Loading...
HomeMy WebLinkAboutE-5 Staff Report - NOC 2021 RSRP CIP No. 66121ACONSENT ITEM E-5 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL VIA: SERGIO GONZALEZ, CITY MANAGER FROM: ROBERT DELGADILLO, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINEER DATE: JANUARY 18, 2022 SUBJECT: ACCEPTANCE OF PROJECT COMPLETION AND AUTHORIZATION TO FILE A NOTICE OF COMPLETION FOR THE CITYWIDE 2021 RESIDENTIAL RESURFACING PROJECT CAPITAL IMPROVEMENT PROJECT NO. 66121A BACKGROUND: On June 21, 2021, the City Council awarded a contract to All American Asphalt for the rehabilitation of approximately 2.2 miles of residential streets, Project No. 66121A. The project was completed on December 22, 2021. The proposed actions will accept the improvements and authorize Staff to file a Notice of Completion for the project. RECOMMENDATION: Staff recommends the City Council take the following actions: 1)Accept the project improvements as recommended by the City Engineer; and 2)Authorize Staff to file a Notice of Completion for the 2021 Residential Resurfacing Project Capital Improvement Project No. 66121A ANALYSIS: The improvement completed extend for approximately 2.2 miles of residential streets and include 510,000 SF of Type II Slurry Seal and 349,000 SF of cape seal. In addition, the concrete improvements listed below were completed: •Remove and replace 7,000 SF of sidewalks •Remove and replace 3,200 SF of gutter spandrel •Remove and replace 330 LF of curb and gutter APPROVED CITY COUNCIL 1/18/2022 2021 Residential Resurfacing Project January 18, 2021 Page 2 FISCAL IMPACT: The amount awarded for the project was $1,037,250.95. The estimated construction cost was $987,056.95 and the estimated Construction Administration was $50,194.00. The actual construction cost for the project was $890,081.32 and $50,194.00 for Construction Administration. The combined construction and Construction Administration cost was $940,275.32. The project was completed under budget by $96,975.63. The cost of this project was funded through the Senate Bill 1 (SB1) Funds ($820,000) and Utility Mitigation Funds ($120,275.32). The total project cost was $940,275.32 Prepared By: Fiscal Impact Reviewed By: Miguel Cabanas, P.E. Talika M. Johnson Principal Civil Engineer Director of Administrative Services Reviewed By: Reviewed and Approved: Robert Delgadillo, P.E. Sergio Gonzalez Director of Public Works/City Engineer City Manager Attachment: 1) Notice of Completion RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: NAME CITY OF AZUSA STREET ADDRESS 213 E. FOOTHILL BLVD CITY, STATE ZIP AZUSA, CA 91702 SPACE ABOVE THIS LINE FOR RECORDER’S USE NOTICE OF COMPLETION Notice pursuant to Civil Code Section 3039, must be filed within 10 days after completion. Notice is hereby given that: 1.The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described: 2.The full name of the owner is The City of Azusa 3.The full address of the owner is 213 E. Foothill Boulevard, Azusa, CA 91702 4.The nature of the interest or estate of the owner is: In fee. City of Azusa Public Right of Way (IF OTHER THAN FEE, STRIKE “IN FEE” AND INSERT, FOR EXAMPLE , “PURCHASER UNDER CONTRACT OF PURCHASE”, OR “LESSEE” 5.The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common, are: NAMES ADDRESSES NONE 6.The full names and full addresses of the predecessors in interest of the undersigned, if the property was transferred subsequent to the commencement of the work or improvements herein referred to: NAMES ADDRESSES NONE 7.A work of improvement on the property hereinafter described was completed on December 22, 2021 . The work done was: Asphalt restoration with slurry seal Type II and Cape seal. Concrete replacement of sidewalks, curb and gutter, and longitudinal gutter. 8.The name of the contractor, if any, for such work of improvement was: All American Asphalt July 19, 2021 (IF NO CONTRACTOR FOR WORK OF IMPROVEMENT AS A WHOLE, INSERT “NONE”) (DATE OF CONTRACT) 9.The property on which said work of improvement was completed is in the City of Azusa, County of Los Angeles, California and as described as follows: Portions of Jackson Ave, Torreon Ave, Zamara St, Jerez Ave, Aspan Ave, Enid Ave, Grandview Drive, Sally Lee Ave, Cindy Lou Ct, Arthur Ave, E Dixon St, S Pasadena Ave, Mason St, E McKinley St, E Gladstone St, S Grantland Dr, E Gaillard St, and E Ghent St. 10.The street address of said property is None (IF NO STREET ADDRESS HAS BEEN OFFICIALLY ASSIGNED, INSERT “NONE”) Dated: Robert Gonzales, Mayor (SIGNATURE OF OWNER OR CORPORATE OFFICER OF OWNER NAMED IN PARAGRAPH 2 OR HIS AGENT) I, the undersigned, say: I am the person who signed the foregoing notice of completion. I have read said notice of completion and know its contents, and the facts stated therein are true of my own knowledge. I declare under penalty of perjury that the foregoing is true and correct. Executed on at (DATE) (CITY, COUNTY, & STATE) (SIGNATURE) Attachment 1