INFORMATION ITEM
To: Honorable Mayor and Members of the City Council
From: John Broderick, Chief of Police and Sam Gonzalez, Lieutena�n�`.../
Via: Henry Garcia, City Administrate
Date: December 1, 1997
Subject: Change Order#7 for Police Facility Addition and Alteration Project
Originally,the plans and specifications called for the departments two existing flag poles and existing
double glass doors at the entrance of the old light and water building to be refurbished. This approach
was used in order to curb costs;however,the contractor has arranged for the installation of one new
flag and one new glass door with sidelights in lieu of refurbishing the old items.
These modifications will be at no costs and are reflected in change order #7 for information and
approval only.
i
* * *
Phone#(626)812-3200 • 725 North Alameda Avenue, Azusa, California 91702-2504 • FAX#(626)812-9308
-. • CHANGE
ORDER# m Distribution to:
OWNER FIELD E]
ARCHITECT n OTHER
CONTRACTOR n
PROJECT: Azusa Police Facility CHANGE ORDER NUMBER: 07
(name,address) 725 North Alameda Avenue
Azusa,California 91702 INITIATION DATE: 11/13/97
TO(contractor): Hazama Corporation CONTRACTOR'S PROJECT NO: CA199
1045 W.Redondo Beach Blvd.,Ste 400
Gardena,CA 90247 CONTRACT FOR: City of Azusa
CONTRACT DATE: 3/3/97
You are directed to make the following changes in this Contract
Modifications for Flag Pole Relocation&Patio Doors Installation
A. Indirect Cost
To install one new flag pole in lieu of refurbish two existing flag poles $0.00
To install new door#118 at Patio in lieu of refurbish existing double doors $0.00
Subcontractor's Overhead/Profit $0.00
Sub-Total $0.00
Overhead/Profit(Indirect Cost-5%) $0.00
Sub-Total of Indirect Cost $0.00
B. DIRECT COST
1. Delay Calendar Days 0 days
2.General Condition($880/day) $0.00
3.Overhead/Profit(Direct Cost- 15%) $0.00
C. TOTAL Sub-Total of Direct Cost&Indirect Cost $0.00
Bond(0.65%) $0.00
Insurance(0.42%) 80.00
TOTAL $0.00
Total Amount This Change Order: $0.00
Not valid until.Igned by both the Owner and Architect.
The Original Contract Sum wns $ 2,908,916.00
Net Change by previously authorized Change Orders $ 293,726.00
The Contract sum prior to this Change Order S 3,202,642.00
The Contract Sum wall unchanged) by this Change Order $ 0.00
The New Contract Sum including this Change Order S 3,202,642.00
The Contract Time wall unchanged)by 0 days
The Date of Substantial Completion as of the date of this Change Order therefore is 7/5/98
Authorized:
WMM Associates The City of Azusa Hazama Corporation
3731 Wilshire Boulevard Suite 670 725 North Alameda Avenue 1045 W.Redondo Beach Blvd.,Ste 400
Los Angeles, • 900,' - / Azusa,California 91702 Gardena,California 90247
,,, 6'%/;G,. _ 9.1111/1"(9.41.u%61:124"
D. r " '7 Date: /V-oZY,S'7 Data "1 ,u.Ig7
LaSalle National Ba / t
135 South LaSalle Street
Chicago,Illinois 60603
Data