Loading...
HomeMy WebLinkAboutI-14 Staff Report - MWH Constructors Inspection ServicesUB CONSENT ITEM I-14 TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD FROM: MANNY ROBLEDO, DIRECTOR OF UTILITIES DATE: JULY 20, 2020 SUBJECT: AWARD A PROFESSIONAL SERVICE AGREEMENT FOR INSPECTION SERVICES TO MWH CONSTRUCTORS FOR WATER CAPITAL IMPROVEMENT PROJECT W-277 BACKGROUND: Azusa Light & Water (“ALW”) has recommended the award of a contract for construction of Water Capital Improvement Project W-277 Cypress Transmission Water Main Replacement, involving 6,500 linear feet of water main and appurtenances. If approved, given the size and scope of this project, ALW will require the services of a dedicated construction inspector to ensure that the project is constructed as specified. After a solicitation of qualified construction inspectors, MWH Constructors is recommended as the lowest responsible bidder. The proposed action would award a Professional Services Agreement (“Agreement”) to MWH Constructors for full-time construction inspector services during the 180 calendar day project construction period. RECOMMENDATION: Staff recommends the Utility Board take the following action: 1) Approve the Professional Services Agreement for Construction Management and Inspection Services to MWH Constructors for Water Project W-277; 2) Authorize the Mayor to execute the Agreement, in a form acceptable to the City Attorney. ANALYSIS: The Water Division’s Capital Improvement Project W-277 Cypress Transmission Water Main Replacement includes 6,500 linear feet of water main on Cypress Street, from Azusa Avenue to APPROVED UTILITY BOARD 7/20/2020 Award PSA for W-277 Cypress Inspection July 20, 2020 Page 2 Vincent Avenue, and a portion of work on various parts of Azusa Avenue from Cypress to Arrow Highway. To ensure proper construction of the project, including safety and installation procedures, ALW requires the services of a fulltime, on-site, construction inspector. The responsibilities of the inspector will include, responding to submittal reviews, requests for information, providing on-site geotechnical work, overseeing quality assurance and quality control in conformance with plans and specifications, and providing as-built drawings. The inspector will be required to provide a 24-hour phone number and contact person for the public to ask questions or report problems. The inspector will also be required to perform after-hour inspection services, as needed. Proposals from five (5) consultants were reviewed in the context of the anticipated 180 calendar day project, and were evaluated based on personnel qualifications, experience inspecting similar projects, and responsiveness to the requirements of the Request for Proposals (“RFP”). The proposals and their respective bid pricing, as submitted, were as follows: 1 Stantec Consulting Services, Inc. Failed to submit 2 Stetson Engineering, Inc. Failed to submit 3 MWH Constructors $ 98,750.00 4 Civiltec Engineering Inc. $ 164,005.00 5 NV5 Inc. (formerly Civil Source Inc.) $ 234,597.00 MWH Constructors (“MWH”) was determined to be the lowest, responsible bidder. Based on the package review and assessment, the lowest bidder met all of the requirements of the RFP. Accordingly, staff recommends MWH be awarded the Agreement for Construction Management and Inspection Services for Water Project W-277. It is noteworthy that MWH has provided successful inspection services on previous capital improvement projects for ALW. FISCAL IMPACT: The fiscal impact of the Agreement is $98,750.00. Funding for this service is available, under Capital Improvement Project W-277 Cypress Transmission Water Main replacement, in Account No. 32-80-000-721-7145-72116B. Prepared by: Reviewed and Approved: Melissa Barbosa, P.E. Manny Robledo Senior Water System Engineer Director of Utilities Award PSA for W-277 Cypress Inspection July 20, 2020 Page 3 Reviewed and Approved: Jared Macias Assistant Director of Utilities - Water Operations Reviewed and Approved: Sergio Gonzalez City Manager Attachment: 1) Professional Service Agreement – Cypress Inspection Services 2) MWH Constructors Proposal Building a Better World June 4, 2020 Melissa Barbosa, P.E. Water System Engineer 729 North Azusa Avenue Azusa, CA 91702 301 N. Lake Avenue, Suite 115, Pasadena, CA Subject: Cypress Inspection Services Proposal W-277 Dear Ms. Barbosa, Azusa Light & Water (ALW) will be selecting a firm to provide Professional Construction Inspection Services for the Cypress CIP Water Main Replacement Project W-277. We are proposing Dennis Brown as the Construction Inspector, who has 26 years of experience with a proven track record of delivering projects within schedule and budget. Dennis brings extensive communication skills in working with the public, effected communities, and stakeholders to proactively mitigate issues before they arise. David Dismang will be backing up Dennis, serving as Quality Assurance and Quality Control. MWH brings the following advantages to ALW: Trusted Partner in the Community – We understand the need to develop strong public relations in order to mitigate construction impacts to the community, adjacent schools and local businesses. Serving as your Principal-in-Charge, I have worked for most of the major Water Agencies and City Utilities in the surrounding community. We are committed to serving as your trusted advisor. Established Relationship – We have established relationships with several ALW staff from working together on past CIP projects over the years. We are familiar with ALW’s processes, procedures, stakeholders, and local issues. Experienced Local Construction Inspection Experience – We have experienced knowledgeable personnel with relevant Southern California experience working for numerous local agencies. Our proposed Construction Inspector, Dennis Brown, brings more than 26 years of construction experience in municipal water/wastewater facilities, and is committed to be a solutions-oriented partner with Azusa Light & Water. We appreciate this opportunity to continue working with ALW and look forward to your response. If you have any questions or require further information, please contact me at (949) 439-0423 or randy.lovan@ mwhconstructors.com. Randy B. Lovan Southern California Regional Manager Construction Management Services Attachment 1 A LW, Cypress CIP Water Main Replacement Project W-227 Azusa Light & Water (ALW) Executive Summary l 1 Executive Summary MWH’s philosophy is to staff every project with highly experienced, multidisciplined personnel who are career professionals. Our goal is to be responsive to Azusa Light & Water’s needs, work pro-actively with the Contractor to keep moving forward, and ensure a quality project is delivered on-time and within budget. Wet Infrastructure Experts MWH’s Construction Management Services Group has been serving the California wet infrastructure industry by providing professional CM services since 1970. MWH has managed the construction, start-up and integration of every type of wet infrastructure facility that is currently on the market. 1. Staffing Resources We provide our proposed team organization, including identification and responsibilities. We provided a brief resume for our Construction Inspector, Dennis Brown, who has 26 years of experience with a proven track record of delivering projects within schedule and budget. 2. Proposed Method to Accomplish the Work MWH will use proven management and inspection techniques to identify overall project issues and apply appropriate controls. We use a flexible approach that allows us to adapt and modify our management strategy as the project progresses. MWH’s project management and inspection approach are based on the application of consistent practices through the project lifecycle. The MWH approach to project management provides governance that results in consistency and efficiency while also allowing innovative ideas to be tested and incorporated into the overall delivery process. 3. Fee Proposal We provide our time and materials, not-to-exceed fee proposal for the Scope of Services based in the Cypress CIP Water Main Replacement Project W-277 RFP. MWH’s terms and conditions are available upon request. 4. Other Information MWH offers state-wide recognized water and wastewater facility experience. Our presence in CA since 1945 and extensive project experience has helped us build a reputation for our ability to deliver capital improvement projects on time and within the allocated budget. We offer world-class pipeline and potable water distribution and treatment system services. We have been involved with the planning, design, and construction of more than 300,000 miles of pipelines. Our conveyance services are focused in the core areas of water and wastewater, including intakes, pipelines, tunnels, pumping stations, canals, and reservoirs. Recent similar projects include:  $11M Talavera Water Main Replacement, Phase 2 Project, Coachella Valley Water District (CVWD), CA. MWH 9.7 miles of 8- inch to 18-inch diameter zinc-coated ductile iron pipe.  $93M Wastewater Reclamation Project, Phase I Collection System, Hi-Desert Water District (HDWD), Yucca Valley, CA. 75 miles of collection system pipeline within the public right-of way.  $1.4M Azusa Avenue Water Main Replacement Project No. W-289, Azusa Light & Water (ALW). 4,200 linear feet of 12- inch ductile iron pipe water main, all associated appurtenances, pavement replacement, concrete replacement, street restoration and traffic control. “The MWH team has been providing comprehensive third-party CM and inspection services... (they have) sound recommendations in dealing with unforeseen issues and assisted in minimizing conflicts and providing constructive recommendations for resolution of various issues. The MWH team has been readily available and accessible as circumstances required and an integral and important resource supporting our overall project.” — Dennis Mejia, P.E., Utilities Engineering Director, Ontario Municipal Utilities Company A LW, Cypress CIP Water Main Replacement Project W-227 Azusa Light & Water (ALW) Staffing Resources l 2 Staffing Resources The MWH Team has expertise in providing Professional Construction Inspection services for water and wastewater facilities. We are committed to delivering quality Inspection services tailored to the specific needs of Azusa Light & Water and its stakeholders. Firm Staffing and Key Personnel Our Inspection Team brings demonstrated knowledge in potable water mainline installation Inspection services needed for this contract and are experienced in resolving the types of construction issues expected to be encountered on contracts of this complexity. RE/Construction Inspector Dennis Brown, RCI, CPII, ICC, Certified Soils Tester Dennis brings 26 years of experience that includes resident engineering and construction inspection, soils compaction testing, scheduling, contract development/implementation, owner/client/community relations, project controls, value engineering, safety, conducting meetings, record drawings, interfacing with project engineers, labor compliance, contractor payments, budget development/management, training, RFI/ COR/ PCO/ DCM/ CO development/review, system testing, start -up and close-out. $93M Wastewater Reclamation Project, Phase I Collection System, Hi-Desert Water District, Yucca Valley, CA – Resident Engineer, PR, Inspection/quality Control Lead. Responsible for managing and conducting site inspections, management of field inspection staff, daily inspection reports review for compliance and posting on electronic document control system ProjetWise/EADOC by Bentley), resolution of site problems, preparation of close-out documentation. Installation of over 50 miles of collection system pipeline and private property connections and replaced existing streets with new roads. $11M Talavera Water Main Replacement, Coachella Valley Water District, Indio, CA – Resident Engineer and Inspector. Managed schedule, budget development, internal/external HOA and resident communication, field inspection, inspection reporting, coordination with Engineer of Record. Included review/processing of all RFIs, CORs and COs. Prepared all payment applications from the Contractor for review/approval. The project consists of the replacement of approximately 20,000 linear feet of 8- in, 12-in and 18-in diameter zinc-coated ductile iron pipe. On-Call Inspection Services, Coachella Valley Water District (CVWD) Palm Desert, CA, Senior Inspector, $2M, 2018 - 2019 Provided inspection services to the Coachella Valley Water District for assigned projects which included gantry crane installations, AC pavement improvement projects, water treatment plant upgrades (WRP 10), potable water pipelines, chlorine replacement projects, sewer pipe installations and video inspection monitoring, well site drilling and brush and bailing projects, and reservoir rehabilitations. Also provided oversight of the water district’s third-party soil compaction and materials testing technicians and scheduled them as needed Role and Responsibilities The RE/Construction Inspector will be responsible for all assigned activities: MWH’s safety and health plan; project activities conducted in accordance with the contract, MWH, and legal; weekly project status reports; coordination with the City; interfacing with client, Contractors, and vendors; project resource management; timely responses to Contractor submittals, RFIs, and other documents; correspondence with Contractor; weekly progress meetings with the Contractor, client, Design Engineer, and subcontractor representatives; day-to-day administration of the contract including review and final recommendation to ALW on Contractor application of payment, change order requests, work change directives, and construction schedule updates; final inspection and issue certificate of substantial completion, and certificate of final completion; assist with permitting, public outreach; constructability reviews as requested by the client; pre- construction conferences; claims submitted by the Contractor; contract close out with Design Engineer, client, and Contractor; change order management, scoping, and estimating efforts; and stakeholder coordination. Subcontractors/ Subconsultants MWH will not be utilizing subcontractors to perform construction management services if awarded this contract. A LW, Cypress CIP Water Main Replacement Project W-227 Azusa Light & Water (ALW) Scope & Approach Work l 3 Scope & Approach Maintaining a consistent approach to delivery, coordination with all key stakeholders, and successful integration with the Owner’s staff throughout the duration of any long-term project has been proven to be critical for successful project delivery. Our approach is based on best practices developed, tested, refined and proven from multiple large capital projects. Approach MWH has been providing construction management services to Southern California clients consistently for the past few decades. The team will be supported by Principal- in-Charge, Mr. Randy Lovan. This section contains detailed descriptions about how the above-specified work will be executed. Frequent and thorough communication with ALW staff will be a common element of every assigned task. Objectives MWH will maintain focus on our primary objective, to serve as facilitators on behalf of ALW and to the benefit of the Project. Our inspection approach directly supports this objective by incorporating the following principles into our daily processes:  MWH will represent ALW’s best interest – MWH will represent ALW’s best interest in all matters of the project while developing a team/ partnering environment.  MWH will provide leadership – MWH’s lead personnel are selected and retained because of their leadership abilities. MWH personnel will provide leadership, while developing an inclusive team environment.  MWH will enforce the Contract requirements – MWH will enforce the Contract requirements of the Project to ensure that, although ALW and MWH seeks to develop a team environment with the Contractor, all provisions of the Project are not compromised.  MWH will take ownership of the project – Each member of the MWH Project Team will take a “pride of ownership” approach to the construction of the project, and will inspect the construction works as if they were building the project for their own personal use.  MWH will deliver a high-quality project – The “pride of ownership” and team-oriented approach ensure that MWH will deliver a lasting, quality project that meets the durability requirements of a public works facility that will operate properly for its duration. MWH’s Approach is designed to achieve these objectives, collaborate with ALW staff; and produce a quality and reliable delivered project within budget and on schedule. MWHC will provide the following services: A. Coordinate the project start and attend all meetings including preconstruction, field meetings, construction progress meetings, project close out meetings, etc. Prepare meeting agenda, and minutes for all meetings. B. Provide full time inspection of construction work to assure quality of construction and adherence to specifications, drawings, and submittals. Inspection will be provided as needed estimated to require 8 hours per day each day the work is being executed. Document daily work progress with written logs and photographs and submit weekly to the ALW Project Manager. Include pre-construction photographs, photographs of installation during construction and post-construction photographs. In the event that the contractor uses two crews, one inspector will inspect the work for this project. Generally, work will take place Monday through Friday. After hours work or holiday work will occasionally be necessary and will be paid for by the Construction Contractor. C. Conduct onsite interviews with contractor workers per the Specifications & document findings. Verify with certified payroll reports and report findings to the City. D. Will meet and maintain the COVID 19 requirements and the ALW Specifications. E. Manage requests for change orders by the Contractor. Provide requests for change orders with documentation and recommendations to ALW for review and approval. Implement changes as required and directed by ALW. F. Maintain record drawings in the field indicating any changes in the design, materials, dimensions, and details. Provide red lined "as-built" drawings to ALW. A LW, Cypress CIP Water Main Replacement Project W-227 Azusa Light & Water (ALW) Fee Proposal l 4 G. Prepare a "punch list" of all items to be completed by the Contractor to obtain final completion. Insure all items are completed. H. Arrange and conduct the final inspection and start-up coordination work with the Azusa Light & Water crews prior to the new facilities being placed into service. Final inspection to be witnessed by ALW. I. Will provide 24-hour number and Contact Person for the Public to answer and field any questions. J. The construction documents require the Contractor to supply a soils technician for backfill, compaction, compaction testing and reports by a licensed geotechnical engineer MWH will provide a Certified Compaction Testing Inspector to monitor the contractor’s backfill, compaction testing, give recommendations and ensure the contractor submits Certified Reports for the trench to satisfy and meet City of Covina Public Works Department & Los Angeles County Public Works requirements. K. Provide recommendations to ALW for each progress payment based on bid item completions. L. Provide clarification of contract documents; respond to contractor requests for information and clarification; review and provide comments and track contractor submittals, mix designs; review and provide comments regarding the BMP & SWPPP plan submitted by the Contractor; review and provide comments regarding the Solid Waste Management & Recycling plan submitted by the Contractor; shop drawings, and material certifications and certificates of compliance; labor compliance/ equal employment opportunities; obtain daily roll call submittals; conduct interviews onsite with Contractor workers; ensure labor compliance. M. Ensure that the contractor has an established safety program and that regular safety meetings are conducted. Ensure that the contractor meets all OSHA safety requirements. Perform and conduct onsite interviews with construction workers. N. Prepare As-Builts including size, type, location of existing and new utility lines, layout and schematic drawings of connection details, verification of alignment, cross sections, location of equipment. As-Builts required to show all field changes made and modifications to the construction drawings in detail. Basis of cost: The construction documents require the Contractor to supply a soils technician for backfill, compaction, compaction testing and reports by a licensed geotechnical engineer. MWH will provide a Certified Compaction Testing Inspector to monitor the contractor’s backfill, compaction testing, give recommendations and ensure the contractor submits Certified Reports for the trench to satisfy and meet City of Covina Public Works Department & Los Angeles County Public Works requirements. Our Fee reflects oversight soils inspection services. Azusa Light & Water (ALW) Resume l 5 Dennis Brown RCI, CPII, ICC, CWI, | Resident Engineer/Senior Inspector Strong planner and problem solver who readily adapts to change, works independently, and exceeds expectations with a strong focus on detail and efficiency. Over 26 years of experience in the construction inspection and materials testing industry. Excellent oral and written communication skills. Trained in using Primavera P6 and proficient with Office programs. Interested in career opportunities in Construction Management with increasing growth and responsibilities. Project Experience  Wastewater Reclamation Project, High Desert Water District (HDWD), Yucca Valley, CA, Resident Engineer, $97M, 2019 - 2020 Provided Resident Engineer services in support of the Construction Manager during the construction of approximately 50+ miles of sewer mainline and associated manholes and laterals to residential and commercial properties, and three individual project lift stations. Duties include conducting pre- construction and weekly progress meetings, document control, reviewing schedules, approving pay estimates, reviewing extra work invoices, and negotiating and writing change orders. On-Call Inspection Services, Inland Empire Utilities Agency (IEUA), Inland Empire, CA, Senior Inspector 2019 Provided inspection services for various projects, including the light pole replacement and handicap access upgrades in the RP-1 Waste Water Treatment Plant, two manhole rehabilitation projects in various locations throughout Ontario and Chino, and the Baseline recycled water pipeline extension project in Fontana. On-Call Inspection Services, Coachella Valley Water District (CVWD) Palm Desert, CA, Senior Inspector, $2M, 2018 - 2019 Provided inspection services to the Coachella Valley Water District for assigned projects which included gantry crane installations, AC pavement improvement projects, water treatment plant upgrades (WRP 10), Water pipeline, chlorine replacement projects, sewer pipe installations and video inspection monitoring, well site drilling and brush and bailing projects, and reservoir rehabilitations. Also provided oversight of the water district’s third-party soil compaction and materials testing technicians and scheduled them as needed. Treatment Plant Modifications and Upgrades – Capital Improvement Projects • Water Reclamation Plant 10 T2 Tertiary Filter Modifications and Plant B upgrades to aeration basins and associated piping and sludge pumps • Water Reclamation Plant 10 Chlorination System Upgrade Water Storage Reservoir Construction and Rehabilitation – Capital Improvement Projects • Water Storage Reservoir 3601-2 Construction • Water Storage Reservoir 4606-1 Construction • Water Storage Reservoirs 5643-1 and 5643-2 Rehabilitation Well Construction and Rehabilitation – Capital Improvement Projects • Well 4519 Repairs • Well 4521 Brush, Bail and Replace Industry Experience  Total MWHC 26 2 Education  John W. North, High School, 1989 Training / Certifications  American Construction Inspectors Association (ACIA)- Registered Construction Inspector (Public Works) American Public Works Association (APWA)- Certified Public Infrastructure Inspector (CPII) ICC#1066095 Certified Inspector for: Reinforced Concrete, Structural Masonry, Structural Steel and Bolting, Prestressed Concrete, Spray-Applied Fireproofing, Soils, and Commercial Building. American Welding Society (AWS) Certified Welding Inspector (CWI) #13081941 County of Los Angeles: Concrete, PT Concrete, Masonry, Structural Steel Bolting & Welding Inspector #01919 Concrete Field-Testing Technician, Grade I: American Concrete Institute (ACI) Nuclear Gauge Operator Training A LW, Cypress CIP Water Main Replacement Project W-227 Azusa Light & Water (ALW) Fee Proposal l 6 Request for Proposal Construction Inspection Services Cypress CIP Water Main Replacement Project W- 277 Azusa Light & Water (ALW) is requesting a not to exceed proposal to provide Construction Inspection Services for Project W-277. The inspection services for this water main replacement is on a high-profile street within multiple jurisdictions. Cost will be a major factor in the selection of the inspector for this project. In order to allow for overtime and weekend work, please base your proposed cost on 180 calendar days for the contract duration. Please include a resume and the name(s) of personnel you intend to use for the project inspection. Please submit a proposed project scope of work included, items excluded and the not to exceed price of work for Cypress CIP Water Main Replacement Project W-277. Construction Inspection Services for Project W- 277 Item Description Price per hour Total Price 1 Construction Inspection Services $ 125.00 $ 89,500.00 2 Certified Compaction Testing during backfill $ 125.00 $ 6,250.00 3 As-Builts $ 125.00 $ 3,000.00 Total Not-To-Exceed Price to Provide Construction Inspection Services Complete for Project W-277 $ 98,750.00 Company Name: MWH Constructors Name: Randy Lovan Phone Number: (949) 439-0423 Authorized Signature: Date: June 4, 2020