Loading...
HomeMy WebLinkAboutE-7 Staff Report - 602093-19_CDBG - NIBCONSENT ITEM E-7 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL VIA: SERGIO GONZALEZ, CITY MANAGER FROM: ROBERT DELGADILLO, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINEER DATE: SEPTEMBER 21, 2020 SUBJECT: COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) SIDEWALK AND ADA IMPROVEMENTS PROJECT NO. 602093-19 BACKGROUND: The City annually receives federal Community Development Block Grant (CDBG) funds for infrastructure improvements within qualified CDBG areas. The recommended actions will approve the proposed project and authorize staff to solicit bids from qualified contractors to remove and replace ten (10)curb ramps, cross gutters, and sidewalk in accordance with Americans with Disabilities Act (ADA) guidelines. RECOMMENDATIONS: Staff recommends the City Council take the following actions: 1) Approve the proposed project; and 2)Authorize staff to solicit a Notice of Inviting Bids for the CDBG Project 602093-19, Sidewalks and ADA Improvements. ANALYSIS: The City has participated in the CDBG Program since its inception in 1974, utilizing federal CDBG funds for various community improvement projects. For Fiscal Year (FY) 2019-2020 CDBG funds totaling $158,460 were available to improve sidewalks and install Americans with Disabilities Act (ADA) compliant curb ramps throughout the City. A Notice Inviting Bids was released on October 7, 2019. On November 7, 2019, sealed bids were opened and nine bids were received. All bids exceeded APPROVED CITY COUNCIL 9/21/2020 Sidewalk and ADA Improvements September 21, 2020 Page 2 the available CDBG project budget. On December 2, 2019, the bids were rejected and the project was postponed until additional CDBG funding was available. Following the close of FY 2019-2020, an additional $110,079 in unspent CDBG funds was identified and reprogrammed into CDBG Project 602093-19. This amount, combined with the current project budget of $158,460, brings the total available budget to approximately $268,539. Of that total amount, approximately $225,000 will be utilized for construction and $43,539 will be allocated for administrative costs associated with CDBG program oversight and compliance with federal labor standards. The proposed concrete improvements will improve pedestrian safety by repairing approximately 1,250 square feet of existing sidewalks and 4,800 square feet of cross gutters that may inhibit pedestrian access or cause injuries, minimizing the risks of trip and fall incidents. In addition, this project will upgrade ten (10) existing curb ramps to comply with the latest ADA guidelines. The project will focus on areas of greatest need within the boundaries qualified for CDBG funds. The areas to be addressed are Cerritos Avenue between Hanks Street to Duell Street, and First Street from Pasadena Avenue to Rodecker Drive. FISCAL IMPACT: FY 2019-2020 CDBG funds in the amount of $268,539 will be used to implement this project. Upon Council approval, staff will prepare a budget amendment consistent with the approved project amount. Prepared by: Reviewed by: Christina Curiel Robert Delgadillo, P.E. Public Works Project Manager Director of Public Works/ City Engineer Fiscal Reviewed by: Reviewed and Approved by: Talika M. Johnson Sergio Gonzalez Director of Administrative Services City Manager Attachment: 1) Exhibit – Project Location Map 11th St 9th St 8th St 3rd St 1st StAspan AveParamount StVernon AveSan Gabriel AveAzusa AvePasadena AveCerritos AveFoothill Blvd Haltern St Armsead St Mason St Arrow Hwy Foothill Blvd Sunset AveMcKinley St Foothill Blvd 10th St 5th St Virginia AveGladstone St 2nd St 3rd St 4th St Rockvale Ave6th St Citrus AveAlosta Ave Baseline Rd Barranca AveVincent AveMcKeever AveMcKeever AveOrange AveSunset AveAerojet AvePark Dr LimeAve Ranburn Ave5th St Gladstone St Irwindale AveArrow Hwy Lark Ellen AveAzusa AvePasadena Ave6th St Citrus AveEnid AveDanlee St Loren AveConey AveMillerAveGeorgia AveIndustrial St Georgia PlOrange AveLemon AveLouise AveBarbara AveVernon AveBayless St 4th St Bayless St Orange AveDuell St Virginia AveParksideSt Jerez St Momax St Solem St Barbara AveLouise AveLemon AveOrange AveLouise AveEnid AveOrange AveSunset AveGrandin AveAngeleno AveSan GabrielAveAngeleno AveDurell AveLee DrLee Pl Matchwood Pl Fenimore AveCalvados AveEdenfield AveViceroy AveGlenlyn Dr Lenfield St Hanks St PowellAveOld Mill RdSoldano AveHolmar AvePasadena AveBagnallSt HollyvaleSt Orangecrest AveTwintree AveGlenfinnan AveLimeSt 6th StCedarglen HollyvaleSt HalternSt Hollyvale St Alford St Galatea St Citrus Edge St Fondale St Nearfield St Gaillard St Ghent StRanger DrCalera AveGrantlandDrManning St McKinley St Murray AveO'Malley AveDixon St Roland St Russell StNoble AveElliott AveAzusa Ln Celeste St Renwick Rd Rosalina AveScott AveSunset AvePayson St Kirkwall RdAlamedaAve Renwick Rd Kirkwall Rd Payson St Newburgh StAspan AveVirginia AveJackkson AveEast AveZachary Padilla AveHollyvale St North StOptical DrMontoya St Adelante St Paramount St Roosevelt RdMotor AvePeckham Rd1st St Ayala AveMartin Rd12th StVista Bonita St Manresa Dr San FelipeHill HollyStLopezLnC h e s t n u t L n Tangerine St Palm DrLak e v i e w T e r Monrovia Pl Mountain Wy The Promenade Palm DrRosedale AveRuby Lace Wy Barberry Wy Woodbine WyCornejoWySweetbriar LnSunriseLnChaparralLnCassiaLnBouquetCtBotanicaLn PrimroseLnRoseway Ct Purple SageDrAcaciaCt OrchardLpPalm DrPonderosa Dr Pepper Tree Dr Silver MapleDr Laurel OakDr SycamoreDr Sequoia LnUniversity Dr Calera AveMauna Loa Ave Duell St 2nd St Hanks St Rodecker DrDuell StDominguezPlHollyvale StStein LnPlum TreeDr Oakview Dr Poplar ViewDr Santa Fe Av e Camino DeLa Cantera Calle EvaMiranda Factor AveGalanto AveOakbank DrHanlin AveTraymore AveKirkwall RdDuggan AveNewburgh St Laxford Rd Fairvale AveMira LomaDr Ayon AveOrkney StHollyvaleSt Alameda AveDalton AveSoldano AveSan G a b r i e l P l GrandviewDr Noble Pl1st St Angeleno AveSan Gabriel AveVernon AveTodd Ave10th St 8th St Al o s t a A v e Little Dalton Wash Little Dalton Wash Southern P a cific R ail R o a d Big Dalton WashMillerAveSouthern Pacific Rail Road Donna Beth AveCerritos AveLittlRodecker DrDalton Wash210 F w y 210 FwyCerritos Ave4006.024006.02 4044.014044.01 4043.014043.01 4042.014042.01 4042.024042.02 4044.024044.02 4045.014045.01 4045.034045.03 4045.034045.03 4045.034045.03 4045.044045.04 4045.044045.04 4045.044045.04 4041.004041.00 4040.004040.00 ´ City of Azusa SIDEWALK AND ADA IMPROVEMENTS PROJECT REMOVE AND REPLACE CURB RAMPS 4043.02