) Sat, Sun, or Holiday (7am-8pm) Elec, Wtr, or both e) Late Payment Penalty Theft of Water/Light Investigation a) Base Fee b) Damages and Estimated Usage Water Pressure Test a) Water Pressure Test b) Water Pressure Test - Main Line Water Meter Test Water Quality Test a) Base Fee b) Lab Costs Flow Test Temporary Meter Rental a) Base Fee b) Estimated Usage c) Deposit New Water Meter (Installation\Inspection) a) Base Fee b) Materials Cost Jumper Fee New Water Service Installation a) 3/4" - 1" b) 2" c) 4" d) 6" Hot Tap Fee a) 1" b) 2" c) 4" d) 6" e) 8" f) 10" g) 12" Fire Service Installation a) 4" b) 6" c) 8" d) 10" e) 12" New Backflow Device Inspection Review City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Light and Water Departments Calculation of the Estimated Cost of Service Input cells shaded in gray 20 Cost Recovery Information Current Fee Fee Type Est. Cost of Svc - Labor Est. Cost of Svc - M'tls Est. Cost of Svc - Total Current Cost Recovery Proposed Fee Fee Type Proposed Cost Recovery Notes $0 flat fee n/a $4,850 n/a n/a $0 flat fee n/a [a] $45 flat fee $60 $60 76% $45 flat fee 76% $35 flat fee n/a n/a n/a $35 flat fee n/a $85 flat fee n/a n/a n/a $85 flat fee n/a $105 flat fee n/a n/a n/a $105 flat fee n/a $205 flat fee n/a n/a n/a $205 flat fee n/a $1.25 flat fee n/a n/a n/a $1.25 flat fee n/a $35 flat fee $75 $75 46% $35 flat fee 46% $85 flat fee n/a n/a n/a $85 flat fee n/a $105 flat fee n/a n/a n/a $105 flat fee n/a $205 flat fee n/a n/a n/a $205 flat fee n/a >$7.5 or 5% flat fee n/a n/a n/a >$7.5 or 5% flat fee n/a of bal of bal $250 flat fee $894 $894 28% $500 flat fee 56% Actual Cost flat fee n/a n/a n/a Actual Cost flat fee n/a $165 flat fee $137 $137 varies $165 flat fee varies $165 flat fee $699 $699 24% $400 flat fee 57% bill hrly flat fee $676 $676 100% bill hrly flat fee 100% $125 flat fee $225 $225 56% $125 flat fee 56% Actual Cost flat fee n/a n/a n/a Actual Cost flat fee n/a $275 flat fee $328 $328 84% $300 flat fee 91% $130 flat fee n/a n/a n/a $130 flat fee n/a Actual Cost flat fee n/a n/a n/a Actual Cost flat fee n/a $1,000 deposit n/a n/a n/a $1,000 deposit n/a $200 flat fee $281 $281 71% $250 flat fee 89% Actual Cost flat fee n/a n/a n/a Actual Cost flat fee n/a $100 flat fee $113 $113 89% $100 flat fee 89% $3,000 deposit $1,937 $6,787 100% $3,500 deposit 100% $3,200 deposit $1,937 $5,100 $7,037 100% $4,000 deposit 100% $7,432 deposit $2,387 $6,200 $8,587 100% $7,500 deposit 100% $9,382 deposit $2,387 $7,000 $9,387 100% $9,500 deposit 100% $275 flat fee $338 $338 81% $300 flat fee 89% $280 flat fee $338 $338 83% $300 flat fee 89% $350 flat fee $394 $394 89% $350 flat fee 89% $400 flat fee $394 $394 102% $400 flat fee 102% $450 flat fee $450 $450 100% $450 flat fee 100% $450 flat fee $450 $450 100% $450 flat fee 100% $525 flat fee $563 $563 93% $525 flat fee 93% $5,055 deposit $4,775 $6,200 $10,975 100% $7,500 deposit 100% $7,077 deposit $4,775 $7,000 $11,775 100% $9,500 deposit 100% $8,088 deposit $5,901 $8,000 $13,901 100% $10,500 deposit 100% $10,110 deposit $7,027 $8,500 $15,527 100% $11,500 deposit 100% $12,132 deposit $8,153 $8,500 $16,653 100% $12,500 deposit 100% $340 flat fee $338 $338 101% $340 flat fee 101% Fee Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 S-105 S-106 S-107 S-108 S-109 S-110 S-111 S-112 S-113 S-114 S-131C S-115 New Utility Account Set-up a) Connect Fee - Apt. Owners b) Connect Fee - All Others c) Same Day Connection (7am-3pm) d) Same Day Connection (3pm-5:30pm) e) Friday (7am-8pm) Elec, Wtr, or both f) Sat, Sun, or Holiday (7am-8pm) Elec, Wtr, or both g) Positive Identification Check Utility Delinquent Turn Off/On a) 7am-3pm b) 3pm-5:30pm c) Friday (7am-8pm) Elec, Wtr, or both d) Sat, Sun, or Holiday (7am-8pm) Elec, Wtr, or both e) Late Payment Penalty Theft of Water/Light Investigation a) Base Fee b) Damages and Estimated Usage Water Pressure Test a) Water Pressure Test b) Water Pressure Test - Main Line Water Meter Test Water Quality Test a) Base Fee b) Lab Costs Flow Test Temporary Meter Rental a) Base Fee b) Estimated Usage c) Deposit New Water Meter (Installation\Inspection) a) Base Fee b) Materials Cost Jumper Fee New Water Service Installation a) 3/4" - 1" b) 2" c) 4" d) 6" Hot Tap Fee a) 1" b) 2" c) 4" d) 6" e) 8" f) 10" g) 12" Fire Service Installation a) 4" b) 6" c) 8" d) 10" e) 12" New Backflow Device Inspection Review City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Light and Water Departments Calculation of the Estimated Cost of Service Input cells shaded in gray 21 [a] Fee waived for first test. Estimated Fully-Burdened Hourly Rate $ 87 $ 94 $ 113 $ 136 $ 166 n/a Estimated Cost of Service Cust Care Records Collect'n Cust Care Field Svcs Wtr P/T/D Eng'r Electric Distr Line Total $ - $ - $ 338 $ - $ - $ 338 $ - $ - $ 4,504 $ 271 $ - $ 4,775 $ - $ - $ 1,351 $ 271 $ - $ 1,622 $ - $ - $ 1,351 $ 271 $ - $ 1,622 $ - $ - $ - $ 271 $ - $ 271 $ - $ - $ 1,351 $ 136 $ - $ 1,487 $ - $ - $ - $ 68 $ - $ 68 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 271 $ - $ 271 $ - $ - $ - $ - $ 166 $ 166 $ - $ - $ - $ - $ 415 $ 415 $ - $ - $ - $ - $ 498 $ 498 $ - $ - $ - $ - $ 831 $ 831 $ - $ - $ - $ - $ 748 $ 748 $ - $ - $ - $ - $ 831 $ 831 $ - $ - $ - $ - $ 4,153 $ 4,153 $ - $ - $ - $ - $ 7,476 $ 7,476 $ - $ - $ - $ - $ 665 $ 665 Estimated Labor Hours Cust Care Records Collect'n Cust Care Field Svcs Wtr P/T/D Eng'r Electric Distr Line / Techs Total 3.00 2.00 1.00 3.00 40.00 42.00 12.00 2.00 14.00 12.00 2.00 14.00 2.00 2.00 12.00 1.00 13.00 0.50 0.50 - 2.00 2.00 1.00 2.50 2.50 3.00 3.00 5.00 5.00 4.50 4.50 5.00 5.00 25.00 25.00 45.00 45.00 4.00 4.00 Fee Description 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 S-116 S-119 S-122 S-123 S-124 S-125 S-126 S-127 S-130 Annual Backflow Device Inspection Review Water Disconnection from Mainline Fire Hydrant Relocation/Inspection Fee Traffic Incident - Hydrant Repair & Wtr Loss (System Impact Fee) Water Improvements a) Water Plan Check b) Water Inspection Fee Will-Serve Letter Sewer Dye Test Electric Plan Check Electric Meter Test a) Residential b) Commercial c) Industrial Total Electrical Service Re-Install (Plus materials) Additional Electric Span Install Plus materials) Temporary Electric Installation (Plus materials) Temp Single Phase Transformer Installation Temp Three Phase Transformer Installation Banner Installation 22 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Light and Water Departments Calculation of the Estimated Cost of Service Input cells shaded in gray [a] Fee waived for first test. Cost Recovery Information Current Fee Fee Type Est. Cost of Svc - Labor Est. Cost of Svc - M'tls Est. Cost of Svc - Total Current Cost Recovery Proposed Fee Fee Type Proposed Cost Recovery Notes $80 flat fee $338 $338 24% $80 flat fee 24% [a] $3,200 deposit $4,775 $4,775 67% $3,200 deposit 100% $1,500 flat fee $1,622 $1,622 92% $1,500 flat fee 92% $1,500 flat fee $1,622 $1,622 92% $1,500 flat fee 92% $0 flat fee $271 $271 0% $200 flat fee 74% $125 per hr $1,487 $1,487 varies $125 per hr 100% $0 flat fee $68 $68 0% $25 flat fee 37% $115 flat fee n/a n/a n/a $115 flat fee n/a $0 flat fee $271 $271 0% $200 flat fee 74% $160 flat fee $166 $166 96% $160 flat fee 96% $370 flat fee $415 $415 89% $370 flat fee 89% [a] $440 flat fee $498 $498 88% $440 flat fee 88% [a] $740 flat fee $831 $831 varies $740 flat fee 89% $725 flat fee $748 $748 varies $725 flat fee 97% $740 flat fee $831 $831 varies $740 flat fee 89% $3,098 flat fee $4,153 $4,153 75% $4,000 flat fee 96% $6,200 flat fee $7,476 $7,476 83% $7,500 flat fee 100% $580 flat fee $665 $665 87% $580 flat fee 87% Fee Description 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 S-116 S-119 S-122 S-123 S-124 S-125 S-126 S-127 S-130 Annual Backflow Device Inspection Review Water Disconnection from Mainline Fire Hydrant Relocation/Inspection Fee Traffic Incident - Hydrant Repair & Wtr Loss (System Impact Fee) Water Improvements a) Water Plan Check b) Water Inspection Fee Will-Serve Letter Sewer Dye Test Electric Plan Check Electric Meter Test a) Residential b) Commercial c) Industrial Total Electrical Service Re-Install (Plus materials) Additional Electric Span Install Plus materials) Temporary Electric Installation (Plus materials) Temp Single Phase Transformer Installation Temp Three Phase Transformer Installation Banner Installation 23 Cost of Service Calculation - Community Improvement 24 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Community Development Department - Community Improvement Fully-Burdened Hourly Rate Calculation and Allocation of Costs of Service Input cells shaded in gray General Allocation of Divisional Effort [a] Description Rental Inspection Program Real Property Records Mgmt Program Complaints / Nuisance Abatement Total Notes Estimated Allocation of Annual Labor Effort 25% 35% 40% 100% Labor Expenditures [b] Recurring Non-Labor Expenditures [c] Citywide Overhead [f] Total Allocable Expenditures Cost Recovery Analysis Description Rental Inspection Program Real Property Records Mgmt Program Complaints / Nuisance Abatement Total Notes Estimated Revenues $ 90,000 $ 46,000 $ 70,000 $ 206,000 [g] Estimated Expenditures $ 120,044 $ 168,062 $ 242,071 $ 530,177 Current Cost Recovery 75% 27% 29% 39% Rental Inspection Program Real Property Records Mgmt Program Complaints / Nuisance Abatement Total Notes $ 86,165 $ 120,631 $ 137,864 $ 344,660 $ 6,943 $ 9,720 $ 61,108 $ 77,770 $ 26,937 $ 37,712 $ 43,099 $ 107,747 $ 120,044 $ 168,062 $ 242,071 $ 530,177 Description Amount Labor Non-Labor Estimated Citywide Overhead $ 344,660 $ 77,770 $ 107,747 Total $ 530,177 Rental Inspection Program Real Property Records Mgmt Program Complaints / Nuisance Abatement Total Notes $ 26,937 $ 37,712 $ 43,099 $ 107,747 [c] $ 26,937 $ 37,712 $ 43,099 $ 107,747 Description Est. C'wide Overhead Estimated Citywide Overhead $ 107,747 Total $ 107,747 Rental Inspection Program Real Property Records Mgmt Program Complaints / Nuisance Abatement Total Notes $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 158 125 620 - - - 25 2,500 375 375 875 75 250 625 100 840 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 221 175 868 - - - 35 3,500 525 525 1,225 105 350 875 140 1,176 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 252 200 992 30,000 10,000 10,000 40 4,000 600 600 1,400 120 400 1,000 160 1,344 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 630 500 2,480 30,000 10,000 10,000 100 10,000 1,500 1,500 3,500 300 1,000 2,500 400 3,360 [d] [d] [d] [e] [e] [e] [d] [d] [d] [d] [d] [d] [d] [d] [d] [d] $ 6,943 $ 9,720 $ 61,108 $ 77,770 Description FY 2015/16 Budget Uniforms & Laundry Dues & Subscriptions Meetings & Conferences Legal Fees Public Nuisance Abatement Outside Services & Repairs Publications/Other Postage Office Supplies Printing, Binding & Duplicating Fuel and Oil Supplies/Special Small Equipment Maint & Repair / Vehicle Lease Payments Utilities/Telephone $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 630 500 2,480 30,000 10,000 10,000 100 10,000 1,500 1,500 3,500 300 1,000 2,500 400 3,360 Total $ 77,770 Rental Inspection Program Real Property Records Mgmt Program Complaints / Nuisance Abatement Total Notes $ 57,339 $ 80,274 $ 91,742 $ 229,355 $ 28,826 $ 40,357 $ 46,122 $ 115,305 $ 86,165 $ 120,631 $ 137,864 $ 344,660 Description Total Salaries Benefits $ 229,355 $ 115,305 Total - Labor Expenditures $ 344,660 25 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Community Development Department - Community Improvement Fully-Burdened Hourly Rate Calculation and Allocation of Costs of Service Input cells shaded in gray Calculation of Fully-Burdened Hourly Rate Description Total FTE Hours Per FTE Total Notes FY 15/16 Divisional FTE Less: Estimated Annual Leave 3.14 3.14 2,080 360 6,531 1,130 [b] [h] Total Available Hours 5,401 Description Total Rental Inspection Program Total Available Hours Estimated % of Time Spent on Indirect Activities Total Estimated Direct Hours Total Estimated Divisional Costs 5,401 [i] 25% $ 4,051 530,177 Fully-Burdened Hourly Rate $ 131 [a] Source: Feedback received from Community Development Director and Community Improvement Supervisor. [b] Source: FY 15/16 budgeted payroll data file provided by Finance Department. [c] Source: FY 15/16 adopted budget. [d] Amounts allocated in proportion to estimated labor effort. [e] Amounts allocated directly to complaints/nuisance abatement. [f] See worksheet labeled "Estimated Citywide Overhead". [g] Estimated revenues for rental inspection program and real property records management program based on FY 15/16 adopted budget. Complaint/nuisance abatement revenue based on FY 14/15 actual revenue for Code Enforcement coded to "Reimb/Court Costs" and "Fees/Public Nuisance Abatement". [h] Estimated leave assumes 120 hours holiday, 120 hours vacation, 120 hours sick. Actual leave amounts vary based on length of employment with city and employee classification. Amounts are intended to serve as reasonable estimates. [i] Amount intended to serve as reasonable estimate. Includes allocation for general administration and management, training, policies and procedures enhancement, and public information and assistance. 26 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Community Development Department - Community Improvement Input cells shaded in gray Calculation of the Estimated Cost of Service [a] City charges appellant $110. This is a pass-through of actual costs incurred by the City for neutral-party hearing officer. Est Volume FY1415 Est Rev at Current Fee Est Rev at Proposed Fee Notes 156 $8,424 $15,327 [a] - $0 $0 243 $42,525 $47,750 - $0 $0 - $0 $0 - $0 $0 - $0 $0 - $0 $0 Total $50,949 $63,077 Fee Description Est Labor Hours Hrly Rate Est Cost of Svc Current Fee Current Cost Recovery Proposed Fee Proposed Cost Recovery 1 2 3 4 3 S-063 S-063 S-063 S-063 S-063 S-063 S-063 S-063 S-064 S-064 S-064 S-064 S-032.5 S-95.1 S-066 Real Property Records Report a) Condominium/Townhouses b) Vacant/Unimproved Land c) Single Family Dwellings d) Multi-Family Dwellings i) Per Parcel ii) Each Add'l Unit e) Commercial Properties Residential Rental Housing Registration and Inspection a) Per Parcel, First Unit b) Each Additional Unit c) Reinspection Weed Abatement Inspection (Processing and Referring) Recovery and Storage of Abandoned Shopping Carts Appeal 0.75 1.50 1.50 1.50 0.08 1.50 n/a - n/a - n/a - n/a - $ $ $ $ $ $ 131 131 131 131 131 131 $ $ $ $ $ $ 98 197 197 197 11 197 $54 $175 $175 $175 $10 $175 $114 55% 89% 89% 89% 92% 89% $ $ $ $ $ $ $ 98 197 197 197 11 197 114 100% 100% 100% 100% 100% 100% fee not examined fee not examined fee not examined fee not examined fee not examined $7 $ 7 $85 $ 85 $329 $ 329 $12 $ 12 $ 110 $110 100% $ 110 100% 27 Cost of Service Calculation - Police 28 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Police Department Fully-Burdened Hourly Rate Calculation Calculation of Estimated Fully-Burdened Hourly Rates by Functional Division Functional Allocation for Fees Description FY 15/16 Adopted FTE or Hrs Alloc Est Hrs Per FTE Total Est Hours FY 15/16 Adopted Salary Dept O'H Direct Svcs Salary Alloc to Dept O'H for Fees Salary Alloc to Direct Svcs for Fees Reallocation of Dep't O'H Salary Allocation of Non-Salary Personnel Exp Allocation of Est Recurring Non-Labor Exp Allocation of Est Citywide O'H Est Total Est Hourly Rate Full-Time Police Chief Police Captain Police Lieutenant Police Sergeant Police Corporal Police Officer Admin Svcs Mgr Communications Sup Comm Svcs Off - Field Prop Evid & CS Tech Dispatcher Records Specialist III Records Specialist II Records Specialist I Admin Analyst Jail, Fleet & Fac Coord Court Liaison Officer Training Coord Subtotal Part-Time Assistant Office Specialist I Police Aide III Police Officer Rsrve Sergeant Rsrve Subtotal 1.00 2.00 4.00 8.00 10.00 35.00 1.00 1.00 3.00 1.00 10.00 2.00 1.00 2.00 1.00 1.00 1.00 1.00 85.00 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 2,080 4,160 8,320 16,640 20,800 72,800 2,080 2,080 6,240 2,080 20,800 4,160 2,080 4,160 2,080 2,080 2,080 2,080 176,800 416 2,080 3,120 2,600 1,664 9,880 $ 188,095 $ 339,770 $ 590,620 $ 975,945 $ 1,008,150 $ 3,233,745 $ 105,565 $ 84,230 $ 179,490 $ 70,780 $ 585,435 $ 113,080 $ 49,590 $ 81,410 $ 70,710 $ 54,650 $ 74,955 $ 72,915 $ 7,879,135 $ 9,685 $ 39,855 $ 34,470 $ 69,020 $ 45,995 $ 199,025 100% 100% 50% 50% 0% 0% 100% 100% 0% 0% 100% 0% 0% 0% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 0% 50% 50% 100% 100% 0% 0% 100% 100% 0% 100% 100% 100% 0% 0% 0% 0% 0% 0% 100% 100% 100% $ 188,095 $ 339,770 $ 295,310 $ 487,973 $ - $ - $ 105,565 $ 84,230 $ - $ - $ 585,435 $ - $ - $ - $ 70,710 $ 54,650 $ 74,955 $ 72,915 $ 2,359,608 $ 9,685 $ 39,855 $ - $ - $ - $ 49,540 - - 295,310 487,973 1,008,150 3,233,745 - - 179,490 70,780 - 113,080 49,590 81,410 - - - - $ 5,519,528 - - 34,470 69,020 45,995 $ 149,485 $ - $ - $ 125,497 $ 207,373 $ 428,431 $ 1,374,237 $ - $ - $ 76,277 $ 30,079 $ - $ 48,055 $ 21,074 $ 34,597 $ - $ - $ - $ - $ 2,345,621 $ - $ - $ 14,649 $ 29,331 $ 19,546 $ 63,526 $ - $ - $ 279,435 $ 461,740 $ 953,954 $ 3,059,906 $ - $ - $ 169,841 $ 66,975 $ - $ 107,001 $ 46,924 $ 77,034 $ - $ - $ - $ - $ 5,222,810 $ - $ - $ - $ - $ - $ - $ - $ - $ 55,035 $ 90,940 $ 187,881 $ 602,648 $ - $ - $ 33,450 $ 13,191 $ - $ 21,074 $ 9,242 $ 15,172 $ - $ - $ - $ - $ 1,028,632 $ - $ - $ 6,424 $ 12,863 $ 8,572 $ 27,858 $ - $ - $ 145,146 $ 239,840 $ 495,508 $ 1,589,393 $ - $ - $ 88,220 $ 34,789 $ - $ 55,579 $ 24,374 $ 40,013 $ - $ - $ - $ - $ 2,712,861 $ - $ - $ 16,942 $ 33,923 $ 22,607 $ 73,472 $ - $ - $ 900,422 $ 1,487,865 $ 3,073,925 $ 9,859,930 $ - $ - $ 547,278 $ 215,813 $ - $ 344,789 $ 151,204 $ 248,225 $ - $ - $ - $ - $16,829,451 $ - $ - $ 72,485 $ 145,137 $ 96,720 $ 314,342 $ - $ - $ 108 $ 89 $ 148 $ 135 $ - $ - $ 88 $ 104 $ - $ 83 $ 73 $ 60 $ - $ - $ - $ - $ - $ - $ 23 $ 56 $ 58 Total 85.00 186,680 $ 8,078,160 $ 2,409,148 $ 5,669,013 $ 2,409,148 $ 5,222,810 $ 1,056,490 $ 2,786,333 $17,143,793 Overhead and Direct 30% 70% Non-Salary Personnel Expenditures Description Amount Adjustment Total Notes Special Holiday Pay OT Pay/Premium S'by Pay/Premium Sal/Educ Incentive Sal/Language Pay Allowances/Uniform PERS/EE Contrib PERS/Employer Cont PARS/Employer FICA/Empl Cont/Med Ret Hlth Prem Reimb Life Ins Allocation Work' Comp Alloc LTD Ins Alloc Unemployment Alloc Benefits/Flex Plan Aff Care Act Penalty Def Comp/Emp Paid $ 133,300 $ 700,000 $ 89,000 $ 99,425 $ 54,875 $ 68,000 $ 734,125 $ 2,721,620 $ 1,725 $ 141,005 $ 59,780 $ 16,800 $ 366,240 $ 61,290 $ 10,115 $ 1,578,975 $ 3,000 $ 39,960 $ (133,300) $ (700,000) $ (89,000) $ - $ - $ - $ (734,125) $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 99,425 $ 54,875 $ 68,000 $ - $ 2,721,620 $ 1,725 $ 141,005 $ 59,780 $ 16,800 $ 366,240 $ 61,290 $ 10,115 $ 1,578,975 $ 3,000 $ 39,960 Total $ 6,879,235 $ (1,656,425) $ 5,222,810 Estimated Recurring Non-Labor Expenditures Description Total Notes Total $ 1,056,490 Estimated Citywide Overhead Description Amount Notes Total $ 2,786,333 29 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Input cells shaded in gray Police Department Calculation of the Estimated Cost of Service Calculation of Estimated Cost of Service Fee Description Minu tes Hrly Rate Est Cost of Svc Notes 1 Equipment Citation Sign-off a) Records Clerk b) Dispatcher c) Police Officer n/a 5 18 $ $ 73 n/a 135 $ $ 6 n/a 40 [a] Total 23 $ 46 Calculation of Estimated Cost Recovery Fee Description Curre Fee nt Est Cost of Svc Current Cost Recovery Proposed Fee Proposed Cost Recovery Current General Fund Subsidy Proposed General Fund Subsidy Notes 1 Equipment Citation Sign-off a) Citation issued by Azusa PD b) Citation issued by Other PD $ $ - 15 $ $ 46 46 0% 33% $ $ 15 15 33% 33% $ $ 46 31 $ $ 31 31 [a] Dispatcher costs included in fully-burdened hourly rates for records and Police Officer personnel. Amounts shown do not include dispatcher time in order to avoid double-counting. 30 Cost of Service and Cost Recovery Analysis - Recreation and Family Services 31 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Recreation and Family Services Department Estimated Cost of Service Est Expenditures w/out Full-Time Salaries Account # Sp Events Classes Adult Sports Pony Baseball Youth Sports Playgrnds Special Events MG/AM Day Camp Aquatics Teen Activities Misc Exp Total Rec. Div. 6006 - Salaries/part-time 6201 - Uniforms & Laundry 6215 - Tuition Reimb. 6220 - Training Schools 6230 - Dues & Subscriptions 6235 - Meetings & Conf. 6240 - Mileage Reimb. 6253 - Licenses/Certificates 6405 - Commission 6430 - Custodial Services 6440 - Class Instruction 6445 - Officiation Fees 6493 - Outside Services 6496 - Gas Tax 6518 - Postage 6530 - Office Supplies 6539 - Printing/Duplication 6548 - Plants & Trees 6551 - Fuel & Oil 6554 - Supplies/Custodial 6560 - Repair Parts 6563 - Supplies/Special 6566 - Small Tools 6569 - Small Equipment 6601 - Advertising 6602 - Concerts 6625 - Program Expenses 6655 - Food Service 6805 - Maint. Land Imp. 6825 - Maint/Repair Vehicles 6830 - Rent Equipment 6835 - Maint. Repair Equip. 6840 - Rent/Office Equip. 6845 - Maint./Office Equip. 6899 Repair/Maintenance 6904 - Utilities/Other 6910 - Utilities/Natural Gas 6915 - Telephone 7080 $ 12,488 - - - - - - - - - - - 4,300 - - 300 500 - - - - 1,100 - 300 - - 1,000 - - - - - - - - - - - - $ 10,680 - - - - - - - - - 30,000 - - - - 500 500 - - - - 50 - - - - - - - - - 400 - - - - - - - $ 38,376 - - 100 180 - - - - - - 400 - - - 600 500 - 500 - - 1,300 - - - - 19,150 - - 500 - 1,000 - - - - - - - $ 8,541 - - - - - - - - - - 10,840 - - - - 500 - - - - - - - - - 5,000 - - - - 700 - - - - - - - $ 13,765 - - - 490 - - - - - - 5,760 1,100 - - 400 500 - - - - - - - - - 10,000 - - - - - - - - - - - - $ 200,717 1,000 - - - 850 - - - - - - 4,398 - - 600 - - - 2,200 - 120 - - - - 11,500 - - - - - - - - - - - - $ 6,823 - - - - - - - - - - - 2,000 - - - - - - - - - - - - 15,000 3,000 - - - - - - - - - - - - $ 56,481 - - 100 - - - - - - - - - - - 300 500 - - - - - - - - - 18,700 - - - - 400 - - - - - - - $ 141,033 1,200 - 300 480 - - - - - - - 47,002 - - - - - - 300 - 17,340 - 1,700 - - 3,450 - - - - 3,000 - - - - - - - $ 4,527 - - - - - - - - - - - - - - 300 - - - - - - - - - - - - - - - - - - - - - - - $ 28,911 1,800 - 500 1,850 150 - - 2,500 - - - 6,200 - - 3,000 - - - - - 90 - - 12,000 - 8,000 - - - - - 300 3,700 500 - 18,000 7,000 - $ 522,342 4,000 - 1,000 3,000 1,000 - - 2,500 - 30,000 17,000 65,000 - - 6,000 3,000 - 500 2,500 - 20,000 - 2,000 12,000 15,000 79,800 - - 500 - 5,500 300 3,700 500 - 18,000 7,000 - Estimated Expenditures $ 19,988 $ 42,130 $ 62,606 $ 25,581 $ 32,015 $ 221,385 $ 26,823 $ 76,481 $ 215,805 $ 4,827 $ 94,501 $ 822,142 Share of Divisional Expenditures 2% 5% 8% 3% 4% 27% 3% 9% 26% 1% 11% 100% Share of Departmental Expenditures 1% 2% 3% 1% 2% 11% 1% 4% 10% 0% 5% 39% Estimated Revenue $ 21,875 $ 80,000 $ 86,435 $ - $ 55,000 $ 6,500 $ 2,400 $ 45,000 $ 59,990 $ 2,000 ####### $ 469,200 Estimated Cost Recovery w/out Full-Time Employees 109% 190% 138% see youth 95% 3% 9% 59% 28% 41% 116% 57% 32 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fee Recreation and Family Services Department Estimated Cost of Service Est Expenditures w/out Full-Time Salaries $ 20,000 $ 39,000 $ 186,775 $ 245,775 $ 500 Estimated Revenue Estimated Cost Recovery w/out Full-Time Employees Grand Total All Div. Notes $ 718,252 10,000 1,000 2,200 3,900 1,800 1,050 500 2,500 8,800 30,000 17,000 412,020 59,000 100 10,640 10,600 4,000 21,700 17,500 1,250 60,500 1,470 3,100 12,000 15,000 103,635 110,150 41,860 8,940 300 10,500 2,800 3,700 500 345,000 24,300 14,400 1,050 $ 2,093,017 100% 100% Womans Club Senior Prog. Senior Nutrition Total Sr. Div. $ 665 - - - - - - - - 6,800 - - 2,900 - - - 1,800 - - - - 200 - 100 - - - - - - - - - - - - 3,200 500 850 $ 29,525 - - 200 400 400 - - - 2,000 - - 2,000 - 100 500 4,200 - - - - - - - - - 23,335 - - - - 1,500 2,500 - - 35,000 2,000 2,300 200 $ 56,720 - - - - 300 1,050 - - - - - - - 3,200 1,600 - - - - 300 - - - - 500 110,150 - - - - - - - 1,100 - - $ 86,910 - - 200 400 700 1,050 - - 8,800 - - 4,900 - 100 3,700 7,600 - - - - 500 - 100 - - 23,835 110,150 - - - 1,500 2,500 - - 35,000 6,300 2,800 1,050 $ 17,015 $ 106,160 $ 174,920 $ 298,095 6% 36% 59% 100% 1% 5% 8% 14% Parks Division $ 109,000 6,000 1,000 1,000 500 100 - 500 - - - - 342,120 59,000 - 940 - 4,000 21,200 15,000 1,250 40,000 1,470 1,000 - - - - 41,860 8,440 300 3,500 - - - 310,000 - 4,600 - $ 972,780 100% 46% Account # 6006 - Salaries/part-time 6201 - Uniforms & Laundry 6215 - Tuition Reimb. 6220 - Training Schools 6230 - Dues & Subscriptions 6235 - Meetings & Conf. 6240 - Mileage Reimb. 6253 - Licenses/Certificates 6405 - Commission 6430 - Custodial Services 6440 - Class Instruction 6445 - Officiation Fees 6493 - Outside Services 6496 - Gas Tax 6518 - Postage 6530 - Office Supplies 6539 - Printing/Duplication 6548 - Plants & Trees 6551 - Fuel & Oil 6554 - Supplies/Custodial 6560 - Repair Parts 6563 - Supplies/Special 6566 - Small Tools 6569 - Small Equipment 6601 - Advertising 6602 - Concerts 6625 - Program Expenses 6655 - Food Service 6805 - Maint. Land Imp. 6825 - Maint/Repair Vehicles 6830 - Rent Equipment 6835 - Maint. Repair Equip. 6840 - Rent/Office Equip. 6845 - Maint./Office Equip. 6899 Repair/Maintenance 6904 - Utilities/Other 6910 - Utilities/Natural Gas 6915 - Telephone 7080 Estimated Expenditures Share of Divisional Expenditures Share of Departmental Expenditures $ 715,475 [a] 34% 0% 118% 37% 107% 82% 33 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Recreation and Family Services Department Estimated Cost of Service Est Allocation of Full-Time Salaries Job Title Est. FY 15/16 Sal & Ben Sp Events Classes Adult Sports Pony Baseball Youth Sports Playgrnds Special Events MG/AM Day Camp Aquatics Teen Activities Misc Exp Total Rec. Div. Director Sr. Office Specialist Rec Superintendent Rec Coordinator Rec Supervisor Rec Superintendent Urban Forester Parks Maint Worker III Parks Maint Worker III Parks Maint Worker III Parks Maint Worker III Parks Maint Worker III Recreation Supervisor Finance Director Senior Office Specialist Recreation Supervisor Recreation Supervisor Senior Office Specialist $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 198,145 84,120 133,275 77,325 5,490 94,535 106,760 95,405 95,405 93,920 90,175 90,175 48,660 9,940 14,450 48,660 5,490 1,690 1,892 803 3,240 1,880 133 - - - - - - - - - - - - - 3,988 1,693 6,830 3,962 281 - - - - - - - - - - - - - 5,927 2,516 10,149 5,888 418 - - - - - - - - - - - - - 2,422 1,028 4,147 2,406 171 - - - - - - - - - - - - - 3,031 1,287 5,190 3,011 214 - - - - - - - - - - - - - 20,958 8,898 35,888 20,822 1,478 - - - - - - - - - - - - - 2,539 1,078 4,348 2,523 179 - - - - - - - - - - - - - 7,240 3,074 12,398 7,193 511 - - - - - - - - - - - - - 20,430 8,673 34,984 20,297 1,441 - - - - - - - - - - - - - 457 194 782 454 32 - - - - - - - - - - - - - 8,946 3,798 15,319 8,888 631 - - - - - - - - - - - - - 77,832 33,043 133,275 77,325 5,490 - - - - - - - - - - - - - Estimated Expenditures $ 1,293,620 $ 7,949 $ 16,755 $ 24,898 $ 10,174 $ 12,732 $ 88,044 $ 10,667 $ 30,416 $ 85,825 $ 1,920 $ 37,583 $ 326,964 Est Expenditures w/ Full-Time Salaries Estimated Expenditures $ 27,937 $ 58,885 $ 87,504 $ 35,755 $ 44,747 $ 309,429 $ 37,490 ####### $ 301,630 $ 6,747 ####### $ 1,149,106 Share of Divisional Expenditures 2% 5% 8% 3% 4% 27% 3% 9% 26% 1% 11% 100% Share of Departmental Expenditures 1% 2% 3% 1% 1% 9% 1% 3% 9% 0% 4% 34% Estimated Revenue $ 21,875 $ 80,000 $ 86,435 $ - $ 55,000 $ 6,500 $ 2,400 $ 45,000 $ 59,990 $ 2,000 ####### $ 469,200 Estimated Cost Recovery w/ Full-Time Employees 78% 136% 99% youth * 68% 2% 6% 42% 20% 30% 83% 41% Estimated Amount Paid from General Fund (i.e. Subsidy) $ 6,062 $ (21,115) $ 1,069 youth * $ 25,502 $ 302,929 $ 35,090 $ 61,897 $ 241,640 $ 4,747 $ 22,084 $ 679,906 Example of Fee Changes to Eliminate Subsidy Increase Required to Eliminate Subsidy 28% 0% 1% youth * 46% n/a n/a 138% 403% 237% n/a n/a Current Fee $ 15 n/a $ 300 youth * $ 45 n/a n/a $ 90 $ 30 $ 20 n/a n/a Fee Required to Eliminate Subsidy $ 19 n/a $ 304 youth * $ 66 n/a n/a $ 214 $ 151 $ 67 n/a n/a Estimated Additional Revenue After Subsidy Elimination $ 6,062 n/a $ 1,069 youth * $ 25,502 n/a n/a $ 61,897 $ 241,640 $ 4,747 n/a $ 340,918 Estimated Revenue from Proposed Changes to Fees Current Fee $ 15 n/a $ 300 youth * $ 45 n/a n/a $ 90 $ 30 $ 20 $ 25 n/a Proposed Fee $ 15 n/a $ 300 youth * $ 45 n/a n/a $ 90 $ 31 $ 20 $ 26 n/a Proposed Fee Change 0% n/a 0% youth * 0% n/a n/a 0% 3% 0% 4% n/a Existing Revenue $ 21,875 n/a $ 86,435 youth * $ 55,000 n/a n/a $ 45,000 $ 59,990 $ 2,000 $ 20,000 n/a Proposed Revenue After Fee Change $ 21,875 n/a $ 86,435 youth * $ 55,000 n/a n/a $ 45,000 $ 61,990 $ 2,000 $ 20,800 n/a Revenue Increase** $ - n/a $ - youth * $ - n/a n/a $ - $ 2,000 $ - $ 800 $ 2,800 Plus Est. Increase from 2% Credit Card Surcharge *** Total Anticipated Revenue Increase * Combine Pony Baseball and Youth Sports expenditures and revenues to determine total youth sports cost recovery level. ** Revenue increase from Miscellaneous category assumes roughly 4% increase in revenue from shelter rentals. *** Estimated revenue from credit card surcharge assumes $100,000 per year in payments made with credit card. [a] Aquatics revenue assumes loss of $36,140, beginning in FY 16/17, of revenue historically received from Los Angeles County. 34 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fee Recreation and Family Services Department Estimated Cost of Service Est Allocation of Full-Time Salaries Est Expenditures w/ Full-Time Salaries Example of Fee Changes to Eliminate Subsidy Estimated Revenue from Proposed Changes to Fees * Combine Pony Baseball and Youth Sports expenditures and revenues to determine total youth sports cost recovery level. ** Revenue increase from Miscellaneous category assumes roughly 4% increase in revenue from shelter rentals. *** Estimated revenue from credit card surcharge assumes $100,000 per year in payments made with credit card. [a] Aquatics revenue assumes loss of $36,140, beginning in FY 16/17, of revenue historically received from Los Angeles County. $ 2,800 $ 2,000 $ 4,800 $ - n/a $ - $ - $ - Revenue Increase** Plus Est. Increase from 2% Credit Card Surcharge *** Total Anticipated Revenue Increase n/a n/a n/a $ 715,475 $ 715,475 $ 500 n/a $ 2 n/a $ 500 n/a $ 2 n/a 0% n/a 0% n/a $ 20,000 n/a $ 186,775 n/a $ 20,000 n/a $ 186,775 n/a n/ a n/ a n/ a $ 500 $ 500 Current Fee Proposed Fee Proposed Fee Change Existing Revenue Proposed Revenue After Fee Change n/a n/a n/a $ 432,192 32% 334% 45% n/a $ 500 n/a $ 2 n/a $ 662 n/a $ 3 n/a $ 6,490 n/a $ 84,785 $ 91,274 n/a n/a n/a n/a Increase Required to Eliminate Subsidy Current Fee Fee Required to Eliminate Subsidy Estimated Additional Revenue After Subsidy Elimination $ 2,671,162 $ 6,490 $ 130,137 $ 84,785 $ 221,411 $ 1,769,844 Estimated Amount Paid from General Fund (i.e. Subsidy) $ 715,475 $ 20,000 $ 39,000 $ 186,775 $ 245,775 $ 500 Estimated Revenue Estimated Cost Recovery w/ Full-Time Employees $ 3,386,637 100% 100% $ 26,490 $ 169,137 $ 271,560 $ 467,186 6% 36% 58% 100% 1% 5% 8% 14% $ 1,770,344 100% 52% Estimated Expenditures Share of Divisional Expenditures Share of Departmental Expenditures Womans Club Senior Prog. Senior Nutrition Total Sr. Div. Grand Total All Div. 1,611 10,050 16,560 28,221 198,145 684 4,267 7,030 11,981 84,120 - - - - 133,275 - - - - 77,325 - - - - 5,490 - - - - 94,535 - - - - 106,760 - - - - 95,405 - - - - 95,405 - - - - 93,920 - - - - 90,175 - - - - 90,175 - - 48,660 48,660 48,660 - - 9,940 9,940 9,940 - - 14,450 14,450 14,450 - 48,660 - 48,660 48,660 5,490 - - 5,490 5,490 1,690 - - 1,690 1,690 $ 9,475 $ 62,977 $ 96,640 $ 169,091 $ 1,293,620 Parks Division 92,093 39,097 - - - 94,535 106,760 95,405 95,405 93,920 90,175 90,175 - - - - - - $ 797,564 Job Title Est. FY 15/16 Sal & Ben Director $ 198,145 Sr. Office Specialist $ 84,120 Rec Superintendent $ 133,275 Rec Coordinator $ 77,325 Rec Supervisor $ 5,490 Rec Superintendent $ 94,535 Urban Forester $ 106,760 Parks Maint Worker III $ 95,405 Parks Maint Worker III $ 95,405 Parks Maint Worker III $ 93,920 Parks Maint Worker III $ 90,175 Parks Maint Worker III $ 90,175 Recreation Supervisor $ 48,660 Finance Director $ 9,940 Senior Office Specialist $ 14,450 Recreation Supervisor $ 48,660 Recreation Supervisor $ 5,490 Senior Office Specialist $ 1,690 Estimated Expenditures $ 1,293,620 0% 21% 76% 23% 69% 53% 35 Cost Recovery Analysis - Library 36 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Input cells shaded in gray Library Department Revenue Modification Assuming Proposed Adjustments to Fees Estimated Cost Recovery and Illustration of Revenue Impact of Proposed Fee Modifications Revenue Description Typical Revenue Type Current Revenue Modification Revenue After Modification Fees/Library Overdue Fines $ 13,000 35% $ 17,550 Rents/Library DVD rental $ 3,000 -100% $ - Vending Machine Collection Fax Machine $ 3,000 0% $ 3,000 Reimb/Lost & Paid Materials Lost Book Charge $ 5,000 0% $ 5,000 Fees/Notary Certification Notary $ 600 0% $ 600 Fees/US Passports US Passports $ 18,000 0% $ 18,000 Total $ 42,600 $ 44,150 Library - General Fund Expenditures $ 1,026,980 $ 1,026,980 Estimated Cost Recovery 4% 4% 37 Estimated Citywide Overhead 38 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Estimated Citywide Overhead Input cells shaded in gray FY 15/16 Support Services Cost Allocations - Initial Cost Allocations [a] Department FY 15/16 Est. FTE FTE Allocation FY 15/16 Adj. Allocation Administration Finance City Clerk City Information Technology Community Development Recreation & Family Services Human Resources Library Light and Water Public Safety Sewer Public Works-Other 3.00 9.00 2.00 6.00 15.00 13.00 3.00 7.00 75.00 87.00 7.00 16.00 1.2% 3.7% 0.8% 2.5% 6.2% 5.3% 1.2% 2.9% 30.9% 35.8% 2.9% 6.6% $ $ $ $ $ $ $ $ $ $ $ $ 47,050 141,151 31,367 94,100 235,251 203,884 47,050 109,784 1,135,115 1,364,456 109,784 250,934 Total 243.00 100.0% $ 3,769,926 FY 15/16 Citywide Budget 1090000 [b] Description FY 2015/16 Budget Adjustment Subtotal Notes Salary - Area D (Reimbursed) PARS Administration Fees Retiree Health Premium Reimb Benefits/Other Professional Services/Other Outside Services & Repair Advertising Expn IT Allocation Insurance Allocation Lease/Vehicles Maint & Repair/Vehicle Utilities/Other Interest Expense-L&W Property Tax Administration Miscellaneous Transfer To Other Funds Transfer To APFA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 100,000 32,500 464,690 132,320 19,215 5,300 1,800 809,625 1,097,920 35,160 15,000 2,400 15,360 55,000 100,000 5,122,585 361,395 $ $ $ $ $ (100,000) (55,000) (100,000) (5,122,585) (361,395) $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - 32,500 464,690 132,320 19,215 5,300 1,800 809,625 1,097,920 35,160 15,000 2,400 15,360 - - - - [c] [d] [e] [f] [f] Total $ 8,370,270 $ (5,738,980) $ 2,631,290 FTE for Allocation of FY 15/16 Citywide Budget 1090000 [g] Department FY 15/16 Est. FTE FTE Allocation FY 15/16 Est. C'wide 1090000 Alloc. Administration 3.00 1.9% $ 49,030 Finance 9.00 5.6% $ 147,091 City Clerk 2.00 1.2% $ 32,687 City Information Technology 6.00 3.7% $ 98,060 Community Development 15.00 9.3% $ 245,151 Recreation & Family Services 13.00 8.1% $ 212,464 Human Resources 3.00 1.9% $ 49,030 Library 7.00 4.3% $ 114,404 Public Safety 87.00 54.0% $ 1,421,877 Public Works-Other 16.00 9.9% $ 261,495 Total 161.00 100.0% $ 2,631,290 39 City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Estimated Citywide Overhead Input cells shaded in gray Estimated Allocation of Community Development Related Citywide Overhead Description FY 15/16 Est. FTE Share of Initial Support Service Cost Allocation Share of Citywide Budget 1090000 Allocation $ 235,251 $ 245,151 Total $ 480,402 Estimated Allocation of Community Development Related Citywide Overhead Amongst Divisions [h] Division FY 15/16 Est. FTE FTE Allocation Est. C'Wide Overhead Allocation Planning 2.35 16.8% $ 80,639 Building 4.35 31.1% $ 149,268 Community Improvement 3.14 22.4% $ 107,747 Business License 3.00 21.4% $ 102,943 CDBG 1.16 8.3% $ 39,805 Total 14.00 100.0% $ 480,402 Estimated Allocation of Public Works/Sewer Related Citywide Overhead Description Est. FTE Share of Initial Support Service Cost Allocation Share of Citywide Budget 1090000 Allocation $ 250,934 $ 261,495 Total $ 512,429 Estimated Allocation of Community Development Related Citywide Overhead Amongst Divisions [h] Division Est. FTE Allocation Overhead Engineering Public Works/Sewer All Other 3.75 12.25 23.4% 76.6% $ 120,101 $ 392,328 Total 16.00 100.0% $ 512,429 [a] Source: City of Azusa Support Services Cost Allocation FY 15/16 (File labeled: Sources and Uses-FY1516.xls; worksheet labeled: Allocation 1516). [b] Source: FY 15/16 Adopted Budget. [c] Excludes reimbursed expenditures. [d] Excludes property tax administration expenses. [e] Excludes contingencies. [f] Excludes transfers. [g] Only General Fund divisions are included, because non-General Fund departments are direct charged and are presumed not to benefit from Program 1090000 expenditures. [h] FY 15/16 Adopted Budget assumes 14 FTE; support services cost allocation assumes 15 FTE. Amounts are intended to serve as reasonable estimates - non-material variance. Appendix D - Fee Comparison DRAFT City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Regional Comparison of Estimated Fees for Service 1 Temporary Use Permit Azusa - Proposed Azusa - Current Monrovia Arcadia Covina Sign Permit - Minor Arcadia Covina Monrovia Azusa - Proposed Azusa - Current Encroachment - Residential Driveway Approach Monrovia Azusa - Current Azusa - Proposed Covina Duarte Arcadia Glendora Encroachment - Temporary Obstruction/Bin Monrovia Covina Azusa - Proposed Azusa - Current Arcadia Glendora Duarte Lot Line Adjustment Covina Azusa - Proposed Glendora Azusa -Current Arcadia Variance - Major Azusa - Proposed Azusa - Current Covina Glendora Arcadia $- $- $- $200 $100 $100 $400 $200 $600 $200 $300 $800 $300 $400 $1,000 $500 $1,200 $400 $600 $1,400 $500 $1,600 $700 $1,800 $600 $800 $- $- $- $1,000 $50 $50 $2,000 $100 $100 $3,000 $150 $150 $4,000 $200 $200 $5,000 $250 $250 $6,000 DRAFT City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Regional Comparison of Estimated Fees for Service 2 Traffic Collision Report - Injury Azusa - Proposed Azusa - Current Duarte Covina Online Glendora Traffic Collision Report - Non-Injury Duarte Azusa - Proposed Azusa - Current Covina Online Glendora Dog License - Altered Monrovia Glendora LA County Covina Azusa - Proposed Azusa - Current Duarte Arcadia Dog License - Unaltered Duarte Monrovia Glendora LA County Covina Azusa - Proposed Azusa - Current Arcadia Citation Signoff - Issued by Home Agency PD Covina Monrovia Azusa Proposed Duarte Glendora Azusa Current Citation Signoff - Issued by Other PD Covina Glendora Monrovia Duarte Azusa - Proposed Azusa - Current $0 $0 $0 $10 $5 $5 $20 $10 $10 $30 $15 $15 $40 $20 $20 $50 $25 $25 $60 $30 $70 $30 $0 $0 $0 $2 $5 $5 $4 $10 $10 $6 $15 $15 $8 $20 $20 $10 $25 $25 $12 $14 $30 $30 DRAFT City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Regional Comparison of Estimated Fees for Service 3 Swimming Lessons (Group) - Child Glendora Covina Azusa Proposed (40 minutes) Azusa Current (40 minutes) Azusa Proposed (25 minutes) Azusa Current (25 minutes) Duarte Day Swim - Under 12 Years Old Glendora Duarte Covina Azusa Proposed Azusa Current Day Swim - Teens/Adults (Non-Senior) Glendora Duarte Azusa Proposed Azusa Current Covina Day Swim - Seniors Glendora Duarte Azusa Proposed Azusa Current Covina $0.00 $0 $0.50 $10 $20 $1.00 $30 $40 $1.50 $50 $60 $2.00 $70 $80 $2.50 $90 $0.00 $0.00 $0.50 $0.50 $1.00 $1.00 $1.50 $1.50 $2.00 $2.00 $2.50 $2.50 DRAFT City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Regional Comparison of Estimated Fees for Service 4 Youth Day Camp Arcadia Glendora Covina Azusa Proposed Azusa Current Youth Basketball Glendora Covina Arcadia Monrovia Duarte Azusa Proposed Azusa Current Adult Softball Monrovia Duarte Covina Azusa Proposed Azusa Current Glendora Picnic Shelter Glendora Resident - All Day (Large) Duarte (Large) Glendora Resident - All Day (Small) Duarte (Small) Azusa Proposed (Large) Azusa Current (Large) Azusa Proposed (Small) Azusa Current (Small) Arcadia Covina $0 $75 $50 $100 $150 $200 $100 $250 $300 $350 $400 $125 $0 $20 $0 $20 $40 $40 $60 $60 $80 $80 $100 $120 $100 $140 $120 $160 DRAFT City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Regional Comparison of Estimated Fees for Service 5 Overdue Fines - Adult LA County Azusa - Proposed Duarte Azusa - Current Arcadia Glendora Monrovia Covina Overdue Fines - Child Arcadia Glendora LA County Azusa - Proposed Monrovia Duarte Covina Azusa - Current DVD Rental Azusa - Current Covina Monrovia LA County Azusa - Proposed Glendora Duarte Arcadia Library Card Replacement Glendora Arcadia LA County Azusa - Proposed Azusa - Current Duarte Monrovia Covina $- $- $0.20 $0.05 $0.40 $0.10 $0.60 $0.15 $0.80 $0.20 $1.00 $0.25 $1.20 $0.30 $1.40 $1.60 $0.35 $- $- $0.50 $0.05 $1.00 $1.50 $0.10 $2.00 $0.15 $2.50 $0.20 $3.00 $3.50 $0.25 $4.00 $0.30 $4.50 DRAFT City of Azusa Cost of Service Study for Analyzing User and Regulatory Fees Regional Comparison of Estimated Fees for Service 6 Notes: - Arcadia used to charge a $2 online transaction fee, but discontinued the fee. - Duarte only allows credit card payment for amounts over $25. - Duarte collects a 2.87% charge on amounts over $1,000 (i.e. $1,500 pmt. receives a 2.87% charge on $500) - Duarte uses a third party for online payment of citations. Third party vendor collects $3.00 fee. - R. Lam asked about county charges for online transactions. ClearSource believes these charges may be linked to the use of third-party providers that charge fees as part of the service agreement. Credit Card Transaction Fee Covina Azusa Proposed Monrovia Glendora Duarte Arcadia Azusa Current 0.00% 0.50% 1.00% 1.50% 2.00% 2.50% 3.00% 3.50%