The Utility Board/City Council of the City of Azusa met in regular session, and the City Council and the Utility Board met
in special session, at the above date and time, at the Azusa Light and Water(AL&W)Conference Room, located at 729 N.
Azusa Avenue, Azusa, California.
Chairman Macias called the meeting to order;he addressed the Secretary to report that as of the date of this Call to Order
meeting, he resumes his duties as Chairman of the Utility Board, as he is back from active duty in
Afghanistan, and thanked everyone for their work and for assisting with his duties in his absence.
Pledge to the flag was led by City Clerk/Secretary Cornejo Flag Salute
ROLL CALL: Roll call was taken by City Clerk/Secretary Cornejo. Roll Call
PRESENT: COUNCILMEMBERS/BOARDMEMBERS: GONZALES, CARRILLO, MACIAS,
ALVAREZ
ABSENT: COUNCILMEMBERS/BOARDMEMBERS: ROCHA
ALSO PRESENT Also Present
Elected Officials: City Clerk/Secretary Cornejo.
Staff Members: City Manager Makshanoff, City Attorneys Ferre and Martinez, Director of Public
Works/Assistant City Manager Haes,Utilities Director Morrow,Finance Director Paragas,Police Captain
Chavez, Assistant Director of Electric Operations Langit, Assistant Director of Resource Management
Lehr, Assistant Director Customer Care Solutions Kalscheuer, Assistant Director Water Operations
Anderson,Administration and Finance Services Graham, Assistant/Deputy City Clerk Hernandez.
PUBLIC PARTICIPATION
Public
None was given. Participation
UTILITIES DIRECTOR COMMENTS
Director's
Utilities Director Morrow addressed the meeting to welcome back Chairman Macias. Comments
UTILITIES BOARD MEMBERS COMMENTS
Boardmembers
None given. Comments
CONSENT CALENDAR:It was moved by Boardmember Gonzales,seconded by Boardmember Carrillo, Consent Cal
to approve Consent Calendar Items D-1 to D-3, by the following vote of the Board:
YES: BOARDMEMBERS: GONZALES, CARRILLO, MACIAS, ALVAREZ
NOES: BOARDMEMBERS:NONE
ABSENT: BOARDMEMBERS: ROCHA
1. The minutes of the regular meeting of January 27, 2014, were approved as written. Minutes
2. The following Resolution No. 14-C10 was adopted and entitled: Reso 14-C10,
Accepting
A RESOLUTION OF THE UTILITY BOARD/CITY COUNCIL OF THE CITY OF AZUSA Easement
ACCEPTING A CERTAIN GRANT OF PERMANENT EASEMENT AND DIRECTING THE
RECORDING THEREOF. Azusa Land Reclamation, Inc., Gladstone Street between Mira Loma
Drive and Vincent Avenue.
3. The Contract with Pre-Fab Builder, Inc. of Fullerton, CA to supply and construct a pre- Contract
engineered shed at the Gladstone Water Yard for protection of the Water Division's hydroexcavator w/Pre-Fab
trucks in the amount of$42,821.00, including tax,delivery,and erection of the building,was approved Builder
SCHEDULED ITEMS Sched Items
Declaration of Phase III Water Shortage Restrictions. Declaration of
Phase III Water
Utilities Director Morrow addressed the item stating that 2013 was the worst water drought year on record; Shortage
in January 2014,the Governor declared a drought,requesting to reduce consumption by 20%;the dams are Restrictions
at their minimal level, the Canyon Basin for this time of year is low, the State Water Project(SWP) is
currently set at 0%and snow pack is below 10%;AL&W has been in business since 1899,and it currently
services parts of the Cities of Covina,Glendora,Irwindale,West Covina and County Areas,in addition to
Azusa; Azusa's wells are located at the Canyon Basin, those wells provide water to the Hsu Water
Filtration Plant;the State Water Project(SWP)also provides water to the treatment plant that comes down
from Northern California through the Four Cities' foothill pipeline; the wells typically provide
approximately 80%of the water needs and the filtration plant the other 20%;Azusa withdraws water from
the smaller Canyon Basin,next to the Main Water Basin,it is recharged by the 3 dams located in this area,
Morris Dam, San Gabriel Dam and Cogswell Dam,the San Gabriel Valley(SGV)Mountains/Rivers,and
the SWP;Azusa has paper water rights that allows to withdraw water from the Main Basin,but it is limited
by the hydrology of its well locations,water travels by gravity and it is expensive as it requires maximum
energy to carry it uphill;since 2007,no water has been purchased from the Metropolitan Water District(via
USGVMWD); during fiscal years 2009 to 2012, there was a 20% consumption reduction due to
conservation, since then sales have gone up approximately 10%;Phase II is currently in effect,customers
have been conserving as much as possible,but at least 10%additional conservation is needed;he explained
the drought Phases I thru IV and staff recommended to move to Phase III, starting May 1, 2014, for
mandatory conservation measures and rate adjustments; 50%-60% of water consumption is landscape
watering;some communities currently prohibit outside watering;he showed the rates for Phase III and the
penalties associated with over usage.
Discussion was held between staff and Boardmember Carrillo regarding how long can the implementation A. Carrillo
of Phase III be delayed in hopes that rain comes soon; letters and educational information will go out to Comments
customers by the end of March.
Discussion was held between staff and Chairman Macias regarding current rebates for water conservation U. Macias
landscaping, reclaimed water for outside watering, the various water associations to which AL&W is a Comments
member, and the possibility of water desalination programs.
02/24/2014 PAGE TWO
It was moved by Boardmember Carrillo, seconded by Boardmember Gonzales, that pursuant to Azusa Approve Phase
Municipal Code Section 78-506,and Rule No. 21 of Azusa Light&Water Rules&Regulations,to ratify III Water
the Director of Utilities to declare that Phase III Water Shortage to go into effect on May 1, 2014,by the Conservation
following vote of the Board:
YES: BOARDMEMBERS: GONZALES, CARRILLO,MACIAS, ALVAREZ
NOES: BOARDMEMBERS: NONE
ABSENT: BOARDMEMBERS: ROCHA
STAFF REPORTS/COMMUNICATIONS Rprts/Comm
FY 13-14 Second Quarter Budget Reports for Water and Electric Funds. FY13-14
Second Quarter
Utilities Director Morrow presented the second quarter budget report as follows: Budget Review
Water: $1.4 million positive cash flow;annual revenues are at 55%and expenses at 45%;a slight reduction
in sales;debt service coverage was tight due to the bonds for the water treatment plant;reserves are at a$22
million level.
Electric: $477 thousand positive cash flow; annual revenues 53%, expenses 48%; a slight reduction in
sales; excellent debt coverage; reserves are at$19 million, better than expected.
Report on study evaluating Athens Services' increased costs to transfer waste to more distant Report on
facilities/landfills following closure of Puente Hills Landfill. Athens Rate
Increase Study
Assistant Director Customer Care Solutions Kalscheuer gave an update on the item, stating that Puente
Hills Landfill closed the at end of October 2013, and staff worked with Athens to find a new location to
take waste; there were two options, El Sobrante by Waste Management, and Mid Valley Landfill by
Athens,yard waste is now being taken to a new location at Recycled Wood Products,in Pomona;the Board
requested from staff a study of Athens incremental costs vs.El Sobrante;a consultant to do the study was
approved by Athens,they signed a confidentiality agreement with the consultant,and currently they have
draft figures, which we estimate to present to the Board at the March, 2014, Meeting.
THE UTILITY BOARD RECESSED AT 7:14 P.M. AND RECONVENED AT 8:12 P.M.TO GO Recess,
JOINTLY WITH THE AZUSA CITY COUNCIL,INTO CLOSED SESSION TO DISCUSS THE Reconvene
FOLLOWING:
CLOSED SESSION Closed Session
CONFERENCE WITH LABOR NEGOTIATOR Pursuant to California Government Code,Section Labor
54957.6 Negotiations
City Negotiators: City Manager Makshanoff AMMA
Organizations: AMMA(Azusa City Employees Association).
02/24/2014 PAGE TWO
CONFERENCE WITH LEGAL COUNSEL-ANTICIPATED LITIGATION- Government Anticipated
Code, Section 54956.9(d)(2). Litigation
1 potential case: Verizon v. City of Azusa/Azusa Utility Verizon v.
Azusa
The City Council and the Utility Board reconvened at 7:50 P.M., City Attorneys Martinez and Ferre,
announced that there was no reportable action taken in Closed session.
02/24/2014 PAGE THREE
It was consensus of the City Council/Utility Board to adjourn the meetings. Adjourn
TIME OF ADJOURNMENT: 8:50 P.M.
dr //
,01°- liarT ECRETAR / V
NEXT RESOLUTION NO.2014-C14.
*Indicates Boardmember Rocha was Absent.