HomeMy WebLinkAboutE-18 Staff Report - Arrow Highway Landscaping Amendment 1 with WilldanCONSENT ITEM E-18 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL VIA: SERGIO GONZALEZ, CITY MANAGER FROM: ROBERT DELGADILLO, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINEER DATE: MAY 18, 2020 SUBJECT: CONSIDERATION OF A PROFESSIONAL SERVICES AGREEMENT FIRST AMENDMENT WITH WILLDAN FOR THE ARROW HIGHWAY RAISED MEDIAN ISLANDS PROJECT NO. HSIPL-5112(019) SUMMARY: Willdan is currently preparing the Plans, Specifications, and Estimate (PS&E) for the Arrow Highway Raised Median Installation Project. This project proposes to increase safety to motorists and pedestrians by installing raised concrete medians which will reduce the likelihood of head-on and broadside collisions. The funding from the Highway Safety Improvement Program does not allow for landscaping improvements and was not previously included in Willdan’s design scope. This action will authorize the City Manager to amend the professional services agreement with Willdan to include the design of draught tolerant landscaping utilizing water conservation program funds. RECOMMENDATION: Staff recommends the City Council take the following actions: 1)Approve an agreement First amendment in the amount of $32,186, which includes a 10% contingency for potential change orders, increasing the not-to-exceed amount to $126,258, in a form acceptable to the City Attorney, on behalf of the City. 2)Authorize the City Manager to execute an agreement amendment with Willdan, in a form acceptable to the City Attorney, on behalf of the City. DISCUSSION: On June 3, 2019, the City Council awarded a professional services agreement to Willdan for the Arrow Highway Raised Median Installation Project. This project proposes to increase safety to motorists and pedestrians by installing raised concrete medians which will reduce the likelihood of head-on and broadside collisions. The project improvements installation of raised medians, pavement rehabilitation, curb & gutter repairs, sidewalk repairs, and curb ramp upgrades. APPROVED CITY COUNCIL 5/18/2020 Agreement Amendment with Willdan May 18, 2020 Page 2 This project is currently in the design phase. During this process, an opportunity was presented to include landscaping improvements within the new raised medians. The City will be utilizing water conservation program funds to incorporate draught tolerant landscaping into the design. Staff is seeking authority to amend the existing professional services agreement with Willdan to include design of the landscaping improvements within the project limits. FISCAL IMPACT: The professional services agreement with Willdan was originally awarded in the amount of $94,072, which included a 10% contingency for potential change orders. The costs for the added scope of services are $32,186, which includes a 10% contingency for potential change orders. Staff requests a revised not- to-exceed amount of $126,258, which includes the original award amount plus the added scope of services. The original agreement was funded with Measure M Funds. The additional scope of work will be funded with Water Conservation Program Funds (32-40-721-791-6633). Prepared by: Fiscal Impact Reviewed by: Robert Delgadillo, P.E. Talika Johnson Director of Public Works/City Engineer Director of Administrative Services Reviewed and Approved: Reviewed and Approved: Sergio Gonzalez City Manager Attachment: 1) Willdan Proposal to Provide Additional Service for Landscape Design for Street Resurfacing Improvements 1 CITY OF AZUSA FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT WITH WILLDAN 1.PARTIES AND DATE. This First Amendment to the Professional Services Agreement (“PSA”) (“First Amendment”) is entered into on the 18th day of May, 2020, by and between the City of Azusa, a municipal corporation organized under the laws of the State of California, with its principal place of business at 213 East Foothill Boulevard, Azusa, California 91702 (“City”) and Willdan, with its principal place of business at 13191 Crossroads Parkway North, Suite 405, Industry, CA 91746 (“Consultant”). City and Consultant are sometimes individually referred to herein as “Party” and collectively as “Parties”. 2.RECITALS. 2.1 Agreement. The Parties entered into that certain Professional Services Agreement dated July 24, 2019 ("Original PSA"), whereby Consultant agreed to render professional engineering services for the Arrow Highway Median Islands Project (“Project”) 2.2 First Amendment. The City now desires to amend the Original PSA to include engineering services for the preparation of Plans, Specifications, and Estimate (PS&E) for landscaping as described in Willdan’s proposal dated March 30, 2020 (Attached). 3.TERMS. 3.1 Scope of Services and Term. The following professional engineering services are added to the scope of services per Willdan’s March 30, 2020 proposal: •Landscape and irrigation improvements for the new raised medians. •The total length of the landscape raised medians is approximately 5,900 lineal feet •The widths of the medians varies from 2 feet to 4 feet (primarily at the turn pocket noses) to 12 feet at mid-blocks. •The installation of river rock cobble at the turn pockets. 3.3 Fees and Payments. The following changes shall be made to this section 3.3.1 Compensation. The total compensation shall be increased from Ninety Four Thousand Seventy Two Dollars and Sixty Cents ($94,072.66) to a total compensation not to exceed One Hundred Twenty Six Thousand Two Hundred Fifty Eight Dollars ($126,258). 4.Continuing Effect of Agreement: Except as amended by this First Amendment, all provisions of the Agreement shall remain unchanged and in full force and effect. From and after the date of this First Amendment, whenever the term “Agreement” appears in the Agreement, it shall mean the Agreement as amended by this First Amendment. Attachment 1 2 5. Adequate Consideration: The Parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this First Amendment. 6. Counterparts: This First Amendment may be executed in duplicate originals, each of which is deemed to be an original, but when taken together shall constitute but one and the same instrument. SIGNATURES ON NEXT PAGE 3 IN WITNESS WHEREOF, City and Contractor have executed this First Amendment as of the date first written above. CITY OF AZUSA WILLDAN By: By: Sergio Gonzalez Vanessa Muñoz, PE, TE, PTOE City Manager Director of Engineering APPROVED AS TO FORM: By: Best Best & Krieger LLP City Attorney March 30, 2020 Mr. Robert Delgadillo Assistant Director of Public Works City of Azusa Public Works Department 213 E. Foothill Boulevard Azusa, CA 91702 Subject: Proposal to Provide Additional Service for Landscape Design for Street Resurfacing Improvements Dear Mr. Delgadillo: Pursuant to the Professional Services Agreement between the City of Azusa and Willdan Engineering, dated July 24, 2019. Willdan Engineering is pleased to submit this proposal to provide supplemental services to prepare Plans, Specifications and Estimate (PS&E) for the median landscape and irrigation improvements for City project the Arrow Highway Median Improvements Project. We understand that project includes federal funds through HSIP program to provide raised medians but based on our understanding the landscape improvements within the raised medians will not be a federally participation scope of work. It is our understanding that the project includes the following proposed improvements: • Landscape and irrigation improvements for the new raised medians. • The total length of the landscape raised medians is approximately 5,900 lineal feet. • The widths of the medians various from 2-feet to 4-feet (primarily at the turn pocket noses) to 12-feet at mid-blocks. • The installation of river rock cobble at the turn pocket noses. This additional landscape and irrigation work will be included as part of the original street improvement construction bid package that is currently being finalized. The following outlines our scope of work for the landscape and irrigation design. SCOPE OF SERVICES Research and Site Review 1. Research and review data documents regarding water supply point of connection for the irrigation system and electrical power supply source for the automatic irrigation controller assemblies. 2. Review and apply City standards and specifications for landscape and irrigation construction plans. 3. City will walk the project and identify empty tree wells to be replaced in the parkway within City’s ROW. All other tree wells will be removed and replaced with PCC sidewalk. Landscape Plans Preparation Willdan will develop a landscape conceptual plan which reflects the landscape themes similar to recent median improvements in the City. The color illustration will be prepared in Plan View at 20 scale. The new raised medians include trees, low shrubs and groundcovers with an automatic irrigation system. City of Azusa Arrow Highway Landscape Design Page 2 Water retention will be implemented to meet California’s water quality management program. The wide width spans of the medians will have a slight inverted finish grade which captures and retains the water (specifically during a rain event) within the median and percolates thus recharging the local groundwater table. The landscape improvements will incorporate local and state water conservation standards, including meeting the requirements of California State irrigation water conservation model ordinance. The irrigation system will be designed with the most up to date technology such as low flow drip systems, irrigation system shut off during rainfall events, pipe breakage awareness and shut down capabilities, and a web based irrigation controller that can be monitored and controlled with a smart phone or laptop computer. The landscape theme will include California native and drought adaptive trees, shrubs, and groundcovers that are attractive, require very low maintenance, and are suitable for this geographic region. Finally, since this project involves median improvements, visibility and un-obstructed views for both pedestrians and drivers are major factors in properly locating trees and shrubs within the medians. Our landscape design team includes consultation with our in-house traffic engineers to coordinate landscape elements regarding site visibility distances and obstructions. Landscape Conceptual Plan Willdan will prepare a landscape conceptual plan (color illustration) in Plan view at 20- Scale of the proposed landscape design. Willdan will submit the conceptual plan to City staff for review and comments. Upon review of the conceptual plan by City staff, prepare a final landscape conceptual plan for final review and approval that addresses the comments from all parties. Specific items that will be illustrated in the final conceptual plan are: • Address planting palette suggestions for trees, shrubs and groundcovers, along with their respective location. Species include drought adaptive and varieties similar to the City’s recent improvements. • Address irrigation systems, e.g. automatic controllers, control valves and low-flow drip irrigation. • Address hardscape materials, e.g. river rock cobble, gravels, decomposed granite and rock mulches. • Address water capturing drainage design in accordance with storm water best management practices; locate possible areas for LID implementation. Final Landscape Plans The plans will conform to the City of Azusa standard plans and will be prepared utilizing AutoCAD software. All landscape and irrigation plans will be signed by a registered landscape architect. 1. The plans will be drawn at 20 Scale and be prepared in compliance with California State model water efficient landscape ordinance. The plans will include the following: City of Azusa Arrow Highway Landscape Design Page 3 • Conceptual plan – 4 sheets • Planting plans – 4 sheets • Landscape construction layout plans – 4 sheets • Irrigation plans – 4 sheets • Construction details – 3 sheets • Water conservation calculations and worksheets 2. Submit at 60% and 95% completion plans and estimates to City staff for review and comment. Revise as necessary based on comments and requirements from the City of Azusa. 3. Prepare 100% final plans, technical special provisions and cost estimate. SERVICES NOT INCLUDED IN THIS PROPOSAL 1. Agronomic soils testing, including infiltration rates. 2. Landscape accent lighting (median and street trees). 3. Street furniture (benches, trash receptacles, urns). 4. Banner poles. 5. Bus shelters. 6. Wayfinding signage. 7. Entry City signs. 8. Preparation and/or processing of environmental documents. ASSUMPTIONS 1. Soil is not contaminated. 2. Willdan will not be liable for the removal or treatment of hazardous materials encountered on or at the site. 3. City will provide the general plan requirements for landscape and hardscapes. 4. New trees added to the existing tree wells will be watered manually during the establishment period. FEE Our proposed fee for the above scope of services is as follows: • Project Management ................................................ $ 800 • Research & Site Review ........................................... $1,060 • Landscape Conceptual Plan .................................... $4,080 • Planting Plans .......................................................... $7,200 • Irrigation Plans ......................................................... $7,200 • Construction Layout Plans ....................................... $4,200 • Construction Details ................................................. $2,520 • Specifications & Estimate ......................................... $2,200 Total Fee $29,260 City of Azusa Arrow Highway Landscape Design Page 4 PROJECT TEAM Mr. John Hidalgo, RLA, is Principal Landscape Architect and Project Manager for Willdan Engineering with over 28 years of diverse experience in park design, urban streetscapes, and a full range of landscape architectural projects. Mr. Hidalgo has completed numerous recreational projects in Southern California, including a variety of special facilities. Mr. Bryan Nguyen, RLA, has over 19 years of landscape architecture and graphic design experience. Mr. Nguyen's experience includes the development of conceptual landscape plans with extensive graphic vignettes such as photographic before and after simulations; and the preparation of construction documents. Mr. Nguyen is proficient in AutoCAD, MicroStation, SketchUp Pro, LandFX, and Adobe Photoshop. Other duties include preparation of irrigation water and landscape management construction documents and performing third-party landscape plan reviews. Mr. Carlos Espinoza, RLA, is an experienced landscape architect with over 15 years’ experience. Mr. Espinoza has been involved in plan reviews of planting, irrigation, and hardscape construction documents for county and municipal entities, large commercial sites, and custom built residential. He prepares documents including site inventories documenting existing conditions. Mr. Espinoza managed and executed planting selection, and coordinated with nurseries for plant availability, and allocation of planting material per availability. He observed the planting process to ensure accurate onsite installation per specifications. Please indicate the City’s approval and authorization to proceed by either printing out and signing two originals and returning one hard copy original to our office, or by scanning one signed original and returning it by e-mail. Thank you for this opportunity to be of continuing service to the City of Azusa. We recognize the importance of this project to the City and are committed to realizing its timely and successful completion. Should you have any questions regarding this proposal, please contact Mr. Tyrone Peter at (657) 223-8557 or tpeter@willdan.com or Ms. Vanessa Munoz at (562) 368-4848 or vmunoz@willdan.com Respectfully submitted, Approval and Authorization to Proceed By: WILLDAN ENGINEERING CITY OF AZUSA Vanessa Muñoz PE, TE, PTOE __________________________________ Director of Engineering Signature __________________________________ Date 910005/06-160/P20-118_20411