Loading...
HomeMy WebLinkAboutC- 3 Approval Change order #33 -A for Police Facility Addition and Alteration �" The City of AzusaIL 9<%oR�, Police Department John Broderick, Chief of Police AGENDA ITEM To: Honorable Mayor and City Council From: John Broderick, Chief of Polic Via: Rick Cole, City Manager te_C. Date: November 2, 1998 Recommendation: Approve the attached change order,No.33-A,for the Police Facility Addition and Alteration Project in the sum of$25,198.54,pending the approval of LaSalle National Bank. Background: On August 17, 1998, Council approved changer order No. 33 in the amount of$17,881.46 for the removal of contaminated soils under the police department's gasoline dispenser. This change order was approved in the form of an allowance and was based upon the removal of 50 tons of contaminated soil. Additionally, this allowance provided for appropriate backfill and compaction, concrete removal and replacement, and structural shoring work necessary to complete the removal of the estimated 50 tons. Unfortunately, once excavation commenced, our independent geotechnical consultant hired to monitor the removal found that the soil was still testing positive for contamination after the 50 tons was removed.However,as he was testing the soil on a regular basis throughout the removal process, he was finding that the level of contamination was decreasing.Therefore,it was his opinion and the recommendation of the Los Angeles County Department of Public Works, Waste Management Division, to continue the removal of contaminated soils until acceptable detection levels were reached. Nearly 100 tons of contaminated soil had to be removed in order to reach those acceptable levels of detection.Also,a non-load bearing wall had to be removed from the carport,additional concrete had to be removed,and more shoring to support the carport was required to accommodate the excavation. This work took another five days in addition to the seven days that was approved in the previous change order. * * * Phone #(626)812-3200 • 725 North Alameda Avenue,Azusa, California 91702-2509 • FAX#(626)812-9308 Fiscal Impact: The additional cost of this change order, $25,198.54, will be funded by the loan from LaSalle National Bank pending their approval and will not impact the General Fund.The total cost to address the soils contamination under the police department's gasoline dispenser was$43,080(change orders 33 and 33-A combined). Prepared by: i Sam Gonzalez, Lt. Project Manager CHANGE ORDER# 33-A Distribution to: OWNER n FIELD ARCHITECT n OTHER CONTRACTOR n PROJECT: Azusa Police Facility CHANGE ORDER NUMBER: 33-A (name,address) 725 North Alameda Avenue Azusa,California 91702 INITIATION DATE: 10/22/98 TO(contractor): Hazama Corporation CONTRACTORS PROJECT NO: CA199 1045 W.Redondo Beach Blvd.,Ste 400 Gardena,CA 90247 CONTRACT FOR: City of Azusa CONTRACT DATE: 03/03/97 You are directed to make the following changes in this Contract: Remove Contaminated Soil from existing gasoline dispencer area A. Indirect Cost T&M Basis work to remove,haul off contaminated soil and back fill $25,792.68 Concrete slab to replace existing $930.00 Rebar for concrete slab(Allowance) $100.00 Metal Studs and stucco to repair existing partition $2,070.00 New pump curb to replace existing $135.50 Sub-Total $29,028.18 13 Overhead/Profit(Indirect Cost-5%) $1,451.41 Sub-Total of Indirect Cost $30,479.59 B. DIRECT COST 1.Delay Calendar Days 12 Days 2.General Condition($880/day) $10,560.00 3.Overhead/Profit(Direct Cost-15%) $1,584.00 Sub-Total of Direct Cost $12,144.00 C. TOTAL Sub-Total of Direct Cost&Indirect Cost $42,623.59 Bond(0.65%) $277.05 Insurance(0.42%) $179.02 TOTAL $43,080.00 D. CREDIT Change Order#33 alredy approved ($17,881.46) $25,198.54 Total Amount This Change Order: $25,198.54 Not valid until signed by both the Owner and Architect The Original Contract Sum was $ 2,908,916.00 Net Change by previously authorized Change Orders $ 761,814.46 The Contract sum prior to this Change Order $ 3,670,730.46 The Contract Sum will be(increased) by this Change Order $ 25,198.54 The New Contract Sum including this Change Order $ 3,695,929.00 The Contract Time will be(increased).-(4eereaseEl-)-(onshaRge4)by 5 Days The Date of Substantial Completion as of the date of this Change Order therefore is 10/31/98 • Authorized: WMM Associates The City of Azusa Hazama Corporation 3731 Wilshire Boulevard Suite 670 725 North Alameda Avenue 1045 W.Redondo Beach Blvd.,Ste 400 Los Angeles,Calif to 991100 Azusa,California 91702 Gardena,California 90247 By: BY: Y Dae: /G` g--Z:e Date: -)-J--5 7' Date: k� 1=1 1 y LaSalle National Bank 135 South LaSalle Street Chicago,Illinois 60603 By: Date: