TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
VIA: SERGIO GONZALEZ, CITY MANAGER
FROM: ROBERT DELGADILLO, P.E., DIRECTOR OF PUBLIC WORKS/CITY
ENGINEER
DATE: JULY 19, 2021
SUBJECT: AWARD CONTRACT TO REMODEL AZUSA LIGHT AND WATER BUILDING,
SUITE 2B FOR RELOCATION OF PUBLIC WORKS ENGINEERING DIVISION
SUMMARY:
In the summer of 2020 the Engineering Division personnel moved out of City Hall’s West Wing due to
scheduled renovations of the office space. Its personnel were temporarily relocated to the Public Works
City Maintenance Yard on North Angeleno Avenue. Upon the completion of the West Wing
renovations, it was determined that the renovated office space would be utilized by the Community
Improvement, Economic Development and Code Enforcement Divisions and that the Engineering
Division personnel would be relocated to Suite 2B of the Azusa Light and Water (ALW) building
located at 729 N Azusa Ave. However, Suite 2B has been vacant for several years and needs substantial
improvements to make it a suitable working space for City personnel and the general public. In addition,
the relocation of the Engineering Division will enhance the synergy between the Engineering and Azusa
Light and Water Divisions to coordinate capital improvement projects.
RECOMMENDATION:
It is recommended that the City Council take the following actions:
1)Award a not-to-exceed contract in the amount of $107,000 ($97,275 contract amount + 10%
contingency for change orders) to RS Construction and Development, Inc. for the remodeling of
Suite 2B in the Azusa Light and Water building; and
2) Authorize the City Manager to execute a contract, in a form acceptable to the City Attorney, on
behalf of the City.
APPROVED
CITY COUNCIL
7/19/2021
ALW Suite 2B Tenant Improvements
July 19, 2021
Page 2
ANALYSIS:
The proposed project will remodel Suite 2B of the Azusa Light and Water building and will create the
necessary office space to accommodate the Engineering Division’s personnel, a total of 7 employees. In
addition, the tenant improvements will allow the Engineering Division to grow by 2 people without
further office space improvements.
Informal bids were received pursuant to AMC Section 2-532 Informal Bidding Procedures. Results are
as follows:
No. Company Location Total Bid
1 RS Construction & Development Inc. Ontario, CA $97,275
2 WF Construction Inc. La Verne, CA $140,256
3 Chalmers Construction Services Inc. La Cresenta, CA $150,937.50
The lowest, responsive bid was submitted by RS Construction and Development, Inc., a general
contractor construction company which has completed projects of similar scope in several Southern
California cities including the Azusa Light and Water lobby and 1st floor offices.
ENVIRONMENTAL CLEARANCE:
This action is categorically exempt from the requirements of the California Environmentally Quality Act
(CEQA) pursuant to Section 15301 Existing facilities.
FISCAL IMPACT:
The recommended actions award a contract to RS Construction & Development Inc. in the amount of
$97,275 and further authorizes staff to amend the contract up to 10% or $9,725 for a total not-to-exceed
amount of $107,000. The project will be funded with Engineering and Facilities General Funds (Fund
10), Sewer Funds (Fund 34), and Gas Tax Funds (Fund 12).
Prepared by: Reviewed by:
Miguel Cabanas Robert Delgadillo, P.E.
Public Works Principal Civil Engineer Director of Public Works/ City Engineer
Fiscal Reviewed by: Reviewed and Approved by:
Talika M. Johnson Sergio Gonzalez
Director of Administrative City Manager
Services
Attachment:
1) Public Works Contract
2) RS Construction & Development, Inc. Proposal
CONTRACT
- 1 -
CITY OF AZUSA STANDARD CONTRACT
AZUSA LIGHT AND WATER BUILDING SUITE 2B TENANT IMPROVEMENTS
PROJECT
THIS CONTRACT is made this 19th day of July, 2021, in the County of Los Angeles,
State of California, by and between the City of Azusa, hereinafter called City, and RS
Construction and Development Inc., hereinafter called Contractor. The City and the Contractor
for the considerations stated herein agree as follows:
ARTICLE 1. SCOPE OF WORK. The Contractor shall perform all Work within the time
stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services,
and transportation to complete all of the Work required in strict compliance with the Contract
Documents as specified in Article 5 below for the following Project:
AZUSA LIGHT AND WATER BUILDING SUITE 2B TENANT IMPROVEMENTS
PROJECT
The Contractor and its surety shall be liable to the City for any damages arising as a result of the
Contractor’s failure to comply with this obligation.
ARTICLE 2. TIME FOR COMPLETION. The Work shall be commenced on the date stated
in the City’s Notice to Proceed. The Contractor shall complete all Work required by the Contract
Documents within 20 working days from the commencement date stated in the Notice to
Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is
adequate and reasonable to complete the Work.
ARTICLE 3. CONTRACT PRICE. The City shall pay to the Contractor as full compensation
for the performance of the Contract, subject to any additions or deductions as provided in the
Contract Documents, and including all applicable taxes and costs, the sum of Ninety-Seven
Thousand Two Hundred and Seventy-Five Dollars ($97,275). Payment shall be made as set
forth in the General Conditions.
ARTICLE 4. LIQUIDATED DAMAGES. In accordance with Government Code section
53069.85, it is agreed that the Contractor will pay the City the sum of $500 for each and every
calendar day of delay beyond the time prescribed in the Contract Documents for finishing the
Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the
Contractor agrees the City may deduct that amount from any money due or that may become due
the Contractor under the Contract. This Article does not exclude recovery of other damages
specified in the Contract Documents.
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents”
include the following:
Attachment 1
CONTRACT
- 2 -
Notice Inviting Bids
Instructions to Bidders
Bid Form
Contractor’s Certificate Regarding Workers’ Compensation
Bid Bond
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Affidavit form
Contract
Performance Bond
Payment Bond
General Conditions
Special Conditions
Technical Specifications
Addenda
Plans and Drawings
Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract
The Contactor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. This Contract shall
supersede any prior agreement of the parties.
ARTICLE 6. PROVISIONS REQUIRED BY LAW. Each and every provision of law
required to be included in these Contract Documents shall be deemed to be included in these
Contract Documents. The Contractor shall comply with all requirements of the California Labor
Code applicable to this Project.
ARTICLE 7. INDEMNIFICATION. Contractor shall provide indemnification as set forth in
the General Conditions.
ARTICLE 8. PREVAILING WAGES. Contractor shall be required to pay the prevailing rate
of wages in accordance with the Labor Code which such rates shall be made available at Azusa
City Hall or may be obtained online at http//www.dir.ca.gov/dlsr and which must be posted at the
job site.
ARTICLE 9. DECLARATION OF POLITICAL CONTRIBUTIONS. Consultant shall,
throughout the term of this Agreement, submit to City an annual statement in writing declaring
any political contributions of money, in-kind services, or loan made to any member of the city
council within the previous twelve-month period by the Consultant and all of Consultant's
employees, including any employee(s) that Consultant intends to assign to perform the Services
described in this Agreement.
ARTICLE 10. CONFLICT OF INTEREST. In the procurement of supplies, equipment,
construction, and services by sub-recipients, the conflict of interest provisions in (State LCA –
CONTRACT
- 3 -
24 CFR 85.36 and Non-Profit Organizations – 24 CFR 84.4), OMB Circular A-110, and 24 CFR
570.611, respectively, shall apply. No employee, officer or agent of the sub-recipient shall
participate in selection, or in the award or administration of a contract supported by Federal
funds if a conflict of interest, real or apparent, would be involved.
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named
parties, on the day and year above written.
RS Construction & Development Inc.
________________________________
Name and Title
________________________________
Signature of Contractor
License No. 1005429
CITY OF AZUSA
________________________________
Robert Gonzales
Mayor
________________________________
Sergio Gonzalez
City Manager
________________________________
Jeffrey Lawrence Cornejo Jr.
City Clerk
Approved as to Form:
______________________________
Best Best & Krieger LLP
City Attorney
BONDS
- 4 -
PERFORMANCE BOND
FOR
AZUSA LIGHT AND WATER BUILDING SUITE 2B TENANT IMPROVEMENTS
PROJECT
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, City of Azusa (hereinafter referred to as “City”) has awarded to RS
Construction and Development Inc., (hereinafter referred to as the “Contractor”) an agreement
for the Azusa Light and Water Building Suite 2B Tenant Improvements Project (hereinafter
referred to as the “Project”).
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project, (hereinafter referred to as “Contract Documents”), the terms
and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof
and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, RS Construction and Development Inc., the undersigned Contractor
and _____________________________________________ as Surety, a corporation organized
and duly authorized to transact business under the laws of the State of California, are held and
firmly bound unto the City in the sum of Ninety-Seven Thousand Two Hundred and Seventy-
Five Dollars ($97,275), said sum being not less than one hundred percent (100%) of the total
amount of the Contract, for which amount well and truly to be made, we bind ourselves, our
heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs,
executors, administrators, successors or assigns, shall in all things stand to and abide by, and
well and truly keep and perform the covenants, conditions and agreements in the Contract
Documents and any alteration thereof made as therein provided, on its part, to be kept and
performed at the time and in the manner therein specified, and in all respects according to their
intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of
all materials and workmanship; and shall indemnify and save harmless the City, its officers and
agents, as stipulated in said Contract Documents, then this obligation shall become null and void;
otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefore,
there shall be included costs and reasonable expenses and fees including reasonable attorney’s
fees, incurred by City in enforcing such obligation.
As a condition precedent to the satisfactory completion of the Contract Documents, unless
otherwise provided for in the Contract Documents, the above obligation shall hold good for a
period of one (1) year after the acceptance of the work by City, during which time if Contractor
shall fail to make full, complete, and satisfactory repair and replacements and totally protect the
BONDS
- 5 -
City from loss or damage resulting from or caused by defective materials or faulty workmanship.
The obligations of Surety hereunder shall continue so long as any obligation of Contractor
remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations
under the Contract, law or equity, including, but not limited to, California Code of Civil
Procedure section 337.15.
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract
Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall
promptly, at the City’s option:
(1) Take over and complete the Project in accordance with all terms and conditions in
the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and
conditions in the Contract Documents and upon determination by Surety of the
lowest responsive and responsible bidder, arrange for a Contract between such
bidder, the Surety and the City, and make available as work progresses sufficient
funds to pay the cost of completion of the Project, less the balance of the contract
price, including other costs and damages for which Surety may be liable. The
term “balance of the contract price” as used in this paragraph shall mean the total
amount payable to Contractor by the City under the Contract and any
modification thereto, less any amount previously paid by the City to the
Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with California
law and make available as work progresses sufficient funds to pay the cost of
completion of the Project, less the balance of the contract price, including other
costs and damages for which Surety may be liable. The term “balance of the
contract price” as used in this paragraph shall mean the total amount payable to
Contractor by the City under the Contract and any modification thereto, less any
amount previously paid by the City to the Contractor and any other set offs
pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be
proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from
Contractor for completion of the Project if the CITY, when declaring the Contractor in default,
notifies Surety of the City’s objection to Contractor’s further participation in the completion of
the Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract Documents or to the Project to be performed
thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of
any such change, extension of time, alteration or addition to the terms of the Contract Documents
or to the Project.
BONDS
- 6 -
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________________, 2021.
_________________________________________
CONTRACTOR/PRINCIPAL
_________________________________________
Name
By_______________________________________
SURETY:
By: ______________________________________
Attorney-In-Fact
The rate of premium on this bond is ____________ per thousand. The total amount of premium
charges, $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________
___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________
Representative for service of
process in California, if different ___________________________________________
from above)
___________________________________________
(Telephone number of Surety and ___________________________________________
Agent or Representative for service
of process in California
BONDS
- 7 -
STATE OF CALIFORNIA
COUNTY OF
On before me, (here insert
name and title of the officer), personally appeared , who proved
to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to
the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under penalty of perjury under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature __________________________________
(Seal)
NOTE: A copy of the Power-of-Attorney to local representatives of the bonding company must
be attached hereto.
BONDS
- 8 -
PAYMENT BOND
FOR
AZUSA LIGHT AND WATER BUILDING SUITE 2B TENANT
IMPROVEMENTS PROJECT
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Azusa (hereinafter designated as the “City”) has awarded to RS Construction and Development Inc., hereinafter designated as the “Principal,” a contract for the work described as follows: Azusa Light and Water Building Suite 2B Tenant Improvements (the “Project”); and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of Ninety-Seven Thousand Two Hundred and Seventy-Five Dollars ($97,275) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 3181 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.
This bond shall inure to the benefit of any of the persons named in Section 3181 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement
BONDS
- 9 -
herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 3110 or 3112 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned.
IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed unoriginal thereof, have been duly executed by the Principal and Surety above named, on the _____ day of ______________________ 2021 the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.
(Corporate Seal of Principal,
if corporation) Principal (Property Name of
Contractor)
By
(Signature of Contractor)
(Seal of Surety)
Surety
By
Attorney in Fact
(Attached Attorney-In-Fact
Certificate and Required
Acknowledgements)
*Note: Appropriate Notarial Acknowledgments of Execution by
Contractor and +surety and a power of Attorney MUST BE ATTACHED.
License # 1005429
218 W. E St Ontario Ca, 91762
909-920-1144 Off / 909-920-1147 Fax
July 1, 2021
City Of Azusa
Office Remodel
Attn: Karina Maldonado Orr
Scope of Work: PW Office remodel Tenant improvement Project
Carpet removal and disposal
New flooring with the same material as installed downstairs
New 4”rubber cove base
New kitchen cabinets sink faucet and countertop. Includes upper cabinets
5 roller shades like the downstairs
Replace damaged acoustic ceiling tiles
Construct three offices and conference room with electrical insulation drywall
Expand one existing office and demolish one wall
Refinish all existing doors
Paint the entire area owner to select color
Front plan cabinet and countertop to be ADA compliant
Electrical work included per layout emailed on 6/30/21
Labor, prevailing wage
Total Project: $97,275.00
Proposal is good for 30 days. Workers comp, general liability insurance included
Excludes; Bonds, Permits, plans, Plan check fees that may be required. All work to be completed at prevailing wage rate.
Attachment 2