TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY
BOARD
FROM: MANNY ROBLEDO, DIRECTOR OF UTILITIES
DATE: SEPTEMBER 21, 2020
SUBJECT: APPROVAL OF THE NOTICE OF COMPLETION FOR WELL 1
REHABILITATION CAPITAL IMPROVEMENT PROJECT
BACKGROUND:
On March 23, 2020, the Azusa Utility Board awarded Task Order 10, under an existing Master
Maintenance Services Agreement, to General Pump Company for Well 1 rehabilitation work.
The project included pulling the well, performing a video inspection, and installing a new
stainless steel casing, glass bead packing, pump, column, oil lubricated shaft, bowl assembly,
check valve, and pump-to-waste piping. This project has been completed and Azusa Light &
Water (ALW) is now required to file a Notice of Completion with the Office of the County
Recorder of Los Angeles County.
RECOMMENDATION:
Staff recommends the Utility Board take the following action:
1)Accept Well 1 project improvements; and
2) Approve the Notice of Completion; and
3) Authorize the Mayor to execute the Notice of Completion on behalf of the City; and
4)Authorize the City Clerk to submit the Notice of Completion for recordation to the
Office of the County Recorder of Los Angeles County, within ten days of the Utility
Board approval, as required by Section 3093 of the California Civil Code.
APPROVED
UTILITY BOARD
9/21/2020
Special Meeting
Approve Notice of Completion for Well 1
September 21, 2020
Page 2
ANALYSIS:
ALW’s Well 1 was constructed in 1975 with a capacity of 3,000 gallons per minute (GPM) and
an average production of 2,800 acre feet per year. The well was last inspected in 2003 and is
currently on a programmatic cycle for rehabilitation to maintain efficiency and promote
longevity. Since the last rehabilitation work in 2003, Well 1 has lost 800 gallons per minute of
production, and overall efficiency is at 53 percent. On March 23, 2020, the Azusa Utility Board
awarded Task Order 10, under an existing Master Maintenance Services Agreement, to General
Pump Company for Well 1 rehabilitation work. The project included pulling the well and video
inspecting the entire 350 foot depth to provide recommendations for repair. The video inspection
revealed the existing mild steel casing to have deteriorated through the entire depth of the well,
with large holes visible throughout.
After a complete assessment, General Pump determined required improvements, including:
installation of a new stainless steel casing, glass bead packing, pump, column, oil lubricated
shaft, bowl assembly, impellers, cone strainer, check valve, and pump-to-waste piping. The liner,
strainer, impellers, bowl bolting, shaft coupling, line shaft, and head shaft were replaced with
stainless steel material to ensure long-life and limited corrosion.
After rehabilitation, bacteriological samples were collected and analyzed, confirming the newly
pumped water met all applicable water quality requirements. On July 20, 2020, Well 1 was
placed back into service. As a result of this rehabilitation project, current production has
increased by approximately 700 GPM to 3,300 GPM, and overall efficiency has increased by
25%.
FISCAL IMPACT:
The Well 1 Rehabilitation Capital Improvement Project was budgeted in the Water Division’s
Capital Improvement Program, Account No. 32-80-000-721-7130/72120A, for an amount not-to-
exceed $343,310, which included a 10% contingency. The project was completed on schedule
and within budget.
Prepared by: Reviewed and Approved:
Melissa Barbosa, P.E. Manny Robledo
Senior Water System Engineer Director of Utilities
Reviewed and Approved: Reviewed and Approved:
Jared Macias Sergio Gonzalez
Assistant Director of Utilities - Water Operations City Manager
Attachment:
1) Notice of Completion Form Well 1 Rehabilitation
RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:
NAME CITY OF AZUSA
STREET ADDRESS 213 E. FOOTHILL BLVD
CITY, STATE ZIP AZUSA, CA 91702 SPACE ABOVE THIS LINE FOR RECORDER’S USE
NOTICE OF COMPLETION
Notice pursuant to Civil Code Section 3039, must be filed within 10 days after completion. Notice is hereby given that:
1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described:
2. The full name of the owner is The City of Azusa
3. The full address of the owner is 213 E. Foothill Boulevard, Azusa, CA 91702
4. The nature of the interest or estate of the owner is: In fee.
(IF OTHER THAN FEE, STRIKE “IN FEE” AND INSERT, FOR EXAMPLE , “PURCHASER UNDER CONTRACT OF PURCHASE”, OR “LESSEE”
5. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common,
are:
NAMES ADDRESSES
NONE
6. The full names and full addresses of the predecessors in interest of the undersigned, if the property was transferred subsequent to the
commencement of the work or improvements herein referred to:
NAMES ADDRESSES
NONE
7. A work of improvement on the property hereinafter described was completed on July 20, 2020 . The work done was:
Well 1 Rehabilitation Capital Improvement including new pump, stainless steel casing, glass bead packing, column, oil lubricated shaft
and bowl assembly for the Water Division Project No. 72120A.
8. The name of the contractor, if any, for such work of improvement was:
General Pump Company, 159 N. Acacia Street San Dimas, CA 91773 March 23, 2020 (IF NO CONTRACTOR FOR WORK OF IMPROVEMENT AS A WHOLE, INSERT “NONE”) (DATE OF CONTRACT)
9. The property on which said work of improvement was completed is in the Azusa Light & Water Service Area, County of Los Angeles,
California and as described as follows:
Azusa Light & Water Service Area
10. The street address of said property is 951 W. Sierra Madre Ave, Azusa CA 91702 (IF NO STREET ADDRESS HAS BEEN OFFICIALLY ASSIGNED, INSERT “NONE”)
Dated: Robert Gonzales, Mayor, City of Azusa (SIGNATURE OF OWNER OR CORPORATE OFFICER OF OWNER NAMED IN PARAGRAPH 2 OR HIS AGENT)
I, the undersigned, say: I am the person who signed the foregoing notice of completion. I have read said notice of completion and know its
contents, and the facts stated therein are true of my own knowledge. I declare under penalty of perjury that the foregoing is true and correct.
Executed on at Azusa, Los Angeles County, California (DATE) (CITY, COUNTY, & STATE)
Robert Gonzales, Mayor, City of Azusa (SIGNATURE)