TO: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY
BOARD
FROM: MANNY ROBLEDO, DIRECTOR OF UTILITIES
DATE: FEBRARY 22, 2021
SUBJECT: ACCEPTANCE OF GRANT OF PERMANENT EASEMENT FOR WATER
UTILITY PURPOSES FROM PROPERTY OWNER SBH REAL ESTATE
GROUP, INC. FOR SITE ADDRESS 1477 NORTH AZUSA AVENUE,
COVINA, CA 91722
BACKGROUND:
The property owner at 1477 N. Azusa Avenue in Covina is developing the lot, and there is an
existing Azusa Light & Water (“ALW”) public transmission water main within this property that
requires an easement for ALW to maintain the water main after the proposed development is
completed. All existing water facilities shall be included within an easement dedicated to Azusa.
A legal and plat was prepared depicting the location of the water facilities and the limits of the
easement dedication.
RECOMMENDATION:
Staff recommends the Utility Board take the following action:
1)Certificate of Acceptance of Grant of Permanent Easement for water utility purposes
from property owner SBH Real Estate Group, Inc. for site address 1477 N. Azusa
Avenue in the City of Covina; and
2) Adopt Resolution Number 2021-UB-04; and
3) Authorize the City Clerk to file said easement documents with the Office of the Los
Angeles County Recorder.
ANALYSIS:
The property owner at 1477 N. Azusa Avenue, in Covina, is developing the lot into a new
restaurant. Azusa Light and Water has an existing water transmission pipeline within the
E-3Approved
Utility Board
2/22/21
1477 N. Azusa 2021 Water Easement
February 22, 2021
Page 2
property. This requires a permanent easement dedication from the property owner to Azusa Light
& Water for access to public water mains, water meters, and all other appurtenances and
facilities for operation and maintenance. The owner is providing an easement to Azusa Light &
Water. This permeant grant of utility easement is to allow the Water Utility right-of-way for
operation and maintenance of its water facilities. Attached hereto are Exhibits A and Exhibits B
for the water facilities located on this property.
FISCAL IMPACT:
All costs associated with the preparation and processing of this Grant of Permanent Easement are
to be borne by the property owner. There is no cost to Azusa Light & Water for accepting this
Grant of Permanent Easement.
Prepared by: Reviewed and Approved:
Melissa Barbosa, P.E. Manny Robledo
Senior Water System Engineer Director of Utilities
Reviewed and Approved: Reviewed and Approved:
Jared Macias Sergio Gonzalez
Assistant Director of Utilities - Water Operations City Manager
Attachments:
1) Resolution Number 2021-UB-04
2) Grant of Permanent Easement notarized including Exhibit A and Exhibit B