HomeMy WebLinkAboutResolution No. 2019-C01CITY OF AZUSA
SCHEDULE OF FEES AND CHARGES
Adopted on January 22, 2019
Proposed on
January 22,
2019
No. Description Pages
1 Building and Safety 3 ‐ 15
2 Planning 16 ‐ 18
3 Engineering 19 ‐ 20
4 Utilities 21 ‐ 23
5 Community Improvement 24
6 Fire Safety 25
7 Police 26 ‐ 29
8 Adult Businesses 30
9 Business License 31
10 Recreation & Parks 32 ‐ 35
11 Recreation Facilities Rentals 36 ‐ 38
12 Transportation 39
13 Library 40
14 GIS Maps 41
15 Administrative Processing 42
City of Azusa
Schedule of Fees and Charges
Table of Contents
2
Adopted Adopted
1/16/2018 1/22/2019
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'17‐'18 S.F. Avg. Notes
S‐1 Building Valuation
Apartment Houses:
1 Type I Or II F.R. $144.78 3.90% $150.42
2 Good $178.24 3.90% $185.19
3 Type V ‐ Masonry (Or Type III)$118.17 3.90% $122.78
4 Good $144.78 3.90% $150.42
5 Type V ‐ Wood Frame $104.13 3.90% $108.19
6 Good $133.84 3.90% $139.06
7 Type I ‐ Basement Garage $61.05 3.90% $63.43
Auditoriums:
8 Type I Or II F.R.$171.05 3.90% $177.72
9 Type II ‐ 1 Hour $123.88 3.90% $128.72
10 Type II ‐ N $117.19 3.90% $121.76
11 Type III ‐ 1 Hour $130.25 3.90% $135.33
12 Type III ‐ N $123.56 3.90% $128.38
13 Type V ‐ 1 Hour $124.54 3.90% $129.40
14 Type V ‐ N $116.21 3.90% $120.74
Banks:
15 Type I Or II F.R.$241.73 3.90% $251.16
16 Type II ‐ 1 Hour $178.07 3.90% $185.02
17 Type II ‐ N $172.36 3.90% $179.08
18 Type III ‐ 1 Hour $196.52 3.90% $204.18
19 Type III ‐ N $189.50 3.90% $196.89
20 Type V ‐ 1 Hour $178.07 3.90% $185.02
21 Type V ‐ N $170.56 3.90% $177.21
Bowling Alleys:
22 Type II ‐ 1 Hour $83.24 3.90% $86.48
23 Type II ‐ N $77.69 3.90% $80.72
24 Type III ‐ 1 Hour $90.59 3.90% $94.12
25 Type III ‐ N $84.71 3.90% $88.02
26 Type V ‐ 1 Hour $61.05 3.90% $63.43
Churches:
27 Type I Or II F.R.$161.91 3.90% $168.23
28 Type II ‐ 1 Hour $121.60 3.90% $126.35
29 Type II ‐ N $115.56 3.90% $120.07
30 Type III ‐ 1 Hour $132.21 3.90% $137.36
31 Type III ‐ N $126.33 3.90% $131.26
32 Type V ‐ 1 Hour $123.56 3.90% $128.38
33 Type V ‐ N $116.21 3.90% $120.74
Convalescent Hospitals:
34 Type I Or II F.R.$227.21 3.90% $236.07
35 Type II ‐ 1 Hour $157.67 3.90% $163.82
36 Type III ‐ 1 Hour $161.58 3.90% $167.89
37 Type V ‐ 1 Hour $152.29 3.90% $158.23
Dwellings:
38 Type V ‐ Masonry $123.56 3.90% $128.38
39 Good $158.16 3.90% $164.33
40 Type V ‐ Wood Frame $109.85 3.90% $114.13
41 Good $150.83 3.90% $156.71
Basements ‐
42 Semi‐Finished $32.81 3.90% $34.09
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
3
Adopted Adopted
1/16/2018 1/22/2019
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'17‐'18 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
43 Good $37.86 3.90% $39.33
44 Unfinished $23.83 3.90% $24.76
45 Good $28.89 3.90% $30.01
Fire Station:
46 Type I Or II F.R.$186.72 3.90% $194.01
47 Type II ‐ 1 Hour $122.90 3.90% $127.70
48 Type II ‐ N $115.89 3.90% $120.41
49 Type III ‐ 1 Hour $134.49 3.90% $139.74
50 Type III ‐ N $128.78 3.90% $133.80
51 Type V ‐ 1 Hour $126.17 3.90% $131.09
52 Type V ‐ N $119.64 3.90% $124.31
Homes For The Elderly:
53 Type I Or II F.R.$169.26 3.90% $175.86
54 Type II ‐ 1 Hour $137.43 3.90% $142.79
55 Type II ‐ N $131.56 3.90% $136.69
56 Type III ‐ 1 Hour $143.14 3.90% $148.73
57 Type III ‐ N $137.27 3.90% $142.62
58 Type V ‐ 1 Hour $138.25 3.90% $143.64
59 Type V ‐ N $133.51 3.90% $138.72
Hospitals:
60 Type I Or II F.R.$266.38 3.90% $276.76
61 Type III ‐ 1 Hour $220.51 3.90% $229.11
62 Type V ‐ 1 Hour $210.39 3.90% $218.60
Hotels And Motels:
63 Type I Or II F.R.$164.85 3.90% $171.28
64 Type III ‐ 1 Hour $142.82 3.90% $148.39
65 Type III ‐ N $136.13 3.90% $141.43
66 Type V ‐ 1 Hour $124.37 3.90% $129.22
67 Type V ‐ N $121.93 3.90% $126.68
Industrial Plants:
68 Type I Or II F.R.$92.87 3.90% $96.49
69 Type II ‐ 1 Hour $64.64 3.90% $67.16
70 Type II ‐ N $59.41 3.90% $61.73
71 Type III ‐ 1 Hour $71.16 3.90% $73.94
72 Type III ‐ N $67.08 3.90% $69.70
73 Tilt‐Up $48.97 3.90% $50.88
74 Type V ‐ 1 Hour $67.08 3.90% $69.70
75 Type V ‐ N $61.37 3.90% $63.76
Jails:
76 Type I Or II F.R.$259.68 3.90% $269.81
77 Type III ‐ 1 Hour $237.49 3.90% $246.75
78 Type V ‐ 1 Hour $178.07 3.90% $185.02
Libraries:
79 Type I Or II F.R.$189.99 3.90% $197.40
80 Type II ‐ 1 Hour $139.06 3.90% $144.49
81 Type II ‐ N $132.21 3.90% $137.36
82 Type III ‐ 1 Hour $146.90 3.90% $152.63
83 Type III ‐ N $139.55 3.90% $145.00
84 Type V ‐ 1 Hour $137.92 3.90% $143.30
85 Type V ‐ N $132.21 3.90% $137.36
Medical Offices:
4
Adopted Adopted
1/16/2018 1/22/2019
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'17‐'18 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
86 Type I Or II F.R.$195.05 3.90% $202.66
87 Type II ‐ 1 Hour $150.49 3.90% $156.36
88 Type II ‐ N $142.98 3.90% $148.56
89 Type III ‐ 1 Hour $163.22 3.90% $169.59
90 Type III ‐ N $151.96 3.90% $157.88
91 Type V ‐ 1 Hour $147.22 3.90% $152.97
92 Type V ‐ N $142.00 3.90% $147.54
Offices
93 Type I Or II F.R.$174.32 3.90% $181.12
94 Type II ‐ 1 Hour $116.70 3.90% $121.25
95 Type II ‐ N $111.15 3.90% $115.49
96 Type III ‐ 1 Hour $126.01 3.90% $130.92
97 Type III ‐ N $120.46 3.90% $125.15
98 Type V ‐ 1 Hour $118.01 3.90% $122.61
99 Type V ‐ N $111.15 3.90% $115.49
Private Garages:
100 Wood Frame $39.66 3.90% $41.21
101 Masonry $44.72 3.90% $46.47
102 Open Carports $27.09 3.90% $28.15
Public Buildings:
103 Type I Or II F.R.$201.41 3.90% $209.27
104 Type II ‐ 1 Hour $163.22 3.90% $169.59
105 Type II ‐ N $156.04 3.90% $162.12
106 Type III ‐ 1 Hour $169.42 3.90% $176.03
107 Type III ‐ N $163.55 3.90% $169.93
108 Type V ‐ 1 Hour $155.06 3.90% $161.11
109 Type V ‐ N $149.51 3.90% $155.34
Public Garages:
110 Type I Or II F.R.$79.81 3.90% $82.93
111 Type I Or II Open Parking $59.90 3.90% $62.24
112 Type II ‐ N $45.70 3.90% $47.48
113 Type III ‐ 1 Hour $60.39 3.90% $62.75
114 Type III ‐ N $53.70 3.90% $55.79
115 Type V ‐ 1 Hour $55.01 3.90% $57.15
Restaurants
116 Type III ‐ 1 Hour $158.98 3.90% $165.18
117 Type III ‐ N $153.59 3.90% $159.58
118 Type V ‐ 1 Hour $145.59 3.90% $151.27
119 Type V ‐ N $139.88 3.90% $145.34
Schools:
120 Type I Or II F.R.$181.50 3.90% $188.58
121 Type II ‐ 1 Hour $123.88 3.90% $128.72
122 Type III ‐ 1 Hour $132.53 3.90% $137.70
123 Type III ‐ N $127.48 3.90% $132.45
124 Type V ‐ 1 Hour $124.21 3.90% $129.05
125 Type V ‐ N $118.50 3.90% $123.12
Service Stations:
126 Type II ‐ N $109.68 3.90% $113.96
127 Type III ‐ 1 Hour $114.42 3.90% $118.88
128 Type V ‐ 1 Hour $97.44 3.90% $101.24
129 Canopies $45.70 3.90% $47.48
5
Adopted Adopted
1/16/2018 1/22/2019
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'17‐'18 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
Stores:
130 Type I Or II F.R.$134.49 3.90% $139.74
131 Type II ‐ 1 Hour $82.26 3.90% $85.47
132 Type II ‐ N $80.47 3.90% $83.61
133 Type III ‐ 1 Hour $100.05 3.90% $103.96
134 Type III ‐ N $93.85 3.90% $97.51
135 Type V ‐ 1 Hour $84.22 3.90% $87.51
136 Type V ‐ N $77.86 3.90% $80.89
Town Homes:
137 Type V ‐ Masonry $141.37 3.90% $146.88
138 Type V ‐ Wood Frame $134.81 3.90% $140.07
139 Garage‐ Wood Frame $55.01 3.90% $57.16
140 Garage‐ Masonry $61.05 3.90% $63.43
Theaters:
141 Type I Or II F.R.$179.22 3.90% $186.21
142 Type III ‐ 1 Hour $130.58 3.90% $135.67
143 Type III ‐ N $124.37 3.90% $129.22
144 Type V ‐ 1 Hour $122.90 3.90% $127.70
145 Type V ‐ N $116.21 3.90% $120.75
Warehouses:
146 Type I Or II F.R.$80.63 3.90% $83.78
147 Type I Or V ‐ 1 Hour $47.82 3.90% $49.69
148 Type I Or V ‐ N $44.89 3.90% $46.64
149 Type III ‐ 1 Hour $54.19 3.90% $56.30
150 Type III ‐ N $51.58 3.90% $53.59
Equipment:
Air Conditioning
151 Commercial $6.86 3.90% $7.12
152 Residential $5.71 3.90% $5.94
153 Sprinkler Systems $4.24 3.90% $4.41
Other Valuations
Reroof
154 Asphalt And Comp ‐ per square foot of material $262.62 3.90% $272.86
155 Built‐up ‐ per square foot of material $278.07 3.90% $288.91
156 Light‐weight tile ‐ per square foot of material $718.34 3.90% $746.35
157 Concrete Tile Or Slate Tile ‐ per square foot of material $865.09 3.90% $898.83
158 Metal Shingles ‐ per square foot of material $546.86 3.90% $568.19
159 Wood Shake ‐ per square foot of material $332.13 3.90% $345.09
160 Wood Shingle ‐ per square foot of material $319.78 3.90% $332.25
161 Rolled Roofing ‐ minimum 300 Sq.Ft. allowed on patio covers only $1,544.81 3.90% $1,605.06
162 Tear off and re‐sheath ‐ per square foot of material $154.48 3.90% $160.51
Tenant Improvements
163 General Commercial $40.17 3.90% $41.73
164 Restaurants $46.34 3.90% $48.15
165 Medical Offices $47.89 3.90% $49.76
Retaining Walls‐ Concrete Block
166 6"$11.98 3.90% $12.45
167 8"$13.26 3.90% $13.78
168 12"$16.26 3.90% $16.89
169 Masonry Fireplace ‐ Minimum Valuation $4,897.05 3.90% $5,088.03
170 Foundation Permits ‐ Based On 1/3 The Overall Valuation Of The Bldg Permit
6
Adopted Adopted
1/16/2018 1/22/2019
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'17‐'18 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
These Figures Shall Be Used When The Applicant Does Not Have A Valuation, Or If
The Valuation Given Is Obviously Low.
171 Factory Built Fireplace‐ Minimum Valuation $1,632.86 3.90% $1,696.55
Signs
1 Side:
172 a) Painted $63.33 3.90% $65.80
173 b) Electrical $122.04 3.90% $126.80
2 Sides:
174 a) Painted $74.15 3.90% $77.04
175 b) Electrical $154.48 3.90% $160.51
Pole /Lineal Foot plus square foot of sign:
176 a) 3" 0 $52.52 3.90% $54.57
177 b) 4" 0 $74.15 3.90% $77.04
178 c) 6" 0 $95.78 3.90% $99.51
179 d) 8" 0 $118.95 3.90% $123.59
180 e) 10" 0 $140.58 3.90% $146.06
181 f) 12" 0 $160.66 3.90% $166.93
Photovoltaic Systems
182 Permit And plan check fees for photovoltaic systems shall be assessed at 45% of
the fee generated by the declared valuation and the per unit electrical item cost
183 Residential 15 kW Or Less=$500 or 45% of the fee generated by the declared
valuation, whichever is less.
184 Residential more than 15 kW=$500 + 15 Per kW over 15 or 45% of the fee
generated by the declared valuation, whichever is less.
185 Commercial 50 kW or less = $1,000 or 45% of the fee generated by the declared
valuation, whichever is less.
186 Commercial more than 50 kw ‐ 250 kw = $500 + $7 per kW above 50 kW or 45% of
the fee generated by the declared valuation, whichever is less.
187 Commercial more than 250 kW = $2,400 + 5 kW above 250 kW or 45% of the fee
generated by the declared valuation, whichever is less.
Swimming Pools
Valuation based on actual construction cost. Permit fees same as building permits.
188 Minimum Valuation:$20,391.49 3.90% $21,186.76
Spas
189 Minimum Valuation
190 Prefabricated $4,078.30 3.90% $4,237.35
191 Gunite $8,187.49 3.90% $8,506.81
Surcharge Fees
192 Optical Records System ‐ Per Permit $15.77 n/a $15.77
193 # General Plan Maintenance ‐ 10% Permit Surcharge To Recover 50% Of Costs 10%10%
194 # Permit Automation Fee $0.00 n/a $0.00
195 # Technology Enhancement (5% of permit and plan check fee‐ $30 minimum)5%5%
7
Adopted Adopted
1/16/2018 1/22/2019
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'17‐'18 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
S‐2 Building Permit Fees
196 Permit Issuance $91.80 n/a $91.80
Total Valuation
197 $1.00 to $500.00 $38.36 3.90% $39.85
198 $501.00 to $2,000.00 $38.36 3.90% $39.85
For the 1st $500.00 plus $3.40 for ea. additional $100.00,
or fraction thereof, to and including $2,000.00
199 $2,001.00 to $25,000.00 $113.03 3.90% $117.44
For the 1st $2,000.00 plus $15.59 for ea. additional $1,000.00,
or fraction thereof, to and including $25,000.00
200 $25,001.00 to $50,000.00 $638.60 3.90% $663.50
For the 1st $25,000.00 plus $11.24 for ea. additional $1,000.00,
or fraction thereof, to and including $50,000.00
201 $50,001.00 to $100,000.00 $1,050.73 3.90% $1,091.71
For the 1st $50,000.00 plus $7.79 for ea. additional $1,000.00,
or fraction thereof, to and including $100,000.00
202 $100,001.00 to $ 500,000.00 $1,622.00 3.90% $1,685.26
For the 1st $100,000.00 plus $6.23 for ea. additional $1,000.00,
or fraction thereof, to and including $500,000.00
203 $500,001.00 to $1,000,000.00 $5,278.14 3.90% $5,483.98
For the 1st $500,000.00 plus $5.28 for ea. additional $1,000.00,
or fraction thereof, to and including $1,000,000.00
204 $1,000,001.00 and up $9,154.62 3.90% $9,511.65
For the 1st $1,000,000.00 plus $3.51 for ea. additional $1,000.00,
or fraction thereof
Other Inspections And Fees:
205 1. Inspections Outside Of Normal Business Hours (Per Hour) (Minimum Charge ‐
Two Hours) [a]
$76.71 3.90% $79.71
206 2. Reinspection Fees Accessed Under Provisions Of Section 305.8 (Per Hour) [a] $76.71 3.90% $79.71
207 3. Inspections For Which No Fee Is Specifically Indicated (Per Hour) (Minimum
Charge ‐ One‐Half Hour) [a]
$76.71 3.90% $79.71
208 4. Additional Plan Review Required By Changes, Additions Or Revisions To Plans
(Per Hour) (Minimum Charge ‐ One‐Half Hour) [a]
$76.71 3.90% $79.71
209 5. For Use Of Outside Consultants For Plan Checking And Inspections, Or Both [b] Actual costs
[b]
n/a Actual costs
[b]
210 [a] Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include
supervision, overhead, equipment, hourly wages and fringe benefits of the employee involved.
[b] Actual costs include administrative and overhead costs.
8
Adopted Adopted
1/16/2018 1/22/2019
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'17‐'18 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
S‐3 Electrical Permit Fees
211 Area Fee Rate ‐ Single Family Dwellings (Rate X Area/Sq Ft)$0.12 3.90% $0.12
Unit Fee Schedule (Note: Does Not Include Permit Issuance Fee)
Receptacle, Switch and Lighting, or other.
For receptacle, switch lighting, smoke detectors, or other outlets, at which current
is used or controlled except services, feeders and meter:
212 First 20, each $1.84 3.90% $1.91
213 Additional outlets, each $1.22 3.90% $1.27
(Note: For multi‐outlet assemblies, each 5 ft. or fraction may be considered as 1
outlet.)
Lighting Fixtures
214 For lighting fixtures, sockets, or other lamp holding devices:
215 First 20, each $1.84 3.90% $1.91
216 Additional fixtures, each $1.22 3.90% $1.27
217 For pole or platform mounted lighting fixtures, each $1.84 3.90% $1.91
218 For theatrical‐type lighting fixtures or assemblies, each $1.84 3.90% $1.91
Residential Appliances
219 For fixed residential appliances or receptacle outlets for same, including wall‐
mounts, electric ovens, counter‐mounted cooking tops, electric ranges, self‐
contained room, console, or through‐wall air conditioners, space heaters, food
waste grinders, dishwasher
$8.57 3.90% $8.91
(Note: For other types of air conditioners and other motor‐driven appliances
having larger electrical ratings, see Power Apparatus)
Temporary Power Service
220 For a temporary service power pole or pedestal, including all pole or pedestal
mounted receptacle outlets and appurtenances, each
$36.72 3.90% $38.15
221 For a temporary distribution system and temporary lighting and receptacle outlets
for construction sites, decorative lighting, Christmas tree sales lots, firework
stands, sales booths, additional pole, etc., each
$17.13 3.90% $17.80
Non‐Residential Appliances
222 For residential appliances and self‐contained, factory‐wired, non‐residential
appliances not exceeding one (1) horsepower (HP), kilowatt (KW), Or kilovolt‐
ampere (KVA) in rating, including medical and dental devices, food, beverage, and
ice cream cabinets
$9.79 3.90% $10.18
Power Apparatus
For motors, generators, transformers, rectifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps, cooking or baking
equipment, and other apparatus, as follows:
Rating in horsepower (HP), kilowatts (KW), kilovolt‐amperes (KVA), Or kilovolt‐
amperes‐reactive (KVAR)
223 Up to and including 1, each $9.79 3.90% $10.18
224 Over 1 and not over 10, each $17.13 3.90% $17.80
225 Over 10 and not over 50, each $44.07 3.90% $45.79
226 Over 50 and not over 100, each $88.13 3.90% $91.57
227 Over 100, each $146.90 3.90% $152.62
9
Adopted Adopted
1/16/2018 1/22/2019
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'17‐'18 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
Note: 1. For equipment or appliances having more than one motor, transformer,
heater, etc., the sum of the combined rating may be used.
Note: 2. These fees include all switches, circuit breakers, contractors, thermostats,
relays and other directly related control equipment.
Busways
228 For trolley and plug‐in type busways, each 100 feet or fraction thereof $24.49 3.90% $25.44
(Note: an additional fee will be required for lighting fixtures, motors and other
appliances that are connected to trolley and plug‐In type busways.)
Signs, Outline Lighting, And Marquees
229 For signs, outline lighting systems, or marquees supplied from one branch circuit,
each
$36.72 3.90% $38.15
230 For additional branch circuits within the same sign outline lighting system, or
marquee, each
$12.23 3.90% $12.71
Services, Switchboards, Switchboard Sections, Motor Control Centers And
Panelboards
231 For services, switchboards, switchboard sections, motor control centers and
panelboards of 600 volts or less & not over 200 amperes In rating, each.
$36.72 3.90% $38.15
232 For services, switchboards, switchboard sections, motor control centers and
panelboards of 600 volts or less and not over 200 amperes 1,000 amperes in
rating, each
$73.46 3.90% $76.32
233 For services, switchboards, switchboard sections, motor control centers and
panelboards over 600 volts or over 1,000 amperes in rating, each
$171.38 3.90% $178.07
Miscellaneous Apparatus, Conduits And Conductors
234 For electrical apparatus, conduits and conductors for which a permit is required
but for which no fee is herein set forth
$36.72 3.90% $38.15
(Note: This fee is not applicable when a fee is paid for one or more services,
outlets, fixtures, appliances, power apparatus, busways, signs or other equipment.
Private Swimming Pools
235 For new private, residential, inground swimming pools for single, or multi‐family
occupancies, including a complete system of necessary branch circuit wiring,
bonding, grounding underwater lighting, water pumping and other similar
electrical equipment
$73.46 3.90% $76.32
236 For other types of swimming pools, therapeutic whirlpools, spas, hot tubs and
alterations to existing swimming pools, each
$48.97 3.90% $50.88
Carnivals And Circuses
Carnivals, circuses and other traveling shows or exhibitions utilizing transportable‐
type rides, booths, displays and attractions.
237 For electrical generators and electrical driven rides, each $36.72 3.90% $38.15
238 For mechanically driven rides and walk‐through attractions or displays having
electric lighting, each
$14.69 3.90% $15.26
239 For a system of area and booth lighting, each $14.69 3.90% $15.26
240 For permanently installed rides, booths, displays, and attractions $14.69 3.90% $15.26
Other Inspections
For Inspection Of Electrical Equipment For Which No Fee Is Herein Set Forth, The
Fee Shall Be Determined By The Building Official
10
Adopted Adopted
1/16/2018 1/22/2019
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'17‐'18 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
S‐4 Plumbing Fees
241 Each plumbing fixture or trap or set of fixtures on one trap (including drainage,
vent, water piping and backflow prevention devices therefore)
$14.69 3.90% $15.26
242 Each permanent type dishwasher whether individually trapped or not $14.69 3.90% $15.26
243 Each industrial waste pretreatment interceptor including its trap & vent, except
kitchen type grease interceptors functioning as fixtures traps
$14.69 3.90% $15.26
244 Each swimming pool drainage trap & receptor whether connected to a building
drain or building sewer (water supply for pool not included)
$14.69 3.90% $15.26
245 Each gas piping system of 1 to 5 outlets or alteration or retest of existing gas
piping system
$14.69 3.90% $15.26
246 Each additional outlet over five $3.68 3.90% $3.82
247 Each gas pressure regulator other than appliance regulators $4.90 3.90% $5.09
248 Each water heater and/or vent $14.69 3.90% $15.26
249 Each solar potable water heating system, including water heater/vent $48.97 3.90% $50.88
250 For repair or alteration of drainage and/or vent piping $14.69 3.90% $15.26
251 Each piece of water‐treating equipment and/or water piping installed without
accompanying plumbing
$14.69 3.90% $15.26
252 Lawn sprinkler systems on 1 meter including backflow prevention devices $14.69 3.90% $15.26
253 Backflow prevention devices on unprotected water supplied, pools, tanks, vats,
etc. (including incidental water piping) 1 to 5
$14.69 3.90% $15.26
254 Any swimming pool piping associated with the construction, remodeling or repair
of a swimming pool, spa and hot tub
$40.80 3.90% $42.39
255 Each additional device over five (5)$3.68 3.90% $3.82
256 Each building drain installed without accompanying plumbing $14.69 3.90% $15.26
257 For connection of a house sewer to a public sewer or the extension of a house
lateral onto a lot for future use
$41.62 3.90% $43.24
258 For each house sewer manhole $41.62 3.90% $43.24
259 Each installation of a section of house sewer for future use $26.93 3.90% $27.98
260 For the connection of each additional bldg. or work to house sewer $26.93 3.90% $27.98
261 For the connection of a house sewer to a private sewage disposal system $26.93 3.90% $27.98
262 For each private sewage disposal system (septic tank & seepage pit or pits and/or
drainfield)
$85.69 3.90% $89.03
263 For each cesspool, overflow seepage pit, percolation test pit, swimming pool
drywell, or drainfield extension or replacement
$41.62 3.90% $43.24
264 For disconnection, abandonment, alteration or repair of any house sewer or
private sewage disposal system or part thereof
$26.93 3.90% $27.98
265 # Annual inspection of fat, oil and grease $160.00 n/a $160.00
11
Adopted Adopted
1/16/2018 1/22/2019
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'17‐'18 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
S‐5 Mechanical Permit Fees
Installation, alteration or relocation of each refrigeration compressor or
absorption unit, & each fuel burning furnace, heater, boiler, and vented decorative
appliance including vents attached thereto:
266 Up to & including 100,000 BTU $24.49 3.90% $25.44
267 More than 100,000 BTU to & including 1,000,000 BTU $48.97 3.90% $50.88
268 More than 1,000,000 BTU $122.41 3.90% $127.18
269 For each air inlet & air outlet served by any air conditioning system $4.29 3.90% $4.46
270 For each 1,000 sq.ft. or fraction thereof of conditioned area $34.28 3.90% $35.62
Note: when a permit is applied for and the total number of air inlets & air outlets is
unknown, the fees shall be based on the sq.ft. of conditioned area.
271 For the installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit
$12.23 3.90% $12.71
For the installation or alteration of each air handling unit for air conditioning
including ducts attached thereto:
272 Up to & including 2,000 CFM ‐ each unit up to 10 $12.23 3.90% $12.71
273 Each unit over 10 $3.68 3.90% $3.82
274 More than 2,000 CFM to and including 10,000 CFM $36.75 3.90% $38.18
275 More than 10,000 CFM $61.21 3.90% $63.59
Note: this fee shall not apply to an air handling unit which is a portion of a factory
assembled air conditioned appliance for which a permit is required elsewhere in
this code.
276 For each evaporative cooler other than portable type $19.59 3.90% $20.35
277 For required ventilation fans which serve a single register:
278 Each fan up to 10 $14.69 3.90% $15.26
279 Each fan over 10 $4.90 3.90% $5.09
280 For each required ventilation system which is not a portion of any air conditioning
system for which a permit is required elsewhere in this code
$29.38 3.90% $30.53
281 For the installation or each commercial kitchen hood or spray booth served by
mechanical exhaust, including the fans and ducts attached thereto
$61.21 3.90% $63.59
282 For the installation of each fire damper $9.79 3.90% $10.18
283 Alteration of existing duct system where a permit is not required elsewhere $24.49 3.90% $25.44
Note: 1) for refrigeration system rating one horsepower, one ton, or 12,000 BTU
per hour shall mean the same quantity
note: 2) for steam boilers rated in boiler horsepower, one horsepower shall equal
50,000 BTU per hour
12
Adopted Adopted
1/16/2018 1/22/2019
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'17‐'18 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
Plan Check Fees
284 # Building Plan Check Fee ‐ 85% Of Permit Fee ‐ $15.00 Minimum:Varies n/a Varies
285 # Electric Plan Check Fee ‐ 80% Of Permit Fee ‐ $15.00 Minimum:Varies n/a Varies
286 # Energy Plan Check Fee ‐ 10% Of Building Permit Fee:Varies n/a Varies
287 # Mechanical Plan Check Fee ‐ 80% Of Permit Fee ‐ $15.00 Minimum:Varies n/a Varies
288 # Plumbing Plan Check Fee ‐ 80% Of Permit Fee ‐ $15.00 Minimum:Varies n/a Varies
289 Temporary Certificate of Occupancy (60 days)$450 [a]
290 Parking Lot Resurface Inspection ($68 up to 10,000 sqare feet, $1 for each
additional sq ft)
Varies [a]
291 Event Permit (1 hr minimum insection time $93 plus plan check fee of $60.50 )$154 [a]
292 General Plan Update Fee (10% of Permit)Varies [a]
# = Fees not automatically adjusted for CPI change.
[a]Proposed New Fees.
13
City of Azusa eSchedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
Adopted Adopted
Svc Area 1/16/2018 CPI 1/22/2019
No. Item # Description Fee/Unit Sept'l7-18 Fee/Unit Notes
1 S-045 Grading Plan Check Fee Variable 3.90% Variable
<100 CY· $899
100 · 1,000 CY· $916.71 Plus $14.84 Per 100 CY
1,000 -10,000 Cf -$1050.24 Plus $78.42 Per 1,000 CY
10,000 -50,000 Cf -$1,756.06 Plus $18.02 Per 1,000 CY
50,000+ CY -$2,476.71 Plus $244.81 Per 10,000 CY
2 S-046 Grading Inspection Variable 3.90% Variable
<100 CY -$358
100 -1,000 CY· $365.62 Plus $50.87 Per 100 CY
1,000 • 10,000 Cf· $823.45 Plus $76.30 Per 1,000 CY
10,000 -50,000 Cf -$1,510.19 Plus $92.20 Per 1,000 CY
50,000+ CY -$5,198.22 Plus $604.07 Per 10,000 CY
3 Grading Permit Fee· Based On Cubic Yards $179 3.90% $186
4 Permit Fee For Changes To Original Permit:
<$20,000 $114 3.90% $118
$20,001 to $50,000 $114 3.90% $118
$50,001 to $75,000 $155 3.90% $161
$75,001 to $100,000 $236 3.90% $245
$100,001 to $200,000 $309 3.90% $321
$200,000 to $500,000 $399 3.90% $415
$500,001 and up $488 3.90% $507
5 Special Site Inspection: $90 3.90% $93
Commercial (Minimum 2 Hours) $179 3.90% $186
Residential (Minimum 2 Hour) $179 3.90% $186
Residential (Non-Habitable Space) (Minimum 2 Hours) $170 3.90% $177
6 Production Lot Plan Check -Per Lot $206 n/a $206
7 Occupancy Inspection Fee:
0-1 To 15,000 Sq Ft (1/2 Hour Of Technical Staff Time) $47 3.90% $49
15,000 Sq.Ft. On (1 Hour Of Techn ical Staff Time) $90 3.90% $93
8 Bonds For Sign(s) (Refundable) $269 3.90% $280
9 Demolition Permit Fee (Minimum 1 Hour) $104 3.90% $108
10 Deputy Inspection Registration Fee (Deputy) $47 3.90% $49
11 Emergency Inspection Fee (Minimum 1 Hours) $146 3.90% $152
12 Hearing Officer Actual Cost Actual Cost
13 Pre-Plan Check Submittal (Minimum 2 Hours) $186 3.90% $194
14 Reinspection Fee (Minimum 1 Hour) $98 3.90% $102
15 Room Addition Plan Check Fee (Minimum 2 Hours) $186 3.90% $194
16 Trailer Coach $179 3.90% $186
17 Trash Enclosure -$10 for additional enclosure $73 3.90% $75
18 Relocation Of Buildings:
0 to 2,000 sq.ft. $422 3.90% $438
2,001 to 5,000 sq.ft. $791 3.90% $822
5,001 sq.ft. and up $1,140 3.90% $1,184
19 Plan Checking Fee:
Staff rates assessed against deposit.
Executive Staff -per hour $162 3.90% $168
14
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
Adopted Adopted
Svc Area 1/16/2018 CPI 1/22/2019
No. Item # Description Fee/Unit Sept'17-18 Fee/Unit Notes
Professional Staff - per hour $116 3.90% $121
Technical Staff (Plan Checker/Inspector) -per hour $98 3.90% $102
20 On-Site Improvement Inspections:
$2,000 deposit required for parking lot paving and miscellaneous testing
Professional Staff -Per Hour $116 3.90% $121
Rates applied against deposit
Technical Staff -Per Hour $98 3.90% $102
Rates applied against deposit
21 Standard Plan Check Fee:
Professional Staff -Per Hour $116 3.90% $121
Technical Staff -Per Hour $98 3.90% $102
22 S-98 # Certified Access Specialist Program (CASp) $4 n/a $4 [a]
[a]Fee set by State.
#=Fees not automatically adjusted for CPI change.
15
Adopted Adopted
Svc Area 1/16/2018 CPI 1/22/2019 Fee
No. Item # Description Fee/Unit Sep'17‐'18 Fee/Unit Type Notes
1 S‐001 Zoning Clearance $82 3.90% $85 flat fee
2 S‐002 Design Review ‐ Minor (over the counter)$1,945 3.90% $2,021 flat fee
3 S‐003 Staff Level Design Review:
#a) Modifications to Existing Structures $350 n/a $350 flat fee
b) All Others $4,362 3.90% $4,532 flat fee
4 S‐004 # Design Review ‐ Major $10,000 n/a $10,000 deposit [a]
5 S‐005 Major Use Permit $5,693 3.90% $5,916 flat fee
6 S‐005A Minor Use Permit $1,084 3.90% $1,127 flat fee
7 S‐006 Use Permit Modifications:flat fee
a) Modifications To Major UP $2,860 3.90% $2,972 flat fee
b) Modifications To Minor UP $599 3.90% $623 flat fee
8 Variance ‐ Minor $1,467 3.90% $1,524 flat fee
9 S‐009 Variance
#a) Involving Single‐Family Structure $1,000 n/a $1,000 flat fee
b) All Others $5,302 n/a $5,302 flat fee
10 S‐010 # Zone Change $5,000 n/a $5,000 deposit [a]
11 S‐011 # Development Code Amendment $5,000 n/a $5,000 deposit [a]
12 S‐012 Development Agreement [a]
#a) Development Agreement Deposit $10,000 n/a $10,000 deposit [a]
#b) Annual Monitoring Deposit $5,000 n/a $5,000 deposit [a]
13 S‐013 # General Plan Amendment $15,000 n/a $15,000 deposit [a]
14 S‐014 # Specific Plan $10,000 n/a $10,000 deposit [a]
15 S‐015 # Specific Plan Amendment $5,000 n/a $5,000 deposit [a]
16 S‐016 Tentative Parcel Map $8,001 3.90% $8,313 flat fee
17 S‐017 Tentative Tract Map:
a) 5‐20 Lots $8,346 3.90% $8,671 flat fee
b) 20‐50 Lots $9,727 3.90% $10,107 flat fee
c) 50‐100 Lots $13,105 3.90% $13,616 flat fee
d) 100+ Lots $14,641 3.90% $15,212 flat fee
18 S‐018 Reversion To Acreage $2,710 3.90% $2,816 flat fee
19 S‐019 Lot Merger $1,691 3.90% $1,757 flat fee
20 S‐020 Environmental Categorical Exemption Rev.$326 3.90% $339 flat fee
20 S‐021 Environmental Initial Study $4,840 3.90% $5,028 flat fee
21 S‐023 # Mitigated Negative Declaration $10,000 n/a $10,000 deposit [a]
22 S‐023 # Environmental Impact Report Preparation $10,000 n/a $10,000 deposit [a]
23 S‐023 # Environmental Impact Report Review $10,000 n/a $10,000 deposit [a]
24 S‐024 # Mitigation Monitoring ‐ CEQA Monitoring $5,000 n/a $5,000 deposit [a]
25 S‐025 # Annexation $10,000 n/a $10,000 deposit [a]
26 S‐026 Condominium Conversion Map:
a) Map Fee $6,365 3.90% $6,614 flat fee
b) Plus Consultant Fee Actual Cost n/a Actual Cost flat fee
27 S‐027 Minor Sign Review $82 3.90% $85 flat fee
28 S‐028 Major Sign Review $897 3.90% $932 flat fee
29 S‐029 Zoning Letter:
a) Single Family Residential $163 3.90% $169 flat fee
b) Other $489 3.90% $508 flat fee
30 S‐030 Temporary Occupancy Review $567 3.90% $589 flat fee
31 S‐031 Temporary Use Permit
City of Azusa
Schedule of Fees and Charges (Development‐Related)
PLANNING
16
Adopted Adopted
Svc Area 1/16/2018 CPI 1/22/2019 Fee
No. Item # Description Fee/Unit Sep'17‐'18 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
PLANNING
a) Temporary Use Permit Fee $526 3.90% $546 [b,d]
b) Azusa Based Non‐Profit Organizations $394 3.90% $410 flat fee [b]
32 S‐032 Continuance Processing $652 3.90% $677 flat fee
33 S‐033 Time Extension Review ‐ Staff $489 3.90% $508 flat fee
34 S‐034 Time Extension Review ‐ Planning Commission $1,100 3.90% $1,143 flat fee
35 S‐035 # Appeal To Planning Commission $500 n/a $500 flat fee
36 S‐036 # Appeal To City Council $1,000 n/a $1,000 flat fee
37 S‐15 Preliminary Plan Review $1,761 3.90% $1,830 flat fee [c]
38 S‐15A Nonconforming Use Time Extension $815 3.90% $847 flat fee
39 S‐037 Certificate Of Compliance $1,439 3.90% $1,495 flat fee
40 S‐038 Street Name Processing W/O Map $1,398 3.90% $1,452 flat fee
41 S‐039 Street Re‐Name Processing $1,887 3.90% $1,960 flat fee
42 S‐040 Building Address Processing W/O Map $909 3.90% $944 flat fee
43 S‐041 Building Re‐Address Processing $652 3.90% $677 flat fee
44 S‐041A Com Dev Newspaper Publication Actual Cost n/a Actual Cost flat fee
45 S‐044 Special Building Inspection (2 Hour Minimum)$163 3.90% $169 flat fee
46 S‐045 Technology Enhancement (5% of permit and plan
check fee‐ $30 minimum)
5% 3.90% 5% flat fee
47 S‐047 Massage Parlor Permit $932 3.90% $968 flat fee [d]
48 S‐048 Massage Parlor Permit Renewal $465 3.90% $483 flat fee [d]
49 S‐049 Residential Indoor Marijuana Permit $425 3.90% $442 flat fee [e]
50 S‐050 Residential Indoor Marijuana Permit Renewal $213 3.90% $221 flat fee [e]
51 S‐051 Accessory Dwelling Unit Permit $1,945 3.90% $2,021 flat fee [f]
52 S‐052 Designation of Historic Landmark, Hictoric District,
Potential Historic Landmark, and Potential Historic
District.
$500 3.90% $520 flat fee
53 S‐053 Mills Act Contract $800 3.90% $831 flat fee
54 S‐054 Miss Act Contract Extension $240 3.90% $249 flat fee
55 S‐055 Major Certificant of Appropriateness $260 3.90% $270 flat fee
56 S‐056 Minor Certificate of Appropriateness $120 3.90% $125 flat fee
57 S‐057 Landscape Plan Review $177 3.90% $183 flat fee
58 S‐058 Covenant Review $229/Hr 3.90% $237.93/Hr flat fee
59 S‐059 Covenant Conditions & Restrictions Review $229/Hr 3.90% $237.93/Hr flat fee
60 S‐060 General Plan Update Fee (10% of permit and plan
check fee)
10%flat fee [g]
[b] Azusa‐based non‐profit organizations receive a 25% discount from standard TUP fee.
[d] Fees Approved by Council on June 5, 2017 per Resolution No. 2017‐C37. Did not apply CIP since it has not been one full year.
[a] Charges to be billed at fully‐burdened hourly rates, including costs of outside service providers, if any. All costs recovered.
[c] Fee is per meeting. 50% of the fee for the first meeting is applied against future Planning/Engineering fee for the project.
17
Adopted Adopted
Svc Area 1/16/2018 CPI 1/22/2019 Fee
No. Item # Description Fee/Unit Sep'17‐'18 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
PLANNING
# = Fees not automatically adjusted for CPI change.
[e] Fees Approved by Council on June 5, 2017 per Resolution No. 2017‐C35. Did not apply CIP since it has not been one full year.
[f] Fees Approved by Council on December 4, 2017 per Resolution No. 2017‐C37. Did not apply CIP since it has not been one full year.
[g] Proposed New Fee.
18
City of Azusa eSchedule of Fees and Charges (Development-Related)
ENGINEERING
Adopted Adopted
Svc Area 1/16/2018 CPI 1/22/2019 Fee
No. Item # Description Fee/Unit Sep'17-'18 Fee/Unit Type Notes
1 S-047 Publi c/Private Improvement Plan Check:
# a)$0-$100,000 Valuation(% of est construction cost)3% n/a 3% flat fee
# b) Next $400,000 Valuation{% of est construction cost)2.5% n/a 2.5% flat fee
# c) > $500,000 Valuation (% of est construction cost)2% n/a 2% flat fee
2 S-048 Publi c/Private Improvement Inspection:
# a)$0-$100,000 Valuation{% of est construction cost)5% n/a 5% flat fee
# b)Next $400,000 Valuation(% of est construction cost)3.5% n/a 3.5% flat fee
# c)> $500,000 Valuation (% of est construction cost)2% n/a 2% flat fee
3 S-049 Final Parcel Map $1,103 3.90% $1,146 flat fee
4 S-050 Final Tract Map
a)S -10 Lots $2,494 3.90% $2,592 flat fee
b) 11 -25 Lots $3,723 3.90% $3,868 flat fee
c) 26 -SO lots $5,258 3.90% $5,463 flat fee
d) 51 -100 Lots $7,715 3.90% $8,016 flat fee
e) 101 -150 lots $8,636 3.90% $8,973 flat fee
f)> 150 lots $10,478 3.90% $10,887 flat fee
5 S-051 Easement Check $345 3.90% $359 flat fee
6 S-052 Monument Inspection:
a)First Monument $307 3.90% $319 flat fee
b)Each Additional Monument $77 3.90% $80 flat fee
7 S-053 Bond Processing $154 3.90% $160 flat fee
8 S-055 lot Line Adjustment $1,763 3.90% $1,832 flat fee
9 Street Light Banner Installation/Removal $76 3.90% $79 flat fee
10 S-056 # Street/Right-of-Way Abandonment $2,000 n/a $2,000 deposit [a]
11 5-0SGA SUSMP/LID Plan Review $2,005 3.90% $2,084 flat fee
12 S-056B SWPPP Plan Review $1,842 3.90% $1,914 flat fee
13 S-056B BMP Review $307 3.90% $319 flat fee
14 S-OSGC Hydrology/Drainage Plan Review $1,842 3.90% $1,914 flat fee
15 S-OSGC Soils Review $307 3.90% $319 flat fee
16 S-056C Traffic St udy Review $768 3.90% $798 flat fee
17 S-057 Sidewalk/Curb/Gutter Encroachment
a)Up to 75 LF $461 3.90% $479 flat fee
b)Each Add'I 75 lF $154 3.90% $160 flat fee
18 S-057A Street Cut Encroachment
a)Up to 100 SF $461 3.90% $479 flat fee
b)[ach Add'l 100 sr $154 3.90% $160 flat fee
19 S-057B Driveway Approach $384 3.90% $399 flat fee
20 S-058 Obstruction Permit $154 3.90% $160 flat fee
21 S-059 Transportation Permits (Oversized And/Or Overweight Trucks):
# a)Single Trip/Rider $16 n/a $16 flat fee [b]
# b) Annual Permit $90 n/a $90 flat fee [bl
22 S-060 # House Moving Permit $2,000 n/a $2,000 deposit [a]
23 S-060A Industrial Waste Permit
19
City of Azusa
Schedule of Fees and Charges (Development-Related)
ENGINEERING
Adopted Adopted
Svc Area 1/16/2018 CPI 1/22/2019
No. Item # Description Fee/Unit Sep'17-'18 Fee/Unit
a) New/Modified $1,075 3.90% $1,117
b) Renewal $307 3.90% $319
24 S-060B Fats,Oils And Grease Program
a)New $537 3.90% $558
b)Annual $230 3.90% $239
25 S-061 Sewer Saddle $461 3.90% $479
26 Sewer Dye Test $115 n/a $115
27 Sewer Blockage Check Actual Staff n/a Actua I Staff
Time Time
28 S-062 # Blueprint/Map Copy Service, Per Sheet (or actual outside costs) $20 n/a $20
29 # Project Plans/Specifications -Plus $10 If Mailed $SO n/a $50
30 Verification of Conditions $169 3.90% $176
31 Agreement And/Or Improvement Security, Each $224 3.90% $233
32 Extension Time For Improvement Agreement, Each $306 3.90% $318
33 Submittals in Excess of Three
a) Fourth Submittal $423 3.90% $439
b) Sixth Submittal $1,482 3.90% $1,540
c) Eighth And Each Subsequent Submittal $1,767 3.90% $1,836
34 Minor Land Division -Lot Split $626 3.90% $650
35 Recording Fee:
# a)First Sheet $8 n/a $8
# b) Additional Sheets, Each $2 n/a $2
36 LDMA Surcharge (County Maps Only):
# a) Tract Map $401 n/a $401
# b) Parcel Map $135 n/a $135
37 # Expedited Plan Review 1.5x fee n/a 1.5x fee
38 # Consultant (Invoice+ 36% Overhead) Invoice n/a Invoice
+ 36% O'H +36%0'H
39 S-6.S Code Compliance Fee $39 3.90% $40
40 S-7 # Landscape Design Standards (Over The Counter Sales) $6 n/a $6
41 S-18 City-Provided Tree Planting -One 15 Gallon Tree $115 3.90% $119
42 City-Provided Tree Planting -One 24" Box Tree $198 3.90% $205
43 Time Extension $77 3.90% $80
44 S-6.3 Engineering Hourly Rate for in-House Staff $154 3.90% $160
45 Technology Enhancement (5% of permit and plan check fee -$30 5% n/a 5%
minimum)
46 S-8.0 General Plan Update Fee {10% of permit and plan check fee) 10%
•All amounts shown are base fees. Applicants are also be responsible for any consultant or other agency fees (e.g. LA County)
incurred.
fa I Charges to be billed at fully-burdened hourly rates, including costs of outside service providers, if any. All costs recovered.
[bl Fee set to match CalTrans.
[c]Proposed New Fee.
#=Fees not automatically adjusted for CPI change.
e Fee
Type Notes
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
Actual Staff
Time
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee
flat fee [c]
20
City of Azusa eSchedule of Fees and Charges (Development-Related)
UTILITIES
Adopted Adopted
Svc Area 1/16/2018 CPI 1/22/2019 Fee
No. Item # Description Fee/Unit Sep'17-'18 Fee/Unit Type Notes
Utility Services
1 S-105 New Utility Account Setup:
# a)Connect Fee $45 n/a $45 flat fee
# b)Same Day Connection (7:00am-4:00pm)$35 n/a $35 flat fee
# c)Same Day Connection (4:00pm-5:30pm)$85 n/a $85 flat fee
# d)Fri 7am-8pm (Elec, Wtr, or Both)$105 n/a $105 flat fee
# e) Sat, Sun Or Holiday 7am-8pm (Elec, Wtr, or Both)$205 n/a $205 flat fee
# f)Positive Identification Check -$1.25 $1.25 n/a $1.25 flat fee
2 S-106 Utility Delinquent Turn Off/On:
# a) 7am-4pm $35 n/a $35 flat fee
# b)4pm-5:30pm $85 n/a $85 flat fee
# c)Fri 7am-8pm (Elec, Wtr, or Both)$105 n/a $105 flat fee
# d)Sat, Sun or Holiday 7am-8pm (Elec, Wtr, or Both)$205 n/a $205 flat fee
e)Late Payment Penalty, The Greater Amount Of Either:
# i)Base Penalty Fee $7.50 n/a $7.50 flat fee
# ii)Percent Of Total Outstanding Balance 5% n/a 5% flat fee
3 S-107 Theft Of Water/Light Investigation:
# a)Investigation Fee $500 n/a $500 flat fee
# b)Damages And Estimated Usage Actual Cost n/a Actual Cost flat fee
4 S-108 Water Pressure Test:
# a) 1st Test Free Per Calender Year $0 n/a $0 flat fee
# b)Additional Test $165 n/a $165 flat fee [al
# c)Main Line $400 n/a $400 flat fee
5 S-109 # Water Meter Test (Fully Allocated Hourly Rate) Bill Hourly n/a Bill Hourly per hour
6 S-110 Water Quality Test:
# a) Test Fee $125 n/a $125 flat fee
# b) Plus Lab Costs Actual Cost n/a Actual Cost flat fee
7 S-111 # Flow Test $300 n/a $300 flat fee
8 S-112 Temporary Meter Rental Services:
# a)Meter Fee (Per Each Meter)$130 n/a $130 flat fee
# b)Deposit $1,000 n/a $1,000 deposit
9 S-113 New Water Meter Installation:
# a)Installation Fee $250 n/a $250 flat fee
b)Plus Material Costs Actual Cost n/a Actual Cost deposit
10 S-131D Water Meter Fee:
# a) 3/4"$290 n/a $150 flat fee
# b)1"$390 n/a $200 flat fee
# c)1.5"$600 n/a $925 flat fee
# d) 2"$720 n/a $1,075 flat fee
# e) > 2"Dev/Owner n/a Dev/Owner deposit
Req'd to Req'd to
Procure Procure
11 S-131E # Jumper Fee (per service) $100 n/a $100 flat fee
12 S-114 New Water Service Installation:
# a) 3/4" -1" Deposit $3,500 n/a $3,500 deposit
# b) 2" Deposit $4,000 n/a $4,000 deposit
21
City of Azusa eSchedule of Fees and Charges (Development-Related)
UTILITIES
Adopted Adopted
Svc Area 1/16/2018 CPI 1/22/2019 Fee
No. Item # Description Fee/Unit Sep'17-'18 Fee/Unit Type Notes
# d) 4" Deposit $7,500 n/a $7,500 deposit
# e) 6" Depos i t $9,500 n/a $9,500 deposit
13 S-131H Hot Tap Fee:
# a) 1"$300 n/a $300 flat fee
# b) 2"$300 n/a $300 [b]
# c)4"$350 n/a $350 flat fee
# d)6"$400 n/a $400 flat fee
# e) 8"$450 n/a $450 flat fee
# f) 10"$450 n/a $450 flat fee
# g) 12"$525 n/a $525 flat fee
14 S-131C Fire Service Installation:
# a) 4" Deposit $7,500 n/a $7,500 deposit
# b) 6" Deposit $9,500 n/a $9,500 deposit
# c) 8" Deposit $10,500 n/a $10,500 deposit
# d) 10" Deposit $11,500 n/a $11,500 deposit
# e) 12" Deposit $12,500 n/a $12,500 deposit
15 S-1318 # Water Disconnection From The Mainline (Deposit) $3,200 n/a $3,200 deposit
16 S-131F # Fire Hydrant Relocation / Inspection Fee $1,500 n/a $1,500 flat fee
17 S-131G Traffic Incident Hit Hydrant Impact Fee:
# a) Impact Fee (Deposit)$1,500 n/a $1,500 flat fee
# b) Additional Cost Of Repair & Water loss Actual Cost n/a Actual Cost flat fee
# c) Damage to Water Main Impact Fee n/a $1,500 flat fee fcJ
# d) Cost of Repair & Water loss n/a Actual Cost flat fee [c]
# e) Damage to Water Facilities Impact Fee n/a $1,500 flat fee [c]
# f) Cost of Repair & Water Loss n/a Actual Cost flat fee fcJ
18 S-115 # New Backflow Device Inspection Review $340 n/a $340 flat fee
19 S-116 # Annual Backflow Device Inspection Review $80 n/a $80 flat fee
20 Water Plan Check $206 3.90% $214 flat fee
21 Water Improvement Inspection (per hour) $129 3.90% $134 per hour
22 Will-Serve Letter $26 3.90% $27 flat fee
23 S-117 # Water Service Various n/a Various variable [b]
No chan ge to various rates based on service size and usage
24 S-118 Sewer Blockage Check:
# a) Minimum Charge $500 n/a $500 deposit
# b) Fully Allocated Hourly Rates Bill Hourly n/a Bill Hourly deposit
# c) Charge If City Causes Blockage $0 n/a $0 flat fee
25 S-119 # Sewer Dye Test $115 n/a $115 flat fee
26 S-120 Emergency Sewage Spill Response:
# a) Spill Response Actual Cost n/a Actual Cost deposit
# b) Fully Allocated Hourly Rate For All Responding Personnel Bill Hourly n/a Bill Hourly deposit
# c) Charge If City Causes Spill $0 n/a $0 flat fee
27 S-121 Wastewater Service: Various n/a Various variable
28 Electric Plan Check $206 n/a $214 flat fee
29 S-122 Electric Meter Test:
# a) First Test Per Calender Year $0 n/a $0 flat fee
# b) Residential $160 n/a $160 flat fee
22
City of Azusa eSchedule of Fees and Charges (Development-Related)
UTILITIES
Adopted Adopted
Svc Area 1/16/2018 CPI 1/22/2019 Fee
No. Item # Description Fee/Unit Sep'17-'18 Fee/Unit Type Notes
# c)Commercial $370 n/a $370 flat fee
# d)Industrial $440 n/a $440 flat fee
30 S-123 Total Electrical Service Re-Install:
# a)Re-Install Fee $740 3.90% $769 flat fee
# b)Additional Materials Actual Cost n/a Actual Cost flat fee
31 S-124 Additional Electric Span Install:
# a) Install Fee $725 3.90% $753 flat fee
# b)Plus Materials Actual Cost n/a Actual Cost flat fee
32 S-125 Temporary Electric Installation:
# a) Install $763 3.90% $793 flat fee
# b)Additional Material Costs Actual Cost n/a Actual Cost flat fee
33 S-126 Temp Single Phase Transformer Installation:
# a) Installation Fee (Minimum)$3,098 3.90% $3,219 flat fee
# b)Additional Material Costs Actual Cost n/a Actual Cost flat fee
34 S-127 Temp Three Phase Transformer Installation:
# a) Installation Fee (Minimum)$6,200 3.90% $6,442 flat fee
# b) Additional Material Costs Actual Cost n/a Actual Cost flat fee
35 S-128 Electric Line Extension/Upgrade:
# a)Extension/Upgrade Actual Cost n/a Actual Cost deposit
# b)Fully Allocated Hourly Rates Bill Hourly n/a Bill Hourly deposit
36 S-129 Electric Services Various n/a Various variable (b]
37 S-130 # Banner Installation $580 n/a $580 flat fee
38 S-131 # After Hours Standby/Call Out (2 Hour Minimum Bill Hourly n/a Bill Hourly deposit
39 S-131A # Inspection Rate (Per Hour) Bill Hourly n/a Bill Hourly deposit
40 S-131H # Water System Development Fees:
a)Residential
# Per Dwelling Unit $2,045 n/a $2,045 flat fee
b)Commercial
# ii) Per SF $0.94 n/a $0.98 flat fee
c) Industrial
# ii) Per SF $0.39 n/a $0.40 flat fee
d)School
# Flat Fee $7,927 n/a $8,000 flat fee
e)Park
# Flat Fee $3,628 n/a $3,770 flat fee
41 S-1311 # Water System Annexation Fees:
a)Residential [a)
# Per Dwelling Unit $891 n/a $1,000 [bl
b)Commercial
# Per SF $0.40 n/a $0.45 flat fee
c) Industrial
# Per SF $0.17 n/a $0.25 flat fee
d)School $3,454 n/a $3,600 flat fee
e)Park $1,581 n/a $1,650 flat fee
# = Fees not automatically adjusted for CPI change.
[al Test fee refunded if there is a system problem.
[b]Rate varies depending on type of services and usage, time of year, and time of day.
[c l Proposed New Fees
23
Adopted Adopted
Svc Area 1/16/2018 CPI 1/22/2019
No. Item # Description Fee/Unit Sep'17‐'18 Fee/Unit Notes
1 S‐063 Real Property Records Report
a) Condominium/Townhouses $103 3.90% $107
b) Vacant/Unimproved Land $207 3.90% $215
c) Single Family Dwellings $207 3.90% $215
d) Multi‐Family Dwelling
i) Per Parcel, First Unit $207 3.90% $215
ii) Each Add'l Unit $12 3.90% $12
e) Commercial Properties $207 3.90% $215
2 S‐064 Residential Rental Housing Registration And Inspection:
a) Per Parcel ‐ Includes First Unit $120 3.90% $125
i) Additional Unit $7 3.90% $8
b) Reinspection $89 3.90% $93
3 Abandoned and Vacant Property Registration Fee $500 n/a $500
4 S‐032.5 Weed Abatement Inspection (Processing and Referring)$346 3.90% $359
5 S‐95.1 # Recovery and Storage of Abandoned Shopping Carts $12 n/a $12
6 S‐066 # Appeal/Hearing $110 n/a $110
7 S‐065 Lien Release
#a) Substandard $100 n/a $100
#b) Admin Fine $80 n/a $80
8 S‐066C Code Enforcement Fines
#a) First Offense $100 n/a $100
#b) Second Offense $250 n/a $250
#c) Third Offense $500 n/a $500
9 Technology Enhancement (5% of permit and plan check fee‐ $30
minimum)
5% n/a 5%
# = Fees not automatically adjusted for CPI change.
City of Azusa
Schedule of Fees and Charges (Development‐Related)
COMMUNITY IMPROVEMENT
24
Adopted Adopted
Svc Area 1/16/2018 CPI 1/22/2019
No. Item # Description Fee/Unit Sep'17‐'18 Fee/Unit Notes
S‐1.1 Fire Safety (Per Hour)
1 Fire Plan Check $110 3.90% $115
2 Fire Alarm System $110 3.90% $115
3 Fire Extinguisher Service $110 3.90% $115
4 Flammable Storage $110 3.90% $115
5 Hood System $110 3.90% $115
6 Spray Booths $110 3.90% $115
7 Subdivision Plan Checking $110 3.90% $115
Fire Permit Fees
8 Occupancy Inspection ‐ Per Hour $110 3.90% $115
9 Christmas Tree Lot Inspection ‐ Per Hour $110 3.90% $115
10 Circus/Carnival Inspection ‐ Minimum 2 Hours $221 3.90% $230
11 Flammable Liquid Tank Site Inspection ‐ Minimum 3 Hours $330 3.90% $343
12 Liquid Petroleum Gasses ‐ Per Hour $110 3.90% $115
13 Magnesium Working ‐ Minimum 2 Hours $221 3.90% $230
14 Motor Vehicle Repair Garages ‐ Per Hour $110 3.90% $115
15 Oxygen System Installation ‐ Minimum 2 Hours $221 3.90% $230
16 Storage/Handling Flammable Liquids ‐ Minimum 2 Hours $221 3.90% $230
17 Underground Tank Installation ‐ Minimum 4 Hours $442 3.90% $459
18 Underground Tank Removal ‐ Minimum 3 Hours $330 3.90% $343
19 Fireworks Stands ‐ Minimum ½ Hour $56 3.90% $58
20 Metal Foundry ‐ Minimum 2 Hours $221 3.90% $230
21 Places Of Assembly ‐ Minimum 2 Hours $221 3.90% $230
22 Pyrotechnical Special Effects ‐ Per Hour $110 3.90% $115
23 Public Rifle/Gun Ranges ‐ Minimum 2 Hours $221 3.90% $230
24 Tire Storage Areas In Excess Of 1,000 Cu. Ft. ‐ Per Hour $110 3.90% $115
25 Automobile Dismantling/Storage Yards ‐ Minimum 2 Hours $221 3.90% $230
26 Commercial Woodworking Facilities With Dust Collection
Systems Greater Than 25 Gallons ‐ Minimum 2 Hours
$221 3.90% $230
27 Educational/Daycare Centers ‐ Minimum 3 Hours $330 3.90% $343
Miscellaneous Fire Fees (Per Hour)
28 Residential Inspection Per Sec. 13146.2 Of H&S Code $110 3.90% $115
29 Engine Company Standby $110 3.90% $115
30 Hazardous Materials Response $110 3.90% $115
31 Special Inspections $110 3.90% $115
32 Weed Abatement (Processing & Referral)$110 3.90% $115
City of Azusa
Schedule of Fees and Charges (Development‐Related)
FIRE SAFETY
Note: The City of Azusa contract out fire services to the Los Angeles County Fire Department. Please see the link listed below for a
comprehensive list of fees related to the Los Angeles County Fire Department:
https://library.municode.com/ca/los_angeles_county/codes/code_of_ordinances?nodeId=TIT32FICO_APXQFIPRFIPE
25