Loading...
HomeMy WebLinkAboutP- 4 Change order #22, for Police Facility Addion and Alteration �0F ASG 4001111111011111111.11.11111111.. Cit ' . * _> The City of Azusa 4,. P Police Department John Broderick, Chief of Police AGENDA ITEM TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: JOHN BRODERICK, CHIEF OF POLICE & SAM GONZALEZ, . ---44ii1;:c5: VIA: JOE HSU,INTERIM CITY ADMINISTRATOR DATE: APRIL 6, 1998 1' SUBJECT: CHANGE ORDER#22 FOR POLICE FACILITY ADDITION AND ALTERATION PROJECT Background The connection of two existing buildings with a new Essential Services Building in the middle is inherently difficult,but the low bid structural steel fabricator was approximately$80,000 lower than the next lowest bidder. In light of this incredible dollar separation,the decision to proceed with this low bidder was well worth the price of potential change orders for field difficulties. Findings Due to field dimensions having some variation from the project drawings and to accommodate proper connection,additional structural steel(i.e. angles,beams and channel caps)were necessary. These steel changes also allowed for proper drainage and mechanical openings. Recommendation Staff recommends that Council approve Change Order #22 in the amount of$7,962 authorizing payment for the necessary structural steel changes,pending the approval of LaSalle National Bank. i Sam Gonzalez, Lt., for John Broderick, Chief of Police 0-_fru-4 q4/9 r !'hone 4(626) 812-3200 . 725 North Alameda Avenue, Azusa, California 91702-2504 . FAX 4(626) 812-9308 `� CHANGE ORDER# 22 Distribution to: OWNER n FIELD n ARCHITECT n OTHER n CONTRACTOR O PROJECT: Azusa Police Facility CHANGE ORDER NUMBER: 22 (name,address) 725 North Alameda Avenue Azusa,California 91702 INITIATION DATE: 3/27/98 TO(contractor): Hazama Corporation CONTRACTOR'S PROJECT NO: CA199 1045 W.Redondo Beach Blvd.,Ste 400 Gardena,CA 90247 CONTRACT FOR City of Azusa CONTRACT DATE: 3/3/97 You are directed to make the following changes in this Contract: A. INDIRECT COST Structural Steel Modifications work done by Progressive Frame and Fabricating 1 Install additional angles under metal deck for roof drains $1,180.00 2 Install additional beams for mechanical openings $2,604.00 3 Install additional channel caps at east trellis $3,719.00 Sub-Total $7,503.00 Overhead/Profit(Indirect Cost-5%) $375.15 Sub-Total of Indirect Cost $7,878.15 B. DIRECT COST 1. Delay Calendar Days 0 Days 2.General Condition($880/day) $0.00 3.Overhead/Profit(Direct Cost- 15%) $0.00 Sub-Total of Direct Cost $0.00 C. TOTAL Sub-Total of Direct Cost&Indirect Cost $7,878.15 Bond(0.65%) $51.21 Insurance(0.42%) $33.09 TOTAL $7,962.45 Total Amount This Change Order. $7,962.00 Not valid until signed by both the Owner and Architect. The Original Contract Sum was. $ 2,908,916.00 Net Change by previously authorized Change Orders. $ 586,552.00 The Contract sum prior to this Change Order $ 3,495,468.00 The Contract Sum will be(increased) by this Change Order $ 7,962.00 The New Contract Sum including this Change Order $ 3,503,430.00 The Contract Time will b unchanged)by 0 days The Date of Substantial Completion as of the date of this Change Order therefore is. 9/4/98 Authorized: W11131 Associates The City of Azusa Hazama Corporation _ 3731 Wilshire Boulevard Suite 670 725 North Alameda Avenue 1045 W.Redondo Beach Blvd.,Ste 400 Los Angeles At: ifonia'.1 I , Azusa,California 91702 Gardena California 90247 BY:/L B /� �///,, By: ...alr_ — ir,,, By: 2�9l_( 7'11 ,L,.& i Date �- �� Date: 3—yo-- '/ ' Date: "'1 c�I cY LaSalle National Bank 135 South LaSalle Street Chicago,lllinois 60603 By: Date: