Loading...
HomeMy WebLinkAboutN- 3 South Wing Remodel Proposal V 44 The Cityfo Azusa" 111 '1<IFOR Police Department John Broderick, Chief of Police Agenda Item TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: JOHN BRODERICK, CHIEF OF POLICEe35e .r.4-3 VIA: JOE HSU,INTERIM CITY ADMINISTRATOR DATE: JANUARY 20, 1997 SUBJECT: SOUTH WING REMODEL PROPOSAL Background In an effort to minimize the cost of the police facility remodeling project, prior to the first professionally-prepared cost estimate in December 1994,the Department deleted the south wing out- building from the project scope. However, the integrity of the structure is in jeopardy and the building is in desperate need of remodeling. The Police Department has been able to negotiate a favorable price for the work from the general contractor that is already on site. This report recommends that Council expand the scope of the police facility remodeling project to include the south wing out-building and allot to it $112,000 of the LaSalle Bank funds. Findings Several years ago, in an effort to create a needed passageway between parking lots for police cars and for employees who park their cars in the south lot,the Police Department cut an opening through the south wall of the south wing out-building. It was not affordable to have the opening engineered, thus it is beginning to sag and to show signs that the structural integrity of the passageway area is in jeopardy. This building also has only its original 1969-71 roof, which is leaking severely. In short, the building is in desperate need of remodeling and refurbishment. In an effort to ensure adequate structural integrity among all of the buildings that comprise the new public safety complex, and to ensure a sufficient overall level of security for the complex, its * * * a & i/a-o/91 Phone#(6261 812-3200 • 725 North Alameda Avenue,Azusa, California 91702-2504 FAX#(626)81 -9308 Honorable Mayor&Members of the City Council January 20, 1998 page 2 employees and the public, staff tentatively worked towards using approximately $100,000, of the funds that LaSalle Bank provided, for properly designing and constructing a remodeled south wing out-building. The project architectural firm, WMM Associates, prepared proposed plans and elevations for renovating this structure that carry out the complex's common architectural theme. A copy of these drawings are attached for your review. In a nut shell, the south wing out-building (carport, vehicle wash rack, storage, and exercise room*) work will consist of widening the passageway through the structure for vehicles/employees; installing needed beams and shoring in order to make the building safe and to guard against seismic damage; eliminating a load-bearing pole that is a dangerous obstacle to cars trying to negotiate their way through the current opening; and bringing the structure into compliance architecturally with the rest of the complex. The Hazama Corporation, general contractor, kindly offered to take on the additional work with no increase to their general conditions, providing that they receive authorization on a timely basis to include the south wing out-building, as generally described in the attached proposal, during Phase H of the Police Facility Addition and Alteration Project. On the monthly police facility construction cost/budget spreadsheet staff tentatively identified $100,000 of LaSalle funds for the south wing out-building remodel. The architect's estimate is $112,000. Even at this slightly higher cost, doing the work will not cause an increase in the City's semi-annual payment to LaSalle. And, there is more good news: the State of California Division of State Architect (DSA) recently announced its award to the Azusa Police Department of$500,000 in grant funds to be expended for the Emergency Operating Center(EOC)portion of the new facility. Thus,the City Council will likely be given the opportunity to reallot to a related, worthwhile project, the portion of the LaSalle funds that was earmarked for the EOC. Staff will furnish Council with more information on this under separate cover. Recommendation Staff recommends that,pending the approval of LaSalle National Bank, the south wing out-building remodel proposal be approved in the amount of$112,000. Sam Gonzalez, Lt., for John Broderick, Chief of Police *The Azusa Police Officers Association provides the equipment for the exercise room; such cost is, therefore, not a General Fund expense. Ian. 12. 1998 3: 10PM HAZAMA CORPORATION No. 6749 P. 2/2 HAZAMA CORPORATION Project: Azusa Police Facility,South Wing Remodel Proposal Filename: azusa.xls Issued Date: 1/12/98 1 DCT1ion Mai 1 Demolition $4,570 2 Landscape&Irrigation(Allowance) $1,000 3 Concrete $6,289 4 Steel Work $4,193 S Roofing $12,473 6 Doors,Frames&Hardware $1,101 7 Metal Stud,Lath,Plaster&Drywall $44,539 $ Acoustical Ceiling $0 9 Carpet&Base $885 10 Painting $1,680 11 Fire protection(Allowance) $3,000 12 Plumbing $734 13 HVAC $5,844 14 Electrical $5,954 15 ADA requirements(Allowance) $3,500 Total Direct Costs $95,760 General Conditions SO Overhead&Fee $4,788 Payment&performance Bond @.84% $845 Insurance @.42% $426 Contingency @ 10% $10,182 Total Preliminary Construction Budget $112,000 Speck QualLacationss 1) The preliminary budget estimate has been prepared in accordance with Sheet A1.6(South Building) prepared by WMM Associates dated 6/5/97. 2) Allowance of$1,000 is included for 2'strip of landscape&irrigation @ south side of building. 3)Non-load bearing facade structure is included. 4)Dash finish stucco with integral color is included. 6) Existing car wash and breezeway interior finishes assumed to remain. 7) Gym flooring is by OWNER and is excluded. 8) Existing lighting system assumed to remain. 9) Handling and or removal of any hazardous materials is excluded. 10) Design,engineering and permit fees are excluded. 11) General Conditions cost is zero(0)based on performing the work simultaneously with main expansion project. Pi c as,. ply 3 F D A . N oz ii I 0 z/D4 r /'----) 1\ -0 I o Dr. \ X m \ • Z O m E ("Ji -11 m -1 N 1 iM o m A Q z ) -n D Z \ A p 0 \ \ M tj 33 0 m m A m z6 r M E E m -4 111 O m m )r----1 Z A ' m / le - I eD N uIIi C3• m \ m I A III E E \m/ m E E E (n O \ \ m m A Pr" A ! f4 7m m C L ir x m Z g m i:_ H A I o PROPERTY LINE r 1 ZZ z E In N N g i m O m 9 D d0 i Eo . In m x z II X OE il tiII 0 h 6 AI m r m m bm sD b E II -< O D I E N O A D rn I • Z I M X zz " I E 33 E -ri CD 0 70 23 § jimil -rt O 1 z 1' ] Z 0 6 T E N r O L-- --1___-