Loading...
HomeMy WebLinkAboutAgenda Packet - September 26, 2005 - UB ,., a ._. ,....m..._.,,..,.. ..._._,. ,. ._, m...,. _:..,.,.....,...:s...,.ae.w..,z.........A..... ._...,., _ .....,..._.. .,,,,,_.� ...._;..�s.�,�.tay.,.__,.,.�.:.,.A.W,,.�:., .s.,A.Mw � AZUSA 'raw C _ EIGHT 8 WATE& INFORMATION ITEM TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD AND AZUSA CITY COUNCIL FROM: JOSEPH F. HSU, DIRECTOR OF UTILITIES �T JUd h717444- DATE: SEPTEMBER 26, 2005 SUBJECT: QUARTERLY FUEL COST ADJUSTMENT FOR SAN JUAN RESOURCE On July 26, 2004, the Utility Board approved a fuel cost adjustment mechanism for San Juan power plant. This mechanism is intended to credit customers with cost savings that are realized when our power plant operates reliably and replacement power cost are avoided, and conversely, allow the Utility to increase revenues to recover a portion of our replacement power costs when the San Juan resource experiences outages. This report encompasses replacement power costs incurred for the San Juan resource during the period of June 16, 2005 through September 15, 2005. There will be no Fuel Cost Adjustment on customer electric billings for the billing period of October 1, 2005 through December 31, 2005. The San Juan unit #3 availability during the period of June 16 through September 15, 2005 was 88%, 3% higher than the budgeted availability. However, the cost of replacement power was considerably higher than the budgeted cost ($58.2/MWh actual vs $40/MWh budget) reflecting a much higher energy commodity price environment in general during this period. The total replacement power cost incurred above the budgeted amount for the period is $65,395 which is lower than the minimum threshold amount of$100,000 for quarterly fuel cost adjustment recovery. The amount of $65,395 will be carried over to the first quarter of 2006 for recovery if applicable. Prepared by: Bob Tang, Assistant Director of Resource Management Attachment: / Ck. ory� San]uanFuelCostAdj .pdf /./_ t/ ir 055 San Juan Fuel Cost Adjustment Calculation for Q4 2005 June16-July August September (*) Actual SJ Output 26,372 21,275 10,640 Actual SJ Replac Energy Cost $378,984 $71,662 $12,189 Maximum Output 33,120 22,320 10,800 Unavailable SJ Output 6,748 1,045 160 % Outage Rate 20.37% 4.68% 1.48% Base SJ Output @`85% 28,152 18,972 9,180 Unavailable SJ Output 4,968 3,348 1,620 Outage Rate 15.00% 15.00% 15.00% Base SJ Replac Energy Cost @$40/MWh $198,720 $133,920 $64,800 Actual - Base SJ Replac Energy Cost $180,264 -$62,258 -$52,611 San Juan Insurance Premium Recovery $0 $0 $0 San Juan Insurance Payout $0 $0 $0 Cumulative Quarterly Difference (CQD) $65,395 Q2 Carry-Over If ((CQD) <$100,000, then adjustment=0 If I(COD)I>$750,000, then adjustment=+-$750,000 or else adjustment = CQD $0 October November December Forecast Retail Sales (MWh) 23,374 19,400 20,200 SJ FCA for Q4 2005 (cents/KWh) 0.00 (*) Through September 15th, 2005