Loading...
HomeMy WebLinkAboutResolution No. 2020-C02RESOLUTION NO. 2020-0O2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, APPROVING AND ADOPTING A REVISED SCHEDULE FOR CERTAIN DEVELOPMENT PROJECT FEES AND SERVICE CHARGES WHEREAS, under the police power granted by Article XI, Section 7 of the California Constitution, the City of Azusa is authorized to impose fees, charges and rates for certain municipal services; and WHEREAS, in addition to the authority granted by the California Constitution, Chapter 8 (commencing with section 66016) of Division 1 of Title 7 of the California Government Code establishes a procedure for adopting fees or service charges for development projects; and WHEREAS, pursuant to Resolution No. 2020-001, adopted on January 22, 2019, the City currently imposes development related fees upon applicants to recover the costs of staff time, inspection, copying costs and other expenses related to the review and processing of applications for property development; and WHEREAS, many of the City's current fees charged for development services no longer reflect the actual cost ofproviding such services; and WHEREAS, Government Code sections 66016 and 66018 provide that the City may adopt new development fees or increase existing fees after providing notice and holding a public hearing; and WHEREAS, notice of a public hearing on the establishment of new and revised fees was published in accordance with provisions of section 6062a of the California Government Code; and WHEREAS, notice of public hearing was mailed to all interested parties who filed a written request for a mailed notice with the City, or a waiver of notice was obtained; and WHEREAS, on January 21 st, 2020, at the time and place specified in the published and mailed notices, the City Council held a public hearing as required by law to allow oral or written presentations prior to levying new development fees or service charges and prior to approving an increase in existing development fees or service charges; and WHEREAS, at least ten (10) days prior to the commencement of the hearing, there was made available to the public a report containing the cost, or estimated cost, of providing the service for which the fee or service charge will be levied, and the revenue sources for providing such services; and WHEREAS, based upon evidence provided, the City Council hereby determines that 1*00, v the development services fees set forth in the Schedule of Fees and Charges attached hereto and incorporated herein by reference will not exceed the estimated reasonable cost of providing the property development services for which the fee is charged; and WHEREAS, the proposed fees are statutorily and categorically exempt from the requirements of the California Environmental Quality Act since these fees fit within the statutory exemptions for local agency decisions involving the adoption and collection of rates, tolls and other charges, pursuant to Public Resources Code Section 21 080(b) (8) and Section 15273 of the California Environmental Quality Act Guidelines. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Azusa, California does hereby find, determine and declare as follows: SECTION 1. Adoption of Schedule of Fees. The City Council hereby approves and adopts the Schedule of Fees and Charges attached hereto as Exhibit "C" and incorporated herein by reference. The adopted fee schedule shall supersede any fees and charge schedule previously adopted. SECTION 2. Reveal of Prior Resolution. Resolution No. 2020 -COI is hereby repealed in its entirety. SECTION 3. Findings. The City Council finds that the fees and charges set forth in the Schedule attached as Exhibit "A": (1) have a reasonable relationship with the City's costs in providing those services; and (2) are necessary to enable the City to continue providing the services to which they relate. SECTION 4. Effective Date. This Resolution shall become effective sixty (60) days from its adoption. PASSED, APPROVED and ADOPTED this 215` day of January, 2020. / J seph komero Rocha Mayor q : �g omejo, Jr. I HEREBY CERTIFY that the foregoing Resolution No. 2020 -CO2 was duly adopted by the City Council of the City of Azusa, at a regular meeting thereof held on the 21" day of January 2020, by the following vote of the Council: AYES: COUNCILMEMBERS: GONZALES, MACIAS, ROCHA NOES: COUNCILMEMBERS: ALVAREZ ABSENT: COUNCILMEMBERS: CARRILLO J a wr Cornejo, Jr. ity Clerk APPROVED AS TO FORM: .-P. k -41 - Best est &Krieger, LP City Attorney CITY OF AZUSA SCHEDULE OF FEES AND CHARGES Adopted on January 21, 2020 City of Azusa Schedule of Fees and Charges Table of Contents Proposed on January 21, 2020 No. Description Pages 1 Building and Safety 3-15 2 Planning 16-18 3 Engineering 19-20 4 Utilities 21-24 5 Community Improvement 25 6 Fire Safety 26 7 Police 27-30 8 Adult Businesses 31 9 Business License 32 30 Community Resources 33-36 11 Recreation Facilities Rentals 37-39 12 Transportation 40 13 Library 41 14 GIS Maps 42 15 Administrative Processing 43 2 No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 Svc Area Item �8 S1 I Mh City of Azusa Schedule of Fees and Charges (Development -Related) VW BUILDING AND SAFETY Adopted Adopted 1/22/2019 1/21/2020 Cost Per CPI Cost Per S.F. Avg. Sept'19'20 S.F. Avg. Notes Building Valuation Apartment Houses: Type I Or II F.R. $150.42 3.00% $154.94 Good $185.19 3.00% $190.74 Type V - Masonry (Or Type 111) $122.78 3.00% $126.47 Good $150.42 3.00% $154.94 Type V- Wood Frame $108.19 3.00% $111.44 Good $139.06 3.00% $143.24 Type l - Basement Garage $63.43 3.00% $65.33 Auditoriums: Type I Or II F.R. $177.72 3.00% $183.05 Type 11-1 Hour $128.72 3.00% $132.58 Type 11-N $121.76 3.00% $125.41 Type 111-1 Hour $135.33 3.00% $139.39 Type III - N $128.38 3.00% $132.23 Type V-1 Hour $129.40 3.00% $133.28 Type V - N $120.74 3.00% $124.36 Banks: Type I Or 11 F.R. $251.16 3.00% $258.69 Type 11.1 Hour $185.02 3.00% $190.57 Type ll- N $179.08 3.00% $184.46 Type 111-1 Hour $204.18 3.G0% $210.31 Type III - N $196.89 3.00% $202.79 Type V-1 Hour $185.02 3.00% $190.57 Type V - N $177.21 3.00% $182.53 Bowling Alleys: Type 11-1 Hour $86.48 3.00% $89.08 Type 11- N $80.72 3.00% $83.14 Type 111 - 1 Hour $94.12 3.00% $96.94 Type III - N $88.02 3.00% $90.66 Type V -1 Hour $63.43 3.00% $65.33 Churches: Type I Or 11 F.R. $168.23 3.00% $173.27 Type 11-1 Hour $126.35 3.00% $130.14 Type 11- N $120.07 3.00% $123.67 Type III - 1 Hour $137.36 3.00% $141.48 Type III - N $131.26 3.00% $135.20 Type V -1 Hour $128.38 3.00% $132.23 Type V - N $120.74 3.00% $124.36 Convalescent Hospitals: Type I Or 11 F.R. $236.07 3.00% $243.15 Type 11-1 Hour $163.82 3.00% $168.74 Type III - 1 Hour $167.89 3.00% $172.92 Type V-1 Hour $158.23 3.00% $162.98 Dwellings: Type V - Masonry $128.38 3.00% $132.23 Good $164.33 3.00% $169.26 Type V - Wood Frame $114.13 3.00% $117.56 Good $156.71 3.00% $161.41 Basements - Semi -Finished $34.09 3.00% $35.11 3 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 City of Azusa Schedule of Fees and Charges (Development -Related) BUILDING AND SAFETY 4D Adopted Adopted 1/22/2019 1/21/2020 Svc Area Cost Per CPI Cost Per Rem # Description S.F. Avg. Sept'19220 S.F. Avg. Notes Good $39.33 3.00% $40.51 Unfinished $24.76 3.00% $25.50 Goad $30.01 3.00% $30.91 Fire Station: Type I Or II F.R. $194.01 3.00% $199.83 Type 11-1 Hour $127.70 3.00% $131.53 Type ll- N $120.41 3.00% $124.02 Type 111-1 Hour $139.74 3.00% $143.93 Type 111-N $133.80 3.00% $137.82 Type V-1 Hour $131.09 3.00% $135.02 Type V - N $124.31 3.00% $128.04 Homes For The Elderly: Type I Or II F.R. $175.86 3.00% $181.14 Type 11-1 Hour $142.79 3.00% $147.08 Type II - N $136.69 3.00% $140.79 Type III - 1 Hour $148.73 3.00% $153.19 Type III - N $142.62 3.00% $146.90 Type V-1 Hour $143.64 3.00% $147.95 Type V - N $138.72 3.00% $142.88 Hospitals: Type I Or II F.R. $276.76 3.00% $285.07 Type III -1 Hour $229.11 3.00% $235.98 Type V - 1 Hour $218.60 3.00% $225.15 Hotels And Motels: Type 1 Or 11 F.R. $171.28 3.00% $176.42 Type III - 1 Hour $148.39 3.00% $152.84 Type III - N $141.43 3.00% $145.68 Type V-1 Hour $129.22 3.00% $133.10 Type V - N $126.68 3.00% $130.48 Industrial Plants: Type I Or II F.R. $96.49 3.00% $99.39 Type 11-1 Hour $67.16 3.00% $69.17 Type II - N $61.73 3.00% $63.58 Type III -1 Hour $73.94 3.00% $76.16 Type III - N $69.70 3.00% $71.79 Tilt -Up $50.88 3.00% $52.40 Type V -1 Hour $69.70 3.00% $71.79 Type V - N $63.76 3.00% $65.68 Jails: Duces Tecum Subpoena Processing $269.81 3.00% $277.91 Type III -1 Hour $246.75 3.00% $254.15 Type V - I Hour $185.02 3.00% $190.57 Libraries: Type I Or II F.R. $197.40 3.00% $203.32 Type II - 1 Hour $144.49 3.00% $148.82 Type II - N $137.36 3.00% $141.49 Type III -1 Hour $152.63 3.00% $157.21 Type III - N $145.00 3.00% $149.35 Type V -1 Hour $143.30 3.00% $147.60 Type V - N $137.36 3.00% $141.49 Medical Offices: 4 No 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 City of Azusa Schedule of Fees and Charges (Development -Related) BUILDING AND SAFETY 0 Adopted Adopted 1/22/2019 1/21/2020 Svc Area Cost Per CPI Cost Per Item p Description S.F. Avg. Sept'19.70 S.F. Avg. Notes Type I Or II F.R. $202.66 3.00% $208.73 Type 11-1 Hour $156.36 3.00% $161.05 Type II - N $148.56 3.00% $153.01 Type III - 1 Hour $169.59 3.00% $174.67 Type III - N $157.88 3.00% $162.62 Type V - 1 Hour $152.97 3.00% $157.56 Type V - N $147.54 3.00% $151.97 Offices Type I Or II F.R. $181.12 3.00% $186.55 Type II -1 Hour $121.25 3.00% $124.89 Type 11-N $115.49 3.00% $118.95 Type Ill -1 Hour $130.92 3.00% $134.85 Type Ill - N $125.15 3.00% $128.91 Type V-1 Hour $122.61 3.00% $126.29 Type V - N $115.49 3.00% $118.95 Private Garages: Picnic Shelter Application Rental (Alisal Park): $41.21 3.00% $42.45 Masonry $46.47 3.00% $47.86 Open Carports $28.15 3.00% $29.00 Public Buildings: Type Or F.P. $209.27 3.00% $215.55 Type II - 1 Hour $169.59 3.00% $174.67 Type 11-N $162.12 3.00% $166.99 Type Ill -1 Hour $176.03 3.00% $181.31 Type Ill - N $169.93 3.00% $175.02 Type V-1 Hour $161.11 3.00% $165.94 Type V - N $155.34 3.00% $160.00 Public Garages: Type I Or II F.R. $82.93 3.00% $85.42 Type I Or II Open Parking $62.24 3.00% $64.11 Type II - N $47.48 3.00% $48.91 Type III -1 Hour $62.75 3.00% $64.63 Type 111-N $55.79 3.00% $57.47 Type V -1 Hour $57.15 3.00% $58.86 Restaurants Type III -1 Hour $165.18 3.00% $170.13 Type III - N $159.58 3.00% $164.37 Type V - 1 Hour $151.27 3.00% $155.81 Type V - N $145.34 3.00% $149.70 Schools: Type I Or II F.R. $188.58 3.00% $194.24 Type 11-1 Hour $128.72 3.00% $132.58 Type III - 1 Hour $137.70 3.00% $141.83 Type III - N $132.45 3.00% $136.42 Type V - 1 Hour $129.05 3.00% $132.93 Type V - N $123.12 3.00% $126.81 Service Stations: Type II - N $113.96 3.00% $117.38 Type III - 1 Hour $118.88 3.00% $122.45 Type V-1 Hour $101.24 3.00% $104.28 Canopies $47.48 3.00% $48.91 Svc Area No. 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 City of Azusa Schedule of Fees and Charges (Development -Related) BUILDING AND SAFETY Adopted Adopted 1/22/2019 1/21/2020 Cost Per CPI Cost Per Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes Stores: Type I Or II F.R. $139.74 3.00% $143.93 Type II -1 Hour $85.47 3.00% $88.04 Type II - N $83.61 3.00% $86.11 Type 111-1 Hour $103.96 3.00% $107.07 Type III - N $97.51 3.00% $100.44 Type V-1 Hour $87.51 3.00% $90.13 Type V - N $80.89 3.00% $83.32 Town Homes: Type V - Masonry $146.88 3.00% $151.29 Type V - Wood Frame $140.07 3.00% $144.27 Garage- Wood Frame $57.16 3.00% $58.87 Garage -Masonry $63.43 3.00% $65.33 Theaters: Type I Or II F.P. $186.21 3.00% $191.79 Type III - 1 Hour $135.67 3.00% $139.74 Type III - N $129.22 3.00% $133.10 Type V - 1 Hour $127.70 3.00% $131.53 Type V - N $120.75 3.00% $124.37 Warehouses: Type I Or II F.R. $83.78 3.00% $86.29 Type I Or V - 1 Hour $49.69 3.00% $51.18 Type I Or V - N $46.64 3.00% $48.04 Type III - 1 Hour $56.30 3.00% $57.99 Type III - N $53.59 3.00% $55.20 Equipment: Air Conditioning Commercial $7.12 3.00% $7.34 Residential $5.94 3.00% $6.11 Sprinkler Systems $4.41 3.00% $4.54 Other Valuations Reroof Asphalt And Comp - per square foot of material $272.86 3.00% $281.05 Built-up- per square foot of material $298.91 3.00% $297.58 Light -weight tile- per square foot of material $746.35 3.00% $768.74 Concrete Tile Or Slate Tile- per square foot of material $898.83 3.00% $925.80 Metal Shingles- per square foot of material $568.19 3.00% $585.24 Wood Shake- per square foot of material $345.09 3.00% $355.44 Wood Shingle- per square foot of material $332.25 3.00% $342.21 Railed Roofing - minimum 300 Sq.Ft. allowed on patio covers only $1,605.06 3.00% $1,653.21 Tear off and re -sheath - per square foot of material $160.51 3.00% $165.32 Tenant Improvements General Commercial $41.73 3.00% $42.98 Restaurants $48.15 3.00% $49.60 Medical Offices $49.76 3.00% $51.25 Retaining Walls -Concrete Block 6" $12.45 3.00% $12.82 8" $13.78 3.00% $14.19 12" $16.89 3.00% $17.40 Masonry Fireplace - Minimum Valuation $5,088.03 3.00% $5,240.67 Foundation Permits - Based On 1/3 The Overall Valuation Of The Bldg Permit 6 Svc Area No. Item 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 City of Azusa Schedule of Fees and Charges (Development -Related) BUILDING AND SAFETY at Adopted Adopted 1/22/2019 1/21/2020 Cost Per CPI Cost Per Description S.F. Avg. Sept'19-70 S.F.Avg. Notes These Figures Shall Be Used When The Applicant Does Not Have A Valuation, Orlf The Valuation Given Is Obviously Low. Factory Built Fireplace- Minimum Valuation $1,696.55 3.00% $1,747.44 Signs S Side: a) Painted $65.80 3.00% $67.78 b) Electrical $126.80 3.00% $130.60 2 Sides: a) Painted $77.04 3.00% $79.35 b) Electrical $160.51 3.00% $165.32 Pole /Lineal Foot plus square foot of sign: a)3" 0 $54.57 3.00% $56.21 b)4" 0 $77.04 3.00% $79.35 c)6" 0 $99.51 3.00% $102.50 d) 8" 0 $123.59 3.00% $127.30 e) 30" 0 $146.06 3.00% $150.44 IQ 12" 0 $166.93 3.00% $171.93 Photovoltaic Systems Permit And plan check fees for photovoltaic systems shall be assessed at 45% of the fee generated by the declared valuation and the per unit electrical item cost Residential 15 kW Or Less=$500 or 45% of the fee generated by the declared valuation, whichever is less. Residential more than 15 kW=$500+ 15 Per kW over 15 or 45% of the fee generated by the declared valuation, whichever is less - Commercial 50 kW or less = $1,000 or 45% of the fee generated by the declared valuation, whichever is less. Commercial more than 50 kw - 250 kw = $500 +$7 per kW above 50 kW or 45% of the fee generated by the declared valuation, whichever is less. Commercial more than 250 kW = $2,400 + 5 kW above 250 kW or 45% of the fee generated by the declared valuation, whichever is less. Swimming Pools Valuation based on actual construction cast. Permit fees same as building permits. Minimum Valuation: $21,186.76 3.00% $21,822.37 Spas Minimum Valuation Prefabricated $4,237.35 3.00% $4,364.47 Gunite $8,506.81 3.00% $8,762.01 Surcharge Fees Optical Records System - Per Permit $15.77 n/a $15.77 # General Plan Maintenance -10% Permit Surcharge To Recover 50% Of Costs 10% 10% # Permit Automation Fee $0.00 n/a $0.00 # Technology Enhancement (5% of permit and plan check fee -$30 minimum) 5% 5% 7 City of Azusa Schedule of Fees and Charges (Development -Related) BUILDING AND SAFETY Adopted 1/22/2019 Svc Area Cost Per CPI Cost Per City of Azusa Schedule of Fees and Charges (Development -Related) BUILDING AND SAFETY Adopted 1/22/2019 Svc Area Cost Per No. Item tl Description S.F. Avg. S-3 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 Electrical Permit Fees Area Fee Rate -Single Family Dwellings (Rate X Area/Sq Ft) Unit Fee Schedule (Note: Does Not Include Permit Issuance Fee) Receptacle, Switch and Lighting, or other. For receptacle, switch lighting, smoke detectors, or other outlets, at which current is used or controlled except services, feeders and meter: First 20, each Additional outlets, each (Note: For multi -outlet assemblies, each 5 ft. or fraction maybe considered as 1 outlet.) Lighting Fixtures For lighting fixtures, sockets, or other lamp holding devices: First 20, each Additional fixtures, each For pole or platform mounted lighting fixtures, each For theatrical -type lighting fixtures or assemblies, each CPI Cost Per V19220 S.F. Avg. Notes $0.12 3.00% $0.13 $1.91 3.00% $1.97 $1.27 3.00% $1.31 $1.91 3.00% $1.97 $1.27 3.00% $1.31 $1.91 3.00% $1.97 $1.91 3.00% $1.97 Residential Appliances For fixed residential appliances or receptacle outlets for same, including wall- $8.91 3.00% $9.18 mounts, electric ovens, counter -mounted cooking tops, electric ranges, self- contained room, console, or through -wall air conditioners, space heaters, food waste grinders, dishwasher (Note: For other types of air conditioners and other motor -driven appliances having larger electrical ratings, see Power Apparatus) Temporary Power Service For a temporary service power pole or pedestal, including all pole or pedestal $38.15 3.00% $39.30 mounted receptacle outlets and appurtenances, each For a temporary distribution system and temporary lighting and receptacle outlets $17.80 3.00% $18.33 for construction sites, decorative lighting, Christmas tree sales lots, firework stands, sales booths, additional pole, etc., each Non -Residential Appliances For residential appliances and self-contained, factory -wired, non-residential $10.18 3.00% $10.48 appliances not exceeding one (1) horsepower (HP), kilowatt (KW), Or kilovolt - ampere (KVA) in rating, including medical and dental devices, food, beverage, and ice cream cabinets Power Apparatus For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, as follows: Rating in horsepower (HP), kilowatts (KW), kilovolt -amperes (KVA), Or kilovolt - amperes -reactive (KVAR) Up to and including 1, each $10.18 3.00% $10.48 Over 1 and not over 10, each $17.80 3.00% $18.33 Over 10 and not over 50, each $45.79 3.00% $47.17 Over 50 and not over 100, each $91.57 3.00% $94.32 Over 100, each $152.62 3.00% $157.20 9 City of Azusa Schedule of Fees and Charges (Development -Related) BUILDING AND SAFETY Adopted 1/22/2019 Svc Area Cost Per No. Item 8 Description S.F. Avg. 228 229 230 231 232 233 234 235 236 237 238 239 240 Note: 1. For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined rating may be used. Note: 2. Thesefees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment. Busways For trolley and plug-in type busways, each 100 feet or fraction thereof (Note: an additional fee will be required for lighting fixtures motors and other appliances that are connected to trolley and plug -In type busways.) Signs, Outline Lighting, And Marquees For signs, outline lighting systems, or marquees supplied from one branch circuit, each For additional branch circuits within the same sign outline lighting system, or marquee, each Services, Switchboards, Switchboard Sections, Motor Control Centers And Panelboards For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less & not over 200 amperes In rating, each. For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less and not over 200 amperes 1,000 amperes in rating, each For services, switchboards, switchboard sections, motor control centers and panelboards over 600 volts or over 1,000 amperes in rating, each Miscellaneous Apparatus, Conduits And Conductors For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth (Note: This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment. Private Swimming Pools For new private, residential, inground swimming pools for single, or multi -family occupancies, including a complete system of necessary branch circuit wiring, bonding, grounding underwater lighting, water pumping and other similar electrical equipment For other types of swimming pools, therapeutic whirlpools, spas, hot tubs and alterations to existing swimming pools, each Carnivals And Circuses Carnivals, circuses and other traveling shows or exhibitions utilizing transportable - type rides, booths, displays and attractions. For electrical generators and electrical driven rides, each For mechanically driven rides and walk-through attractions or displays having electric lighting, each For a system of area and booth lighting, each For permanently installed rides, booths, displays, and attractions Other Inspections For Inspectian Of Electrical Equipment For Which No Fee Is Herein Set Forth, The Fee Shall Be Determined By The Building Official Adopted 1/21/2020 CPI Cost Per Sept'19220 S.F. Avg, Notes $25.44 3.00% $26.20 $38.15 3.00% $39.30 $12.71 3.00% $13.09 $38.15 3.00% $39.30 $76.32 3.00% $78.61 $178.07 3.00% $183.41 $38.15 3.00% $39.30 $76.32 3.00% $78.61 $50.88 3.00% $52.41 $38.15 3,00% $39.30 $15.26 3.00% $15.72 $15.26 3.00% $15.72 $15.26 3.00% $15.72 10 Svc Area No. Item S-4 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 160 261 162 263 264 265 City of Azusa Schedule of Fees and Charges (Development -Related) BUILDING AND SAFETY Adopted 1/22/2019 Cost Per H Description S.F. Avg. Plumbing Fees Each plumbing fixture or trap or set of fixtures an one trap (Including drainage, vent, water piping and backflow prevention devices therefore) Each permanent type dishwasher whether individually trapped or not Each industrial waste pretreatment interceptor including its trap & vent, except kitchen type grease interceptors functioning as fixtures traps Each swimming pool drainage trap & receptor whether connected to a building drain or building sewer (water supply for pool not included) Each gas piping system of 1 to 5 outlets or alteration or retest of existing gas piping system Each additional outlet over five Each gas pressure regulator other than appliance regulators Each water heater and/or vent Each solar potable water heating system, Including water heater/vent For repair or alteration of drainage and/or vent piping Each piece of water -treating equipment and/or water piping installed without accompanying plumbing Lawn sprinkler systems on 1 meter including backflow prevention devices Backflow prevention devices on unprotected water supplied, pools, tanks, vats, etc. (including Incidental water piping)1 to 5 Any swimming pool piping associated with the construction, remodeling or repair of a swimming pool, spa and hot tub Each additional device over five (5) Each building drain installed without accompanying plumbing For connection of a house sewer to a public sewer or the extension of a house lateral onto a lot for future use For each house sewer manhole Each installation of a section of house sewer for future use For the connection of each additional bldg. or work to house sewer For the connection of a house sewer to a private sewage disposal system For each private sewage disposal system (septic tank & seepage ph or pits and/or drainfield) For each cesspool, overflow seepage pit, percolation test pit, swimming pool drywell, or drainfield extension or replacement For disconnection, abandonment, alteration or repair of any house sewer or private sewage disposal system or part thereof g Annual inspection of fat, oil and grease $15.26 $15.26 $15.26 $15.26 $15.26 $3.82 $5.09 $15.26 $50.88 $15.26 $15.26 $15.26 $15.26 $42.39 $3.82 $15.26 $43.24 $43.24 $27.98 $27.98 $27.98 $89.03 $43.24 $27.98 $160.00 Adopted 1/21/2020 CPI Cost Per t'19-'20 S.F. Avg. Notes 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% n/a $15.72 $15.72 $15.72 $15.72 $15.72 $3.93 $5.24 $15.72 $52.41 $15.72 $15.72 $15.72 $15.72 $43.66 $3.93 $15.72 $44.54 $44.54 $28.82 $28.82 $28.82 $91.70 $44.54 $28.82 $160.00 11 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 City of AzusadM Schedule of Fees and Charges (Development -Related) BUILDING AND SAFETY Adopted Adopted 1/22/2019 1/21/2020 Svc Area Cost Per CPI Cost Per Item g Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes S-5 Mechanical Permit Fees Installation, alteration or relocation of each refrigeration compressor or absorption unit, & each fuel burning furnace, heater, boiler, and vented decorative appliance including vents attached thereto: Up to & Including 100,000 BTU $25.44 3.00% $26.20 More than 100,000 BTU to & including 1,000,000 BTU $50.88 3.00% $52.41 More than 1,000,000 BTU $127.18 3.00% $131.00 For each air inlet& air outlet served by any air conditioning system $4.46 3.00% $4.60 For each 1,000 sq.ft. or fraction thereof of conditioned area $35.62 3.00% $36.68 Note: when a permit is applied for and the total number of air inlets & air outlets is unknown, the fees shall be based on the sq.ft. of conditioned area. For the installation, relocation or replacement of each appliance vent installed and $12.71 3.00% $13.09 not included in an appliance permit For the installation or alteration of each air handling unit for air conditioning including ducts attached thereto: Up to & including 2,000 CFM - each unit up to 10 $12.71 3.D0% $13.09 Each unit over 10 $3.82 3.00% $3.93 More than 2,000 CFM to and including 10,000 CFM $38.18 3.00% $39.33 More than 10,000 CFM $63.59 3.00% $65.50 Note: this fee shall not apply to an air handling unit which is a portion of a factory assembled airconditioned appliance for which a permit is required elsewhere in this code. For each evaporative cooler other than portable type $20.35 3.00% $20.96 For required ventilation fans which serve a single register: Each fan up to 10 $15.26 3.00% $15.72 Each fan over 10 $5.09 3.00% $5.24 For each required ventilation system which is not a portion of any air conditioning $30.53 3.00% $31.44 system for which a permit is required elsewhere in this code For the installation or each commercial kitchen hood or spray booth served by $63.59 3.00% $65.50 mechanical exhaust, including the fans and ducts attached thereto For the installation of each fire damper $10.18 3.00% $10.48 Alteration of existing duct system where a permit is not required elsewhere $25.44 3.00% $26.20 Note: 1) far refrigeration system rating one horsepower, one ton, or 12,000 BTU per hoursholl mean the some quantity note: 2) forsteam boilers rated in boiler horsepower, one horsepower shall equal 50,000 BTU per hour 12 AMPA City of Azusa Schedule of Fees and Charges (Development-Related) BUILDING AND SAFETY Adopted Adopted 1/22/2019 1/21/2020 Svc Area Cost Per CPI Cost Per No. Item If Description S.F. Avg. Sept'19-'20 S.F. Avg. Notes Plan Check Fees 284 # Building Plan Check Fee -85%Of Permit Fee-$15.00 Minimum: Varies n/a Varies 285 If Electric Plan Check Fee - 80% Of Permit Fee-$15.00 Minimum: Varies n/a Varies 286 # Energy Plan Check Fee - 10% Of Building Permit Fee: Varies n/a Varies 287 # Mechanical Plan Check Fee -80%Of Permit Fee-$15.00 Minimum: Varies n/a Varies 288 # Plumbing Plan Check Fee -80%Of Permit Fee-$15.00 Minimum: Varies n/a Varies 289 Temporary Certificate of Occupancy (60 days) $450 $450 290 Parking Lot Resurface Inspection ($68 up to 10,000 sgare feet, $1 far each Varies Varies additional sq h) 291 Event Permit (1 hr minimum Insection time $93 plus plan check fee of $60.50 ) $154 $154 292 General Plan Update Fee (10%of Permit) Varies Varies # = Fees not automatically adjusted for CPI change. 13 City of Azusa Schedule of Fees and Charges (Development -Related) BUILDING AND SAFETY 0 Adopted Adopted Svc Area 1/22/2019 CPI 1/21/2020 No. Item 4 Description Fee/Unit Sept'1910 Fee/Unit Notes 1 S-045 Grading Plan Check Fee Variable 3.00% Variable <100 CY - $899 100 -1,000 CY - $916.71 Plus $14.84 Per 100 CY 1,000 -10,000 CY - $1050.24 Plus $78.42 Per 1,000 CY 10,000-50,000 CY - $1,756.06 Plus $18.02 Per 1,000 CY 50,000+ CY - $2,476.71 Plus $244.81 Per 10,000 CY 2 5-046 Grading Inspection Variable 3.00% Variable <100 CY-$358 100-1,000 CY- $365.62 Plus $50.87 Per 100 CY 1,000 -10,000 CY - $823.45 Plus $76.30 Per 1,000 CY 10,000 - 50,000 CY - $1,510.19 Plus $92.20 Per 1,000 CY 50,000+CY- $5,198.22 Plus $604.07 Per 10,000 CY 3 Grading Permit Fee- Based On Cubic Yards $186 3.00% $191 4 Permit Fee For Changes To Original Permit: <$20,000 $118 3.00% $122 $20,001 to $50,000 $118 3.00% $122 $50,001 to $75,000 $161 3.00% $166 $75,001 to $100,000 $245 3.00% $252 $100,001 to $200,000 $321 3.00% $331 $200,000 to $500,000 $415 3.00% $427 $500,001 and up $507 3.00% $522 5 Special Site Inspection: $93 3.00% $96 Commercial (Minimum 2 Hours) $186 3.00% $191 Residential (Minimum 2 Hour) $186 3.00% $191 Residential (Non -Habitable Space) (Minimum 2 Hours) $177 3.00% $182 6 Production Lot Plan Check- Per Lot $206 n/a $206 7 Occupancy Inspection Fee: 0-1 To 15,000 Sq Ft (1/2 Hour Of Technical Staff Time) $49 3.00% $51 15,000 Sq.Ft. On (1 Hour OFTechnical Staff Time) $93 3.00% $96 8 Bonds For Sign(s) (Refundable) $280 3.00% $288 9 Demolition Permit Fee (Minimum 1 Hour) $108 3.00% $111 30 Deputy Inspection Registration Fee (Deputy) $49 3.00% $51 11 Emergency Inspection Fee (Minimum 1 Hours) $152 3.00% $157 12 Hearing Officer Actual Cost Actual Cost 13 Pre -Plan Check Submittal (Minimum 2 Hours) $194 3.00% $199 14 Reinspection Fee (Minimum 1 Hour) $102 3.00% $105 15 Room Addition Plan Check Fee (Minimum 2 Hours) $194 3.00% $199 16 Trailer Coach $186 3.00% $191 17 Trash Enclosure - $10 for additional enclosure $75 3.00% $78 18 Relocation Of Buildings: 0 to 2,000 sq.ft. $438 3.00% $451 2,001 to 5,000 sq.ft. $822 3.00% $847 5,001 sq.ft. and up $1,184 3.00% $1,220 19 Plan Checking Fee: Staff rates assessed against deposit. Executive Staff - per hour $168 3.00% $173 14 [a] Fee set by State -City has to collect $4 for each business license applicant throught 12/31/23 (fee will reduce to $1 per business license applicant beginning 1/1/2024 per State Mandates) and pass it through to the State for construction related accessibility. [b] Proposed New Fees [c] Fee is associated with ordinance 2020-01 scheduled to go for Council approval on 1-21-20. The ordinance will amend chapter 14 of the City of Azusa Municipal Code, adding Article XVIII, Construction and Demolition Waste Recycling and Diversion. p = Fees not automatically adjusted for CPI change. 15 City of Azusa iy -ar Schedule of Fees and Charges (Development -Related) BUILDING AND SAFETY Adapted Adopted Svc Area 1/22/2019 CPI 1/21/2020 No. Item H Description Fee/Unit Sept'19'20 Fee/Unit Notes Professional Staff - per hour $121 3.00% 5124 Technical Staff (Plan Checker/Inspector) - per hour $102 3.00% $105 20 On -Site Improvement Inspections: $2,000 deposit required for parking lot paving and miscellaneous testing Professional Staff - Per Hour $121 3.00% $124 Rates applied against deposit Technical Staff -Per Hour $102 3.00% $105 Rates applied against deposit 21 Standard Plan Check Fee: Professional 5taff-Per Hour $121 3.00% $124 Technical Staff - Per Hour $102 3.00% $105 22 5-98 g Certified Access Specialist Program (CASp) $4 n/a 54 [a] 23 Construction and Demolition Administrative Fee [b], [c] All tenant improvements with a valuation of up to $25,000: and all n/a n/a $68 [b], [c] residential additions. All tenant improvements with a valuation of $25,001 to $50,000, and all n/a n/a $100 [b], [c] single family residential new constructions. All tenant improvements with a valuation greater than $50,000; all n/a n/a $135 IN, [c] multifamily, commercial, and Industrial projects, and all other projects. [a] Fee set by State -City has to collect $4 for each business license applicant throught 12/31/23 (fee will reduce to $1 per business license applicant beginning 1/1/2024 per State Mandates) and pass it through to the State for construction related accessibility. [b] Proposed New Fees [c] Fee is associated with ordinance 2020-01 scheduled to go for Council approval on 1-21-20. The ordinance will amend chapter 14 of the City of Azusa Municipal Code, adding Article XVIII, Construction and Demolition Waste Recycling and Diversion. p = Fees not automatically adjusted for CPI change. 15 No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 35 16 17 18 19 20 20 21 22 23 24 25 26 27 28 29 30 31 Svc Area Item # City of Azusa Schedule of Fees and Charges (Development -Related) PLANNING Adopted Adopted 1/22/2019 CPI 1/21/2020 Fee/Unit Sept'19220 Fee/Unit Fee 5-001 Zoning Clearance $85 3.00% $87 flat fee 5-002 Design Review- Minor (over the counter) $2,021 3.00% $2,081 flat fee 5-003 Staff Level Design Review: # a) Modifications to Existing Structures $350 n/a $350 flatfee b)All Others $4,532 3.00% $4,668 flat fee 5-004 # Design Review - Major $10,000 n/a $10,000 deposit 5-005 Major Use Permit $5,916 3.00% $6,093 flat fee 5-005A Minor Use Permit $1,127 3.00% $1,160 flat fee 5-006 Use Permit Modifications: flat fee a) Modifications To Major UP $2,972 3.00% $3,061 flat fee b) Modifications To Minor UP $623 3.00% $641 flat fee Variance- Minor $1,524 3.00% $1,570 flat fee 5-009 Variance # a) Involving Single -Family Structure $1,000 n/a $1,000 flat fee b)All Others $5,302 n/a $5,302 flat fee 5-010 # Zone Change $5,000 n/a $5,000 deposit 5-011 # Development Code Amendment $5,000 n/a $5,000 deposit 5-012 Development Agreement # a) Development Agreement Deposit $10,000 n/a $10,000 deposit # b) Annual Monitoring Deposit $5,000 n/a $5,000 deposit 5-013 # General Plan Amendment $15,000 n/a $15,000 deposit 5-014 # Specific Plan $10,000 n/a $10,(300 deposit 5-015 # Specific Plan Amendment $5,000 n/a $5,000 deposit 5-016 Tentative Parcel Map $8,313 3.00% $8,562 flat fee 5-017 Tentative Tract Map: a)5.20 Lots $8,671 3.00% $8,931 flat fee b) 20-50 Lots $10,107 3.00% $10,410 flat fee c)50-100 Lots $13,616 3.00% $14,025 flat fee d)100+Lots $15,212 3.00% $15,668 flat fee 5-018 Reversion To Acreage $2,816 3.00% $2,900 flat fee 5-019 Lot Merger $1,757 3.00% $1,810 flat fee 5-020 Environmental Categorical Exemption Rev. $339 3.00% $349 flat fee 5-021 Environmental initial Study $5,028 3.00% $5,179 flat fee 5-023 # Mitigated Negative Declaration $10,000 n/a $10,000 deposit 5-023 # Environmental Impact Report Preparation $10,000 n/a $10,000 deposit 5-023 # Environmental Impact Report Review $10,000 n/a $10,000 deposit 5.024 # Mitigation Monitoring -CEOA Monitoring $5,000 n/a $5,000 deposit 5-025 # Annexation $10,000 n/a $10,000 deposit 5-026 Condominium Conversion Map: a) Map Fee $6,614 3.00% $6,812 flat fee b) Plus Consultant Fee Actual Cost n/a Actual Cost flat fee 5-027 Minor Sign Review $85 3.00% $88 flat fee 5-028 Major Sign Review $932 3.00% $960 flat fee 5-029 Zoning Letter: a) Single Family Residential $169 3.00% $174 flat fee b) Other $508 3.00% $523 flat fee 5-030 Temporary Occupancy Review $589 3.00% $607 flat fee 5-031 Temporary Use Permit Notes (a] 16 Svc Area No. Item # 32 5-032 33 5-033 34 5-034 35 5-035 36 5-036 37 S-15 38 5-15A 39 5-037 40 5-038 41 5-039 42 5-040 43 5-041 44 5-042A 45 5-044 46 5-045 47 5-047 48 5-048 49 5-049 50 5-050 51 5-051 52 5-052 53 5-053 54 5-054 55 5-055 56 5-056 57 5.057 58 5-058 59 5-059 60 5-060 (a] Charges to be bil City of Azusa Schedule of Fees and Charges (Development -Related) PLANNING a) Temporary Use Permit Fee b) Azusa Based Non -Profit Organizations Continuance Processing Time Extension Review -Staff Time Extension Review- Planning Commission # Appeal To Planning Commission # Appeal To City Council Preliminary Plan Review Nonconforming Use Time Extension Certificate Of Compliance Street Name Processing W/O Map Street Re -Name Processing Building Address Processing W/O Map Building Re -Address Processing Com Dev Newspaper Publication Special Building Inspection (2 Hour Minimum) Technology Enhancement (5% of permit and plan check fee- $30 minimum) Massage Parlor Permit Massage Parlor Permit Renewal Adopted 1/22/2019 CPI Adopted 1/21/2020 Fee $546 3.00% $563 [b,d] $410 3.00% $422 flat fee $677 3.00% $698 flat fee $508 3.00% $523 flat fee $1,143 3.00% $1,177 flat fee $500 n/a $500 flat fee $1,000 n/a $1,000 flat fee $1,830 3.00% $1,885 flat fee $847 3.00% $872 flat fee $1,495 3.00% $1,540 flat fee $1,452 3.00% $1,496 flat fee $1,960 3.00% $2,019 flat fee $944 3.00% $972 flat fee $677 3.00% $698 flat fee Actual Cost n/a Actual Cost flat fee $169 3.00% $174 flat fee 5% 3.00% 5% flat fee $968 3.00% $997 flat fee $483 3.00% $498 flat fee Residential Indoor Marijuana Permit $442 3.00% $455 Residential Indoor Marijuana Permit Renewal $221 3.00% $228 Accessory Dwelling Unit Permit $2,021 3.00% $2,081 Designation of Historic Landmark, Historic District, $520 3.00% $535 Potential Historic Landmark, and Potential Historic District. Mills Act Contract $831 3.00% $856 Miss Act Contract Extension $249 3.00% $257 Major Certificate of Appropriateness $270 3.00% $278 Minor Certificate of Appropriateness $125 3.00% $128 Landscape Plan Review $183 3.00% $189 Covenant Review $237.93/Hr 3.00% $245.07/Hr Covenant Conditions & Restrictions Review $237.93/Hr 3.00% $245.07/Hr General Plan Update Fee (10% of permit and plan 10% n/a 10% checkfee) ed at fully -burdened hourly rates, including costs of outside service providers, if any for cost recovery. [b] Azusa -based non-profit organizations receive a 25% discount from standard TUP fee. [c] Fee is per meeting. 50% of the fee for the first meeting is applied against future Planning/Engineering fee for the project. [d] Fees Approved by Council on lune 5, 2017 per Resolution No. 2017-C37. Did not apply CIP since it has not been one full year. flat fee flat fee flat fee flat fee flat fee flat fee flat fee flat fee flat fee flat fee flat fee flat fee Notes [b] [c] [d] [d] [e] [e] [fl Ig] 17 dft City of Azusa Schedule of Fees and Charges (Development -Related) PLANNING MW Adopted Adopted Svc Area 1/22/2019 CPI 1/21/2020 Fee No. Item 0 Description Fee/Unit Sept'19-'20 Fee/Unit Type Notes lej Fees Approved by Council on June 5, 2017 per Resolution No. 2017-C35. Did not apply OF since it has not been one full year. Ifl Fees Approved by Council an December 4, 2017 per Resolution No. 2017-C37. Did not apply CIP since it has not been one full year. Igl Fee Approved by Council 1-22-19. N = Fees not automatically adjusted for CPI change. 18 Svc Area No. Item # s, City of Azusa Schedule of Fees and Charges (Development -Related)`. ENGINEERING Adopted Adopted 1/22/2019 CPI 1/21/2020 Fee Notes 1 5-047 Public/Private Improvement Plan Check: # a) $0-$500,000 Valuation (% of est construction cost) 3% n/a 3% flat fee # b) Next $400,000 Valuation (% of est construction cost) 2.5% n/a 2.5% flat fee # c)>$500,000 Valuation (% of est construction cost) 2% n/a 2% flat fee 2 5-048 Public/Private Improvement Inspection: # a)$0-$100,000 Valuation I% of est construction cost) 5% n/a 5% flat fee # b) Next $400,000 Valuation (% of est construction cost) 3.5% n/a 3.5% flat fee # c) > $500,000 Valuation (% of est construction cost) 2% n/a 2% flat fee 3 5-049 Final Parcel Map $1,146 3.00% $1,181 flat fee 4 5-050 Final Tract Map a) 5 -10 Lots $2,592 3.00% $2,669 flat fee b) 11- 25 Lots $3,868 3.00% $3,984 flat fee c) 26 - 50 Lots $5,463 3.00% $5,627 flat fee d) 51-100 Lots $8,016 3.00% $8,256 flat fee a)101-150 Lots $8,973 3.00% $9,242 flat fee f) > 150 Lots $10,887 3.00% $11,214 flat fee 5 5-051 Easement Check $359 3.00% $370 flat fee 6 5-052 Monument Inspection: a) First Monument $319 3.00% $329 flat fee b) Each Additional Monument $80 3.00% $82 flat fee 7 5-053 Bond Processing $160 3.00% $164 flat fee 8 5-055 Lot Line Adjustment $1,832 3.00% $1,886 flat fee 9 Street Light Banner installation/Removal $79 3.00% $81 flat fee 10 5-056 # Street/Right-of-Way Abandonment $2,000 n/a $2,000 deposit [a] 11 5-056A SUSMP/LID Plan Review $2,084 3.00% $2,146 flat fee 12 5-0568 SWPPP Plan Review $1,914 3.00% $1,972 flat fee 13 S-0568 BMP Review $319 3.00% $329 flat fee 14 S -056C Hydrology/Drainage Plan Review $1,914 3.00% $1,972 flat fee 15 5-056C Soils Review $319 3.00% $329 flat fee 16 S -OSIS[ Traffic Study Review $798 3.00% $822 flat fee 17 5-057 Sidewalk/Curb/Gutter Encroachment a)Up to 75 LF $479 3.00% $493 flat fee b) Each Add'175 LF $160 3.00% $164 flat fee 18 S -057A Street Cut Encroachment a) Up to 100 SF $479 3.00% $493 flat fee b) Each Add'11005F $160 3.00% $164 flat fee 19 5-0576 Driveway Approach $399 3.00% $411 flat fee 20 5-058 Obstruction Permit $160 3.00% $164 flat fee 21 5-059 Transportation Permits (Oversized And/Or Overweight Trucks): # a)Single Trip/Rider $16 n/a $16 flat fee [b] # b) Annual Permit $90 n/a $90 flat fee [b] 22 5-060 # House Moving Permit $2,000 n/a $2,000 deposit [a] 23 S -060A Industrial Waste Permit 19 AMh City of Azusa Schedule of Fees and Charges (Development -Related) ENGINEERING NOW Adopted Adopted Svc Area 1/22/2019 CPI 1/21/2020 Fee No. Item # Description Fee/Unit Sept'19220 Fee/Unit Type Notes a)New/Modified $1,117 3.00% $1,150 flat fee b) Renewal $319 3.00% $329 flat fee 24 5-060B Fats,Oils And Grease Program a) New $558 3.00% $575 flat fee b) Annual $239 3.00% $246 flat fee 25 5-061 Sewer Saddle $479 3.00% $493 flat fee 26 Sewer Dye Test $115 3.00% $118 flat fee 27 Sewer Blockage Check Actual Staff n/a Actual Staff Actual Staff Time Time Time 28 5-062 # Blueprint/Map Copy Service, Per Sheet (or actual outside costs) $20 n/a $20 flat fee 29 # Project Plans/Specifications - Plus $10 If Mailed $50 n/a $50 flat fee 30 Verification of Conditions $176 3.00% $181 flat fee 31 Agreement And/Or Improvement Security, Each $233 3.00% $240 flat fee 32 Extension Time For Improvement Agreement, Each $318 3.00% $327 flat fee 33 Submittals in Excess of Three a) Fourth Submittal $439 3.00% $452 flat fee b) Sixth Submittal $1,540 3.00% $1,586 flat fee c) Eighth And Each Subsequent Submittal $1,836 3.00% $1,891 flat fee 34 Minor Land Division - Lot Split $650 3.00% $670 flat fee 35 Recording Fee: # a) First Sheet $8 n/a $8 flat fee # b) Additional Sheets, Each $2 n/a $2 flat fee 36 LDMA Surcharge (County Maps Only): # a)Tract Map $401 n/a $401 flat fee # b) Parcel Map $135 n/a $135 flat fee 37 # Expedited Plan Review 1.Sx fee n/a I.Sx fee flat fee 38 # Consultant (invoice + 36% Overhead) Invoice n/a Invoice flat fee +36%O'H +36%O'H 39 5-6.5 Code Compliance Fee $40 3.00% $42 flat fee 40 S-7 # Landscape Design Standards (Over The Counter Sales) $6 n/a $6 flat fee 41 S-18 City -Provided Tree Planting- One 15 Gallon Tree $119 3.00% $123 flat fee 42 City -Provided Tree Planting- One 24" Box Tree $205 3.00% $212 flat fee 43 Time Extension $80 3.00% $82 flat fee 44 5-6.3 Engineering Hourly Rate for in -House Staff $160 3.00% $164 flat fee 45 Technology Enhancement S% of permit and plan check fee- $30 5% n/a 5% flat fee minimum) 46 5-8.0 General Plan Update Fee (30% of permit and plan check fee) 10% n/a 10% flat fee All amounts shown are base fees. Applicants are also be responsible for any consultant or other agency fees (e.g. LA County) incurred. [a] Charges to be billed at fully -burdened hourly rates, including costs of outside service providers, if any. All costs recovered. [b] Fee set to match CalTrans. # =Fees not automatically adjusted for CPI change. 20 Aeh City of Azusa Schedule of Fees and Charges (Development -Related) UTILITIES MP Adopted Adopted Svc Area 1/22/2019 CPI 1/21/2020 Fee No. Item # Description Fee/Unit Sept'19220 Fee/Unit Type Notes Utility Services 1 5-105 New Utility Account Setup: # a) Connect Fee $45 n/a $45 flat fee # b) Same Day Connection (7:OOam-4:00pm) $35 n/a $35 flat fee # Q Same Day Connection (4:OOpm-5:30pm) $85 n/a $85 flat fee # d) Fri 7am-8pm (Elec, Wtr, or Both) $105 n/a $105 flat fee It e) Sat, Sun Or Holiday 7am-8pm [Elec, Wtr, or Both) $205 n/a $205 flat fee # f) Positive Identification Check- $1.25 $1.25 n/a $1.25 flat fee 2 5.106 Utility Delinquent Turn Off/On: # a) 7am-4pm $35 n/a $35 flat fee # b)4pm-5:30pm $85 n/a $85 flat fee # c) Fri 7am-gpm (Elec, Water, or Both) $105 n/a $105 flat fee # d) Sat, Sun or Holiday 7am-8pm (Elec, Water, or Both) $205 n/a $205 flat fee e) Late Payment Penalty, The Greater Amount Of Either: # i) Base Penalty Fee $7.50 n/a $7.50 flat fee # 11) Percent Of Total Outstanding Balance 5% n/a 5% flat fee fl Miscellaneous Collection Fee n/a n/a 24% Variable [c] g) AMI Opt -Out Fees: # i) One-time Initial Set-up Charge n/a n/a $75 flat fee [c] # ii) Monthly Opt -Out Fee n/a n/a $SO flat fee [c] # iii) Monthly Opt -Out Fee (Low -Income) n/a n/a $5 flat fee [c] 3 5-107 Theft Of Water/Light Investigation: # a) Investigation Fee $500 n/a $500 flat fee # b) Damages And Estimated Usage Actual Cost n/a Actual Cost flat fee 4 5-108 Water Pressure Test: # a) 1st Test Free Per Calendar Year $0 n/a $0 flat fee # b) Additional Test $165 n/a $165 flat fee [a] # c) Main Line $400 n/a $400 flat fee 5 S-109 # Water Meter Test (Fully Allocated Hourly Rate) Bill Hourly n/a Bill Hourly per hour 6 5-110 Water QualityTest: # a)Test Fee $125 n/a $125 flat fee # b) Plus Lab Costs Actual Cost n/a Actual Cost flat fee 7 5-131 # Flow Test $300 n/a $300 flat fee 8 5-112 Temporary Meter Rental Services: # a) Meter Fee (Per Each Meter) $130 n/a $200 flat fee # b) Deposit $1,000 n/a $1,200 deposit 9 5-113 New Water Meter Installation: # a)Installation Fee $250 n/a $250 flat fee bl Plus Material Costs Actual Cost n/a Actual Cost deposit 10 5-131D Water Meter Fee: a a)3/4" $150 n/a $150 flat fee 4 b) 1" $200 n/a $200 flat fee 4 c) 1.5" $925 n/a $925 flat fee # d)2" $1,075 n/a $1,075 flat fee 21 Svc Area No. Item # Descript # e)>2" 11 5-131E 12 5-114 13 5-131H 14 5-131C 15 16 17 5-1318 5-131F 5-1316 18 5-115 19 5-116 20 21 22 23 5-117 24 5-118 25 5119 26 5120 City of Azusa Schedule of Fees and Charges (Development -Related) UTILITIES Adopted Adapted 1/22/2019 CPI 1/21/2020 If Jumper Fee (per service) New Water Service Installation: If a) 3/4" -1" Deposit # b) 2" Deposit # c) 4" Deposit # d) 6" Deposit Hot Tap Fee: # a)1" # b) 2" # c)4" If d)6" # e) 8" # f)10" # 11)12" Fire Service Installation: # a) 4" Deposit If b) 6" Deposit # cl 8" Deposit It d)10" Deposit If a)12" Deposit If Water Disconnection From The Mainline (Deposit) If Fire Hydrant Relocation / Inspection Fee Traffic Incident Hit Hydrant Impact Fee: # a) Impact Fee (Deposit) If b) Additional Cost Of Repair & Water Loss # c) Damage to Water Main Impact Fee If d) Cast of Repair & Water Loss # e) Damage to Water Facilities Impact Fee # 9 Cost of Repair & Water Loss # New Backflow Device Inspection Review # Annual Backflow Device Inspection Review Water Plan Check Water Improvement Inspection (per hour) Will -Serve Letter # Water Service No change to various rates based on service size and usage Sewer Blockage Check: If a) Minimum Charge # b) Fully Allocated Hourly Rates # c) Charge If City Causes Blockage # Sewer Dye Test Emergency Sewage Spill Response: # a) Spill Response Fee Fee/Unit Sept'19220 Fee/Unit Type Notes Dev/Owner n/a Dev/Owner deposit Req'd to Req'd to Procure Procure $100 n/a $100 flatfee $3,500 n/a $4,000 deposit $4,000 n/a $4,500 deposit $7,500 n/a $8,000 deposit $9,500 n/a $10,000 deposit $300 n/a $300 flatfee $300 n/a $300 [b] $350 n/a $350 flatfee $400 n/a $400 flatfee $450 n/a $450 fiat fee $450 n/a $450 fiat fee $525 n/a $525 flatfee $7,500 n/a $8,000 deposit $9,500 n/a $10,000 deposit $10,500 n/a $11,000 deposit $11,500 n/a $12,000 deposit $12,500 n/a $13,000 deposit $3,200 n/a $3,500 deposit $1,500 n/a $1,500 fiat fee $1,500 n/a $1,500 flatfee Actual Cost n/a Actual Cost flatfee $1,500 n/a $1,500 flatfee Actual Cost n/a Actual Cost flatfee $1,500 n/a $1,500 flatfee Actual Cost n/a Actual Cost flat fee $340 n/a $340 flatfee $80 n/a $80 flatfee $214 3.00% $220 flatfee $134 3.00% $140 perhour $27 3.00% $30 flatfee Various n/a Various variable [b] $500 n/a $500 deposit Bill Hourly n/a Bill Hourly deposit $0 n/a $0 fiat fee $115 n/a $115 flatfee Actual Cost n/a Actual Cost deposit 22 Svc Area No. Item # Description 27 5-121 28 29 5-122 30 5-123 31 5-124 32 5325 33 S-126 34 5127 35 5128 36 5129 37 5130 38 5-131 39 5-131A 40 5-131H 41 5-1311 City of Azusa Schedule of Fees and Charges (Development -Related) UTILITIES Adopted Adopted 1/22/2019 CPI 1/21/2020 It b) Fully Allocated Hourly Rate For All Responding Personnel # c) Charge If City Causes Spill Wastewater Service: Duces Tecum Subpoena Processing Electric Meter Test: # a) First Test Per Calendar Year # b) Residential # c) Commercial # d) Industrial Total Electrical Service Re -Install: # a) Re -Install Fee # b) Additional Materials Additional Electric Span Install: # a) Install Fee # b) Plus Materials Temporary Electric Installation: # a)Install # b) Additional Material Costs Temp Single Phase Transformer Installation: # a) Installation Fee (Minimum) # b) Additional Material Costs Temp Three Phase Transformer Installation: # a) Installation Fee (Minimum) # b) Additional Material Costs Electric Line Extension/Upgrade: # a) Extension/Upgrade # b) Fully Allocated Hourly Rates Electric Services # Banner Installation # After Hours Standby/Call Out (2 Hour Minimum # Inspection Rate (Per Hour) # Water System Development Fees: a) Residential # Per Dwelling Unit b) Commercial # III Per SF c) Industrial # 11)Per SF d)School # Flat Fee e) Park # Flat Fee # f) Accessory dwelling units 750 SF or more # Water System Annexation Fees: a) Residential # Per Dwelling Unit b) Commercial # Per SF Bill Hourly $0 Various $214 $0 $160 $370 $440 $769 Actual Cost $753 Actual Cost $793 Actual Cost $3,219 Actual Cost $6,442 Actual Cost Actual Cost Bill Hourly Various $560 Bill Hourly Bill Hourly Fee pt'19-'20 Fee/Unit Type Notes n/a Bill Hourly deposit n/a $0 flat fee n/a Various variable n/a $220 flat fee n/a $0 flat fee n/a $160 flat fee n/a $370 flat fee n/a $440 flat fee 3.00% $792 flat fee n/a Actual Cost flat fee 3.00% $776 flat fee n/a Actual Cost flat fee 3.00% $816 flat fee n/a Actual Cost flat fee 3.00% $3,315 flat fee n/a Actual Cost flat fee 3.00% $6,635 flat fee n/a Actual Cost flat fee n/a Actual Cost deposit n/a Bill Hourly deposit n/a Various variable [b] n/a $580 flat fee n/a Bill Hourly deposit n/a Bill Hourly deposit $2,045 n/a $2,050 flat fee $0.98 n/a $0.98 flat fee $0.40 n/a $0.40 flat fee $8,000 n/a $8,000 flat fee $3,770 n/a $4,000 flat fee n/a n/a $700 flat fee [a] $1,000 n/a $1,000 [b] $0.45 n/a $0.45 flat fee 23 Svc Area No. Item 9 City of Azusa Schedule of Fees and Charges (Development -Related) UTILITIES Adopted Adopted 1/22/2019 CPI 1/21/2020 Fee Fee/Unit Sept'19-'20 Fee/Unit Type c) Industrial # Per SF d)School e) Park 42 S -131J Water Capacity Fee: # e) Accessory dwelling units less than 750 SF a = Fees not automatically adjusted for CPI change. [a] Test fee refunded if there is a system problem. [b] Rate varies depending on type of services and usage, time of year, and time of day. Icl Proposed New Fees z �bfGu`�P Notes $0.25 n/a $0.25 flat fee $3,600 n/a $4,000 fiat fee $1,650 n/a $2,000 flat fee n/a n/a $300 flat fee [c] 24 No. 1 City of Azusa Schedule of Fees and Charges (Development -Related) COMMUNITY IMPROVEMENT Svc Area Item p Description S-063 Real Property Records Report 2 S-064 3 4 5.032.5 5 S-95.1 6 5-066 7 S-065 6 S -066C 9 10 a) Condominium/Townhouses b) Vacant/Unimproved Land c) Single Family Dwellings d) Multi -Family Dwelling i) Per Parcel, First Unit ii) Each Add'I Unit e) Commercial Properties Residential Rental Housing Registration And Inspection: a) Per Parcel - Includes First Unit I) Additional Unit b) Reinspection Abandoned and Vacant Property Registration Fee Weed Abatement Inspection (Processing and Referring) g Recovery and Storage of Abandoned Shopping Carts p Appeal/Hearing Lien Release M a)Substandard # b) Admin Fine Code Enforcement Fines g a) First Offense g b) Second Offense N c) Third Offense Technology Enhancement (S% of permit and plan check fee -$30 minimum) Impound and Storage Fee (Non -Automobile) Adopted 1/22/2019 CPI Adopted 1/21/2020 Notes $107 3.00% $110 $215 3.00% $222 $215 3.00% $222 $215 3.00% $222 $12 3.00% $12 $215 3.00% $222 $125 3.00% $128 $8 3.00% $8 $93 3.00% $96 $500 n/a $500 $359 3.00% $370 $12 n/a $12 $110 n/a $110 $100 n/a $100 $80 n/a $80 $100 n/a $100 $250 n/a $200 $500 n/a $500 5% n/a 5% n/a n/a Actual Costs [a], [b] [a] Proposed New Fees [b] Fee is associated with ordinance 2020-01 scheduled to go for Council approval on 1-21-20. The ordinance will amend chapter 14 of the City of Azusa Municipal Code, adding Article XVIII, Construction and Demolition Waste Recycling and Diversion. H = Fees not automatically adjusted for CPI change. 25 No. Svc Area Item 5-1.1 City of Azusa Schedule of Fees and Charges (Development -Related) FIRE SAFETY Adopted 1/22/2019 N/A Adopted CPI 1/21/2020 t'19-70 Fee/Unit Notes N/A The City of Azusa Contract Out Fire Prevention Services (including Ambulance Services) with the County of Los Angeles Fire Department. The City of Azusa does not have any control over Fire Services or ambulance fees/rates. For the County of Los Angeles Fire Department fire services fees, ambulance rates, and contact information, please refer to the link and contact information listed below: County of Los Angeles Fire Department Fire Prevention Fees - Contact: County of LA Fire Chief Jon O'Brian 626-255-9354. httos://www,fire.lacounty.gov/fire-prevention-di Asion/fire-prevention-fees/ httos://www.fire.lacounty.gov/wp-content/uoloads/2017/04/FirePreventionService Fees. odf httos://www.fi re.lacounty.clov/hhmd-2/permits-and-fees-2/ Ambulance Rates - County of Los Angeles Department of Health Services Emergency Medical Services Agency- Contact: Chief Prehospital Operations -John Telmos 562-378-1677 https://I ibra ry. municode.com/ca/los_a ngeles_cou nty/codes/code_of_ordinances?nodeld=TIT7BULl_DIV2S PBU CH7.16AM#I 26