HomeMy WebLinkAboutD-1 Staff Report - Citywide Fee Schedule Staff ReportSCHEDULED ITEM/PUBLIC HEARING
D-1
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
VIA: SERGIO GONZALEZ, CITY MANAGER
FROM: TALIKA M. JOHNSON, DIRECTOR OF ADMINISTRATIVE SERVICES
DATE: JANUARY 21, 2020
SUBJECT: ADOPTION OF UPDATED CITYWIDE SCHEDULE OF FEES AND CHARGES
BACKGROUND:
On January 19, 2016, the City Council adopted several resolutions approving certain adjustments to the
City’s Schedule of Fees and Charges. In addition, the City Council authorized Staff to adjust the
schedule of fees and charges annually based on the change in the Consumer Price Index (CPI) or 2%,
whichever was greater. The Los Angeles Area CPI change from September 2018 through September
2019 was 3.0%. Consequently, Staff has adjusted the majority of fees by 3.0% consistent with previous
instructions established by the City Council. These changes are ministerial in nature and no further
action is required by the Council in order to complete these fee updates. As part of the fee update, Staff
would like to make other modifications to the Schedule of Fees and Charges that fall outside of the
parameters of the previous direction provided by the City Council. The proposed recommendations
requests the City Council to adopt the fee modifications outlined in Attachment 4 which includes three
tables: 1) New fees proposed; 2) Fees proposed to be modified by an amount other than the previously
directed CPI adjustment; and 3) Fee proposed to be eliminated.
RECOMMENDATIONS:
Staff recommends that the City Council take the following actions:
1)Receive, review, and file the updated Citywide Fee and Charges Schedule; and
2)Open the Public Hearing, receive public testimony, and close the Public Hearing; and
3)Adopt Resolution No. 2020-C01, regarding various municipal activities and services, to be
effective on January 21, 2020.
4)Adopt Resolution No. 2020-C02, regarding development project services fees, to be effective
60 days from January 21, 2020 (March 21, 2020); and
APPROVED
CITY COUNCIL
1/21/2020
Approved with Amendments
Adoption of Citywide Fees and Charges
January 21, 2020
Page 2
ANALYSIS:
California Government Code 66000 allows public agencies to impose fees to recover the costs of
providing various public services to the community. In an effort to keep current with the cost of
providing services, the City Council authorized Staff to implement the recommendations and fee
adjustment from the fee study on January 19, 2016.
The City Council also directed Staff to annually adjust the City’s Schedule of Fees and Charges by the
change in the Consumer Price Index - Los Angeles Area (CPI) with a minimum increase of 2% and a
maximum increase of 5% for most fee categories. This provision allows City fees to keep pace with
increased costs for services without having to conduct a complete study each year. The CPI change
from September 2018 through September 2019 was 3.0%; consequently Staff has adjusted the majority
of fees by 3.0%.
There are several fees that fall outside the parameter of the previous direction provided by the
City Council. Specifically, twelve (12) new fees are being proposed (Attachment 4, Table 1) to
reflect new programs and/or to enhance the City’s ability to provide services. The new fees
include:
1) Miscellaneous Collection Fees: S-106 f) - 24% assessed on all closed utility accounts that
remain unpaid. The 24% fee is the cost that the Utility incurs when an account is written off to
the collection agency. The fee will be assessed on all closed accounts that remain unpaid 20
days from the rendering of the final billing statement.
2) AMI Opt-Out Fees: - S-106 g) i One-time initial set-up charge - $75. Added fee per the
Utility's Rules and Regulations pertaining to the new AMI meters, when customers opt out.
3) AMI Opt-Out Fees: - S-106 g) ii Monthly Opt-Out Fee - $10. Provided the option to not have
an AMI meter installed at their location for an additional cost each month.
4) AMI Opt-Out Fees: - S-106 g) iii Monthly Opt-Out Fee (Low-Income) - $5. These fees are
related to the costs of providing and reading disabled two-way radio communication meters.
5) Water System Development Fee S-131H f) Accessory dwelling units less than 750 Sq. Ft-
$700. To recover cost of Engineer time and administrative assessment by Water master.
6) Water Capacity Fee S-131J: e) Accessory dwelling units less than 750 Sq. Ft - $300. One time
impact fee to connect to the water system for Accessory dwelling units.
7) Police Section #79 - Fire Arm Storage Fee - Levy upon release of firearm - $50. AB2431
allows administrative fees to be charged for storage and processing of firearms.
8) Rental of Civic Center Auditorium S-48.1: F) Custodial Services - $40 per hour. Cleanup
costs for facility use.
9) 23 (Building Section) Construction and Demolition Administrative Fees: All tenant
improvements with a valuation of up to $25,000: and all residential additions - $68. This fee is
established for recovery of staff time in reviewing documents mandated by the State of
California's Green Building Standards Code. Effective January 1, 2011, California’s Green
Building Standards Code, Section 4.408 and 5.408, required the diversion/recycling of at least
Adoption of Citywide Fees and Charges
January 21, 2020
Page 3
50% of the construction waste during most new construction projects. Subsequent
amendments to the legislation have expanded the types of construction and increased
diversion/recycling requirement to 65%. The proposed ordinance would require the owners or
developers of certain construction or demolition projects within the City, which are greater
than 1,000 square feet, to develop and adhere to a Construction Waste Management Plan
(CWMP).
10) 23 (Building Section) Construction and Demolition Administrative Fees: All tenant
improvements with a valuation of $25,001 to $50,000, and all single family residential new
constructions - $100. This fee is established for recovery of staff time in reviewing documents
mandated by the State of California's Green Building Standards Code. Effective January 1,
2011, California’s Green Building Standards Code, Section 4.408 and 5.408, required the
diversion/recycling of at least 50% of the construction waste during most new construction
projects. Subsequent amendments to the legislation have expanded the types of construction
and increased diversion/recycling requirement to 65%. The proposed ordinance would require
the owners or developers of certain construction or demolition projects within the City, which
are greater than 1,000 square feet, to develop and adhere to a Construction Waste
Management Plan (CWMP).
11) 23 (Building Section) Construction and Demolition Administrative Fees: All tenant
improvements with a valuation greater than $50,000; all multifamily, commercial, and
industrial projects, and all other projects - $135. This fee is established for recovery of staff
time in reviewing documents mandated by the State of California's Green Building Standards
Code. Effective January 1, 2011, California’s Green Building Standards Code, Section 4.408
and 5.408, required the diversion/recycling of at least 50% of the construction waste during
most new construction projects. Subsequent amendments to the legislation have expanded the
types of construction and increased diversion/recycling requirement to 65%. The proposed
ordinance would require the owners or developers of certain construction or demolition
projects within the City, which are greater than 1,000 square feet, to develop and adhere to a
Construction Waste Management Plan (CWMP).
12) 10 (Community Improvement Section) Impound and Storage Fee (Non-Automobile) - Actual
Costs. Cost of removal of unlawful property such as containers/roll of operated and illegally
staged in the Azusa jurisdiction and storage fees.
There are eighteen (18) proposed fees that will increase more than the 3.0% CPI (Attachment 4,
Table 2):
1) Temporary Meter Rental Services S-112: a) Meter Fee (Per each meter) - from $130 to $200.
To recover the actual cost of meter which has gone up in price. Typical hydrant meters are
installed for longer than 12 months.
2) Temporary Meter Rental Services S-112: b) Deposit - from $1,000 to $1,200. To recover the
actual cost of meter which has gone up in price.
3) New Water Service Installation S-114: a) 3/4" to 1" Deposit - from $3,500 to $4,000. To
account for cost of materials such as copper and brass fittings as well as paving asphalt for
installation.
Adoption of Citywide Fees and Charges
January 21, 2020
Page 4
4) New Water Service Installation S-114: b) 2" Deposit - from $4,000 to $4,500. To account
for cost of materials such as copper and brass fittings as well as paving asphalt for
installation.
5) New Water Service Installation S-114: c) 4" Deposit - from $7,500 to $8,000. To account
for cost of materials such as copper and brass fittings as well as paving asphalt for
installation.
6) New Water Service Installation S-114: d) 6" Deposit - from $9,500 to $10,000. To account
for cost of materials such as copper and brass fittings as well as paving asphalt for
installation.
7) Fire Service Installation S-131C: a) 4" Deposit - from $7,500 to $8,000. To account for
cost of materials such as copper and brass fittings as well as paving asphalt for installation.
8) Fire Service Installation S-131C: b) 6" Deposit - from $9,500 to $10,000. To account for
cost of materials such as copper and brass fittings as well as paving asphalt for installation.
9) Fire Service Installation S-131C: c) 8" Deposit - from $10,500 to $11,000 . To account for
cost of materials such as copper and brass fittings as well as paving asphalt for installation.
10) Fire Service Installation S-131C: d) 10" Deposit - from $11,500 to $12,000. To account for
cost of materials such as copper and brass fittings as well as paving asphalt for installation.
11) Fire Service Installation S-131C: e) 12" Deposit - from $12,500 to $13,000. To account for
cost of materials such as copper and brass fittings as well as paving asphalt for installation.
12) Water Disconnection From The Mainline (Deposit) S-131B (from $3,200 to $3,500) – To
account for cost of materials such as copper and brass fittings as well as paving asphalt for
installation.
13) Annual Backflow Device Inspection Review S-116: Water Improvement Inspection (Per
Hour) - from $134 to $140. To recover Inspection labor costs.
14) Annual Backflow Device Inspection Review S-116: Will-Serve Letter - from $27 to $30.
To recover inspection and engineering labor costs.
15) Water System Development Fees S-131H: e) Park - Flat Fee - from $3,770 to $4,000. To
recover cost of engineering labor time and higher administrative assessment by Water
master.
16) Water System Annexation Fees S-131I: d) School - from $3,600 to $4,000. To recover cost
of engineering labor time and administrative assessment by Water master.
17) S-131I Water System Annexation Fees: e) Park - from $1,650 to $2,000. To recover cost of
engineering labor time and administrative assessment by Water master.
18) Booking Services S-072A - from $135 to $150. Per Government Code 29550-29550.3,
agencies are allowed to recover actual administrative costs associated with processing
individuals through jail.
There is one (1) proposed fee that will be eliminated (Attachment 4, Table 3):
Adoption of Citywide Fees and Charges
January 21, 2020
Page 5
1) Accident Report Investigation S-025 - from $20 to $0. Obsolete due to lack of assessment of
this fee in several years.
FISCAL IMPACT:
The adoption of the proposed fee schedule is anticipated to allow cost recovery of various City services
without depleting the City’s funds, and are contingent on the timing of various development projects and
municipal activities.
Prepared by: Reviewed and Approved:
Richard Lam Talika M. Johnson
Budget Administrator Director of Administrative Services
Reviewed and Approved:
Sergio Gonzalez
City Manager
Attachments:
1) Proposed Schedule of Citywide Fees and Charges
2) Resolution No. 2020-C01 – Establishing and Revising a User Fee Schedule for Various
Municipal Activities and Services
3) Resolution No. 2020-C02 – Establishing and Revising Certain Development Project Fees and
Charges
4) Proposed Fee Changes outside of CPI
CITY OF AZUSA
SCHEDULE OF FEES AND CHARGES
Proposed on January 21, 2020
Attachment 1
Proposed on
January 21,
2020
No. Description Pages
1 Building and Safety 3 - 15
2 Planning 16 - 18
3 Engineering 19 - 20
4 Utilities 21 - 24
5 Community Improvement 25
6 Fire Safety 26
7 Police 27 - 30
8 Adult Businesses 31
9 Business License 32
10 Community Resources 33 - 36
11 Recreation Facilities Rentals 37 - 39
12 Transportation 40
13 Library 41
14 GIS Maps 42
15 Administrative Processing 43
City of Azusa
Schedule of Fees and Charges
Table of Contents
2
Adopted Proposed
1/22/2019 1/21/2020
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes
S-1 Building Valuation
Apartment Houses:
1 Type I Or II F.R. $150.42 3.00% $154.94
2 Good $185.19 3.00% $190.74
3 Type V - Masonry (Or Type III)$122.78 3.00% $126.47
4 Good $150.42 3.00% $154.94
5 Type V - Wood Frame $108.19 3.00% $111.44
6 Good $139.06 3.00% $143.24
7 Type I - Basement Garage $63.43 3.00% $65.33
Auditoriums:
8 Type I Or II F.R.$177.72 3.00% $183.05
9 Type II - 1 Hour $128.72 3.00% $132.58
10 Type II - N $121.76 3.00% $125.41
11 Type III - 1 Hour $135.33 3.00% $139.39
12 Type III - N $128.38 3.00% $132.23
13 Type V - 1 Hour $129.40 3.00% $133.28
14 Type V - N $120.74 3.00% $124.36
Banks:
15 Type I Or II F.R.$251.16 3.00% $258.69
16 Type II - 1 Hour $185.02 3.00% $190.57
17 Type II - N $179.08 3.00% $184.46
18 Type III - 1 Hour $204.18 3.00% $210.31
19 Type III - N $196.89 3.00% $202.79
20 Type V - 1 Hour $185.02 3.00% $190.57
21 Type V - N $177.21 3.00% $182.53
Bowling Alleys:
22 Type II - 1 Hour $86.48 3.00% $89.08
23 Type II - N $80.72 3.00% $83.14
24 Type III - 1 Hour $94.12 3.00% $96.94
25 Type III - N $88.02 3.00% $90.66
26 Type V - 1 Hour $63.43 3.00% $65.33
Churches:
27 Type I Or II F.R.$168.23 3.00% $173.27
28 Type II - 1 Hour $126.35 3.00% $130.14
29 Type II - N $120.07 3.00% $123.67
30 Type III - 1 Hour $137.36 3.00% $141.48
31 Type III - N $131.26 3.00% $135.20
32 Type V - 1 Hour $128.38 3.00% $132.23
33 Type V - N $120.74 3.00% $124.36
Convalescent Hospitals:
34 Type I Or II F.R.$236.07 3.00% $243.15
35 Type II - 1 Hour $163.82 3.00% $168.74
36 Type III - 1 Hour $167.89 3.00% $172.92
37 Type V - 1 Hour $158.23 3.00% $162.98
Dwellings:
38 Type V - Masonry $128.38 3.00% $132.23
39 Good $164.33 3.00% $169.26
40 Type V - Wood Frame $114.13 3.00% $117.56
41 Good $156.71 3.00% $161.41
Basements -
42 Semi-Finished $34.09 3.00% $35.11
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
3
Adopted Proposed
1/22/2019 1/21/2020
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
43 Good $39.33 3.00% $40.51
44 Unfinished $24.76 3.00% $25.50
45 Good $30.01 3.00% $30.91
Fire Station:
46 Type I Or II F.R.$194.01 3.00% $199.83
47 Type II - 1 Hour $127.70 3.00% $131.53
48 Type II - N $120.41 3.00% $124.02
49 Type III - 1 Hour $139.74 3.00% $143.93
50 Type III - N $133.80 3.00% $137.82
51 Type V - 1 Hour $131.09 3.00% $135.02
52 Type V - N $124.31 3.00% $128.04
Homes For The Elderly:
53 Type I Or II F.R.$175.86 3.00% $181.14
54 Type II - 1 Hour $142.79 3.00% $147.08
55 Type II - N $136.69 3.00% $140.79
56 Type III - 1 Hour $148.73 3.00% $153.19
57 Type III - N $142.62 3.00% $146.90
58 Type V - 1 Hour $143.64 3.00% $147.95
59 Type V - N $138.72 3.00% $142.88
Hospitals:
60 Type I Or II F.R.$276.76 3.00% $285.07
61 Type III - 1 Hour $229.11 3.00% $235.98
62 Type V - 1 Hour $218.60 3.00% $225.15
Hotels And Motels:
63 Type I Or II F.R.$171.28 3.00% $176.42
64 Type III - 1 Hour $148.39 3.00% $152.84
65 Type III - N $141.43 3.00% $145.68
66 Type V - 1 Hour $129.22 3.00% $133.10
67 Type V - N $126.68 3.00% $130.48
Industrial Plants:
68 Type I Or II F.R.$96.49 3.00% $99.39
69 Type II - 1 Hour $67.16 3.00% $69.17
70 Type II - N $61.73 3.00% $63.58
71 Type III - 1 Hour $73.94 3.00% $76.16
72 Type III - N $69.70 3.00% $71.79
73 Tilt-Up $50.88 3.00% $52.40
74 Type V - 1 Hour $69.70 3.00% $71.79
75 Type V - N $63.76 3.00% $65.68
Jails:
76 Duces Tecum Subpoena Processing $269.81 3.00% $277.91
77 Type III - 1 Hour $246.75 3.00% $254.15
78 Type V - 1 Hour $185.02 3.00% $190.57
Libraries:
79 Type I Or II F.R.$197.40 3.00% $203.32
80 Type II - 1 Hour $144.49 3.00% $148.82
81 Type II - N $137.36 3.00% $141.49
82 Type III - 1 Hour $152.63 3.00% $157.21
83 Type III - N $145.00 3.00% $149.35
84 Type V - 1 Hour $143.30 3.00% $147.60
85 Type V - N $137.36 3.00% $141.49
Medical Offices:
4
Adopted Proposed
1/22/2019 1/21/2020
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
86 Type I Or II F.R.$202.66 3.00% $208.73
87 Type II - 1 Hour $156.36 3.00% $161.05
88 Type II - N $148.56 3.00% $153.01
89 Type III - 1 Hour $169.59 3.00% $174.67
90 Type III - N $157.88 3.00% $162.62
91 Type V - 1 Hour $152.97 3.00% $157.56
92 Type V - N $147.54 3.00% $151.97
Offices
93 Type I Or II F.R.$181.12 3.00% $186.55
94 Type II - 1 Hour $121.25 3.00% $124.89
95 Type II - N $115.49 3.00% $118.95
96 Type III - 1 Hour $130.92 3.00% $134.85
97 Type III - N $125.15 3.00% $128.91
98 Type V - 1 Hour $122.61 3.00% $126.29
99 Type V - N $115.49 3.00% $118.95
Private Garages:
100 Picnic Shelter Application Rental (Alisal Park):$41.21 3.00% $42.45
101 Masonry $46.47 3.00% $47.86
102 Open Carports $28.15 3.00% $29.00
Public Buildings:
103 Type I Or II F.R.$209.27 3.00% $215.55
104 Type II - 1 Hour $169.59 3.00% $174.67
105 Type II - N $162.12 3.00% $166.99
106 Type III - 1 Hour $176.03 3.00% $181.31
107 Type III - N $169.93 3.00% $175.02
108 Type V - 1 Hour $161.11 3.00% $165.94
109 Type V - N $155.34 3.00% $160.00
Public Garages:
110 Type I Or II F.R.$82.93 3.00% $85.42
111 Type I Or II Open Parking $62.24 3.00% $64.11
112 Type II - N $47.48 3.00% $48.91
113 Type III - 1 Hour $62.75 3.00% $64.63
114 Type III - N $55.79 3.00% $57.47
115 Type V - 1 Hour $57.15 3.00% $58.86
Restaurants
116 Type III - 1 Hour $165.18 3.00% $170.13
117 Type III - N $159.58 3.00% $164.37
118 Type V - 1 Hour $151.27 3.00% $155.81
119 Type V - N $145.34 3.00% $149.70
Schools:
120 Type I Or II F.R.$188.58 3.00% $194.24
121 Type II - 1 Hour $128.72 3.00% $132.58
122 Type III - 1 Hour $137.70 3.00% $141.83
123 Type III - N $132.45 3.00% $136.42
124 Type V - 1 Hour $129.05 3.00% $132.93
125 Type V - N $123.12 3.00% $126.81
Service Stations:
126 Type II - N $113.96 3.00% $117.38
127 Type III - 1 Hour $118.88 3.00% $122.45
128 Type V - 1 Hour $101.24 3.00% $104.28
129 Canopies $47.48 3.00% $48.91
5
Adopted Proposed
1/22/2019 1/21/2020
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
Stores:
130 Type I Or II F.R.$139.74 3.00% $143.93
131 Type II - 1 Hour $85.47 3.00% $88.04
132 Type II - N $83.61 3.00% $86.11
133 Type III - 1 Hour $103.96 3.00% $107.07
134 Type III - N $97.51 3.00% $100.44
135 Type V - 1 Hour $87.51 3.00% $90.13
136 Type V - N $80.89 3.00% $83.32
Town Homes:
137 Type V - Masonry $146.88 3.00% $151.29
138 Type V - Wood Frame $140.07 3.00% $144.27
139 Garage- Wood Frame $57.16 3.00% $58.87
140 Garage- Masonry $63.43 3.00% $65.33
Theaters:
141 Type I Or II F.R.$186.21 3.00% $191.79
142 Type III - 1 Hour $135.67 3.00% $139.74
143 Type III - N $129.22 3.00% $133.10
144 Type V - 1 Hour $127.70 3.00% $131.53
145 Type V - N $120.75 3.00% $124.37
Warehouses:
146 Type I Or II F.R.$83.78 3.00% $86.29
147 Type I Or V - 1 Hour $49.69 3.00% $51.18
148 Type I Or V - N $46.64 3.00% $48.04
149 Type III - 1 Hour $56.30 3.00% $57.99
150 Type III - N $53.59 3.00% $55.20
Equipment:
Air Conditioning
151 Commercial $7.12 3.00% $7.34
152 Residential $5.94 3.00% $6.11
153 Sprinkler Systems $4.41 3.00% $4.54
Other Valuations
Reroof
154 Asphalt And Comp - per square foot of material $272.86 3.00% $281.05
155 Built-up - per square foot of material $288.91 3.00% $297.58
156 Light-weight tile - per square foot of material $746.35 3.00% $768.74
157 Concrete Tile Or Slate Tile - per square foot of material $898.83 3.00% $925.80
158 Metal Shingles - per square foot of material $568.19 3.00% $585.24
159 Wood Shake - per square foot of material $345.09 3.00% $355.44
160 Wood Shingle - per square foot of material $332.25 3.00% $342.21
161 Rolled Roofing - minimum 300 Sq.Ft. allowed on patio covers only $1,605.06 3.00% $1,653.21
162 Tear off and re-sheath - per square foot of material $160.51 3.00% $165.32
Tenant Improvements
163 General Commercial $41.73 3.00% $42.98
164 Restaurants $48.15 3.00% $49.60
165 Medical Offices $49.76 3.00% $51.25
Retaining Walls- Concrete Block
166 6"$12.45 3.00% $12.82
167 8"$13.78 3.00% $14.19
168 12"$16.89 3.00% $17.40
169 Masonry Fireplace - Minimum Valuation $5,088.03 3.00% $5,240.67
170 Foundation Permits - Based On 1/3 The Overall Valuation Of The Bldg Permit
6
Adopted Proposed
1/22/2019 1/21/2020
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
These Figures Shall Be Used When The Applicant Does Not Have A Valuation, Or If
The Valuation Given Is Obviously Low.
171 Factory Built Fireplace- Minimum Valuation $1,696.55 3.00% $1,747.44
Signs
1 Side:
172 a) Painted $65.80 3.00% $67.78
173 b) Electrical $126.80 3.00% $130.60
2 Sides:
174 a) Painted $77.04 3.00% $79.35
175 b) Electrical $160.51 3.00% $165.32
Pole /Lineal Foot plus square foot of sign:
176 a) 3" 0 $54.57 3.00% $56.21
177 b) 4" 0 $77.04 3.00% $79.35
178 c) 6" 0 $99.51 3.00% $102.50
179 d) 8" 0 $123.59 3.00% $127.30
180 e) 10" 0 $146.06 3.00% $150.44
181 f) 12" 0 $166.93 3.00% $171.93
Photovoltaic Systems
182 Permit And plan check fees for photovoltaic systems shall be assessed at 45% of
the fee generated by the declared valuation and the per unit electrical item cost
183 Residential 15 kW Or Less=$500 or 45% of the fee generated by the declared
valuation, whichever is less.
184 Residential more than 15 kW=$500 + 15 Per kW over 15 or 45% of the fee
generated by the declared valuation, whichever is less.
185 Commercial 50 kW or less = $1,000 or 45% of the fee generated by the declared
valuation, whichever is less.
186 Commercial more than 50 kw - 250 kw = $500 + $7 per kW above 50 kW or 45% of
the fee generated by the declared valuation, whichever is less.
187 Commercial more than 250 kW = $2,400 + 5 kW above 250 kW or 45% of the fee
generated by the declared valuation, whichever is less.
Swimming Pools
Valuation based on actual construction cost. Permit fees same as building permits.
188 Minimum Valuation:$21,186.76 3.00% $21,822.37
Spas
189 Minimum Valuation
190 Prefabricated $4,237.35 3.00% $4,364.47
191 Gunite $8,506.81 3.00% $8,762.01
Surcharge Fees
192 Optical Records System - Per Permit $15.77 n/a $15.77
193 # General Plan Maintenance - 10% Permit Surcharge To Recover 50% Of Costs 10% 10%
194 # Permit Automation Fee $0.00 n/a $0.00
195 # Technology Enhancement (5% of permit and plan check fee- $30 minimum) 5% 5%
7
Adopted Proposed
1/22/2019 1/21/2020
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
S-2 Building Permit Fees
196 Permit Issuance $91.80 3.00% $94.55
Total Valuation
197 $1.00 to $500.00 $39.85 3.00% $41.05
198 $501.00 to $2,000.00 $39.85 3.00% $41.05
For the 1st $500.00 plus $3.40 for ea. additional $100.00,
or fraction thereof, to and including $2,000.00
199 $2,001.00 to $25,000.00 $117.44 3.00% $120.96
For the 1st $2,000.00 plus $15.59 for ea. additional $1,000.00,
or fraction thereof, to and including $25,000.00
200 $25,001.00 to $50,000.00 $663.50 3.00% $683.41
For the 1st $25,000.00 plus $11.24 for ea. additional $1,000.00,
or fraction thereof, to and including $50,000.00
201 $50,001.00 to $100,000.00 $1,091.71 3.00% $1,124.46
For the 1st $50,000.00 plus $7.79 for ea. additional $1,000.00,
or fraction thereof, to and including $100,000.00
202 $100,001.00 to $ 500,000.00 $1,685.26 3.00% $1,735.82
For the 1st $100,000.00 plus $6.23 for ea. additional $1,000.00,
or fraction thereof, to and including $500,000.00
203 $500,001.00 to $1,000,000.00 $5,483.98 3.00% $5,648.50
For the 1st $500,000.00 plus $5.28 for ea. additional $1,000.00,
or fraction thereof, to and including $1,000,000.00
204 $1,000,001.00 and up $9,511.65 3.00% $9,797.00
For the 1st $1,000,000.00 plus $3.51 for ea. additional $1,000.00,
or fraction thereof
Other Inspections And Fees:
205 1. Inspections Outside Of Normal Business Hours (Per Hour) (Minimum Charge -
Two Hours) [a]
$79.71 3.00% $82.10
206 2. Reinspection Fees Accessed Under Provisions Of Section 305.8 (Per Hour) [a] $79.71 3.00% $82.10
207 3. Inspections For Which No Fee Is Specifically Indicated (Per Hour) (Minimum
Charge - One-Half Hour) [a]
$79.71 3.00% $82.10
208 4. Additional Plan Review Required By Changes, Additions Or Revisions To Plans
(Per Hour) (Minimum Charge - One-Half Hour) [a]
$79.71 3.00% $82.10
209 5. For Use Of Outside Consultants For Plan Checking And Inspections, Or Both [b] Actual costs
[b]
n/a Actual costs
[b]
210 [a] Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include
supervision, overhead, equipment, hourly wages and fringe benefits of the employee involved.
[b] Actual costs include administrative and overhead costs.
8
Adopted Proposed
1/22/2019 1/21/2020
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
S-3 Electrical Permit Fees
211 Area Fee Rate - Single Family Dwellings (Rate X Area/Sq Ft) $0.12 3.00% $0.13
Unit Fee Schedule (Note: Does Not Include Permit Issuance Fee)
Receptacle, Switch and Lighting, or other.
For receptacle, switch lighting, smoke detectors, or other outlets, at which current
is used or controlled except services, feeders and meter:
212 First 20, each $1.91 3.00% $1.97
213 Additional outlets, each $1.27 3.00% $1.31
(Note: For multi-outlet assemblies, each 5 ft. or fraction may be considered as 1
outlet.)
Lighting Fixtures
214 For lighting fixtures, sockets, or other lamp holding devices:
215 First 20, each $1.91 3.00% $1.97
216 Additional fixtures, each $1.27 3.00% $1.31
217 For pole or platform mounted lighting fixtures, each $1.91 3.00% $1.97
218 For theatrical-type lighting fixtures or assemblies, each $1.91 3.00% $1.97
Residential Appliances
219 For fixed residential appliances or receptacle outlets for same, including wall-
mounts, electric ovens, counter-mounted cooking tops, electric ranges, self-
contained room, console, or through-wall air conditioners, space heaters, food
waste grinders, dishwasher
$8.91 3.00% $9.18
(Note: For other types of air conditioners and other motor-driven appliances
having larger electrical ratings, see Power Apparatus)
Temporary Power Service
220 For a temporary service power pole or pedestal, including all pole or pedestal
mounted receptacle outlets and appurtenances, each
$38.15 3.00% $39.30
221 For a temporary distribution system and temporary lighting and receptacle outlets
for construction sites, decorative lighting, Christmas tree sales lots, firework
stands, sales booths, additional pole, etc., each
$17.80 3.00% $18.33
Non-Residential Appliances
222 For residential appliances and self-contained, factory-wired, non-residential
appliances not exceeding one (1) horsepower (HP), kilowatt (KW), Or kilovolt-
ampere (KVA) in rating, including medical and dental devices, food, beverage, and
ice cream cabinets
$10.18 3.00% $10.48
Power Apparatus
For motors, generators, transformers, rectifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps, cooking or baking
equipment, and other apparatus, as follows:
Rating in horsepower (HP), kilowatts (KW), kilovolt-amperes (KVA), Or kilovolt-
amperes-reactive (KVAR)
223 Up to and including 1, each $10.18 3.00% $10.48
224 Over 1 and not over 10, each $17.80 3.00% $18.33
225 Over 10 and not over 50, each $45.79 3.00% $47.17
226 Over 50 and not over 100, each $91.57 3.00% $94.32
227 Over 100, each $152.62 3.00% $157.20
9
Adopted Proposed
1/22/2019 1/21/2020
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
Note: 1. For equipment or appliances having more than one motor, transformer,
heater, etc., the sum of the combined rating may be used.
Note: 2. These fees include all switches, circuit breakers, contractors, thermostats,
relays and other directly related control equipment.
Busways
228 For trolley and plug-in type busways, each 100 feet or fraction thereof $25.44 3.00% $26.20
(Note: an additional fee will be required for lighting fixtures, motors and other
appliances that are connected to trolley and plug-In type busways.)
Signs, Outline Lighting, And Marquees
229 For signs, outline lighting systems, or marquees supplied from one branch circuit,
each
$38.15 3.00% $39.30
230 For additional branch circuits within the same sign outline lighting system, or
marquee, each
$12.71 3.00% $13.09
Services, Switchboards, Switchboard Sections, Motor Control Centers And
Panelboards
231 For services, switchboards, switchboard sections, motor control centers and
panelboards of 600 volts or less & not over 200 amperes In rating, each.
$38.15 3.00% $39.30
232 For services, switchboards, switchboard sections, motor control centers and
panelboards of 600 volts or less and not over 200 amperes 1,000 amperes in
rating, each
$76.32 3.00% $78.61
233 For services, switchboards, switchboard sections, motor control centers and
panelboards over 600 volts or over 1,000 amperes in rating, each
$178.07 3.00% $183.41
Miscellaneous Apparatus, Conduits And Conductors
234 For electrical apparatus, conduits and conductors for which a permit is required
but for which no fee is herein set forth
$38.15 3.00% $39.30
(Note: This fee is not applicable when a fee is paid for one or more services,
outlets, fixtures, appliances, power apparatus, busways, signs or other equipment.
Private Swimming Pools
235 For new private, residential, inground swimming pools for single, or multi-family
occupancies, including a complete system of necessary branch circuit wiring,
bonding, grounding underwater lighting, water pumping and other similar
electrical equipment
$76.32 3.00% $78.61
236 For other types of swimming pools, therapeutic whirlpools, spas, hot tubs and
alterations to existing swimming pools, each
$50.88 3.00% $52.41
Carnivals And Circuses
Carnivals, circuses and other traveling shows or exhibitions utilizing transportable-
type rides, booths, displays and attractions.
237 For electrical generators and electrical driven rides, each $38.15 3.00% $39.30
238 For mechanically driven rides and walk-through attractions or displays having
electric lighting, each
$15.26 3.00% $15.72
239 For a system of area and booth lighting, each $15.26 3.00% $15.72
240 For permanently installed rides, booths, displays, and attractions $15.26 3.00% $15.72
Other Inspections
For Inspection Of Electrical Equipment For Which No Fee Is Herein Set Forth, The
Fee Shall Be Determined By The Building Official
10
Adopted Proposed
1/22/2019 1/21/2020
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
S-4 Plumbing Fees
241 Each plumbing fixture or trap or set of fixtures on one trap (including drainage,
vent, water piping and backflow prevention devices therefore)
$15.26 3.00% $15.72
242 Each permanent type dishwasher whether individually trapped or not $15.26 3.00% $15.72
243 Each industrial waste pretreatment interceptor including its trap & vent, except
kitchen type grease interceptors functioning as fixtures traps
$15.26 3.00% $15.72
244 Each swimming pool drainage trap & receptor whether connected to a building
drain or building sewer (water supply for pool not included)
$15.26 3.00% $15.72
245 Each gas piping system of 1 to 5 outlets or alteration or retest of existing gas
piping system
$15.26 3.00% $15.72
246 Each additional outlet over five $3.82 3.00% $3.93
247 Each gas pressure regulator other than appliance regulators $5.09 3.00% $5.24
248 Each water heater and/or vent $15.26 3.00% $15.72
249 Each solar potable water heating system, including water heater/vent $50.88 3.00% $52.41
250 For repair or alteration of drainage and/or vent piping $15.26 3.00% $15.72
251 Each piece of water-treating equipment and/or water piping installed without
accompanying plumbing
$15.26 3.00% $15.72
252 Lawn sprinkler systems on 1 meter including backflow prevention devices $15.26 3.00% $15.72
253 Backflow prevention devices on unprotected water supplied, pools, tanks, vats,
etc. (including incidental water piping) 1 to 5
$15.26 3.00% $15.72
254 Any swimming pool piping associated with the construction, remodeling or repair
of a swimming pool, spa and hot tub
$42.39 3.00% $43.66
255 Each additional device over five (5)$3.82 3.00% $3.93
256 Each building drain installed without accompanying plumbing $15.26 3.00% $15.72
257 For connection of a house sewer to a public sewer or the extension of a house
lateral onto a lot for future use
$43.24 3.00% $44.54
258 For each house sewer manhole $43.24 3.00% $44.54
259 Each installation of a section of house sewer for future use $27.98 3.00% $28.82
260 For the connection of each additional bldg. or work to house sewer $27.98 3.00% $28.82
261 For the connection of a house sewer to a private sewage disposal system $27.98 3.00% $28.82
262 For each private sewage disposal system (septic tank & seepage pit or pits and/or
drainfield)
$89.03 3.00% $91.70
263 For each cesspool, overflow seepage pit, percolation test pit, swimming pool
drywell, or drainfield extension or replacement
$43.24 3.00% $44.54
264 For disconnection, abandonment, alteration or repair of any house sewer or
private sewage disposal system or part thereof
$27.98 3.00% $28.82
265 # Annual inspection of fat, oil and grease $160.00 n/a $160.00
11
Adopted Proposed
1/22/2019 1/21/2020
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
S-5 Mechanical Permit Fees
Installation, alteration or relocation of each refrigeration compressor or
absorption unit, & each fuel burning furnace, heater, boiler, and vented decorative
appliance including vents attached thereto:
266 Up to & including 100,000 BTU $25.44 3.00% $26.20
267 More than 100,000 BTU to & including 1,000,000 BTU $50.88 3.00% $52.41
268 More than 1,000,000 BTU $127.18 3.00% $131.00
269 For each air inlet & air outlet served by any air conditioning system $4.46 3.00% $4.60
270 For each 1,000 sq.ft. or fraction thereof of conditioned area $35.62 3.00% $36.68
Note: when a permit is applied for and the total number of air inlets & air outlets is
unknown, the fees shall be based on the sq.ft. of conditioned area.
271 For the installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit
$12.71 3.00% $13.09
For the installation or alteration of each air handling unit for air conditioning
including ducts attached thereto:
272 Up to & including 2,000 CFM - each unit up to 10 $12.71 3.00% $13.09
273 Each unit over 10 $3.82 3.00% $3.93
274 More than 2,000 CFM to and including 10,000 CFM $38.18 3.00% $39.33
275 More than 10,000 CFM $63.59 3.00% $65.50
Note: this fee shall not apply to an air handling unit which is a portion of a factory
assembled air conditioned appliance for which a permit is required elsewhere in
this code.
276 For each evaporative cooler other than portable type $20.35 3.00% $20.96
277 For required ventilation fans which serve a single register:
278 Each fan up to 10 $15.26 3.00% $15.72
279 Each fan over 10 $5.09 3.00% $5.24
280 For each required ventilation system which is not a portion of any air conditioning
system for which a permit is required elsewhere in this code
$30.53 3.00% $31.44
281 For the installation or each commercial kitchen hood or spray booth served by
mechanical exhaust, including the fans and ducts attached thereto
$63.59 3.00% $65.50
282 For the installation of each fire damper $10.18 3.00% $10.48
283 Alteration of existing duct system where a permit is not required elsewhere $25.44 3.00% $26.20
Note: 1) for refrigeration system rating one horsepower, one ton, or 12,000 BTU
per hour shall mean the same quantity
note: 2) for steam boilers rated in boiler horsepower, one horsepower shall equal
50,000 BTU per hour
12
Adopted Proposed
1/22/2019 1/21/2020
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
Plan Check Fees
284 # Building Plan Check Fee - 85% Of Permit Fee - $15.00 Minimum: Varies n/a Varies
285 # Electric Plan Check Fee - 80% Of Permit Fee - $15.00 Minimum: Varies n/a Varies
286 # Energy Plan Check Fee - 10% Of Building Permit Fee: Varies n/a Varies
287 # Mechanical Plan Check Fee - 80% Of Permit Fee - $15.00 Minimum: Varies n/a Varies
288 # Plumbing Plan Check Fee - 80% Of Permit Fee - $15.00 Minimum: Varies n/a Varies
289 Temporary Certificate of Occupancy (60 days)$450 $450
290 Parking Lot Resurface Inspection ($68 up to 10,000 sqare feet, $1 for each
additional sq ft)
Varies Varies
291 Event Permit (1 hr minimum insection time $93 plus plan check fee of $60.50 ) $154 $154
292 General Plan Update Fee (10% of Permit)Varies Varies
# = Fees not automatically adjusted for CPI change.
13
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
1 S-045 Grading Plan Check Fee Variable 3.00% Variable
<100 CY - $899
100 - 1,000 CY - $916.71 Plus $14.84 Per 100 CY
1,000 - 10,000 CY - $1050.24 Plus $78.42 Per 1,000 CY
10,000 - 50,000 CY - $1,756.06 Plus $18.02 Per 1,000 CY
50,000+ CY - $2,476.71 Plus $244.81 Per 10,000 CY
2 S-046 Grading Inspection Variable 3.00% Variable
<100 CY - $358
100 -1,000 CY - $365.62 Plus $50.87 Per 100 CY
1,000 - 10,000 CY - $823.45 Plus $76.30 Per 1,000 CY
10,000 - 50,000 CY - $1,510.19 Plus $92.20 Per 1,000 CY
50,000+ CY - $5,198.22 Plus $604.07 Per 10,000 CY
3 Grading Permit Fee - Based On Cubic Yards $186 3.00%$191
4 Permit Fee For Changes To Original Permit:
< $20,000 $118 3.00% $122
$20,001 to $50,000 $118 3.00% $122
$50,001 to $75,000 $161 3.00% $166
$75,001 to $100,000 $245 3.00% $252
$100,001 to $200,000 $321 3.00% $331
$200,000 to $500,000 $415 3.00% $427
$500,001 and up $507 3.00% $522
5 Special Site Inspection:$93 3.00% $96
Commercial (Minimum 2 Hours)$186 3.00% $191
Residential (Minimum 2 Hour)$186 3.00% $191
Residential (Non-Habitable Space) (Minimum 2 Hours)$177 3.00% $182
6 Production Lot Plan Check - Per Lot $206 n/a $206
7 Occupancy Inspection Fee:
0-1 To 15,000 Sq Ft (1/2 Hour Of Technical Staff Time) $49 3.00% $51
15,000 Sq.Ft. On (1 Hour Of Technical Staff Time) $93 3.00% $96
8 Bonds For Sign(s) (Refundable)$280 3.00% $288
9 Demolition Permit Fee (Minimum 1 Hour)$108 3.00% $111
10 Deputy Inspection Registration Fee (Deputy) $49 3.00% $51
11 Emergency Inspection Fee (Minimum 1 Hours) $152 3.00% $157
12 Hearing Officer Actual Cost Actual Cost
13 Pre-Plan Check Submittal (Minimum 2 Hours) $194 3.00% $199
14 Reinspection Fee (Minimum 1 Hour)$102 3.00% $105
15 Room Addition Plan Check Fee (Minimum 2 Hours) $194 3.00% $199
16 Trailer Coach $186 3.00% $191
17 Trash Enclosure - $10 for additional enclosure $75 3.00% $78
18 Relocation Of Buildings:
0 to 2,000 sq.ft.$438 3.00% $451
2,001 to 5,000 sq.ft.$822 3.00% $847
5,001 sq.ft. and up $1,184 3.00% $1,220
19 Plan Checking Fee:
Staff rates assessed against deposit.
Executive Staff - per hour $168 3.00% $173
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
14
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
BUILDING AND SAFETY
Professional Staff - per hour $121 3.00% $124
Technical Staff (Plan Checker/Inspector) - per hour $102 3.00% $105
20 On-Site Improvement Inspections:
$2,000 deposit required for parking lot paving and miscellaneous testing
Professional Staff - Per Hour $121 3.00% $124
Rates applied against deposit
Technical Staff - Per Hour $102 3.00% $105
Rates applied against deposit
21 Standard Plan Check Fee:
Professional Staff - Per Hour $121 3.00% $124
Technical Staff - Per Hour $102 3.00% $105
22 S-98 # Certified Access Specialist Program (CASp)$4 n/a $4 [a]
23 Construction and Demolition Administrative Fee [b], [c]
All tenant improvements with a valuation of up to $25,000: and all
residential additions.
n/a n/a $68 [b], [c]
All tenant improvements with a valuation of $25,001 to $50,000, and all
single family residential new constructions.
n/a n/a $100 [b], [c]
All tenant improvements with a valuation greater than $50,000; all
multifamily, commercial, and industrial projects, and all other projects.
n/a n/a $135 [b], [c]
[b] Proposed New Fees
# = Fees not automatically adjusted for CPI change.
[a] Fee set by State-City has to collect $4 for each business license applicant throught 12/31/23 (fee will reduce to $1 per business license applicant
beginning 1/1/2024 per State Mandates) and pass it through to the State for construction related accessibility.
[c] Fee is associated with ordinance 2020-01 scheduled to go for Council approval on 1-21-20. The ordinance will amend chapter 14 of the City of Azusa
Municipal Code, adding Article XVIII, Construction and Demolition Waste Recycling and Diversion.
15
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020 Fee
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Type Notes
1 S-001 Zoning Clearance $85 3.00% $87 flat fee
2 S-002 Design Review - Minor (over the counter) $2,021 3.00% $2,081 flat fee
3 S-003 Staff Level Design Review:
# a) Modifications to Existing Structures $350 n/a $350 flat fee
b) All Others $4,532 3.00% $4,668 flat fee
4 S-004 # Design Review - Major $10,000 n/a $10,000 deposit [a]
5 S-005 Major Use Permit $5,916 3.00% $6,093 flat fee
6 S-005A Minor Use Permit $1,127 3.00% $1,160 flat fee
7 S-006 Use Permit Modifications:flat fee
a) Modifications To Major UP $2,972 3.00% $3,061 flat fee
b) Modifications To Minor UP $623 3.00% $641 flat fee
8 Variance - Minor $1,524 3.00% $1,570 flat fee
9 S-009 Variance
# a) Involving Single-Family Structure $1,000 n/a $1,000 flat fee
b) All Others $5,302 n/a $5,302 flat fee
10 S-010 # Zone Change $5,000 n/a $5,000 deposit [a]
11 S-011 # Development Code Amendment $5,000 n/a $5,000 deposit [a]
12 S-012 Development Agreement [a]
# a) Development Agreement Deposit $10,000 n/a $10,000 deposit [a]
# b) Annual Monitoring Deposit $5,000 n/a $5,000 deposit [a]
13 S-013 # General Plan Amendment $15,000 n/a $15,000 deposit [a]
14 S-014 # Specific Plan $10,000 n/a $10,000 deposit [a]
15 S-015 # Specific Plan Amendment $5,000 n/a $5,000 deposit [a]
16 S-016 Tentative Parcel Map $8,313 3.00% $8,562 flat fee
17 S-017 Tentative Tract Map:
a) 5-20 Lots $8,671 3.00% $8,931 flat fee
b) 20-50 Lots $10,107 3.00% $10,410 flat fee
c) 50-100 Lots $13,616 3.00% $14,025 flat fee
d) 100+ Lots $15,212 3.00% $15,668 flat fee
18 S-018 Reversion To Acreage $2,816 3.00% $2,900 flat fee
19 S-019 Lot Merger $1,757 3.00% $1,810 flat fee
20 S-020 Environmental Categorical Exemption Rev. $339 3.00% $349 flat fee
20 S-021 Environmental Initial Study $5,028 3.00% $5,179 flat fee
21 S-023 # Mitigated Negative Declaration $10,000 n/a $10,000 deposit [a]
22 S-023 # Environmental Impact Report Preparation $10,000 n/a $10,000 deposit [a]
23 S-023 # Environmental Impact Report Review $10,000 n/a $10,000 deposit [a]
24 S-024 # Mitigation Monitoring - CEQA Monitoring $5,000 n/a $5,000 deposit [a]
25 S-025 # Annexation $10,000 n/a $10,000 deposit [a]
26 S-026 Condominium Conversion Map:
a) Map Fee $6,614 3.00% $6,812 flat fee
b) Plus Consultant Fee Actual Cost n/a Actual Cost flat fee
27 S-027 Minor Sign Review $85 3.00% $88 flat fee
28 S-028 Major Sign Review $932 3.00% $960 flat fee
29 S-029 Zoning Letter:
a) Single Family Residential $169 3.00% $174 flat fee
b) Other $508 3.00% $523 flat fee
30 S-030 Temporary Occupancy Review $589 3.00% $607 flat fee
31 S-031 Temporary Use Permit
City of Azusa
Schedule of Fees and Charges (Development-Related)
PLANNING
16
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020 Fee
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
PLANNING
a) Temporary Use Permit Fee $546 3.00% $563 [b,d]
b) Azusa Based Non-Profit Organizations $410 3.00% $422 flat fee [b]
32 S-032 Continuance Processing $677 3.00% $698 flat fee
33 S-033 Time Extension Review - Staff $508 3.00% $523 flat fee
34 S-034 Time Extension Review - Planning Commission $1,143 3.00% $1,177 flat fee
35 S-035 # Appeal To Planning Commission $500 n/a $500 flat fee
36 S-036 # Appeal To City Council $1,000 n/a $1,000 flat fee
37 S-15 Preliminary Plan Review $1,830 3.00% $1,885 flat fee [c]
38 S-15A Nonconforming Use Time Extension $847 3.00% $872 flat fee
39 S-037 Certificate Of Compliance $1,495 3.00% $1,540 flat fee
40 S-038 Street Name Processing W/O Map $1,452 3.00% $1,496 flat fee
41 S-039 Street Re-Name Processing $1,960 3.00% $2,019 flat fee
42 S-040 Building Address Processing W/O Map $944 3.00% $972 flat fee
43 S-041 Building Re-Address Processing $677 3.00% $698 flat fee
44 S-041A Com Dev Newspaper Publication Actual Cost n/a Actual Cost flat fee
45 S-044 Special Building Inspection (2 Hour Minimum) $169 3.00% $174 flat fee
46 S-045 Technology Enhancement (5% of permit and plan
check fee- $30 minimum)
5% 3.00% 5% flat fee
47 S-047 Massage Parlor Permit $968 3.00% $997 flat fee [d]
48 S-048 Massage Parlor Permit Renewal $483 3.00% $498 flat fee [d]
49 S-049 Residential Indoor Marijuana Permit $442 3.00% $455 flat fee [e]
50 S-050 Residential Indoor Marijuana Permit Renewal $221 3.00% $228 flat fee [e]
51 S-051 Accessory Dwelling Unit Permit $2,021 3.00% $2,081 flat fee [f]
52 S-052 Designation of Historic Landmark, Historic District,
Potential Historic Landmark, and Potential Historic
District.
$520 3.00% $535 flat fee
53 S-053 Mills Act Contract $831 3.00% $856 flat fee
54 S-054 Miss Act Contract Extension $249 3.00% $257 flat fee
55 S-055 Major Certificate of Appropriateness $270 3.00% $278 flat fee
56 S-056 Minor Certificate of Appropriateness $125 3.00% $128 flat fee
57 S-057 Landscape Plan Review $183 3.00% $189 flat fee
58 S-058 Covenant Review $237.93/Hr 3.00% $245.07/Hr flat fee
59 S-059 Covenant Conditions & Restrictions Review $237.93/Hr 3.00% $245.07/Hr flat fee
60 S-060 General Plan Update Fee (10% of permit and plan
check fee)
10% n/a 10% flat fee [g]
[b] Azusa-based non-profit organizations receive a 25% discount from standard TUP fee.
[d] Fees Approved by Council on June 5, 2017 per Resolution No. 2017-C37. Did not apply CIP since it has not been one full year.
[a] Charges to be billed at fully-burdened hourly rates, including costs of outside service providers, if any for cost recovery.
[c] Fee is per meeting. 50% of the fee for the first meeting is applied against future Planning/Engineering fee for the project.
17
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020 Fee
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
PLANNING
# = Fees not automatically adjusted for CPI change.
[e] Fees Approved by Council on June 5, 2017 per Resolution No. 2017-C35. Did not apply CIP since it has not been one full year.
[f] Fees Approved by Council on December 4, 2017 per Resolution No. 2017-C37. Did not apply CIP since it has not been one full year.
[g] Fee Approved by Council 1-22-19.
18
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020 Fee
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Type Notes
1 S-047 Public/Private Improvement Plan Check:
# a) $0-$100,000 Valuation (% of est construction cost) 3% n/a 3% flat fee
# b) Next $400,000 Valuation (% of est construction cost) 2.5% n/a 2.5% flat fee
# c) > $500,000 Valuation (% of est construction cost) 2% n/a 2% flat fee
2 S-048 Public/Private Improvement Inspection:
# a) $0-$100,000 Valuation (% of est construction cost) 5% n/a 5% flat fee
# b) Next $400,000 Valuation (% of est construction cost) 3.5% n/a 3.5% flat fee
# c) > $500,000 Valuation (% of est construction cost) 2% n/a 2% flat fee
3 S-049 Final Parcel Map $1,146 3.00% $1,181 flat fee
4 S-050 Final Tract Map
a) 5 - 10 Lots $2,592 3.00% $2,669 flat fee
b) 11 - 25 Lots $3,868 3.00% $3,984 flat fee
c) 26 - 50 Lots $5,463 3.00% $5,627 flat fee
d) 51 - 100 Lots $8,016 3.00% $8,256 flat fee
e) 101 - 150 Lots $8,973 3.00% $9,242 flat fee
f) > 150 Lots $10,887 3.00% $11,214 flat fee
5 S-051 Easement Check $359 3.00% $370 flat fee
6 S-052 Monument Inspection:
a) First Monument $319 3.00% $329 flat fee
b) Each Additional Monument $80 3.00% $82 flat fee
7 S-053 Bond Processing $160 3.00% $164 flat fee
8 S-055 Lot Line Adjustment $1,832 3.00% $1,886 flat fee
9 Street Light Banner Installation/Removal $79 3.00% $81 flat fee
10 S-056 # Street/Right-of-Way Abandonment $2,000 n/a $2,000 deposit [a]
11 S-056A SUSMP/LID Plan Review $2,084 3.00% $2,146 flat fee
12 S-056B SWPPP Plan Review $1,914 3.00% $1,972 flat fee
13 S-056B BMP Review $319 3.00% $329 flat fee
14 S-056C Hydrology/Drainage Plan Review $1,914 3.00% $1,972 flat fee
15 S-056C Soils Review $319 3.00% $329 flat fee
16 S-056C Traffic Study Review $798 3.00% $822 flat fee
17 S-057 Sidewalk/Curb/Gutter Encroachment
a) Up to 75 LF $479 3.00% $493 flat fee
b) Each Add'l 75 LF $160 3.00% $164 flat fee
18 S-057A Street Cut Encroachment
a) Up to 100 SF $479 3.00% $493 flat fee
b) Each Add'l 100 SF $160 3.00% $164 flat fee
19 S-057B Driveway Approach $399 3.00% $411 flat fee
20 S-058 Obstruction Permit $160 3.00% $164 flat fee
21 S-059 Transportation Permits (Oversized And/Or Overweight Trucks):
# a) Single Trip/Rider $16 n/a $16 flat fee [b]
# b) Annual Permit $90 n/a $90 flat fee [b]
22 S-060 # House Moving Permit $2,000 n/a $2,000 deposit [a]
23 S-060A Industrial Waste Permit
City of Azusa
Schedule of Fees and Charges (Development-Related)
ENGINEERING
19
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020 Fee
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
ENGINEERING
a) New/Modified $1,117 3.00% $1,150 flat fee
b) Renewal $319 3.00% $329 flat fee
24 S-060B Fats,Oils And Grease Program
a) New $558 3.00% $575 flat fee
b) Annual $239 3.00% $246 flat fee
25 S-061 Sewer Saddle $479 3.00% $493 flat fee
26 Sewer Dye Test $115 3.00% $118 flat fee
27 Sewer Blockage Check Actual Staff
Time
n/a Actual Staff
Time
Actual Staff
Time
28 S-062 # Blueprint/Map Copy Service, Per Sheet (or actual outside costs) $20 n/a $20 flat fee
29 # Project Plans/Specifications - Plus $10 If Mailed $50 n/a $50 flat fee
30 Verification of Conditions $176 3.00% $181 flat fee
31 Agreement And/Or Improvement Security, Each $233 3.00% $240 flat fee
32 Extension Time For Improvement Agreement, Each $318 3.00% $327 flat fee
33 Submittals in Excess of Three
a) Fourth Submittal $439 3.00% $452 flat fee
b) Sixth Submittal $1,540 3.00% $1,586 flat fee
c) Eighth And Each Subsequent Submittal $1,836 3.00% $1,891 flat fee
34 Minor Land Division - Lot Split $650 3.00% $670 flat fee
35 Recording Fee:
# a) First Sheet $8 n/a $8 flat fee
# b) Additional Sheets, Each $2 n/a $2 flat fee
36 LDMA Surcharge (County Maps Only):
# a) Tract Map $401 n/a $401 flat fee
# b) Parcel Map $135 n/a $135 flat fee
37 # Expedited Plan Review 1.5x fee n/a 1.5x fee flat fee
38 # Consultant (Invoice + 36% Overhead) Invoice
+ 36% O'H
n/a Invoice
+ 36% O'H
flat fee
39 S-6.5 Code Compliance Fee $40 3.00% $42 flat fee
40 S-7 # Landscape Design Standards (Over The Counter Sales) $6 n/a $6 flat fee
41 S-18 City-Provided Tree Planting - One 15 Gallon Tree $119 3.00% $123 flat fee
42 City-Provided Tree Planting - One 24" Box Tree $205 3.00% $212 flat fee
43 Time Extension $80 3.00% $82 flat fee
44 S-6.3 Engineering Hourly Rate for in-House Staff $160 3.00% $164 flat fee
45 Technology Enhancement (5% of permit and plan check fee- $30
minimum)
5% n/a 5% flat fee
46 S-8.0 General Plan Update Fee (10% of permit and plan check fee) 10% n/a 10% flat fee
[b] Fee set to match CalTrans.
* All amounts shown are base fees. Applicants are also be responsible for any consultant or other agency fees (e.g. LA County) incurred.
[a] Charges to be billed at fully-burdened hourly rates, including costs of outside service providers, if any. All costs recovered.
# = Fees not automatically adjusted for CPI change.
20
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020 Fee
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Type Notes
Utility Services
1 S-105 New Utility Account Setup:
# a) Connect Fee $45 n/a $45 flat fee
# b) Same Day Connection (7:00am-4:00pm) $35 n/a $35 flat fee
# c) Same Day Connection (4:00pm-5:30pm) $85 n/a $85 flat fee
# d) Fri 7am-8pm (Elec, Wtr, or Both) $105 n/a $105 flat fee
# e) Sat, Sun Or Holiday 7am-8pm (Elec, Wtr, or Both) $205 n/a $205 flat fee
# f) Positive Identification Check - $1.25 $1.25 n/a $1.25 flat fee
2 S-106 Utility Delinquent Turn Off/On:
# a) 7am-4pm $35 n/a $35 flat fee
# b) 4pm-5:30pm $85 n/a $85 flat fee
# c) Fri 7am-8pm (Elec, Water, or Both) $105 n/a $105 flat fee
# d) Sat, Sun or Holiday 7am-8pm (Elec, Water, or Both) $205 n/a $205 flat fee
e) Late Payment Penalty, The Greater Amount Of Either:
# i) Base Penalty Fee $7.50 n/a $7.50 flat fee
# ii) Percent Of Total Outstanding Balance 5% n/a 5% flat fee
f) Miscellaneous Collection Fee n/a n/a 24% Variable [c]
g) AMI Opt-Out Fees:
# i) One-time Initial Set-up Charge n/a n/a $75 flat fee [c]
# ii) Monthly Opt-Out Fee n/a n/a $10 flat fee [c]
# iii) Monthly Opt-Out Fee (Low-Income) n/a n/a $5 flat fee [c]
3 S-107 Theft Of Water/Light Investigation:
# a) Investigation Fee $500 n/a $500 flat fee
# b) Damages And Estimated Usage Actual Cost n/a Actual Cost flat fee
4 S-108 Water Pressure Test:
# a) 1st Test Free Per Calendar Year $0 n/a $0 flat fee
# b) Additional Test $165 n/a $165 flat fee [a]
# c) Main Line $400 n/a $400 flat fee
5 S-109 # Water Meter Test (Fully Allocated Hourly Rate) Bill Hourly n/a Bill Hourly per hour
6 S-110 Water Quality Test:
# a) Test Fee $125 n/a $125 flat fee
# b) Plus Lab Costs Actual Cost n/a Actual Cost flat fee
7 S-111 # Flow Test $300 n/a $300 flat fee
8 S-112 Temporary Meter Rental Services:
# a) Meter Fee (Per Each Meter)$130 n/a $200 flat fee
# b) Deposit $1,000 n/a $1,200 deposit
9 S-113 New Water Meter Installation:
# a) Installation Fee $250 n/a $250 flat fee
b) Plus Material Costs Actual Cost n/a Actual Cost deposit
10 S-131D Water Meter Fee:
# a) 3/4"$150 n/a $150 flat fee
# b) 1"$200 n/a $200 flat fee
# c) 1.5"$925 n/a $925 flat fee
# d) 2"$1,075 n/a $1,075 flat fee
City of Azusa
Schedule of Fees and Charges (Development-Related)
UTILITIES
21
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020 Fee
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
UTILITIES
# e) > 2"Dev/Owner
Req'd to
Procure
n/a Dev/Owner
Req'd to
Procure
deposit
11 S-131E # Jumper Fee (per service)$100 n/a $100 flat fee
12 S-114 New Water Service Installation:
# a) 3/4" - 1" Deposit $3,500 n/a $4,000 deposit
# b) 2" Deposit $4,000 n/a $4,500 deposit
# c) 4" Deposit $7,500 n/a $8,000 deposit
# d) 6" Deposit $9,500 n/a $10,000 deposit
13 S-131H Hot Tap Fee:
# a) 1"$300 n/a $300 flat fee
# b) 2"$300 n/a $300 [b]
# c) 4"$350 n/a $350 flat fee
# d) 6"$400 n/a $400 flat fee
# e) 8"$450 n/a $450 flat fee
# f) 10"$450 n/a $450 flat fee
# g) 12"$525 n/a $525 flat fee
14 S-131C Fire Service Installation:
# a) 4" Deposit $7,500 n/a $8,000 deposit
# b) 6" Deposit $9,500 n/a $10,000 deposit
# c) 8" Deposit $10,500 n/a $11,000 deposit
# d) 10" Deposit $11,500 n/a $12,000 deposit
# e) 12" Deposit $12,500 n/a $13,000 deposit
15 S-131B # Water Disconnection From The Mainline (Deposit) $3,200 n/a $3,500 deposit
16 S-131F # Fire Hydrant Relocation / Inspection Fee $1,500 n/a $1,500 flat fee
17 S-131G Traffic Incident Hit Hydrant Impact Fee:
# a) Impact Fee (Deposit)$1,500 n/a $1,500 flat fee
# b) Additional Cost Of Repair & Water Loss Actual Cost n/a Actual Cost flat fee
# c) Damage to Water Main Impact Fee $1,500 n/a $1,500 flat fee
# d) Cost of Repair & Water Loss Actual Cost n/a Actual Cost flat fee
# e) Damage to Water Facilities Impact Fee $1,500 n/a $1,500 flat fee
# f) Cost of Repair & Water Loss Actual Cost n/a Actual Cost flat fee
18 S-115 # New Backflow Device Inspection Review $340 n/a $340 flat fee
19 S-116 # Annual Backflow Device Inspection Review $80 n/a $80 flat fee
20 Water Plan Check $214 3.00% $220 flat fee
21 Water Improvement Inspection (per hour) $134 3.00% $140 per hour
22 Will-Serve Letter $27 3.00% $30 flat fee
23 S-117 # Water Service
No change to various rates based on service size and usage
Various n/a Various variable [b]
24 S-118 Sewer Blockage Check:
# a) Minimum Charge $500 n/a $500 deposit
# b) Fully Allocated Hourly Rates Bill Hourly n/a Bill Hourly deposit
# c) Charge If City Causes Blockage $0 n/a $0 flat fee
25 S-119 # Sewer Dye Test $115 n/a $115 flat fee
26 S-120 Emergency Sewage Spill Response:
# a) Spill Response Actual Cost n/a Actual Cost deposit
22
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020 Fee
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
UTILITIES
# b) Fully Allocated Hourly Rate For All Responding Personnel Bill Hourly n/a Bill Hourly deposit
# c) Charge If City Causes Spill $0 n/a $0 flat fee
27 S-121 Wastewater Service:Various n/a Various variable
28 Duces Tecum Subpoena Processing $214 n/a $220 flat fee
29 S-122 Electric Meter Test:
# a) First Test Per Calendar Year $0 n/a $0 flat fee
# b) Residential $160 n/a $160 flat fee
# c) Commercial $370 n/a $370 flat fee
# d) Industrial $440 n/a $440 flat fee
30 S-123 Total Electrical Service Re-Install:
# a) Re-Install Fee $769 3.00% $792 flat fee
# b) Additional Materials Actual Cost n/a Actual Cost flat fee
31 S-124 Additional Electric Span Install:
# a) Install Fee $753 3.00% $776 flat fee
# b) Plus Materials Actual Cost n/a Actual Cost flat fee
32 S-125 Temporary Electric Installation:
# a) Install $793 3.00% $816 flat fee
# b) Additional Material Costs Actual Cost n/a Actual Cost flat fee
33 S-126 Temp Single Phase Transformer Installation:
# a) Installation Fee (Minimum)$3,219 3.00% $3,315 flat fee
# b) Additional Material Costs Actual Cost n/a Actual Cost flat fee
34 S-127 Temp Three Phase Transformer Installation:
# a) Installation Fee (Minimum)$6,442 3.00% $6,635 flat fee
# b) Additional Material Costs Actual Cost n/a Actual Cost flat fee
35 S-128 Electric Line Extension/Upgrade:
# a) Extension/Upgrade Actual Cost n/a Actual Cost deposit
# b) Fully Allocated Hourly Rates Bill Hourly n/a Bill Hourly deposit
36 S-129 Electric Services Various n/a Various variable [b]
37 S-130 # Banner Installation $580 n/a $580 flat fee
38 S-131 # After Hours Standby/Call Out (2 Hour Minimum Bill Hourly n/a Bill Hourly deposit
39 S-131A # Inspection Rate (Per Hour)Bill Hourly n/a Bill Hourly deposit
40 S-131H #Picnic Shelter Application Rental (Alisal Park):
a) Residential
#Per Dwelling Unit $2,045 n/a $2,050 flat fee
b) Commercial
#ii) Per SF $0.98 n/a $0.98 flat fee
c) Industrial
#ii) Per SF $0.40 n/a $0.40 flat fee
d) School
#Flat Fee $8,000 n/a $8,000 flat fee
e) Park
# Flat Fee $3,770 n/a $4,000 flat fee
# f) Accessory dwelling units 750 SF or more n/a n/a $700 flat fee
41 S-131I #Water System Annexation Fees:
a) Residential [a]
#Per Dwelling Unit $1,000 n/a $1,000 [b]
b) Commercial
#Per SF $0.45 n/a $0.45 flat fee
23
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020 Fee
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development-Related)
UTILITIES
c) Industrial
#Per SF $0.25 n/a $0.25 flat fee
d) School $3,600 n/a $4,000 flat fee
e) Park $1,650 n/a $2,000 flat fee
42 S-131J Water Capacity Fee:
# e) Accessory dwelling units less than 750 SF n/a n/a $300 flat fee [c]
# = Fees not automatically adjusted for CPI change.
[a] Test fee refunded if there is a system problem.
[b] Rate varies depending on type of services and usage, time of year, and time of day.
[c] Proposed New Fees
24
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
1 S-063 Real Property Records Report
a) Condominium/Townhouses $107 3.00% $110
b) Vacant/Unimproved Land $215 3.00% $222
c) Single Family Dwellings $215 3.00% $222
d) Multi-Family Dwelling
i) Per Parcel, First Unit $215 3.00% $222
ii) Each Add'l Unit $12 3.00% $12
e) Commercial Properties $215 3.00% $222
2 S-064 Residential Rental Housing Registration And Inspection:
a) Per Parcel - Includes First Unit $125 3.00% $128
i) Additional Unit $8 3.00% $8
b) Reinspection $93 3.00% $96
3 Abandoned and Vacant Property Registration Fee $500 n/a $500
4 S-032.5 Weed Abatement Inspection (Processing and Referring) $359 3.00% $370
5 S-95.1 # Recovery and Storage of Abandoned Shopping Carts $12 n/a $12
6 S-066 # Appeal/Hearing $110 n/a $110
7 S-065 Lien Release
# a) Substandard $100 n/a $100
# b) Admin Fine $80 n/a $80
8 S-066C Code Enforcement Fines
# a) First Offense $100 n/a $100
# b) Second Offense $250 n/a $250
# c) Third Offense $500 n/a $500
9 Technology Enhancement (5% of permit and plan check fee- $30
minimum)
5% n/a 5%
10 Impound and Storage Fee (Non-Automobile) n/a n/a Actual Costs [a], [b]
# = Fees not automatically adjusted for CPI change.
[b] Fee is associated with ordinance 2020-01 scheduled to go for Council approval on 1-21-20. The ordinance will amend chapter 14 of the City of
Azusa Municipal Code, adding Article XVIII, Construction and Demolition Waste Recycling and Diversion.
City of Azusa
Schedule of Fees and Charges (Development-Related)
COMMUNITY IMPROVEMENT
[a] Proposed New Fees
25
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
S-1.1 N/A N/A
https://www.fire.lacounty.gov/fire-prevention-division/fire-prevention-fees/
https://www.fire.lacounty.gov/wp-content/uploads/2017/04/FirePreventionServiceFees.pdf
https://www.fire.lacounty.gov/hhmd-2/permits-and-fees-2/
City of Azusa
Schedule of Fees and Charges (Development-Related)
FIRE SAFETY
The City of Azusa Contract Out Fire Prevention Services (including Ambulance Services) with the County of
Los Angeles Fire Department. The City of Azusa does not have any control over Fire Services or ambulance
fees/rates. For the County of Los Angeles Fire Department fire services fees, ambulance rates, and contact
information, please refer to the link and contact information listed below:
County of Los Angeles Fire Department Fire Prevention Fees - Contact: County of LA Fire Chief Jon O’Brian
626-255-9354.
Ambulance Rates - County of Los Angeles Department of Health Services Emergency Medical Services
Agency - Contact: Chief Prehospital Operations - John Telmos 562-378-1677
https://library.municode.com/ca/los_angeles_county/codes/code_of_ordinances?nodeId=TIT7BULI_DIV2S
PBU_CH7.16AM#!
26
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
1 S-067 # Noise Disturbance Response
Full Cost Recovery After 2nd Response
Variable n/a Variable
Alarm Users
Alarm Fees
2 S-068 Alarm Registration and Renewal
# a) Registration and Renewal $25 n/a $25
# b) Senior Residential 65+, Permanently Disabled, or Low Income $12 n/a $12
3 # Appeal Fee, per request $25 n/a $25
Alarm Fines
4 # Registration Late Charge $25 n/a $25
5 # Alarm Fee Late Charge - All fees and fines late $25 n/a $25
6 # Reinstatement Fee $100 n/a $100
7 # Automatic Dialing Device $100 n/a $100
8 # Audible Alarm Violation $100 n/a $100
9 Burglar False Alarm Response - Registered Alarm:
# a) First Response (fee may be waived with online school attendance) $50 n/a $50
# b) Second Response $75 n/a $75
# c) Third Response $125 n/a $125
# d) Fourth Response $175 n/a $175
# e) Fifth Response $225 n/a $225
# f) Six or More $275 n/a $275
10 Burglar False Alarm Response - Non-registered Alarm Site:
# a) First Response $150 n/a $150
# b) Second Response $175 n/a $175
# c) Third Response $225 n/a $225
# d) Fourth Response $275 n/a $275
# e) Fifth Response $325 n/a $325
# f) Six or More $375 n/a $375
11 Robbery/Panic False Alarm Response (Resid/Comm) Permit Holder
# a) Per Response $100 n/a $100
12 Robbery/Panic False Alarm Response (Resid/Comm) Non-Permit Holder
# a) First Response $150 n/a $150
# b) Second Response $175 n/a $175
# c) Third Response $225 n/a $225
# d) Fourth Response $275 n/a $275
# e) Fifth Response $325 n/a $325
# f) Six or More $375 n/a $375
13 Operating Suspended Alarm System
# a) One $200 n/a $200
# b) Two or More $300 n/a $300
Alarm Company
Alarm Fines
14 # Failure to Report New Install $50 n/a $50
15 # Failure to Report Disconnect $50 n/a $50
16 # False Alarm Caused by Alarm Company $100 n/a $100
17 # Employee False Statement $200 n/a $200
18 # Failure to Use Enhanced Call Verification Procedures $100 n/a $100
19 # All Late Charges $25 n/a $25
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
POLICE
27
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
POLICE
20 # Suspension Reinstatement Fee and Mailing Costs $200 n/a $200
a) Additional Fee Per Customer, if Contacted $11 3.00% $11
Alarm Fee
21 # Appeal Fee, per request $25 n/a $25
22 S-069 # DUI Accident Response Investigation
Charge At Fully Allocated Hourly Rates. Not to exceed $12,000 per
incident by State Law.
Variable n/a Variable
23 S-070 Equipment Citation Verification
# a) Sign Off Citations Issued by Azusa Police Department $15 n/a $15
b) Sign Off Citations Issued by External Agencies/Police Departments $20 n/a $20
24 S-071 Vehicle VIN Verification $48 3.00% $49
25 S-072 Public Safety At Special Events:
a) Officer - Per Hour $148 3.00% $152
b) Reserve Officer $42 3.00% $43
26 S-072A # Booking Services $135 n/a $150
27 S-073 Entertainment Permit:
a) Temporary $329 3.00% $339
b) Regular $1,315 3.00% $1,355
c) Renewal $1,315 3.00% $1,355
28 S-074 Dance Permit:
a) One Time $52 3.00% $54
b) Annual $52 3.00% $54
29 S-074A Pawn Shop Permit $1,633 3.00% $1,682
30 S-074B Massage Parlor Permit $604 3.00% $622
31 S-074C Carnival Worker Permit $167 3.00% $172
32 S-075 Vehicle Impound Fees
# a) Standard Release $150 n/a $150
# b) DUI Release $400 n/a $400
33 S-076 # Repossessed Vehicle Release $15 n/a $15 [a]
34 S-077 # Police Records Check/Clear Letter $25 n/a $25
35 S-078 # Immigration Letters $25 n/a $25
36 S-079 # Public Safety Application Background Check n/a n/a n/a
37 S-081 # Photograph Service Fee (Cost of CD is included) $10 n/a $10
38 S-082 Video/Audio Tape/Cd Reproduction:
# a) Dispatch Tape (911 Tape)$110 n/a $110
# b) Video/Audio Reproduction $85 n/a $85
39 S-083 Police Incident/Crime Report Copy:
# a) Document <4 Pages In Length $0.00 3.00% $0.00
# b) First Sheet (>4 Page Document)$0.65 3.00% $0.65
# c) Each Additional Sheet (>4 Page Document) $0.20 3.00% $0.20
40 S-084 Special Computer Search - Per Hour $102 3.00% $105
41 S-085 Civil Subpoena Processing
# a) Subpoena Processing Fee (Per Request) $20 n/a $20
28
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
POLICE
# b) Additional Reproduction Cost Actual Cost n/a Actual Cost
# c) Additional Deposit + Travel (Per Day, Regulated Fee) $275 n/a $275
42 S-086 Duces Tecum Subpoena Processing
# a) Subpoena Processing Fee (Per Request) $15 n/a $15
# b) Additional Reproduction Cost Actual Cost n/a Actual Cost
43 S-087 Animal Regulation, As Per Ordinance:
# a) Dog License - Unaltered- 1 Year License $62 n/a $62
# b) Dog License - Altered - 1 Year License $21 n/a $21
# c) Senior Rate - 1 Pet Altered $8 n/a $8
# d) Duplicate $10 n/a $10
# e) Delinquency Charge Equal to
License Fee
n/a Equal to
License Fee
# f) Field Enforcement (licensing initiated in the the field) $41 n/a $41
Voluntary Cat Licenses
# a) One Year - Altered $5 n/a $5
# b) One Year - Unaltered $10 n/a $10
# c) Microchip - With Licensing Of Altered Pet Free n/a Free
S-020 Vehicle Code Enforcement
44 # Improper Display Of License Plates (CVC 5200(a)) $58 n/a $58
45 # Improper Display Of Tabs (CVC 5204(a))$80 n/a $80
46 # Blkg. Driveway/Garage Entrance (CVC 22500(e) $58 n/a $58
47 # No Parking On Sidewalk (CVC 22500(f))$58 n/a $58
48 # No Parking Alongside Pkd. Veh./Dbl.Pkg. (CVC 22500(h)) $58 n/a $58
49 # Blkg. Disabled Access Ramp (CVC 22500(I)) $272 n/a $272
50 # Fire Accessway/Fire Lane (CVC 22500.1)$170 n/a $170
51 # Parking 18 Inches Form Curb/Wrong Way (CVC 22502(a), AMC 74-441) $56 n/a $56
52 # Parking In Disabled Zone (CVC 22507.8(a)) $382 n/a $382
53 # Blk./Obstruct Disabled Zone (CVC 22507.8(b)) $338 n/a $338
54 # Parking On Disabled Crosshatch (CVC 22507.8(c)(2)) $338 n/a $338
55 # Fire Hydrant (CVC 22514)$56 n/a $56
S-021 Parking Enforcement
56 # Picnic Shelter Application Rental (Alisal Park): $45 n/a $45
57 # Parking For Purpose Of Sale (AMC 74-439(1)) $68 n/a $68
58 # Not Parked Within Painted Lines (AMC 74-443b) $44 n/a $44
59 # Red Curb (AMC 74-449(a)(1))$51 n/a $51
60 # No Parking In Alley (AMC 74-450)$52 n/a $52
61 # 18” From Curb Or Facing Wrong Way (AMC 74-441, CVC 22502(a)) $56 n/a $56
62 # Prohibited By Signs / Markings (AMC 74-446) $51 n/a $51
63 # Limited Or Prohibited Parking (AMC 74-453) $51 n/a $51
64 # Parking on Private Property Without Consent (AMC 74-463 (b)) $52 n/a $52
65 # Commercial Veh. Over 6,000 Lbs. +/Over 60 Minutes (AMC 74-466) $85 n/a $85
66 # Detached Trailer On Street (AMC 74-466 (B)) $68 n/a $68
67 # Parking On Front Yard Prohibited (AMC 74-468) $49 n/a $49
68 S-022 # General Code Enforcement Actual Cost n/a Actual Cost
69 # Impound & Collision Tow Service-Per Hr. (Minimum 1 Hr.) Variable n/a Variable
70 Storage Fees - Per Day
# a) Automobiles And Light Trucks Variable n/a Variable
# b) Trucks Over 1 Ton Variable n/a Variable
# c) Semi-Truck And Trailer Variable n/a Variable
29
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
POLICE
# d) Motorcycle Variable n/a Variable
71 S-025 # Accident Report Investigation. $20 n/a $0 [c]
72 S-027 # Alarm Monitoring Service Actual Cost n/a Actual Cost
73 S-028 # Jail $104 n/a $104
74 S-032.1 # Court Order Custody Reimbursement Fee Per 24-Hour Period Or Fraction
Thereof
$104 n/a $104
75 S-032.4 # Paramedic Service Actual Cost n/a Actual Cost
76 S-032.5 Traffic Collision Report
# a) Injury $20 n/a $20
b) Non-Injury $20 n/a $20
77 Comm Srvc Officer Special Event Fees (Per Hour) $105 3.00% $108
78 Police Aide Special Event Fees (Per Hour)$25 3.00% $26
79 Fire arm storage Fee (Court order/Safekeeping) - Levy Upon released of firearm. n/a $50 [b]
[a] Fee set by State.
# = Fees not automatically adjusted for CPI change.
[b] Proposed New Fees
[c] Deleted
30
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item Description Fee/Unit Sept'19-'20 Fee/Unit Notes
Business Licenses
1 Adult-oriented business license:
# a) License Fee See Business License n/a See Business License
# b) Partial Payment of Fees - Additional Charge $17 n/a $17
2 Adult Business License Application Fee:
# a) Application Fee $196 n/a $196
# b) Partial Payment of Fees - Additional Charge $17 n/a $17
3 Initial Business License Fee:
# a) Initial License Fee See Business License n/a See Business License
# b) Partial Payment of Fees - Additional Charge $17 n/a $17
4 Annual Renewal Fee:
# a) Renewal Fee $41 n/a $41
# b) Partial Payment of Fees - Additional Charge $17 n/a $17
5 Adult Business License Appeal Fee:
# a) License Appeal Fee $2,616 n/a $2,616
# b) Partial Payment of Fees - Additional Charge $17 n/a $17
6 # Live Entertainer License Actual time spent at
hourly rate of involved
City staff, charged
against $2,500 initial
deposit
n/a Actual time spent at
hourly rate of involved
City staff, charged
against $2,500 initial
deposit
7 # Figure Model License Actual time spent at
hourly rate of involved
City staff, charged
against $2,500 initial
deposit
n/a Actual time spent at
hourly rate of involved
City staff, charged
against $2,500 initial
deposit
8 # Live Entertainer/Figure Model License Renewal Actual time spent at
hourly rate of involved
City staff, charged
against $2,500 initial
deposit
n/a Actual time spent at
hourly rate of involved
City staff, charged
against $2,500 initial
deposit
Planning
1 # Interim Adult Use Planning Permit Actual time spent at
hourly rate of involved
City staff, charged
against $5,000 initial
deposit
n/a Actual time spent at
hourly rate of involved
City staff, charged
against $5,000 initial
deposit
2 # Final Adult Use Planning Permit Actual time spent at
hourly rate of involved
City staff, charged
against $5,000 initial
deposit
n/a Actual time spent at
hourly rate of involved
City staff, charged
against $5,000 initial
deposit
3 # Extension Of Amortization Actual time spent at
hourly rate of involved
City staff, charged
against $5,000 initial
deposit
n/a Actual time spent at
hourly rate of involved
City staff, charged
against $5,000 initial
deposit
All Adult Business Fees were rounded to the nearest dollar for administrative efficiency.
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
ADULT BUSINESSES
31
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
1 S-133 Application Fee - New Business
a) Outside Contractor $60 3.00% $62
b) Reinstate Outside Contractor $47 3.00% $48
c) Rental Business $60 3.00% $62
d) All Others $193 n/a $193
2 # First Offense Administrative Penalty For Business License Related Violations $250 n/a $250
3 S-134 Home Occupation Permit $100 3.00% $103
4 S-135 New Taxi/Tow Truck Permit $615 3.00% $634
5 S-136 Massage Parlor Technician Permit See notes on C n/a See notes on C [c]
Massage Business Operators Permit See notes on C n/a See notes on C [c]
Massage Facility Inspection $285 3.00% $293
6 Application Fee - Renewal $25 3.00% $26
7 Field Collection Fee On Delinquent Accounts $30 3.00% $31
8 Partial Payment Of Fees - Additional Charge $16 3.00% $17
9 S-138 Business License Duplicates $15 3.00% $16
10 S-139 Printouts Of Business License Lists 1 hr Staff Time n/a 1 hr Staff Time
11 S-140 Solicitor Permit-All
a) 1st Solicitation $66 3.00% $68
b) Each Additional Permit $44 3.00% $46
12 S-141 Yard Sale Permit Not Required n/a Not Required [a]
13 S-142 Bingo Permit $54 3.00% $55
14 S-143 Fireworks Stand Permit $380 3.00% $392
15 S-96 Filming Or Other Use Of City Facilities - Per Day
25% Discount for Azusa-based nonprofit organizations
$1,438 3.00% $1,481
16 Filming On Private Property $321 3.00% $331
17 S-97 Registration Fee For Non-Profit Businesses Within A Commercial
Building (i.e. banks, schools, churches, etc.)
$47 3.00% $49
18 S-98 Certified Access Specialist Program (CASp)$4 n/a $4 [b]
[a] Ordinance No. 07-05, Approved By Council On 05/07/07
[b] Fee set by the State (Per AB 1379) - The $4 fee will be effective until 12-31-23. Starting on 1-1-24, the CASp fee will be reduced to $1.
[c] Please refer to the Planning Division's Fee Schedule for the Massage Permit fee amount under S-047 and S-048.
All Business License Fees were rounded to the nearest dollar for administrative efficiency.
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
BUSINESS LICENSES
# = Fees not automatically adjusted for CPI change.
32
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
S-33 Aquatics Program/Leisure Classes
1 Swimming Lessons:
a) Children/Group
i) 25 Minutes $34 n/a $35 [b]
ii) 40 Minutes $45 n/a $45 [b]
b) Children/Private $34 n/a $35 [b]
c) Adult/Group [b]
i) 25 Minutes $34 n/a $35 [b]
ii) 40 Minutes $45 n/a $45 [b]
d) Adult/Private $34 n/a $35 [b]
2 Swimming Team:
a) 1st Session (Includes Shirts And Swim Cap)
i) First Child (Same Family)$71 n/a $75 [b]
ii) Additional Child (Same Family)$60 n/a $65 [b]
b) 2nd Session [b]
i) First Child (Same Family)$60 n/a $60 [b]
ii) Additional Child (Same Family)$49 n/a $50 [b]
3 Water Exercise - Adults (Leisure Class-Rates Varies) Varies n/a Varies [b]
4 Lifeguard Training Class (Leisure Class-Rates Varies) Varies n/a Varies [b]
5 Aqua Zumba (Leisure Class-Rates Varies) Varies n/a Varies [b]
6 S-34 Recreation Swimming - Day Swim:
# a) 12 Years Old & Under Includes Slide $0.50 n/a $0.50
# b) Teens - Up To 17 Years Includes Slide $2 n/a $2
# c) Seniors - 50 years And Older $1 n/a $1
# d) Adults - 18 Years And Older Includes Slide $2 n/a $2
# e) Lap Swim - Adult 18 And Over $2 n/a $2
# f) Lap Swim - Seniors $0.50 n/a $0.50
7 Recreation Swimming - Season Pass:
a) Children - 12 Years Old & Under $34 n/a $35 [b]
b) Teens - Up To 17 Years $45 n/a $45 [b]
c) Seniors - 50 Years And Older $45 n/a $35 [b]
d) Adults - 18 Years And Older $56 n/a $60 [b]
8 S-35 Swimming Pool Rental (2 Hours):
a) 1-100 People $382 n/a $382
b) 101-250 People $492 n/a $492
c) 251-350 People $601 n/a $601
d) Swimming Pool Rental Deposit (Refundable) $219 n/a $219
e) Additional - Water Slide $109 n/a $109
f) Water Slide Rental Deposit (Refundable) $55 n/a $55
g) Non- Resident Fee (Additional)$164 n/a $164
9 S-36 #Leisure Classes Varies n/a Varies
S-38 Adult Sports Programs *, [b]
10 Adult Baseball:
a) Weeknights $492 n/a $500
b) Weekends $546 n/a $550
11 Adult Softball $328 n/a $315
12 Adult Basketball $382 n/a $375
13 Adult Volleyball $202 n/a $200
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
COMMUNITY RESOURCES
33
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
COMMUNITY RESOURCES
14 Golf Tournament Varies n/a Varies
15 Adult Flag Football $328 n/a $300
16 Adult Futsal (Indoor Soccer)$202 n/a $200
17 Adult Kickball $202 n/a $200
S-41 Youth Sports Programs *, [b]
18 Pony Baseball:
a) Regular Fee $82 n/a $82
b) Additional Child - Same Family $71 n/a $71
19 Winter Pony Baseball:
a) Regular Fee $49 n/a $49
b) Additional Child - Same Family $44 n/a $44
20 Mighty-Mite Baseball (T-Ball/Coach Pitch):
a) Regular Fee $49 n/a $49
b) Additional Child - Same Family $44 n/a $44
21 Mighty-Mite Basketball:
a) Regular Fee $49 n/a $49
b) Additional Child - Same Family $44 n/a $44
22 Mighty-Mite Flag Football:
a) Regular Fee $49 n/a $49
b) Additional Child - Same Family $44 n/a $44
23 Mighty-Mite Soccer:
a) Regular Fee $49 n/a $49
b) Additional Child - Same Family $44 n/a $44
24 Flag Football (T-Shirt Uniforms):
a) New $33 n/a $33
b) Returning $27 n/a $27
c) Additional Child - Same Family - New $27 n/a $27
d) Additional Child - Same Family - Returning $22 n/a $22
25 Basketball (T-Shirt Uniforms):
a) New $33 n/a $33
b) Returning $27 n/a $27
c) Additional Child - Same Family - New $27 n/a $27
d) Additional Child - Same Family - Returning $22 n/a $22
26 Summer Basketball (Include Uniform):
a) Regular Fee $55 n/a $55
b) Additional Child - Same Family $49 n/a $49
27 Volleyball (T-Shirt Uniforms-Shirt Only; No Shorts):
a) New $32 n/a $32 [a]
b) Returning $33 n/a $33
c) Additional Child - Same Family - New $33 n/a $33
d) Additional Child - Same Family - Returning $22 n/a $22 [a]
28 Soccer (T-Shirt Uniforms):
a) New $33 n/a $33
Duces Tecum Subpoena Processing $27 n/a $27
c) Additional Child - Same Family - New $27 n/a $27
d) Additional Child - Same Family - Returning $22 n/a $22
Athletic Field Rental (Including Ball Diamond)*, [b]
34
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
COMMUNITY RESOURCES
29 S-41.1 Ball Field/Diamond Rental:[b]
a) Field/Diamond Rental-No Lights $32 n/a $32
b) Field/Diamond Rental-With Lights $45 n/a $45
c) Drag, Line And Water Field-Prepared $28 n/a $28
d) Staff, Scorekeeping - Per Hour $17 n/a $17
e) Use Of Scoreboards $17 n/a $17
f) Use Of Bases $17 n/a $17
g) Deposit For Use Of Bases $219 n/a $219
h) Use Of Strike Zone Mat $17 n/a $17
i) Non-Resident Fee (Except Memorial Park) (Additional) $55 n/a $55
30 Athletic Field Only Charge (Green Space):
a) Memorial Park - Per Hour (Lights Not Included) $68 n/a $68
b) Northside South Field Area - (Lights Not Included) $68 n/a $68
c) Zacatecas Park (Currently Not Available For Rental) $65 n/a $65
d) Gladstone Park (Lights Not Included) $36 n/a $36
e) Lights Included When Applicable $66 n/a $66
f) Non-Resident Fee (Except Memorial Park) (Additional) $57 n/a $57
S-43 Golden Days Special Events [b]
31 2K/5K Run/Walk:
a) Youth
i) Pre-Registration $5 3.00% $5
ii) Day Of The Event $10 3.00% $15
b) Adult
i) Pre-Registration $16 3.00% $15
Picnic Shelter Application Rental (Alisal Park): $20 3.00% $25
32 S-44 Children's Day Camp (This program is not available):
a) Registration Fee (One-Time)$0 3.00% $0
b) New $0 3.00% $0
c) New - 2nd Child In Same Family $0 3.00% $0
d) Returning $0 3.00% $0
e) Returning - 2nd Child In Same Family $0 3.00% $0
33 S-44 Summer Day Camp:[b]
a) Registration Fee (One-Time)$22 n/a $25
b) New (Per Day)$22 n/a $25
c) Returning - 2nd Child Same Family $20 n/a $20
S-47 Recreation Special Events [b]
34 Fall Festival Booth Rental Varies n/a Varies
35 Tournament Of Champions Finals At APU Events Center:
a) Adults $3 n/a $3
b) Student $2 n/a $2
c) Child (3-11)$1 n/a $1
36 Volleyball Clinic $0 n/a $0 [a]
37 Junior Olympic Track (Per School)$109 n/a $110
38 Spring Thing Food Vendor Varies n/a Varies
39 Winter Fiesta Food Vendor Varies n/a Varies
41 Spring Thing (Novelty And Craft Vendor Fees) Varies n/a Varies
42 Holiday Crafts (Vendors Fees)Varies n/a Varies
35
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
COMMUNITY RESOURCES
* Additional fees may apply for use of game officials. Amounts vary.
# = Fees not automatically adjusted for CPI change.
[a] Volleyball Clinic Handle By External Agencies
[b] Rates will be determined by market rate.
All Recreation Fees were rounded to the nearest dollar for administrative efficiency.
36
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
1 S-48 Woman's Club Rental To Public :[a]
a) Weekdays Meetings - 8 A.M. - 5 P.M. (Add'l Hours $75 Each) $250 n/a $250
b) Friday Evening Event $300 n/a $300
c) Saturday Afternoon Event (Until 5P.M.) - Replaced with d below $0 n/a $0
d) Saturday Event (Anytime)$800 n/a $800
e) Sunday Event (Anytime)$400 n/a $400
f) Event Liability Insurance Varies n/a Varies
g) Damage Deposit (Refundable).$500 n/a $500
h) Deposit to hold date (Non-refundable) $350 n/a $350
i) Additional Time > 5 Hours (Per Hour, Split Between City And
Contractor)
$250 n/a $250
j) Teen Party (Anytime except Saturday - Saturday Rate is $800): $700 n/a $700
k) Cleaning Fee $100 n/a $100
l) Decorating Fee Outside Normal Hours Of Operation (Per Hour) $15 n/a $15
2 Woman's Club-For Azusa Based Non-Profit Organizations:
a) Building Rental (Per Hour Including Setup And Clean Up Time) $50 n/a $50
b) Kitchen (Flat Fee)$75 n/a $75
c) Damage Deposit (Refundable)$500 n/a $500
d) Staffing (Per Hour)$15 n/a $15
e) Cleaning Fee $100 n/a $100
f) Event Liability Insurance Varies n/a Varies
g) Alcohol Liability Insurance $0 n/a $0
3 Gazebo At City Hall $500 n/a $500
4 S-48.2 Senior Lunch Program (Suggested) Donation $2 n/a $2 #
5 Rental Of Memorial Park North Recreation Center:[a]
a) Small Class Rooms: (Per Hour)
i) Non-Profit $30 n/a $30
ii) For Profit $50 n/a $50
b) Large Room: (Per Hour)
i) Non-Profit $60 n/a $60
ii) For Profit $75 n/a $75
c) Kitchen: (Per Hour)
i) Non-Profit $50 n/a $50
ii) For Profit $75 n/a $75
d) Staffing: (Per Hour)
i) Non-Profit $30 n/a $30
ii) For Profit $30 n/a $30
e) Cleaning Fee (Maximum Fee)$225 n/a $225
f) Security Deposit: (Refundable Deposit) $300 n/a $300
g) Non-Resident Fee (Flat Rate) (Additional) $100 n/a $100
h) Event Liability Insurance Varies n/a Varies
i) Decorating Fee Outside Normal Hours Of Operation (Per Hour) $15 n/a $15
6 S-48.3 Rental Of Senior Center:[a]
a) Small Class Rooms: (Per Hour)
i) Non-Profit $30 n/a $30
ii) For Profit $50 n/a $50
b) Large Room: (Per Hour)
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
RECREATION FACILITIES RENTAL-INCLUDING WOMAN'S CLUB, SENIOR CENTER AND NORTH RECREATION CENTER (NRC), ETC.
37
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
RECREATION FACILITIES RENTAL-INCLUDING WOMAN'S CLUB, SENIOR CENTER AND NORTH RECREATION CENTER (NRC), ETC.
i) Non-Profit $50 n/a $50
ii) For Profit $90 n/a $90
c) Kitchen: (Flat Fee)
i) Non-Profit $50 n/a $50
ii) For Profit $75 n/a $75
d) Staffing: (After Hours Only, Minimal Per Hour)
i) Non-Profit $30 n/a $30
ii) For Profit $30 n/a $30
e) Cleaning Fee (Maximum)$225 n/a $225
f) Security Deposit: (Refundable Deposit) $300 n/a $300
g) Non-Resident Fee (Flat Fee) (Additional) $100 n/a $100
h) Decorating Fee Outside Normal Hours Of Operation (Per Hour) $15 n/a $15
i) Event Liability Insurance Varies n/a Varies
j) Deposit to hold date (Non-refundable) $200 n/a $200
Memorial Park Facilities Rental [a]
40 Memorial Park Facilities:
a) Meeting Room
i) Normal Hours $33 n/a $35
ii) Outside Normal Hours $44 n/a $45
iii) Non-Resident Fee (Additional)$109 n/a $110
b) Gym or Main Room
i) Normal Hours $44 n/a $45
ii) Outside Normal Hours $66 n/a $70
iii) Non-Resident Fee (Additional)$191 n/a $200
c) Kitchen
i) Resident $55 n/a $55
ii) Non-Resident $55 n/a $55
d) Cleaning $55 n/a $55
43 Bounce House Application Usage $22 n/a $25
44 Non-Resident Fee (Additional)$44 n/a $60
Picnic Shelter Rental [a]
45 Picnic Shelter Application Rental (Gladstone Park):
a) Section # 1 $28 n/a $30
b) Section # 2 $28 n/a $30
c) Section # 3 $28 n/a $30
d) Non-Resident Fee (Additional)$55 n/a $60
46 Picnic Shelter Application Rental (Memorial Park): $0 n/a $0
a) Single Shelter (Section # 2,3,4 & 5)$28 n/a $35
b) Double Shelter (Section # 1& 6)$39 n/a $45
c) Non-Resident Fee (Additional)$55 n/a $60
47 Picnic Shelter Application Rental (Northside Park):
a) S-Leg Section # 1 $28 n/a $30
b) S-Leg Section # 2 $28 n/a $30
c) S-Leg Section # 3 $28 n/a $30
d) S-Leg Section # 4 $28 n/a $30
Duces Tecum Subpoena Processing $39 n/a $45
38
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
RECREATION FACILITIES RENTAL-INCLUDING WOMAN'S CLUB, SENIOR CENTER AND NORTH RECREATION CENTER (NRC), ETC.
f) Non-Resident Fee (Additional)$55 n/a $60
48 Picnic Shelter Application Rental (Pioneer Park):
a) NE Section # 1 (Double Shelter)$39 n/a $45
b) NE Section # 2 $28 n/a $30
c) NE Section # 3 $28 n/a $30
d) Gazebo Shelter #4 $50 n/a $60
e) Non-Resident Fee (Additional)$55 n/a $60
49 Picnic Shelter Application Rental (Zacatecas Park):
a) NE Section # 1 Double Shelter $39 n/a $45
b) NW Section # 2 $28 n/a $30
c) SE Section # 3 Double Shelter $39 n/a $45
d) SW Section # 4 $28 n/a $30
e) NE Section # 5 Double Shelter $39 n/a $45
f) Non-Resident Fee (Additional)$55 n/a $60
50 Picnic Shelter Application Rental (Slauson Park):
a) Section #1 $28 n/a $30
b) Section #2 $28 n/a $30
c) Section #3 $28 n/a $30
d) Section #4 $28 n/a $30
e) Non-Resident Fee (Additional)$55 n/a $60
51 Picnic Shelter Application Rental (Veteran's Freedom Park):
a) Gazebo #1 $28 n/a $30
b) Gazebo #2 $28 n/a $30
c) Non-Resident Fee (Additional)$55 n/a $60
52 Picnic Shelter Application Rental (Rancho Park):
a) Section #1 $28 n/a $30
b) Non-Resident Fee (Additional)$55 n/a $60
53 Picnic Shelter Application Rental (Alisal Park):
a) Section #1 $39 n/a $45
b) Section #2 $39 n/a $45
c) Non-Resident Fee (Additional)$55 n/a $60
# = Fees not automatically adjusted for CPI change.
[a] Rates will be determined by market rate.
All Woman's Club/Senior Center/N. Recreation Center Fees were rounded to the nearest dollar for administrative efficiency
39
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
Monthly Foothill Transit Passes *
1 Senior/Disabled:
# a) Regular Rate $25 n/a $30 [b]
# b) Discounted Rate $19 n/a $19 [b]
2 Student K-12:
# a) Regular Rate $36 n/a $40 [b]
# b) Discounted Rate $27.75 n/a $27.75 [b]
3 Local Lines:
# a) Regular Rate $50 n/a $60 [b]
# b) Discounted Rate $56 n/a $56 [b]
4 Silver Streak:
# a) Regular Rate $105 n/a $110 [b]
# b) Discounted Rate $85 n/a $85 [b]
5 Commuter Express:
# a) Regular Rate $170 n/a $180 [b]
# b) Discounted Rate $150 n/a $150 [b]
Dial-A-Ride Transit (one-way)
6 Medical and Social Services:
# a) Azusa, Covina, Duarte, Glendora $0.50 n/a $0.50
# b) Baldwin Park, Monrovia, San Dimas, West Covina $1.50 n/a $1.50
7 # Non-Medical Appointments Limited to City Limits $0.50 n/a $0.50
8 # Senior Lunch Program $0.25 n/a $0.25
Metrolink Monthly Passes *
9 # City residents save $25 on monthly pass Variable n/a Variable [a], [c]
10 # Employees of Azusa Businesses receive $15 or a match of the amount
offered by employer up to a limit of $25
Variable n/a Variable [a], [c]
Access *
11 # Base Books (10 Coupons Per Book)$27.50 n/a $27.50 [d]
12 # Plus Books (10 Coupons Per Book)$7.50 n/a $7.50 [d]
* Discounted Passes Are Available To Eligible Users And On A First Come-First Serve Basis.
[a] Varies Depending On Point Of Origin And Destination.
[b] Rates set by Foothill Transit
[c] Rates set by Metrolink
[d] Rates set by Access Services
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
TRANSPORTATION
40
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
1 S-097 Inter-Library Loan Processing:
# a) Processing Fee $2 n/a $2
b) Plus Postage Actual Cost n/a Actual Cost
2 S-099 # Lost Library Card Processing $3 n/a $3
3 S-100 Processing Overdue Material:
# a) Per Item Per Day - Adult $0.30 n/a $0.30
# b) Per Item Per Day - Child $0.15 n/a $0.15
4 S-101 Lost/Damage Library Material Processing:
# a) Processing Fee (plus the cost of the item) $15 n/a $15
# b) Missing AV Case (Audio Book, DVD, & CD) $1 n/a $1
# c) Missing Bar Code $1 n/a $1
# d) Missing Pamphlet- AV Materials & Books $1 n/a $1
5 S-102 # Passport Application (Rate Set by Fed. Govt.) $25 n/a $25
6 S-103 # DVD Rental Per Item (For Two Days)$0 n/a $0
7 S-104 Rental Of Library Auditorium:
a) For Profit
# i) During Business Hours - Per Hour (Min. 3 Hours) $25 n/a $25
# ii) Outside Business Hours - Per Hour (Min. 3 Hours-Based on Actual-Lib
Assist III)
$100/Hr n/a $100/Hr
b) Non-Profit Organizations - Outside Azusa
# i) During Business Hours - Per Hour (Min. 3 Hours) $15 n/a $15
# ii) Outside Business Hours Per Hour (Min. 3 Hours) $100/Hr n/a $100/Hr
# c) Resident Non-Profit & Government (Minimum 3 Hours) No Charge n/a No Charge
8 S-104B Library Fax Service:
# a) Domestic - First Page (Each Additional Page $1) $2 n/a $2
# b) International - First Page $6 n/a $6
# c) International - Additional Page $2 n/a $2
9 # Library Cards No Charge n/a No Charge
10 Personal Computer Usage:
# a) First 2 Hours No Charge n/a No Charge
# b) Excess Of 2 Hours $2 n/a $2
# c) Guest Pass (Non Library Cardholders)$2 n/a $2
11 S-53 Photocopy Charges Per Page:
# a) Black & White Copies $0.15 n/a $0.15
# b) Color Copies $0.25 n/a $0.25
12 S-54 Merchandise Sales:
# a) USB Drives Variable n/a Variable
# b) Canvas Bags Variable n/a Variable
# c) Ear Buds Variable n/a Variable
# = Fees not automatically adjusted for CPI change.
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
LIBRARY
41
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
S-16.1 Paper Map Products
1 City Map Books $14 3.00% $15
2 A Size Plot; 8.5 X 11 $14 3.00% $15
3 A Size Plot: 8.5 X 11 With Photo $22 3.00% $23
4 B Size Plot: 11 X 17 $14 3.00% $15
5 B Size Plot: 11 X 17 With Photo $22 3.00% $23
6 C Size Plot: 17 X 22 $35 3.00% $37
7 C Size Plot: 17 X 22 With Photo $48 3.00% $50
8 D Size Plot: 34 X 22 $69 3.00% $71
9 D Size Plot: 34 X 22 With Photo $91 3.00% $94
10 E Size Plot: 34 X 46 $110 3.00% $114
11 E Size Plot: 34 X 46 With Photo $181 3.00% $186
12 Zoning Citywide Book (11 X 17 Sheets) $69 3.00% $71
13 City General Plan Land Use Or Zoning Map (3 X 5 Ft.) $35 3.00% $37
14 City General Plan Land Use Or Zoning Map (6 X 6 Ft.) $69 3.00% $71
15 Hourly Charge For Custom Mapping Work $102 3.00% $105
16 # Public Notice Radius Maps And Labels $240 n/a $240
# = Fees not automatically adjusted for CPI change.
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
GIS MAPS
42
Adopted Proposed
Svc Area 1/22/2019 CPI 1/21/2020
No. Item # Description Fee/Unit Sept'19-'20 Fee/Unit Notes
1 Credit Card Processing Fee 2% n/a 2% [a]
2 S-144 Returned Check Processing - 1st and 2nd Check
# a) First Check $35 n/a $35 [b]
# b) Each Additional Check $25 n/a $25 [b]
3 S-145 # Re-Issuance Of Lost Checks $65 n/a $65
4 S-146 Document Reproduction:
# a) Document <4 Pages In Length $0 n/a $0
# b) First Sheet (>4 Page Document)$0.65 n/a $0.65
# c) Each Additional Sheet (>4 Page Document) $0.20 n/a $0.20
# d) Per Sheet Charge for Certain Documents Specified in Gov't Code $0.10 n/a $0.10 [b]
5 S-146.1 # Documents Reproduced on staff time and costs of CD/DVD/USB Flash Drive $10 n/a $10
6 # Document Certification $15 n/a $15
7 S-149 # Candidate Processing $25 n/a $25 [b]
8 S-149A # Initiative Processing $200 n/a $200 [b]
9 S-150 # Notary Service For Each Signature Taken $15 n/a $15 [b]
10 S-150A Project Specifications And Plans:
# a) Base Fee $50 n/a $50
# b) Additional Mailing Fee (If Mailed)$10 n/a $10
11 S-88.1 # Processing Of Payroll Garnishments Per Transactions $0 n/a $0 [c]
12 S-93 Records Research Service:
# a) Document And Supplies Actual Cost n/a Actual Cost [d]
b) Per Hour Fee (1/4 Hour Increments)$0 3.00% $0
13 S-94 Bond Issuance And Administration - (Includes Extra $50 Per Hour) $423 3.00% $436
14 S-48.1 Rental Of Civic Center Auditorium:
# a) During City's Normal Business Hours Until 4:00pm (Per Hour) $50/Hour n/a $50/Hour
# b) After 4:00pm, Weekends Or Holidays (Per Hour) $100/Hour n/a $100/Hour
# c) Non-Resident Groups - Additional Fee Per Event $100/Hour n/a $100/Hour
# d) Discount For Azusa-Based Non-Profit Organizations 25% n/a 25%
# e) A/V Technician Services ($60 Per Hour or Current Cost-After 4pm,
Weekends)
$60/Hour or
Current Costs
n/a $60/Hour or
Current Costs
# f) Custodial Services n/a n/a $40/Hour or
Current Costs
[f]
15 S-48.2 Deposition Subpoena
# Personal Appearance $275 n/a $275 [e]
# Production of Documents/Records $15 n/a $15 [d]
[b] Fees Set By State.
[c] Fees set by court order.
[d] Government Code Section 6253.9 (b)
[e] Government Code Section 68096.1
[f] Proposed New Fees
# = Fees not automatically adjusted for CPI change.
[a] Fee applies to all payments made directly to the City, via credit card. (Example scenario - For $100 fee, paid via credit card, the total amount charged
will be $102 (2% of $100).
Schedule of Fees and Charges (Municipal Activities and Services)
City of Azusa
ADMINISTRATIVE PROCESSING COSTS
43
-1-
Attachment 2
RESOLUTION NO. 2020-C01
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AZUSA, CALIFORNIA, APPROVING AND ADOPTING A
REVISED SCHEDULE OF FEES AND CHARGES FOR VARIOUS
MUNICIPAL ACTIVITIES AND SERVICES
WHEREAS, under the police power granted by Article XI, Section 7 of the
California Constitution, the City of Azusa is authorized to impose reasonable service fees
for a variety municipal benefits and services; and
WHEREAS, the City Council of the City of Azusa previously determined that the
users of these services should be charged fees to recover the City's expenses for
providing these services; and
WHEREAS, the City Council previously adopted Resolution No. 2019-C02, which
established fees for various municipal activities and services; and
WHEREAS, the City Council has determined that in order to continue providing
effective services for the public welfare, it is necessary to adopt a revised Schedule of Fees
and Charges which sets forth fees for City services; and
WHEREAS, based upon evidence provided, the City Council hereby determines that
the proposed fees cover, but do not exceed, the reasonable cost of providing the services for
which the fee is charged; and
WHEREAS, the City Council has determined that the proposed Schedule of Fees
and Charges is statutorily and categorically exempt from the requirements of the California
Environmental Quality Act since citing these fees fit within the statutory exemptions for
local agency decisions involving the adoption and collection of rates, tolls and other
charges, pursuant to Public Resources Code Section 21080(b)(8) and Section 15273 of the
California Environmental Quality Act Guidelines.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Azusa,
California does hereby find, determine and declare as follows:
SECTION 1. A doption of Schedule of Fees and Ch arges. The City Council
approves and adopts the Schedule of Fees and Charges (the "Schedule"), which is attached
hereto as Exhibit "C" and incorporated herein by reference. The adopted fee schedule shall
supersede any fees and charge schedule previously adopted.
SECTION 2. Findings. The City Council finds that the fees and charges set forth in
the Schedule attached as Exhibit "A": (1) have a reasonable relationship with the City's costs
in providing and maintaining those services and facilities; and (2) are necessary to enable the
City to continue providing and maintaining the services and facilities to which they relate.
SECTION 3. Repeal of Prior Resol ution . Resolution No. 2019-C02 is hereby repealed in its
entirety.
-2-
Attachment 2
SECTION 4. Effective Date. This Resolution shall become effective upon its adoption.
PASSED, APPROVED and ADOPTED this 21st day of January, 2020.
________________________________________
Joseph Romero Rocha
Mayor
____________________________________
Jeffrey Lawrence Cornejo, Jr.
City Clerk
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF AZUSA )
ATTEST:
I HEREBY CERTIFY that the foregoing Resolution No. 2020-CX was duly adopted by
the City Council of the City of Azusa at a regular meeting thereof on the 21st day of January
2020, by the following vote of City Council Members .
AYES: COUNCILMEMBERS: TBD
NOES: COUNCILMEMBERS: TBD
ABSTAIN: COUNCILMEMBERS: TBD
ABSENT: COUNCILMEMBERS: TBD
___________________________________
Jeffrey Lawrence Cornejo, Jr.
City Clerk
APPROVED AS TO FORM:
___________________________________
Marco Martinez
City Attorney Best Best & Krieger, LLP
Attachment 3
RESOLUTION NO. 2020-C02
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AZUSA, CALIFORNIA, APPROVING AND ADOPTING A REVISED
SCHEDULE FOR CERTAIN DEVELOPMENT PROJECT FEES AND
SERVICE CHARGES
WHEREAS, under the police power granted by Article XI, Section 7 of the
California Constitution, the City of Azusa is authorized to impose fees, charges and rates
for certain municipal services; and
WHEREAS, in addition to the authority granted by the California Constitution,
Chapter 8 (commencing with section 66016) of Division 1 of Title 7 of the California
Government Code establishes a procedure for adopting fees or service charges for development
projects; and
WHEREAS, pursuant to Resolution No. 2019-C01, adopted on January 22, 2019, the
City currently imposes development related fees upon applicants to recover the costs of
staff time, inspection, copying costs and other expenses related to the review and processing of
applications for property development; and
WHEREAS, many of the City's current fees charged for development services no
longer reflect the actual cost of providing such services; and
WHEREAS, Government Code sections 66016 and 66018 provide that the City
may adopt new development fees or increase existing fees after providing notice and holding a
public hearing; and
WHEREAS, notice of a public hearing on the establishment of new and revised fees
was published in accordance with provisions of section 6062a of the California Government
Code; and
WHEREAS, notice of public hearing was mailed to all interested parties who filed
a written request for a mailed notice with the City, or a waiver of notice was obtained; and
WHEREAS, on January 21st, 2020, at the time and place specified in the published
and mailed notices, the City Council held a public hearing as required by law to allow oral or
written presentations prior to levying new development fees or service charges and prior to
approving an increase in existing development fees or service charges; and
WHEREAS, at least ten (10) days prior to the commencement of the hearing, there
was made available to the public a report containing the cost, or estimated cost, of
providing the service for which the fee or service charge will be levied, and the revenue
sources for providing such services; and
WHEREAS, based upon evidence provided, the City Council hereby determines that
Attachment 3
the development services fees set forth in the Schedule of Fees and Charges attached
hereto and incorporated herein by reference will not exceed the estimated reasonable cost of
providing the property development services for which the fee is charged; and
WHEREAS, the proposed fees are statutorily and categorically exempt from the
requirements of the California Environmental Quality Act since these fees fit within the statutory
exemptions for local agency decisions involving the adoption and collection of rates, tolls and
other charges, pursuant to Public Resources Code Section 21 080(b) (8) and Section 15273 of the
California Environmental Quality Act Guidelines.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Azusa,
California does hereby find, determine and declare as follows:
SECTION 1. Adoption of Schedule of Fees. The City Council hereby approves and
adopts the Schedule of Fees and Charges attached hereto as Exhibit "C" and incorporated herein
by reference. The adopted fee schedule shall supersede any fees and charge schedule
previously adopted.
SECTION 2. Repeal of Prior Resolution. Resolution No. 2019-C01 is hereby repealed in
its entirety.
SECTION 3. Findings. The City Council finds that the fees and charges set forth in the
Schedule attached as Exhibit "A": (1) have a reasonable relationship with the City's costs in
providing those services; and (2) are necessary to enable the City to continue providing the
services to which they relate.
SECTION 4. Effective Date. This Resolution shall become effective sixty (60) days from
its adoption.
PASSED, APPROVED and ADOPTED this 22nd day of January, 2020.
________________________________________
Joseph Romero Rocha
Mayor
ATTEST:
___________________________________
Jeffrey Lawrence Cornejo, Jr.
City Clerk
Attachment 3
I HEREBY CERTIFY that the foregoing Resolution No. 2019-CX was duly adopted by the City
Council of the City of Azusa, at a regular meeting of said City Council held on the 21st day of January
2020, by the following vote of the Council:
AYES: COUNCILMEMBERS: TBD
NOES: COUNCILMEMBERS: TBD
ABSTAIN: COUNCILMEMBERS: TBD
ABSENT: COUNCILMEMBERS: TBD
___________________________________
Jeffrey Lawrence Cornejo, Jr.
City Clerk
APPROVED AS TO FORM:
___________________________________
Marco Martinez
City Attorney Best Best & Krieger, LLP
ATTACHMENT 4
Description Reason For Establishing Fees
1)
2)
3)
4)
5)
6)
7)
8)
9)$68
S-106 AMI Opt-Out Fees: - g) iii Monthly
Opt-Out Fee (Low-Income)
These charges are related to the costs of
providing and reading disabled two-way radio
communication meters.
S-131H Water System Development Fee:
f) Accessory dwelling units less than 750
Sq Ft
To recover cost of Engineer time and
administrative assessment by Watermaster.
S-131J Water Capacity Fee: e) Accessory
dwelling units less than 750 Sq Ft
One time impact fee to connect to the water
system for Accessory dwelling units.
Police Section #79 - Fire Arm Storage
Processing Fee: Levy upon release of
firearm.
AB2431 allows administrative fees may be
charged for storage and processing of firearms.
$5
$700
$300
$50
23 (Bldg) Construction and Demolition
Administrative Fees: All tenant
improvements with a valuation of up to
$25,000: and all residential additions.
This fee is established for recovery of staff time
in reviewing documents mandated by the State
of California's Green Building Standards Code.
Effective January 1, 2011, California’s Green
Building Standards Code, Section 4.408 and
5.408, required the diversion/recycling of at
least 50% of the construction waste during most
new construction projects. Subsequent
amendments to the legislation have expanded
the types of construction and increased
diversion/recycling requirement to 65%. The
proposed ordinance would require the owners
or developers of certain construction or
demolition projects within the City, which are
greater than 1,000 square feet, to develop and
adhere to a Construction Waste Management
Plan (CWMP).
$40/Hr
Table 1 - Summary of Proposed New Fees
S-106 f) Misc. Collection Fee The 24% fee is the cost that the Utility incurs
when an account is written off to the collection
agency. The fee will be assessed on all closed
accounts that remain unpaid 20 days from the
rendering of the final billing statement.
S-106 AMI Opt-Out Fees: g) i-One-time
initial set-up charge
Added per the Utility's Rules and Regulations
pertaining to the new AMI meters, when
customers opt out.
24% will be assessed on all closed
accounts that remain unpaid
$75
S-48.1 Rental of Civic Center Auditorium:
f) Custodial Services
Clean up costs for facility use.
Fee
S-106 AMI Opt-Out Fees: - g) ii Monthly
Opt-Out Fee
Provided the option to not have an AMI meter
installed at their location for an additional cost
each month.
$10
ATTACHMENT 4
Description Reason For Establishing Fees
Table 1 - Summary of Proposed New Fees
Fee
10)
11)
12)
23 (Bldg) Construction and Demolition
Administrative Fees: All tenant
improvements with a valuation of
$25,001 to $50,000, and all single family
residential new constructions.
23 (Bldg) Construction and Demolition
Administrative Fees: All tenant
improvements with a valuation greater
than $50,000; all multifamily,
commercial, and industrial projects, and
all other projects.
10 (Comm Improve) Impound and
Storage Fee (Non-Automobile)
$100
$135
Actual Costs
This fee is established for recovery of staff time
in reviewing documents mandated by the State
of California's Green Building Standards Code.
Effective January 1, 2011, California’s Green
Building Standards Code, Section 4.408 and
5.408, required the diversion/recycling of at
least 50% of the construction waste during most
new construction projects. Subsequent
amendments to the legislation have expanded
the types of construction and increased
diversion/recycling requirement to 65%. The
proposed ordinance would require the owners
or developers of certain construction or
demolition projects within the City, which are
greater than 1,000 square feet, to develop and
adhere to a Construction Waste Management
Plan (CWMP).
Actual costs of removal of unlawful property
such as containers/roll of operated and illegally
staged in the Azusa jurisdiction.
This fee is established for recovery of staff time
in reviewing documents mandated by the State
of California's Green Building Standards Code.
Effective January 1, 2011, California’s Green
Building Standards Code, Section 4.408 and
5.408, required the diversion/recycling of at
least 50% of the construction waste during most
new construction projects. Subsequent
amendments to the legislation have expanded
the types of construction and increased
diversion/recycling requirement to 65%. The
proposed ordinance would require the owners
or developers of certain construction or
demolition projects within the City, which are
greater than 1,000 square feet, to develop and
adhere to a Construction Waste Management
Plan (CWMP).
ATTACHMENT 4
Description Current Fee Proposed Fee Reason For Increase
1)$130 $200
2)$1,000 $1,200
3)$3,500 $4,000
4)$4,000 $4,500
5)$7,500 $8,000
6)$9,500 $10,000
7)$7,500 $8,000
8)$9,500 $10,000
9)$10,500 $11,000
10)$11,500 $12,000
11)$12,500 $13,000
12)$3,200 $3,500
13)$134 $140
14)$27 $30
15)$3,770 $4,000S-131H Water System Development Fees:
e) Park - Flat Fee
To recover cost of engineer labor time and
higher administrative assessment by
Watermaster.
S-131B Water Disconnection From The
Mainline (Deposit)
To account for cost of materials such as copper
and brass fittings as well as paving asphalt for
installation.
S-116 Annual Backflow Device Inspection
Review: Water Improvement Inspection
(Per Hour)
To recover Inspection labor costs.
S-116 Annual Backflow Device Inspection
Review: Will-Serve Letter
To recover inspection and engineering labor
costs.
S-131C Fire Service Installation: c) 8"
Deposit
To account for cost of materials such as copper
and brass fittings as well as paving asphalt for
installation.
S-131C Fire Service Installation: d) 10"
Deposit
To account for cost of materials such as copper
and brass fittings as well as paving asphalt for
installation.
S-131C Fire Service Installation: e) 12"
Deposit
To account for cost of materials such as copper
and brass fittings as well as paving asphalt for
installation.
S-114 New Water Service Installation: d)
6" Deposit
To account for cost of materials such as copper
and brass fittings as well as paving asphalt for
installation.
S-131C Fire Service Installation: a) 4"
Deposit
To account for cost of materials such as copper
and brass fittings as well as paving asphalt for
installation.
S-131C Fire Service Installation: b) 6"
Deposit
To account for cost of materials such as copper
and brass fittings as well as paving asphalt for
installation.
S-114 New Water Service Installation: a)
3/4" to 1" Deposit
To account for cost of materials such as copper
and brass fittings as well as paving asphalt for
installation.
S-114 New Water Service Installation: b)
2" Deposit
To account for cost of materials such as copper
and brass fittings as well as paving asphalt for
installation.
S-114 New Water Service Installation: c)
4" Deposit
To account for cost of materials such as copper
and brass fittings as well as paving asphalt for
installation.
S-112 Temporary Meter Rental Services:
b) Deposit
To recover the actual cost of meter which has
gone up in price.
Table 2 - Summary of Proposed Fees to Increase more than 3.0% CPI
S-112 Temporary Meter Rental Services:
a) Meter Fee (Per each meter)
To recover the actual cost of meter which has
gone up in price. Typical hydrant meters are
installed for longer than 12 months.
Description Current Fee Proposed Fee Reason For Increase
Table 2 - Summary of Proposed Fees to Increase more than 3.0% CPI
16)$3,600 $4,000
17)$1,650 $2,000
18)$135 $150S-072A Booking Services Per Government Code 29550-29550.3, agencies
are allowed to recover actual administrative
costs associated with processing individuals
through jail.
S-131I Water System Annexation Fees: d)
School
To recover cost of engineer labor time and
higher administrative assessment by
Watermaster.
S-131I Water System Annexation Fees: e)
Park
To recover cost of engineer labor time and
higher administrative assessment by
Watermaster.
ATTACHMENT 4
Description Current Fee Proposed Fee Reason For Deleting Fee
1)$20 $0
Table 3 - Summary of Proposed Fee to Delete
S-025 Accident Report Investigation Obsolete due to lack of assessment of this fee