HomeMy WebLinkAboutI- VI Staff Report 12-17-01CONSENT CALENDAR MEMORANDUM TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL I - FROM: ROY BRUCICN4�, 71' LECTOR OF COMMUNITY DEVELOPMENT VIA: RICK COLE, CITY MANAGER DATE: DECEMBER 17, 2001 SUBJECT: SELECTION OF EDAW AND TORTI-GALLAS AS THE PLANNING AND DESIGN TEAM FOR THE GENERAL PLAN FOR THE MONROVIA NURSERY PROPERTY, AND APPROVAL TO AMEND THEIR RESPECTIVE EXISTING CONTRACTS. Recommended Action The City Council should select the team of EDAW and Torti-Gallas to undertake the Monrovia Nursery planning and design effort for inclusion in the General Plan, and approve amendment of their respective existing contracts to incorporate the new scopes of work and new budgets as presented in the staff report. Background On October 27, the City conducted a highly successful design competition for the Monrovia Nursery property, using 4 renowned planning and design firms, namely: ■ Lennertz & Coyle Architects and Town Planners - Portland, Oregon • EDAW - Irvine, California ■ Torti - Gallas CHK, Inc. - Silver Springs, Maryland • FORMA - Irvine, California These firms presented an interesting mix of planning and design solutions for the site, and citizens participated in selecting the desirable elements of the various plans for further consideration in the final plan. City staff and Monrovia Nursery staff have met several times to select one of the four consultants to further develop the elements of the plan into a more refined plan that will be included in the General Plan. In the evaluations done by the participants in our community design workshop, the concept designs developed by EDAW and Torti-Gallas scored the highest ratings for "strongly agree." Ultimately, it was the historic and design sensitivity, creativity and practicality of EDAW in combination with experience of Tord-Gallas in designing livable and walkable neighborhoods and districts, that determined the selection. The strengths of both firms in their respective areas will compliment each other and it is expected that the team will produce a highly imaginative, yet practical plan. The role of EDAW will be to manage the project and collaborate with Torti-Gallas on the planning and design of the overall plan, while Torti-Gallas will be focused on creating the plan for the Mixed- use/Transit-Oriented District. In developing the design competition model, Monrovia Nursery initially agreed to fund $ 150,000 for the second phase process of completing a final Nursery plan for the General Plan. This unique process has shown that the next phase will entail a higher level of detail than originally anticipated because it will produce a plan more fully developed than is typical for General Plan purposes. This will avoid the costs and time of a Specific Plan being developed later. Recognizing that $150,000 is not sufficient to complete the next phase of work, the Nursery has agreed to split the costs, absorbing the share allocated to EDAW ($236,040 including expenses), if the City will fund the Torti-Gallas share, Monrovia has agreed to refund this cost as part of a development agreement. There is a limited time frame to perform the project, with the schedule of the rest of the General Plan calling for the public hearing process to start towards the end of summer. Therefore, because time is of the essence, it is prudent to receive Council approval of the selected team and general scope of work at this point in time, with the actual contracts coming back for Council approval at a later Council meeting. The general scopes of work are attached as Exhibits A and B, while the project schedule is presented in Exhibit C. The proposed budgets are as follows: EDAW $236,040 including expenses Torti-Gallas $ 80,500 including expenses FISCAL IMPACT Monrovia Nursery will provide the cost of EDAW's share, with the City funding the remaining $80,500 from the forthcoming jobs -Housing Balance Grant from the State, to be reimbursed later from a development agreement with the Nursery. In the interim, progress payments would be advanced from the General Fund fund balance. Attachments 2 Exhibit A Monrovia Nursery = Phase 2 EDAW Preliminary Scope Revised 12112101 Task 1 Verify Scope/Schedule Attend a kick-off meeting with City staff and property owner to discuss/verify the scope, fee and schedule at the City of Azusa. Obtain results of the October 27, 2001 public workshop. Discuss process for evaluating alternative plans and identifying potential new plan elements. One additional interim meeting is scheduled as part of this task. Meetings: 1 kick-off meeting 1 interim team meeting Task 2 Evaluate Alternative Plans/Internal Design Session/Community Open House Review results of the public workshop in preparation of first internal design session and prepare matrix of the 10-12 elements that should be considered and identify potential components that could be incorporated in the Preferred Plan. Prepare graphic representations of the public workshop results. Attend the first internal design session. At this meeting EDAW will lead the session and brainstorm ideas for the Preferred Plan. The City staff and the Property Owner will also discuss their concerns and issues regarding the design. At the end of the session, direction will be given for development of the Preferred Plan. Two interim team meetings at the Irvine office are scheduled as part of this task. Attend a community open house on the evening of January 9, 2002 where the results of the public workshop are presented and the winning team is introduced. Meetings: 2 interim team meetings All day Design Session Community Open House Task 3 Plan Refinement / Second Design Session EDAW will incorporate ideas and directions generated at the Design Session and develop several alternative plan variations. These will be reviewed during two interim team meetings at the Irvine office that are scheduled as part of this task. The refined plan will include the following framework design elements: Backbone vehicular circulation Density by product type/area Acreage by land use Trails/pedestrian circulation Community amenities, including schools and parks Design guidelines will be initiated for neighborhood design, architecture and landscape. Image boards and sketch diagrams will be developed to explore primary guideline components. It is assumed guidelines during this stage are for purposes of communicating intended community character and do not need to be at a builders package level of detail or documentation. The EDAW Team will present the refined plan (and options) and design guideline components at the second Design Session on February 13, 2001. Traffic and engineering issues will be discussed and the preferred vehicular connections will be agreed upon. The Project Team will define General Plan topics and requirements. Meetings: 2 interim team meetings All day Design Session Task 4 Plan Refinement/Internal Design Session/Community Open House The plan will be further refined on the basis of the second design session. A single plan will be developed at a higher level of detail. Concept grading and detailed statistical summaries will be prepared. EDAW will coordinate with the consulting engineers for engineering validation. Illustrative exhibits will be prepared to communicate community and neighborhood character to residents. Architectural elevations, street scenes and selected public facilities will be illustrated. An internal full-day design session will be held on March 13, 2002 to review the illustrative exhibits and to determine the elements to be included in the General Plan. The internal design session will also kick-off preparation of the design guidelines identified in Task 5. As part of this task, two interim team meetings at the Irvine office. The Community Open House will be held April 2, 2002 set up in a informal manner with the EDAW Team staffing four different stations to explain aspects of the Preferred Plan. Meetings: 2 interim team meetings All day internal Design Session Community Open House Task 5 Prepare General Plan Exhibits Assumptions Prepare illustrative general plan exhibits for inclusion in the Draft General Plan. Two types of General Plan documents will be developed. The first type will include illustrative images that demonstrate possible development scenarios permitted under the General Plan which were prepared as part of the previous task. The second type of document will include the specific exhibits and text that will be included in the General Plan. These exhibits and text will include approximately 20 to 25 pages of design guidelines to ensure the vision established in the previous tasks can be accomplished. Two interim team meetings at the Irvine office are scheduled as part of this task. Meetings: 2 interim team meetings 1. Torti Gallas design efforts and traffic and engineering services are not part of the EDAW scope. 2. All Design Sessions and team meetings will be held at the EDAW, Irvine offices. 3. Extensive additional design refinement will not be generated by the Community Open House and the design as it is presented can be used as a basis for the General Plan documentation. 4. The EIR alternatives will be the four development concepts prepared as part of the Phase I efforts. 5. The aggressive time schedule assumes that the City and Monrovia Development Team resolve outstanding issues and reach concurrence of the General Plan documents at the January Design Session meeting. 6. The General Plan design guidelines will be approximately 20 to 25 pages long in a black and white format. T" 0 0 N M Irl N r O a 0 ami a� �3 a� a 0 a. ami 0 Cd E 0 b 0 aAi cu O z Ln x 4-J Q) 0 0 0 0 0 0 IT _ 00 00 O O O O O Co [� ' + o0 0\ � � O 6R Gq 6q N F 69 66R 69 � O O O O O O �y O O O O O O 6�R bort � � 3 00 00 o 0 0 0 0 �+ M O 00 N N A H bg M in M n W 69 64 69 64 69 -4 W t It W a W 0 0 � � 6S W 3 a� o 6g � p W A 0 0 000 0 0 0 A �4En W � � a � CLI o x 0 0 U 0 a to o a� ., t A A ? b ° p v o W U b Y p a U G7 a� cd aj o V) N > o > w h Y. N w Cd C13 w U) Cd C13x� H F H H O a 0 ami a� �3 a� a 0 a. ami 0 Cd E 0 b 0 aAi cu O z Ln x 4-J Q) Exhibit B Monrovia Nursery Site, City of Azusa, Phase 2 Planning Torti Gallas and Partners, Scope of Services Task 1 Review work done by EDAW, City of Azusa Staff, and Monrovia Nursery Prior to the First Design Session, Torti Gallas will review the reports, timelines, and graphics produced as a result of discussions between City staff, property owner and EDAW to discuss results of the October 27, 2001 public workshop and the process for evaluating alternative plans and identifying potential new plan elements. Torti Gallas will also review matrix, prepared by EDAW, of the 10-12 elements that should be considered and identify potential components that could be incorporated in the Preferred Plan. We will also provide independent identification of plan elements/issues to be discussed at first session. Task 2 Evaluate Alternative Plans/First Design Session and Public Meeting Torti Gallas will send two people, including Neal Payton, to a design session, tentatively scheduled for January 8' and 9`h. While this session will be led by EDAW, Torti Gallas will play an active and energetic role in brainstorming ideas for the Preferred Plan. The City staff and the Property Owner will also discuss their concerns and issues regarding the design. At the end of the Design Session, direction will be given for development of the Preferred Plan, including the specific location of the Transit Oriented Center. At this event, Torti Gallas is also prepared to lead a discussion on determining an overarching strategy for preparing developing design guidelines and or regulations consistent with the City of Azusa's requirements for the General Plan, and the owner's requirement to secure the value of the land. Torti Gallas will participate in a public meeting to be held in Azusa tentatively scheduled on the evening of January 9' Fee for Tasks 1 and 2: $9000. Task 3 Plan Refinement / Second Design Session Torti Gallas will incorporate ideas and directions generated at the first Design Session and at the public meeting with respect to the Transit Oriented Center and develop several alternative plan variations. These will be reviewed during interim phone meetings and presented at the Second Design session, tentatively scheduled for February 13, at EDAW's, Irvine, CA office. The refined plan will include the following conceptual design elements: Program Matrix and density Product types including a mix of housing, office and retail uses Street sections 3 - 4 Plan variations Community amenities and open space including parks, plazas and markets Design guidelines will be initiated for neighborhood design, architecture and landscape for the Transit Oriented Center. Image boards and sketch diagrams will Monrovia Nursery Site, City of Azusa, Phase 2 Planning Torii Gallas and Partners, Scope of Services Page 2 of 3 be developed to explore primary guideline components. It is assumed guidelines during this stage are for purposes of communicating intended community character and do not need to be at a builders package level of detail or documentation. Torti Gallas will send one person to the second Design Session tentatively scheduled for February 13" to present the plan variations, design guideline components and related drawings and diagrams. At this time, we will also participate in discussions on general plan topics and requirements as presented by EDAW including the overall Design Guidelines package. Fee for Task 3: $17,000. Task 4 Plan Refinement/Third Design Session The Transit Oriented Center Plan and related design guidelines will be further refined on the basis of the Second Design Session. A single plan will be developed at a higher level of detail. Concept grading and detailed statistical summaries will be prepared. Architectural elevations, public facilities will be illustrated. Two (2) preliminary ground level perspectives will be prepared to communicate neighborhood character to residents. These can be discussed as to appropriateness of view angle and subject matter. Torti Gallas will also provide review and written comment on design guidelines proffered by EDAW in to date. Drawings to be produced for this meeting include: Refined Program Matrix Refined product types including a mix of housing, office and retail uses Refined Street Sections Plan at 1: = 50' Community amenities and open space including parks, plazas and markets Circulation Diagram Urban Sequence Diagrams Ground Floor Land Use Diagram Street Hierarchy Building Height Diagram Parking location and Access Diagram Focal elements Detail of proposed rail station and/or commuter bus stop Two (2) refined ground level perspective renderings. In addition, Torti Gallas will provide refined guidelines Transit Center Guidelines, in both illustrated and narrative form, in conformance with the format agreed upon at the first design session. Torti Gallas will send one person to the third Design Session tentatively scheduled for March 13' and the morning of March 14' to present the refined plan (and options) and design guideline components. At this time, we will also participate Monrovia Nursery Site, City of Azusa, Phase 2 Planning Torti Gallas and Partners, Scope of Services Page 3 of 3 in discussions on general plan topics and requirements as presented by EDAW including the overall Design Guidelines package. Fee for Task 4. $20,000. Task 5 Prepare General Plan Exhibits and Final Presentation Torti Gallas, in cooperation with EDAW will prepare illustrative general plan exhibits for inclusion in the Draft General Plan. Two types of General Plan documents will be developed. The first type will include illustrative images that demonstrate possible development scenarios permitted under the General Plan. The second type of document will include the specific exhibits and text that will be included in the General Plan. Torti Gallas will also send one person to attend Open House Meeting. Fee for Task 5. $18,000. Task 6 Revisions to General Plan Torti Gallas expects minor revisions to the plan after the Citizens Congress Meeting and is prepared to make such revisions at this time. However substantial changes to the plan and or the perspective renderings would be considered an additional service and be billed at our Standard Hourly Rates or, in the case of the perspective renderings at $5000 each. Fee for Task 6. $4,000. TOTAL LABOR $68,000. TOTAL EXPENSES $12,500. GRAND TOTAL $80,5W Assumptions 1. Reimbursable expenses including the cost of travel (economy air fare), and lodging, printing and reproduction are not included in these fees and will be reimbursed at cost. Torti Gallas will provide all drawings to EDAW, Monrovia Nursery and the City of Azusa in print form as well as electronically as TIFFs. 2. EDAW design efforts and traffic and engineering services are not part of the Torti Gallas scope. 3. All Design Sessions and team meetings will be held at the EDAW, Irvine offices. 4. The EIR alternatives will be the four development concepts prepared as part of the Phase I efforts. 5. The General Plan design guidelines will be approximately 10-15 pages long. Color will be provided. EXHIBIT C PROJECT SCHEDULE TASK EVENT 1. Kick-off/Organizational tasks 2. Evaluate Plans ftom Design Competition/First internal design session 3. Community workshop 4. Plan refinement/Second internal design session 5. Plan Refinement - Prepare Draft Plan 6. Community Workshop/Open House 7. Prepare General Plan Exhibits 8. Prepare Design Guidelines 3 TIME FRAME December - January January January 9 January - February March - April April 2 April April - May