Loading...
HomeMy WebLinkAboutE-4 Staff Report - CDBG Staff Report - NIBCONSENT ITEM E-4 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL VIA: SERGIO GONZALEZ, CITY MANAGER FROM: ROBERT DELGADILLO, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINEER DATE: NOVEMBER 1, 2021 SUBJECT: APPROVE PLANS AND SPECIFICATIONS FOR THE COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) SIDEWALK AND ADA IMPROVEMENTS PROJECT NO. 602307-21 AND AUTHORIZE STAFF TO SOLICIT A NOTICE OF INVITING BIDS BACKGROUND: The City annually receives federal Community Development Block Grant (CDBG) funds for infrastructure improvements within qualified CDBG areas. The recommended actions will approve the proposed project and authorize staff to solicit bids from qualified contractors to remove and replace twelve (12) curb ramps, cross gutters, and sidewalk in accordance with Americans with Disabilities Act (ADA) guidelines. RECOMMENDATION: Staff recommends the City Council take the following actions: 1) Approve the Plans and Specifications for CDBG Project 602307-21; and 2)Authorize staff to solicit a Notice of Inviting Bids for the CDBG Project 602307-21, Sidewalks and ADA Improvements. ANALYSIS: The City has participated in the CDBG Program since its inception in 1974, utilizing federal CDBG funds for various community improvement projects. For Fiscal Year (FY) 2021-2022 CDBG funds totaling $31,969 were available to improve sidewalks and install Americans with Disabilities Act (ADA) compliant curb ramps throughout the City. APPROVED CITY COUNCIL 11/1/2021 Sidewalk and ADA Improvements November 1, 2021 Page 2 Following the close of the prior fiscal year, 2020-2021, an additional $165,031 in unspent CDBG funds was identified and reprogrammed into CDBG Project 602307-21. This amount, combined with the current project budget of $31,969, brings the total, current available budget to approximately $197,000. Of that total amount, approximately $164,167 will be utilized for construction and $32,833 will be allocated for administrative costs associated with CDBG program oversight and compliance with federal labor standards. The proposed concrete improvements will improve pedestrian safety by repairing approximately 1,500 square feet of existing sidewalks and 4,800 square feet of cross gutters that may inhibit pedestrian access or cause injuries, minimizing the risks of trip and fall incidents. In addition, this project will upgrade twelve (12) existing curb ramps to comply with the latest ADA guidelines. The project will focus on areas of greatest need within the boundaries qualified for CDBG funds. The areas to be addressed are Rodecker Drive between Hanks Street to Duell Street, and the intersection of Fifth Street and Rockvale Avenue. FISCAL IMPACT: FY 2021-2022 CDBG funds in the amount of $197,000 will be used to implement this project. Prepared by: Reviewed by: Christina Curiel Robert Delgadillo, P.E. Public Works Project Manager Director of Public Works/ City Engineer Fiscal Reviewed by: Reviewed and Approved by: Talika M. Johnson Sergio Gonzalez Director of Administrative City Manager Services Attachment: 1) Exhibit – Project Location Map 11th St 9th St 8th St 3rd St 1st St As p a n A v e Paramount St Ve r n o n A v e Sa n G a b r i e l A v e Az u s a A v e Pa s a d e n a A v e Ce r r i t o s A v e Foothill Blvd Haltern St Armsead St Mason St Arrow Hwy Foothill Blvd Su n s e t A v e McKinley St Foothill Blvd 10th St 5th St Vi r g i n i a A v e Gladstone St 2nd St 3rd St 4th St Ro c k v a l e A v e 6th St Ci t r u s A v e Alosta Ave Baseline Rd Ba r r a n c a A v e Vi n c e n t A v e Mc K e e v e r A v e Mc K e e v e r A v e Or a n g e A v e Su n s e t A v e Ae r o j e t A v e Park Dr LimeAve Ra n b u r n A v e 5th St Gladstone St Ir w i n d a l e A v e Arrow Hwy La r k E l l e n A v e Az u s a Av e Pa s a d e n a A v e 6th St Ci t r u s A v e En i d A v e Danlee St Lo r e n A v e Co n e y A v e Mi l l e r Av e Ge o r g i a A v e Industrial St Ge o r g i a P l Or a n g e A v e Le m o n A v e Lo u i s e A v e Ba r b a r a A v e Ve r n o n A v e Bayless St 4th St Bayless St Or a n g e A v e Duell St Vi r g i n i a A v e ParksideSt Jerez St Momax St Solem St Ba r b a r a A v e Lo u i s e A v e Le m o n A v e Or a n g e A v e Lo u i s e A v e En i d A v e Or a n g e A v e Su n s e t A v e Gr a n d i n A v e An g e l e n o A v e Sa n G a b r i e l Av e An g e l e n o A v e Du r e l l A v e Le e D r Lee Pl Matchwood Pl Fe n i m o r e A v e Ca l v a d o s A v e Ed e n f i e l d A v e Vi c e r o y A v e Glenlyn Dr Lenfield St Hanks St Po w e l l Av e Ol d M i l l R d So l d a n o A v e Ho l m a r A v e Pa s a d e n a A v e BagnallSt HollyvaleSt Or a n g e c r e s t A v e Tw i n t r e e A v e Gl e n f i n n a n A v e LimeSt 6th StCe d a r g l e n HollyvaleSt HalternSt Hollyvale St Alford St Galatea St Citrus Edge St Fondale St Nearfield St Gaillard St Ghent St Ra n g e r D r Ca l e r a A v e Gr a n t l a n d Dr Manning St McKinley St Mu r r a y A v e O' M a l l e y Av e Dixon St Roland St Russell St No b l e A v e El l i o t t A v e Azusa Ln Celeste St Renwick Rd Ro s a l i n a A v e Sc o t t A v e Su n s e t A v e Payson St Kirkwall Rd Al a m e d a Av e Renwick Rd Kirkwall Rd Payson St Newburgh St As p a n A v e Vi r g i n i a A v e Ja c k k s o n A v e Ea s t A v e Za c h a r y P a d i l l a A v e Hollyvale St North StOptical DrMontoya St Adelante St Paramount St Roosevelt Rd Mo t o r A v e Pe c k h a m R d 1st St Ay a l a A v e Ma r t i n R d 12th St Vista Bonita St Manresa D r San FelipeHill HollyStLopezLnC h e s t n u t L n Tangerine St Pa l m D r Lak e v i e w T e r Monrovia Pl Mountain Wy The Promenade Pa l m D r Ro s e d a l e A v e Ruby Lace Wy Barberry Wy Wo o d b i n e W y Co r n e j o Wy Sw e e t b r i a r L n Su n r i s e Ln Ch a p a r r a l Ln CassiaLn Bo u q u e t Ct Bo t a n i c a Ln Pr i m r o s e Ln Roseway Ct Pu r p l e S a g e Dr AcaciaCt OrchardLp Pa l m D r Ponderosa Dr Pepper Tree Dr Silver MapleDr Laurel OakDr SycamoreDr Se q u o i a L n University Dr Ca l e r a A v e Mauna Loa Ave Duell St 2nd St Hanks St Ro d e c k e r D r Duell St Dom i n g u e z Pl Hollyvale St St e i n L n Plum TreeDr Oakview Dr Poplar ViewDr Santa Fe A v e Camino DeLa Cantera Calle EvaMiranda Fa c t o r A v e Ga l a n t o A v e Oa k b a n k D r Ha n l i n A v e Tr a y m o r e A v e Kirkwall Rd Du g g a n A v e Newburgh St Laxford Rd Fa i r v a l e A v e Mira LomaDr Ay o n A v e Orkney S t HollyvaleSt Al a m e d a A v e Da l t o n A v e So l d a n o A v e San G a b r i e l P l GrandviewDr Nob l e P l 1st St An g e l e n o A v e Sa n G a b r i e l A v e Ve r n o n A v e To d d A v e 10th St 8th St Al o s t a A v e Little Dalton Wash Little Da l t o n W a s h Southern P a c i f i c R a i l R o a d Big Dalt o n W a s h Mi l l e r Av e Southern Pacific Rail Road Do n n a B e t h A v e Ce r r i t o s Av e Litt l Rod e c k e r DrDal t o n W a s h 210 F w y 210 Fwy Ce r r i t o s A v e 4006.024006.02 4044.014044.01 4043.014043.01 4042.014042.01 4042.024042.02 4044.024044.02 4045.014045.01 4045.034045.03 4045.034045.03 4045.034045.03 4045.044045.04 4045.044045.04 4045.044045.04 4041.004041.00 4040.004040.00 ´ City of Azusa SIDEWALK AND ADA IMPROVEMENTS PROJECT REMOVE AND REPLACE CURB RAMPS 4043.02