The proposed work consists of the construction of approximately 270 linear feet of 8-inch ductile
iron pipe water main, 130 linear feet of 10-inch ductile iron pipe water main, 1,570 linear feet of
18-inch ductile iron pipe water main, 235 linear feet of 20-inch ductile iron pipe water main, and
3,970 linear feet of 24-inch ductile iron pipe water main, in the County of Los Angeles and the
City of Covina. This includes water main replacements at the intersection of Cypress and Azusa
Avenue, as well as installing two (2) Inserta valves on Azusa Avenue between Cypress Street
and Arrow Hwy. Along with water main installation, construction will include new valves, fire
hydrants, services, connections, abandonments, appurtenances, pavement replacement, concrete
replacement, street restoration, slurry seal, traffic control, and all supplies, equipment, shoring,
services, bidding schedule items, and transportation necessary to construct and complete the
project.
FISCAL IMPACT:
There is no immediate fiscal impact to the bidding of this project. This project, if awarded, will
be funded from the Water Capital Improvement Program budget.
Prepared by: Reviewed and Approved:
Melissa Barbosa, P.E. Manny Robledo
Senior Water System Engineer Director of Utilities
Reviewed and Approved:
Jared Macias
Assistant Director of Utilities - Water Operations
Reviewed and Approved:
Sergio Gonzalez
City Manager
Attachments:
1) Notice Inviting Bids
2) Contract Documents, Plans, and Specifications for Construction of Cypress Water
Transmission Main Replacement Project No. W-277
3) Construction Plans - Cypress Water Transmission Main Replacement Project