Loading...
HomeMy WebLinkAboutF-2. Regulatory Report Information Item Presented .(iift - F-2 .acm, INFORMATION ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIES DATE: MAY 27,2014 SUBJECT: REGULATORY REPORTING BACKGROUND Because of the increasingly complex business and regulatory scene, compliance reporting requirements by the electric utilities have increased several-fold. As an example, Azusa Light &Water has a variety of monthly and annual reporting obligations to the Federal Energy Information Administration (EIA), the California Energy Commission (CEC), and California Air Resources Board(CARB). Additionally,regular(monthly and annual) reports are required by the California Independent System Operator(CAISO). Moreover, certain types of financial transactions are reportable to the Federal Commodities Futures Trading Commission(CFTC). Please note that all above mentioned reporting is compliance reporting, meaning that all "reportable business" must be first conducted within strict legal, regulatory, and operational confines before it is reported. In preparation for an upcoming meeting of the Southern California publically owned utilities (POUs) with the CEC commissioners, SCPPA prepared a sample of the CEC—required reports. It is planned that the document will be provided to the commissioners to illustrate the increasingly heavy(and many times redundant)reporting burden. Please see the attached draft document intended for distribution to the CEC Commissioners during the upcoming meeting. Prepared by: Yarek Lehr,P.E.,Assistant Director of Resource Management Attachment: CEC Reporting Chart Draft UB-62 • .. . . ..... a Nli I-„ sli ill t t 3 . r � a=, ill 1§1 a k.,- 1-. 1/ ill $y 1 .� '7, Ail w ill Ilk-- ow vt g§ imli ifish . A €�` 1 _2 a :1:11.-cotti::-A r_ ill jilt8 Oriii ui OL ill .11 0 i 1 f 1."...,t-f?"44-.- I i I i i I ca..-ft i 1 i 1( ' j 14 ° 0-3., 111._ 0 p: -A - r. I ill ::: ill 11:114:421, ` OO (1:::1,1) g i tijr-1111 ,i41 r -1 ,j1 ill Lill lrilrplii,pi 1 ;., -71 i5J 1 N is r04:: el . ....,, 0 :111T-141Y4 g 1 1 1 i li " t'' ,,,, iloe. ttKe ; 1 4 N id till - - . .i; 11 Ili 1111 ill s1s#21 ill a o ¢1•y 4 ';,--2 ,.c- 4 o z o y < -, -b z" < E LL ..i M V F ` _ _ M , a ;_1 n Z c 4 ?" U V id Z *. ig IM mil w Z iii N �a Zoe o O Z � cn W Os v Z Ce a- W z W W 12 4 ix u- tiia Z v o o F- mOZ ' wa d -- " UB-63 CEC-RPS-1:Application for Certification or Precertification, including but not limited to supplemental forms S1-Biopower, M RPS MuMuel and Attestation Form for RPS-certified facilities S2-Hydroetectrc,and iS3-Faciities with a first point of using more than one fuel OM Cen,ficannn interconnection to anon-Calfomian balancing authority outside California and tackifies located outside the U.S. Procurement POUs with participating Proposition 39 schools are required to CES rocur adk complete Utility Data Release Authorization fonn(s)and any RPS PPement Claims and Attestation Form for load- ' necessary bads-up documentation. serving entities reporting generation not avalable in WREGIS Annual hourly meter and annual hourly final e-Tag schedule reporting for POUs claiming PCC 1 not directly Assembly Bill 1103 Commercial Building Energy Use Interconnected to a California Balancing Authority Disclosure Program to..„"• Ira e-Tagsummary report for 7 s not tracked in WREGIS for «r� all AInterim Tracking System reports were used whle CEC was svia�wy, POUs transition to WREGIS for tracking all renewable energy "' credits;POUs could use the ITS to report generation occurring through October 2012. RPS claims from RPS-certified facilities using biomethane To reconcile differences that occur in WREGIS and verified date,additional documentation may be needed to substantiate �REthe reason(s)why WREGIS Certificate amounts may differ hays Each POU must adopt a RPS procurement plan as required kri '".'"t` from.the amounts reported in the RPS Verification Report. noamNrt ::. under subsection 3205(a)of the regulations.(The fix, procurement plan,or any revisions thereto,must be Senate Bit 1368 limits long-term investments in baseload submitted to CEC within 30 calendar days of adoption.) generation that meet an Emissions Performance Standard. A I,- POU will be required to notice when their governing board REC Retirement and Reporting Requirements SL.,3t t deltherates an investment of>$2.5M to meet environmental RECs must be retired within 36 months from the month and regulatory requirements ata non-EPS compliant facility. year of generation in order to be used for the RPS. Hydro facilities are divided into two categories larger than 30 MW capacity;smaller than 30 MW capacity is considered R "' Demonstration of reasonable progress for actons taken and able k"""' %mar hydro and are totaled into the RPS. Utilities are planned. required to permit andpumped storageeta; certify P mP fadntties. California'sA Budding Energy Efficiency Standards are updated r 7 BM 2514 requires each POU Governing Board to determine the cost-effectiveness and the viability of energy on an approximately 3-year cycle.Participating utilities in the ,v,!,-4,"!.-.1'- storage technologies and to set any procurement targets. standards-development process can claim energy efficiency .._` The decision must be revisited at least once = 3 years. savings and are required to report compliance to CEC. ASenate Bill X1-2 applied the RPS to POUs;increased CEC's 13•4 Power r These tams provide electric generation and fuel use role specific to:1)adopt regulations for RPS enforcement;2) ;Fuel information to power plant operations,and is used by post information on date,time,and location of any public c'iw fr CEC staff for various analyses including the integrated meeting to consider the POU's RPS procurement plan;and 3) Energy tel'Report. Each owner of a power plant located post any public documents on POU RPS procurement status. 'ar'°.°' within Calfomla or within a control area with end users inside Plant a California.Based on power plant nameplate capacity as Assembly BB 162 and Senate Bill 1305 require all retail (1-l(mir listed. ,; ,, electricity suppliers to disclose information to customers about the energy resources used to generate the electricity sold. f�; ..?' Independent Audit of the Annual Power Content Label and a POUs must declare under penalty of perjury that the ,�y the Annual Report Writ-GI` statements in all WREGIS StatelProvincialNokmtary Compliance report attachments and supporting delivery Senate BM 1305 requires retail suppliers of electricity to documentation,and/or other attachments are true and correctPorterdisclose to consumers'accurate,rentable,and simple-to- $0wD° understand information on the sources of energythat are PuDldy owned utilities are required under Senate Bill 1 to *do"report an the progress of their solar incentive program to the (being)mrsed...' Energy Commission on a yearly basis.Reporting data must be California bad-serving entities must provide CEC information submitted by July 1st of each year(for previous year). ( It- related to electricity demand forecasts,DSM and EE impacts, Senate Bit 1037 established several EE policies,including aIIII l supply impacts,and related information for 2013-2024 statewide commitment to cost effective,reliable,and feasible and historic years 2000-2012. EE,WM the expectation that all utilities consider EE before These forms cover forecast years 2013-2022 and historical Investing in other resources to meet demand, years 2011 and 2012.California load-serving entities are Assembly Bi12021 requires a POU to identify all potentially E required to wind plans showing how demand for energy and b 1' admievable cost-effective electricity efficiency savings and to annual peak load will be met by specific supply resources. establish annual targets for savigs and demand reduction nom CEC-1305A Peak Demand Monthly Report over 10 years,every three years. Peery provides monthly system peak demand and-hourly toad in Demand each California antral area PS Annual report summary information and compliance report information for POUs. 13eea CEC-13058 Control Area Quarterly Report Control provides monthly system peak demand and hourly load in CEC-RPS-GEN:RPS Generation and Attestation Form for Armee each California control area rips - RPS-eligible facilities.Required for facilities with generation 1304A CEC-1306A SaleslDelNeries Quarterly Report not tracked in WREGIS for an entire calendar year.Once done,this form is only required upon request scar provides the quantity of electricity delivered monthly by utility Delveras distribution companies to end-use customers *`` Historic carryover report with 2004-2010 RPS procurement CEC-1306C List of Power Plants Semi-Amual Report MIMRim claims for POUs 1301C This list of power pat's located within the UDC servicearea. tot slPorow rwa, The list provides power pent owner contact information so they can be contacted to report generation and fuel use data. ( j;j , Wind Project Performance or tMnd Power Purchases— ) Verification(1384);Wrnd Project Performance(1385)[this fore has 4 schedules];Wind Power Purchases(1386) UB-64