Loading...
HomeMy WebLinkAboutE-5.1. Authorization to Solicit Bids for Project W-277 Water Main Replacement_APPROVEDUB-173 Approved Utility Board 03/23/20 The proposed work consists of the construction of approximately 270 linear feet of 8-inch ductile iron pipe water main, 130 linear feet of 10-inch ductile iron pipe water main, 1,570 linear feet of 18-inch ductile iron pipe water main, 235 linear feet of 20-inch ductile iron pipe water main, and 3,970 linear feet of 24-inch ductile iron pipe water main, in the County of Los Angeles and the City of Covina. This includes water main replacements at the intersection of Cypress and Azusa Avenue, as well as installing two (2) Inserta valves on Azusa Avenue between Cypress Street and Arrow Hwy. Along with water main installation, construction will include new valves, fire hydrants, services, connections, abandonments, appurtenances, pavement replacement, concrete replacement, street restoration, slurry seal, traffic control, and all supplies, equipment, shoring, services, bidding schedule items, and transportation necessary to construct and complete the project. FISCAL IMPACT: There is no immediate fiscal impact to the bidding of this project. This project, if awarded, will be funded from the Water Capital Improvement Program budget. Prepared by: Reviewed and Approved: Melissa Barbosa, P.E. Manny Robledo Senior Water System Engineer Director of Utilities Reviewed and Approved: Jared Macias Assistant Director of Utilities - Water Operations Reviewed and Approved: Sergio Gonzalez City Manager Attachments: 1) Notice Inviting Bids 2) Contract Documents, Plans, and Specifications for Construction of Cypress Water Transmission Main Replacement Project No. W-277 3) Construction Plans - Cypress Water Transmission Main Replacement Project UB-174