Loading...
HomeMy WebLinkAboutD-1 Staff Report - Citywide Schedule of Fees and Charges SCHEDULED ITEM/PUBLIC HEARING D-1 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL VIA: SERGIO GONZALEZ, CITY MANAGER FROM: TALIKA M. JOHNSON, DIRECTOR OF ADMINISTRATIVE SERVICES DATE: JANUARY 18, 2022 SUBJECT: PUBLIC HEARING - ADOPTION OF UPDATED CITYWIDE SCHEDULE OF FEES AND CHARGES BACKGROUND: On January 19, 2016, the City Council adopted several resolutions approving certain adjustments to the City’s Schedule of Fees and Charges. In addition, the City Council authorized Staff to adjust the schedule of fees and charges annually based on the change in the Consumer Price Index (CPI) or 2%, whichever was greater, but not to exceed 5%. The Los Angeles Area CPI change from September 2020 through September 2021 was 4.6%. Consequently, Staff has adjusted the majority of fees by 4.6% consistent with previous instructions established by the City Council. These changes are ministerial in nature and no further action is required by the Council in order to complete these fee updates. As part of the fee update, Staff would like to make other modifications to the schedule of fees and charges that fall outside of the parameters of the previous direction provided by the City Council. The proposed action requests the City Council to adopt the fee modifications outlined in Attachment 4 which includes three tables: 1) New fees proposed; 2) Fees proposed to be modified by an amount other than the previously directed CPI adjustment; and 3) Fee proposed to be eliminated. RECOMMENDATIONS: Staff recommends that the City Council take the following actions: 1) Receive, review, and file the updated Citywide Fee and Charges Schedule; and 2) Open the Public Hearing, receive public testimony, and close the Public Hearing; and 3) Adopt Resolution No. 2022-C01, regarding various municipal activities and services, to be effective on January 18, 2022; and 4) Adopt Resolution No. 2022-C02, regarding development project services fees, to be effective 60 days from January 18, 2022 (March 19, 2022). Adoption of Citywide Fees and Charges January 18, 2022 Page 2 ANALYSIS: California Government Code 66000 allows public agencies to impose fees to recover the costs of providing various public services. In an effort to keep current with the cost of providing services, the City Council authorized Staff to implement the recommendations and fee adjustments from the latest fee study adopted January 19, 2016. The City Council also directed Staff to annually adjust the City’s Schedule of Fees and Charges by the change in the Consumer Price Index - Los Angeles Area (CPI) with a minimum increase of 2% and a maximum increase of 5% for most fee categories. The minimum increase of 2% is intended to mirror the City’s labor cost inflation. The City’s labor costs typically increase annually, even when there is a small change in the CPI. Inflation at the Los Angeles area grew during the last quarter in calendar year 2021 mainly due to supply chain issues and the reopening of the economy. During the government mandated shut-down, companies cut investment spending, restocking was put off, and the economy was at a prolonged downturn. As the economy reopens and more restrictions are lifted, consumers are buying a lot more and companies are finding it difficult to keep up with rapidly rising product demand as they rebuild supply chains that were badly impacted by the pandemic. Challenges such as a shortage of shipping containers and transportation logistic issues means shipping and distribution of goods has become more difficult and more expensive. Additionally, there were an enormous amount of government spending and congressional approved stimulus including the Cares Act (Coronavirus Relief Fund) and the American Rescue Plan that created even higher demands. When an economy is growing and there is high demand, businesses find it easier to raise prices without losing customers. The stated scenario in essence translated into higher consumer prices and driving up inflation. For the current review period, the CPI change from September 2020 through September 2021 was 4.6%. Consequently, Staff has adjusted the majority of fees by 4.6%. There are several fees that fall outside the parameter of the previous direction provided by the City Council. Specifically, six (6) new fees are being proposed (Attachment 4, Table 1) to reflect new programs and/or to enhance the City’s ability to provide services. The new fees include: 1) Emergency Sewage Spill Response Sect. 26.1 (Engineering Div) Actual Staff Time ($504 Minimum) - An Emergency Sewage Spill can occur when any of the following takes place: overflowing of a septic tank, tree roots invading and blocking underground sewer lines, misaligned sewage pipes that cause buildup over time, or blockages within the interior sewer systems caused by improper materials flushed into the sewer system. In extreme cases the sewage spill can overflow from the City's sewer mainlines into public right-of-way where clean-up efforts are to be provided to clean, and dispose of all raw hazardous sewage material. Emergency Sewage Spills can vary in the size of the contaminated area, and volume discharged. Therefore, the fee proposed is actual staff time spent to recuperate the time spent by the Public Works Department. 2) Sewer Area Study Sect. 49 S-8.3 (Engineering Division) $656 or Actual Staff Time - The purpose of a Sewer Area Study is to determine the amount of sewage flow generated by new developments. It ensures that the City's exiting sewer infrastructure has capacity to convey the sewer flows from new developments. The proposed increase will recuperate Adoption of Citywide Fees and Charges January 18, 2022 Page 3 Engineering Division's actual time spent to review and approve the Sewer Area Study. Moreover, the proposed fee will be closer to the fee other adjacent agencies (Glendora, Irwindale, Baldwin Park) charge for the same service. 3) Potholing-Per Location Sect. 50 S-8.4 (Engineering Division) $168 - Potholing refers to identifying utilities lines that are underground to gather information that can include the following: material, depth, and horizontal and vertical. Typically, potholes range from 6" to 12" in diameter, and 4' to 6' deep. Usually, the inspection for these holes to ensure the road has been restored to Azusa's City Standard R12-1 takes one hour. As a result, the proposed increase will recuperate Engineering Division's actual time spent to review and approve the street restoration. 4) Door tag fee Sect. 2 - Sect. S106 f (Utilities Dept) $250 - Fee to cover the expense of manually delivering 24-hour disconnection notice. 5) Plan Check Fee a) Residential and ADU Per Dwelling Unit Sect. 45 S-131M (Utilities Dept) $250 - Recovers cost of Engineer time spent. 6) Plan Check Fee b) Commercial and Industrial Sect. 45 S-131M (Utilities Dept) $250 - Recovers cost of Engineer time spent. There are twenty-two (22) proposed fees that will increase more than the 4.6% CPI (Attachment 4, Table 2): 1) Soil Review Sect. S-15 S-056C (Engineering Division) from $335 to $656 - The Soil Report takes approximately 3-4 hours of review, and sometimes requires multiple review cycles. As a result, the proposed increase will recuperate Engineering Division's actual time spent to review and approve the Soil Report. Moreover, the proposed fee will be closer to the fee other adjacent agencies (Glendora, Irwindale, Baldwin Park) charge for the same service. 2) a) Water Meter Fee 3/4" Sect. 10 S-131D (Utilities Dept) from $200 to $250 - To recover the actual cost of meter which has gone up in price. The supplier increased the price of the meter, and this is a pass-through cost. 3) b) Water Meter Fee 1" Sect. 10 S-131D (Utilities Dept) from $250 to $300 - To recover the actual cost of meter which has gone up in price. The supplier increased the price of the meter, and this is a pass-through cost. 4) c) Water Meter Fee 1.5" Sect. 10 S-131D (Utilities Dept) from $1,000 to $1,250 - To recover the actual cost of meter which has gone up in price. The supplier increased the price of the meter, and this is a pass-through cost. 5) d) Water Meter Fee 2" Sect. 10 S-131D (Utilities Dept) from $1,150 to $1,500 - To recover the actual cost of meter which has gone up in price. The supplier increased the price of the meter, and this is a pass-through cost. 6) Hot Tab Fee a) 1" Sect. 13 S-131H (Utilities Dept) from $300 to $345 - To recover the actual costs of labor. 7) Hot Tab Fee b) 2" Sect. 13 S-131H (Utilities Dept) from $300 to $345 - To recover the actual costs of labor. Adoption of Citywide Fees and Charges January 18, 2022 Page 4 8) Hot Tab Fee c) 4" Sect. 13 S-131H (Utilities Dept) from $350 to $400 - To recover the actual costs of labor. 9) Hot Tab Fee d) 6" Sect. 13 S-131H (Utilities Dept) - from $400 to $465 - To recover the actual costs of labor. 10) Hot Tab Fee e) 8" Sect. 13 S-131H (Utilities Dept) - from $450 to $520 - To recover the actual costs of labor. 11) Hot Tab Fee f) 10" Sect. 13 S-131H (Utilities Dept) from $450 to $520 - To recover the actual costs of labor. 12) Hot Tab Fee g) 12" Sect. 13 S-131H (Utilities Dept) from $525 to $605 - To recover the actual costs of labor. 13) Fire Hydrant Relocation/Inspection Fee Sect. 16 S-131F (Utilities Dept) from $1,500 to $2,000 - Cost recovery of labor and inspection costs- Increased costs has outpaced inflation. 14) c) Damage to Water Main Impact Fee Sect. 17 S-131G (Utilities Dept) from $1,500 to $2,000 - Cover costs related to impact to the water main. 15) e) Damage to Water Facilities Impact Fee Sect. 17 S-131G (Utilities Dept) from $1,500 to $2,000 - Cover costs related to impact to the water main. 16) Water Plan Check Sect. 20 S-116A Water Plan Check (Utilities Dept) from $224 to $250 - Cost recovery of labor and inspection costs - Increased costs has outpaced inflation. 17) Will Serve Letter Sect. 22 S-116C (Utilities Dept) from $35 to $40 - Higher than CPI- Fee for time, material, and postage. 18) Electrical Engineering Sect. 43 S-131K (Utilities Dept) from $100 to $250 - Cost recovery of engineering time. 19) Golden Day Special Events a) Youth ii Day of the Event Sect. 31 S-43 (Community Resources Dept) from $15 to $20 - Decrease cash handling and improve operation efficiency. 20) Golden Day Special Events b) Adult i Pre-Registration Sect. 31 S-43 (Community Resources Dept) from $15 to $20 - Decrease cash handling and improve operation efficiency. 21) Woman's Club Rental to Public k) Cleaning Fee Sect. 1 S-48 (Community Resources Dept) from $100 to $250 - Recover actual cost of services. 22) Woman's Club Rental to Public-Sect. 1 S-48 l) Decorating Fee Outside Normal Hours of Operation (Per Hour) (Community Resources Dept) from $15 to $60 - Recover actual cost of services. There are three (3) proposed fees that will be eliminated (Attachment 4, Table 3): 1) Recovery and Storage of Abandoned Shopping Cart Sect. 5 S-95.1 (Community Improvement Division) from $12 to $0 - The City no longer recovers or store shopping carts. Adoption of Citywide Fees and Charges January 18, 2022 Page 5 2) Swimming Team: a) First Child (Same Family)-ii) Additional Child (Same Family) Sect. S-33 2a (Recreation Div) from $65 to $0 - Easy of cash handling and operation efficiency. 3) Swimming Team: b) 2nd Session-ii) Additional Child (Same Family) Sect. S-33 2b- (Recreation Div)-from $50 to $0 - Easy of cash handling and operation efficiency. FISCAL IMPACT: The adoption of the proposed fee schedule is anticipated to allow cost recovery of various City services without depleting the City’s funds, and are contingent on the timing of various development projects and municipal activities. Prepared by: Reviewed and Approved: Richard Lam Talika M. Johnson Budget Administrator Director of Administrative Services Reviewed and Approved: Sergio Gonzalez City Manager Attachments: 1. Proposed Schedule of Citywide Fees and Charges 2. Resolution 2022-C01 – Establishing and Revising a User Fee Schedule for Various Municipal Activities and Services 3. Resolution 2022-C02 – Establishing and Revising Certain Development Project Fees and Charges 4. Proposed Fee Additions and Changes outside of CPI 5. County of Los Angeles Fire Department Fire Prevention Fees 6. General Public Ambulance Rates – Los Angeles County Emergency Medical Services Agency CITY OF AZUSA SCHEDULE OF FEES AND CHARGES To Adopt on January 18, 2022 Attachment 1 Adopted on  January 18,  2022 No. Description Pages 1 Building and Safety 3 ‐ 16 2 Planning 17 ‐ 19 3 Engineering 20 ‐ 22 4 Utilities 23 ‐ 26 5 Community Improvement 27 6 Fire Safety 28 7 Police 29 ‐ 32 8 Adult Businesses 33 9 Business License 34 ‐ 36 10 Community Resources 37 ‐ 39 11 Recreation Facilities Rentals 40 ‐ 42 12 Transportation 43 13 Library 44 14 GIS Maps 45 15 Administrative Processing 46 City of Azusa Schedule of Fees and Charges Table of Contents 2 Adopted Adopted 1/19/2021 1/18/2022 Svc Area Cost Per CPI Cost Per No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes S‐1 Building Valuation Apartment Houses: 1  Type I Or II F.R. $158.03 4.60% $165.30 2     Good $194.56 4.60% $203.51 3  Type V ‐ Masonry (Or Type III) $128.99 4.60% $134.93 4     Good $158.03 4.60% $165.30 5  Type V ‐ Wood Frame $113.66 4.60% $118.89 6     Good $146.10 4.60% $152.82 7  Type I ‐ Basement Garage $66.64 4.60% $69.70 Auditoriums: 8  Type I Or II F.R. $186.72 4.60% $195.30 9  Type II ‐ 1 Hour $135.23 4.60% $141.45 10  Type II ‐ N $127.92 4.60% $133.81 11  Type III ‐ 1 Hour $142.18 4.60% $148.72 12  Type III ‐ N $134.87 4.60% $141.08 13  Type V ‐ 1 Hour $135.94 4.60% $142.20 14  Type V ‐ N $126.85 4.60% $132.68 Banks: 15  Type I Or II F.R. $263.87 4.60% $276.00 16  Type II ‐ 1 Hour $194.38 4.60% $203.32 17  Type II ‐ N $188.15 4.60% $196.80 18  Type III ‐ 1 Hour $214.51 4.60% $224.38 19  Type III ‐ N $206.85 4.60% $216.36 20  Type V ‐ 1 Hour $194.38 4.60% $203.32 21  Type V ‐ N $186.18 4.60% $194.74 Bowling Alleys: 22  Type II ‐ 1 Hour $90.86 4.60% $95.04 23  Type II ‐ N $84.80 4.60% $88.71 24  Type III ‐ 1 Hour $98.88 4.60% $103.43 25  Type III ‐ N $92.47 4.60% $96.72 26  Type V ‐ 1 Hour $66.64 4.60% $69.70 Churches: 27  Type I Or II F.R. $176.74 4.60% $184.87 28  Type II ‐ 1 Hour $132.74 4.60% $138.84 29  Type II ‐ N $126.15 4.60% $131.95 30  Type III ‐ 1 Hour $144.31 4.60% $150.95 31  Type III ‐ N $137.90 4.60% $144.24 32  Type V ‐ 1 Hour $134.87 4.60% $141.08 33  Type V ‐ N $126.85 4.60% $132.68 Convalescent Hospitals: 34  Type I Or II F.R. $248.01 4.60% $259.42 35  Type II ‐ 1 Hour $172.11 4.60% $180.03 36  Type III ‐ 1 Hour $176.38 4.60% $184.49 37  Type V ‐ 1 Hour $166.24 4.60% $173.88 Dwellings: 38  Type V ‐ Masonry $134.87 4.60% $141.08 39     Good $172.64 4.60% $180.58 40  Type V ‐ Wood Frame $119.91 4.60% $125.42 41     Good $164.64 4.60% $172.21  Basements ‐  42     Semi‐Finished $35.81 4.60% $37.46 43     Good $41.33 4.60% $43.23 44     Unfinished $26.01 4.60% $27.21 45     Good $31.53 4.60% $32.98 Fire Station: 46  Type I Or II F.R. $203.82 4.60% $213.20 47  Type II ‐ 1 Hour $134.16 4.60% $140.33 48  Type II ‐ N $126.50 4.60% $132.32 49  Type III ‐ 1 Hour $146.81 4.60% $153.56 50  Type III ‐ N $140.57 4.60% $147.04 51  Type V ‐ 1 Hour $137.72 4.60% $144.06 52  Type V ‐ N $130.60 4.60% $136.60 City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY 3 Adopted Adopted 1/19/2021 1/18/2022 Svc Area Cost Per CPI Cost Per No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY Homes For The Elderly: 53  Type I Or II F.R. $184.76 4.60% $193.26 54  Type II ‐ 1 Hour $150.02 4.60% $156.92 55  Type II ‐ N $143.60 4.60% $150.21 56  Type III ‐ 1 Hour $156.25 4.60% $163.44 57  Type III ‐ N $149.84 4.60% $156.73 58  Type V ‐ 1 Hour $150.91 4.60% $157.85 59  Type V ‐ N $145.74 4.60% $152.44 Hospitals: 60  Type I Or II F.R. $290.77 4.60% $304.14 61  Type III ‐ 1 Hour $240.70 4.60% $251.78 62  Type V ‐ 1 Hour $229.66 4.60% $240.22 Hotels And Motels: 63  Type I Or II F.R. $179.95 4.60% $188.23 64  Type III ‐ 1 Hour $155.90 4.60% $163.07 65  Type III ‐ N $148.59 4.60% $155.43 66  Type V ‐ 1 Hour $135.76 4.60% $142.01 67  Type V ‐ N $133.09 4.60% $139.21 Industrial Plants: 68  Type I Or II F.R. $101.38 4.60% $106.04 69  Type II ‐ 1 Hour $70.55 4.60% $73.80 70  Type II ‐ N $64.85 4.60% $67.84 71  Type III ‐ 1 Hour $77.68 4.60% $81.25 72  Type III ‐ N $73.23 4.60% $76.60 73  Tilt‐Up $53.45 4.60% $55.91 74  Type V ‐ 1 Hour $73.23 4.60% $76.60 75  Type V ‐ N $66.99 4.60% $70.07 Jails: 76 Duces Tecum Subpoena Processing $283.46 4.60% $296.50 77  Type III ‐ 1 Hour $259.23 4.60% $271.16 78  Type V ‐ 1 Hour $194.38 4.60% $203.32 Libraries: 79  Type I Or II F.R. $207.39 4.60% $216.93 80  Type II ‐ 1 Hour $151.80 4.60% $158.78 81  Type II ‐ N $144.32 4.60% $150.95 82  Type III ‐ 1 Hour $160.35 4.60% $167.73 83  Type III ‐ N $152.33 4.60% $159.34 84  Type V ‐ 1 Hour $150.55 4.60% $157.48 85  Type V ‐ N $144.32 4.60% $150.95 Medical Offices: 86  Type I Or II F.R. $212.91 4.60% $222.70 87  Type II ‐ 1 Hour $164.27 4.60% $171.83 88  Type II ‐ N $156.07 4.60% $163.25 89  Type III ‐ 1 Hour $178.17 4.60% $186.36 90  Type III ‐ N $165.87 4.60% $173.50 91  Type V ‐ 1 Hour $160.71 4.60% $168.10 92  Type V ‐ N $155.01 4.60% $162.14 Offices 93  Type I Or II F.R. $190.28 4.60% $199.04 94  Type II ‐ 1 Hour $127.39 4.60% $133.25 95  Type II ‐ N $121.33 4.60% $126.91 96  Type III ‐ 1 Hour $137.54 4.60% $143.87 97  Type III ‐ N $131.49 4.60% $137.54 98  Type V ‐ 1 Hour $128.81 4.60% $134.74 99  Type V ‐ N $121.33 4.60% $126.91 Private Garages: 100 Picnic Shelter Application Rental (Alisal Park):$43.29 4.60% $45.29 101  Masonry $48.82 4.60% $51.06 102  Open Carports $29.58 4.60% $30.94 Public Buildings: 103  Type I Or II F.R. $219.86 4.60% $229.97 104  Type II ‐ 1 Hour $178.17 4.60% $186.36 4 Adopted Adopted 1/19/2021 1/18/2022 Svc Area Cost Per CPI Cost Per No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY 105  Type II ‐ N $170.33 4.60% $178.16 106  Type III ‐ 1 Hour $184.94 4.60% $193.44 107  Type III ‐ N $178.52 4.60% $186.74 108  Type V ‐ 1 Hour $169.26 4.60% $177.04 109  Type V ‐ N $163.20 4.60% $170.71 Public Garages: 110  Type I Or II F.R. $87.12 4.60% $91.13 111  Type I Or II Open Parking $65.39 4.60% $68.40 112  Type II ‐ N $49.89 4.60% $52.18 113  Type III ‐ 1 Hour $65.92 4.60% $68.95 114  Type III ‐ N $58.62 4.60% $61.31 115  Type V ‐ 1 Hour $60.04 4.60% $62.80 Restaurants 116  Type III ‐ 1 Hour $173.53 4.60% $181.52 117  Type III ‐ N $167.66 4.60% $175.37 118  Type V ‐ 1 Hour $158.92 4.60% $166.24 119  Type V ‐ N $152.69 4.60% $159.71 Schools: 120  Type I Or II F.R. $198.12 4.60% $207.24 121  Type II ‐ 1 Hour $135.23 4.60% $141.45 122  Type III ‐ 1 Hour $144.67 4.60% $151.33 123  Type III ‐ N $139.15 4.60% $145.55 124  Type V ‐ 1 Hour $135.59 4.60% $141.82 125  Type V ‐ N $129.35 4.60% $135.30 Service Stations: 126  Type II ‐ N $119.73 4.60% $125.24 127  Type III ‐ 1 Hour $124.90 4.60% $130.64 128  Type V ‐ 1 Hour $106.37 4.60% $111.26 129  Canopies $49.89 4.60% $52.18 Stores: 130  Type I Or II F.R. $146.81 4.60% $153.56 131  Type II ‐ 1 Hour $89.80 4.60% $93.93 132  Type II ‐ N $87.84 4.60% $91.88 133  Type III ‐ 1 Hour $109.22 4.60% $114.24 134  Type III ‐ N $102.45 4.60% $107.16 135  Type V ‐ 1 Hour $91.93 4.60% $96.16 136  Type V ‐ N $84.99 4.60% $88.89 Town Homes: 137  Type V ‐ Masonry $154.31 4.60% $161.41 138  Type V ‐ Wood Frame $147.15 4.60% $153.92 139  Garage‐ Wood Frame $60.05 4.60% $62.81 140  Garage‐ Masonry $66.64 4.60% $69.70 Theaters: 141  Type I Or II F.R. $195.63 4.60% $204.63 142  Type III ‐ 1 Hour $142.53 4.60% $149.09 143  Type III ‐ N $135.76 4.60% $142.01 144  Type V ‐ 1 Hour $134.16 4.60% $140.33 145  Type V ‐ N $126.85 4.60% $132.69 Warehouses: 146  Type I Or II F.R. $88.01 4.60% $92.06 147  Type I Or V ‐ 1 Hour $52.20 4.60% $54.60 148  Type I Or V ‐ N $49.00 4.60% $51.25 149  Type III ‐ 1 Hour $59.15 4.60% $61.87 150  Type III ‐ N $56.30 4.60% $58.89 Equipment:  Air Conditioning 151     Commercial $7.48 4.60% $7.83 152     Residential $6.24 4.60% $6.52 153  Sprinkler Systems $4.63 4.60% $4.85 Other Valuations Reroof 154 Asphalt And Comp ‐ per square foot of material $286.67 4.60% $299.85 5 Adopted Adopted 1/19/2021 1/18/2022 Svc Area Cost Per CPI Cost Per No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY 155 Built‐up ‐ per square foot of material $303.53 4.60% $317.49 156 Light‐weight tile ‐ per square foot of material $784.12 4.60% $820.19 157 Concrete Tile Or Slate Tile ‐ per square foot of materi $944.31 4.60% $987.75 158 Metal Shingles ‐ per square foot of material $596.94 4.60% $624.40 159 Wood Shake ‐ per square foot of material $362.55 4.60% $379.23 160 Wood Shingle ‐ per square foot of material $349.06 4.60% $365.12 161 Rolled Roofing ‐ minimum 300 Sq.Ft. allowed on patio $1,686.27 4.60% $1,763.84 162 Tear off and re‐sheath ‐ per square foot of materia $168.63 4.60% $176.38 Tenant Improvements 163 General Commercial $43.84 4.60% $45.86 164 Restaurants $50.59 4.60% $52.92 165 Medical Offices $52.27 4.60% $54.68 Retaining Walls‐ Concrete Block 166 6" $13.08 4.60% $13.68 167 8" $14.48 4.60% $15.14 168 12" $17.75 4.60% $18.56 169 Masonry Fireplace ‐ Minimum Valuation $5,345.49 4.60% $5,591.38 170 Foundation Permits ‐ Based On 1/3 The Overall Valuation Of The Bldg Permit These Figures Shall Be Used When The Applicant  Does Not Have A Valuation, Or If The Valuation  Given Is Obviously Low. 171 Factory Built Fireplace‐ Minimum Valuation $1,782.39 4.60% $1,864.38 Signs 1 Side: 172 a) Painted $69.13 4.60% $72.31 173 b) Electrical $133.22 4.60% $139.34 2 Sides: 174 a) Painted $80.94 4.60% $84.66 175 b) Electrical $168.63 4.60% $176.38 Pole /Lineal Foot plus square foot of sign: 176 a) 3"  0 $57.33 4.60% $59.97 177 b) 4"  0 $80.94 4.60% $84.66 178 c) 6"  0 $104.55 4.60% $109.36 179 d) 8"  0 $129.84 4.60% $135.82 180 e) 10"  0 $153.45 4.60% $160.51 181 f) 12"  0 $175.37 4.60% $183.44 Photovoltaic Systems 182 Permit And plan check fees for photovoltaic systems  shall be assessed at 45% of the fee generated by the  declared valuation and the per unit electrical item  cost 183 Residential 15 kW Or Less=$500 or 45% of the fee  generated by the declared valuation, whichever is  less. 184 Residential more than 15 kW=$500 + 15 Per kW over 15 or 45% of the fee generated by the declared  valuation, whichever is less. 185 Commercial 50 kW or less = $1,000 or 45% of the fee  generated by the declared valuation, whichever is  less. 186 Commercial more than 50 kw ‐ 250 kw = $500 + $7  per kW above 50 kW or 45% of the fee generated by  the declared valuation, whichever is less. 187 Commercial more than 250 kW = $2,400 + 5 kW  above 250 kW or 45% of the fee generated by the  declared valuation, whichever is less. Swimming Pools Valuation based on actual construction cost.  Permit fees same as building permits 188 Minimum Valuation: $22,258.81 4.60% $23,282.72 Spas 6 Adopted Adopted 1/19/2021 1/18/2022 Svc Area Cost Per CPI Cost Per No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY 189 Minimum Valuation 190 Prefabricated $4,451.76 4.60% $4,656.54 191 Gunite $8,937.25 4.60% $9,348.36 Surcharge Fees 192 Optical Records System ‐ Per Permit $15.77 n/a $15.77 193 # General Plan Maintenance ‐ 10% Permit Surcharge To 10% n/a 10% 194 # Permit Automation Fee $0.00 n/a $0.00 195 # Technology Enhancement (5% of permit and plan che 5% n/a 5% 7 Adopted Adopted 1/19/2021 1/18/2022 Svc Area Cost Per CPI Cost Per No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY S‐2 Building Permit Fees 196 Permit Issuance $96.45 4.60% $100.88 Total Valuation  197 $1.00 to $500.00 $41.87 4.60% $43.80 198 $501.00 to $2,000.00 $41.87 4.60% $43.80 For the 1st $500.00 plus $3.56 for ea. additional  $100.00,      or fraction thereof, to and including $2,000.00 199 $2,001.00 to $25,000.00 $123.38 4.60% $129.06 For the 1st $2,000.00 plus $16.31 for ea. additional  $1,000.00,      or fraction thereof, to and including $25,000.00 200 $25,001.00 to $50,000.00 $697.08 4.60% $729.14 For the 1st $25,000.00 plus $11.76 for ea. additional  $1,000.00,      or fraction thereof, to and including $50,000.00 201 $50,001.00 to $100,000.00 $1,146.95 4.60% $1,199.71 For the 1st $50,000.00 plus $8.15 for ea. additional  $1,000.00,      or fraction thereof, to and including $100,000.00 202 $100,001.00 to $ 500,000.00 $1,770.53 4.60% $1,851.98 For the 1st $100,000.00 plus $6.52 for ea. additional  $1,000.00,      or fraction thereof, to and including $500,000.00 203 $500,001.00 to $1,000,000.00 $5,761.47 4.60% $6,026.50 For the 1st $500,000.00 plus $5.52 for ea. additional  $1,000.00,      or fraction thereof, to and including $1,000,000.00 204 $1,000,001.00 and up $9,992.94 4.60% $10,452.61 For the 1st $1,000,000.00 plus $3.67 for ea.  additional $1,000.00,     or fraction thereof Other Inspections And Fees: 205 1.  Inspections Outside Of Normal Business Hours  (Per Hour) (Minimum Charge ‐ Two Hours) [a]  $83.74 4.60% $87.59 206 2.  Reinspection Fees Accessed Under Provisions Of  Section 305.8 (Per Hour) [a] $83.74 4.60% $87.59 207 3.  Inspections For Which No Fee Is Specifically  Indicated (Per Hour) (Minimum Charge  ‐ One‐Half  Hour) [a] $83.74 4.60% $87.59 208 4.  Additional Plan Review Required By Changes,  Additions Or Revisions To Plans (Per Hour)  (Minimum Charge  ‐ One‐Half Hour) [a] $83.74 4.60% $87.59 209 5.  For Use Of Outside Consultants For Plan Checking  And Inspections, Or Both [b] Actual costs  [b] n/a Actual costs  [b] 210 [a] Or the total hourly cost to the jurisdiction, whichever is the  greatest.  This cost shall include supervision, overhead,  equipment, hourly wages and fringe benefits of the employee  involved. [b] Actual costs include administrative and overhead costs. 8 Adopted Adopted 1/19/2021 1/18/2022 Svc Area Cost Per CPI Cost Per No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY S‐3 Electrical Permit Fees 211 Area Fee Rate ‐ Single Family Dwellings (Rate X Area/$0.13 4.60% $0.14 Unit Fee Schedule (Note: Does Not Include Permit Issuance Fee) Receptacle, Switch and Lighting, or other. For receptacle, switch lighting, smoke detectors, or  other outlets, at which current is used or controlled  except services, feeders and meter: 212 First 20, each $2.01 4.60% $2.10 213 Additional outlets, each $1.33 4.60% $1.39 (Note:  For multi‐outlet assemblies, each 5 ft. or  fraction may be considered as 1 outlet.) Lighting Fixtures 214 For lighting fixtures, sockets, or other lamp holding  devices: 215 First 20, each $2.01 4.60% $2.10 216 Additional fixtures, each $1.33 4.60% $1.39 217 For pole or platform mounted lighting fixtures, each $2.01 4.60% $2.10 218 For theatrical‐type lighting fixtures or assemblies,  each $2.01 4.60% $2.10 Residential Appliances 219 For fixed residential appliances or receptacle outlets  for same, including wall‐mounts, electric ovens,  counter‐mounted cooking tops, electric ranges, self‐ contained room, console, or through‐wall air  conditioners, space heaters, food waste grinders,  dishwasher $9.36 4.60% $9.79 (Note: For other types of air conditioners and other  motor‐driven appliances having larger electrical  ratings, see Power Apparatus) Temporary Power Service 220 For a temporary service power pole or pedestal,  including all pole or pedestal mounted receptacle  outlets and appurtenances, each $40.08 4.60% $41.93 221 For a temporary distribution system and temporary  lighting and receptacle outlets for construction sites,  decorative lighting, Christmas tree sales lots,  firework stands, sales booths, additional pole, etc.,  each $18.70 4.60% $19.56 Non‐Residential Appliances 222 For residential appliances and self‐contained, factory wired, non‐residential appliances not exceeding one  (1) horsepower (HP), kilowatt (KW), Or kilovolt‐ ampere (KVA) in rating, including medical and dental  devices, food, beverage, and ice cream cabinets $10.69 4.60% $11.18 Power Apparatus For motors, generators, transformers, rectifiers,  synchronous converters, capacitors, industrial  heating, air conditioners and heat pumps, cooking or  baking equipment, and other apparatus, as follows: Rating in horsepower (HP), kilowatts (KW), kilovolt‐ amperes (KVA), Or kilovolt‐amperes‐reactive (KVAR) 223 Up to and including 1, each $10.69 4.60% $11.18 224 Over 1 and not over 10, each $18.70 4.60% $19.56 225 Over 10 and not over 50, each $48.11 4.60% $50.32 226 Over 50 and not over 100, each $96.20 4.60% $100.63 9 Adopted Adopted 1/19/2021 1/18/2022 Svc Area Cost Per CPI Cost Per No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY 227 Over 100, each $160.35 4.60% $167.72 Note: 1. For equipment or appliances having more  than one motor, transformer, heater, etc., the sum  of the combined rating may be used. Note: 2. These fees include all switches, circuit  breakers, contractors, thermostats, relays and other  directly related control equipment. Busways 228 For trolley and plug‐in type busways, each 100 feet  or fraction thereof $26.73 4.60% $27.96 (Note: an additional fee will be required for lighting  fixtures, motors and other appliances that are  connected to trolley and plug‐In type busways.) Signs, Outline Lighting, And Marquees 229 For signs, outline lighting systems, or marquees  supplied from one branch circuit, each  $40.08 4.60% $41.93 230 For additional branch circuits within the same sign  outline lighting system, or marquee, each $13.36 4.60% $13.97 Services, Switchboards, Switchboard Sections,  Motor Control Centers And Panelboards 231 For services, switchboards, switchboard sections,  motor control centers and panelboards of 600 volts  or less & not over 200 amperes In rating, each. $40.08 4.60% $41.93 232 For services, switchboards, switchboard sections,  motor control centers and panelboards of 600 volts  or less and not over 200 amperes 1,000 amperes in  rating,each $80.18 4.60% $83.87 233 For services, switchboards, switchboard sections,  motor control centers and panelboards over 600  volts or over 1,000 amperes in rating, each $187.08 4.60% $195.68 Miscellaneous Apparatus, Conduits And Conductors 234 For electrical apparatus, conduits and conductors for  which a permit is required but for which no fee is  herein set forth $40.08 4.60% $41.93 (Note: This fee is not applicable when a fee is paid  for one or more services, outlets, fixtures,  appliances, power apparatus, busways, signs or  other equipment. Private Swimming Pools 235 For new private, residential, inground swimming  pools for single, or multi‐family occupancies,  including a complete system of necessary branch  circuit wiring, bonding, grounding underwater  lighting, water pumping and other similar electrical  equipment $80.18 4.60% $83.87 236 For other types of swimming pools, therapeutic  whirlpools, spas, hot tubs and alterations to existing  swimming pools, each $53.45 4.60% $55.91 Carnivals And Circuses Carnivals, circuses and other traveling shows or  exhibitions utilizing transportable‐type rides, booths, displays and attractions. 237 For electrical generators and electrical driven rides,  each $40.08 4.60% $41.93 238 For mechanically driven rides and walk‐through  attractions or displays having electric lighting, each $16.04 4.60% $16.77 10 Adopted Adopted 1/19/2021 1/18/2022 Svc Area Cost Per CPI Cost Per No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY 239 For a system of area and booth lighting, each $16.04 4.60% $16.77 240 For permanently installed rides, booths, displays,  and attractions $16.04 4.60% $16.77 Other Inspections For Inspection Of Electrical Equipment For Which No  Fee Is Herein Set Forth, The Fee Shall Be Determined  By The Building Official 11 Adopted Adopted 1/19/2021 1/18/2022 Svc Area Cost Per CPI Cost Per No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY S‐4 Plumbing Fees 241 Each plumbing fixture or trap or set of fixtures on  one trap (including drainage, vent, water piping and  backflow prevention devices therefore) $16.04 4.60% $16.77 242 Each permanent type dishwasher whether  individually trapped or not $16.04 4.60% $16.77 243 Each industrial waste pretreatment interceptor  including its trap & vent, except kitchen type grease  interceptors functioning as fixtures traps $16.04 4.60% $16.77 244 Each swimming pool drainage trap & receptor  whether connected to a building drain or building  sewer (water supply for pool not included) $16.04 4.60% $16.77 245 Each gas piping system of 1 to 5 outlets or alteration  or retest of existing gas piping system $16.04 4.60% $16.77 246 Each additional outlet over five $4.01 4.60% $4.20 247 Each gas pressure regulator other than appliance  regulators $5.35 4.60% $5.59 248 Each water heater and/or vent $16.04 4.60% $16.77 249 Each solar potable water heating system, including  water heater/vent $53.45 4.60% $55.91 250 For repair or alteration of drainage and/or vent  piping $16.04 4.60% $16.77 251 Each piece of water‐treating equipment and/or  water piping installed without accompanying  plumbing $16.04 4.60% $16.77 252 Lawn sprinkler systems on 1 meter including  backflow prevention devices $16.04 4.60% $16.77 253 Backflow prevention devices on unprotected water  supplied, pools, tanks, vats, etc. (including incidental  water piping) 1 to 5 $16.04 4.60% $16.77 254 Any swimming pool piping associated with the  construction, remodeling or repair of a swimming  pool, spa and hot tub $44.53 4.60% $46.58 255 Each additional device over five (5)$4.01 4.60% $4.20 256 Each building drain installed without accompanying  plumbing $16.04 4.60% $16.77 257 For connection of a house sewer to a public sewer or the extension of a house lateral onto a lot for future  use $45.43 4.60% $47.52 258 For each house sewer manhole $45.43 4.60% $47.52 259 Each installation of a section of house sewer for  future use $29.39 4.60% $30.74 260 For the connection of each additional bldg. or work  to house sewer $29.39 4.60% $30.74 261 For the connection of a house sewer to a private  sewage disposal system $29.39 4.60% $30.74 262 For each private sewage disposal system (septic tank  & seepage pit or pits and/or drainfield) $93.54 4.60% $97.84 263 For each cesspool, overflow seepage pit, percolation  test pit, swimming pool drywell, or drainfield  extension or replacement $45.43 4.60% $47.52 264 For disconnection, abandonment, alteration or  repair of any house sewer or private sewage disposal system or part thereof $29.39 4.60% $30.74 265 # Annual inspection of fat, oil and grease $160.00 n/a $160.00 12 Adopted Adopted 1/19/2021 1/18/2022 Svc Area Cost Per CPI Cost Per No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY S‐5 Mechanical Permit Fees Installation, alteration or relocation of each  refrigeration condensor or absorption unit, & each  fuel burning furnace, heater, boiler, and vented  decorative appliance including vents attached  thereto: 266 Up to & including 100,000 BTU $26.73 4.60% $27.96 267 More than 100,000 BTU to & including 1,000,000 B $53.45 4.60% $55.91 268 More than 1,000,000 BTU $133.62 4.60% $139.77 269 For each air inlet & air outlet served by any air cond $4.69 4.60% $4.90 270 For each 1,000 sq.ft. or fraction thereof of conditio $37.42 4.60% $39.14 Note: when a permit is applied for and the total  number of air inlets & air outlets is unknown, the  fees shall be based on the sq.ft. of conditioned area. 271 For the installation, relocation or replacement of  each appliance vent installed and not included in an  appliance permit $13.36 4.60% $13.97 For the installation or alteration of each air handling  unit for air conditioning including ducts attached  thereto: 272 Up to & including 2,000 CFM ‐ each unit up to 10 $13.36 4.60% $13.97 273 Each unit over 10 $4.01 4.60% $4.20 274 More than 2,000 CFM to and including 10,000 CFM $40.12 4.60% $41.96 275 More than 10,000 CFM $66.81 4.60% $69.88 Note: this fee shall not apply to an air handling unit  which is a portion of a factory assembled air  conditioned appliance for which a permit is required  elsewhere in this code. 276 For each evaporative cooler other than portable type $21.38 4.60% $22.37 277 For required ventilation fans which serve a single register 278 Each fan up to 10 $16.04 4.60% $16.77 279 Each fan over 10 $5.35 4.60% $5.59 280 For each required ventilation system which is not a  portion of any air conditioning system for which a  permit is required elsewhere in this code $32.07 4.60% $33.55 281 For the installation or each commercial kitchen hood  or spray booth served by mechanical exhaust,  including the fans and ducts attached thereto $66.81 4.60% $69.88 282 For the installation of each fire damper $10.69 4.60% $11.18 283 Alteration of existing duct system where a permit is n $26.73 4.60% $27.96 Note: 1) for refrigeration system rating one  horsepower, one ton, or 12,000 BTU per hour shall  mean the same quantity note: 2) for steam boilers rated in boiler  horsepower, one horsepower shall equal 50,000 BTU  per hour 13 Adopted Adopted 1/19/2021 1/18/2022 Svc Area Cost Per CPI Cost Per No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY Plan Check Fees 284 # Building Plan Check Fee ‐ 85% Of Permit Fee ‐ $15.00 Varies n/a Varies 285 # Electric Plan Check Fee ‐ 80% Of Permit Fee ‐ $15.00 M Varies n/a Varies 286 # Energy Plan Check Fee ‐ 10% Of Building Permit Fee:Varies n/a Varies 287 # Mechanical Plan Check Fee ‐ 80% Of Permit Fee ‐ $15 Varies n/a Varies 288 # Plumbing Plan Check Fee ‐ 80% Of Permit Fee ‐ $15.0 Varies n/a Varies 289 Temporary Certificate of Occupancy (60 days)$450 n/a $450 290 Parking Lot Resurface Permit ($68 up to 10,000  sqare feet, $1 for each additional sq ft) Varies n/a Varies 291 Event Permit (1 hr minimum insection time $93 plus p $157 4.60% $163.77 292 General Plan Update Fee (10% of Permit)Varies n/a Varies # = Fees not automatically adjusted for CPI change. 14 Ad t dAdopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes 1 S‐045 Grading Plan Check Fee Variable 4.60% Variable <100 CY ‐ $899 100 ‐ 1,000 CY ‐ $916.71 Plus $14.84 Per 100 CY 1,000 ‐ 10,000 CY ‐ $1050.24 Plus $16.43 Per 1,000 CY 10,000 ‐ 50,000 CY ‐ $1,756.06 Plus $18.02 Per 1,000 CY 50,000+ CY ‐ $2,476.71 Plus $244.81 Per 10,000 CY 2 S‐046 Grading Inspection Variable 4.60% Variable <100 CY ‐ $358 100 ‐1,000 CY ‐ $365.62 Plus $50.87 Per 100 CY 1,000 ‐ 10,000 CY ‐ $823.45 Plus $76.30 Per 1,000 CY 10,000 ‐ 50,000 CY ‐ $1,510.19 Plus $92.20 Per 1,000 CY 50,000+ CY ‐ $5,198.22 Plus $604.07 Per 10,000 CY 3 Grading Permit Fee ‐ Based On Cubic Yards $195 4.60% $204 4Permit Fee For Changes To Original Permit: < $20,000 $124 4.60% $130 $20,001 to $50,000 $124 4.60% $130 $50,001 to $75,000 $169 4.60% $177 $75,001 to $100,000 $257 4.60% $269 $100,001 to $200,000 $338 4.60% $353 $200,000 to $500,000 $436 4.60% $456 $500,001 and up $533 4.60% $557 5 Special Site Inspection: $98 4.60% $102 Commercial (Minimum 2 Hours) $195 4.60% $204 Residential (Minimum 2 Hour) $195 4.60% $204 Residential (Non‐Habitable Space) (Minimum 2 Hours) $186 4.60% $195 6 Production Lot Plan Check ‐ Per Lot $206 n/a $206 7 Occupancy Inspection Fee: 0‐1 To 15,000 Sq Ft (1/2 Hour Of Technical Staff Time) $52 4.60% $54 15,000 Sq.Ft. On (1 Hour Of Technical Staff Time) $98 4.60% $102 8 Bonds For Sign(s) (Refundable) $294 4.60% $307 9 Demolition Permit Fee (Minimum 1 Hour) $114 4.60% $119 10 Deputy Inspection Registration Fee (Deputy) $52 4.60% $54 11 Emergency Inspection Fee (Minimum 1 Hours) $160 4.60% $167 12 Hearing Officer Actual Cost n/a Actual Cost 13 Pre‐Plan Check Submittal (Minimum 2 Hours) $203 4.60% $213 14 Reinspection Fee (Minimum 1 Hour) $107 4.60% $112 15 Room Addition Plan Check Fee (Minimum 2 Hours) $203 4.60% $213 16 Trailer Coach $195 4.60% $204 17 Trash Enclosure ‐ $10 for additional enclosure $79 4.60% $83 18 Relocation Of Buildings: 0 to 2,000 sq.ft. $460 4.60% $481 2,001 to 5,000 sq.ft. $864 4.60% $903 5,001 sq.ft. and up $1,244 4.60% $1,302 19 Plan Checking Fee: Staff rates assessed against deposit. Executive Staff ‐ per hour $177 4.60% $185 Professional Staff ‐ per hour $127 4.60% $132 Technical Staff (Plan Checker/Inspector) ‐ per hour $107 4.60% $112 20 On‐Site Improvement Inspections: $2,000 deposit required for parking lot paving and miscellaneous testing City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY 15 Ad t dAdopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes City of Azusa Schedule of Fees and Charges (Development‐Related) BUILDING AND SAFETY Professional Staff ‐ Per Hour $127 4.60% $132 Rates applied against deposit Technical Staff  ‐ Per Hour $107 4.60% $112 Rates applied against deposit 21 Standard Plan Check Fee: Professional Staff ‐ Per Hour $127 4.60% $132 Technical Staff  ‐ Per Hour $107 4.60% $112 22 S‐98 # Certified Access Specialist Program (CASp) $4 n/a $4 [a] 23 Construction and Demolition Administrative Fee [b], [c] All tenant improvements with a valuation of up to $25,000: and all  residential additions. $68 n/a $68 [b], [c] All tenant improvements with a valuation of $25,001 to $50,000, and all  single family residential new constructions. $100 n/a $100 [b], [c] All tenant improvements with a valuation greater than $50,000; all  multifamily, commercial, and industrial projects, and all other projects. $135 n/a $135 [b], [c] [b] Proposed New Fees # = Fees not automatically adjusted for CPI change. [a]  Fee set by State‐City has to collect $4 for each business license applicant throught 12/31/23 (fee will reduce to $1 per business license applicant beginning  1/1/2024 per State Mandates) and pass it through to the State for construction related accessibility. [c]  Fee is associated with ordinance 2020‐01 scheduled approved by Council on 1‐21‐20.   The ordinance will amend chapter 14 of the City of Azusa Municipal  Code, adding Article XVIII, Construction and Demolition Waste Recycling and Diversion. 16 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 Fee No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes 1 S‐001 Zoning Clearance $89 4.60% $93 flat fee 2 S‐002 Design Review ‐ Minor (over the counter) $2,123 4.60% $2,220 flat fee 3 S‐003 Staff Level Design Review: #a) Modifications to Existing Structures $350 n/a $350 flat fee b) All Others $4,762 4.60% $4,981 flat fee 4 S‐004 # Design Review ‐ Major $10,000 n/a $10,000 deposit [a] 5 S‐005 Major Use Permit $6,215 4.60% $6,501 flat fee 6 S‐005A Minor Use Permit $1,184 4.60% $1,238 flat fee 7 S‐006 Use Permit Modifications: flat fee a) Modifications To Major UP $3,122 4.60% $3,266 flat fee b) Modifications To Minor UP $654 4.60% $684 flat fee 8 Variance ‐ Minor $1,601 4.60% $1,675 flat fee 9 S‐009 Variance #a) Involving Single‐Family Structure $1,000 n/a $1,000 flat fee b) All Others $5,302 n/a $5,302 flat fee 10 S‐010 # Zone Change $5,000 n/a $5,000 deposit [a] 11 S‐011 # Development Code Amendment $5,000 n/a $5,000 deposit [a] 12 S‐012 Development Agreement [a] #a) Development Agreement Deposit $10,000 n/a $10,000 deposit [a] #b) Annual Monitoring  Deposit $5,000 n/a $5,000 deposit [a] 13 S‐013 # General Plan Amendment $15,000 n/a $15,000 deposit [a] 14 S‐014 # Specific Plan $10,000 n/a $10,000 deposit [a] 15 S‐015 # Specific Plan Amendment $5,000 n/a $5,000 deposit [a] 16 S‐016 Tentative Parcel Map $8,733 4.60% $9,135 flat fee 17 S‐017 Tentative Tract Map: a) 5‐20 Lots $9,110 4.60% $9,529 flat fee b) 20‐50 Lots $10,618 4.60% $11,107 flat fee c) 50‐100 Lots $14,305 4.60% $14,963 flat fee d) 100+ Lots $15,981 4.60% $16,716 flat fee Lot Line Adjustment $1,924 4.60% $2,013 flat fee Minor Land Division ‐ Lot Split $683 4.60% $715 flat fee 18 S‐018 Reversion To Acreage $2,958 4.60% $3,094 flat fee 19 S‐019 Lot Merger $1,846 4.60% $1,931 flat fee 20 S‐020 Environmental Categorical Exemption Rev. $356 4.60% $372 flat fee 20 S‐021 Environmental Initial Study $5,283 4.60% $5,526 flat fee 21 S‐023 # Mitigated Negative Declaration $10,000 n/a $10,000 deposit [a] 22 S‐023 # Environmental Impact Report Preparation $10,000 n/a $10,000 deposit [a] 23 S‐023 # Environmental Impact Report Review $10,000 n/a $10,000 deposit [a] 24 S‐024 # Mitigation Monitoring ‐ CEQA Monitoring $5,000 n/a $5,000 deposit [a] 25 S‐025 # Annexation $10,000 n/a $10,000 deposit [a] 26 S‐026 Condominium Conversion Map: a) Map Fee $6,948 4.60% $7,268 flat fee b) Plus Consultant Fee Actual Cost n/a Actual Cost flat fee 27 S‐027 Minor Sign Review $90 4.60% $94 flat fee 28 S‐028 Major Sign Review $979 4.60% $1,024 flat fee 29 S‐029 Zoning Letter: City of Azusa Schedule of Fees and Charges (Development‐Related) PLANNING 17 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 Fee No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes City of Azusa Schedule of Fees and Charges (Development‐Related) PLANNING a) Single Family Residential $178 4.60% $186 flat fee b) Other $534 4.60% $558 flat fee 30 S‐030 Temporary Occupancy Review $619 4.60% $647 flat fee 31 S‐031 Temporary Use Permit a) Temporary Use Permit Fee $574 4.60% $600 [b,d] b) Azusa Based Non‐Profit Organizations $430 4.60% $450 flat fee [b] 32 S‐032 Continuance Processing $712 4.60% $744 flat fee 33 S‐033 Time Extension Review ‐ Staff $534 4.60% $558 flat fee 34 S‐034 Time Extension Review ‐ Planning Commission $1,201 4.60% $1,256 flat fee 35 S‐035 # Appeal To Planning Commission $500 n/a $500 flat fee 36 S‐036 # Appeal To City Council $1,000 n/a $1,000 flat fee 37 S‐15 Preliminary Plan Review $1,923 4.60% $2,011 flat fee [c] 38 S‐15A Nonconforming Use Time Extension $890 4.60% $931 flat fee 39 S‐037 Certificate Of Compliance $1,570 4.60% $1,643 flat fee 40 S‐038 Street Name Processing W/O Map $1,526 4.60% $1,596 flat fee 41 S‐039 Street Re‐Name Processing $2,059 4.60% $2,154 flat fee 42 S‐040 Building Address Processing W/O Map $992 4.60% $1,037 flat fee 43 S‐041 Building Re‐Address Processing $712 4.60% $744 flat fee 44 S‐041A Com Dev Newspaper Publication Actual Cost n/a Actual Cost flat fee 45 S‐044 Special Building Inspection (2 Hour Minimum) $178 4.60% $186 flat fee 46 S‐045 Technology Enhancement (5% of permit and plan  check fee‐ $30 minimum) 5% n/a 5% flat fee 47 S‐047 Massage Parlor Permit $1,017 4.60% $1,064 flat fee [d] 48 S‐048 Massage Parlor Permit Renewal $508 4.60% $531 flat fee [d] 49 S‐049 Residential Indoor Marijuana Permit $464 4.60% $485 flat fee [e] 50 S‐050 Residential Indoor Marijuana Permit Renewal $233 4.60% $243 flat fee [e] 51 S‐051 Accessory Dwelling Unit Permit $2,123 4.60% $2,221 flat fee [f] 52 S‐052 Designation of Historic Landmark, Historic District,  Potential Historic Landmark, and Potential Historic  District. $546 4.60% $571 flat fee 53 S‐053 Mills Act Contract $873 4.60% $913 flat fee 54 S‐054 Miss Act Contract Extension $262 4.60% $274 flat fee 55 S‐055 Major Certificate of Appropriateness $284 4.60% $297 flat fee 56 S‐056 Minor Certificate of Appropriateness $131 4.60% $137 flat fee 57 S‐057 Landscape Plan Review $193 4.60% $202 flat fee 58 S‐058 Covenant Review $249.97/Hr 4.60% $261.47/Hr flat fee 59 S‐059 Covenant Conditions & Restrictions Review $249.97/Hr 4.60% $261.47/Hr flat fee 60 S‐060 General Plan Update Fee (10% of permit and plan  check fee) 10% n/a 10% flat fee [g] 61 S‐061 Public Art Project Fee $500 n/a $500 flat fee 62 S‐062 Non‐Residential Landscape Review $468 n/a $468 flat fee 18 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 Fee No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes City of Azusa Schedule of Fees and Charges (Development‐Related) PLANNING 63 S‐063 Accessory Dwelling Unit Permit Amendment $1,044 n/a $1,044 flat fee [b] Azusa‐based non‐profit organizations receive a 25% discount from standard TUP fee. # = Fees not automatically adjusted for CPI change. [d] Fees Approved by Council on June 5, 2017 per Resolution No. 2017‐C37.   [e] Fees Approved by Council on June 5, 2017 per Resolution No. 2017‐C35.   [f] Fees Approved by Council on December 4, 2017 per Resolution No. 2017‐C37.   [g] Fee Approved by Council 1‐22‐19. [a] Charges to be billed at fully‐burdened hourly rates, including costs of outside service providers, if any for cost recovery. [c] Fee is per meeting.  50% of the fee for the first meeting is applied against future Planning/Engineering fee for the project. 19 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 Fee No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes 1 S‐047 Public/Private Improvement Plan Check: #a) $0‐$100,000 Valuation (% of est construction cost) 3% n/a 3% flat fee #b) Next $400,000 Valuation (% of est construction cost) 2.5% n/a 2.5% flat fee #c) > $500,000 Valuation (% of est construction cost) 2% n/a 2% flat fee 2 S‐048 Public/Private Improvement Inspection: #a) $0‐$100,000 Valuation (% of est construction cost) 5% n/a 5% flat fee #b) Next $400,000 Valuation (% of est construction cost) 3.5% n/a 3.5% flat fee #c) > $500,000 Valuation (% of est construction cost) 2% n/a 2% flat fee 3 S‐049 Final Parcel Map $1,204 4.60% $1,260 $1,260 or  Actual Staff  Time 4 S‐050 Final Tract Map a) 5 ‐ 10 Lots $2,723 4.60% $2,848 $2,848 or  Actual Staff  Time b) 11 ‐ 25 Lots $4,064 4.60% $4,251 $4,251 or  Actual Staff  Time c) 26 ‐ 50 Lots $5,740 4.60% $6,004 $6,004 or  Actual Staff  Time d) 51 ‐ 100 Lots $8,421 4.60% $8,809 $8,809 or  Actual Staff  Time e) 101 ‐ 150 Lots $9,427 4.60% $9,860 $9,860 or  Actual Staff  Time f) > 150 Lots $11,438 4.60% $11,964 $11,964 or  Actual Staff  Time 5 S‐051 Easement Check $377 4.60% $394 flat fee 6 S‐052 Monument Inspection: a) First Monument $335 4.60% $351 flat fee b) Each Additional Monument $84 4.60% $88 flat fee 7 S‐053 Bond Processing $168 4.60% $175 flat fee 8 S‐055 Lot Line Adjustment Engineering Plan Check Fee $1,924 4.60% Actual Staff  Time flat fee 9 Street Light Banner Installation/Removal $83 4.60% $86 flat fee 10 S‐056 # Street/Right‐of‐Way Abandonment $2,000 n/a $2,000 deposit [a] 11 S‐056A SUSMP/LID Plan Review $2,189 4.60% $2,290 flat fee 12 S‐056B SWPPP Plan Review $2,011 4.60% $656 flat fee 13 S‐056B BMP Review $335 4.60% $351 flat fee 14 S‐056C Hydrology/Drainage Plan Review $2,011 4.60% $2,104 flat fee 15 S‐056C Soils Review $335 4.60% $656 flat fee 16 S‐056C Traffic Study Review $838 4.60% $877 flat fee 17 S‐057 Sidewalk/Curb/Gutter Encroachment a) Up to 75 LF $503 4.60% $526 flat fee b) Each Add'l 75 LF $168 4.60% $175 flat fee 18 S‐057A Street Cut Encroachment  a) Up to 100 SF $503 4.60% $526 flat fee b) Each Add'l 100 SF $168 4.60% $175 flat fee City of Azusa Schedule of Fees and Charges (Development‐Related) ENGINEERING 20 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 Fee No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes City of Azusa Schedule of Fees and Charges (Development‐Related) ENGINEERING 19 S‐057B Driveway Approach $419 4.60% $438 flat fee 20 S‐058 Obstruction Permit $168 4.60% $175 flat fee 21 S‐059 Transportation Permits (Oversized And/Or Overweight Trucks): #a) Single Trip/Rider $16 n/a $16 flat fee [b] #b) Annual Permit $90 n/a $90 flat fee [b] 22 S‐060 # House Moving Permit $2,000 n/a $2,000 deposit [a] 23 S‐060A Industrial Waste Permit a) New/Modified $1,173 4.60% $1,227 flat fee b) Renewal $335 4.60% $351 flat fee 24 S‐060B Fats,Oils And Grease Program a) New $587 4.60% $614 flat fee b) Annual $251 4.60% $263 flat fee 25 S‐061 Sewer Saddle $503 4.60% $526 flat fee 26 Sewer Dye Test $121 4.60% $126 flat fee 26.1 Emergency Sewage Spill Response n/a n/a Actual Staff  Time  (Minimum  $504) Actual Staff  Time  (Minimum  $504) [e] 27 Sewer Blockage Check Actual Staff  Time n/a Actual Staff  Time Actual Staff  Time 28 S‐062 # Blueprint/Map Copy Service, Per Sheet (or actual outside costs) $20 n/a $20 Min or  Actual  $20 min or  Actual 29 # Project Plans/Specifications ‐ Plus $10 If Mailed $50 n/a $50 flat fee 30 Verification of Conditions $185 4.60% $193 or Actual  Staff Time $193 or Actual  Staff Time 31 Agreement And/Or Improvement Security, Each $245 4.60% $256 flat fee 32 Extension Time For Improvement Agreement, Each $334 4.60% $349 flat fee 33 Submittals in Excess of Four a) Fifth Submittals and subsequent submittals thereafter n/a Actual Staff  Time Actual Staff  Time 34 Minor Land Division ‐ Lot Split ‐ Please refer to Planning Division  Fee # ‐ 17 S‐017.   This is a Planning Division Fee. n/a n/a n/a flat fee [d] 35 Recording Fee: #a) First Sheet $8 n/a $8 flat fee #b) Additional Sheets, Each $2 n/a $2 flat fee 36 LDMA Surcharge (County Maps Only): #a) Tract Map $401 n/a $401 flat fee #b) Parcel Map $135 n/a $135 flat fee 37 # Expedited Plan Review 1.5x fee n/a 1.5x fee flat fee 38 # Consultant (Invoice + 36% Overhead)Invoice  + 36% O'H n/a Invoice  + 36% O'H flat fee 39 S‐6.5 Code Compliance Fee $42 4.60% $44 flat fee 40 S‐7 # Landscape Design Standards (Over The Counter Sales)$6 n/a $6 flat fee 41 S‐18 City‐Provided Tree Planting ‐ One 15 Gallon Tree $125 4.60% $131 flat fee 42 City‐Provided Tree Planting ‐ One 24" Box Tree $216 4.60% $226 flat fee 43 Time Extension $84 4.60% $88 flat fee 44 S‐6.3 Engineering Hourly Rate for in‐House Staff $168 4.60% $175 flat fee 21 Actual Staff  Time Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 Fee No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes City of Azusa Schedule of Fees and Charges (Development‐Related) ENGINEERING 45 Technology Enhancement (5% of permit and plan check fee‐ $30  minimum) 5% n/a 5% flat fee 46 S‐8.0 General Plan Update Fee (10% of permit and plan check fee) 10% n/a 10% flat fee 47 S‐8.1 Curb Drain (Per Drain) $168 4.60% $176 flat fee [c] 48 S‐8.2 Concrete Pavement (Up to 100LF no deposit) $503 4.60% $526 flat fee [c] (For each additional 100 LF, no deposit $168 4.60% $176 flat fee [c] 49 S‐8.3 Sewer Area Study n/a n/a $656 or Actual  Staff Time $656 or Actual  Staff Time [e] 50 S‐8.4 Potholing (Per location) n/a n/a $168 flat fee [e] [b] Fee set to match CalTrans. * All amounts shown are base fees.  Applicants are also be responsible for any consultant  or other agency fees (e.g. LA County) incurred. [a] Charges to be billed at fully‐burdened hourly rates, including costs of outside service  # = Fees not automatically adjusted for CPI change. [c] Added Fees to reflect the same fees from the FY2021 engineering fee schedules. [d] Please refer to the Planning Division Fee Schedule Section 17 S‐017 [e] New Fees  22 Adopted Adopted Svc  Area 1/19/2021 CPI 1/18/2022 Fee No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes Utility Services 1 S‐105 New Utility Account Setup: #a) Connect Fee $45 n/a $45 flat fee #b) Same Day Connection (7:00am‐4:00pm) $35 n/a $35 flat fee #c) Same Day Connection (4:00pm‐5:30pm) $85 n/a $85 flat fee #d) Fri 7am‐8pm (Elec, Wtr, or Both) $105 n/a $105 flat fee #e) Sat, Sun Or Holiday 7am‐8pm (Elec, Wtr, or Both) $205 n/a $205 flat fee #f) Positive Identification Check ‐ $1.25 $1.25 n/a $1.25 flat fee 2 S‐106 Utility Delinquent Turn Off/On: #a) 7am‐4pm $35 n/a $35 flat fee #b) 4pm‐5:30pm $85 n/a $85 flat fee #c) Fri 7am‐8pm (Elec, Water, or Both) $105 n/a $105 flat fee #d) Sat, Sun or Holiday 7am‐8pm (Elec, Water, or Both) $205 n/a $205 flat fee e) Late Payment Penalty, The Greater Amount Of Either: #i) Base Penalty Fee $7.50 n/a $7.50 flat fee # ii) Percent Of Total Outstanding Balance 5% n/a 5% flat fee f) Door Tag Fee n/a n/a $250 flat fee [e] g) Miscellaneous Collection Fee 24% n/a 24% Variable h) AMI Opt‐Out Fees: #i) One‐time Initial Set‐up Charge $75 n/a $75 flat fee # ii) Monthly Opt‐Out Fee $10 n/a $10 flat fee # iii) Monthly Opt‐Out Fee (Low‐Income) $5 n/a $5 flat fee 3 S‐107 Theft Of Water/Light Investigation: #a) Investigation Fee $500 n/a $500 flat fee #b) Damages And Estimated Usage Actual Cost n/a Actual Cost flat fee 4 S‐108 Water Pressure Test: #a) 1st Test Free Per Calendar Year $0 n/a $0 flat fee #b) Additional Test $165 n/a $170 Actual  Labor Costs [a] #c) Main Line $400 n/a $410 Actual  Labor Costs 5 S‐109 #Water Meter Test (Fully Allocated Hourly Rate) Bill Hourly n/a Bill Hourly per hour 6 S‐110 Water Quality Test: #a) Test Fee $125 4.60% $131 flat fee #b) Plus Lab Costs Actual Cost n/a Actual Cost flat fee 7 S‐111 #Flow Test $300 4.60% $314 flat fee 8 S‐112 Temporary Meter Rental Services: #a) Meter Fee (Per Each Meter) $200 n/a $210 Actual  material  costs #b) Deposit $1,200 n/a $1,250 deposit 9 S‐113 New Water Meter Installation: #a) Installation Fee $250 4.60% $262 flat fee b) Plus Material Costs Actual Cost n/a Actual Cost deposit 10 S‐131D Water Meter Fee: #a) 3/4" $200 n/a $250 flat fee #b) 1" $250 n/a $300 flat fee #c) 1.5" $1,000 n/a $1,250 flat fee #d) 2" $1,150 n/a $1,500 flat fee City of Azusa Schedule of Fees and Charges (Development‐Related) UTILITIES 23 Adopted Adopted Svc  Area 1/19/2021 CPI 1/18/2022 Fee No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes City of Azusa Schedule of Fees and Charges (Development‐Related) UTILITIES #e) > 2" Dev/Owner  Req'd to  Procure n/a Dev/Owner  Req'd to  Procure deposit 11 S‐131E # Jumper Fee (per service) $200 n/a $210 flat fee 12 S‐114 New Water Service Installation: #a) 3/4" ‐ 1" Deposit $4,000 n/a $4,500 deposit #b) 2" Deposit $4,500 n/a $5,000 deposit #c) 4" Deposit $8,000 n/a $8,500 deposit #d) 6" Deposit $10,000 n/a $10,500 deposit 13 S‐131H Hot Tap Fee: #a) 1" $300 n/a $345 flat fee  #b) 2" $300 n/a $345 flat fee [b] #c) 4" $350 n/a $400 flat fee [d] #d) 6" $400 n/a $465 flat fee [d] #e) 8" $450 n/a $520 flat fee [d] #f) 10" $450 n/a $520 flat fee [d] #g) 12" $525 n/a $605 flat fee [d] 14 S‐131C Fire Service Installation: #a) 4" Deposit $8,000 n/a $8,500 deposit #b) 6" Deposit $10,000 n/a $10,500 deposit #c) 8" Deposit $11,000 n/a $11,500 deposit #d) 10" Deposit $12,000 n/a $12,500 deposit #e) 12" Deposit $13,000 n/a $13,500 deposit 15 S‐131B #Water Disconnection From The Mainline (Deposit) $3,500 n/a $4,000 deposit 16 S‐131F #Fire Hydrant Relocation / Inspection Fee                 $1,500 n/a $2,000 flat fee 17 S‐131G Traffic Incident Hit Hydrant Impact Fee: #a) Impact Fee (Deposit) $1,500 n/a $2,000 flat fee #b) Additional Cost Of Repair & Water Loss Actual Cost n/a Actual Cost flat fee #c) Damage to Water Main Impact Fee $1,500 n/a $2,000 flat fee #d) Cost of Repair & Water Loss Actual Cost n/a Actual Cost flat fee #e) Damage to Water Facilities Impact Fee $1,500 n/a $2,000 flat fee #f) Cost of Repair & Water Loss Actual Cost n/a Actual Cost flat fee 18 S‐115 #New Backflow Device Inspection Review $347 4.60% $363 flat fee 19 S‐116 # Annual Backflow Device Inspection Review $82 4.60% $85 flat fee 20 S‐116A Water Plan Check $224 4.60% $250 flat fee 21 S‐116B Water Improvement Inspection (per hour) $145 4.60% $150 per hour 22 S116C Will‐Serve Letter $35 4.60% $40 flat fee 23 S‐117 #Water Service No change to various rates based on service size and  Various n/a Various variable [b] 24 S‐118 Sewer Blockage Check: #a) Minimum Charge $500 n/a $500 deposit #b) Fully Allocated Hourly Rates Bill Hourly n/a Bill Hourly deposit #c) Charge If City Causes Blockage $0 n/a $0 flat fee 25 S‐119 # Sewer Dye Test $115 4.60% $120 flat fee 26 S‐120 Emergency Sewage Spill Response: #a) Spill Response Actual Cost n/a Actual Cost deposit #b) Fully Allocated Hourly Rate For All Responding  Personnel Bill Hourly n/a Bill Hourly deposit #c) Charge If City Causes Spill $0 n/a $0 flat fee 27 S‐121 Wastewater Service: Various n/a Various variable 24 Adopted Adopted Svc  Area 1/19/2021 CPI 1/18/2022 Fee No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes City of Azusa Schedule of Fees and Charges (Development‐Related) UTILITIES 28 Duces Tecum Subpoena Processing $220 n/a $220 flat fee 29 S‐122 Electric Meter Test: #a) First Test Per Calendar Year $0 n/a $0 flat fee #b) Residential $160 n/a $160 flat fee #c) Commercial $370 n/a $370 flat fee #d) Industrial $440 n/a $440 flat fee 30 S‐123 Total Electrical Service Re‐Install: #a) Re‐Install Fee $808 4.60% $845 flat fee #b) Additional Materials Actual Cost n/a Actual Cost flat fee 31 S‐124 Additional Electric Span Install: #a) Install Fee $791 4.60% $828 flat fee #b) Plus Materials Actual Cost n/a Actual Cost flat fee 32 S‐125 Temporary Electric Installation: #a) Install $833 4.60% $871 flat fee #b) Additional Material Costs Actual Cost n/a Actual Cost flat fee 33 S‐126 Temp Single Phase Transformer Installation: #a) Installation Fee (Minimum) $3,382 4.60% $3,537 flat fee #b) Additional Material Costs Actual Cost n/a Actual Cost flat fee 34 S‐127 Temp Three Phase Transformer Installation: #a) Installation Fee (Minimum) $6,768 4.60% $7,079 flat fee #b) Additional Material Costs Actual Cost n/a Actual Cost flat fee 35 S‐128 Electric Line Extension/Upgrade: #a) Extension/Upgrade Actual Cost n/a Actual Cost deposit #b) Fully Allocated Hourly Rates Bill Hourly n/a Bill Hourly deposit 36 S‐129 Electric Services Various n/a Various variable [b] 37 S‐130 # Banner Installation $592 4.60% $619 flat fee 38 S‐131 #After Hours Standby/Call Out (2 Hour Minimum Bill Hourly n/a Bill Hourly deposit 39 S‐131A # Inspection Rate (Per Hour) Bill Hourly n/a Bill Hourly deposit 40 S‐131H #Water System Development Fees: a) Residential #Per Dwelling Unit $2,091 4.60% $2,187 flat fee b) Commercial # ii) Per SF $1 4.60% $1 flat fee c) Industrial # ii) Per SF $0.41 4.60% $0.43 flat fee d) School #Flat Fee $8,160 4.60% $8,535 flat fee e) Park #Flat Fee $4,080 4.60% $4,268 flat fee #f) Accessory dwelling units 750 SF or more $714 4.60% $747 flat fee 41 S‐131I #Water System Annexation Fees: a) Residential [a] #Per Dwelling Unit $1,020 4.60% $1,067 [b] b) Commercial #Per SF $0.46 4.60% $0.48 flat fee c) Industrial #Per SF $0.25 n/a $0.25 flat fee d) School $4,080 4.60% $4,268 flat fee e) Park $2,040 4.60% $2,134 flat fee 42 S‐131J Water Capacity Fee: #e) Accessory dwelling units less than 750 SF $306 4.60% $320 flat fee 25 Adopted Adopted Svc  Area 1/19/2021 CPI 1/18/2022 Fee No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes City of Azusa Schedule of Fees and Charges (Development‐Related) UTILITIES 43 S‐131k Electrical Engineering $100 n/a $250 Per Hour [c] 44 S‐131L Short Circuit Study Fee $200 n/a $200 Per Hour [c] 45 S‐131M Plan Check Fees a) Residential & ADU Per Dwelling Unit n/a n/a $250 flat fee [e] b) Commercial and Industrial n/a n/a $250 Per Hour [e] # = Fees not automatically adjusted for CPI change. [a] Test fee refunded if there is a system problem. [b] Rate varies depending on type of services and usage, time of year, and time of day. [c] Proposed New Fees [d] Fee is related to actual labor costs. [e] New Fees 26 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes 1 S‐063 Real Property Records Report a) Condominium/Townhouses $112 4.60% $118 b) Vacant/Unimproved Land $226 4.60% $237 c) Single Family Dwellings $226 4.60% $237 d) Multi‐Family Dwelling i) Per Parcel, First Unit $226 4.60% $237 ii) Each Add'l Unit $13 4.60% $13 e) Commercial Properties $226 4.60% $237 2 S‐064 Residential Rental Housing Registration And Inspection: a) Per Parcel ‐ Includes First Unit $131 4.60% $137 i) Additional Unit $8 4.60% $8 b) Reinspection $98 4.60% $102 3 Abandoned and Vacant Property Registration Fee $500 n/a $500 4 S‐032.5 Weed Abatement Inspection (Processing and Referring) $378 4.60% $395 5 S‐95.1 # Recovery and Storage of Abandoned Shopping Carts‐The City no longer  offer this service. $12 n/a $0 6 S‐066 # Appeal/Hearing $110 n/a Actual Costs of  Hearing  Officer Time 7 S‐065 Lien Release #a) Substandard $100 n/a $100 #b) Admin Fine $80 n/a $80 8 S‐066C Code Enforcement Fines #a) First Offense $100 n/a $100 #b) Second Offense $200 n/a $200 #c) Third Offense $500 n/a $500 #d) First and Second Offense ‐ No Business License Violation $250 n/a $250 9 Technology Enhancement (5% of permit and plan check fee‐ $30  minimum) 5% n/a 5% 10 Impound and Storage Fee (Non‐Automobile) Actual Costs n/a Actual Costs [a] # = Fees not automatically adjusted for CPI change. [a]  Fee is associated with ordinance 2020‐01 approved by Council on 1‐21‐20.   The ordinance will amend chapter 14 of the City of Azusa Municipal  Code, adding Article XVIII, Construction and Demolition Waste Recycling and Diversion. City of Azusa Schedule of Fees and Charges (Development‐Related) COMMUNITY IMPROVEMENT 27 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Fee/Unit Notes S‐1.1 https://www.fire.lacounty.gov/fire-prevention-division/fire-prevention-fees/ http://fire.lacounty.gov/wp-content/uploads/2019/09/FirePreventionServiceFees.pdf https://fire.lacounty.gov/ City of Azusa Schedule of Fees and Charges (Development‐Related) FIRE SAFETY The City of Azusa Contract Out Fire Prevention Services (including Ambulance Services) with the County of Los  Angeles Fire Department.   The City of Azusa does not have any control over Fire Services or ambulance  fees/rates.   For the County of Los Angeles Fire Department fire services fees, ambulance rates, and contact  information, please refer to the link and contact information listed below: County of Los Angeles Fire Department Fire Prevention Fees ‐ Contact: County of LA Acting Assistant Fire Chief  Carl N. Flores (Email Address: carl.flores@fire.lacounty.gov) or  626‐974‐8371. Ambulance Rates ‐ County of Los Angeles Department of Health Services Emergency Medical Services Agency ‐  Contact: Chief Prehospital Operations ‐ John Telmos 562‐378‐1677 (Email Address: jtelmos@dhs.lacounty.gov) https://library.municode.com/ca/los_angeles_county/codes/code_of_ordinances?nodeId=TIT7BULI_DIV2SPBU_CH7.16A M http://file.lacounty.gov/SDSInter/dhs/1106181_GeneralPublicAmbulanceRatesEffective7.1.21.pdf 28 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes 1 S‐067 #Noise Disturbance Response  Full Cost Recovery After 2nd Response Variable n/a Variable Alarm Users Alarm Fees 2 S‐068 Alarm Registration and Renewal #a) Registration and Renewal $25 n/a $25 #b) Senior Residential 65+, Permanently Disabled, or Low Income $12 n/a $12 3 # Appeal Fee, per request $25 n/a $25 Alarm Fines 4#Registration Late Charge $25 n/a $25 5#Alarm Fee Late Charge ‐ All fees and fines late $25 n/a $25 6 # Reinstatement Fee $100 n/a $100 7 # Automatic Dialing Device $100 n/a $100 8 # Audible Alarm Violation $100 n/a $100 9Burglar False Alarm Response ‐ Registered Alarm: #a) First Response (fee may be waived with online school attendance) $50 n/a $50 #b) Second Response $75 n/a $75 #c) Third Response $125 n/a $125 #d) Fourth Response $175 n/a $175 #e) Fifth Response $225 n/a $225 #f) Six or More $275 n/a $275 10 Burglar False Alarm Response ‐ Non‐registered Alarm Site: #a) First Response $150 n/a $150 #b) Second Response $175 n/a $175 #c) Third Response $225 n/a $225 #d) Fourth Response $275 n/a $275 #e) Fifth Response $325 n/a $325 #f) Six or More $375 n/a $375 11 Robbery/Panic False Alarm Response (Resid/Comm) Permit Holder  #a) Per Response $100 n/a $100 12 Robbery/Panic False Alarm Response (Resid/Comm) Non‐Permit Holder  #a) First Response $150 n/a $150 #b) Second Response $175 n/a $175 #c) Third Response $225 n/a $225 #d) Fourth Response $275 n/a $275 #e) Fifth Response $325 n/a $325 #f) Six or More $375 n/a $375 13 Operating Suspended Alarm System #a) One $200 n/a $200 #b) Two or More $300 n/a $300 Alarm Company Alarm Fines 14 # Failure to Report New Install $50 n/a $50 15 # Failure to Report Disconnect $50 n/a $50 16 # False Alarm Caused by Alarm Company $100 n/a $100 17 # Employee False Statement $200 n/a $200 18 # Failure to Use Enhanced Call Verification Procedures $100 n/a $100 19 # All Late Charges $25 n/a $25 City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) POLICE 29 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) POLICE 20 # Suspension Reinstatement Fee and Mailing Costs $200 n/a $200 a) Additional Fee Per Customer, if Contacted $11 4.60% $12 Alarm Fee 21 # Appeal Fee, per request $25 n/a $25 22 S‐069 #DUI Accident Response Investigation Charge At Fully Allocated Hourly Rates.  Not to exceed $12,000 per  incident by State Law. Variable n/a Variable 23 S‐070 Equipment Citation Verification #a) Sign Off Citations Issued by Azusa Police Department $15 n/a $15 b) Sign Off Citations Issued by External Agencies/Police Departments $20 n/a $20 24 S‐071 Vehicle VIN Verification $50 4.60% $52 25 S‐072 Public Safety At Special Events: a) Officer ‐ Per Hour ‐ PER EXECUTED CONTRACT RATES $155 4.60% $162 b) Reserve Officer ‐ PER EXECUTED CONTRACT RATES $43 4.60% $45 26 S‐072A # Booking Services $150 n/a $150 27 S‐073 Entertainment Permit: a) Temporary $345 4.60% $361 b) Regular $1,382 4.60% $1,445 c) Renewal $1,382 4.60% $1,445 28 S‐074 Dance Permit: a) One Time $55 4.60% $58 b) Annual $55 4.60% $58 29 S‐074A Pawn Shop Permit $1,716 4.60% $1,795 30 S‐074B Massage Parlor Permit $634 4.60% $663 31 S‐074C Carnival Worker Permit $176 4.60% $184 32 S‐075 Vehicle Impound Fees #a) Standard Release $150 n/a $150 #b) DUI Release $400 n/a $400 33 S‐076 # Repossessed Vehicle Release $15 n/a $15 [a] 34 S‐077 # Police Records Check/Clear Letter $25 n/a $25 35 S‐078 # Immigration Letters $25 n/a $25 36 S‐079 # Public Safety Application Background Check n/a n/a n/a 37 S‐081 #Photograph Service Fee (Cost of CD is included) $10 n/a $10 38 S‐082 Video/Audio Tape/Cd Reproduction: #a) Dispatch Tape (911 Tape) $110 n/a $110 #b) Video/Audio Reproduction $85 n/a $85 39 S‐083 Police Incident/Crime Report Copy: #a) Document <4 Pages In Length $0.00 4.60% $0 #b) First Sheet (>4 Page Document) $0.65 4.60% $0.68 #c) Each Additional Sheet  (>4 Page Document) $0.20 4.60% $0.21 40 S‐084 Special Computer Search ‐ Per Hour $107 4.60% $112 41 S‐085 Civil Subpoena Processing #a) Subpoena Processing Fee (Per Request) $20 n/a $20 30 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) POLICE #b) Additional Reproduction Cost Actual Cost n/a Actual Cost #c) Additional Deposit + Travel (Per Day, Regulated Fee) $275 n/a $275 42 S‐086 Duces Tecum Subpoena Processing #a) Subpoena Processing Fee (Per Request) $15 n/a $15 #b) Additional Reproduction Cost Actual Cost n/a Actual Cost 43 S‐087 Animal Regulation, As Per Ordinance: #a) Dog License ‐ Unaltered‐ 1 Year License $80 n/a $80 [b] #b) Dog License ‐ Altered ‐ 1 Year License $22 n/a $22 [b] #c) Senior Rate ‐ 1 Pet Altered $8 n/a $8 #d) Duplicate $10 n/a $10 #e) Delinquency Charge Equal to  License Fee n/a Equal to  License Fee #f) Field Enforcement (licensing initiated in the the field) $41 n/a $41 Voluntary Cat Licenses #a) One Year ‐ Altered $5 n/a $5 #b) One Year ‐ Unaltered $10 n/a $10 #c) Microchip ‐ With Licensing Of Altered Pet Free n/a Free S‐020 Vehicle Code Enforcement 44 # Improper Display Of License Plates (CVC 5200(a)) $58 n/a $58 45 # Improper Display Of Tabs (CVC 5204(a)) $80 n/a $80 46 # Blkg. Driveway/Garage Entrance (CVC 22500(e) $58 n/a $58 47 # No Parking On Sidewalk (CVC 22500(f)) $58 n/a $58 48 # No Parking Alongside Pkd. Veh./Dbl.Pkg. (CVC 22500(h)) $58 n/a $58 49 # Blkg. Disabled Access Ramp (CVC 22500(I)) $272 n/a $272 50 # Fire Accessway/Fire Lane (CVC 22500.1) $170 n/a $170 51 # Parking 18 Inches Form Curb/Wrong Way (CVC 22502(a), AMC 74‐441) $56 n/a $56 52 # Parking In Disabled Zone (CVC 22507.8(a)) $382 n/a $382 53 # Blk./Obstruct Disabled Zone (CVC 22507.8(b)) $338 n/a $338 54 # Parking On Disabled Crosshatch (CVC 22507.8(c)(2)) $338 n/a $338 55 # Fire Hydrant (CVC 22514) $56 n/a $56 S‐021 Parking Enforcement 56 57 # Parking For Purpose Of Sale (AMC 74‐439(1)) $68 n/a $68 58 # Not Parked Within Painted Lines (AMC 74‐443b) $44 n/a $44 59 # Red Curb (AMC 74‐449(a)(1)) $51 n/a $51 60 # No Parking In Alley (AMC 74‐450) $52 n/a $52 61 # 18” From Curb Or Facing Wrong Way (AMC 74‐441, CVC 22502(a)) $56 n/a $56 62 # Prohibited By Signs / Markings (AMC 74‐446) $51 n/a $51 63 # Limited Or Prohibited Parking (AMC 74‐453) $51 n/a $51 64 # Parking on Private Property Without Consent (AMC 74‐463 (b)) $52 n/a $52 65 # Commercial Veh. Over 6,000 Lbs. +/Over 60 Minutes (AMC 74‐466) $85 n/a $85 66 # Detached Trailer On Street (AMC 74‐466 (B)) $68 n/a $68 67 # Parking On Front Yard Prohibited (AMC 74‐468) $49 n/a $49 68 S‐022 # General Code Enforcement Actual Cost n/a Actual Cost 69 # Impound & Collision Tow Service‐Per Hr. (Minimum 1 Hr.) Variable n/a Variable 70 Storage Fees ‐ Per Day #a) Automobiles And Light Trucks Variable n/a Variable #b) Trucks Over 1 Ton Variable n/a Variable #c) Semi‐Truck And Trailer Variable n/a Variable 31 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) POLICE #d) Motorcycle Variable n/a Variable 71 S‐025 # Accident Report Investigation ‐ This service is no longer available N/A n/a N/A [c] 72 S‐027 #Alarm Monitoring Service Actual Cost n/a Actual Cost 73 S‐028 # Jail $104 n/a $104 74 S‐032.1 #Court Order Custody Reimbursement Fee Per 24‐Hour Period Or Fraction  Thereof $104 n/a $104 75 S‐032.4 # Paramedic Service Actual Cost n/a Actual Cost 76 S‐032.5 Traffic Collision Report #a) Injury $20 n/a $20 b) Non‐Injury $20 n/a $20 77 Comm Srvc Officer Special Event Fees (Per Hour)  PER EXECUTED CONTRACT  RATES $110 4.60% $115 78 Police Aide Special Event Fees (Per Hour) ‐ PER EXECUTED CONTRACT RATES $26 4.60% $28 79 Fire arm storage Fee (Court order/Safekeeping) ‐ Levy Upon released of fire $50 n/a $50 [a]  Fee set by State. # = Fees not automatically adjusted for CPI change. [b] Fee increased higher than CPI ‐ Proposed Fee Adjustment to recoup cost of services from LA County Animal Control Services [c] Deleted 32 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item Description Fee/Unit Sept'20‐'21 Fee/Unit Notes Business Licenses 1 Adult‐oriented business license: #a) License Fee See Business License n/a See Business License #b) Partial Payment of Fees ‐ Additional Charge $17 n/a $17 2 Adult Business License Application Fee: #a) Application Fee $196 n/a $196 #b) Partial Payment of Fees ‐ Additional Charge $17 n/a $17 3Initial Business License Fee: #a) Initial License Fee See Business License n/a See Business License #b) Partial Payment of Fees ‐ Additional Charge $17 n/a $17 4 Annual Renewal Fee: #a) Renewal Fee $41 n/a $41 #b) Partial Payment of Fees ‐ Additional Charge $17 n/a $17 5 Adult Business License Appeal Fee: #a) License Appeal Fee $2,616 n/a $2,616 #b) Partial Payment of Fees ‐ Additional Charge $17 n/a $17 6#Live Entertainer License Actual time spent at  hourly rate of involved  City staff, charged  against $2,500 initial  deposit n/a Actual time spent at  hourly rate of involved  City staff, charged  against $2,500 initial  deposit 7#Figure Model License Actual time spent at  hourly rate of involved  City staff, charged  against $2,500 initial  deposit n/a Actual time spent at  hourly rate of involved  City staff, charged  against $2,500 initial  deposit 8#Live Entertainer/Figure Model License Renewal Actual time spent at  hourly rate of involved  City staff, charged  against $2,500 initial  deposit n/a Actual time spent at  hourly rate of involved  City staff, charged  against $2,500 initial  deposit Planning 1#Interim Adult Use Planning Permit Actual time spent at  hourly rate of involved  City staff, charged  against $5,000 initial  deposit n/a Actual time spent at  hourly rate of involved  City staff, charged  against $5,000 initial  deposit 2#Final Adult Use Planning Permit Actual time spent at  hourly rate of involved  City staff, charged  against $5,000 initial  deposit n/a Actual time spent at  hourly rate of involved  City staff, charged  against $5,000 initial  deposit 3#Extension Of Amortization Actual time spent at  hourly rate of involved  City staff, charged  against $5,000 initial  deposit n/a Actual time spent at  hourly rate of involved  City staff, charged  against $5,000 initial  deposit All Adult Business Fees were rounded to the nearest dollar for administrative efficiency.   City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) ADULT BUSINESSES 33 Adopted Adopted Svc Area 1/21/2020 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes 1 S‐133 Application Fee ‐ New Business & Miscellanenous Business a) Outside Contractor $63 4.60% $66 b) Reinstate Outside Contractor $49 4.60% $51 c) Rental Business $63 4.60% $66 d) All Others $193 n/a $193 e) Renewal‐Every person engaged in the business of selling goods, wares  or merchandise at wholesale; every person in the business of  manufacturing, processing or fabricating goods, wares or merchandise,  including the production of oil, natural gas and other hydrocarbons;  every person engaged in the business of selling to the general public at  retail goods, wares, merchandise or commodities, including restaurants  and other foods dispensers; every person engaged in any professional or  semiprofessional occupation, trade or craft; every person primarily  engaged in selling, performing or furnishing services other than  commodities, including trades and crafts; and all other persons engaged  in any business 1) Group 1: Gross receipts during fiscal year of business  between $0.00 and $4,999.00 shall pay a tax of $50.00.  $50 n/a $50 2) Group 2: Gross receipts during fiscal year of business  between $5,000.00 and $9,999.00 shall pay a tax of  $90.00.  $90 n/a $90 3) Group 3: Gross receipts during fiscal year of business  between $10,000.00 and $99,999.00 shall pay a tax of  $150 n/a $150 4) Group 4: Gross receipts during fiscal year of business  between $100,000.00 and $499,999.00 shall pay a tax of  $300 n/a $300 5) Group 5: Gross receipts during fiscal year of business  between $500,000.00 and $999,999.00 shall pay a tax of  $750 n/a $750 6) Group 6: Gross receipts during fiscal year of business  between $1,000,000.00 and $4,999,999.00 shall pay a tax  of $750.00 plus $0.15 for each $1,000.00 over  $1,000,000.00 up to $4,999,999.00.  $750+ 15 cents  ($.15) for each  additional $1,000 in  exesss from  $1,000,000 to  $4,999,999 n/a $750+ 15 cents  ($.15) for each  additional $1,000 in  exesss from  $1,000,000 to  $4,999,999 7) Group 7: Gross receipts during fiscal year of business  between $5,000,000.00 and $14,999,999.00 shall pay a  tax of $1,350.00 plus $0.135 for each $1,000.00 over  $5,000,000.00 up to $14,999,999.00.  $1,350+ 15 cents  ($.15) for each  additional $1,000 in  exesss from  $5,000,000 to  $14,999,999 n/a $1,350+ 15 cents  ($.15) for each  additional $1,000 in  exesss from  $5,000,000 to  $14,999,999 8) Gross receipts during fiscal year of business of  $15,000,000.00 or more shall pay a tax of $2,700.00 plus  $0.10 for each $1,000.00 over $15,000,000.00.  $2,700 +  10 cents  ($.10) for each  additional $1,000 in  exesss from  $15,000,000  n/a $2,700 +  10 cents  ($.10) for each  additional $1,000 in  exesss from  $15,000,000  f) Commercial Rentals $90 (from $0 to  $20,000) + 95 cents  ($.95) per $1,000 on  rental amounts over  $20,000 annually n/a $90 (from $0 to  $20,000) + 95 cents  ($.95) per $1,000 on  rental amounts over  $20,000 annually g) Warehouses‐The measure of gross receipts shall be the  estimated annual waarehouse inventory value times the  estimated annual turnover rate.   If actual value of  merchandise shipped annually is avliable, that will be used  as the measure of gross receipt. Same as S‐133 ( e )  from above n/a Same as S‐133 ( e )  from above City of Azusa BUSINESS LICENSES 34 Adopted Adopted Svc Area 1/21/2020 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes City of Azusa BUSINESS LICENSES h) Mobile Home Parks $24.00 for the first  three spaces, then  an additional $12.00  for each parking  space or units over  three n/a $24.00 for the first  three spaces, then  an additional $12.00  for each parking  space or units over  three I) Rental of Apartments, Roomhouse, individual homes,  etc. (Three less units for duplex, triplex, single family  homes or condos) Under $5,000 Per Year $50 n/a $50 From $5,000 to $10,000 per year $50 plus $1.50  per  $1,000 n/a $50 plus $1.50  per  $1,000 From $10,001 to $20,000 per year $60 plus $2.50  per  $1,000 n/a $60 plus $2.50  per  $1,000 $20,001 and over $70 plus $3.50  per  $1,000 n/a $70 plus $3.50  per  $1,000 j) Apartments ‐ Rentals of four of more units $199.17 per unit n/a $204.69 per unit k) Vending Machines $30.00 per year for  the first $10,000.00  of annual gross  receipts or part  thereof, and $3.50  per $1,000.00 on  each additional sum  in excess but not to  exeed $1,500.00 per  year.  n/a $30.00 per year for  the first $10,000.00  of annual gross  receipts or part  thereof, and $3.50  per $1,000.00 on  each additional sum  in excess but not to  exeed $1,500.00 per  year.  l) Mechanical or Electronic Games $58 per machine not  to exceed $500 per  year n/a $58 per machine not  to exceed $500 per  year m) Outdoor Advertising $70.00 per year plus  $0.14 per square  foot n/a $70.00 per year plus  $0.14 per square  foot o) Side walk Benches $60.00 plus $6.00  per bench n/a $60.00 plus $6.00  per bench 2#First Offense Administrative Penalty For Business License  Related Violations $250 n/a $250 3 S‐134 Home Occupation Permit $105 4.60% $109 4 S‐135 New Taxi/Tow Truck Permit $646 4.60% $676 5 S‐136 Massage Parlor Technician Permit See notes on Cn/aSee notes on C[c] Massage Business Operators Permit See notes on Cn/aSee notes on C[c] Massage Facility Inspection $299 4.60% $313 6 Application Fee ‐ Renewal $26 4.60% $27 7 Field Collection Fee On Delinquent Accounts $32 4.60% $33 8 Partial Payment Of Fees ‐ Additional Charge $17 4.60% $18 9 S‐138 Business License  Duplicates $16 4.60% $17 10 S‐139 Printouts Of Business License Lists 1 hr Staff Time n/a 1 hr Staff Time 11 S‐140 Solicitor Permit‐All 35 Adopted Adopted Svc Area 1/21/2020 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes City of Azusa BUSINESS LICENSES a) 1st Solicitation $70 4.60% $73 b) Each Additional Permit $47 4.60%$49 12 S‐141 Yard Sale Permit Not Required n/a Not Required [a] 13 S‐142 Bingo Permit $56 4.60%$59 14 S‐143 Fireworks Stand Permit $400 4.60%$418 15 S‐96 Filming Or Other Use Of City Facilities ‐ Per Day 25% Discount for Azusa‐based nonprofit organizations $1,510 4.60% $1,580 16 Filming On Private Property $338 4.60%$353 17 S‐97 Registration Fee For Non‐Profit Businesses Within A  Commercial  Building (i.e. banks, schools, churches, etc.) $50 4.60%$52 18 S‐98 Certified Access Specialist Program (CASp)$4 n/a $4 [b] [a] Ordinance No. 07‐05, Approved By Council On 05/07/07 [b]Fee set by the State (Per AB 1379) ‐ The $4 fee will be effective until 12‐31‐23.   Starting on 1‐1‐24, the CASp fee will be reduced to $1. [c]Please refer to the Planning Division's Fee Schedule for the Massage Permit fee amount under S‐047 and S‐048. All Business License Fees were rounded to the nearest dollar for administrative efficiency. # = Fees not automatically adjusted for CPI change. 36 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes S‐33 Aquatics Program/Leisure Classes [b] 1 Swimming Lessons: a) Children/Group i) 25 Minutes $35 n/a $35 ii) 40 Minutes $45 n/a $45 b) Children/Private $35 n/a $35 c) Adult/Group i) 25 Minutes $35 n/a $35 ii) 40 Minutes $45 n/a $45 d) Adult/Private $35 n/a $35 2 Swimming Team: a) 1st Session (Includes Shirts And Swim Cap) i) First Child (Same Family) $75 n/a $65 b) 2nd Session i) First Child (Same Family) $60 n/a $55 3Water Exercise ‐ Adults (Leisure Class‐Rates Varies) Varies n/a Varies 4Lifeguard Training Class (Leisure Class‐Rates Varies) Varies n/a Varies 5 Aqua Zumba (Leisure Class‐Rates Varies) Varies n/a Varies 6 S‐34 Recreation Swimming ‐ Day Swim: #a) 12 Years Old & Under Includes Slide $1 n/a $1 #b) Teens ‐ Up To 17 Years Includes Slide $2 n/a $1 #c) Seniors ‐ 50 years And Older $1 n/a $1 #d) Adults ‐ 18 Years And Older Includes Slide $2 n/a $1 #e) Lap Swim ‐ Adult 18 And Over $2 n/a $1 #f) Lap Swim ‐ Seniors 50 years and older $1 n/a $1 7Recreation Swimming ‐ Month Pass (All Groups) $5 n/a $5 [b] Aquatics Center Event (All Groups) $5 n/a $5 [b] 8 S‐35 Swimming Pool Rental (2 Hours): a) 1‐100 People $382 n/a $382 b) 101‐250 People $492 n/a $492 c) 251‐350 People $601 n/a $601 d) Swimming Pool Rental Deposit (Refundable) $219 n/a $219 e) Additional ‐ Water Slide $109 n/a $109 f) Water Slide Rental Deposit (Refundable) $55 n/a $55 g) Non‐ Resident Fee (Additional) $164 n/a $164 9 S‐36 #Leisure Classes Varies n/a Varies S‐38 Adult Sports Programs *, [b] 10 Adult Baseball: a) Weeknights $500 n/a $500 b) Weekends $550 n/a $550 11 Adult Softball $315 n/a $315 12 Adult Basketball $375 n/a $375 13 Adult Volleyball $200 n/a $200 14 Golf Tournament Varies n/a Varies 15 Adult Flag Football $300 n/a $300 16 Adult Futsal (Indoor Soccer) $200 n/a $200 17 Adult Kickball $200 n/a $200 S‐41 Youth Sports Programs *, [b] 18 Pony Baseball: City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) COMMUNITY RESOURCES 37 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) COMMUNITY RESOURCES a) Regular Fee $85 n/a $85 b) Additional Child ‐ Same Family $75 n/a $75 19 Winter Pony Baseball: a) Regular Fee $50 n/a $50 b) Additional Child ‐ Same Family $45 n/a $45 20 Mighty‐Mite Baseball (T‐Ball/Coach Pitch): a) Regular Fee $50 n/a $50 b) Additional Child ‐ Same Family $45 n/a $45 21 Mighty‐Mite Basketball:  a) Regular Fee $50 n/a $50 b) Additional Child ‐ Same Family $45 n/a $45 22 Mighty‐Mite Flag Football: a) Regular Fee $50 n/a $50 b) Additional Child ‐ Same Family $45 n/a $45 23 Mighty‐Mite Soccer: a) Regular Fee $50 n/a $50 b) Additional Child ‐ Same Family $45 n/a $45 24 Flag Football (T‐Shirt Uniforms): a) New $35 n/a $35 b) Returning $30 n/a $30 c) Additional Child ‐ Same Family ‐ New $30 n/a $30 d) Additional Child ‐ Same Family ‐ Returning $25 n/a $25 25 Basketball (T‐Shirt Uniforms): a) New $35 n/a $35 b) Returning $30 n/a $30 c) Additional Child ‐ Same Family ‐ New $30 n/a $30 d) Additional Child ‐ Same Family ‐ Returning $25 n/a $25 26 Summer Basketball (Include Uniform): a) Regular Fee $55 n/a $55 b) Additional Child ‐ Same Family $50 n/a $50 27 Volleyball (T‐Shirt Uniforms‐Shirt Only; No Shorts): a) New $35 n/a $35 [a],[b],* b) Returning $30 n/a $30 c) Additional Child ‐ Same Family ‐ New $30 n/a $30 d) Additional Child ‐ Same Family ‐ Returning $25 n/a $25 [a],[b],* 28 Soccer (T‐Shirt Uniforms): a) New $35 n/a $35 b) Returning $30 n/a $30 c) Additional Child ‐ Same Family ‐ New $30 n/a $30 d) Additional Child ‐ Same Family ‐ Returning $25 n/a $25 Athletic Field Rental (Including Ball Diamond)*, [b] 29 S‐41.1 Ball Field/Diamond Rental: a) Field/Diamond Rental‐No Lights $32 n/a $32 b) Field/Diamond Rental‐With Lights $45 n/a $45 c) Drag, Line And Water Field‐Prepared $28 n/a $28 d) Staff, Scorekeeping ‐ Per Hour $17 n/a $17 e) Use Of Scoreboards $17 n/a $17 f) Use Of Bases $17 n/a $17 38 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) COMMUNITY RESOURCES g) Deposit For Use Of Bases $219 n/a $219 h) Use Of Strike Zone Mat $17 n/a $17 i) Non‐Resident Fee (Except Memorial Park) (Additional) $55 n/a $55 30 Athletic Field Only Charge (Green Space): a) Memorial Park ‐ Per Hour (Lights Not Included) $68 n/a $68 b) Northside South Field Area ‐ (Lights Not Included) $68 n/a $68 c) Zacatecas Park (Currently Not Available For Rental) $65 n/a $65 d) Gladstone Park (Lights Not Included) $36 n/a $36 e) Lights Included When Applicable $66 n/a $66 f) Non‐Resident Fee (Except Memorial Park) (Additional) $55 n/a $55 S‐43 Golden Days Special Events [b] 31 2K/5K Run/Walk: a) Youth i) Pre‐Registration $5 4.60% $5 ii) Day Of The Event $15 4.60% $20 b) Adult i) Pre‐Registration $15 4.60% $20 ii) Day of the Event $30 n/a $30 32 S‐44 Children's Day Camp (This program is not available): a) Registration Fee (One‐Time) $0 4.60% $0 b) New $0 4.60% $0 c) New ‐ 2nd Child In Same Family $0 4.60% $0 d) Returning $0 4.60% $0 e) Returning ‐ 2nd Child In Same Family $0 4.60% $0 33 S‐44 Summer Day Camp:[b] a) Registration Fee (One‐Time) $25 n/a $25 b) New (Per Day) $25 n/a $25 c) Returning ‐ 2nd Child Same Family $20 n/a $20 S‐47 Recreation Special Events [b] 34 Fall Festival Booth Rental Varies n/a Varies 35 Tournament Of Champions Finals At APU Events Center: a) Adults $3 n/a $3 b) Student $2 n/a $2 c) Child (3‐11) $1 n/a $1 36 Volleyball Clinic $0 n/a $0 [a],[b] 37 Junior Olympic Track (Per School) $110 n/a $110 38 Spring Thing Food Vendor Varies n/a Varies 39 Winter Fiesta Food Vendor Varies n/a Varies 41 Spring Thing (Novelty And Craft Vendor Fees) Varies n/a Varies 42 Holiday Crafts (Vendors Fees) Varies n/a Varies * Additional fees may apply for use of game officials.  Amounts vary. # = Fees not automatically adjusted for CPI change. [a] Volleyball Clinic Handle By External Agencies [b] Rates will be determined by market rate.   All Recreation Fees were rounded to the nearest dollar for administrative efficiency.   39 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes 1 S‐48 Woman's Club Rental To Public :[a] a) Weekdays Meetings ‐ 8 A.M. ‐ 5 P.M. (Add'l Hours $75 Each) $250 n/a $250 b) Friday Evening Event $300 n/a $300 c) Saturday Afternoon Event (Until 5P.M.) ‐ Replaced  with d below $0 n/a $0 d) Saturday Event (Anytime) $800 n/a $800 e) Sunday Event (Anytime) $400 n/a $400 f) Event Liability Insurance Varies n/a Varies g) Damage Deposit (Refundable). $500 n/a $500 h) Deposit to hold date (Non‐refundable) $350 n/a $350 i) Additional Time > 5 Hours (Per Hour, Split Between City And  Contractor) $250 n/a $250 j) Teen Party (Anytime except Saturday ‐ Saturday Rate is $800): $700 n/a $700 k) Cleaning Fee $100 n/a $250 l) Decorating Fee Outside Normal Hours Of Operation (Per Hour) $15 n/a $60 2Woman's Club‐For Azusa Based Non‐Profit Organizations: a) Building Rental (Per Hour Including Setup And Clean Up Time) $50 n/a $50 b) Kitchen (Flat Fee) $75 n/a $75 c) Damage Deposit (Refundable) $500 n/a $500 d) Staffing (Per Hour) $15 n/a $15 e) Cleaning Fee $100 n/a $100 f) Event Liability Insurance Varies n/a Varies g) Alcohol Liability Insurance $0 n/a $0 3Gazebo At City Hall $500 n/a $500 4 S‐48.2 Senior Lunch Program (Suggested) Donation $2 n/a $2 # 5 Rental Of Memorial Park North Recreation Center:[a] a) Small Class Rooms: (Per Hour) i) Non‐Profit $30 n/a $30 ii) For Profit $50 n/a $50 b) Large Room: (Per Hour) i) Non‐Profit $60 n/a $60 ii) For Profit $75 n/a $75 c) Kitchen: (Per Hour) i) Non‐Profit $50 n/a $50 ii) For Profit $75 n/a $75 d) Staffing: (Per Hour) i) Non‐Profit $30 n/a $30 ii) For Profit $30 n/a $30 e) Cleaning Fee (Maximum Fee) $225 n/a $225 f) Security Deposit: (Refundable Deposit) $300 n/a $300 g) Non‐Resident Fee (Flat Rate) (Additional) $100 n/a $100 h) Event Liability Insurance Varies n/a Varies i) Decorating Fee Outside Normal Hours Of Operation (Per Hour) $15 n/a $15 6 S‐48.3 Rental Of Senior Center:[a] a) Small Class Rooms: (Per Hour) i) Non‐Profit $30 n/a $30 ii) For Profit $50 n/a $50 b) Large Room: (Per Hour) City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) RECREATION FACILITIES RENTAL‐INCLUDING WOMAN'S CLUB, SENIOR CENTER AND NORTH RECREATION CENTER (NRC), ETC. 40 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) RECREATION FACILITIES RENTAL‐INCLUDING WOMAN'S CLUB, SENIOR CENTER AND NORTH RECREATION CENTER (NRC), ETC. i) Non‐Profit $50 n/a $50 ii) For Profit $90 n/a $90 c) Kitchen: (Flat Fee) i) Non‐Profit $50 n/a $50 ii) For Profit $75 n/a $75 d) Staffing: (After Hours Only, Minimal Per Hour) i) Non‐Profit $30 n/a $30 ii) For Profit $30 n/a $30 e) Cleaning Fee (Maximum)$225 n/a $225 f) Security Deposit: (Refundable Deposit)$300 n/a $300 g) Non‐Resident Fee (Flat Fee) (Additional)$100 n/a $100 h) Decorating Fee Outside Normal Hours Of Operation (Per Hour)$15 n/a $15 i) Event Liability Insurance Varies n/a Varies j) Deposit to hold date (Non‐refundable) $200 n/a $200 Memorial Park Facilities Rental [a] 40 Memorial Park Facilities: a) Meeting Room i) Normal Hours $35 n/a $35 ii) Outside Normal Hours $45 n/a $45 iii) Non‐Resident Fee (Additional)$110 n/a $110 b) Gym or Main Room i) Normal Hours $45 n/a $45 ii) Outside Normal Hours $70 n/a $70 iii) Non‐Resident Fee (Additional)$200 n/a $200 c) Kitchen i) Resident $55 n/a $55 ii) Non‐Resident $55 n/a $55 d) Cleaning $55 n/a $55 e) Security Deposit $200 n/a $200 43 Bounce House Application Usage $25 n/a $25 44 Non‐Resident Fee (Additional)$60 n/a $60 Picnic Shelter Rental [a] 45 Picnic Shelter Application Rental (Gladstone Park): a) Section # 1 $30 n/a $30 b) Section # 2 $30 n/a $30 c) Section # 3 $30 n/a $30 d) Non‐Resident Fee (Additional)$60 n/a $60 46 Picnic Shelter Application Rental (Memorial Park): a) Single Shelter (Section # 2,3,4 & 5)$35 n/a $35 b) Double Shelter (Section # 1& 6)$45 n/a $45 c) Non‐Resident Fee (Additional)$60 n/a $60 47 Picnic Shelter Application Rental (Northside Park): a) S‐Leg Section # 1 $30 n/a $30 b) S‐Leg Section # 2 $30 n/a $30 c) S‐Leg Section # 3 $30 n/a $30 41 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) RECREATION FACILITIES RENTAL‐INCLUDING WOMAN'S CLUB, SENIOR CENTER AND NORTH RECREATION CENTER (NRC), ETC. d) S‐Leg Section # 4 $30 n/a $30 e) S‐Leg Section # 5 $45 n/a $45 $60 n/a $60 48 f) Non‐Resident Fee (Additional) Picnic Shelter Application Rental (Pioneer Park): a) NE Section  # 1 $45 n/a $30 b) NE Section  # 2 $30 n/a $30 c) NE Section  # 3 Double Shelter $30 n/a $45 d) Gazebo Shelter  #4 $60 n/a $60 e) Non‐Resident Fee (Additional)$60 n/a $60 49 Picnic Shelter Application Rental (Zacatecas Park): a) NE Section  # 1  Double Shelter $45 n/a $45 b) NW Section  # 2 Double Shelter $30 n/a $45 c) SE Section  # 3 $45 n/a $30 d) SW Section  # 4 Double Shelter $30 n/a $45 e) NE Section  # 5 $45 n/a $30 f) Non‐Resident Fee (Additional)$60 n/a $60 50 Picnic Shelter Application Rental (Slauson Park): a) Section #1 $30 n/a $30 b) Section #2 $30 n/a $30 c) Section #3 $30 n/a $30 d) Section #4 $30 n/a $30 e) Non‐Resident Fee (Additional)$60 n/a $60 51 Picnic Shelter Application Rental (Veteran's Freedom Park): a) Gazebo #1 $30 n/a $30 b) Gazebo #2 $30 n/a $30 c) Non‐Resident Fee (Additional)$60 n/a $60 52 Picnic Shelter Application Rental (Rancho Park): a) Section #1 $30 n/a $30 b) Non‐Resident Fee (Additional)$60 n/a $60 53 Picnic Shelter Application Rental (Alisal Park): a) Section #1 $45 n/a $45 b) Section #2 $45 n/a $45 c) Non‐Resident Fee (Additional)$60 n/a $60 # = Fees not automatically adjusted for CPI change. [a] Rates will be determined by market rate. All Woman's Club/Senior Center/N. Recreation Center Fees were rounded to the nearest dollar for administrative efficiency 42 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes Monthly Foothill Transit Passes * 1 Senior/Disabled: #a) Regular Rate $30 n/a $30 [b] #b) Discounted Rate $19 n/a $19 [b] 2 Student K‐12: #a) Regular Rate $40 n/a $40 [b] #b) Discounted Rate $27.75 n/a $27.75 [b] 3Local Lines: #a) Regular Rate $60 n/a $60 [b] #b) Discounted Rate $56 n/a $56 [b] 4 Silver Streak: #a) Regular Rate $110 n/a $110 [b] #b) Discounted Rate $85 n/a $85 [b] 5 Commuter Express: #a) Regular Rate $180 n/a $180 [b] #b) Discounted Rate $150 n/a $150 [b] Dial‐A‐Ride Transit (one‐way) 6Medical and Social Services: #a) Azusa, Covina, Duarte, Glendora, Irwindale $0.50 n/a $0.50 #b) Baldwin Park, Monrovia, San Dimas, West Covina $1.50 n/a $1.50 7#Non‐Medical Appointments Limited to City Limits $0.50 n/a $0.50 8#Senior Lunch Program $0.25 n/a $0.25 Metrolink Monthly Passes * 9#City residents save $25 on monthly pass Variable n/a Variable [a], [c] 10 # Employees of Azusa Businesses receive $15 or a match of the amount  offered by employer up to a limit of $25 Variable n/a Variable [a], [c] Access * 11 # Base Books (10 Coupons Per Book)$27.50 n/a $27.50 [d] 12 # Plus Books (10 Coupons Per Book)$7.50 n/a $7.50 [d] * Discounted Passes Are Available To Eligible Users And On A First Come‐First Serve Basis. [a] Varies Depending On Point Of Origin And Destination. [b] Rates set by Foothill Transit [c] Rates set by Metrolink [d] Rates set by Access Services City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) TRANSPORTATION 43 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes 1 S‐097 Inter‐Library Loan Processing: #a) Processing Fee $2 n/a $2 b) Plus Postage Actual Cost n/a Actual Cost 2 S‐099 #Lost Library Card Processing $3 n/a $3 3 S‐100 Processing Overdue Material: #a) Per Item Per Day ‐ Adult $0.30 n/a $0.00 #b) Per Item Per Day ‐ Child $0.15 n/a $0.00 4 S‐101 Lost/Damage Library Material Processing: #a) Processing Fee (plus the cost of the item)$15 n/a $15 #b) Missing AV Case (Audio Book, DVD, & CD)$1 n/a $1 #c) Missing Bar Code $1 n/a $1 #d) Missing Pamphlet‐ AV Materials & Books $1 n/a $1 5 S‐102 # Passport Application (Rate Set by Fed. Govt.)$35 n/a $35 6 S‐103 #DVD Rental Per Item (For Two Days)$0 n/a $0 7 S‐104 Rental Of Library Auditorium: a) For Profit #i) During Business Hours ‐ Per Hour (Min. 3 Hours)$25 n/a $25 # ii) Outside Business Hours ‐ Per Hour (Min. 3 Hours‐Based on Actual‐Lib  Assist III) $100/Hr n/a $100/Hr b) Non‐Profit Organizations ‐ Outside Azusa #i) During Business Hours ‐ Per Hour (Min. 3 Hours)$15 n/a $15 # ii) Outside Business Hours Per Hour (Min. 3 Hours)$100/Hr n/a $100/Hr #c) Resident Non‐Profit & Government (Minimum 3 Hours)No Charge n/a No Charge 8 S‐104B Library Fax Service: #a) Domestic ‐ First Page (Each Additional Page $1)$2 n/a $2 #b) International ‐ First Page $6 n/a $6 #c) International ‐ Additional Page $2 n/a $2 9#Library Cards No Charge n/a No Charge 10 Personal Computer Usage: #a) First 2 Hours No Charge n/a No Charge #b) Excess Of 2 Hours $2 n/a $1 #c) Guest Pass (Non Library Cardholders)$2 n/a $1 11 S‐53 Photocopy Charges Per Page: #a) Black & White Copies $0.15 n/a $0.15 #b) Color Copies $0.25 n/a $0.25 12 S‐54 Merchandise Sales: #a) USB Drives Variable n/a Variable #b) Canvas Bags Variable n/a Variable #c) Ear Buds Variable n/a Variable # = Fees not automatically adjusted for CPI change. City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) LIBRARY  44 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes S‐16.1 Paper Map Products 1City Map Books $15 4.60% $16 2A Size Plot; 8.5 X 11 $15 4.60% $16 3A Size Plot: 8.5 X 11 With Photo $23 4.60% $24 4B Size Plot: 11 X 17 $15 4.60% $16 5B Size Plot: 11 X 17 With Photo $24 4.60% $25 6C Size Plot: 17 X 22 $37 4.60% $39 7C Size Plot: 17 X 22 With Photo $51 4.60% $53 8D Size Plot: 34 X 22 $72 4.60% $76 9D Size Plot: 34 X 22 With Photo $96 4.60% $100 10 E Size Plot: 34 X 46 $116 4.60% $121 11 E Size Plot: 34 X 46 With Photo $190 4.60% $199 12 Zoning Citywide Book (11 X 17 Sheets) $72 4.60% $76 13 City General Plan Land Use Or Zoning Map (3 X 5 Ft.) $37 4.60% $39 14 City General Plan Land Use Or Zoning Map (6 X 6 Ft.) $72 4.60% $76 15 Hourly Charge For Custom Mapping Work $107 4.60% $112 16 # Public Notice Radius Maps And Labels $240 n/a $240 # = Fees not automatically adjusted for CPI change. City of Azusa Schedule of Fees and Charges (Municipal Activities and Services) GIS MAPS 45 Adopted Adopted Svc Area 1/19/2021 CPI 1/18/2022 No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes 1Credit Card Processing Fee 2% n/a 2% [a] 2 S‐144 Returned Check Processing ‐ 1st and 2nd Check #a) First Check $35 n/a $35 [b] #b) Each Additional Check $25 n/a $25 [b] 3 S‐145 #Re‐Issuance Of Lost Checks $65 n/a $65 4 S‐146 Document Reproduction: #a) Document <4 Pages In Length $0 n/a $0 #b) First Sheet (>4 Page Document) $0.65 n/a $0.65 #c) Each Additional Sheet  (>4 Page Document) $0.20 n/a $0.20 #d) Per Sheet Charge for Certain Documents Specified in Gov't Code $0.10 n/a $0.10 [b] 5 S‐146.1 #Documents Reproduced on staff time and costs of CD/DVD/USB Flash Drive $10 n/a $10 6#Document Certification $15 n/a $15 7 S‐149 # Candidate Processing $25 n/a $25 [b] 8 S‐149A #Initiative Processing $200 n/a $200 [b] 9 S‐150 #Notary Service For Each Signature Taken $15 n/a $15 [b] 10 S‐150A Project Specifications And Plans: #a) Base Fee $50 n/a $50 #b) Additional Mailing Fee (If Mailed) $10 n/a $10 11 S‐88.1 # Processing Of Payroll Garnishments Per Transactions $0 n/a $0 [c] 12 S‐93 Records Research Service: #a) Document And Supplies Actual Cost n/a Actual Cost [d] b) Per Hour Fee (1/4 Hour Increments) $0 4.60% $0 13 S‐94 Bond Issuance And Administration ‐ (Includes Extra $50 Per Hour) $444 4.60% $465 14 S‐48.1 Rental Of Civic Center Auditorium: #a) During City's Normal Business Hours Until 4:00pm (Per Hour) $50/Hour n/a $50/Hour #b) After 4:00pm, Weekends Or Holidays (Per Hour) $100/Hour n/a $100/Hour #c) Non‐Resident Groups ‐ Additional Fee Per Event $100/Hour n/a $100/Hour #d) Discount For Azusa‐Based Non‐Profit Organizations 25% n/a 25% #e) A/V Technician Services ($60 Per Hour or Current Cost‐After 4pm,  Weekends) $60/Hour or  Current Costs n/a $60/Hour or  Current Costs #f) Custodial Services $40/Hour or  Current Costs n/a $40/Hour or  Current Costs 15 S‐48.2 Deposition Subpoena #Personal Appearance $275 n/a $275 [e] # Production of Documents/Records $15 n/a $15 [d] 16 S48.3 Military Banner Application Fees $130 4.60% $136  [b] Fees Set By State. [c] Fees set by court order. [d] Government Code Section 6253.9 (b) [e] Government Code Section 68096.1 # = Fees not automatically adjusted for CPI change. [a] Fee applies to all payments made directly to the City, via credit card.  (Example scenario ‐ For $100 fee, paid via credit card, the total amount charged will  be $102 (2% of $100). Schedule of Fees and Charges (Municipal Activities and Services) City of Azusa ADMINISTRATIVE PROCESSING COSTS 46 -1- Attachment 2 RESOLUTION NO. 2022-C01 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, APPROVING AND ADOPTING A REVISED SCHEDULE OF FEES AND CHARGES FOR VARIOUS MUNICIPAL ACTIVITIES AND SERVICES WHEREAS, under the police power granted by Article XI, Section 7 of the California Constitution, the City of Azusa is authorized to impose reasonable service fees for a variety municipal benefits and services; and WHEREAS, the City Council of the City of Azusa previously determined that the users of these services should be charged fees to recover the City's expenses for providing these services; and WHEREAS, the City Council previously adopted Resolution No. 2021-C01, which established fees for various municipal activities and services; and WHEREAS, the City Council has determined that in order to continue providing effective services for the public welfare, it is necessary to adopt a revised Schedule of Fees and Charges which sets forth fees for City services; and WHEREAS, based upon evidence provided, the City Council hereby determines that the proposed fees cover, but do not exceed, the reasonable cost of providing the services for which the fee is charged; and WHEREAS, the City Council has determined that the proposed Schedule of Fees and Charges is statutorily and categorically exempt from the requirements of the California Environmental Quality Act since citing these fees fit within the statutory exemptions for local agency decisions involving the adoption and collection of rates, tolls and other charges, pursuant to Public Resources Code Section 21080(b)(8) and Section 15273 of the California Environmental Quality Act Guidelines. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Azusa, California does hereby find, determine and declare as follows: SECTION 1. A doption of Schedule of Fees and Ch arges. The City Council approves and adopts the Schedule of Fees and Charges (the "Schedule"), which is attached hereto as Exhibit "C" and incorporated herein by reference. The adopted fee schedule shall supersede any fees and charge schedule previously adopted. SECTION 2. Findings. The City Council finds that the fees and charges set forth in the Schedule attached as Exhibit "A": (1) have a reasonable relationship with the City's costs in providing and maintaining those services and facilities; and (2) are necessary to enable the City to continue providing and maintaining the services and facilities to which they relate. SECTION 3. Repeal of Prior Resol ution . Resolution No. 2021-C01 is hereby repealed in its entirety. -2- Attachment 2 SECTION 4. Effective Date. This Resolution shall become effective upon its adoption. PASSED, APPROVED and ADOPTED this 18th day of January, 2022. ________________________________________ Robert Gonzales Mayor ____________________________________ Jeffrey Lawrence Cornejo, Jr. City Clerk STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) ss. CITY OF AZUSA ) ATTEST: I HEREBY CERTIFY that the foregoing Resolution No. 2022-C01 was duly adopted by the City Council of the City of Azusa at a regular meeting thereof on the 18th day of January 2022, by the following vote of City Council Members . AYES: COUNCILMEMBERS: TBD NOES: COUNCILMEMBERS: TBD ABSTAIN: COUNCILMEMBERS: TBD ABSENT: COUNCILMEMBERS: TBD ___________________________________ Jeffrey Lawrence Cornejo, Jr. City Clerk APPROVED AS TO FORM: ___________________________________ Marco Martinez City Attorney Best Best & Krieger, LLP Attachment 3 RESOLUTION NO. 2022-C02 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AZUSA, CALIFORNIA, APPROVING AND ADOPTING A REVISED SCHEDULE FOR CERTAIN DEVELOPMENT PROJECT FEES AND SERVICE CHARGES WHEREAS, under the police power granted by Article XI, Section 7 of the California Constitution, the City of Azusa is authorized to impose fees, charges and rates for certain municipal services; and WHEREAS, in addition to the authority granted by the California Constitution, Chapter 8 (commencing with section 66016) of Division 1 of Title 7 of the California Government Code establishes a procedure for adopting fees or service charges for development projects; and WHEREAS, pursuant to Resolution No. 2021-C02, adopted on January 19, 2021, the City currently imposes development related fees upon applicants to recover the costs of staff time, inspection, copying costs and other expenses related to the review and processing of applications for property development; and WHEREAS, many of the City's current fees charged for development services no longer reflect the actual cost of providing such services; and WHEREAS, Government Code sections 66016 and 66018 provide that the City may adopt new development fees or increase existing fees after providing notice and holding a public hearing; and WHEREAS, notice of a public hearing on the establishment of new and revised fees was published in accordance with provisions of section 6062a of the California Government Code; and WHEREAS, notice of public hearing was mailed to all interested parties who filed a written request for a mailed notice with the City, or a waiver of notice was obtained; and WHEREAS, on January 18th, 2022, at the time and place specified in the published and mailed notices, the City Council held a public hearing as required by law to allow oral or written presentations prior to levying new development fees or service charges and prior to approving an increase in existing development fees or service charges; and WHEREAS, at least ten (10) days prior to the commencement of the hearing, there was made available to the public a report containing the cost, or estimated cost, of providing the service for which the fee or service charge will be levied, and the revenue sources for providing such services; and WHEREAS, based upon evidence provided, the City Council hereby determines that the development services fees set forth in the Schedule of Fees and Charges attached hereto and Attachment 3 incorporated herein by reference will not exceed the estimated reasonable cost of providing the property development services for which the fee is charged; and WHEREAS, the proposed fees are statutorily and categorically exempt from the requirements of the California Environmental Quality Act since these fees fit within the statutory exemptions for local agency decisions involving the adoption and collection of rates, tolls and other charges, pursuant to Public Resources Code Section 21 080(b) (8) and Section 15273 of the California Environmental Quality Act Guidelines. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Azusa, California does hereby find, determine and declare as follows: SECTION 1. Adoption of Schedule of Fees. The City Council hereby approves and adopts the Schedule of Fees and Charges attached hereto as Exhibit "C" and incorporated herein by reference. The adopted fee schedule shall supersede any fees and charge schedule previously adopted. SECTION 2. Repeal of Prior Resolution. Resolution No. 2021-C02 is hereby repealed in its entirety. SECTION 3. Findings. The City Council finds that the fees and charges set forth in the Schedule attached as Exhibit "A": (1) have a reasonable relationship with the City's costs in providing those services; and (2) are necessary to enable the City to continue providing the services to which they relate. SECTION 4. Effective Date. This Resolution shall become effective sixty (60) days from its adoption. PASSED, APPROVED and ADOPTED this 18th day of January, 2022. ________________________________________ Robert Gonzales Mayor ATTEST: ___________________________________ Jeffrey Lawrence Cornejo, Jr. City Clerk Attachment 3 I HEREBY CERTIFY that the foregoing Resolution No. 2022-C02 was duly adopted by the City Council of the City of Azusa, at a regular meeting of said City Council held on the 18th day of January 2022, by the following vote of the Council: AYES: COUNCILMEMBERS: TBD NOES: COUNCILMEMBERS: TBD ABSTAIN: COUNCILMEMBERS: TBD ABSENT: COUNCILMEMBERS: TBD ___________________________________ Jeffrey Lawrence Cornejo, Jr. City Clerk APPROVED AS TO FORM: ___________________________________ Marco Martinez City Attorney Best Best & Krieger, LLP ATTACHMENT 4 Description Reason For Establishing Fees 1) 2) 3) 4) 5) 6) $250 Section 2 ‐ S106 f ‐ Door tag fee (Utilities  Department) Fee to cover the expense of manually delivering  24 hour disconnection notice. Section 45 S‐131M Plan Check Fee a) Residential and ADU Per Dwelling Unit  (Utilities Department) Recovers cost of Engineer time spent. Section 45 S‐131M Plan Check Fee b) Commercial and Industrial (Utilities  Department) Recovers cost of Engineer time spent. Section 50 ‐ S‐8.4 ‐  Potholing‐Per  Location (Engineering Division) Potholing refers to identifying utilities lines that  are underground to gather information that can  include the following: material, depth, and  horizontal and vertical. Typically, potholes  range from 6" to 12" in diameter, and 4' to 6'  deep. Usually, the inspection for these holes to  ensure the road has been restored to Azusa's  City Standard R12‐1 takes one hour. As a result,  the proposed increase will recuperate  Engineering Division's actual time spent to  review and approve the street restoration. $168 $250 $250 Table 1 ‐ Summary of Proposed New Fees  Section 26.1  ‐ Emergency Sewage Spill  Response (Engineering Division) An Emergency Sewage Spill can occur when any  of the following takes place: overflowing of a  septic tank, tree roots invading and blocking  underground sewer lines, misaligned sewage  pipes that cause buildup over time, or  blockages within the interior sewer systems  caused by improper materials flushed into the  sewer system. In extreme cases the sewage spill  can overflow from the City's sewer mainlines  into public right‐of‐way where clean‐up efforts  are to be provided to clean, and dispose of all  raw hazardous sewage material. Emergency  Sewage Spills can vary in the size of the  contaminated area, and volume discharged.  Therefore, the fee proposed is actual staff time  spent to recuperate the time spent by the  Public Works Department.  Section 49 ‐ S‐8.3 ‐  Sewer Area Study  (Engineering Division) The purpose of a Sewer Area Study is to  determine the amount of sewage flow  generated by new developments. It ensures  that the City's exiting sewer infrastructure has  capacity to convey the sewer flows from new  developments. The proposed increase will  recuperate Engineering Division's actual time  spent to review and approve the Sewer Area  Study. Moreover, the proposed fee will be  closer to the fee other adjacent agencies  (Glendora, Irwindale, Baldwin Park) charge for  the same service.  Actual Staff Time (minimum $504) $656 or Actual Staff Time Fee ATTACHMENT 4 Description Current Fee Proposed Fee Reason For Increase 1)$335 $656 2)$200 $250 3)$250 $300 4)$1,000 $1,250 5)$1,150 $1,500 6)$300 $345 7)$300 $345 8)$350 $400 9)$400 $465 10)$450 $520 11)$450 $520 12)$525 $605 13)$1,500 $2,000 14)$1,500 $2,000 15)$1,500 $2,000 Section 16 S‐131F ‐ Fire Hydrant  Relocation / Inspection Fee (Utilities  Dept) Cost recovery of labor and inspection costs‐  Increased costs has outpaced inflation. Section 17 S‐131G ‐ c) Damage to Water  Main Impact Fee (Utilities Dept) Cover costs related to impact to the water main. Section 17 S‐131G ‐ e) Damage to Water  Facilities Impact Fee (Utilities Dept) Cover costs related to impact to the water main. Section 10 S‐131D: b) Water Meter Fee 1  " ‐ (Utilities Dept) To recover the actual cost of meter which has  gone up in price.   The supplier increased the  price of the meter, and this is a pass through  costs. Section 10 S‐131D: c) Water Meter Fee  1.5 " ‐ (Utilities Dept) To recover the actual cost of meter which has  gone up in price.   The supplier increased the  price of the meter, and this is a pass through  costs. Section 10 S‐131D: d) Water Meter Fee 2  " ‐ (Utilities Dept) To recover the actual cost of meter which has  gone up in price.   The supplier increased the  price of the meter, and this is a pass through  costs. Section 13 S‐131H‐ Hot Tab Fee: f 10"‐  (Utility Dept) Section 13 S‐131H‐ Hot Tab Fee: g 12"‐  (Utility Dept) To cover actual labor costs. To cover actual labor costs. To cover actual labor costs. Section 13 S‐131H‐ Hot Tab Fee: a 1" ‐  (Utility Dept) Section 13 S‐131H‐ Hot Tab Fee: b 2"‐  (Utility Dept) Section 13 S‐131H‐ Hot Tab Fee: c 4"‐  (Utility Dept) Section 13 S‐131H‐ Hot Tab Fee: d 6"‐  (Utility Dept) Section 13 S‐131H‐ Hot Tab Fee: e 8"‐  (Utility Dept) To cover actual labor costs. To cover actual labor costs. To cover actual labor costs. To cover actual labor costs. Section 10 S‐131D: a) Water Meter Fee  3/4 " ‐ (Utilities Dept) To recover the actual cost of meter which has  gone up in price.   The supplier increased the  price of the meter, and this is a pass through  costs. Table 2 ‐ Summary of Proposed Fees to Increase more than 4.6% CPI  Section 15 S‐056C ‐ Soil Review  (Engineering Division) The Soil Report takes approximately 3‐4 hours  of review, and sometimes requires multiple  review cycles. As a result, the proposed increase  will recuperate Engineering Division's actual  time spent to review and approve the Soil  Report. Moreover, the proposed fee will be  closer to the fee other adjacent agencies  (Glendora, Irwindale, Baldwin Park) charge for  the same service.  Description Current Fee Proposed Fee Reason For Increase Table 2 ‐ Summary of Proposed Fees to Increase more than 4.6% CPI  16) $224 $250 17) $35 $40 18) $100 $250 19) $15 $20 20) $15 $20 21) $100 $250 22) $15 $60 Section 1‐ S‐48 Woman's Club Rental To  Public k) Cleaning Fee (Community Resources  Dept) Recover actual cost of services. Section 20‐ S‐116A  Water Plan Check  (Utilities Dept) Cost recovery of labor and inspection costs‐  Increased costs has outpaced inflation. Section 31‐ S‐43 Golden Day Special  Events a) Youth ii Day of the Event (Community Resources  Dept) Decrease cash handling and improve operation  efficiency. Section 31‐ S‐43 Golden Day Special  Events b) Adult i‐Preregistration (Community Resources  Dept) Decrease cash handling and improve operation  efficiency. Section 22‐ S‐116C  Will Serve Letter  (Utilities Dept) Higher than CPI‐Fee for time, material, and  postage. Section 43‐ S‐131K  Electrical Engineering  (Utilities Dept) Cost recovery of engineering time. Section 1‐ S‐48 Woman's Club Rental To  Public l) Decorating Fee Outside Normal Hours  Of Operation (Per Hour) ‐ (Community  Resources Dept) Recover actual cost of services. ATTACHMENT 4 Description Current Fee Proposed Fee To Delete Reason For Deleting Fee 1) $12 $12 2) $65 $65 3) $50 $50 Section S‐33 2a Swimming  Team: a) First Child (Same Family) ii) Additional Child (Same Family)  (Recreation Div) Ease of cash handling and operation efficiency. Table 3 ‐ Summary of Proposed Fees to Delete  Section 5 S‐95.1 ‐ Recovery and Storage  of Abandoned Shopping Cart (Community  Improvement Division) The City no longer recovers or stores shopping  carts. Section S‐33 2b Swimming  Team   (Recreation Div): b) 2nd Session ii) Additional Child (Same Family)  (Recreation Div) Ease of cash handling and operation efficiency. County of Los Angeles Fire Department Fire Prevention Fees Engineering Fees Attachment 5 Fee Type Fee Amount Assembly Occupancy 613.00$ Commercial (B, F, S, M)675.00$ Dwelling, 1 & 2 Family 491.00$ Educational/Institutional Occupancy 920.00$ Hazardous Materials Review (1-50 chemicals)675.00$ Hazardous Materials Review (51-100 chemicals)1,104.00$ Hazardous Occupancy 797.00$ High Piled Combustible Storage 491.00$ Multi-Family Residence 675.00$ Site Plan Review - Water and Access 491.00$ Fee Type Fee Amount Emergency Responder Radio Coverage 982.00$ Fire Alarm System: > 131 devices 859.00$ Fire Alarm System: 11-50 devices 429.00$ Fire Alarm System: 51-90 devices 613.00$ Fire Alarm System: 91-130 devices 736.00$ Fire Sprinkler Monitoring system & Fire Alarm System with <10 devices 245.00$ Special Extinguishing Systems: CO2, FM 200, Foam Liquid Systems,Inert Gas (Halon, Inergen)368.00$ Fee Type Fee Amount Fire Flow Test Witness/Perform 245.00$ Fire Pump Installation 613.00$ New NFPA 13 fire sprinkler system:< 100 heads per system 491.00$ New NFPA 13 fire sprinkler system:> 100 heads per system 736.00$ New NFPA 13D fire sprinkler system: one or two family dwelling 491.00$ New NFPA 13R fire sprinkler system: Multifamily family dwellings 613.00$ NFPA #22 fire water storage tank 491.00$ Special hazard fire extinguishing foam water spray nozzle system 491.00$ Standpipe System (Class I,II, & III)463.00$ TI to NFPA 13 fire sprinkler system:< 25 heads without calculation 245.00$ TI to NFPA 13 fire sprinkler system:> 25 heads and < 100 heads with/without calculation 368.00$ TI to NFPA 13 fire sprinkler system:>100 heads with/without calculation 613.00$ Underground fire protection system: 5 or more additional connections for hydrants or risers 491.00$ Underground fire protection system: single hydrant or single riser connection 307.00$ Fee Type Fee Amount Additional plan review after initial review and one resubmmittal (per hour)123.00$ Alternative Materials and Methods Review 480.00$ Expedited review (each 2- hours + initial fee)245.00$ Plan review time (per hour) for modifications, re-stamp (minimum 1-hour)123.00$ Pre-Submittal Meeting (initial 2-hours)245.00$ Building Plan Review Plan Check Fire Alarm System Plan Check Fire Sprinkler Plan Check Miscellaneous Building Plan Review https://fire.lacounty.gov/fire-prevention-fees/1 Field Permit Fees Fee Type Fee Amount Activities in Hazardous Fire Areas 332.00$ Aerosol Products 332.00$ Amusement Buildings 332.00$ Automobile Wrecking Yard 332.00$ Aviation Facility 332.00$ Battery Systems Stationary 332.00$ Bonfires or Rubbish Fires 332.00$ Carbon Dioxide Systems used in Beverage Dispensing Applications 332.00$ Carbon Dioxide Enrichment Systems 332.00$ Carnival & Fair Requirements 332.00$ Combustible Dust Producing Operations 332.00$ Combustible Fibers 332.00$ Commercial Rubbish Handling Operation 332.00$ Covered Mall Buildings 332.00$ Cryogens Fluids 332.00$ Cutting and Welding Permit 332.00$ Dipping Operations 332.00$ Dry Cleaning Plants 332.00$ Emergency Helicopter Landing Facility for High Rise Buildings 332.00$ Exhibits and Trade Shows 332.00$ Fire Hydrants and Valves 332.00$ Fireworks Display 332.00$ Floor Finishing 332.00$ Fruit and Crop Ripening 332.00$ Fumigation/Thermal Insecticidal Fogging 332.00$ Hazardous Materials 332.00$ Hazardous Production Materials 332.00$ High Piled Combustible Storage 332.00$ Hot Work Operations 332.00$ HPM Facilities 332.00$ Industrial Ovens 332.00$ Liquid Gas-Fueled Vehicles or Equipment 332.00$ Lumber Yard and Woodworking 332.00$ Magnesium 332.00$ Miscellaneous Combustible Storage 332.00$ Model Rockets 332.00$ Motor Fuel-Dispensing Facilities 332.00$ Open Burning 332.00$ Open Flames and Candles 332.00$ Open Flames and Torches 332.00$ Organic Coating 332.00$ Pallet Yards 332.00$ Parade Float 332.00$ Places of Assembly 332.00$ https://fire.lacounty.gov/fire-prevention-fees/2 Field Permit Fees Fee Type Fee Amount Plant Extraction Systems 332.00$ Private Fire Fighting Resources 332.00$ Private Fire Hydrants 332.00$ Pyrotechnic Special Effects Materials 332.00$ Pyroxylin Plastics 332.00$ Radioactive Materials 332.00$ Recreational Fires 332.00$ Refrigeration Equipment 332.00$ Repair Garage/Automotive/Marine/Fleet Fuel Dispensing 332.00$ Rifle Range 332.00$ Special Events 332.00$ Spraying or Dipping 332.00$ Storage of Scrap Tires and by-Products 332.00$ Tank Removal 332.00$ Tank/Cistems 332.00$ Temporary Sales Lots 332.00$ Temporary Tents, Canopies, Membrane Structures 332.00$ Tire Rebuilding Plants 332.00$ Tire Storage 332.00$ Waste Handling 332.00$ Wood Products 332.00$ https://fire.lacounty.gov/fire-prevention-fees/3 Film Unit Fees Fee Type Fee Amount Film 282.00$ Fuel Truck 208.00$ Special Effects 288.00$ Still Photos 277.00$ https://fire.lacounty.gov/fire-prevention-fees/4 Forestry Fees Fee Type Fee Amount Barns, garages, accessory structures 613.00$ New Residential Structure greater than or equal to 2,500 sq. ft. in total area, within currently developing tracts of 25 or more lots.725.00$ New residential, commercial, or industrial structures greater than or equal to 2,500 sq. ft. in total area, or additions/modifications to existing residential, commercial or industrial structures which increase the square footage of the structure by 50 percent or more and which addition/modification does not exceed 2,500 sq. ft. in total area. 832.00$ New residential, commercial, or industrial structures less than 2,500 sq. ft. in total area, or additions/modifications to existing residential, commercial or industrial structures which increase the square footage of the structure by 50 percent or more and which addition/modification does not exceed 2,500 sq. ft. in total area. 711.00$ Parcel maps / lot splits of 4 or fewer parcels 141.00$ Tract maps - preliminary plan approval 980.00$ Tract maps - final plan approval (Includes lots 5-20)1,064.00$ Each additional 10 lots over 20 651.00$ Fee Type Fee Amount 001-015 775.00$ 016-050 861.00$ 051-100 1,551.00$ 101-200 2,412.00$ 201-400 4,135.00$ 401-999 6,892.00$ Plan Review and Inspection Oak Trees Fuel Modification Plan Check https://fire.lacounty.gov/fire-prevention-fees/5 High Rise Fees Fee Type Fee Amount High Rise Buildings over 75 Feet in Height 1,472.00$ Fee Type Fee Amount High Rise Buildings over 75 Feet in Height 665.00$ Building Plan Review Plan Check Construction Field Inspection https://fire.lacounty.gov/fire-prevention-fees/6 Land Development Unit Fees Fee Type Fee Amount Clean Hands Waiver 262.00$ Conditional Use Permit 384.00$ Conditional Use Permit - Revised 225.00$ Fire Hydrant Approval (Includes first 10 hydrants)262.00$ Each additional hydrant over 10 43.00$ Grading Plan Review - Fire Lanes and Private Driveways 507.00$ Grant of Waiver 286.00$ Lot Line Adjustments 262.00$ Mobile Home Park 384.00$ One Stop Meeting 153.00$ Revised Exhibit A 262.00$ Site Plan Review 139.00$ Street Vacation 262.00$ Tentative Parcel Map - Amendment 384.00$ Tentative Parcel Map - Initial (3 Reviews)1,120.00$ Tentative Parcel Map - Revised 630.00$ Tenative Parcel Map Revisions or Re-submit 323.00$ Tentative Tract Map - Amendment 594.00$ Tentative Tract Map - Initial (3 Reviews)2,593.00$ Each additional lot between 11-50 20.00$ Each additional lot between 51-100 15.00$ Each additional lot between 101-1000 11.00$ Each additional lot 1,001 or greater 6.00$ Tentative Tract Map - Revised 1,243.00$ Tentative Tract Map Revision or Re-submittal 384.00$ Water Appeals Board 139.00$ Water Plans and Systems Review for Compliance 262.00$ Zone Change 262.00$ Fee Type Fee Amount 01-04 Parcels 630.00$ 05-10 Parcels 691.00$ 11-50 Parcels 936.00$ 51 or more Parcels 1,120.00$ Fourth and Subsequent Submittals 200.00$ Verification of Condition - Parcel 262.00$ Fee Type Fee Amount 01-05 Lots 630.00$ 06-10 Lots 691.00$ 11-25 Lots 814.00$ 26-50 Lots 936.00$ 51 or more Lots 1,120.00$ Fourth and Subsequent Submittals 200.00$ Verification of Condition - Tract 262.00$ Plan Review - per map or as noted Parcel Map (Final Map) per submittal Tract Map (Final Map) per submittal https://fire.lacounty.gov/fire-prevention-fees/7 Petro Chem Fees Fee Type Fee Amount Cellulose Nitrate Film 332.00$ Compressed Gases 332.00$ Explosives 332.00$ Flammable or Combustible Liquids 332.00$ LP Gas 332.00$ Oil Natural Gas Wells 332.00$ Field Permits https://fire.lacounty.gov/fire-prevention-fees/8 Regional Service Fees Fee Type Fee Amount Assembly Occupancy 498.00$ Commercial (B, F, S, M)498.00$ Dwelling, 1 & 2 Family 332.00$ Educational/Institutional Occupancy 332.00$ Hazardous Occupancy 415.00$ High Piled Combustible Storage 997.00$ Multi-Family Residence 332.00$ Repair Garage 415.00$ Tank Installation or Removal 415.00$ Tenant Improvements Projects 332.00$ Fee Type Fee Amount Emergency Responder Radio Coverage 1,328.00$ Fire Alarm System: 11-50 devices 497.00$ Fire Alarm System: 51-90 devices 580.00$ Fire Alarm System: 91-130 devices 664.00$ Fire Sprinkler Monitoring system & Fire Alarm System with <10 devices 331.00$ Halon System/FM 200 331.00$ UL-300 System (Hood Systems)331.00$ Fee Type Fee Amount New NFPA 13 fire sprinkler system:< 100 heads per system 665.00$ New NFPA 13 fire sprinkler system:> 100 heads per system 831.00$ New NFPA 13D fire sprinkler system: one or two family dwelling 332.00$ New NFPA 13R fire sprinkler system: Multifamily family dwellings 665.00$ TI to NFPA 13 fire sprinkler system:< 25 heads without calculation 332.00$ TI to NFPA 13 fire sprinkler system:> 25 heads and < 100 heads with/without calculation 498.00$ TI to NFPA 13 fire sprinkler system:>100 heads with/without calculation 581.00$ Underground fire protection system: 5 or more additional connections for hydrants or risers 665.00$ Underground fire protection system: single hydrant or single riser connection 332.00$ Construction Field Inspection Fire Alarm System Field Inspection Fire Sprinkler System Field Inspection https://fire.lacounty.gov/fire-prevention-fees/9 EMERGENCY MEDICAL SERVICES AGENCY LOS ANGELES COUNTY Los Angeles County Board of Supervisors Hilda L. Solis First District Holly J. Mitchell Second District Sheila Kuehl Third District Janice Hahn Fourlh Districl Kathryn Barger F'fthDistrict Cathy Chidester Director Marianne Gausche-Hill, MD Medical Director 10100 Pioneer Blvd, Suite 200 Santa Fe Springs, CA 90670 ,Tel: (562) 378-1500 Fax: (562) 941-5835 •ro advance the health of our communities by ensuring quality emergency and disaster medical facility services.". April 9, 2021 TO: Fire Chief, All 9-1-1 Paramedic Provider Agencies CEO, Private Provider Agencies City Manager, Each Los Angeles County City FROM: Cathy Chideste& Director SUBJECT: GENERAL PUBLIC AMBULANCE RA TES JULY 1, 2021 THROUGH JUNE 30, 2022 Attached are the maximum allowable rates chargeable to the general public for ambulance transportation as of July 1, 2021, as per section 7.16.340, Modification of Rates, of the County Ordinance (attachment I). Transportation services provided on or after July 1, 2021 may not be billed above the allowable maximum rates per the attached rate schedule. If you have any questions, please contact John Telmos, Chief Prehospital Operations at (562) 378-1677. CC:jt 04-14 Attachment c: Brian Chu, Deputy County Counsel, Health Services Julio Alvarado, Director, Contracts and Grants Enrique Sandoval, Contract Manager, Contracts and Grants Cristina Talamantes, Ordinance liaison, Board of Supervisors Executive Office ATTACHMENT 6 COUNTY OF LOS ANGELES GENERAL PUBLIC AMBULANCE RATES EFFECTIVE JULY 1, 2021 Section 7.16.280 Rate Schedule For Ambulances ATTACHMENT 6 A A ground ambulance operator shall charge no more than the following rates for one patient: Rates Effective July 1, 2021 1.Response to a non-emergency call with equipment and personnel at an advanced life support (ALS) level 2.Response to an emergency 9-1-1 call with equipment and personnel at an advanced life support (ALS) level 3.Response to a nonemergency call with equipment and personnel at a basic life support (BLS) level 4.Response to an emergency 9-1-1 call with equipment and personnel at a basic life support (BLS) level 5.Mileage rate. Each mile or fraction thereof 6.Waiting time. For each 30-minute period or fraction thereof after the first 30 minutes of waiting time at the request of the person hiring the ambulance 7.Standby time. The base rate for the prescribed level of service and, in addition, for each 30-minute period or fraction thereof after the first 30 minutes of standby time $2,383.00 $2,550.00 $1,587.00 $1,702.00 $19.00 $135.00 $129.00 8.This section does not apply to a contract between the ambulance operator and the County where different rates or payment mechanisms are specified. Section 7.16.310 Special Charges A A ground ambulance operator shall charge no more than the following rates for special ancillary services: 1.Request for services after 7 PM and before 7 AM of the next day will be subject to an additional maximum charge of 2.Persons requiring oxygen, shall be subject to an additional maximum charge per tank or fraction thereof, and oxygen delivery equipment to include nasal cannula and/or oxygen mask, of 3.Neonatal transport 4.Registered nurse or respiratory therapist specialty care transport with equipment and personnel for up to 3 hours of transportation time 5.Registered nurse and respiratory therapist specialty care transport with equipment and personnel for up to 3 hours of transportation time 6.Registered Nurse and/or Respiratory Therapist per hour after the first 3 hours 7.Volume ventilator 8.Disposable medical supplies $27.00 $102.00 $255.00 $2869.00 $3242.00 $162.00 $197.00 $29.00 ATTACHMENT 6 B.Where other special services are requested or needed by any patient or authorized representative thereof, a reasonable charge commensurate with the cost of furnishing such special service may be made, provided that the ambulance operator shall file with the Director of the Department of Health Services a schedule of each special service proposed and the charge therefore, which charge shall be effective unless modified, restricted, or denied by the Director of the Department of Health Services. Special services are defined as services provided to a patient that are unique and individual to a specific patient's needs, and are performed on a limited basis. C.Charges for special services provided to patients that are new services, but will become an industry standard, must be reviewed and a rate commensurate with the service developed prior to ambulance operators charging such rate to the general public. Such rates shall not be charged to patients until approved by the Board of Supervisors. D.This section does not apply to a contract between an ambulance operator and the County where different rates or payment mechanisms are specified. Section 7.16.340 Modification of Rates. The maximum rates chargeable to the general public as set forth in Sections 7.16.280 and 7.16.310 of this chapter shall be adjusted effective July 1, 1992, and on July 1st of each year thereafter, to reflect changes in the value of the dollar. For each of the one year periods respectively beginning July 1, 1992 and July 1, 1993 such adjustments shall be made by multiplying the ba·se amounts by the percentage change in the transportation portion of the Consumer Price Index for All Urban Consumers, Western Region, as compiled and reported by the Bureau of Labor Statistics for the 12-month period ending with the last day of the prior month of February. Beginning July 1, 1994, and on each July 1 thereafter, such adjustments shall be determined by multiplying the base amounts by the average of the percentage changes of the transportation portion and of the medical portion of the Consumer Price Index for All Urban Consumers, Western Region, as compiled and reported by the Bureau of Labor Statistics for the 12-month period ending with the last day of the prior month of February. Beginning July 1, 2017, and on every July 1 thereafter, such adjustments shall be determined by multiplying seventy-five (75) percent of the base amounts by the percentage change of the minimum wage change in Los Angeles County as defined in County Code Section 8.100 .040 -Minimum Wage and by multiplying twenty-five (25) percent of the base amounts by the percentage change of the Medical Care line item of the Consumer Price Index for all Urban Customers, Western Region, as compiled and reported by the Bureau of Labor Statistics for the 12- month period ending with the last day of the prior month of February, except for the following changes: Registered Nurse/Respiratory Therapist per hour after the first three (3) hours adjustment shall be determined by multiplying the current charge by the percentage change of the minimum wage change in Los Angeles County as defined in County Code Section 8.100 .040 -Minimum Wage: mileage adjustment shall be determined by multiplying the current charge for the percentage change of the transportation line item of the Consumer Price Index for All Urban Customers, Western Region, as compiled and reported by the Bureau of Labor Statistics for the 12-month period ending with the last day of the prior month of February: and Oxygen, Disposable Medical Supplies, and a Ventilator adjustment shall be determined by multiplying the current charges by the percentage change of the Medical Care line item of the Consumer Price Index for all of the Customers, Western Region, as compiled and reported by the Bureau of Labor Statistics for the 12 month period ending with the last day of the prior month of February. The result so determined shall be rounded to the nearest whole number and added or subtracted, as appropriate, to the rate. The result so determined shall be rounded to the nearest whole number and added or subtracted, as appropriate, to the rate. The Director of the Department of Health Services, or authorized designee, shall initiate implementation of these rate changes by notifying in writing each licensed private ambulance operator in Los Angeles County thereof, and any other individual or agency requesting such notification from the Director. Such notice shall be sent by first class mail no later than June 15 of the prior period.