HomeMy WebLinkAboutF-2. 2013 Annual Summary Inspection Reports Information Item F-2 Presented 9 ft (i4- INFORMATION AK ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD FROM: GEORGE F. MORROW, DIRECTOR OF UTILITIES DATE: SEPTEMBER 22,2014 SUBJECT: 2013 ANNUAL SUMMARY INSPECTION REPORTS (GO 165 AND 174) Azusa Light & Water is a municipal public utility designated as a Reliable Public Power Provider under the American Public Power Association - RP3 Program. The Electric Division of the Azusa Light&Water performs annual inspections of the City's electric facilities as part of its commitment to promote a safe electric system and provide reliable electricity to City residents or customers. The 2013 annual inspections were performed in conformance with established minimum inspections requirements adopted by the State of California Public Utilities Commission under General Order 165 and 174. These inspections consist of, but not limited to, circuit and streetlight patrols, infrared inspections, visual inspections of electrical equipment both overhead and underground, intrusive and/or detailed wood pole inspections, and inspection of substation facilities. The 2013 Annual Inspection Report, which is a summary of the completed inspection program, is hereby presented to the Azusa Utility Board in faithful compliance to applicable provision of General Order 165 and 174. A copy of the completed inspection program summary is attached to this report for reference and is also available online at the Utility's website address. Prepared by: Dan Kjar—Electric Distribution Supervisor F. Langit Jr.—Assistant Director of Electric Operations Attachments: 1. GO 165 2013 Annual Report 2. GO 165 2013 Inspection Report 3. GO 174 2013 Annual Report UB-141 AZUSA LIGHT & WATER DEPARTMENT ANNUAL REPORT OF 2013 PURSUANT TO GENERAL ORDER NO. 165 Dated: 12/24/2013 UB-142 Azusa Light & Water Annual Compliance Report to General Order No. 165 TABLE OF CONTENTS Section Title Page I. INTRODUCTION AND SUMMARY ,,.1 II. BACKGROUND .1 III. SUMMARY OF AZUSA LIGHT & WATER'S INSPECTIONS AND CORRECTIVE ACTION ACTIVITIES DURING CALENDAR YEAR 2013 3 A. Patrols 3 1. Circuit Patrols 3 2. Streetlight Patrols 3 B. Intrusive and Detailed Inspections .4 1. Intrusive Wood Pole Inspections 4 2. Overhead Detailed Inspections ,,..4 3. Underground and Pad Mounted Equipment Detailed Inspections 5 C. Condition Ratings 5 UB-143 AZUSA LIGHT & WATER DEPARTMENT'S ANNUAL REPORT PURSUANT TO GENERAL ORDER NO. 165 I. INTRODUCTION AND SUMMARY In 2013, Azusa completed 20 circuit patrols, 372 detailed inspections, 0 intrusive wood pole inspections, and 140 corrective actions on facilities subject to G.O. 165. This report includes Attachment A, a table containing summary data of Azusa's compliance activities for 2013 presented on a system wide basis. II. BACKGROUND The California Public Utility Commission adopted G.O. 165, which established minimum inspection requirements for certain electric distribution facilities (including maximum allowable inspection cycle lengths), condition rating, and recordkeeping and reporting on scheduling and performance of corrective action. G.O. 165 imposed the following reporting requirements: Each utility shall complete an annual report detailing its compliance with the general order. These reports will include the utility's plans for the types of inspections and equipment to be inspected during the coming year. The report shall identify the number of facilities, by type, which have been UB-144 inspected during the previous period. It shall identify those facilities which were scheduled for inspection but which were not inspected according to schedule and shall explain why the inspections were not conducted, and a date certain by which the required inspection will occur. The report shall also present the total and percentage breakdown of equipment rated at each condition rating level, including that equipment determined to be in need of corrective action. Where corrective action was scheduled during the reporting period, the report will present the total and percentage of equipment which was and was not corrected during the reporting period. For the latter, an explanation will be provided, including a date certain by which required corrective action will occur. The report will also present totals and the percentage of equipment in need of corrective action, but with a schedule date beyond the reporting period, classified by the amount of time remaining before the scheduled action. All of the above required information shall be presented for each type of identified facility. UB-1245 III. SUMMARY OF AZUSA LIGHT & WATER'S INSPECTIONS AND CORRECTIVE ACTION ACTIVITIES DURING CALENDAR YEAR 2013 G.O. 165 requires annual inspection performance data, condition ratings, and corrective action information. The following is a narrative summary of the required data. In addition, Attachment A contains a tabular summary of data. A. Patrols As defined in G.O. 165, a patrol is a simple visual inspection, of applicable utility equipment and structures that is designed to identify obvious structural problems and hazards. Patrols may be carried out in the course of other company business. 1. Circuit Patrols G.O. 165 requires annual patrols of all urban circuits. In 2013 Azusa completed 20 circuits, or 100 % of the planned number of circuit patrols due for inspection in 2013. 2. Streetlight Patrols G.O. 165 requires annual patrols of all urban streetlights. In 2013, Azusa patrolled 100 % of its urban streetlight inventory. UB-t46 B. Intrusive and Detailed Inspections 1. Intrusive Wood Pole Inspections In 2012, Azusa planned to complete a total of 0 intrusive inspections of wood poles in 2013. Azusa completed 100% of the planned inspections from 2001 to 2004. Overall, our G.O. 165 compliance plan is completed given that all poles older than 10 years have received their first intrusive inspection. A total of 2,845 poles were tested. 2. Overhead Detailed Inspections In 2013, Azusa planned inspections of 191 overhead transformer detailed inspections and completed 191 detailed inspections or 20% of total overhead transformers on the system. For overhead switching and protective devices, the 2013 plan was to complete 20 detailed inspections. Azusa completed 20 detailed inspections or 20% of the planned five year program. For overhead capacitors, Azusa planned and completed 5 detailed inspections, 20% of the five year plan. Azusa also completed detailed inspections on all of the overhead conductors. Azusa completed inspections on 88.8 miles of overhead conductor or 100 % of the planned inspections in 2013. 3. Underground and Pad Mounted Equipment Detailed Inspections UB-147 In 2013, Azusa planned to complete 148 underground and pad mounted equipment detailed inspections. Azusa actually completed 155 underground and pad mounted equipment detailed inspections. This amounts to 33% of Underground and 20% of Padmount system devices. C. Condition Ratings G.O. 165 requires Azusa to rate the condition of specified equipment such as, (transformers, switches, regulators, capacitors and conductors). Under Azusa's condition rating system, established in 2001, revised in 2004, condition rated 1 equipment and structure repairs are made immediately. Azusa plans ahead for condition rated 2 &3 repairs. Condition rating 4 is used for all equipment whose condition either does not require any repair or does not require any scheduled repair. As of 12/24/2013, Azusa's condition rating system included 0 facilities with Level 1 condition ratings, 0 facilities with Level 2 condition ratings and 3 facilities with Level 3 condition ratings. The remaining 369 facilities subject to condition rating were rated at Level 4. UB-148 Summary of 2013 G.O. 165 Inspection Report Transformers: Pole mount: 191 inspected - 20%required for 5 yr. cycle Circuits completed: Paramount Pasadena Rockvale Todd Arrow Pad mount: 112 inspected—20%required for 5 yr. cycle Circuits completed: Angeleno Brewery Cerritos Coney B.U.R.D: 34 inspected—33%required for 3 yr. cycle Areas completed: Rue-DeValle& Sally Lee 100/200 Block E. Payson&Kirkwall 200 E. Gladstone 200 W. Arrow 1015 E. Arrow Switches: PME: 5 inspected- 20%required for 5 yr.cycle Switches inspected: 316, 317, 318, 319, & 320 Vacuum: 4 inspected—33%required for 3 yr cycle Switches completed: 401,402, 403 &404 (100%Inspected in 2013) Pole mount: 20 inspected—20%required for 5 yr. cycle Switches completed: 82, 83, 84, 5,26, 30, 69,4, 24, 29, 51, 54,73, 68, 13 , 70, 78, 105, 113, & 115 Capacitors: Overhead 5 inspected—20%required for 5 yr. cycle Capacitor Banks Completed: 13, 19,26, 27, &30 Pad Mount 0 inspected Capacitor Banks Completed: 0 (28, 33, and 34 Insp. In 2012, 100%of 3 Yr. Plan) UB-149 "ova AZUSA IGS 7 & NATER For Quality of Life AZUSA LIGHT & WATER 2013 ANNUAL REPORT PURSUANT TO GENERAL ORDER NO. 174 Dated: 09/09/2014 UB-150 AZUSA LIGHT & WATER 2013 ANNUAL REPORT GENERAL ORDER NO.174 TABLE OF CONTENTS Section Title Page I. INTRODUCTION ... 3 II. BACKGROUND .4 III. SUMMARY 4 IV. GO I74 INSPECTION REQUIREMENT .5 V. SAMPLE INSPECTION FORM 8 UB-151 AZUSA LIGHT & WATER 2013 ANNUAL REPORT - GENERAL ORDER NO.174 I. INTRODUCTION Pursuant to General Order 174 and in compliance to the safety order, Azusa Light & Water established in early 2013 a monthly schedule for performing inspections inside City owned electrical substations/facilities. Inspections are performed by designated qualified personnel of Azusa Light & Water and their findings are recorded in a checklist format used during these inspections. Azusa Light & Water currently owns and operate only two (2) electrical substations in the City. Both of these substations are jointly operated with another investor owned utility, which operates their own portion of switching facilities inside these substations. For calendar year 2013, Azusa Light & Water followed an inspection program performed by qualified personnel and the results were recorded and retained. Azusa complied with GO 174 by completing monthly inspections of the two City of Azusa owned electrical substations/facilities located within Azusa's electric service territory. Based on the substation inspections, there were two (2) URGENT ratings that were recorded which required immediate corrective action. There were three (3) TIMELY ratings which require UB-x'52 corrective action within 6 months, were recorded and duly corrected. There was one (1) NON EMERGENCY rating, which requires corrective action in two (2) years was recorded, and that the recommended correction is pending in this one substation which is subject to G.O. 174. IL BACKGROUND The California Public Utility Commission adopted G.O. 174, which established inspection and reporting requirements for electric substations. These requirements are set forth under Section 3 and Section 4 of the GO 174 as adopted on 25 October 2012 under CPUC Decision 12-10-029. A copy of the GO 174 is included in this report for reference. IIh SUMMARY OF INSPECTIONS AND CORRECTIVE ACTION ACTIVITIES DURING CALENDAR YEAR 2013 G.O. 174 requires the governing utility to identify, set a condition rating standard (where applicable), and categorize the inspection for all distribution substation within the utility's jurisdiction. The condition ratings and time for corrective action was established by Azusa Light & Water for performing inspection and assessment on the condition of specified substation equipment such as, (transformers, switches, regulators, capacitors, relays, batteries, A/C units and conductors etc.). Under Azusa's condition UB-1453 rating system, a condition rated "Level 1" requires equipment and structure repairs are performed or made immediately. Azusa plans ahead for needed repairs under conditions rated "Levels 2" & "3". Condition rating "Level 4" is used for all equipment whose condition either does not require any repair or does not require any scheduled repair. As of 12/24/ 2013 and after completing the monthly scheduled inspection for the reporting period, Azusa's condition rating system included two (2) facilities/equipment with Level 1 condition ratings. The blown cap bank fuse at Kirkwall Substation was immediately replaced and also a DC battery bank that showed imminent failure was immediately replaced with new batteries. Also, three (3) identified facilities/equipment with Level 2 condition ratings, were all corrected. These corrections included replacement of control relay for cap bank at Kirkwall Substation, installation of bird guard at Azusa Substation CB bushings, and restoration of internal telephone extension line in the control room at Azusa Substation. There was one (1) facility/equipment with Level 3 condition rating which entailed replacement of one of the security camera lens at Kirkwall Sub. All other remaining facilities subject to condition rating were rated at Level 4. IV. GO 174 UB-f54 General Order 174 Rules for Electric Utility Substations (Adopted October 25, 2012 by Decision 12-10-029) Inspection Programs 30 General 30.1 Each Operator shall establish, update as needed, and follow an Inspection Program. At a minimum, this Program shall specify for each piece of equipment and system listed in Rule 32.1: ❑ Inspection activities ❑ Frequency of Inspections ❑ Record keeping and retention 30.2 Inspections shall be performed by persons who, by reason of training, experience and instruction, are qualified to perform the task. 31 Frequency 31.1 Substations shall be inspected as frequently as necessary. ❑ Time intervals or other bases shall be specified in the Inspection Program. 32 Facilities 32.1 Facilities subject to Inspection shall include, but are not limited to: ❑ Batteries ❑ Buses ❑ Support Structures ❑ Capacitor Banks ❑ Circuit Breakers ❑ Fire Detection and Suppression System (Where applicable) O Grounding System ❑ Insulators/Bushing/Arrestors O Perimeter Fences and Gates ❑ Transformers ❑ Reactors ❑ Voltage Regulators UB-155 33 Records 33.1 Electronic or hard copy records of completed Inspections shall include, at a minimum: ❑ Inspector name or identification ❑ Inspection date ❑ Brief description of identified discrepancies ❑ Condition rating (where applicable) ❑ Scheduled date of corrective action (where applicable) 33.2 Electronic or hard copy records of completed Inspections shall be retained for not less than five (5) years. Section IV Reporting 40 Annual Filings 40.1 No later than July 1st of each year, each Operator shall transmit to the Utilities Safety and Reliability Branch (USRB) an Inspection Program Summary. Changes to the Inspection Program shall be reflected in the Inspection Program Summary, including the effective date of the change. Should no changes occur since the previous filing, the Operator shall transmit written correspondence confirming that no changes were made to the program. 40.2 No later than July 1st of each year, each Operator shall transmit to the CPSD a report summarizing completed and past due Inspections for the prior calendar year. UB-156 V. SAMPLE INSPECTION FORM Substation Inspection Form Substation: Date: Inpector: Ratin•s Res•onse Time Requires urgent or immediate 1 corrective action 1 -9 days • 2 ' Requires-timelycorrective action 6 months 3 No emergency repair action 2 years Good condition no action 4 required 0 Not A.•licatable EXPLAIN ALL 1,2, &3s Area Rate Description Perimeter Fences &Gates Circuit Switcher(s) Transformers/LTCs Insulators/Bushings Support Structure Grounding System VCB/OCBICap Banks Cameras Fire Suppresion Vandalism/Graffiti/Tampering Signage Control House/Storage Bin Landscaping/Refuse/Weeds Batteries Pilot Cell Voltage NOTES: UB-157