Loading...
HomeMy WebLinkAboutAgenda Packet - June 26, 2006 - UB AZUSA t"W) LIGHT 6 WATER INFORMATION ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: 1 OSEPH F. HSU, DIRECTOR OF UTILITIES L2T iL tg-71 DATE: JUNE 26, 2006 SUBJECT: QUARTERLY FUEL COST ADJUSTMENT FOR SAN JUAN RESOURCE On July 26, 2004, the Utility Board approved a fuel cost adjustment mechanism for San Juan power plant. This mechanism is intended to credit customers with cost savings that are realized when our power plant operates reliably and replacement power costs are avoided, and conversely, allow the Utility to increase revenues to recover a portion of our replacement power costs when the San Juan resource experiences outages. This report encompasses replacement power costs incurred for the San Juan resource during the period of March 16, 2006 through June 15, 2006. There will be a Fuel Cost Adjustment of 0.81 cents per kWh on customer electric billings for the billing period of July 1, 2006 through September 30, 2006. The San Juan unit #3 availability during the period of March 16, 2006 through June 15, 2006 was 66% substantially lower than the budgeted availability of 85%. The lower availability is expected and mainly due to the scheduled maintenance outage from March 31 through April 26 idling the unit completely. Excluding the effect of scheduled maintenance, the availability would have been 92%. The cost of replacement power as about 10% higher than the budgeted cost ($44/MWh actual vs. $40/MWh budget). The total replacement power cost incurred above the budgeted amount for the period is $614,739 for quarterly fuel cost adjustment recovery. The Fuel Cost Adjustment rate will be 0.81 cents per kWh or about 7% of the retail rate. This rate will be applicable for electric bills rendered commencing July 1 through September 30, 2006. Prepared by: Bob Tang, Assistant Director of Resource Management Attachmenti( d1) �j} U c° )11 k SJ_FCA_cak Q306. pdf 145) 114 San Juan Fuel Cost Adjustment Calculation for Q3 2006 Mar 16-April May June (*) Actual SJ Output 12,387 18,891 9,653 Actual SJ Replac Energy Cost $868,417 $85,191 $40,686 Maximum Output 31,987 20,832 10,440 Unavailable SJ Output 19,600 1,941 787 % Outage Rate 61.27% 9.32% 7.54% Base SJ Output @ 85% 27,189 17,707 8,874 Unavailable SJ Output 4,798 3,125 1,566 % Outage Rate 15.00% 15.00% 15.00% Base SJ Replac Energy Cost @$40/MWh $191,922 $124,992 $62,640 Actual- Base SJ Replac Energy Cost $676,495 -$39,801 -$21,954 San Juan Insurance Premium Recovery $0 $0 $0 San Juan Insurance Payout $0 $0 $0 Cumulative Quarterly Difference (CQD) $614,739 Q3 2005 Carry-Over If KCQD)I<$100,000, then adjustment=0 If KCQD)I>$750,000, then adjustment=+-$750,000 or else adjustment= CQD $614,739 July August September Forecast Retail Sales(MWh) 25,648 25,233 25,116 SJ FCA for Q3 2006 (cents/KWh) 0.81 (*) Through June 15th, 2006 Fmg M. e or, 12IE 21 1