HomeMy WebLinkAboutI- 3 Change Order #8 for Police Facility Addition and Alteration %OFA?G 711 lu -ate�� The City o Azusa ''�f osil'al Police Department John Broderick, Chief of Police Agenda Item To: Honorable Mayor and Members of the City Council From: John Broderick, Chief of Police and Sam Gonzalez, Lieuten. ill I RV& 4111 P l0 Via: Henry Garcia, City Administrator V Date: December 1, 1997 Subject: Change Order#8 for Police Facility Addition and Alteration Project Background The plans and specifications for this project called for reusing the existing fire sprinkler system in the police department with some modification and the fire department connection(FDC) accessible from the alley. However, this approach was not acceptable by the Los Angeles County Fire Prevention Bureau (sprinkler unit) and was in need of additional modification. The original quotes to the contractor,the Hazama Corporation, could not include the additional modifications nor the number of days required to complete this work. Findings Staff and project architects have had much dialogue with the Fire Prevention Bureau, which culminated with a meeting of Department Heads. The most cost effective and reasonable approach was to add an additional FDC in front of the station and leave the existing connection accessible from the alley. This approach also requires expanding the fire sprinkler system in the police department to include additional coverage, with the exception of the jail proper which is essentially a stand-alone structure. Recommendation Staff recommends that pending the approval of LaSalle National Bank, Change Order#8 be approved as attached in the amount of$49,479. John Broderick Chief of Police á2# /L— /j'-//, j * * * / Phone #0261 812-?200 • 725 North Alameda Avenue, Azusa, California 91702-2504 • FAX#(626)812-9308 CHANGE ORDER# O8 Distribution to: OWNER [J FIELD ARCHITECT E] OTHER CONTRACTOR PROJECT: Azusa Police Facility CHANGE ORDER NUMBER: 08 (name,address) 725 North Alameda Avenue Azusa,California 91702 INITIATION DATE: 11/13/97 TO(contractor): Hazama Corporation CONTRACTOR'S PROJECT NO: CA 199 1045 W.Redondo Beach Blvd.,Ste 400 Gardena,CA 90247 CONTRACT FOR City of Azusa CONTRACT DATE: 3/3/97 You are directed to make the following changes in this Contract: Modified Sprinkler System at South Building and Additional Fire Department Connection A-1. Indirect Cost for South Building Fire Sprinkler System at South Building(14 days) $13,670.50 Subcontractor's Overhead/Profit $0.00 Sub-Total $13,670.50 Overhead/Profit(Indirect Cost-5%) $0.00 Sub-Total of Indirect Cost $13,670.50 A-2. Indirect Cost for Fire Department Connection Fire Sprinkler System-Additional Fire Department Connection(14 days) $6,617.70 Sub-Total $6,617.70 Overhead/Profit(Indirect Cost-5%) $330.89 Sub-Total of Indirect Cost $6,948.59 B. DIRECT COST 1. Delay Calendar Days 28 Days 2.General Condition($880/day) $24,640.00 3. Overhead/Profit(Direct Cost- 15%) $3,696.00 Sub-Total of Direct Cost $28,336.00 C. TOTAL Sub-Total of Direct Cost&Indirect Cost $48,955.09 Bond(0.65%) $318.21 Insurance(0.42%) $205.61 TOTAL $49,478.90 TotalAmount This Change Order: $49,479.00 • Not valid until signed by both the Owner and Architect. The Original Contract Sum was $ 2,908,916.00 Net Change by previously authorized Change Orders. $ 293,726.00 The Contract sum prior to this Change Order $ 3,202,642.00 The Contract Sum will be(increased) by this Change Order $ 49,479.00 The New Contract Sum including this Change Order $ 3,252,121.00 The Contract Time will be(inc by 28 days The Date of Substantial Completion as of the date of this Change Order therefore is 8/2/98 Authorized: WMM Associates The City of Azusa Hazama Corporation 3731 Wilshire Bo evard Suite 670 725 North Alameda Avenue 1045 W.Redondo Beach Blvd.,Ste 400 Los Angeles, onus��r 1$ Azusa,California 91702 Gardena California 90247 %/N Br P NE/ By: — �� By. D �. D r f ' Date: l/'etY�X77 Date: ♦ x.y 1G`'1 LaSalle National Bank' 135 South LaSalle Street Chicago,Illinois 60603 By: Date: