HomeMy WebLinkAboutE-6 Staff Report - Amendment No. 2 with Metro and Project fundingCONSENT ITEM
E-6
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
VIA: SERGIO GONZALEZ, CITY MANAGER
FROM: ROBERT DELGADILLO, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
DATE: FEBRUARY 1, 2021
SUBJECT: EXECUTE AMENDMENT NO. 2 TO FUNDING AGREEMENT BETWEEN THE
CITY AND THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION
AUTHORITY AND APPROVE REVISED FUNDING FOR THE TRAFFIC
MANAGEMENT SYSTEM PROJECT NO. 66117C, 66117I, 66118C AND 66117J
BACKGROUND:
The City received a grant from the Los Angeles County Metropolitan Transportation Authority
(LACMTA) for the Traffic Management System Project and entered into a Funding Agreement. This
project will alleviate traffic congestion, improve traffic and pedestrian safety, and reduce travel times,
allowing vehicles to operate more efficiently with less impact to the environment. Minor project delays
have resulted in the need to extend the timeframe of the Agreement with LACMTA to February 28,
2021.
On September 16, 2019, City Council approved the award of the construction contract to Ferreira
Construction Company, identifying Measure R proceeds to fund a $1,524,352 shortfall in the project due
to the bids coming in above the engineer’s estimate and other incidental project expenses. After further
analyses of funds available and long-term commitments, the proposed funding is being revised.
RECOMMENDATION:
Staff recommends the City Council take the following actions:
1)Authorize the City Manager to execute Amendment No. 2 to existing Funding Agreement
between the City of Azusa and the Los Angeles County Metropolitan Transportation Authority
to extend lapsing date of the Project to February 28, 2021, in a form acceptable to the City
Attorney, on behalf of the City; and
APPROVED
CITY COUNCIL
2/1/2021
Traffic Management System Project
February 1, 2021
Page 2
2) Approve revised funding for the Traffic Management System Project contract to add an
additional $350,000 in Prop C funding and $1,174,352 in Utility Mitigation funding.
ANALYSIS:
In April 2016, the City was awarded a $3,507,490 Proposition C grant from Metro for the City of Azusa
Traffic Management System. On September 16, 2020, the City Council awarded a contract to Ferreira
Construction Company for the Traffic Management System Project No. 66117C & 66117I. The project
will modernize various signalized intersections along major corridors in the City to improve local and
regional traffic flow.
On September 16, 2019, City Council awarded the construction contract in the amount of $7,436,683 to
Ferreira Construction Company as the lowest and responsible bidder. At that time, due to bids coming in
over the engineer’s estimate, there was an anticipated shortfall in overall project funding. It was
suggested that Measure R funds be utilized to fund the shortfall. The total project funding at that time
was $8,135,884. After further analyses of funds available for the project, and long term commitments,
Staff is proposing that the funding for the Traffic Management System Project be changed to the
following:
Funding Source Value
Prop C Grant – Call for Projects $3,108,214
Measure R Bond Proceeds $2,192,233
MSRC Complete Streets Grant $474,925
Prop C $952,696
Utility Mitigation $1,174,352
Total $7,902,420
This table represents the revised estimated total project costs, an increase in Prop C funding and the
addition of Utility Mitigation funding.
FISCAL IMPACT:
An additional $350,000 is available in Prop C and $1,174,352 is available in the Utility Mitigation Fund
to fund the shortfall. Upon City Council approval, Staff will prepare the appropriate budget
amendments. There is no fiscal impact in executing Amendment No. 2.
Prepared by: Reviewed by:
Christina Curiel Robert Delgadillo, P.E.
Public Works Project Manager Director of Public Works/ City Engineer
Fiscal Reviewed by: Reviewed and Approved by:
Traffic Management System Project
February 1, 2021
Page 3
Talika M. Johnson Sergio Gonzalez
Director of Administrative City Manager
Services
Attachment:
1) Amendment No. 2 to Funding Agreement between the City of Azusa and the Los Angeles
County Metropolitan Transportation Authority
FTIP# LAF5309 CFP#F5309
AMENDMENT NO. 2
Funding Agreement No. 920000000F5309
Rev: 08.13.19 FA Local Amendment Lapsing Date Extension
1
AMENDMENT No. 2 TO FUNDING AGREEMENT
BETWEEN CITY OF AZUSA AND
THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY
This Amendment No. 2 to Funding Agreement (this "Amendment"), is dated as of
October 1, 2020, by and between City of Azusa ("GRANTEE"), and the Los Angeles County
Metropolitan Transportation Authority ("LACMTA").
RECITALS:
A.GRANTEE and LACMTA entered into that certain Funding Agreement No.
9200000000F5309 dated November 15, 2015, which was amended on September 15, 2018 (as
amended, the "Existing FA"), which Existing FA provides for the City of Azusa Traffic
Management System (the “Project”); and
B.Whereas, LACMTA Board on August 27, 2020, desires to extend the
lapsing date of the Project to February 28, 2021; and
C.GRANTEE and LACMTA desire to amend the Existing FA as provided
herein.
Attachment 1
FTIP# LAF5309
CFP#F5309
AMENDMENT NO. 2
Funding Agreement No. 920000000F5309
Rev: 08.13.19 FA Local Amendment Lapsing Date Extension
2
AGREEMENT:
NOW, THEREFORE, for good and valuable consideration, the receipt and
adequacy of which are hereby acknowledged, the parties hereby agree as follows:
1. Part II, Paragraph 8.1 (iv) of the Existing FA is hereby amended by
deleting it in its entirety and replacing it with the following: “Funds programmed for FY 2015-16
are subject to lapse on February 28, 2021.”
2. Part II, Paragraph 11 of Existing FA is hereby amended by deleting it in its
entirety and replacing it with the following:
“11. COMMUNICATIONS:
11.1 GRANTEE shall ensure that all Communication Materials contain
recognition of LACMTA’s contribution to the Project as more particularly set forth in “Funding
Recipient Communications Guidelines” available at http://metro.net/partners-civic. The
Funding Recipient Communications Guidelines may be changed from time to time during the
course of this Agreement. GRANTEE shall be responsible for complying with the latest Funding
Recipient Communications Guidelines during the term of this Agreement, unless otherwise
specifically authorized in writing by the LACMTA Chief Communications Officer.
11.2 For purposes of this Agreement, “Communications Materials” include,
but are not limited to, press events, public and external newsletters, printed materials,
advertising, websites radio and public service announcements, electronic media, and
construction site signage. A more detailed definition of “Communications Materials” is found in
the Funding Recipient Communications Guidelines.
11.3 The Metro logo is a trademarked item that shall be reproduced and
displayed in accordance with specific graphic guidelines. The preferred logo lock-up for Funding
Recipients to use is included in the Funding Recipient Communications Guidelines.
11.4 GRANTEE shall ensure that any subcontractor, including, but not limited
to, public relations, public affairs, and/or marketing firms hired to produce Project
Communications Materials for public and external purposes will comply with the requirements
contained in this Section.
11.5 The LACMTA Project Manager shall be responsible for monitoring
GRANTEE’s compliance with the terms and conditions of this Section. GRANTEE’s failure to
comply with the terms of this Section sha ll be deemed a default hereunder and LACMTA shall
have all rights and remedies set forth herein.”
FTIP# LAF5309
CFP#F5309
AMENDMENT NO. 2
Funding Agreement No. 920000000F5309
Rev: 08.13.19 FA Local Amendment Lapsing Date Extension
3
3. Attachment B – Scope of Work, attached to the Existing FA is hereby
amended by deleting the Project Schedule and replacing it with the following Revised Project
Schedule.
FA Milestones Revised Schedule
in Amendment 1 Revised Schedule
Begin Design Engineering May 2017 May 2017
Completion of Plans, Specifications, and Estimates December 2018 March 2019
Construction Bid & Advertise January 2019 July 2019
Construction February 2019 December 2020
Project Completion February 2020 February 2021
Total Project Duration (Months) 33 45
4. Except as expressly amended hereby, the Existing FA remains in full force
and effect as originally executed. All rights and obligations of the parties under the Existing FA
that are not expressly amended by this Amendment shall remain unchanged.
FTIP# LAF5309
CFP#F5309
AMENDMENT NO. 2
Funding Agreement No. 920000000F5309
Rev: 08.13.19 FA Local Amendment Lapsing Date Extension
4
IN WITNESS WHEREOF, the parties have caused this Amendment No. 2 to be duly
executed and delivered as of the above date.
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY
By: _________________________________ Date: ____________________
Phillip A. Washington
Chief Executive Officer
APPROVED AS TO FORM:
RODRIGO CASTRO-SILVA
Acting County Counsel
By: _________________________________ Date: ____________________
Deputy
CITY OF AZUSA
By: _________________________________ Date: ____________________
Sergio Gonzalez
City Manager
APPROVED AS TO FORM:
By: __________________________________ Date: ____________________
Jeffery L. Cornejo
City Clerk