HomeMy WebLinkAboutD-1 Staff Report - Citywide Schedule of Fees and Charges
SCHEDULED ITEM/PUBLIC HEARING
D-1
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
VIA: SERGIO GONZALEZ, CITY MANAGER
FROM: TALIKA M. JOHNSON, DIRECTOR OF ADMINISTRATIVE SERVICES
DATE: JANUARY 18, 2022
SUBJECT: PUBLIC HEARING - ADOPTION OF UPDATED CITYWIDE SCHEDULE OF FEES
AND CHARGES
BACKGROUND:
On January 19, 2016, the City Council adopted several resolutions approving certain adjustments to the
City’s Schedule of Fees and Charges. In addition, the City Council authorized Staff to adjust the schedule
of fees and charges annually based on the change in the Consumer Price Index (CPI) or 2%, whichever
was greater, but not to exceed 5%. The Los Angeles Area CPI change from September 2020 through
September 2021 was 4.6%. Consequently, Staff has adjusted the majority of fees by 4.6% consistent with
previous instructions established by the City Council. These changes are ministerial in nature and no
further action is required by the Council in order to complete these fee updates. As part of the fee update,
Staff would like to make other modifications to the schedule of fees and charges that fall outside of the
parameters of the previous direction provided by the City Council. The proposed action requests the City
Council to adopt the fee modifications outlined in Attachment 4 which includes three tables: 1) New fees
proposed; 2) Fees proposed to be modified by an amount other than the previously directed CPI
adjustment; and 3) Fee proposed to be eliminated.
RECOMMENDATIONS:
Staff recommends that the City Council take the following actions:
1) Receive, review, and file the updated Citywide Fee and Charges Schedule; and
2) Open the Public Hearing, receive public testimony, and close the Public Hearing; and
3) Adopt Resolution No. 2022-C01, regarding various municipal activities and services, to be
effective on January 18, 2022; and
4) Adopt Resolution No. 2022-C02, regarding development project services fees, to be effective
60 days from January 18, 2022 (March 19, 2022).
Adoption of Citywide Fees and Charges
January 18, 2022
Page 2
ANALYSIS:
California Government Code 66000 allows public agencies to impose fees to recover the costs of
providing various public services. In an effort to keep current with the cost of providing services, the City
Council authorized Staff to implement the recommendations and fee adjustments from the latest fee study
adopted January 19, 2016.
The City Council also directed Staff to annually adjust the City’s Schedule of Fees and Charges by the
change in the Consumer Price Index - Los Angeles Area (CPI) with a minimum increase of 2% and a
maximum increase of 5% for most fee categories. The minimum increase of 2% is intended to mirror the
City’s labor cost inflation. The City’s labor costs typically increase annually, even when there is a small
change in the CPI.
Inflation at the Los Angeles area grew during the last quarter in calendar year 2021 mainly due to supply
chain issues and the reopening of the economy. During the government mandated shut-down, companies
cut investment spending, restocking was put off, and the economy was at a prolonged downturn. As the
economy reopens and more restrictions are lifted, consumers are buying a lot more and companies are
finding it difficult to keep up with rapidly rising product demand as they rebuild supply chains that were
badly impacted by the pandemic. Challenges such as a shortage of shipping containers and transportation
logistic issues means shipping and distribution of goods has become more difficult and more expensive.
Additionally, there were an enormous amount of government spending and congressional approved
stimulus including the Cares Act (Coronavirus Relief Fund) and the American Rescue Plan that created
even higher demands. When an economy is growing and there is high demand, businesses find it easier
to raise prices without losing customers. The stated scenario in essence translated into higher consumer
prices and driving up inflation.
For the current review period, the CPI change from September 2020 through September 2021 was 4.6%.
Consequently, Staff has adjusted the majority of fees by 4.6%.
There are several fees that fall outside the parameter of the previous direction provided by the City
Council. Specifically, six (6) new fees are being proposed (Attachment 4, Table 1) to reflect new programs
and/or to enhance the City’s ability to provide services. The new fees include:
1) Emergency Sewage Spill Response Sect. 26.1 (Engineering Div) Actual Staff Time ($504
Minimum) - An Emergency Sewage Spill can occur when any of the following takes
place: overflowing of a septic tank, tree roots invading and blocking underground sewer
lines, misaligned sewage pipes that cause buildup over time, or blockages within the
interior sewer systems caused by improper materials flushed into the sewer system. In
extreme cases the sewage spill can overflow from the City's sewer mainlines into public
right-of-way where clean-up efforts are to be provided to clean, and dispose of all raw
hazardous sewage material. Emergency Sewage Spills can vary in the size of the
contaminated area, and volume discharged. Therefore, the fee proposed is actual staff
time spent to recuperate the time spent by the Public Works Department.
2) Sewer Area Study Sect. 49 S-8.3 (Engineering Division) $656 or Actual Staff Time - The
purpose of a Sewer Area Study is to determine the amount of sewage flow generated by
new developments. It ensures that the City's exiting sewer infrastructure has capacity to
convey the sewer flows from new developments. The proposed increase will recuperate
Adoption of Citywide Fees and Charges
January 18, 2022
Page 3
Engineering Division's actual time spent to review and approve the Sewer Area Study.
Moreover, the proposed fee will be closer to the fee other adjacent agencies (Glendora,
Irwindale, Baldwin Park) charge for the same service.
3) Potholing-Per Location Sect. 50 S-8.4 (Engineering Division) $168 - Potholing refers to
identifying utilities lines that are underground to gather information that can include the
following: material, depth, and horizontal and vertical. Typically, potholes range from 6"
to 12" in diameter, and 4' to 6' deep. Usually, the inspection for these holes to ensure the
road has been restored to Azusa's City Standard R12-1 takes one hour. As a result, the
proposed increase will recuperate Engineering Division's actual time spent to review and
approve the street restoration.
4) Door tag fee Sect. 2 - Sect. S106 f (Utilities Dept) $250 - Fee to cover the expense of
manually delivering 24-hour disconnection notice.
5) Plan Check Fee a) Residential and ADU Per Dwelling Unit Sect. 45 S-131M (Utilities
Dept) $250 - Recovers cost of Engineer time spent.
6) Plan Check Fee b) Commercial and Industrial Sect. 45 S-131M (Utilities Dept) $250 -
Recovers cost of Engineer time spent.
There are twenty-two (22) proposed fees that will increase more than the 4.6% CPI (Attachment
4, Table 2):
1) Soil Review Sect. S-15 S-056C (Engineering Division) from $335 to $656 - The Soil
Report takes approximately 3-4 hours of review, and sometimes requires multiple review
cycles. As a result, the proposed increase will recuperate Engineering Division's actual
time spent to review and approve the Soil Report. Moreover, the proposed fee will be
closer to the fee other adjacent agencies (Glendora, Irwindale, Baldwin Park) charge for
the same service.
2) a) Water Meter Fee 3/4" Sect. 10 S-131D (Utilities Dept) from $200 to $250 - To recover
the actual cost of meter which has gone up in price. The supplier increased the price of
the meter, and this is a pass-through cost.
3) b) Water Meter Fee 1" Sect. 10 S-131D (Utilities Dept) from $250 to $300 - To recover
the actual cost of meter which has gone up in price. The supplier increased the price of
the meter, and this is a pass-through cost.
4) c) Water Meter Fee 1.5" Sect. 10 S-131D (Utilities Dept) from $1,000 to $1,250 - To
recover the actual cost of meter which has gone up in price. The supplier increased the
price of the meter, and this is a pass-through cost.
5) d) Water Meter Fee 2" Sect. 10 S-131D (Utilities Dept) from $1,150 to $1,500 - To
recover the actual cost of meter which has gone up in price. The supplier increased the
price of the meter, and this is a pass-through cost.
6) Hot Tab Fee a) 1" Sect. 13 S-131H (Utilities Dept) from $300 to $345 - To recover the
actual costs of labor.
7) Hot Tab Fee b) 2" Sect. 13 S-131H (Utilities Dept) from $300 to $345 - To recover the
actual costs of labor.
Adoption of Citywide Fees and Charges
January 18, 2022
Page 4
8) Hot Tab Fee c) 4" Sect. 13 S-131H (Utilities Dept) from $350 to $400 - To recover the
actual costs of labor.
9) Hot Tab Fee d) 6" Sect. 13 S-131H (Utilities Dept) - from $400 to $465 - To recover the
actual costs of labor.
10) Hot Tab Fee e) 8" Sect. 13 S-131H (Utilities Dept) - from $450 to $520 - To recover the
actual costs of labor.
11) Hot Tab Fee f) 10" Sect. 13 S-131H (Utilities Dept) from $450 to $520 - To recover the
actual costs of labor.
12) Hot Tab Fee g) 12" Sect. 13 S-131H (Utilities Dept) from $525 to $605 - To recover the
actual costs of labor.
13) Fire Hydrant Relocation/Inspection Fee Sect. 16 S-131F (Utilities Dept) from $1,500 to
$2,000 - Cost recovery of labor and inspection costs- Increased costs has outpaced
inflation.
14) c) Damage to Water Main Impact Fee Sect. 17 S-131G (Utilities Dept) from $1,500 to
$2,000 - Cover costs related to impact to the water main.
15) e) Damage to Water Facilities Impact Fee Sect. 17 S-131G (Utilities Dept) from $1,500
to $2,000 - Cover costs related to impact to the water main.
16) Water Plan Check Sect. 20 S-116A Water Plan Check (Utilities Dept) from $224 to $250
- Cost recovery of labor and inspection costs - Increased costs has outpaced inflation.
17) Will Serve Letter Sect. 22 S-116C (Utilities Dept) from $35 to $40 - Higher than CPI-
Fee for time, material, and postage.
18) Electrical Engineering Sect. 43 S-131K (Utilities Dept) from $100 to $250 - Cost
recovery of engineering time.
19) Golden Day Special Events a) Youth ii Day of the Event Sect. 31 S-43 (Community
Resources Dept) from $15 to $20 - Decrease cash handling and improve operation
efficiency.
20) Golden Day Special Events b) Adult i Pre-Registration Sect. 31 S-43 (Community
Resources Dept) from $15 to $20 - Decrease cash handling and improve operation
efficiency.
21) Woman's Club Rental to Public k) Cleaning Fee Sect. 1 S-48 (Community Resources
Dept) from $100 to $250 - Recover actual cost of services.
22) Woman's Club Rental to Public-Sect. 1 S-48 l) Decorating Fee Outside Normal Hours of
Operation (Per Hour) (Community Resources Dept) from $15 to $60 - Recover actual
cost of services.
There are three (3) proposed fees that will be eliminated (Attachment 4, Table 3):
1) Recovery and Storage of Abandoned Shopping Cart Sect. 5 S-95.1 (Community
Improvement Division) from $12 to $0 - The City no longer recovers or store shopping
carts.
Adoption of Citywide Fees and Charges
January 18, 2022
Page 5
2) Swimming Team: a) First Child (Same Family)-ii) Additional Child (Same Family) Sect.
S-33 2a (Recreation Div) from $65 to $0 - Easy of cash handling and operation efficiency.
3) Swimming Team: b) 2nd Session-ii) Additional Child (Same Family) Sect. S-33 2b-
(Recreation Div)-from $50 to $0 - Easy of cash handling and operation efficiency.
FISCAL IMPACT:
The adoption of the proposed fee schedule is anticipated to allow cost recovery of various City services
without depleting the City’s funds, and are contingent on the timing of various development projects and
municipal activities.
Prepared by: Reviewed and Approved:
Richard Lam Talika M. Johnson
Budget Administrator Director of Administrative Services
Reviewed and Approved:
Sergio Gonzalez
City Manager
Attachments:
1. Proposed Schedule of Citywide Fees and Charges
2. Resolution 2022-C01 – Establishing and Revising a User Fee Schedule for Various
Municipal Activities and Services
3. Resolution 2022-C02 – Establishing and Revising Certain Development Project Fees and Charges
4. Proposed Fee Additions and Changes outside of CPI
5. County of Los Angeles Fire Department Fire Prevention Fees
6. General Public Ambulance Rates – Los Angeles County Emergency Medical Services Agency
CITY OF AZUSA
SCHEDULE OF FEES AND CHARGES
To Adopt on January 18, 2022
Attachment 1
Adopted on
January 18,
2022
No. Description Pages
1 Building and Safety 3 ‐ 16
2 Planning 17 ‐ 19
3 Engineering 20 ‐ 22
4 Utilities 23 ‐ 26
5 Community Improvement 27
6 Fire Safety 28
7 Police 29 ‐ 32
8 Adult Businesses 33
9 Business License 34 ‐ 36
10 Community Resources 37 ‐ 39
11 Recreation Facilities Rentals 40 ‐ 42
12 Transportation 43
13 Library 44
14 GIS Maps 45
15 Administrative Processing 46
City of Azusa
Schedule of Fees and Charges
Table of Contents
2
Adopted Adopted
1/19/2021 1/18/2022
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes
S‐1 Building Valuation
Apartment Houses:
1 Type I Or II F.R. $158.03 4.60% $165.30
2 Good $194.56 4.60% $203.51
3 Type V ‐ Masonry (Or Type III) $128.99 4.60% $134.93
4 Good $158.03 4.60% $165.30
5 Type V ‐ Wood Frame $113.66 4.60% $118.89
6 Good $146.10 4.60% $152.82
7 Type I ‐ Basement Garage $66.64 4.60% $69.70
Auditoriums:
8 Type I Or II F.R. $186.72 4.60% $195.30
9 Type II ‐ 1 Hour $135.23 4.60% $141.45
10 Type II ‐ N $127.92 4.60% $133.81
11 Type III ‐ 1 Hour $142.18 4.60% $148.72
12 Type III ‐ N $134.87 4.60% $141.08
13 Type V ‐ 1 Hour $135.94 4.60% $142.20
14 Type V ‐ N $126.85 4.60% $132.68
Banks:
15 Type I Or II F.R. $263.87 4.60% $276.00
16 Type II ‐ 1 Hour $194.38 4.60% $203.32
17 Type II ‐ N $188.15 4.60% $196.80
18 Type III ‐ 1 Hour $214.51 4.60% $224.38
19 Type III ‐ N $206.85 4.60% $216.36
20 Type V ‐ 1 Hour $194.38 4.60% $203.32
21 Type V ‐ N $186.18 4.60% $194.74
Bowling Alleys:
22 Type II ‐ 1 Hour $90.86 4.60% $95.04
23 Type II ‐ N $84.80 4.60% $88.71
24 Type III ‐ 1 Hour $98.88 4.60% $103.43
25 Type III ‐ N $92.47 4.60% $96.72
26 Type V ‐ 1 Hour $66.64 4.60% $69.70
Churches:
27 Type I Or II F.R. $176.74 4.60% $184.87
28 Type II ‐ 1 Hour $132.74 4.60% $138.84
29 Type II ‐ N $126.15 4.60% $131.95
30 Type III ‐ 1 Hour $144.31 4.60% $150.95
31 Type III ‐ N $137.90 4.60% $144.24
32 Type V ‐ 1 Hour $134.87 4.60% $141.08
33 Type V ‐ N $126.85 4.60% $132.68
Convalescent Hospitals:
34 Type I Or II F.R. $248.01 4.60% $259.42
35 Type II ‐ 1 Hour $172.11 4.60% $180.03
36 Type III ‐ 1 Hour $176.38 4.60% $184.49
37 Type V ‐ 1 Hour $166.24 4.60% $173.88
Dwellings:
38 Type V ‐ Masonry $134.87 4.60% $141.08
39 Good $172.64 4.60% $180.58
40 Type V ‐ Wood Frame $119.91 4.60% $125.42
41 Good $164.64 4.60% $172.21
Basements ‐
42 Semi‐Finished $35.81 4.60% $37.46
43 Good $41.33 4.60% $43.23
44 Unfinished $26.01 4.60% $27.21
45 Good $31.53 4.60% $32.98
Fire Station:
46 Type I Or II F.R. $203.82 4.60% $213.20
47 Type II ‐ 1 Hour $134.16 4.60% $140.33
48 Type II ‐ N $126.50 4.60% $132.32
49 Type III ‐ 1 Hour $146.81 4.60% $153.56
50 Type III ‐ N $140.57 4.60% $147.04
51 Type V ‐ 1 Hour $137.72 4.60% $144.06
52 Type V ‐ N $130.60 4.60% $136.60
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
3
Adopted Adopted
1/19/2021 1/18/2022
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
Homes For The Elderly:
53 Type I Or II F.R. $184.76 4.60% $193.26
54 Type II ‐ 1 Hour $150.02 4.60% $156.92
55 Type II ‐ N $143.60 4.60% $150.21
56 Type III ‐ 1 Hour $156.25 4.60% $163.44
57 Type III ‐ N $149.84 4.60% $156.73
58 Type V ‐ 1 Hour $150.91 4.60% $157.85
59 Type V ‐ N $145.74 4.60% $152.44
Hospitals:
60 Type I Or II F.R. $290.77 4.60% $304.14
61 Type III ‐ 1 Hour $240.70 4.60% $251.78
62 Type V ‐ 1 Hour $229.66 4.60% $240.22
Hotels And Motels:
63 Type I Or II F.R. $179.95 4.60% $188.23
64 Type III ‐ 1 Hour $155.90 4.60% $163.07
65 Type III ‐ N $148.59 4.60% $155.43
66 Type V ‐ 1 Hour $135.76 4.60% $142.01
67 Type V ‐ N $133.09 4.60% $139.21
Industrial Plants:
68 Type I Or II F.R. $101.38 4.60% $106.04
69 Type II ‐ 1 Hour $70.55 4.60% $73.80
70 Type II ‐ N $64.85 4.60% $67.84
71 Type III ‐ 1 Hour $77.68 4.60% $81.25
72 Type III ‐ N $73.23 4.60% $76.60
73 Tilt‐Up $53.45 4.60% $55.91
74 Type V ‐ 1 Hour $73.23 4.60% $76.60
75 Type V ‐ N $66.99 4.60% $70.07
Jails:
76 Duces Tecum Subpoena Processing $283.46 4.60% $296.50
77 Type III ‐ 1 Hour $259.23 4.60% $271.16
78 Type V ‐ 1 Hour $194.38 4.60% $203.32
Libraries:
79 Type I Or II F.R. $207.39 4.60% $216.93
80 Type II ‐ 1 Hour $151.80 4.60% $158.78
81 Type II ‐ N $144.32 4.60% $150.95
82 Type III ‐ 1 Hour $160.35 4.60% $167.73
83 Type III ‐ N $152.33 4.60% $159.34
84 Type V ‐ 1 Hour $150.55 4.60% $157.48
85 Type V ‐ N $144.32 4.60% $150.95
Medical Offices:
86 Type I Or II F.R. $212.91 4.60% $222.70
87 Type II ‐ 1 Hour $164.27 4.60% $171.83
88 Type II ‐ N $156.07 4.60% $163.25
89 Type III ‐ 1 Hour $178.17 4.60% $186.36
90 Type III ‐ N $165.87 4.60% $173.50
91 Type V ‐ 1 Hour $160.71 4.60% $168.10
92 Type V ‐ N $155.01 4.60% $162.14
Offices
93 Type I Or II F.R. $190.28 4.60% $199.04
94 Type II ‐ 1 Hour $127.39 4.60% $133.25
95 Type II ‐ N $121.33 4.60% $126.91
96 Type III ‐ 1 Hour $137.54 4.60% $143.87
97 Type III ‐ N $131.49 4.60% $137.54
98 Type V ‐ 1 Hour $128.81 4.60% $134.74
99 Type V ‐ N $121.33 4.60% $126.91
Private Garages:
100 Picnic Shelter Application Rental (Alisal Park):$43.29 4.60% $45.29
101 Masonry $48.82 4.60% $51.06
102 Open Carports $29.58 4.60% $30.94
Public Buildings:
103 Type I Or II F.R. $219.86 4.60% $229.97
104 Type II ‐ 1 Hour $178.17 4.60% $186.36
4
Adopted Adopted
1/19/2021 1/18/2022
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
105 Type II ‐ N $170.33 4.60% $178.16
106 Type III ‐ 1 Hour $184.94 4.60% $193.44
107 Type III ‐ N $178.52 4.60% $186.74
108 Type V ‐ 1 Hour $169.26 4.60% $177.04
109 Type V ‐ N $163.20 4.60% $170.71
Public Garages:
110 Type I Or II F.R. $87.12 4.60% $91.13
111 Type I Or II Open Parking $65.39 4.60% $68.40
112 Type II ‐ N $49.89 4.60% $52.18
113 Type III ‐ 1 Hour $65.92 4.60% $68.95
114 Type III ‐ N $58.62 4.60% $61.31
115 Type V ‐ 1 Hour $60.04 4.60% $62.80
Restaurants
116 Type III ‐ 1 Hour $173.53 4.60% $181.52
117 Type III ‐ N $167.66 4.60% $175.37
118 Type V ‐ 1 Hour $158.92 4.60% $166.24
119 Type V ‐ N $152.69 4.60% $159.71
Schools:
120 Type I Or II F.R. $198.12 4.60% $207.24
121 Type II ‐ 1 Hour $135.23 4.60% $141.45
122 Type III ‐ 1 Hour $144.67 4.60% $151.33
123 Type III ‐ N $139.15 4.60% $145.55
124 Type V ‐ 1 Hour $135.59 4.60% $141.82
125 Type V ‐ N $129.35 4.60% $135.30
Service Stations:
126 Type II ‐ N $119.73 4.60% $125.24
127 Type III ‐ 1 Hour $124.90 4.60% $130.64
128 Type V ‐ 1 Hour $106.37 4.60% $111.26
129 Canopies $49.89 4.60% $52.18
Stores:
130 Type I Or II F.R. $146.81 4.60% $153.56
131 Type II ‐ 1 Hour $89.80 4.60% $93.93
132 Type II ‐ N $87.84 4.60% $91.88
133 Type III ‐ 1 Hour $109.22 4.60% $114.24
134 Type III ‐ N $102.45 4.60% $107.16
135 Type V ‐ 1 Hour $91.93 4.60% $96.16
136 Type V ‐ N $84.99 4.60% $88.89
Town Homes:
137 Type V ‐ Masonry $154.31 4.60% $161.41
138 Type V ‐ Wood Frame $147.15 4.60% $153.92
139 Garage‐ Wood Frame $60.05 4.60% $62.81
140 Garage‐ Masonry $66.64 4.60% $69.70
Theaters:
141 Type I Or II F.R. $195.63 4.60% $204.63
142 Type III ‐ 1 Hour $142.53 4.60% $149.09
143 Type III ‐ N $135.76 4.60% $142.01
144 Type V ‐ 1 Hour $134.16 4.60% $140.33
145 Type V ‐ N $126.85 4.60% $132.69
Warehouses:
146 Type I Or II F.R. $88.01 4.60% $92.06
147 Type I Or V ‐ 1 Hour $52.20 4.60% $54.60
148 Type I Or V ‐ N $49.00 4.60% $51.25
149 Type III ‐ 1 Hour $59.15 4.60% $61.87
150 Type III ‐ N $56.30 4.60% $58.89
Equipment:
Air Conditioning
151 Commercial $7.48 4.60% $7.83
152 Residential $6.24 4.60% $6.52
153 Sprinkler Systems $4.63 4.60% $4.85
Other Valuations
Reroof
154 Asphalt And Comp ‐ per square foot of material $286.67 4.60% $299.85
5
Adopted Adopted
1/19/2021 1/18/2022
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
155 Built‐up ‐ per square foot of material $303.53 4.60% $317.49
156 Light‐weight tile ‐ per square foot of material $784.12 4.60% $820.19
157 Concrete Tile Or Slate Tile ‐ per square foot of materi $944.31 4.60% $987.75
158 Metal Shingles ‐ per square foot of material $596.94 4.60% $624.40
159 Wood Shake ‐ per square foot of material $362.55 4.60% $379.23
160 Wood Shingle ‐ per square foot of material $349.06 4.60% $365.12
161 Rolled Roofing ‐ minimum 300 Sq.Ft. allowed on patio $1,686.27 4.60% $1,763.84
162 Tear off and re‐sheath ‐ per square foot of materia $168.63 4.60% $176.38
Tenant Improvements
163 General Commercial $43.84 4.60% $45.86
164 Restaurants $50.59 4.60% $52.92
165 Medical Offices $52.27 4.60% $54.68
Retaining Walls‐ Concrete Block
166 6" $13.08 4.60% $13.68
167 8" $14.48 4.60% $15.14
168 12" $17.75 4.60% $18.56
169 Masonry Fireplace ‐ Minimum Valuation $5,345.49 4.60% $5,591.38
170 Foundation Permits ‐ Based On 1/3 The Overall Valuation Of The Bldg Permit
These Figures Shall Be Used When The Applicant
Does Not Have A Valuation, Or If The Valuation
Given Is Obviously Low.
171 Factory Built Fireplace‐ Minimum Valuation $1,782.39 4.60% $1,864.38
Signs
1 Side:
172 a) Painted $69.13 4.60% $72.31
173 b) Electrical $133.22 4.60% $139.34
2 Sides:
174 a) Painted $80.94 4.60% $84.66
175 b) Electrical $168.63 4.60% $176.38
Pole /Lineal Foot plus square foot of sign:
176 a) 3" 0 $57.33 4.60% $59.97
177 b) 4" 0 $80.94 4.60% $84.66
178 c) 6" 0 $104.55 4.60% $109.36
179 d) 8" 0 $129.84 4.60% $135.82
180 e) 10" 0 $153.45 4.60% $160.51
181 f) 12" 0 $175.37 4.60% $183.44
Photovoltaic Systems
182 Permit And plan check fees for photovoltaic systems
shall be assessed at 45% of the fee generated by the
declared valuation and the per unit electrical item
cost
183 Residential 15 kW Or Less=$500 or 45% of the fee
generated by the declared valuation, whichever is
less.
184 Residential more than 15 kW=$500 + 15 Per kW over
15 or 45% of the fee generated by the declared
valuation, whichever is less.
185 Commercial 50 kW or less = $1,000 or 45% of the fee
generated by the declared valuation, whichever is
less.
186 Commercial more than 50 kw ‐ 250 kw = $500 + $7
per kW above 50 kW or 45% of the fee generated by
the declared valuation, whichever is less.
187 Commercial more than 250 kW = $2,400 + 5 kW
above 250 kW or 45% of the fee generated by the
declared valuation, whichever is less.
Swimming Pools
Valuation based on actual construction cost. Permit fees same as building permits
188 Minimum Valuation: $22,258.81 4.60% $23,282.72
Spas
6
Adopted Adopted
1/19/2021 1/18/2022
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
189 Minimum Valuation
190 Prefabricated $4,451.76 4.60% $4,656.54
191 Gunite $8,937.25 4.60% $9,348.36
Surcharge Fees
192 Optical Records System ‐ Per Permit $15.77 n/a $15.77
193 # General Plan Maintenance ‐ 10% Permit Surcharge To 10% n/a 10%
194 # Permit Automation Fee $0.00 n/a $0.00
195 # Technology Enhancement (5% of permit and plan che 5% n/a 5%
7
Adopted Adopted
1/19/2021 1/18/2022
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
S‐2 Building Permit Fees
196 Permit Issuance $96.45 4.60% $100.88
Total Valuation
197 $1.00 to $500.00 $41.87 4.60% $43.80
198 $501.00 to $2,000.00 $41.87 4.60% $43.80
For the 1st $500.00 plus $3.56 for ea. additional
$100.00,
or fraction thereof, to and including $2,000.00
199 $2,001.00 to $25,000.00 $123.38 4.60% $129.06
For the 1st $2,000.00 plus $16.31 for ea. additional
$1,000.00,
or fraction thereof, to and including $25,000.00
200 $25,001.00 to $50,000.00 $697.08 4.60% $729.14
For the 1st $25,000.00 plus $11.76 for ea. additional
$1,000.00,
or fraction thereof, to and including $50,000.00
201 $50,001.00 to $100,000.00 $1,146.95 4.60% $1,199.71
For the 1st $50,000.00 plus $8.15 for ea. additional
$1,000.00,
or fraction thereof, to and including $100,000.00
202 $100,001.00 to $ 500,000.00 $1,770.53 4.60% $1,851.98
For the 1st $100,000.00 plus $6.52 for ea. additional
$1,000.00,
or fraction thereof, to and including $500,000.00
203 $500,001.00 to $1,000,000.00 $5,761.47 4.60% $6,026.50
For the 1st $500,000.00 plus $5.52 for ea. additional
$1,000.00,
or fraction thereof, to and including $1,000,000.00
204 $1,000,001.00 and up $9,992.94 4.60% $10,452.61
For the 1st $1,000,000.00 plus $3.67 for ea.
additional $1,000.00,
or fraction thereof
Other Inspections And Fees:
205 1. Inspections Outside Of Normal Business Hours
(Per Hour) (Minimum Charge ‐ Two Hours) [a]
$83.74 4.60% $87.59
206 2. Reinspection Fees Accessed Under Provisions Of
Section 305.8 (Per Hour) [a]
$83.74 4.60% $87.59
207 3. Inspections For Which No Fee Is Specifically
Indicated (Per Hour) (Minimum Charge ‐ One‐Half
Hour) [a]
$83.74 4.60% $87.59
208 4. Additional Plan Review Required By Changes,
Additions Or Revisions To Plans (Per Hour)
(Minimum Charge ‐ One‐Half Hour) [a]
$83.74 4.60% $87.59
209 5. For Use Of Outside Consultants For Plan Checking
And Inspections, Or Both [b]
Actual costs
[b]
n/a Actual costs
[b]
210 [a] Or the total hourly cost to the jurisdiction, whichever is the
greatest. This cost shall include supervision, overhead,
equipment, hourly wages and fringe benefits of the employee
involved.
[b] Actual costs include administrative and overhead costs.
8
Adopted Adopted
1/19/2021 1/18/2022
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
S‐3 Electrical Permit Fees
211 Area Fee Rate ‐ Single Family Dwellings (Rate X Area/$0.13 4.60% $0.14
Unit Fee Schedule (Note: Does Not Include Permit Issuance Fee)
Receptacle, Switch and Lighting, or other.
For receptacle, switch lighting, smoke detectors, or
other outlets, at which current is used or controlled
except services, feeders and meter:
212 First 20, each $2.01 4.60% $2.10
213 Additional outlets, each $1.33 4.60% $1.39
(Note: For multi‐outlet assemblies, each 5 ft. or
fraction may be considered as 1 outlet.)
Lighting Fixtures
214 For lighting fixtures, sockets, or other lamp holding
devices:
215 First 20, each $2.01 4.60% $2.10
216 Additional fixtures, each $1.33 4.60% $1.39
217 For pole or platform mounted lighting fixtures, each $2.01 4.60% $2.10
218 For theatrical‐type lighting fixtures or assemblies,
each
$2.01 4.60% $2.10
Residential Appliances
219 For fixed residential appliances or receptacle outlets
for same, including wall‐mounts, electric ovens,
counter‐mounted cooking tops, electric ranges, self‐
contained room, console, or through‐wall air
conditioners, space heaters, food waste grinders,
dishwasher
$9.36 4.60% $9.79
(Note: For other types of air conditioners and other
motor‐driven appliances having larger electrical
ratings, see Power Apparatus)
Temporary Power Service
220 For a temporary service power pole or pedestal,
including all pole or pedestal mounted receptacle
outlets and appurtenances, each
$40.08 4.60% $41.93
221 For a temporary distribution system and temporary
lighting and receptacle outlets for construction sites,
decorative lighting, Christmas tree sales lots,
firework stands, sales booths, additional pole, etc.,
each
$18.70 4.60% $19.56
Non‐Residential Appliances
222 For residential appliances and self‐contained, factory
wired, non‐residential appliances not exceeding one
(1) horsepower (HP), kilowatt (KW), Or kilovolt‐
ampere (KVA) in rating, including medical and dental
devices, food, beverage, and ice cream cabinets
$10.69 4.60% $11.18
Power Apparatus
For motors, generators, transformers, rectifiers,
synchronous converters, capacitors, industrial
heating, air conditioners and heat pumps, cooking or
baking equipment, and other apparatus, as follows:
Rating in horsepower (HP), kilowatts (KW), kilovolt‐
amperes (KVA), Or kilovolt‐amperes‐reactive (KVAR)
223 Up to and including 1, each $10.69 4.60% $11.18
224 Over 1 and not over 10, each $18.70 4.60% $19.56
225 Over 10 and not over 50, each $48.11 4.60% $50.32
226 Over 50 and not over 100, each $96.20 4.60% $100.63
9
Adopted Adopted
1/19/2021 1/18/2022
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
227 Over 100, each $160.35 4.60% $167.72
Note: 1. For equipment or appliances having more
than one motor, transformer, heater, etc., the sum
of the combined rating may be used.
Note: 2. These fees include all switches, circuit
breakers, contractors, thermostats, relays and other
directly related control equipment.
Busways
228 For trolley and plug‐in type busways, each 100 feet
or fraction thereof
$26.73 4.60% $27.96
(Note: an additional fee will be required for lighting
fixtures, motors and other appliances that are
connected to trolley and plug‐In type busways.)
Signs, Outline Lighting, And Marquees
229 For signs, outline lighting systems, or marquees
supplied from one branch circuit, each
$40.08 4.60% $41.93
230 For additional branch circuits within the same sign
outline lighting system, or marquee, each
$13.36 4.60% $13.97
Services, Switchboards, Switchboard Sections,
Motor Control Centers And Panelboards
231 For services, switchboards, switchboard sections,
motor control centers and panelboards of 600 volts
or less & not over 200 amperes In rating, each.
$40.08 4.60% $41.93
232 For services, switchboards, switchboard sections,
motor control centers and panelboards of 600 volts
or less and not over 200 amperes 1,000 amperes in
rating,each
$80.18 4.60% $83.87
233 For services, switchboards, switchboard sections,
motor control centers and panelboards over 600
volts or over 1,000 amperes in rating, each
$187.08 4.60% $195.68
Miscellaneous Apparatus, Conduits And Conductors
234 For electrical apparatus, conduits and conductors for
which a permit is required but for which no fee is
herein set forth
$40.08 4.60% $41.93
(Note: This fee is not applicable when a fee is paid
for one or more services, outlets, fixtures,
appliances, power apparatus, busways, signs or
other equipment.
Private Swimming Pools
235 For new private, residential, inground swimming
pools for single, or multi‐family occupancies,
including a complete system of necessary branch
circuit wiring, bonding, grounding underwater
lighting, water pumping and other similar electrical
equipment
$80.18 4.60% $83.87
236 For other types of swimming pools, therapeutic
whirlpools, spas, hot tubs and alterations to existing
swimming pools, each
$53.45 4.60% $55.91
Carnivals And Circuses
Carnivals, circuses and other traveling shows or
exhibitions utilizing transportable‐type rides, booths,
displays and attractions.
237 For electrical generators and electrical driven rides,
each
$40.08 4.60% $41.93
238 For mechanically driven rides and walk‐through
attractions or displays having electric lighting, each
$16.04 4.60% $16.77
10
Adopted Adopted
1/19/2021 1/18/2022
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
239 For a system of area and booth lighting, each $16.04 4.60% $16.77
240 For permanently installed rides, booths, displays,
and attractions
$16.04 4.60% $16.77
Other Inspections
For Inspection Of Electrical Equipment For Which No
Fee Is Herein Set Forth, The Fee Shall Be Determined
By The Building Official
11
Adopted Adopted
1/19/2021 1/18/2022
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
S‐4 Plumbing Fees
241 Each plumbing fixture or trap or set of fixtures on
one trap (including drainage, vent, water piping and
backflow prevention devices therefore)
$16.04 4.60% $16.77
242 Each permanent type dishwasher whether
individually trapped or not
$16.04 4.60% $16.77
243 Each industrial waste pretreatment interceptor
including its trap & vent, except kitchen type grease
interceptors functioning as fixtures traps
$16.04 4.60% $16.77
244 Each swimming pool drainage trap & receptor
whether connected to a building drain or building
sewer (water supply for pool not included)
$16.04 4.60% $16.77
245 Each gas piping system of 1 to 5 outlets or alteration
or retest of existing gas piping system
$16.04 4.60% $16.77
246 Each additional outlet over five $4.01 4.60% $4.20
247 Each gas pressure regulator other than appliance
regulators
$5.35 4.60% $5.59
248 Each water heater and/or vent $16.04 4.60% $16.77
249 Each solar potable water heating system, including
water heater/vent
$53.45 4.60% $55.91
250 For repair or alteration of drainage and/or vent
piping
$16.04 4.60% $16.77
251 Each piece of water‐treating equipment and/or
water piping installed without accompanying
plumbing
$16.04 4.60% $16.77
252 Lawn sprinkler systems on 1 meter including
backflow prevention devices
$16.04 4.60% $16.77
253 Backflow prevention devices on unprotected water
supplied, pools, tanks, vats, etc. (including incidental
water piping) 1 to 5
$16.04 4.60% $16.77
254 Any swimming pool piping associated with the
construction, remodeling or repair of a swimming
pool, spa and hot tub
$44.53 4.60% $46.58
255 Each additional device over five (5)$4.01 4.60% $4.20
256 Each building drain installed without accompanying
plumbing
$16.04 4.60% $16.77
257 For connection of a house sewer to a public sewer or
the extension of a house lateral onto a lot for future
use
$45.43 4.60% $47.52
258 For each house sewer manhole $45.43 4.60% $47.52
259 Each installation of a section of house sewer for
future use
$29.39 4.60% $30.74
260 For the connection of each additional bldg. or work
to house sewer
$29.39 4.60% $30.74
261 For the connection of a house sewer to a private
sewage disposal system
$29.39 4.60% $30.74
262 For each private sewage disposal system (septic tank
& seepage pit or pits and/or drainfield)
$93.54 4.60% $97.84
263 For each cesspool, overflow seepage pit, percolation
test pit, swimming pool drywell, or drainfield
extension or replacement
$45.43 4.60% $47.52
264 For disconnection, abandonment, alteration or
repair of any house sewer or private sewage disposal
system or part thereof
$29.39 4.60% $30.74
265 # Annual inspection of fat, oil and grease $160.00 n/a $160.00
12
Adopted Adopted
1/19/2021 1/18/2022
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
S‐5 Mechanical Permit Fees
Installation, alteration or relocation of each
refrigeration condensor or absorption unit, & each
fuel burning furnace, heater, boiler, and vented
decorative appliance including vents attached
thereto:
266 Up to & including 100,000 BTU $26.73 4.60% $27.96
267 More than 100,000 BTU to & including 1,000,000 B $53.45 4.60% $55.91
268 More than 1,000,000 BTU $133.62 4.60% $139.77
269 For each air inlet & air outlet served by any air cond $4.69 4.60% $4.90
270 For each 1,000 sq.ft. or fraction thereof of conditio $37.42 4.60% $39.14
Note: when a permit is applied for and the total
number of air inlets & air outlets is unknown, the
fees shall be based on the sq.ft. of conditioned area.
271 For the installation, relocation or replacement of
each appliance vent installed and not included in an
appliance permit
$13.36 4.60% $13.97
For the installation or alteration of each air handling
unit for air conditioning including ducts attached
thereto:
272 Up to & including 2,000 CFM ‐ each unit up to 10 $13.36 4.60% $13.97
273 Each unit over 10 $4.01 4.60% $4.20
274 More than 2,000 CFM to and including 10,000 CFM $40.12 4.60% $41.96
275 More than 10,000 CFM $66.81 4.60% $69.88
Note: this fee shall not apply to an air handling unit
which is a portion of a factory assembled air
conditioned appliance for which a permit is required
elsewhere in this code.
276 For each evaporative cooler other than portable type $21.38 4.60% $22.37
277 For required ventilation fans which serve a single register
278 Each fan up to 10 $16.04 4.60% $16.77
279 Each fan over 10 $5.35 4.60% $5.59
280 For each required ventilation system which is not a
portion of any air conditioning system for which a
permit is required elsewhere in this code
$32.07 4.60% $33.55
281 For the installation or each commercial kitchen hood
or spray booth served by mechanical exhaust,
including the fans and ducts attached thereto
$66.81 4.60% $69.88
282 For the installation of each fire damper $10.69 4.60% $11.18
283 Alteration of existing duct system where a permit is n $26.73 4.60% $27.96
Note: 1) for refrigeration system rating one
horsepower, one ton, or 12,000 BTU per hour shall
mean the same quantity
note: 2) for steam boilers rated in boiler
horsepower, one horsepower shall equal 50,000 BTU
per hour
13
Adopted Adopted
1/19/2021 1/18/2022
Svc Area Cost Per CPI Cost Per
No. Item # Description S.F. Avg. Sept'20‐'21 S.F. Avg. Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
Plan Check Fees
284 # Building Plan Check Fee ‐ 85% Of Permit Fee ‐ $15.00 Varies n/a Varies
285 # Electric Plan Check Fee ‐ 80% Of Permit Fee ‐ $15.00 M Varies n/a Varies
286 # Energy Plan Check Fee ‐ 10% Of Building Permit Fee:Varies n/a Varies
287 # Mechanical Plan Check Fee ‐ 80% Of Permit Fee ‐ $15 Varies n/a Varies
288 # Plumbing Plan Check Fee ‐ 80% Of Permit Fee ‐ $15.0 Varies n/a Varies
289 Temporary Certificate of Occupancy (60 days)$450 n/a $450
290 Parking Lot Resurface Permit ($68 up to 10,000
sqare feet, $1 for each additional sq ft)
Varies n/a Varies
291 Event Permit (1 hr minimum insection time $93 plus p $157 4.60% $163.77
292 General Plan Update Fee (10% of Permit)Varies n/a Varies
# = Fees not automatically adjusted for CPI change.
14
Ad t dAdopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
1 S‐045 Grading Plan Check Fee Variable 4.60% Variable
<100 CY ‐ $899
100 ‐ 1,000 CY ‐ $916.71 Plus $14.84 Per 100 CY
1,000 ‐ 10,000 CY ‐ $1050.24 Plus $16.43 Per 1,000 CY
10,000 ‐ 50,000 CY ‐ $1,756.06 Plus $18.02 Per 1,000 CY
50,000+ CY ‐ $2,476.71 Plus $244.81 Per 10,000 CY
2 S‐046 Grading Inspection Variable 4.60% Variable
<100 CY ‐ $358
100 ‐1,000 CY ‐ $365.62 Plus $50.87 Per 100 CY
1,000 ‐ 10,000 CY ‐ $823.45 Plus $76.30 Per 1,000 CY
10,000 ‐ 50,000 CY ‐ $1,510.19 Plus $92.20 Per 1,000 CY
50,000+ CY ‐ $5,198.22 Plus $604.07 Per 10,000 CY
3 Grading Permit Fee ‐ Based On Cubic Yards $195 4.60% $204
4Permit Fee For Changes To Original Permit:
< $20,000 $124 4.60% $130
$20,001 to $50,000 $124 4.60% $130
$50,001 to $75,000 $169 4.60% $177
$75,001 to $100,000 $257 4.60% $269
$100,001 to $200,000 $338 4.60% $353
$200,000 to $500,000 $436 4.60% $456
$500,001 and up $533 4.60% $557
5 Special Site Inspection: $98 4.60% $102
Commercial (Minimum 2 Hours) $195 4.60% $204
Residential (Minimum 2 Hour) $195 4.60% $204
Residential (Non‐Habitable Space) (Minimum 2 Hours) $186 4.60% $195
6 Production Lot Plan Check ‐ Per Lot $206 n/a $206
7 Occupancy Inspection Fee:
0‐1 To 15,000 Sq Ft (1/2 Hour Of Technical Staff Time) $52 4.60% $54
15,000 Sq.Ft. On (1 Hour Of Technical Staff Time) $98 4.60% $102
8 Bonds For Sign(s) (Refundable) $294 4.60% $307
9 Demolition Permit Fee (Minimum 1 Hour) $114 4.60% $119
10 Deputy Inspection Registration Fee (Deputy) $52 4.60% $54
11 Emergency Inspection Fee (Minimum 1 Hours) $160 4.60% $167
12 Hearing Officer Actual Cost n/a Actual Cost
13 Pre‐Plan Check Submittal (Minimum 2 Hours) $203 4.60% $213
14 Reinspection Fee (Minimum 1 Hour) $107 4.60% $112
15 Room Addition Plan Check Fee (Minimum 2 Hours) $203 4.60% $213
16 Trailer Coach $195 4.60% $204
17 Trash Enclosure ‐ $10 for additional enclosure $79 4.60% $83
18 Relocation Of Buildings:
0 to 2,000 sq.ft. $460 4.60% $481
2,001 to 5,000 sq.ft. $864 4.60% $903
5,001 sq.ft. and up $1,244 4.60% $1,302
19 Plan Checking Fee:
Staff rates assessed against deposit.
Executive Staff ‐ per hour $177 4.60% $185
Professional Staff ‐ per hour $127 4.60% $132
Technical Staff (Plan Checker/Inspector) ‐ per hour $107 4.60% $112
20 On‐Site Improvement Inspections:
$2,000 deposit required for parking lot paving and miscellaneous testing
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
15
Ad t dAdopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
BUILDING AND SAFETY
Professional Staff ‐ Per Hour $127 4.60% $132
Rates applied against deposit
Technical Staff ‐ Per Hour $107 4.60% $112
Rates applied against deposit
21 Standard Plan Check Fee:
Professional Staff ‐ Per Hour $127 4.60% $132
Technical Staff ‐ Per Hour $107 4.60% $112
22 S‐98 # Certified Access Specialist Program (CASp) $4 n/a $4 [a]
23 Construction and Demolition Administrative Fee [b], [c]
All tenant improvements with a valuation of up to $25,000: and all
residential additions.
$68 n/a $68 [b], [c]
All tenant improvements with a valuation of $25,001 to $50,000, and all
single family residential new constructions.
$100 n/a $100 [b], [c]
All tenant improvements with a valuation greater than $50,000; all
multifamily, commercial, and industrial projects, and all other projects.
$135 n/a $135 [b], [c]
[b] Proposed New Fees
# = Fees not automatically adjusted for CPI change.
[a] Fee set by State‐City has to collect $4 for each business license applicant throught 12/31/23 (fee will reduce to $1 per business license applicant beginning
1/1/2024 per State Mandates) and pass it through to the State for construction related accessibility.
[c] Fee is associated with ordinance 2020‐01 scheduled approved by Council on 1‐21‐20. The ordinance will amend chapter 14 of the City of Azusa Municipal
Code, adding Article XVIII, Construction and Demolition Waste Recycling and Diversion.
16
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022 Fee
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes
1 S‐001 Zoning Clearance $89 4.60% $93 flat fee
2 S‐002 Design Review ‐ Minor (over the counter) $2,123 4.60% $2,220 flat fee
3 S‐003 Staff Level Design Review:
#a) Modifications to Existing Structures $350 n/a $350 flat fee
b) All Others $4,762 4.60% $4,981 flat fee
4 S‐004 # Design Review ‐ Major $10,000 n/a $10,000 deposit [a]
5 S‐005 Major Use Permit $6,215 4.60% $6,501 flat fee
6 S‐005A Minor Use Permit $1,184 4.60% $1,238 flat fee
7 S‐006 Use Permit Modifications: flat fee
a) Modifications To Major UP $3,122 4.60% $3,266 flat fee
b) Modifications To Minor UP $654 4.60% $684 flat fee
8 Variance ‐ Minor $1,601 4.60% $1,675 flat fee
9 S‐009 Variance
#a) Involving Single‐Family Structure $1,000 n/a $1,000 flat fee
b) All Others $5,302 n/a $5,302 flat fee
10 S‐010 # Zone Change $5,000 n/a $5,000 deposit [a]
11 S‐011 # Development Code Amendment $5,000 n/a $5,000 deposit [a]
12 S‐012 Development Agreement [a]
#a) Development Agreement Deposit $10,000 n/a $10,000 deposit [a]
#b) Annual Monitoring Deposit $5,000 n/a $5,000 deposit [a]
13 S‐013 # General Plan Amendment $15,000 n/a $15,000 deposit [a]
14 S‐014 # Specific Plan $10,000 n/a $10,000 deposit [a]
15 S‐015 # Specific Plan Amendment $5,000 n/a $5,000 deposit [a]
16 S‐016 Tentative Parcel Map $8,733 4.60% $9,135 flat fee
17 S‐017 Tentative Tract Map:
a) 5‐20 Lots $9,110 4.60% $9,529 flat fee
b) 20‐50 Lots $10,618 4.60% $11,107 flat fee
c) 50‐100 Lots $14,305 4.60% $14,963 flat fee
d) 100+ Lots $15,981 4.60% $16,716 flat fee
Lot Line Adjustment $1,924 4.60% $2,013 flat fee
Minor Land Division ‐ Lot Split $683 4.60% $715 flat fee
18 S‐018 Reversion To Acreage $2,958 4.60% $3,094 flat fee
19 S‐019 Lot Merger $1,846 4.60% $1,931 flat fee
20 S‐020 Environmental Categorical Exemption Rev. $356 4.60% $372 flat fee
20 S‐021 Environmental Initial Study $5,283 4.60% $5,526 flat fee
21 S‐023 # Mitigated Negative Declaration $10,000 n/a $10,000 deposit [a]
22 S‐023 # Environmental Impact Report Preparation $10,000 n/a $10,000 deposit [a]
23 S‐023 # Environmental Impact Report Review $10,000 n/a $10,000 deposit [a]
24 S‐024 # Mitigation Monitoring ‐ CEQA Monitoring $5,000 n/a $5,000 deposit [a]
25 S‐025 # Annexation $10,000 n/a $10,000 deposit [a]
26 S‐026 Condominium Conversion Map:
a) Map Fee $6,948 4.60% $7,268 flat fee
b) Plus Consultant Fee Actual Cost n/a Actual Cost flat fee
27 S‐027 Minor Sign Review $90 4.60% $94 flat fee
28 S‐028 Major Sign Review $979 4.60% $1,024 flat fee
29 S‐029 Zoning Letter:
City of Azusa
Schedule of Fees and Charges (Development‐Related)
PLANNING
17
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022 Fee
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
PLANNING
a) Single Family Residential $178 4.60% $186 flat fee
b) Other $534 4.60% $558 flat fee
30 S‐030 Temporary Occupancy Review $619 4.60% $647 flat fee
31 S‐031 Temporary Use Permit
a) Temporary Use Permit Fee $574 4.60% $600 [b,d]
b) Azusa Based Non‐Profit Organizations $430 4.60% $450 flat fee [b]
32 S‐032 Continuance Processing $712 4.60% $744 flat fee
33 S‐033 Time Extension Review ‐ Staff $534 4.60% $558 flat fee
34 S‐034 Time Extension Review ‐ Planning Commission $1,201 4.60% $1,256 flat fee
35 S‐035 # Appeal To Planning Commission $500 n/a $500 flat fee
36 S‐036 # Appeal To City Council $1,000 n/a $1,000 flat fee
37 S‐15 Preliminary Plan Review $1,923 4.60% $2,011 flat fee [c]
38 S‐15A Nonconforming Use Time Extension $890 4.60% $931 flat fee
39 S‐037 Certificate Of Compliance $1,570 4.60% $1,643 flat fee
40 S‐038 Street Name Processing W/O Map $1,526 4.60% $1,596 flat fee
41 S‐039 Street Re‐Name Processing $2,059 4.60% $2,154 flat fee
42 S‐040 Building Address Processing W/O Map $992 4.60% $1,037 flat fee
43 S‐041 Building Re‐Address Processing $712 4.60% $744 flat fee
44 S‐041A Com Dev Newspaper Publication Actual Cost n/a Actual Cost flat fee
45 S‐044 Special Building Inspection (2 Hour Minimum) $178 4.60% $186 flat fee
46 S‐045 Technology Enhancement (5% of permit and plan
check fee‐ $30 minimum)
5% n/a 5% flat fee
47 S‐047 Massage Parlor Permit $1,017 4.60% $1,064 flat fee [d]
48 S‐048 Massage Parlor Permit Renewal $508 4.60% $531 flat fee [d]
49 S‐049 Residential Indoor Marijuana Permit $464 4.60% $485 flat fee [e]
50 S‐050 Residential Indoor Marijuana Permit Renewal $233 4.60% $243 flat fee [e]
51 S‐051 Accessory Dwelling Unit Permit $2,123 4.60% $2,221 flat fee [f]
52 S‐052 Designation of Historic Landmark, Historic District,
Potential Historic Landmark, and Potential Historic
District.
$546 4.60% $571 flat fee
53 S‐053 Mills Act Contract $873 4.60% $913 flat fee
54 S‐054 Miss Act Contract Extension $262 4.60% $274 flat fee
55 S‐055 Major Certificate of Appropriateness $284 4.60% $297 flat fee
56 S‐056 Minor Certificate of Appropriateness $131 4.60% $137 flat fee
57 S‐057 Landscape Plan Review $193 4.60% $202 flat fee
58 S‐058 Covenant Review $249.97/Hr 4.60% $261.47/Hr flat fee
59 S‐059 Covenant Conditions & Restrictions Review $249.97/Hr 4.60% $261.47/Hr flat fee
60 S‐060 General Plan Update Fee (10% of permit and plan
check fee)
10% n/a 10% flat fee [g]
61 S‐061 Public Art Project Fee $500 n/a $500 flat fee
62 S‐062 Non‐Residential Landscape Review $468 n/a $468 flat fee
18
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022 Fee
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
PLANNING
63 S‐063 Accessory Dwelling Unit Permit Amendment $1,044 n/a $1,044 flat fee
[b] Azusa‐based non‐profit organizations receive a 25% discount from standard TUP fee.
# = Fees not automatically adjusted for CPI change.
[d] Fees Approved by Council on June 5, 2017 per Resolution No. 2017‐C37.
[e] Fees Approved by Council on June 5, 2017 per Resolution No. 2017‐C35.
[f] Fees Approved by Council on December 4, 2017 per Resolution No. 2017‐C37.
[g] Fee Approved by Council 1‐22‐19.
[a] Charges to be billed at fully‐burdened hourly rates, including costs of outside service providers, if any for cost recovery.
[c] Fee is per meeting. 50% of the fee for the first meeting is applied against future Planning/Engineering fee for the project.
19
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022 Fee
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes
1 S‐047 Public/Private Improvement Plan Check:
#a) $0‐$100,000 Valuation (% of est construction cost) 3% n/a 3% flat fee
#b) Next $400,000 Valuation (% of est construction cost) 2.5% n/a 2.5% flat fee
#c) > $500,000 Valuation (% of est construction cost) 2% n/a 2% flat fee
2 S‐048 Public/Private Improvement Inspection:
#a) $0‐$100,000 Valuation (% of est construction cost) 5% n/a 5% flat fee
#b) Next $400,000 Valuation (% of est construction cost) 3.5% n/a 3.5% flat fee
#c) > $500,000 Valuation (% of est construction cost) 2% n/a 2% flat fee
3 S‐049 Final Parcel Map $1,204 4.60% $1,260 $1,260 or
Actual Staff
Time
4 S‐050 Final Tract Map
a) 5 ‐ 10 Lots $2,723 4.60% $2,848 $2,848 or
Actual Staff
Time
b) 11 ‐ 25 Lots $4,064 4.60% $4,251 $4,251 or
Actual Staff
Time
c) 26 ‐ 50 Lots $5,740 4.60% $6,004 $6,004 or
Actual Staff
Time
d) 51 ‐ 100 Lots $8,421 4.60% $8,809 $8,809 or
Actual Staff
Time
e) 101 ‐ 150 Lots $9,427 4.60% $9,860 $9,860 or
Actual Staff
Time
f) > 150 Lots $11,438 4.60% $11,964 $11,964 or
Actual Staff
Time
5 S‐051 Easement Check $377 4.60% $394 flat fee
6 S‐052 Monument Inspection:
a) First Monument $335 4.60% $351 flat fee
b) Each Additional Monument $84 4.60% $88 flat fee
7 S‐053 Bond Processing $168 4.60% $175 flat fee
8 S‐055 Lot Line Adjustment Engineering Plan Check Fee $1,924 4.60% Actual Staff
Time
flat fee
9 Street Light Banner Installation/Removal $83 4.60% $86 flat fee
10 S‐056 # Street/Right‐of‐Way Abandonment $2,000 n/a $2,000 deposit [a]
11 S‐056A SUSMP/LID Plan Review $2,189 4.60% $2,290 flat fee
12 S‐056B SWPPP Plan Review $2,011 4.60% $656 flat fee
13 S‐056B BMP Review $335 4.60% $351 flat fee
14 S‐056C Hydrology/Drainage Plan Review $2,011 4.60% $2,104 flat fee
15 S‐056C Soils Review $335 4.60% $656 flat fee
16 S‐056C Traffic Study Review $838 4.60% $877 flat fee
17 S‐057 Sidewalk/Curb/Gutter Encroachment
a) Up to 75 LF $503 4.60% $526 flat fee
b) Each Add'l 75 LF $168 4.60% $175 flat fee
18 S‐057A Street Cut Encroachment
a) Up to 100 SF $503 4.60% $526 flat fee
b) Each Add'l 100 SF $168 4.60% $175 flat fee
City of Azusa
Schedule of Fees and Charges (Development‐Related)
ENGINEERING
20
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022 Fee
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
ENGINEERING
19 S‐057B Driveway Approach $419 4.60% $438 flat fee
20 S‐058 Obstruction Permit $168 4.60% $175 flat fee
21 S‐059 Transportation Permits (Oversized And/Or Overweight Trucks):
#a) Single Trip/Rider $16 n/a $16 flat fee [b]
#b) Annual Permit $90 n/a $90 flat fee [b]
22 S‐060 # House Moving Permit $2,000 n/a $2,000 deposit [a]
23 S‐060A Industrial Waste Permit
a) New/Modified $1,173 4.60% $1,227 flat fee
b) Renewal $335 4.60% $351 flat fee
24 S‐060B Fats,Oils And Grease Program
a) New $587 4.60% $614 flat fee
b) Annual $251 4.60% $263 flat fee
25 S‐061 Sewer Saddle $503 4.60% $526 flat fee
26 Sewer Dye Test $121 4.60% $126 flat fee
26.1 Emergency Sewage Spill Response n/a n/a Actual Staff
Time
(Minimum
$504)
Actual Staff
Time
(Minimum
$504)
[e]
27 Sewer Blockage Check Actual Staff
Time
n/a Actual Staff
Time
Actual Staff
Time
28 S‐062 # Blueprint/Map Copy Service, Per Sheet (or actual outside costs) $20 n/a $20 Min or
Actual
$20 min or
Actual
29 # Project Plans/Specifications ‐ Plus $10 If Mailed $50 n/a $50 flat fee
30 Verification of Conditions $185 4.60% $193 or Actual
Staff Time
$193 or Actual
Staff Time
31 Agreement And/Or Improvement Security, Each $245 4.60% $256 flat fee
32 Extension Time For Improvement Agreement, Each $334 4.60% $349 flat fee
33 Submittals in Excess of Four
a) Fifth Submittals and subsequent submittals thereafter n/a Actual Staff
Time
Actual Staff
Time
34 Minor Land Division ‐ Lot Split ‐ Please refer to Planning Division
Fee # ‐ 17 S‐017. This is a Planning Division Fee.
n/a n/a n/a flat fee [d]
35 Recording Fee:
#a) First Sheet $8 n/a $8 flat fee
#b) Additional Sheets, Each $2 n/a $2 flat fee
36 LDMA Surcharge (County Maps Only):
#a) Tract Map $401 n/a $401 flat fee
#b) Parcel Map $135 n/a $135 flat fee
37 # Expedited Plan Review 1.5x fee n/a 1.5x fee flat fee
38 # Consultant (Invoice + 36% Overhead)Invoice
+ 36% O'H
n/a Invoice
+ 36% O'H
flat fee
39 S‐6.5 Code Compliance Fee $42 4.60% $44 flat fee
40 S‐7 # Landscape Design Standards (Over The Counter Sales)$6 n/a $6 flat fee
41 S‐18 City‐Provided Tree Planting ‐ One 15 Gallon Tree $125 4.60% $131 flat fee
42 City‐Provided Tree Planting ‐ One 24" Box Tree $216 4.60% $226 flat fee
43 Time Extension $84 4.60% $88 flat fee
44 S‐6.3 Engineering Hourly Rate for in‐House Staff $168 4.60% $175 flat fee
21
Actual Staff
Time
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022 Fee
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
ENGINEERING
45 Technology Enhancement (5% of permit and plan check fee‐ $30
minimum)
5% n/a 5% flat fee
46 S‐8.0 General Plan Update Fee (10% of permit and plan check fee) 10% n/a 10% flat fee
47 S‐8.1 Curb Drain (Per Drain) $168 4.60% $176 flat fee [c]
48 S‐8.2 Concrete Pavement
(Up to 100LF no deposit) $503 4.60% $526 flat fee [c]
(For each additional 100 LF, no deposit $168 4.60% $176 flat fee [c]
49 S‐8.3 Sewer Area Study n/a n/a $656 or Actual
Staff Time
$656 or Actual
Staff Time
[e]
50 S‐8.4 Potholing (Per location) n/a n/a $168 flat fee [e]
[b] Fee set to match CalTrans.
* All amounts shown are base fees. Applicants are also be responsible for any consultant
or other agency fees (e.g. LA County) incurred.
[a] Charges to be billed at fully‐burdened hourly rates, including costs of outside service
# = Fees not automatically adjusted for CPI change.
[c] Added Fees to reflect the same fees from the FY2021 engineering fee schedules.
[d] Please refer to the Planning Division Fee Schedule Section 17 S‐017
[e] New Fees
22
Adopted Adopted
Svc
Area
1/19/2021 CPI 1/18/2022 Fee
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes
Utility Services
1 S‐105 New Utility Account Setup:
#a) Connect Fee $45 n/a $45 flat fee
#b) Same Day Connection (7:00am‐4:00pm) $35 n/a $35 flat fee
#c) Same Day Connection (4:00pm‐5:30pm) $85 n/a $85 flat fee
#d) Fri 7am‐8pm (Elec, Wtr, or Both) $105 n/a $105 flat fee
#e) Sat, Sun Or Holiday 7am‐8pm (Elec, Wtr, or Both) $205 n/a $205 flat fee
#f) Positive Identification Check ‐ $1.25 $1.25 n/a $1.25 flat fee
2 S‐106 Utility Delinquent Turn Off/On:
#a) 7am‐4pm $35 n/a $35 flat fee
#b) 4pm‐5:30pm $85 n/a $85 flat fee
#c) Fri 7am‐8pm (Elec, Water, or Both) $105 n/a $105 flat fee
#d) Sat, Sun or Holiday 7am‐8pm (Elec, Water, or Both) $205 n/a $205 flat fee
e) Late Payment Penalty, The Greater Amount Of Either:
#i) Base Penalty Fee $7.50 n/a $7.50 flat fee
# ii) Percent Of Total Outstanding Balance 5% n/a 5% flat fee
f) Door Tag Fee n/a n/a $250 flat fee [e]
g) Miscellaneous Collection Fee 24% n/a 24% Variable
h) AMI Opt‐Out Fees:
#i) One‐time Initial Set‐up Charge $75 n/a $75 flat fee
# ii) Monthly Opt‐Out Fee $10 n/a $10 flat fee
# iii) Monthly Opt‐Out Fee (Low‐Income) $5 n/a $5 flat fee
3 S‐107 Theft Of Water/Light Investigation:
#a) Investigation Fee $500 n/a $500 flat fee
#b) Damages And Estimated Usage Actual Cost n/a Actual Cost flat fee
4 S‐108 Water Pressure Test:
#a) 1st Test Free Per Calendar Year $0 n/a $0 flat fee
#b) Additional Test $165 n/a $170 Actual
Labor Costs
[a]
#c) Main Line $400 n/a $410 Actual
Labor Costs
5 S‐109 #Water Meter Test (Fully Allocated Hourly Rate) Bill Hourly n/a Bill Hourly per hour
6 S‐110 Water Quality Test:
#a) Test Fee $125 4.60% $131 flat fee
#b) Plus Lab Costs Actual Cost n/a Actual Cost flat fee
7 S‐111 #Flow Test $300 4.60% $314 flat fee
8 S‐112 Temporary Meter Rental Services:
#a) Meter Fee (Per Each Meter) $200 n/a $210 Actual
material
costs
#b) Deposit $1,200 n/a $1,250 deposit
9 S‐113 New Water Meter Installation:
#a) Installation Fee $250 4.60% $262 flat fee
b) Plus Material Costs Actual Cost n/a Actual Cost deposit
10 S‐131D Water Meter Fee:
#a) 3/4" $200 n/a $250 flat fee
#b) 1" $250 n/a $300 flat fee
#c) 1.5" $1,000 n/a $1,250 flat fee
#d) 2" $1,150 n/a $1,500 flat fee
City of Azusa
Schedule of Fees and Charges (Development‐Related)
UTILITIES
23
Adopted Adopted
Svc
Area
1/19/2021 CPI 1/18/2022 Fee
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
UTILITIES
#e) > 2" Dev/Owner
Req'd to
Procure
n/a Dev/Owner
Req'd to
Procure
deposit
11 S‐131E # Jumper Fee (per service) $200 n/a $210 flat fee
12 S‐114 New Water Service Installation:
#a) 3/4" ‐ 1" Deposit $4,000 n/a $4,500 deposit
#b) 2" Deposit $4,500 n/a $5,000 deposit
#c) 4" Deposit $8,000 n/a $8,500 deposit
#d) 6" Deposit $10,000 n/a $10,500 deposit
13 S‐131H Hot Tap Fee:
#a) 1" $300 n/a $345 flat fee
#b) 2" $300 n/a $345 flat fee [b]
#c) 4" $350 n/a $400 flat fee [d]
#d) 6" $400 n/a $465 flat fee [d]
#e) 8" $450 n/a $520 flat fee [d]
#f) 10" $450 n/a $520 flat fee [d]
#g) 12" $525 n/a $605 flat fee [d]
14 S‐131C Fire Service Installation:
#a) 4" Deposit $8,000 n/a $8,500 deposit
#b) 6" Deposit $10,000 n/a $10,500 deposit
#c) 8" Deposit $11,000 n/a $11,500 deposit
#d) 10" Deposit $12,000 n/a $12,500 deposit
#e) 12" Deposit $13,000 n/a $13,500 deposit
15 S‐131B #Water Disconnection From The Mainline (Deposit) $3,500 n/a $4,000 deposit
16 S‐131F #Fire Hydrant Relocation / Inspection Fee $1,500 n/a $2,000 flat fee
17 S‐131G Traffic Incident Hit Hydrant Impact Fee:
#a) Impact Fee (Deposit) $1,500 n/a $2,000 flat fee
#b) Additional Cost Of Repair & Water Loss Actual Cost n/a Actual Cost flat fee
#c) Damage to Water Main Impact Fee $1,500 n/a $2,000 flat fee
#d) Cost of Repair & Water Loss Actual Cost n/a Actual Cost flat fee
#e) Damage to Water Facilities Impact Fee $1,500 n/a $2,000 flat fee
#f) Cost of Repair & Water Loss Actual Cost n/a Actual Cost flat fee
18 S‐115 #New Backflow Device Inspection Review $347 4.60% $363 flat fee
19 S‐116 # Annual Backflow Device Inspection Review $82 4.60% $85 flat fee
20 S‐116A Water Plan Check $224 4.60% $250 flat fee
21 S‐116B Water Improvement Inspection (per hour) $145 4.60% $150 per hour
22 S116C Will‐Serve Letter $35 4.60% $40 flat fee
23 S‐117 #Water Service
No change to various rates based on service size and
Various n/a Various variable [b]
24 S‐118 Sewer Blockage Check:
#a) Minimum Charge $500 n/a $500 deposit
#b) Fully Allocated Hourly Rates Bill Hourly n/a Bill Hourly deposit
#c) Charge If City Causes Blockage $0 n/a $0 flat fee
25 S‐119 # Sewer Dye Test $115 4.60% $120 flat fee
26 S‐120 Emergency Sewage Spill Response:
#a) Spill Response Actual Cost n/a Actual Cost deposit
#b) Fully Allocated Hourly Rate For All Responding
Personnel
Bill Hourly n/a Bill Hourly deposit
#c) Charge If City Causes Spill $0 n/a $0 flat fee
27 S‐121 Wastewater Service: Various n/a Various variable
24
Adopted Adopted
Svc
Area
1/19/2021 CPI 1/18/2022 Fee
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
UTILITIES
28 Duces Tecum Subpoena Processing $220 n/a $220 flat fee
29 S‐122 Electric Meter Test:
#a) First Test Per Calendar Year $0 n/a $0 flat fee
#b) Residential $160 n/a $160 flat fee
#c) Commercial $370 n/a $370 flat fee
#d) Industrial $440 n/a $440 flat fee
30 S‐123 Total Electrical Service Re‐Install:
#a) Re‐Install Fee $808 4.60% $845 flat fee
#b) Additional Materials Actual Cost n/a Actual Cost flat fee
31 S‐124 Additional Electric Span Install:
#a) Install Fee $791 4.60% $828 flat fee
#b) Plus Materials Actual Cost n/a Actual Cost flat fee
32 S‐125 Temporary Electric Installation:
#a) Install $833 4.60% $871 flat fee
#b) Additional Material Costs Actual Cost n/a Actual Cost flat fee
33 S‐126 Temp Single Phase Transformer Installation:
#a) Installation Fee (Minimum) $3,382 4.60% $3,537 flat fee
#b) Additional Material Costs Actual Cost n/a Actual Cost flat fee
34 S‐127 Temp Three Phase Transformer Installation:
#a) Installation Fee (Minimum) $6,768 4.60% $7,079 flat fee
#b) Additional Material Costs Actual Cost n/a Actual Cost flat fee
35 S‐128 Electric Line Extension/Upgrade:
#a) Extension/Upgrade Actual Cost n/a Actual Cost deposit
#b) Fully Allocated Hourly Rates Bill Hourly n/a Bill Hourly deposit
36 S‐129 Electric Services Various n/a Various variable [b]
37 S‐130 # Banner Installation $592 4.60% $619 flat fee
38 S‐131 #After Hours Standby/Call Out (2 Hour Minimum Bill Hourly n/a Bill Hourly deposit
39 S‐131A # Inspection Rate (Per Hour) Bill Hourly n/a Bill Hourly deposit
40 S‐131H #Water System Development Fees:
a) Residential
#Per Dwelling Unit $2,091 4.60% $2,187 flat fee
b) Commercial
# ii) Per SF $1 4.60% $1 flat fee
c) Industrial
# ii) Per SF $0.41 4.60% $0.43 flat fee
d) School
#Flat Fee $8,160 4.60% $8,535 flat fee
e) Park
#Flat Fee $4,080 4.60% $4,268 flat fee
#f) Accessory dwelling units 750 SF or more $714 4.60% $747 flat fee
41 S‐131I #Water System Annexation Fees:
a) Residential [a]
#Per Dwelling Unit $1,020 4.60% $1,067 [b]
b) Commercial
#Per SF $0.46 4.60% $0.48 flat fee
c) Industrial
#Per SF $0.25 n/a $0.25 flat fee
d) School $4,080 4.60% $4,268 flat fee
e) Park $2,040 4.60% $2,134 flat fee
42 S‐131J Water Capacity Fee:
#e) Accessory dwelling units less than 750 SF $306 4.60% $320 flat fee
25
Adopted Adopted
Svc
Area
1/19/2021 CPI 1/18/2022 Fee
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Type Notes
City of Azusa
Schedule of Fees and Charges (Development‐Related)
UTILITIES
43 S‐131k Electrical Engineering $100 n/a $250 Per Hour [c]
44 S‐131L Short Circuit Study Fee $200 n/a $200 Per Hour [c]
45 S‐131M Plan Check Fees
a) Residential & ADU Per Dwelling Unit n/a n/a $250 flat fee [e]
b) Commercial and Industrial n/a n/a $250 Per Hour [e]
# = Fees not automatically adjusted for CPI change.
[a] Test fee refunded if there is a system problem.
[b] Rate varies depending on type of services and usage, time of year, and time of day.
[c] Proposed New Fees
[d] Fee is related to actual labor costs.
[e] New Fees
26
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
1 S‐063 Real Property Records Report
a) Condominium/Townhouses $112 4.60% $118
b) Vacant/Unimproved Land $226 4.60% $237
c) Single Family Dwellings $226 4.60% $237
d) Multi‐Family Dwelling
i) Per Parcel, First Unit $226 4.60% $237
ii) Each Add'l Unit $13 4.60% $13
e) Commercial Properties $226 4.60% $237
2 S‐064 Residential Rental Housing Registration And Inspection:
a) Per Parcel ‐ Includes First Unit $131 4.60% $137
i) Additional Unit $8 4.60% $8
b) Reinspection $98 4.60% $102
3 Abandoned and Vacant Property Registration Fee $500 n/a $500
4 S‐032.5 Weed Abatement Inspection (Processing and Referring) $378 4.60% $395
5 S‐95.1 # Recovery and Storage of Abandoned Shopping Carts‐The City no longer
offer this service.
$12 n/a $0
6 S‐066 # Appeal/Hearing $110 n/a Actual Costs of
Hearing
Officer Time
7 S‐065 Lien Release
#a) Substandard $100 n/a $100
#b) Admin Fine $80 n/a $80
8 S‐066C Code Enforcement Fines
#a) First Offense $100 n/a $100
#b) Second Offense $200 n/a $200
#c) Third Offense $500 n/a $500
#d) First and Second Offense ‐ No Business License Violation $250 n/a $250
9 Technology Enhancement (5% of permit and plan check fee‐ $30
minimum)
5% n/a 5%
10 Impound and Storage Fee (Non‐Automobile) Actual Costs n/a Actual Costs [a]
# = Fees not automatically adjusted for CPI change.
[a] Fee is associated with ordinance 2020‐01 approved by Council on 1‐21‐20. The ordinance will amend chapter 14 of the City of Azusa Municipal
Code, adding Article XVIII, Construction and Demolition Waste Recycling and Diversion.
City of Azusa
Schedule of Fees and Charges (Development‐Related)
COMMUNITY IMPROVEMENT
27
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Fee/Unit Notes
S‐1.1
https://www.fire.lacounty.gov/fire-prevention-division/fire-prevention-fees/
http://fire.lacounty.gov/wp-content/uploads/2019/09/FirePreventionServiceFees.pdf
https://fire.lacounty.gov/
City of Azusa
Schedule of Fees and Charges (Development‐Related)
FIRE SAFETY
The City of Azusa Contract Out Fire Prevention Services (including Ambulance Services) with the County of Los
Angeles Fire Department. The City of Azusa does not have any control over Fire Services or ambulance
fees/rates. For the County of Los Angeles Fire Department fire services fees, ambulance rates, and contact
information, please refer to the link and contact information listed below:
County of Los Angeles Fire Department Fire Prevention Fees ‐ Contact: County of LA Acting Assistant Fire Chief
Carl N. Flores (Email Address: carl.flores@fire.lacounty.gov) or 626‐974‐8371.
Ambulance Rates ‐ County of Los Angeles Department of Health Services Emergency Medical Services Agency ‐
Contact: Chief Prehospital Operations ‐ John Telmos 562‐378‐1677 (Email Address: jtelmos@dhs.lacounty.gov)
https://library.municode.com/ca/los_angeles_county/codes/code_of_ordinances?nodeId=TIT7BULI_DIV2SPBU_CH7.16A
M
http://file.lacounty.gov/SDSInter/dhs/1106181_GeneralPublicAmbulanceRatesEffective7.1.21.pdf
28
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
1 S‐067 #Noise Disturbance Response
Full Cost Recovery After 2nd Response
Variable n/a Variable
Alarm Users
Alarm Fees
2 S‐068 Alarm Registration and Renewal
#a) Registration and Renewal $25 n/a $25
#b) Senior Residential 65+, Permanently Disabled, or Low Income $12 n/a $12
3 # Appeal Fee, per request $25 n/a $25
Alarm Fines
4#Registration Late Charge $25 n/a $25
5#Alarm Fee Late Charge ‐ All fees and fines late $25 n/a $25
6 # Reinstatement Fee $100 n/a $100
7 # Automatic Dialing Device $100 n/a $100
8 # Audible Alarm Violation $100 n/a $100
9Burglar False Alarm Response ‐ Registered Alarm:
#a) First Response (fee may be waived with online school attendance) $50 n/a $50
#b) Second Response $75 n/a $75
#c) Third Response $125 n/a $125
#d) Fourth Response $175 n/a $175
#e) Fifth Response $225 n/a $225
#f) Six or More $275 n/a $275
10 Burglar False Alarm Response ‐ Non‐registered Alarm Site:
#a) First Response $150 n/a $150
#b) Second Response $175 n/a $175
#c) Third Response $225 n/a $225
#d) Fourth Response $275 n/a $275
#e) Fifth Response $325 n/a $325
#f) Six or More $375 n/a $375
11 Robbery/Panic False Alarm Response (Resid/Comm) Permit Holder
#a) Per Response $100 n/a $100
12 Robbery/Panic False Alarm Response (Resid/Comm) Non‐Permit Holder
#a) First Response $150 n/a $150
#b) Second Response $175 n/a $175
#c) Third Response $225 n/a $225
#d) Fourth Response $275 n/a $275
#e) Fifth Response $325 n/a $325
#f) Six or More $375 n/a $375
13 Operating Suspended Alarm System
#a) One $200 n/a $200
#b) Two or More $300 n/a $300
Alarm Company
Alarm Fines
14 # Failure to Report New Install $50 n/a $50
15 # Failure to Report Disconnect $50 n/a $50
16 # False Alarm Caused by Alarm Company $100 n/a $100
17 # Employee False Statement $200 n/a $200
18 # Failure to Use Enhanced Call Verification Procedures $100 n/a $100
19 # All Late Charges $25 n/a $25
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
POLICE
29
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
POLICE
20 # Suspension Reinstatement Fee and Mailing Costs $200 n/a $200
a) Additional Fee Per Customer, if Contacted $11 4.60% $12
Alarm Fee
21 # Appeal Fee, per request $25 n/a $25
22 S‐069 #DUI Accident Response Investigation
Charge At Fully Allocated Hourly Rates. Not to exceed $12,000 per
incident by State Law.
Variable n/a Variable
23 S‐070 Equipment Citation Verification
#a) Sign Off Citations Issued by Azusa Police Department $15 n/a $15
b) Sign Off Citations Issued by External Agencies/Police Departments $20 n/a $20
24 S‐071 Vehicle VIN Verification $50 4.60% $52
25 S‐072 Public Safety At Special Events:
a) Officer ‐ Per Hour ‐ PER EXECUTED CONTRACT RATES $155 4.60% $162
b) Reserve Officer ‐ PER EXECUTED CONTRACT RATES $43 4.60% $45
26 S‐072A # Booking Services $150 n/a $150
27 S‐073 Entertainment Permit:
a) Temporary $345 4.60% $361
b) Regular $1,382 4.60% $1,445
c) Renewal $1,382 4.60% $1,445
28 S‐074 Dance Permit:
a) One Time $55 4.60% $58
b) Annual $55 4.60% $58
29 S‐074A Pawn Shop Permit $1,716 4.60% $1,795
30 S‐074B Massage Parlor Permit $634 4.60% $663
31 S‐074C Carnival Worker Permit $176 4.60% $184
32 S‐075 Vehicle Impound Fees
#a) Standard Release $150 n/a $150
#b) DUI Release $400 n/a $400
33 S‐076 # Repossessed Vehicle Release $15 n/a $15 [a]
34 S‐077 # Police Records Check/Clear Letter $25 n/a $25
35 S‐078 # Immigration Letters $25 n/a $25
36 S‐079 # Public Safety Application Background Check n/a n/a n/a
37 S‐081 #Photograph Service Fee (Cost of CD is included) $10 n/a $10
38 S‐082 Video/Audio Tape/Cd Reproduction:
#a) Dispatch Tape (911 Tape) $110 n/a $110
#b) Video/Audio Reproduction $85 n/a $85
39 S‐083 Police Incident/Crime Report Copy:
#a) Document <4 Pages In Length $0.00 4.60% $0
#b) First Sheet (>4 Page Document) $0.65 4.60% $0.68
#c) Each Additional Sheet (>4 Page Document) $0.20 4.60% $0.21
40 S‐084 Special Computer Search ‐ Per Hour $107 4.60% $112
41 S‐085 Civil Subpoena Processing
#a) Subpoena Processing Fee (Per Request) $20 n/a $20
30
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
POLICE
#b) Additional Reproduction Cost Actual Cost n/a Actual Cost
#c) Additional Deposit + Travel (Per Day, Regulated Fee) $275 n/a $275
42 S‐086 Duces Tecum Subpoena Processing
#a) Subpoena Processing Fee (Per Request) $15 n/a $15
#b) Additional Reproduction Cost Actual Cost n/a Actual Cost
43 S‐087 Animal Regulation, As Per Ordinance:
#a) Dog License ‐ Unaltered‐ 1 Year License $80 n/a $80 [b]
#b) Dog License ‐ Altered ‐ 1 Year License $22 n/a $22 [b]
#c) Senior Rate ‐ 1 Pet Altered $8 n/a $8
#d) Duplicate $10 n/a $10
#e) Delinquency Charge Equal to
License Fee
n/a Equal to
License Fee
#f) Field Enforcement (licensing initiated in the the field) $41 n/a $41
Voluntary Cat Licenses
#a) One Year ‐ Altered $5 n/a $5
#b) One Year ‐ Unaltered $10 n/a $10
#c) Microchip ‐ With Licensing Of Altered Pet Free n/a Free
S‐020 Vehicle Code Enforcement
44 # Improper Display Of License Plates (CVC 5200(a)) $58 n/a $58
45 # Improper Display Of Tabs (CVC 5204(a)) $80 n/a $80
46 # Blkg. Driveway/Garage Entrance (CVC 22500(e) $58 n/a $58
47 # No Parking On Sidewalk (CVC 22500(f)) $58 n/a $58
48 # No Parking Alongside Pkd. Veh./Dbl.Pkg. (CVC 22500(h)) $58 n/a $58
49 # Blkg. Disabled Access Ramp (CVC 22500(I)) $272 n/a $272
50 # Fire Accessway/Fire Lane (CVC 22500.1) $170 n/a $170
51 # Parking 18 Inches Form Curb/Wrong Way (CVC 22502(a), AMC 74‐441) $56 n/a $56
52 # Parking In Disabled Zone (CVC 22507.8(a)) $382 n/a $382
53 # Blk./Obstruct Disabled Zone (CVC 22507.8(b)) $338 n/a $338
54 # Parking On Disabled Crosshatch (CVC 22507.8(c)(2)) $338 n/a $338
55 # Fire Hydrant (CVC 22514) $56 n/a $56
S‐021 Parking Enforcement
56
57 # Parking For Purpose Of Sale (AMC 74‐439(1)) $68 n/a $68
58 # Not Parked Within Painted Lines (AMC 74‐443b) $44 n/a $44
59 # Red Curb (AMC 74‐449(a)(1)) $51 n/a $51
60 # No Parking In Alley (AMC 74‐450) $52 n/a $52
61 # 18” From Curb Or Facing Wrong Way (AMC 74‐441, CVC 22502(a)) $56 n/a $56
62 # Prohibited By Signs / Markings (AMC 74‐446) $51 n/a $51
63 # Limited Or Prohibited Parking (AMC 74‐453) $51 n/a $51
64 # Parking on Private Property Without Consent (AMC 74‐463 (b)) $52 n/a $52
65 # Commercial Veh. Over 6,000 Lbs. +/Over 60 Minutes (AMC 74‐466) $85 n/a $85
66 # Detached Trailer On Street (AMC 74‐466 (B)) $68 n/a $68
67 # Parking On Front Yard Prohibited (AMC 74‐468) $49 n/a $49
68 S‐022 # General Code Enforcement Actual Cost n/a Actual Cost
69 # Impound & Collision Tow Service‐Per Hr. (Minimum 1 Hr.) Variable n/a Variable
70 Storage Fees ‐ Per Day
#a) Automobiles And Light Trucks Variable n/a Variable
#b) Trucks Over 1 Ton Variable n/a Variable
#c) Semi‐Truck And Trailer Variable n/a Variable
31
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
POLICE
#d) Motorcycle Variable n/a Variable
71 S‐025 # Accident Report Investigation ‐ This service is no longer available N/A n/a N/A [c]
72 S‐027 #Alarm Monitoring Service Actual Cost n/a Actual Cost
73 S‐028 # Jail $104 n/a $104
74 S‐032.1 #Court Order Custody Reimbursement Fee Per 24‐Hour Period Or Fraction
Thereof
$104 n/a $104
75 S‐032.4 # Paramedic Service Actual Cost n/a Actual Cost
76 S‐032.5 Traffic Collision Report
#a) Injury $20 n/a $20
b) Non‐Injury $20 n/a $20
77 Comm Srvc Officer Special Event Fees (Per Hour) PER EXECUTED CONTRACT
RATES
$110 4.60% $115
78 Police Aide Special Event Fees (Per Hour) ‐ PER EXECUTED CONTRACT RATES $26 4.60% $28
79 Fire arm storage Fee (Court order/Safekeeping) ‐ Levy Upon released of fire $50 n/a $50
[a] Fee set by State.
# = Fees not automatically adjusted for CPI change.
[b] Fee increased higher than CPI ‐ Proposed Fee Adjustment to recoup cost of services from LA County Animal Control Services
[c] Deleted
32
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
Business Licenses
1 Adult‐oriented business license:
#a) License Fee See Business License n/a See Business License
#b) Partial Payment of Fees ‐ Additional Charge $17 n/a $17
2 Adult Business License Application Fee:
#a) Application Fee $196 n/a $196
#b) Partial Payment of Fees ‐ Additional Charge $17 n/a $17
3Initial Business License Fee:
#a) Initial License Fee See Business License n/a See Business License
#b) Partial Payment of Fees ‐ Additional Charge $17 n/a $17
4 Annual Renewal Fee:
#a) Renewal Fee $41 n/a $41
#b) Partial Payment of Fees ‐ Additional Charge $17 n/a $17
5 Adult Business License Appeal Fee:
#a) License Appeal Fee $2,616 n/a $2,616
#b) Partial Payment of Fees ‐ Additional Charge $17 n/a $17
6#Live Entertainer License Actual time spent at
hourly rate of involved
City staff, charged
against $2,500 initial
deposit
n/a Actual time spent at
hourly rate of involved
City staff, charged
against $2,500 initial
deposit
7#Figure Model License Actual time spent at
hourly rate of involved
City staff, charged
against $2,500 initial
deposit
n/a Actual time spent at
hourly rate of involved
City staff, charged
against $2,500 initial
deposit
8#Live Entertainer/Figure Model License Renewal Actual time spent at
hourly rate of involved
City staff, charged
against $2,500 initial
deposit
n/a Actual time spent at
hourly rate of involved
City staff, charged
against $2,500 initial
deposit
Planning
1#Interim Adult Use Planning Permit Actual time spent at
hourly rate of involved
City staff, charged
against $5,000 initial
deposit
n/a Actual time spent at
hourly rate of involved
City staff, charged
against $5,000 initial
deposit
2#Final Adult Use Planning Permit Actual time spent at
hourly rate of involved
City staff, charged
against $5,000 initial
deposit
n/a Actual time spent at
hourly rate of involved
City staff, charged
against $5,000 initial
deposit
3#Extension Of Amortization Actual time spent at
hourly rate of involved
City staff, charged
against $5,000 initial
deposit
n/a Actual time spent at
hourly rate of involved
City staff, charged
against $5,000 initial
deposit
All Adult Business Fees were rounded to the nearest dollar for administrative efficiency.
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
ADULT BUSINESSES
33
Adopted Adopted
Svc Area 1/21/2020 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
1 S‐133 Application Fee ‐ New Business & Miscellanenous Business
a) Outside Contractor $63 4.60% $66
b) Reinstate Outside Contractor $49 4.60% $51
c) Rental Business $63 4.60% $66
d) All Others $193 n/a $193
e) Renewal‐Every person engaged in the business of selling goods, wares
or merchandise at wholesale; every person in the business of
manufacturing, processing or fabricating goods, wares or merchandise,
including the production of oil, natural gas and other hydrocarbons;
every person engaged in the business of selling to the general public at
retail goods, wares, merchandise or commodities, including restaurants
and other foods dispensers; every person engaged in any professional or
semiprofessional occupation, trade or craft; every person primarily
engaged in selling, performing or furnishing services other than
commodities, including trades and crafts; and all other persons engaged
in any business
1) Group 1: Gross receipts during fiscal year of business
between $0.00 and $4,999.00 shall pay a tax of $50.00.
$50 n/a $50
2) Group 2: Gross receipts during fiscal year of business
between $5,000.00 and $9,999.00 shall pay a tax of
$90.00.
$90 n/a $90
3) Group 3: Gross receipts during fiscal year of business
between $10,000.00 and $99,999.00 shall pay a tax of
$150 n/a $150
4) Group 4: Gross receipts during fiscal year of business
between $100,000.00 and $499,999.00 shall pay a tax of
$300 n/a $300
5) Group 5: Gross receipts during fiscal year of business
between $500,000.00 and $999,999.00 shall pay a tax of
$750 n/a $750
6) Group 6: Gross receipts during fiscal year of business
between $1,000,000.00 and $4,999,999.00 shall pay a tax
of $750.00 plus $0.15 for each $1,000.00 over
$1,000,000.00 up to $4,999,999.00.
$750+ 15 cents
($.15) for each
additional $1,000 in
exesss from
$1,000,000 to
$4,999,999
n/a $750+ 15 cents
($.15) for each
additional $1,000 in
exesss from
$1,000,000 to
$4,999,999
7) Group 7: Gross receipts during fiscal year of business
between $5,000,000.00 and $14,999,999.00 shall pay a
tax of $1,350.00 plus $0.135 for each $1,000.00 over
$5,000,000.00 up to $14,999,999.00.
$1,350+ 15 cents
($.15) for each
additional $1,000 in
exesss from
$5,000,000 to
$14,999,999
n/a $1,350+ 15 cents
($.15) for each
additional $1,000 in
exesss from
$5,000,000 to
$14,999,999
8) Gross receipts during fiscal year of business of
$15,000,000.00 or more shall pay a tax of $2,700.00 plus
$0.10 for each $1,000.00 over $15,000,000.00.
$2,700 + 10 cents
($.10) for each
additional $1,000 in
exesss from
$15,000,000
n/a $2,700 + 10 cents
($.10) for each
additional $1,000 in
exesss from
$15,000,000
f) Commercial Rentals $90 (from $0 to
$20,000) + 95 cents
($.95) per $1,000 on
rental amounts over
$20,000 annually
n/a $90 (from $0 to
$20,000) + 95 cents
($.95) per $1,000 on
rental amounts over
$20,000 annually
g) Warehouses‐The measure of gross receipts shall be the
estimated annual waarehouse inventory value times the
estimated annual turnover rate. If actual value of
merchandise shipped annually is avliable, that will be used
as the measure of gross receipt.
Same as S‐133 ( e )
from above
n/a Same as S‐133 ( e )
from above
City of Azusa
BUSINESS LICENSES
34
Adopted Adopted
Svc Area 1/21/2020 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
City of Azusa
BUSINESS LICENSES
h) Mobile Home Parks $24.00 for the first
three spaces, then
an additional $12.00
for each parking
space or units over
three
n/a $24.00 for the first
three spaces, then
an additional $12.00
for each parking
space or units over
three
I) Rental of Apartments, Roomhouse, individual homes,
etc. (Three less units for duplex, triplex, single family
homes or condos)
Under $5,000 Per Year $50 n/a $50
From $5,000 to $10,000 per year $50 plus $1.50 per
$1,000
n/a $50 plus $1.50 per
$1,000
From $10,001 to $20,000 per year $60 plus $2.50 per
$1,000
n/a $60 plus $2.50 per
$1,000
$20,001 and over $70 plus $3.50 per
$1,000
n/a $70 plus $3.50 per
$1,000
j) Apartments ‐ Rentals of four of more units $199.17 per unit n/a $204.69 per unit
k) Vending Machines $30.00 per year for
the first $10,000.00
of annual gross
receipts or part
thereof, and $3.50
per $1,000.00 on
each additional sum
in excess but not to
exeed $1,500.00 per
year.
n/a $30.00 per year for
the first $10,000.00
of annual gross
receipts or part
thereof, and $3.50
per $1,000.00 on
each additional sum
in excess but not to
exeed $1,500.00 per
year.
l) Mechanical or Electronic Games $58 per machine not
to exceed $500 per
year
n/a $58 per machine not
to exceed $500 per
year
m) Outdoor Advertising $70.00 per year plus
$0.14 per square
foot
n/a $70.00 per year plus
$0.14 per square
foot
o) Side walk Benches $60.00 plus $6.00
per bench
n/a $60.00 plus $6.00
per bench
2#First Offense Administrative Penalty For Business License
Related Violations
$250 n/a $250
3 S‐134 Home Occupation Permit $105 4.60% $109
4 S‐135 New Taxi/Tow Truck Permit $646 4.60% $676
5 S‐136 Massage Parlor Technician Permit See notes on Cn/aSee notes on C[c]
Massage Business Operators Permit See notes on Cn/aSee notes on C[c]
Massage Facility Inspection $299 4.60% $313
6 Application Fee ‐ Renewal $26 4.60% $27
7 Field Collection Fee On Delinquent Accounts $32 4.60% $33
8 Partial Payment Of Fees ‐ Additional Charge $17 4.60% $18
9 S‐138 Business License Duplicates $16 4.60% $17
10 S‐139 Printouts Of Business License Lists 1 hr Staff Time n/a 1 hr Staff Time
11 S‐140 Solicitor Permit‐All
35
Adopted Adopted
Svc Area 1/21/2020 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
City of Azusa
BUSINESS LICENSES
a) 1st Solicitation $70 4.60% $73
b) Each Additional Permit $47 4.60%$49
12 S‐141 Yard Sale Permit Not Required n/a Not Required [a]
13 S‐142 Bingo Permit $56 4.60%$59
14 S‐143 Fireworks Stand Permit $400 4.60%$418
15 S‐96 Filming Or Other Use Of City Facilities ‐ Per Day
25% Discount for Azusa‐based nonprofit organizations
$1,510 4.60% $1,580
16 Filming On Private Property $338 4.60%$353
17 S‐97 Registration Fee For Non‐Profit Businesses Within A
Commercial
Building (i.e. banks, schools, churches, etc.)
$50 4.60%$52
18 S‐98 Certified Access Specialist Program (CASp)$4 n/a $4 [b]
[a] Ordinance No. 07‐05, Approved By Council On 05/07/07
[b]Fee set by the State (Per AB 1379) ‐ The $4 fee will be effective until 12‐31‐23. Starting on 1‐1‐24, the CASp fee will be reduced to $1.
[c]Please refer to the Planning Division's Fee Schedule for the Massage Permit fee amount under S‐047 and S‐048.
All Business License Fees were rounded to the nearest dollar for administrative efficiency.
# = Fees not automatically adjusted for CPI change.
36
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
S‐33 Aquatics Program/Leisure Classes [b]
1 Swimming Lessons:
a) Children/Group
i) 25 Minutes $35 n/a $35
ii) 40 Minutes $45 n/a $45
b) Children/Private $35 n/a $35
c) Adult/Group
i) 25 Minutes $35 n/a $35
ii) 40 Minutes $45 n/a $45
d) Adult/Private $35 n/a $35
2 Swimming Team:
a) 1st Session (Includes Shirts And Swim Cap)
i) First Child (Same Family) $75 n/a $65
b) 2nd Session
i) First Child (Same Family) $60 n/a $55
3Water Exercise ‐ Adults (Leisure Class‐Rates Varies) Varies n/a Varies
4Lifeguard Training Class (Leisure Class‐Rates Varies) Varies n/a Varies
5 Aqua Zumba (Leisure Class‐Rates Varies) Varies n/a Varies
6 S‐34 Recreation Swimming ‐ Day Swim:
#a) 12 Years Old & Under Includes Slide $1 n/a $1
#b) Teens ‐ Up To 17 Years Includes Slide $2 n/a $1
#c) Seniors ‐ 50 years And Older $1 n/a $1
#d) Adults ‐ 18 Years And Older Includes Slide $2 n/a $1
#e) Lap Swim ‐ Adult 18 And Over $2 n/a $1
#f) Lap Swim ‐ Seniors 50 years and older $1 n/a $1
7Recreation Swimming ‐ Month Pass (All Groups) $5 n/a $5 [b]
Aquatics Center Event (All Groups) $5 n/a $5 [b]
8 S‐35 Swimming Pool Rental (2 Hours):
a) 1‐100 People $382 n/a $382
b) 101‐250 People $492 n/a $492
c) 251‐350 People $601 n/a $601
d) Swimming Pool Rental Deposit (Refundable) $219 n/a $219
e) Additional ‐ Water Slide $109 n/a $109
f) Water Slide Rental Deposit (Refundable) $55 n/a $55
g) Non‐ Resident Fee (Additional) $164 n/a $164
9 S‐36 #Leisure Classes Varies n/a Varies
S‐38 Adult Sports Programs *, [b]
10 Adult Baseball:
a) Weeknights $500 n/a $500
b) Weekends $550 n/a $550
11 Adult Softball $315 n/a $315
12 Adult Basketball $375 n/a $375
13 Adult Volleyball $200 n/a $200
14 Golf Tournament Varies n/a Varies
15 Adult Flag Football $300 n/a $300
16 Adult Futsal (Indoor Soccer) $200 n/a $200
17 Adult Kickball $200 n/a $200
S‐41 Youth Sports Programs *, [b]
18 Pony Baseball:
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
COMMUNITY RESOURCES
37
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
COMMUNITY RESOURCES
a) Regular Fee $85 n/a $85
b) Additional Child ‐ Same Family $75 n/a $75
19 Winter Pony Baseball:
a) Regular Fee $50 n/a $50
b) Additional Child ‐ Same Family $45 n/a $45
20 Mighty‐Mite Baseball (T‐Ball/Coach Pitch):
a) Regular Fee $50 n/a $50
b) Additional Child ‐ Same Family $45 n/a $45
21 Mighty‐Mite Basketball:
a) Regular Fee $50 n/a $50
b) Additional Child ‐ Same Family $45 n/a $45
22 Mighty‐Mite Flag Football:
a) Regular Fee $50 n/a $50
b) Additional Child ‐ Same Family $45 n/a $45
23 Mighty‐Mite Soccer:
a) Regular Fee $50 n/a $50
b) Additional Child ‐ Same Family $45 n/a $45
24 Flag Football (T‐Shirt Uniforms):
a) New $35 n/a $35
b) Returning $30 n/a $30
c) Additional Child ‐ Same Family ‐ New $30 n/a $30
d) Additional Child ‐ Same Family ‐ Returning $25 n/a $25
25 Basketball (T‐Shirt Uniforms):
a) New $35 n/a $35
b) Returning $30 n/a $30
c) Additional Child ‐ Same Family ‐ New $30 n/a $30
d) Additional Child ‐ Same Family ‐ Returning $25 n/a $25
26 Summer Basketball (Include Uniform):
a) Regular Fee $55 n/a $55
b) Additional Child ‐ Same Family $50 n/a $50
27 Volleyball (T‐Shirt Uniforms‐Shirt Only; No Shorts):
a) New $35 n/a $35 [a],[b],*
b) Returning $30 n/a $30
c) Additional Child ‐ Same Family ‐ New $30 n/a $30
d) Additional Child ‐ Same Family ‐ Returning $25 n/a $25 [a],[b],*
28 Soccer (T‐Shirt Uniforms):
a) New $35 n/a $35
b) Returning $30 n/a $30
c) Additional Child ‐ Same Family ‐ New $30 n/a $30
d) Additional Child ‐ Same Family ‐ Returning $25 n/a $25
Athletic Field Rental (Including Ball Diamond)*, [b]
29 S‐41.1 Ball Field/Diamond Rental:
a) Field/Diamond Rental‐No Lights $32 n/a $32
b) Field/Diamond Rental‐With Lights $45 n/a $45
c) Drag, Line And Water Field‐Prepared $28 n/a $28
d) Staff, Scorekeeping ‐ Per Hour $17 n/a $17
e) Use Of Scoreboards $17 n/a $17
f) Use Of Bases $17 n/a $17
38
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
COMMUNITY RESOURCES
g) Deposit For Use Of Bases $219 n/a $219
h) Use Of Strike Zone Mat $17 n/a $17
i) Non‐Resident Fee (Except Memorial Park) (Additional) $55 n/a $55
30 Athletic Field Only Charge (Green Space):
a) Memorial Park ‐ Per Hour (Lights Not Included) $68 n/a $68
b) Northside South Field Area ‐ (Lights Not Included) $68 n/a $68
c) Zacatecas Park (Currently Not Available For Rental) $65 n/a $65
d) Gladstone Park (Lights Not Included) $36 n/a $36
e) Lights Included When Applicable $66 n/a $66
f) Non‐Resident Fee (Except Memorial Park) (Additional) $55 n/a $55
S‐43 Golden Days Special Events [b]
31 2K/5K Run/Walk:
a) Youth
i) Pre‐Registration $5 4.60% $5
ii) Day Of The Event $15 4.60% $20
b) Adult
i) Pre‐Registration $15 4.60% $20
ii) Day of the Event $30 n/a $30
32 S‐44 Children's Day Camp (This program is not available):
a) Registration Fee (One‐Time) $0 4.60% $0
b) New $0 4.60% $0
c) New ‐ 2nd Child In Same Family $0 4.60% $0
d) Returning $0 4.60% $0
e) Returning ‐ 2nd Child In Same Family $0 4.60% $0
33 S‐44 Summer Day Camp:[b]
a) Registration Fee (One‐Time) $25 n/a $25
b) New (Per Day) $25 n/a $25
c) Returning ‐ 2nd Child Same Family $20 n/a $20
S‐47 Recreation Special Events [b]
34 Fall Festival Booth Rental Varies n/a Varies
35 Tournament Of Champions Finals At APU Events Center:
a) Adults $3 n/a $3
b) Student $2 n/a $2
c) Child (3‐11) $1 n/a $1
36 Volleyball Clinic $0 n/a $0 [a],[b]
37 Junior Olympic Track (Per School) $110 n/a $110
38 Spring Thing Food Vendor Varies n/a Varies
39 Winter Fiesta Food Vendor Varies n/a Varies
41 Spring Thing (Novelty And Craft Vendor Fees) Varies n/a Varies
42 Holiday Crafts (Vendors Fees) Varies n/a Varies
* Additional fees may apply for use of game officials. Amounts vary.
# = Fees not automatically adjusted for CPI change.
[a] Volleyball Clinic Handle By External Agencies
[b] Rates will be determined by market rate.
All Recreation Fees were rounded to the nearest dollar for administrative efficiency.
39
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
1 S‐48 Woman's Club Rental To Public :[a]
a) Weekdays Meetings ‐ 8 A.M. ‐ 5 P.M. (Add'l Hours $75 Each) $250 n/a $250
b) Friday Evening Event $300 n/a $300
c) Saturday Afternoon Event (Until 5P.M.) ‐ Replaced with d below $0 n/a $0
d) Saturday Event (Anytime) $800 n/a $800
e) Sunday Event (Anytime) $400 n/a $400
f) Event Liability Insurance Varies n/a Varies
g) Damage Deposit (Refundable). $500 n/a $500
h) Deposit to hold date (Non‐refundable) $350 n/a $350
i) Additional Time > 5 Hours (Per Hour, Split Between City And
Contractor)
$250 n/a $250
j) Teen Party (Anytime except Saturday ‐ Saturday Rate is $800): $700 n/a $700
k) Cleaning Fee $100 n/a $250
l) Decorating Fee Outside Normal Hours Of Operation (Per Hour) $15 n/a $60
2Woman's Club‐For Azusa Based Non‐Profit Organizations:
a) Building Rental (Per Hour Including Setup And Clean Up Time) $50 n/a $50
b) Kitchen (Flat Fee) $75 n/a $75
c) Damage Deposit (Refundable) $500 n/a $500
d) Staffing (Per Hour) $15 n/a $15
e) Cleaning Fee $100 n/a $100
f) Event Liability Insurance Varies n/a Varies
g) Alcohol Liability Insurance $0 n/a $0
3Gazebo At City Hall $500 n/a $500
4 S‐48.2 Senior Lunch Program (Suggested) Donation $2 n/a $2 #
5 Rental Of Memorial Park North Recreation Center:[a]
a) Small Class Rooms: (Per Hour)
i) Non‐Profit $30 n/a $30
ii) For Profit $50 n/a $50
b) Large Room: (Per Hour)
i) Non‐Profit $60 n/a $60
ii) For Profit $75 n/a $75
c) Kitchen: (Per Hour)
i) Non‐Profit $50 n/a $50
ii) For Profit $75 n/a $75
d) Staffing: (Per Hour)
i) Non‐Profit $30 n/a $30
ii) For Profit $30 n/a $30
e) Cleaning Fee (Maximum Fee) $225 n/a $225
f) Security Deposit: (Refundable Deposit) $300 n/a $300
g) Non‐Resident Fee (Flat Rate) (Additional) $100 n/a $100
h) Event Liability Insurance Varies n/a Varies
i) Decorating Fee Outside Normal Hours Of Operation (Per Hour) $15 n/a $15
6 S‐48.3 Rental Of Senior Center:[a]
a) Small Class Rooms: (Per Hour)
i) Non‐Profit $30 n/a $30
ii) For Profit $50 n/a $50
b) Large Room: (Per Hour)
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
RECREATION FACILITIES RENTAL‐INCLUDING WOMAN'S CLUB, SENIOR CENTER AND NORTH RECREATION CENTER (NRC), ETC.
40
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
RECREATION FACILITIES RENTAL‐INCLUDING WOMAN'S CLUB, SENIOR CENTER AND NORTH RECREATION CENTER (NRC), ETC.
i) Non‐Profit $50 n/a $50
ii) For Profit $90 n/a $90
c) Kitchen: (Flat Fee)
i) Non‐Profit $50 n/a $50
ii) For Profit $75 n/a $75
d) Staffing: (After Hours Only, Minimal Per Hour)
i) Non‐Profit $30 n/a $30
ii) For Profit $30 n/a $30
e) Cleaning Fee (Maximum)$225 n/a $225
f) Security Deposit: (Refundable Deposit)$300 n/a $300
g) Non‐Resident Fee (Flat Fee) (Additional)$100 n/a $100
h) Decorating Fee Outside Normal Hours Of Operation (Per Hour)$15 n/a $15
i) Event Liability Insurance Varies n/a Varies
j) Deposit to hold date (Non‐refundable) $200 n/a $200
Memorial Park Facilities Rental [a]
40 Memorial Park Facilities:
a) Meeting Room
i) Normal Hours $35 n/a $35
ii) Outside Normal Hours $45 n/a $45
iii) Non‐Resident Fee (Additional)$110 n/a $110
b) Gym or Main Room
i) Normal Hours $45 n/a $45
ii) Outside Normal Hours $70 n/a $70
iii) Non‐Resident Fee (Additional)$200 n/a $200
c) Kitchen
i) Resident $55 n/a $55
ii) Non‐Resident $55 n/a $55
d) Cleaning $55 n/a $55
e) Security Deposit $200 n/a $200
43 Bounce House Application Usage $25 n/a $25
44 Non‐Resident Fee (Additional)$60 n/a $60
Picnic Shelter Rental [a]
45 Picnic Shelter Application Rental (Gladstone Park):
a) Section # 1 $30 n/a $30
b) Section # 2 $30 n/a $30
c) Section # 3 $30 n/a $30
d) Non‐Resident Fee (Additional)$60 n/a $60
46 Picnic Shelter Application Rental (Memorial Park):
a) Single Shelter (Section # 2,3,4 & 5)$35 n/a $35
b) Double Shelter (Section # 1& 6)$45 n/a $45
c) Non‐Resident Fee (Additional)$60 n/a $60
47 Picnic Shelter Application Rental (Northside Park):
a) S‐Leg Section # 1 $30 n/a $30
b) S‐Leg Section # 2 $30 n/a $30
c) S‐Leg Section # 3 $30 n/a $30
41
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
RECREATION FACILITIES RENTAL‐INCLUDING WOMAN'S CLUB, SENIOR CENTER AND NORTH RECREATION CENTER (NRC), ETC.
d) S‐Leg Section # 4 $30 n/a $30
e) S‐Leg Section # 5 $45 n/a $45
$60 n/a $60
48
f) Non‐Resident Fee (Additional)
Picnic Shelter Application Rental (Pioneer Park):
a) NE Section # 1 $45 n/a $30
b) NE Section # 2 $30 n/a $30
c) NE Section # 3 Double Shelter $30 n/a $45
d) Gazebo Shelter #4 $60 n/a $60
e) Non‐Resident Fee (Additional)$60 n/a $60
49 Picnic Shelter Application Rental (Zacatecas Park):
a) NE Section # 1 Double Shelter $45 n/a $45
b) NW Section # 2 Double Shelter $30 n/a $45
c) SE Section # 3 $45 n/a $30
d) SW Section # 4 Double Shelter $30 n/a $45
e) NE Section # 5 $45 n/a $30
f) Non‐Resident Fee (Additional)$60 n/a $60
50 Picnic Shelter Application Rental (Slauson Park):
a) Section #1 $30 n/a $30
b) Section #2 $30 n/a $30
c) Section #3 $30 n/a $30
d) Section #4 $30 n/a $30
e) Non‐Resident Fee (Additional)$60 n/a $60
51 Picnic Shelter Application Rental (Veteran's Freedom Park):
a) Gazebo #1 $30 n/a $30
b) Gazebo #2 $30 n/a $30
c) Non‐Resident Fee (Additional)$60 n/a $60
52 Picnic Shelter Application Rental (Rancho Park):
a) Section #1 $30 n/a $30
b) Non‐Resident Fee (Additional)$60 n/a $60
53 Picnic Shelter Application Rental (Alisal Park):
a) Section #1 $45 n/a $45
b) Section #2 $45 n/a $45
c) Non‐Resident Fee (Additional)$60 n/a $60
# = Fees not automatically adjusted for CPI change.
[a] Rates will be determined by market rate.
All Woman's Club/Senior Center/N. Recreation Center Fees were rounded to the nearest dollar for administrative efficiency
42
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
Monthly Foothill Transit Passes *
1 Senior/Disabled:
#a) Regular Rate $30 n/a $30 [b]
#b) Discounted Rate $19 n/a $19 [b]
2 Student K‐12:
#a) Regular Rate $40 n/a $40 [b]
#b) Discounted Rate $27.75 n/a $27.75 [b]
3Local Lines:
#a) Regular Rate $60 n/a $60 [b]
#b) Discounted Rate $56 n/a $56 [b]
4 Silver Streak:
#a) Regular Rate $110 n/a $110 [b]
#b) Discounted Rate $85 n/a $85 [b]
5 Commuter Express:
#a) Regular Rate $180 n/a $180 [b]
#b) Discounted Rate $150 n/a $150 [b]
Dial‐A‐Ride Transit (one‐way)
6Medical and Social Services:
#a) Azusa, Covina, Duarte, Glendora, Irwindale $0.50 n/a $0.50
#b) Baldwin Park, Monrovia, San Dimas, West Covina $1.50 n/a $1.50
7#Non‐Medical Appointments Limited to City Limits $0.50 n/a $0.50
8#Senior Lunch Program $0.25 n/a $0.25
Metrolink Monthly Passes *
9#City residents save $25 on monthly pass Variable n/a Variable [a], [c]
10 # Employees of Azusa Businesses receive $15 or a match of the amount
offered by employer up to a limit of $25
Variable n/a Variable [a], [c]
Access *
11 # Base Books (10 Coupons Per Book)$27.50 n/a $27.50 [d]
12 # Plus Books (10 Coupons Per Book)$7.50 n/a $7.50 [d]
* Discounted Passes Are Available To Eligible Users And On A First Come‐First Serve Basis.
[a] Varies Depending On Point Of Origin And Destination.
[b] Rates set by Foothill Transit
[c] Rates set by Metrolink
[d] Rates set by Access Services
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
TRANSPORTATION
43
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
1 S‐097 Inter‐Library Loan Processing:
#a) Processing Fee $2 n/a $2
b) Plus Postage Actual Cost n/a Actual Cost
2 S‐099 #Lost Library Card Processing $3 n/a $3
3 S‐100 Processing Overdue Material:
#a) Per Item Per Day ‐ Adult $0.30 n/a $0.00
#b) Per Item Per Day ‐ Child $0.15 n/a $0.00
4 S‐101 Lost/Damage Library Material Processing:
#a) Processing Fee (plus the cost of the item)$15 n/a $15
#b) Missing AV Case (Audio Book, DVD, & CD)$1 n/a $1
#c) Missing Bar Code $1 n/a $1
#d) Missing Pamphlet‐ AV Materials & Books $1 n/a $1
5 S‐102 # Passport Application (Rate Set by Fed. Govt.)$35 n/a $35
6 S‐103 #DVD Rental Per Item (For Two Days)$0 n/a $0
7 S‐104 Rental Of Library Auditorium:
a) For Profit
#i) During Business Hours ‐ Per Hour (Min. 3 Hours)$25 n/a $25
# ii) Outside Business Hours ‐ Per Hour (Min. 3 Hours‐Based on Actual‐Lib
Assist III)
$100/Hr n/a $100/Hr
b) Non‐Profit Organizations ‐ Outside Azusa
#i) During Business Hours ‐ Per Hour (Min. 3 Hours)$15 n/a $15
# ii) Outside Business Hours Per Hour (Min. 3 Hours)$100/Hr n/a $100/Hr
#c) Resident Non‐Profit & Government (Minimum 3 Hours)No Charge n/a No Charge
8 S‐104B Library Fax Service:
#a) Domestic ‐ First Page (Each Additional Page $1)$2 n/a $2
#b) International ‐ First Page $6 n/a $6
#c) International ‐ Additional Page $2 n/a $2
9#Library Cards No Charge n/a No Charge
10 Personal Computer Usage:
#a) First 2 Hours No Charge n/a No Charge
#b) Excess Of 2 Hours $2 n/a $1
#c) Guest Pass (Non Library Cardholders)$2 n/a $1
11 S‐53 Photocopy Charges Per Page:
#a) Black & White Copies $0.15 n/a $0.15
#b) Color Copies $0.25 n/a $0.25
12 S‐54 Merchandise Sales:
#a) USB Drives Variable n/a Variable
#b) Canvas Bags Variable n/a Variable
#c) Ear Buds Variable n/a Variable
# = Fees not automatically adjusted for CPI change.
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
LIBRARY
44
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
S‐16.1 Paper Map Products
1City Map Books $15 4.60% $16
2A Size Plot; 8.5 X 11 $15 4.60% $16
3A Size Plot: 8.5 X 11 With Photo $23 4.60% $24
4B Size Plot: 11 X 17 $15 4.60% $16
5B Size Plot: 11 X 17 With Photo $24 4.60% $25
6C Size Plot: 17 X 22 $37 4.60% $39
7C Size Plot: 17 X 22 With Photo $51 4.60% $53
8D Size Plot: 34 X 22 $72 4.60% $76
9D Size Plot: 34 X 22 With Photo $96 4.60% $100
10 E Size Plot: 34 X 46 $116 4.60% $121
11 E Size Plot: 34 X 46 With Photo $190 4.60% $199
12 Zoning Citywide Book (11 X 17 Sheets) $72 4.60% $76
13 City General Plan Land Use Or Zoning Map (3 X 5 Ft.) $37 4.60% $39
14 City General Plan Land Use Or Zoning Map (6 X 6 Ft.) $72 4.60% $76
15 Hourly Charge For Custom Mapping Work $107 4.60% $112
16 # Public Notice Radius Maps And Labels $240 n/a $240
# = Fees not automatically adjusted for CPI change.
City of Azusa
Schedule of Fees and Charges (Municipal Activities and Services)
GIS MAPS
45
Adopted Adopted
Svc Area 1/19/2021 CPI 1/18/2022
No. Item # Description Fee/Unit Sept'20‐'21 Fee/Unit Notes
1Credit Card Processing Fee 2% n/a 2% [a]
2 S‐144 Returned Check Processing ‐ 1st and 2nd Check
#a) First Check $35 n/a $35 [b]
#b) Each Additional Check $25 n/a $25 [b]
3 S‐145 #Re‐Issuance Of Lost Checks $65 n/a $65
4 S‐146 Document Reproduction:
#a) Document <4 Pages In Length $0 n/a $0
#b) First Sheet (>4 Page Document) $0.65 n/a $0.65
#c) Each Additional Sheet (>4 Page Document) $0.20 n/a $0.20
#d) Per Sheet Charge for Certain Documents Specified in Gov't Code $0.10 n/a $0.10 [b]
5 S‐146.1 #Documents Reproduced on staff time and costs of CD/DVD/USB Flash Drive $10 n/a $10
6#Document Certification $15 n/a $15
7 S‐149 # Candidate Processing $25 n/a $25 [b]
8 S‐149A #Initiative Processing $200 n/a $200 [b]
9 S‐150 #Notary Service For Each Signature Taken $15 n/a $15 [b]
10 S‐150A Project Specifications And Plans:
#a) Base Fee $50 n/a $50
#b) Additional Mailing Fee (If Mailed) $10 n/a $10
11 S‐88.1 # Processing Of Payroll Garnishments Per Transactions $0 n/a $0 [c]
12 S‐93 Records Research Service:
#a) Document And Supplies Actual Cost n/a Actual Cost [d]
b) Per Hour Fee (1/4 Hour Increments) $0 4.60% $0
13 S‐94 Bond Issuance And Administration ‐ (Includes Extra $50 Per Hour) $444 4.60% $465
14 S‐48.1 Rental Of Civic Center Auditorium:
#a) During City's Normal Business Hours Until 4:00pm (Per Hour) $50/Hour n/a $50/Hour
#b) After 4:00pm, Weekends Or Holidays (Per Hour) $100/Hour n/a $100/Hour
#c) Non‐Resident Groups ‐ Additional Fee Per Event $100/Hour n/a $100/Hour
#d) Discount For Azusa‐Based Non‐Profit Organizations 25% n/a 25%
#e) A/V Technician Services ($60 Per Hour or Current Cost‐After 4pm,
Weekends)
$60/Hour or
Current Costs
n/a $60/Hour or
Current Costs
#f) Custodial Services $40/Hour or
Current Costs
n/a $40/Hour or
Current Costs
15 S‐48.2 Deposition Subpoena
#Personal Appearance $275 n/a $275 [e]
# Production of Documents/Records $15 n/a $15 [d]
16 S48.3 Military Banner Application Fees $130 4.60% $136
[b] Fees Set By State.
[c] Fees set by court order.
[d] Government Code Section 6253.9 (b)
[e] Government Code Section 68096.1
# = Fees not automatically adjusted for CPI change.
[a] Fee applies to all payments made directly to the City, via credit card. (Example scenario ‐ For $100 fee, paid via credit card, the total amount charged will
be $102 (2% of $100).
Schedule of Fees and Charges (Municipal Activities and Services)
City of Azusa
ADMINISTRATIVE PROCESSING COSTS
46
-1-
Attachment 2
RESOLUTION NO. 2022-C01
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AZUSA, CALIFORNIA, APPROVING AND ADOPTING A
REVISED SCHEDULE OF FEES AND CHARGES FOR VARIOUS
MUNICIPAL ACTIVITIES AND SERVICES
WHEREAS, under the police power granted by Article XI, Section 7 of the California
Constitution, the City of Azusa is authorized to impose reasonable service fees for a variety
municipal benefits and services; and
WHEREAS, the City Council of the City of Azusa previously determined that the
users of these services should be charged fees to recover the City's expenses for providing
these services; and
WHEREAS, the City Council previously adopted Resolution No. 2021-C01, which
established fees for various municipal activities and services; and
WHEREAS, the City Council has determined that in order to continue providing
effective services for the public welfare, it is necessary to adopt a revised Schedule of Fees
and Charges which sets forth fees for City services; and
WHEREAS, based upon evidence provided, the City Council hereby determines that
the proposed fees cover, but do not exceed, the reasonable cost of providing the services for
which the fee is charged; and
WHEREAS, the City Council has determined that the proposed Schedule of Fees
and Charges is statutorily and categorically exempt from the requirements of the California
Environmental Quality Act since citing these fees fit within the statutory exemptions for local
agency decisions involving the adoption and collection of rates, tolls and other charges,
pursuant to Public Resources Code Section 21080(b)(8) and Section 15273 of the California
Environmental Quality Act Guidelines.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Azusa,
California does hereby find, determine and declare as follows:
SECTION 1. A doption of Schedule of Fees and Ch arges. The City Council
approves and adopts the Schedule of Fees and Charges (the "Schedule"), which is attached
hereto as Exhibit "C" and incorporated herein by reference. The adopted fee schedule shall
supersede any fees and charge schedule previously adopted.
SECTION 2. Findings. The City Council finds that the fees and charges set forth in
the Schedule attached as Exhibit "A": (1) have a reasonable relationship with the City's costs
in providing and maintaining those services and facilities; and (2) are necessary to enable the
City to continue providing and maintaining the services and facilities to which they relate.
SECTION 3. Repeal of Prior Resol ution . Resolution No. 2021-C01 is hereby repealed in its
entirety.
-2-
Attachment 2
SECTION 4. Effective Date. This Resolution shall become effective upon its adoption.
PASSED, APPROVED and ADOPTED this 18th day of January, 2022.
________________________________________
Robert Gonzales
Mayor
____________________________________
Jeffrey Lawrence Cornejo, Jr.
City Clerk
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF AZUSA )
ATTEST:
I HEREBY CERTIFY that the foregoing Resolution No. 2022-C01 was duly adopted by
the City Council of the City of Azusa at a regular meeting thereof on the 18th day of January
2022, by the following vote of City Council Members .
AYES: COUNCILMEMBERS: TBD
NOES: COUNCILMEMBERS: TBD
ABSTAIN: COUNCILMEMBERS: TBD
ABSENT: COUNCILMEMBERS: TBD
___________________________________
Jeffrey Lawrence Cornejo, Jr.
City Clerk
APPROVED AS TO FORM:
___________________________________
Marco Martinez
City Attorney Best Best & Krieger, LLP
Attachment 3
RESOLUTION NO. 2022-C02
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AZUSA, CALIFORNIA, APPROVING AND ADOPTING A REVISED
SCHEDULE FOR CERTAIN DEVELOPMENT PROJECT FEES AND
SERVICE CHARGES
WHEREAS, under the police power granted by Article XI, Section 7 of the California
Constitution, the City of Azusa is authorized to impose fees, charges and rates for certain
municipal services; and
WHEREAS, in addition to the authority granted by the California Constitution, Chapter
8 (commencing with section 66016) of Division 1 of Title 7 of the California Government Code
establishes a procedure for adopting fees or service charges for development projects; and
WHEREAS, pursuant to Resolution No. 2021-C02, adopted on January 19, 2021, the
City currently imposes development related fees upon applicants to recover the costs of staff
time, inspection, copying costs and other expenses related to the review and processing of
applications for property development; and
WHEREAS, many of the City's current fees charged for development services no longer
reflect the actual cost of providing such services; and
WHEREAS, Government Code sections 66016 and 66018 provide that the City may
adopt new development fees or increase existing fees after providing notice and holding a public
hearing; and
WHEREAS, notice of a public hearing on the establishment of new and revised fees was
published in accordance with provisions of section 6062a of the California Government Code;
and
WHEREAS, notice of public hearing was mailed to all interested parties who filed
a written request for a mailed notice with the City, or a waiver of notice was obtained; and
WHEREAS, on January 18th, 2022, at the time and place specified in the published
and mailed notices, the City Council held a public hearing as required by law to allow oral or
written presentations prior to levying new development fees or service charges and prior to
approving an increase in existing development fees or service charges; and
WHEREAS, at least ten (10) days prior to the commencement of the hearing, there was
made available to the public a report containing the cost, or estimated cost, of providing the
service for which the fee or service charge will be levied, and the revenue sources for providing
such services; and
WHEREAS, based upon evidence provided, the City Council hereby determines that the
development services fees set forth in the Schedule of Fees and Charges attached hereto and
Attachment 3
incorporated herein by reference will not exceed the estimated reasonable cost of providing the
property development services for which the fee is charged; and
WHEREAS, the proposed fees are statutorily and categorically exempt from the
requirements of the California Environmental Quality Act since these fees fit within the statutory
exemptions for local agency decisions involving the adoption and collection of rates, tolls and
other charges, pursuant to Public Resources Code Section 21 080(b) (8) and Section 15273 of the
California Environmental Quality Act Guidelines.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Azusa,
California does hereby find, determine and declare as follows:
SECTION 1. Adoption of Schedule of Fees. The City Council hereby approves and
adopts the Schedule of Fees and Charges attached hereto as Exhibit "C" and incorporated herein
by reference. The adopted fee schedule shall supersede any fees and charge schedule
previously adopted.
SECTION 2. Repeal of Prior Resolution. Resolution No. 2021-C02 is hereby repealed in
its entirety.
SECTION 3. Findings. The City Council finds that the fees and charges set forth in the
Schedule attached as Exhibit "A": (1) have a reasonable relationship with the City's costs in
providing those services; and (2) are necessary to enable the City to continue providing the
services to which they relate.
SECTION 4. Effective Date. This Resolution shall become effective sixty (60) days from
its adoption.
PASSED, APPROVED and ADOPTED this 18th day of January, 2022.
________________________________________
Robert Gonzales
Mayor
ATTEST:
___________________________________
Jeffrey Lawrence Cornejo, Jr.
City Clerk
Attachment 3
I HEREBY CERTIFY that the foregoing Resolution No. 2022-C02 was duly adopted by the City
Council of the City of Azusa, at a regular meeting of said City Council held on the 18th day of January
2022, by the following vote of the Council:
AYES: COUNCILMEMBERS: TBD
NOES: COUNCILMEMBERS: TBD
ABSTAIN: COUNCILMEMBERS: TBD
ABSENT: COUNCILMEMBERS: TBD
___________________________________
Jeffrey Lawrence Cornejo, Jr.
City Clerk
APPROVED AS TO FORM:
___________________________________
Marco Martinez
City Attorney Best Best & Krieger, LLP
ATTACHMENT 4
Description Reason For Establishing Fees
1)
2)
3)
4)
5)
6) $250
Section 2 ‐ S106 f ‐ Door tag fee (Utilities
Department)
Fee to cover the expense of manually delivering
24 hour disconnection notice.
Section 45 S‐131M Plan Check Fee
a) Residential and ADU Per Dwelling Unit
(Utilities Department)
Recovers cost of Engineer time spent.
Section 45 S‐131M Plan Check Fee
b) Commercial and Industrial (Utilities
Department)
Recovers cost of Engineer time spent.
Section 50 ‐ S‐8.4 ‐ Potholing‐Per
Location (Engineering Division)
Potholing refers to identifying utilities lines that
are underground to gather information that can
include the following: material, depth, and
horizontal and vertical. Typically, potholes
range from 6" to 12" in diameter, and 4' to 6'
deep. Usually, the inspection for these holes to
ensure the road has been restored to Azusa's
City Standard R12‐1 takes one hour. As a result,
the proposed increase will recuperate
Engineering Division's actual time spent to
review and approve the street restoration.
$168
$250
$250
Table 1 ‐ Summary of Proposed New Fees
Section 26.1 ‐ Emergency Sewage Spill
Response (Engineering Division)
An Emergency Sewage Spill can occur when any
of the following takes place: overflowing of a
septic tank, tree roots invading and blocking
underground sewer lines, misaligned sewage
pipes that cause buildup over time, or
blockages within the interior sewer systems
caused by improper materials flushed into the
sewer system. In extreme cases the sewage spill
can overflow from the City's sewer mainlines
into public right‐of‐way where clean‐up efforts
are to be provided to clean, and dispose of all
raw hazardous sewage material. Emergency
Sewage Spills can vary in the size of the
contaminated area, and volume discharged.
Therefore, the fee proposed is actual staff time
spent to recuperate the time spent by the
Public Works Department.
Section 49 ‐ S‐8.3 ‐ Sewer Area Study
(Engineering Division)
The purpose of a Sewer Area Study is to
determine the amount of sewage flow
generated by new developments. It ensures
that the City's exiting sewer infrastructure has
capacity to convey the sewer flows from new
developments. The proposed increase will
recuperate Engineering Division's actual time
spent to review and approve the Sewer Area
Study. Moreover, the proposed fee will be
closer to the fee other adjacent agencies
(Glendora, Irwindale, Baldwin Park) charge for
the same service.
Actual Staff Time (minimum $504)
$656 or Actual Staff Time
Fee
ATTACHMENT 4
Description Current Fee Proposed Fee Reason For Increase
1)$335 $656
2)$200 $250
3)$250 $300
4)$1,000 $1,250
5)$1,150 $1,500
6)$300 $345
7)$300 $345
8)$350 $400
9)$400 $465
10)$450 $520
11)$450 $520
12)$525 $605
13)$1,500 $2,000
14)$1,500 $2,000
15)$1,500 $2,000
Section 16 S‐131F ‐ Fire Hydrant
Relocation / Inspection Fee (Utilities
Dept)
Cost recovery of labor and inspection costs‐
Increased costs has outpaced inflation.
Section 17 S‐131G ‐ c) Damage to Water
Main Impact Fee (Utilities Dept)
Cover costs related to impact to the water main.
Section 17 S‐131G ‐ e) Damage to Water
Facilities Impact Fee (Utilities Dept)
Cover costs related to impact to the water main.
Section 10 S‐131D: b) Water Meter Fee 1
" ‐ (Utilities Dept)
To recover the actual cost of meter which has
gone up in price. The supplier increased the
price of the meter, and this is a pass through
costs.
Section 10 S‐131D: c) Water Meter Fee
1.5 " ‐ (Utilities Dept)
To recover the actual cost of meter which has
gone up in price. The supplier increased the
price of the meter, and this is a pass through
costs.
Section 10 S‐131D: d) Water Meter Fee 2
" ‐ (Utilities Dept)
To recover the actual cost of meter which has
gone up in price. The supplier increased the
price of the meter, and this is a pass through
costs.
Section 13 S‐131H‐ Hot Tab Fee: f 10"‐
(Utility Dept)
Section 13 S‐131H‐ Hot Tab Fee: g 12"‐
(Utility Dept)
To cover actual labor costs.
To cover actual labor costs.
To cover actual labor costs.
Section 13 S‐131H‐ Hot Tab Fee: a 1" ‐
(Utility Dept)
Section 13 S‐131H‐ Hot Tab Fee: b 2"‐
(Utility Dept)
Section 13 S‐131H‐ Hot Tab Fee: c 4"‐
(Utility Dept)
Section 13 S‐131H‐ Hot Tab Fee: d 6"‐
(Utility Dept)
Section 13 S‐131H‐ Hot Tab Fee: e 8"‐
(Utility Dept)
To cover actual labor costs.
To cover actual labor costs.
To cover actual labor costs.
To cover actual labor costs.
Section 10 S‐131D: a) Water Meter Fee
3/4 " ‐ (Utilities Dept)
To recover the actual cost of meter which has
gone up in price. The supplier increased the
price of the meter, and this is a pass through
costs.
Table 2 ‐ Summary of Proposed Fees to Increase more than 4.6% CPI
Section 15 S‐056C ‐ Soil Review
(Engineering Division)
The Soil Report takes approximately 3‐4 hours
of review, and sometimes requires multiple
review cycles. As a result, the proposed increase
will recuperate Engineering Division's actual
time spent to review and approve the Soil
Report. Moreover, the proposed fee will be
closer to the fee other adjacent agencies
(Glendora, Irwindale, Baldwin Park) charge for
the same service.
Description Current Fee Proposed Fee Reason For Increase
Table 2 ‐ Summary of Proposed Fees to Increase more than 4.6% CPI
16) $224 $250
17) $35 $40
18) $100 $250
19) $15 $20
20) $15 $20
21) $100 $250
22) $15 $60
Section 1‐ S‐48 Woman's Club Rental To
Public
k) Cleaning Fee (Community Resources
Dept)
Recover actual cost of services.
Section 20‐ S‐116A Water Plan Check
(Utilities Dept)
Cost recovery of labor and inspection costs‐
Increased costs has outpaced inflation.
Section 31‐ S‐43 Golden Day Special
Events
a) Youth
ii Day of the Event (Community Resources
Dept)
Decrease cash handling and improve operation
efficiency.
Section 31‐ S‐43 Golden Day Special
Events
b) Adult
i‐Preregistration (Community Resources
Dept)
Decrease cash handling and improve operation
efficiency.
Section 22‐ S‐116C Will Serve Letter
(Utilities Dept)
Higher than CPI‐Fee for time, material, and
postage.
Section 43‐ S‐131K Electrical Engineering
(Utilities Dept)
Cost recovery of engineering time.
Section 1‐ S‐48 Woman's Club Rental To
Public
l) Decorating Fee Outside Normal Hours
Of Operation (Per Hour) ‐ (Community
Resources Dept)
Recover actual cost of services.
ATTACHMENT 4
Description Current Fee Proposed Fee To Delete Reason For Deleting Fee
1) $12 $12
2) $65 $65
3) $50 $50
Section S‐33 2a Swimming Team:
a) First Child (Same Family)
ii) Additional Child (Same Family)
(Recreation Div)
Ease of cash handling and operation efficiency.
Table 3 ‐ Summary of Proposed Fees to Delete
Section 5 S‐95.1 ‐ Recovery and Storage
of Abandoned Shopping Cart (Community
Improvement Division)
The City no longer recovers or stores shopping
carts.
Section S‐33 2b Swimming Team
(Recreation Div):
b) 2nd Session
ii) Additional Child (Same Family)
(Recreation Div)
Ease of cash handling and operation efficiency.
County of Los Angeles Fire Department Fire Prevention Fees
Engineering Fees Attachment 5
Fee Type Fee Amount
Assembly Occupancy 613.00$
Commercial (B, F, S, M)675.00$
Dwelling, 1 & 2 Family 491.00$
Educational/Institutional Occupancy 920.00$
Hazardous Materials Review (1-50 chemicals)675.00$
Hazardous Materials Review (51-100 chemicals)1,104.00$
Hazardous Occupancy 797.00$
High Piled Combustible Storage 491.00$
Multi-Family Residence 675.00$
Site Plan Review - Water and Access 491.00$
Fee Type Fee Amount
Emergency Responder Radio Coverage 982.00$
Fire Alarm System: > 131 devices 859.00$
Fire Alarm System: 11-50 devices 429.00$
Fire Alarm System: 51-90 devices 613.00$
Fire Alarm System: 91-130 devices 736.00$
Fire Sprinkler Monitoring system & Fire Alarm System with
<10 devices 245.00$
Special Extinguishing Systems: CO2, FM 200, Foam Liquid Systems,Inert Gas (Halon, Inergen)368.00$
Fee Type Fee Amount
Fire Flow Test Witness/Perform 245.00$
Fire Pump Installation 613.00$
New NFPA 13 fire sprinkler system:< 100 heads per system 491.00$
New NFPA 13 fire sprinkler system:> 100 heads per system 736.00$
New NFPA 13D fire sprinkler system: one or two family dwelling 491.00$
New NFPA 13R fire sprinkler system: Multifamily family dwellings 613.00$
NFPA #22 fire water storage tank 491.00$
Special hazard fire extinguishing foam water spray nozzle system 491.00$
Standpipe System (Class I,II, & III)463.00$
TI to NFPA 13 fire sprinkler system:< 25 heads without calculation 245.00$
TI to NFPA 13 fire sprinkler system:> 25 heads and < 100 heads with/without calculation 368.00$
TI to NFPA 13 fire sprinkler system:>100 heads with/without calculation 613.00$
Underground fire protection system: 5 or more additional connections for hydrants or risers 491.00$
Underground fire protection system: single hydrant or single riser connection 307.00$
Fee Type Fee Amount
Additional plan review after initial review and one resubmmittal (per hour)123.00$
Alternative Materials and Methods Review 480.00$
Expedited review (each 2- hours + initial fee)245.00$
Plan review time (per hour) for modifications, re-stamp (minimum 1-hour)123.00$
Pre-Submittal Meeting (initial 2-hours)245.00$
Building Plan Review Plan Check
Fire Alarm System Plan Check
Fire Sprinkler Plan Check
Miscellaneous Building Plan Review
https://fire.lacounty.gov/fire-prevention-fees/1
Field Permit Fees
Fee Type Fee Amount
Activities in Hazardous Fire Areas 332.00$
Aerosol Products 332.00$
Amusement Buildings 332.00$
Automobile Wrecking Yard 332.00$
Aviation Facility 332.00$
Battery Systems Stationary 332.00$
Bonfires or Rubbish Fires 332.00$
Carbon Dioxide Systems used in Beverage Dispensing Applications 332.00$
Carbon Dioxide Enrichment Systems 332.00$
Carnival & Fair Requirements 332.00$
Combustible Dust Producing Operations 332.00$
Combustible Fibers 332.00$
Commercial Rubbish Handling Operation 332.00$
Covered Mall Buildings 332.00$
Cryogens Fluids 332.00$
Cutting and Welding Permit 332.00$
Dipping Operations 332.00$
Dry Cleaning Plants 332.00$
Emergency Helicopter Landing Facility for High Rise Buildings 332.00$
Exhibits and Trade Shows 332.00$
Fire Hydrants and Valves 332.00$
Fireworks Display 332.00$
Floor Finishing 332.00$
Fruit and Crop Ripening 332.00$
Fumigation/Thermal Insecticidal Fogging 332.00$
Hazardous Materials 332.00$
Hazardous Production Materials 332.00$
High Piled Combustible Storage 332.00$
Hot Work Operations 332.00$
HPM Facilities 332.00$
Industrial Ovens 332.00$
Liquid Gas-Fueled Vehicles or Equipment 332.00$
Lumber Yard and Woodworking 332.00$
Magnesium 332.00$
Miscellaneous Combustible Storage 332.00$
Model Rockets 332.00$
Motor Fuel-Dispensing Facilities 332.00$
Open Burning 332.00$
Open Flames and Candles 332.00$
Open Flames and Torches 332.00$
Organic Coating 332.00$
Pallet Yards 332.00$
Parade Float 332.00$
Places of Assembly 332.00$
https://fire.lacounty.gov/fire-prevention-fees/2
Field Permit Fees
Fee Type Fee Amount
Plant Extraction Systems 332.00$
Private Fire Fighting Resources 332.00$
Private Fire Hydrants 332.00$
Pyrotechnic Special Effects Materials 332.00$
Pyroxylin Plastics 332.00$
Radioactive Materials 332.00$
Recreational Fires 332.00$
Refrigeration Equipment 332.00$
Repair Garage/Automotive/Marine/Fleet Fuel Dispensing 332.00$
Rifle Range 332.00$
Special Events 332.00$
Spraying or Dipping 332.00$
Storage of Scrap Tires and by-Products 332.00$
Tank Removal 332.00$
Tank/Cistems 332.00$
Temporary Sales Lots 332.00$
Temporary Tents, Canopies, Membrane Structures 332.00$
Tire Rebuilding Plants 332.00$
Tire Storage 332.00$
Waste Handling 332.00$
Wood Products 332.00$
https://fire.lacounty.gov/fire-prevention-fees/3
Film Unit Fees
Fee Type Fee Amount
Film 282.00$
Fuel Truck 208.00$
Special Effects 288.00$
Still Photos 277.00$
https://fire.lacounty.gov/fire-prevention-fees/4
Forestry Fees
Fee Type Fee Amount
Barns, garages, accessory structures 613.00$
New Residential Structure greater than or equal to 2,500 sq. ft. in total area, within currently
developing tracts of 25 or more lots.725.00$
New residential, commercial, or industrial structures greater than or equal to 2,500 sq. ft. in total area,
or additions/modifications to existing residential, commercial or industrial structures which increase the
square footage of the structure by 50 percent or more and which addition/modification does not exceed
2,500 sq. ft. in total area.
832.00$
New residential, commercial, or industrial structures less than 2,500 sq. ft. in total area, or
additions/modifications to existing residential, commercial or industrial structures which increase the
square footage of the structure by 50 percent or more and which addition/modification does not exceed
2,500 sq. ft. in total area.
711.00$
Parcel maps / lot splits of 4 or fewer parcels 141.00$
Tract maps - preliminary plan approval 980.00$
Tract maps - final plan approval (Includes lots 5-20)1,064.00$
Each additional 10 lots over 20 651.00$
Fee Type Fee Amount
001-015 775.00$
016-050 861.00$
051-100 1,551.00$
101-200 2,412.00$
201-400 4,135.00$
401-999 6,892.00$
Plan Review and Inspection Oak Trees
Fuel Modification Plan Check
https://fire.lacounty.gov/fire-prevention-fees/5
High Rise Fees
Fee Type Fee Amount
High Rise Buildings over 75 Feet in Height 1,472.00$
Fee Type Fee Amount
High Rise Buildings over 75 Feet in Height 665.00$
Building Plan Review Plan Check
Construction Field Inspection
https://fire.lacounty.gov/fire-prevention-fees/6
Land Development Unit Fees
Fee Type Fee Amount
Clean Hands Waiver 262.00$
Conditional Use Permit 384.00$
Conditional Use Permit - Revised 225.00$
Fire Hydrant Approval (Includes first 10 hydrants)262.00$
Each additional hydrant over 10 43.00$
Grading Plan Review - Fire Lanes and Private Driveways 507.00$
Grant of Waiver 286.00$
Lot Line Adjustments 262.00$
Mobile Home Park 384.00$
One Stop Meeting 153.00$
Revised Exhibit A 262.00$
Site Plan Review 139.00$
Street Vacation 262.00$
Tentative Parcel Map - Amendment 384.00$
Tentative Parcel Map - Initial (3 Reviews)1,120.00$
Tentative Parcel Map - Revised 630.00$
Tenative Parcel Map Revisions or Re-submit 323.00$
Tentative Tract Map - Amendment 594.00$
Tentative Tract Map - Initial (3 Reviews)2,593.00$
Each additional lot between 11-50 20.00$
Each additional lot between 51-100 15.00$
Each additional lot between 101-1000 11.00$
Each additional lot 1,001 or greater 6.00$
Tentative Tract Map - Revised 1,243.00$
Tentative Tract Map Revision or Re-submittal 384.00$
Water Appeals Board 139.00$
Water Plans and Systems Review for Compliance 262.00$
Zone Change 262.00$
Fee Type Fee Amount
01-04 Parcels 630.00$
05-10 Parcels 691.00$
11-50 Parcels 936.00$
51 or more Parcels 1,120.00$
Fourth and Subsequent Submittals 200.00$
Verification of Condition - Parcel 262.00$
Fee Type Fee Amount
01-05 Lots 630.00$
06-10 Lots 691.00$
11-25 Lots 814.00$
26-50 Lots 936.00$
51 or more Lots 1,120.00$
Fourth and Subsequent Submittals 200.00$
Verification of Condition - Tract 262.00$
Plan Review - per map or as noted
Parcel Map (Final Map) per submittal
Tract Map (Final Map) per submittal
https://fire.lacounty.gov/fire-prevention-fees/7
Petro Chem Fees
Fee Type Fee Amount
Cellulose Nitrate Film 332.00$
Compressed Gases 332.00$
Explosives 332.00$
Flammable or Combustible Liquids 332.00$
LP Gas 332.00$
Oil Natural Gas Wells 332.00$
Field Permits
https://fire.lacounty.gov/fire-prevention-fees/8
Regional Service Fees
Fee Type Fee Amount
Assembly Occupancy 498.00$
Commercial (B, F, S, M)498.00$
Dwelling, 1 & 2 Family 332.00$
Educational/Institutional Occupancy 332.00$
Hazardous Occupancy 415.00$
High Piled Combustible Storage 997.00$
Multi-Family Residence 332.00$
Repair Garage 415.00$
Tank Installation or Removal 415.00$
Tenant Improvements Projects 332.00$
Fee Type Fee Amount
Emergency Responder Radio Coverage 1,328.00$
Fire Alarm System: 11-50 devices 497.00$
Fire Alarm System: 51-90 devices 580.00$
Fire Alarm System: 91-130 devices 664.00$
Fire Sprinkler Monitoring system & Fire Alarm System with
<10 devices 331.00$
Halon System/FM 200 331.00$
UL-300 System (Hood Systems)331.00$
Fee Type Fee Amount
New NFPA 13 fire sprinkler system:< 100 heads per system 665.00$
New NFPA 13 fire sprinkler system:> 100 heads per system 831.00$
New NFPA 13D fire sprinkler system: one or two family dwelling 332.00$
New NFPA 13R fire sprinkler system: Multifamily family dwellings 665.00$
TI to NFPA 13 fire sprinkler system:< 25 heads without calculation 332.00$
TI to NFPA 13 fire sprinkler system:> 25 heads and < 100 heads with/without calculation 498.00$
TI to NFPA 13 fire sprinkler system:>100 heads with/without calculation 581.00$
Underground fire protection system: 5 or more additional connections for hydrants or risers 665.00$
Underground fire protection system: single hydrant or single riser connection 332.00$
Construction Field Inspection
Fire Alarm System Field Inspection
Fire Sprinkler System Field Inspection
https://fire.lacounty.gov/fire-prevention-fees/9
EMERGENCY MEDICAL SERVICES AGENCY
LOS ANGELES COUNTY
Los Angeles County
Board of Supervisors
Hilda L. Solis First District
Holly J. Mitchell Second District
Sheila Kuehl Third District
Janice Hahn Fourlh Districl
Kathryn Barger F'fthDistrict
Cathy Chidester Director
Marianne Gausche-Hill, MD Medical Director
10100 Pioneer Blvd, Suite 200 Santa Fe Springs, CA 90670
,Tel: (562) 378-1500 Fax: (562) 941-5835
•ro advance the health of our
communities by ensuring
quality emergency and
disaster medical facility
services.".
April 9, 2021
TO: Fire Chief, All 9-1-1 Paramedic Provider Agencies
CEO, Private Provider Agencies
City Manager, Each Los Angeles County City
FROM: Cathy Chideste&
Director
SUBJECT: GENERAL PUBLIC AMBULANCE RA TES
JULY 1, 2021 THROUGH JUNE 30, 2022
Attached are the maximum allowable rates chargeable to the general public
for ambulance transportation as of July 1, 2021, as per section 7.16.340,
Modification of Rates, of the County Ordinance (attachment I).
Transportation services provided on or after July 1, 2021 may not be billed
above the allowable maximum rates per the attached rate schedule.
If you have any questions, please contact John Telmos, Chief Prehospital
Operations at (562) 378-1677.
CC:jt
04-14
Attachment
c: Brian Chu, Deputy County Counsel, Health Services
Julio Alvarado, Director, Contracts and Grants
Enrique Sandoval, Contract Manager, Contracts and Grants
Cristina Talamantes, Ordinance liaison, Board of Supervisors
Executive Office
ATTACHMENT 6
COUNTY OF LOS ANGELES
GENERAL PUBLIC AMBULANCE RATES
EFFECTIVE JULY 1, 2021
Section 7.16.280 Rate Schedule For Ambulances
ATTACHMENT 6
A A ground ambulance operator shall charge no more than the following rates for one patient:
Rates Effective July 1, 2021
1.Response to a non-emergency call with equipment and personnel at
an advanced life support (ALS) level
2.Response to an emergency 9-1-1 call with equipment and personnel at
an advanced life support (ALS) level
3.Response to a nonemergency call with equipment and personnel at a
basic life support (BLS) level
4.Response to an emergency 9-1-1 call with equipment and personnel at
a basic life support (BLS) level
5.Mileage rate. Each mile or fraction thereof
6.Waiting time. For each 30-minute period or fraction thereof after the
first 30 minutes of waiting time at the request of the person hiring the
ambulance
7.Standby time. The base rate for the prescribed level of service and, in
addition, for each 30-minute period or fraction thereof after the first 30
minutes of standby time
$2,383.00
$2,550.00
$1,587.00
$1,702.00
$19.00
$135.00
$129.00
8.This section does not apply to a contract between the ambulance operator and the County where
different rates or payment mechanisms are specified.
Section 7.16.310 Special Charges
A A ground ambulance operator shall charge no more than the following rates for special
ancillary services:
1.Request for services after 7 PM and before 7 AM of the next day will
be subject to an additional maximum charge of
2.Persons requiring oxygen, shall be subject to an additional maximum
charge per tank or fraction thereof, and oxygen delivery equipment to
include nasal cannula and/or oxygen mask, of
3.Neonatal transport
4.Registered nurse or respiratory therapist specialty care transport with
equipment and personnel for up to 3 hours of transportation time
5.Registered nurse and respiratory therapist specialty care transport with
equipment and personnel for up to 3 hours of transportation time
6.Registered Nurse and/or Respiratory Therapist per hour after the first 3
hours
7.Volume ventilator
8.Disposable medical supplies
$27.00
$102.00
$255.00
$2869.00
$3242.00
$162.00
$197.00
$29.00
ATTACHMENT 6
B.Where other special services are requested or needed by any patient or authorized representative thereof,
a reasonable charge commensurate with the cost of furnishing such special service may be made, provided
that the ambulance operator shall file with the Director of the Department of Health Services a schedule of
each special service proposed and the charge therefore, which charge shall be effective unless modified,
restricted, or denied by the Director of the Department of Health Services. Special services are defined as
services provided to a patient that are unique and individual to a specific patient's needs, and are performed
on a limited basis.
C.Charges for special services provided to patients that are new services, but will become an industry
standard, must be reviewed and a rate commensurate with the service developed prior to ambulance
operators charging such rate to the general public. Such rates shall not be charged to patients until
approved by the Board of Supervisors.
D.This section does not apply to a contract between an ambulance operator and the County where different
rates or payment mechanisms are specified.
Section 7.16.340 Modification of Rates.
The maximum rates chargeable to the general public as set forth in Sections 7.16.280 and 7.16.310 of this
chapter shall be adjusted effective July 1, 1992, and on July 1st of each year thereafter, to reflect changes
in the value of the dollar. For each of the one year periods respectively beginning July 1, 1992 and July 1,
1993 such adjustments shall be made by multiplying the ba·se amounts by the percentage change in the
transportation portion of the Consumer Price Index for All Urban Consumers, Western Region, as
compiled and reported by the Bureau of Labor Statistics for the 12-month period ending with the last day
of the prior month of February. Beginning July 1, 1994, and on each July 1 thereafter, such adjustments
shall be determined by multiplying the base amounts by the average of the percentage changes of the
transportation portion and of the medical portion of the Consumer Price Index for All Urban Consumers,
Western Region, as compiled and reported by the Bureau of Labor Statistics for the 12-month period
ending with the last day of the prior month of February. Beginning July 1, 2017, and on every July 1
thereafter, such adjustments shall be determined by multiplying seventy-five (75) percent of the base
amounts by the percentage change of the minimum wage change in Los Angeles County as defined in
County Code Section 8.100 .040 -Minimum Wage and by multiplying twenty-five (25) percent of the
base amounts by the percentage change of the Medical Care line item of the Consumer Price Index for all
Urban Customers, Western Region, as compiled and reported by the Bureau of Labor Statistics for the 12-
month period ending with the last day of the prior month of February, except for the following changes:
Registered Nurse/Respiratory Therapist per hour after the first three (3) hours adjustment shall be
determined by multiplying the current charge by the percentage change of the minimum wage change in
Los Angeles County as defined in County Code Section 8.100 .040 -Minimum Wage: mileage adjustment
shall be determined by multiplying the current charge for the percentage change of the transportation line
item of the Consumer Price Index for All Urban Customers, Western Region, as compiled and reported by
the Bureau of Labor Statistics for the 12-month period ending with the last day of the prior month of
February: and Oxygen, Disposable Medical Supplies, and a Ventilator adjustment shall be determined by
multiplying the current charges by the percentage change of the Medical Care line item of the Consumer
Price Index for all of the Customers, Western Region, as compiled and reported by the Bureau of Labor
Statistics for the 12 month period ending with the last day of the prior month of February. The result so
determined shall be rounded to the nearest whole number and added or subtracted, as appropriate, to the
rate. The result so determined shall be rounded to the nearest whole number and added or subtracted, as
appropriate, to the rate. The Director of the Department of Health Services, or authorized designee, shall
initiate implementation of these rate changes by notifying in writing each licensed private ambulance
operator in Los Angeles County thereof, and any other individual or agency requesting such notification
from the Director. Such notice shall be sent by first class mail no later than June 15 of the prior period.