Loading...
HomeMy WebLinkAboutE-5.1. Award contract to EPS for Addition of Medium Voltage Circuit Breaker_APPROVEDUB-29 Approved Utility Board 09/23/2019 ANALYSIS: On June 13, 2019 Staff advertised in the San Gabriel Valley Tribune to solicit proposals for engineer, inspection, and commission for an additional circuit breaker in the Azusa Substation. On June 26, 2019, Staff held a pre-bid Job Walk with prospective bidders to discuss the scope of works and the project requirements. On July 18, 2019, Staff received only one proposal from Electric Power Systems (EPS), Inc. for the not-to-exceed amount of $49,999. The scope of works consists of three phases: Engineering, Inspection, and Commissioning. There will be time out periods between phases. First, EPS will prepare detailed drawings and specifications of the scope of work for use in the solicitation of a construction contractor. Staff will then seek Utility Board’s approval to solicit bids for the project construction based on these drawings and specifications. EPS will then serve as owner’s engineer during the project construction and commissioning phase for quality assurance. Staff has reviewed the EPS proposal for each phase of the project, and found it to be in conformance with the scope of work and functional specifications. Staff compared the hourly rates of EPS’s and other consultants who had provided similar type of service, and they are within reasonable range. The table below depicts the comparison. Task EPS Rate/hr Other Rates/hr Engineering $195 $212 Inspection $170 N/A Commissioning $170 $177 Based on its vast experiences in substation works and reasonable cost EPS has proposed, Staff is seeking Utility Board’s approval in awarding a Professional Service Contract to EPS to perform the EIC services to add a Medium Voltage Circuit Breaker at the Azusa Substation. FISCAL IMPACT: The cost of EIC services for Project L-2019CB is $49,999. Funding for this project is budgeted for under the Utility’s Capital Improvement Budget Acct # 33-80-000-730-7120. Prepared by: Reviewed and Approved: Hien K. Vuong Manny Robledo Assistant Director – Electric Operations Director of Utilities Reviewed and Approved: Sergio Gonzalez City Manager Attachments: 1) EPS Proposal 2)Professional Service Agreement – Electric Power Systems UB-30