Loading...
HomeMy WebLinkAboutInformation Item Change Order 37 for Police Facility Addition and Alteration tfl * �� The City of Azusa "ftiFoo ..._ Police Department John Broderick, Chief of Police INFORMATION ITEM To: Honorable Mayor and Members of the City Council From: John Broderick, Chief of Police and Sam Gonzalez, Lieutena�n�`.../ Via: Henry Garcia, City Administrate Date: December 1, 1997 Subject: Change Order#7 for Police Facility Addition and Alteration Project Originally,the plans and specifications called for the departments two existing flag poles and existing double glass doors at the entrance of the old light and water building to be refurbished. This approach was used in order to curb costs;however,the contractor has arranged for the installation of one new flag and one new glass door with sidelights in lieu of refurbishing the old items. These modifications will be at no costs and are reflected in change order #7 for information and approval only. i * * * Phone#(626)812-3200 • 725 North Alameda Avenue, Azusa, California 91702-2504 • FAX#(626)812-9308 -. • CHANGE ORDER# m Distribution to: OWNER FIELD E] ARCHITECT n OTHER CONTRACTOR n PROJECT: Azusa Police Facility CHANGE ORDER NUMBER: 07 (name,address) 725 North Alameda Avenue Azusa,California 91702 INITIATION DATE: 11/13/97 TO(contractor): Hazama Corporation CONTRACTOR'S PROJECT NO: CA199 1045 W.Redondo Beach Blvd.,Ste 400 Gardena,CA 90247 CONTRACT FOR: City of Azusa CONTRACT DATE: 3/3/97 You are directed to make the following changes in this Contract Modifications for Flag Pole Relocation&Patio Doors Installation A. Indirect Cost To install one new flag pole in lieu of refurbish two existing flag poles $0.00 To install new door#118 at Patio in lieu of refurbish existing double doors $0.00 Subcontractor's Overhead/Profit $0.00 Sub-Total $0.00 Overhead/Profit(Indirect Cost-5%) $0.00 Sub-Total of Indirect Cost $0.00 B. DIRECT COST 1. Delay Calendar Days 0 days 2.General Condition($880/day) $0.00 3.Overhead/Profit(Direct Cost- 15%) $0.00 C. TOTAL Sub-Total of Direct Cost&Indirect Cost $0.00 Bond(0.65%) $0.00 Insurance(0.42%) 80.00 TOTAL $0.00 Total Amount This Change Order: $0.00 Not valid until.Igned by both the Owner and Architect. The Original Contract Sum wns $ 2,908,916.00 Net Change by previously authorized Change Orders $ 293,726.00 The Contract sum prior to this Change Order S 3,202,642.00 The Contract Sum wall unchanged) by this Change Order $ 0.00 The New Contract Sum including this Change Order S 3,202,642.00 The Contract Time wall unchanged)by 0 days The Date of Substantial Completion as of the date of this Change Order therefore is 7/5/98 Authorized: WMM Associates The City of Azusa Hazama Corporation 3731 Wilshire Boulevard Suite 670 725 North Alameda Avenue 1045 W.Redondo Beach Blvd.,Ste 400 Los Angeles, • 900,' - / Azusa,California 91702 Gardena,California 90247 ,,, 6'%/;G,. _ 9.1111/1"(9.41.u%61:124" D. r " '7 Date: /V-oZY,S'7 Data "1 ,u.Ig7 LaSalle National Ba / t 135 South LaSalle Street Chicago,Illinois 60603 Data