Loading...
HomeMy WebLinkAboutD-1 Staff Report - PPR 2022_Azusa GreensPUBLIC HEARING/SCHEDULED ITEM D-1 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL VIA: SERGIO GONZALEZ, CITY MANAGER FROM: MATT MARQUEZ, ECONOMIC AND COMMUNITY DEVELOPMENT DIRECTOR DATE: JUNE 6, 2022 SUBJECT: PUBLIC HEARING ON PRELIMINARY PLAN REVIEW NO. 2022-01 FOR THE PROPERTIES LOCATED AT 919 WEST SIERRA MADRE AVENUE (APNS: 8617-001-005, 8684-013-030, 8617-001-013, 8617-013-001, 8617-011-001, 8684- 043-002, AND 8684-013-014 - A REQUEST TO DEVELOP EXISTING GOLF COURSE PROPERTY WITH SIX (6) INDUSTRIAL BUILDINGS, 250 - 300 RESIDENTIAL HOUSNIG UNITS, AND THE REDESIGN OF THE REMAINING PROPERTY AS A NINE (9) HOLE GOLF COURSE BACKGROUND: Process for Review In 2020, in response to a previous project application for the subject location, the City Council directed staff to develop an updated process for the review of legislative zoning actions (General Plan Amendments, Zone Changes, Specific Plans, etc.). The goal was to find a way for Council to evaluate these applications at an earlier stage of the review process. Up to that point in time, Council reviewed these applications only after they had been vetted by staff and reviewed by the Planning Commission. At the conclusion of the Commission’s review, a recommendation on the project was forwarded to the City Council for their consideration. Staff developed an updated policy for these applications and on June 15, 2020, the City Council directed staff to implement the new policy. The updated procedure now requires a public hearing before the City Council at the conclusion of the Preliminary Plan Review (PPR) process. The Subject Property The Azusa Greens Country Club, located at 919 West Sierra Madre Avenue, is situated on approximately 87.78 acres of land. It consists of an eighteen (18) hole golf course with a clubhouse and event space. The golf course and country club are currently closed to the public. The applicant Approved with Recommend changes to Developer CITY COUNCIL 6/6/2022 Preliminary Plan Review No. 2022-01 – 919 West Sierra Madre Avenue June 6, 2022 Page 2 for the subject project, Overton Moore Properties, is in the process of purchasing the property. The image below shows the existing Country Club and golf course area. Previous Application In 2019, the City Council conducted public hearings on a different project proposed for the subject property, known as the California Grand Village Specific Plan. Ultimately, the Council denied that project, which proposed the redevelopment of approximately 4.8 acres of the golf course by adding a 253-luxury independent senior citizen village. Along with an Environmental Impact Report (EIR), the entitlements requested were the following: 1.General Plan Amendment – To change the proposed Senior Village’s land use designation from Open Space to Specific Plan; 2.Zone Change – To change the proposed Senior Village’s zoning from Recreation to Specific Plan; 3.Specific Plan – Designate the 4.48-acre Senior Village site Residential Care Facility for the Elderly (RCFE), establish permitted uses and provide design standards, development standards, infrastructure requirements, and implementation requirements specific to the site; 4.Tentative Tract Map – To subdivide existing parcel 8617-001-005 into two parcels; and 5.Design Review – To consider the proposed project for consistency with the permitted uses, development/design standards, and requirements per the proposed California Grand Village Specific Plan. Preliminary Plan Review No. 2022-01 – 919 West Sierra Madre Avenue June 6, 2022 Page 3 The subject project discussed in this staff report is different than what was previously proposed, is being proposed by a different applicant, and is following a somewhat different review process; as discussed in this report. RECOMMENDATIONS: Pursuant to policy adopted by the City Council in 2020, the City Council has two options as shown below. Staff is seeking direction on Council’s preferred option. 1)Direct staff to continue processing the subject application. 2) Direct staff to discontinue processing the subject application. Please note that a vote of the City Council to continue processing the subject application does not constitute an approval of the project. ANALYSIS: Proposed Project, Zoning & The General Plan Overton Moore Properties submitted to the City an application for Preliminary Plan Review (PPR). On April 21, 2022, staff provided notice to the applicant that the application was deemed complete for the purposes of progressing through the City’s PPR process. The application describes the major components of the applicant’s proposal as follows: 1.Industrial: Development of roughly 19.33 acres of current golf course property with six (6) new concrete tilt-up industrial buildings totaling approximately 395,696 square feet. This site is currently home to golf holes 3,4,5 and 6. As the applicant continued to study this portion of the project site it was determined that a portion of it is unbuildable due to the presence of an earthquake fault. The result will more than likely lead to a reduction in total square footage of this component of the project should it move forward through the entitlement process. 2.Senior Housing: A 250-unit senior housing project on 8.8 acres of existing golf course property. The site currently includes golf holes 1 and 18. After submittal of the subject application, during subsequent discussions with City staff, the applicant discussed proposing up to 300 market rate units, with at least 15% of those units being affordable. The level of affordability has not yet been determined. 3.Golf Course: A redesigned 9-hole golf course with a driving range on approximately 59.65 acres of existing golf course property. This would include a renovated and improved clubhouse/banquet space. 4.Specific Plan: The applicant is proposing to utilize a Specific Plan for the implementation of the proposed project. These are used to systematically implement a city’s General Plan for an area under its scope by acting as statements of planning policy that refine the General Plan policies applicable to the defined area, by directly regulating land use, or by bringing together detailed policies and regulations into a focused development scheme. Specific Plans are considered to be legislative zoning actions. These actions establish rules or Preliminary Plan Review No. 2022-01 – 919 West Sierra Madre Avenue June 6, 2022 Page 4 standards of general applicability for future application. Examples of such actions include, but are not limited to Specific Plans, Zone Changes, and General Plan Amendments. 5. Zoning & The General Plan: The subject property has a zoning designation of Recreation and also a General Plan Land Use designation of Recreation. Pursuant to Section 88.28.020(C) of Azusa’s Development Code: The REC zone is applied to public park and recreation sites and areas within the City. The REC zoning district is consistent with and implements the Recreation land use classification of the General Plan. However, neither the City’s Development Code (Zoning) nor General Plan allow for or contemplate housing or industrial development on properties with these designations. Therefore, the applicant’s proposal would also require a Zone Change and General Plan Amendment, which are also legislative zoning actions as stated in item #4 above. Additionally, if directed to continue processing the subject project, further entitlement applications beyond those referenced above will be requested, perhaps including but not limited to a density bonus, subdivision, and design review. The image below shows the locations for the proposed uses listed above. Preliminary Plan Review No. 2022-01 – 919 West Sierra Madre Avenue June 6, 2022 Page 5 Zone Change & General Plan Amendments As discussed earlier in this report, the applicant’s request will include legislative zoning actions in the form of at minimum, a Specific Plan, Zone Change, and General Plan amendment. The project site consists of multiple properties located along Sierra Madre Avenue. This area also includes properties with a variety of Zoning and General Plan Designations, including Neighborhood General 3 – Moderate Density Residential, Neighborhood General 3 – Medium Density Residential, Neighborhood General 3 – Low Density Residential, DWL – West End Light Industrial District, and Neighborhood General 1 – Institutional/School. This mix of Zoning designations has led to the development of condominiums, townhomes, apartments, and single- family homes, in close proximity to the existing golf course, as well as park space, a school, and light industrial development. The site’s existing Zoning and General Plan designations are shown on the images below, as are those of the surrounding properties. Preliminary Plan Review No. 2022-01 – 919 West Sierra Madre Avenue June 6, 2022 Page 6 The applicant’s request would require changing the Zoning and General Plan designations as shown on the images below: Preliminary Plan Review No. 2022-01 – 919 West Sierra Madre Avenue June 6, 2022 Page 7 CONCLUSION: The City Council has the ability to direct staff to continue processing the subject project if it is inclined to do so. The applicant is proposing new industrial development and housing, along with a redesigned 9-hole golf course. This request would require the City to approve legislative zoning actions. An updated process for these projects was adopted in 2020, and this project is the first one subject to said process. Staff is seeking direction from Council regarding the further processing of the project. FISCAL IMPACT: There is no fiscal impact related to this item. Prepared by: Reviewed by: Matt Marquez Marco Martinez Economic and Community Development Director City Attorney Fiscal Review by: Reviewed and Approved by: Talika M. Johnson Sergio Gonzalez Director of Administrative Services City Manager (Attachments listed on following page) Preliminary Plan Review No. 2022-01 – 919 West Sierra Madre Avenue June 6, 2022 Page 8 Attachments: 1) Process for Reviewing Legislative Zoning Actions 2) Preliminary Plan Review Comment Letter 3) Conceptual Plans 4) Legal and Project Descriptions Preliminary Plan Review No. 2022-01 – 919 West Sierra Madre Avenue June 6, 2022 Page 9 ATTACHMENT 1 – Process for Reviewing Legislative Zoning Actions Staff developed an updated policy for applications for legislative zoning actions and on June 15, 2020, the City Council directed staff to implement the new policy. The updated procedure is shown below: 1. Submittal of Preliminary Plan Review (PPR) Application to Economic & Community Development (ECD). 2. ECD forwards complete application for review to relevant City Departments (Public Works, Light & Water, Parks, Police, etc.). 3. Staff reviews completed application and discusses proposed project during a meeting of the City’s Development Review Committee. 4. Applicant is provided with feedback on the project. 5. Applicant addresses staff’s comments. 6. Application scheduled for public hearing before the City Council. Council can deny the application/s, or direct staff to process application through the Planning Commission for a recommendation and to City Council for final consideration at a future date. The subject application is currently at this step in the process. 7. If directed to proceed through to Planning Commission hearing, applicant submits entitlement application/s and corresponding environmental analysis. 8. Upon receipt of complete application/s and completion of environmental review, application/s scheduled for Planning Commission public hearing. 9. Commission conducts public hearing and makes recommendation to City Council. 10. Upon receipt of Commission recommendation, City Council conducts public hearing and makes a decision on the project. CITY OF AZUSA | ECONOMIC & COMMUNITY DEVELOPMENT DEPARTMENT | (626) 812-5200 www.azusaca.gov PRELIMINARY PLAN REVIEW COMMENTS DATE: May 5, 2022 CASE NUMBER: PPR-2021-01 PROJECT ADDRESS: 919 Sierra Madre Avenue, Azusa, CA 91702 PROJECT DESCRIPTION: Preliminary Plan Review request for Industrial park, Senior housing, 9-hole golf course with Banquet Facilities and third-party land owner area. The property is located in the in the Recreation Zone. STAFF CONTACT: Manuel Munoz 626-812-5226 mmunoz@azusaca.gov Planning Division Comments: Apply: • Apply for: o General Plan Amendment (GPA) o Zone Change (Z) o Specific Plan (If applicable) o Design Review for Industrial Project o Design Review for Residential Project o Design Review for Golf Course Project o TTM o Environmental Determination for Environmental Impact Report o Density Bonus – may be required depending on final make up of the proposal. Overall Comments: 1. How would the loss of open space be mitigated? 2. Provide a pedestrian connectivity implementation plan that will link all three projects. 3. Provide a wayfinding implementation plan that will connect the projects to the local open space and recreation areas. 4. What if anything is happening with the third-party land owner lot? 5. Due to the project scope. Staff is recommending hiring a Project Planner. The city would execute a Reimbursement Agreement for all cost associated with the planning firm. ECONOMIC & COMMUNITY DEVELOPMENT DEPARTMENT CITY OF AZUSA | ECONOMIC & COMMUNITY DEVELOPMENT DEPARTMENT | (626) 812-5200 www.azusaca.gov Industrial Project: Questions: 1. What type of industrial uses would be the tenants? Confirm AMC 88.24.005 – Allowable Uses in Districts if a Minor Use Permit or Use Permit is required. 2. Will the entire project be parked at warehouse parking ratio? This will limit future leasing if you get a tenant that is manufacturing. The project should be parked at the manufacturing ratio to allow for greater leasing flexibility in the future. The industrial, manufacturing, processing and wholesaling parking ratio are: a. 1 space for each 500 sf of building and outdoor activity area; b. 1 space for each 250 sf of office area; c. 1 space for each company vehicle. d. You may obtain the entire parking code by visiting Azusa Municipal Code Chapter 88.36 3. Will the business operate between 9 pm and 7 am? Per Azusa Municipal Code Chapter 88.51.040 – Use Permit and Minor Use Permit you have the option of applying for a Use Permit that will allow the business operation between 9 pm and 7 am. 4. Will the property have outdoor storage? Per Azusa Municipal Code Chapter 88.51.040 – Use Permit and Minor Use Permit you have the option of applying for a Minor Use Permit that will allows for outdoor storage. The plans shall show the location of the outdoor storage and the required screening. Comments: 1. The potential zone change shall adhere to the West End Light Industrial District (DWL) development standards. 2. The property line wall on the north that is parallel to 10th Street and to the east shall be 8’ high. The existing adjacent residential use shall have a minimum 10’ setback as a good neighbor policy. 3. Per the Azusa Municipal Code Chapter 88.39 – Art in Public Places Program the project shall adhere to all related requirements and be respective to each individual project. 4. The proposed project is subject to the California Environmental Quality Act (CEQA) and will mostly likely require Environmental Impact Report (EIR). Residential Project: Questions: 1. What density is being proposed? What is the zone change being proposed? NG3 – Moderate Density Residential or Specific Plan? The existing residential development to the west is zoned Neighborhood General 3 (NG3 - Moderate Density Residential) with a 27 Dwelling Units per Acre. 2. Will the project have any time of affordable units (low-income, very low-income, or moderate income)? 3. Will the project have any additional units based on the Bonus Density Incentive? Per Azusa Municipal Code Chapter 88.32.020 – Density Bonus Incentive you can apply for additional CITY OF AZUSA | ECONOMIC & COMMUNITY DEVELOPMENT DEPARTMENT | (626) 812-5200 www.azusaca.gov housing if you provide some units that are low -income, very low-income, moderate income, and/or senior housing units. 4. What development standards are being implemented on the proposed project? If the proposed zone change adheres to the NG3 – Moderate Density Residential then the respective development standards shall be upheld. Comments: 1. The potential zone change shall adhere to the NG3 – Moderate Density Residential development standards or apply for a Specific Plan. 2. Per the Azusa Municipal Code Chapter 88.39 – Art in Public Places Program the project shall adhere to those standards specified in the code. 3. The proposed project is subject to the California Environmental Quality Act (CEQA) and will mostly likely require Environmental Impact Report (EIR). 4. Massing compatibility is a concern to the residential property to the west. The site design and architectural massing on the west side of the proposed project shall have some mitigating design factors that will provide some massing compatibility. Golf Course Project Questions: 1. What is the proposed expansion of the banquet facilities? 2. Will the banquet facilities serve alcohol? 3. What type of events will be held at the banquet facilities? Comments: 5. Per the Azusa Municipal Code Chapter 88.39 – Art in Public Places Program the project shall adhere to the standards as specified in the code. 6. The proposed project is subject to the California Environmental Quality Act (CEQA) and will mostly likely require Environmental Impact Report (EIR). 7. Due to the protection of the water spreading grounds. All existing fencing to the north adjacent to the water spreading grounds shall be replaced with a 8’ block wall. Chain link fencing is not allowed. 8. All new golf course holes shall have netting to prevent any golf balls going into adjacent residential neighborhoods. 9. Provide a golf cart circulation study. APPLICABE FEES DUE UPON SUBMITTAL (**at minimum and are subject to change based on final composition of the project**): 1. Design Review (Major Project Review) – Industrial $ 11,500.00 2. Design Review (Major Project Review) – Residential $ 11,500.00 3. Design Review (Major Project Review) – Golf Course $ 11,500.00 4. Tentative Tract Map (5-20 lots) $ 10,958.35 5. General Plan Amendment $ 17,250.00 CITY OF AZUSA | ECONOMIC & COMMUNITY DEVELOPMENT DEPARTMENT | (626) 812-5200 www.azusaca.gov 6. Zone Change $ 5,750.00 5. Building Address Assignment – Industrial $ 1,192.55 6. Building Address Assignment – Residential $ 1,192.55 7. Landscape Review $ 568.20 6. Covenant, Conditions, & Restrictions (CC&Rs):1 $ 300.69 7. Public Notice/Radius Maps:2 $ 240.00 8. Newspaper Publication:3 Varies 9. Public Art Fee4 Varies Total Due for Entitlement Applications $ 71,592.34 Total Due for Deposit (Separate Check) $ 57,500.00 Building Division Comments: Staff Contact: Tony Meyers, Building Official tmyers@AzusaCa.Gov 626-812-5295 1. Applicant shall conform to the 2019 California Building Standards C; including the 2019 California Code, 2019 Californian Residential Code, 2019 California Green Building Code, 2019 California Electrical Code, 2019 California Plumbing Code, 2019 California Mechanical Code, 2019 California Energy Code and the City of Azusa Municipal Code. 2. All plan check fees shall be paid at the time of plan check submittal. Once plan check is completed and approved, applicant shall be responsible to pay in full all other appropriate development fees (i.e. school district fees, water reimbursement, park fees) prior to issuance of any building permit. Electrical, mechanical, plumbing plan check fees are required. 3. Energy plan check fees are required. 4. Applicant shall submit two copies of site plan, two copies of architectural plans including floor, elevations, and architectural details, two copies of structural including foundation, roof, wall structural elements and structural details, two copies of plumbing, electrical and mechanical plans, for plan check. 5. Applicant shall provide an additional copy of the building floor plan to be submitted to the County Assessor. 6. Structural, architectural, electrical, mechanical, plumbing plans shall be designed by a State of California Registered Architect or State of California Registered Engineer. 7. Applicant shall submit copies of structural calculations concurrently with the construction plans. 1 CC&Rs required if doing condos. 2 Public Notice/Radius Maps can be generated by private agency if applicant prefers. If not done by City, subtract $240.00 3 Newspaper Publication fees are invoiced to applicant after the public hearing notice is published. 4 See section 88.39.040 of the AMC for applicability. Regardless, the maximum art allocation per project will be set at $50,000.00. CITY OF AZUSA | ECONOMIC & COMMUNITY DEVELOPMENT DEPARTMENT | (626) 812-5200 www.azusaca.gov 8. Applicant shall submit copies of energy calculations concurrently with the construction plans. 9. Electrical, mechanical, plumbing plans shall be submitted for plan check concurrently with the construction plans. 10. Residential Fire Sprinklers are required. Applicant shall submit two sets of Fire Sprinkler plans for plan check. Fire Sprinkler plans must be designed by a licensed G-16 contractor and be submitted to Los Angeles County Fire Department. 11. Applicant shall submit copies of soil report concurrently with the construction plans to Public Works Department. 12. Property shall be surveyed by a State of California Licensed Surveyor and the survey report shall be submitted concurrently with the construction plans. 13. Prior to issuance of a permit, the applicant shall submit approval from the Los Angeles County Fire Department. 14. Property falls within an area of potential earthquake induced Liquefaction, Landslides or both. A site specific Geologic investigation must be conducted for the property. The site- investigation report must be prepared by a certified engineering geologist or registered civil engineer who must have competence in the field of seismic hazard evaluation and mitigation. The geologic report must be submitted to the Department of Community Development for review. Plan review fees will be based on actual costs with a minimum deposit of $1,000.00 due when the report is submitted. Engineering Division Comments: Staff Contact: Robert Delgadillo, P.E., Director of Public Works/City Engineer rdelgadillo@AzusaCa.Gov 626-812-5248 1. Dedicate 4 feet on Todd Ave. for street purposes. Deed shall be executed before a Notary Public and delivered to the City Engineer prior to issuance of building permits. 2. Prior to performing any grading, obtain a permit from the Engineering Division. Prepare and submit two sets of grading/drainage plans per the City’s Grading Guidelines and the latest edition of the Los Angeles County Building Code. The plans shall be stamped and signed by a California State Registered Civil Engineer. 3. Prepare and submit two sets of geotechnical reports, less than one year old. The reports shall include information on the nature, distribution, physical, and engineering properties of the soils onsite and/or soils to be used as fill, and include recommendations on grading procedures. 4. Prepare and submit two sets of hydrology and hydraulic calculations for sizing of all proposed drainage devices. The analysis shall also determine if changes in the post-development versus pre-development conditions have occurred. The analysis shall be stamped and signed by a California State Registered Civil Engineer and prepared per the Los Angeles County Department of Public Works Hydrologic Method. 5. State law under the County of Los Angeles "National Pollution Discharge Elimination System" (NPDES) permit requires certain new development and redevelopment projects/activities to incorporate post construction Best Management Practices (BMPs) into the grading/drainage plans to control pollutants. Please refer to the County of Los Angeles’ Low Impact Development (LID) Guidelines for specific comments and requirements. CITY OF AZUSA | ECONOMIC & COMMUNITY DEVELOPMENT DEPARTMENT | (626) 812-5200 www.azusaca.gov 6. The contractor shall take every step necessary to contain all dirt, construction materials, and construction run-off on site. No grading or construction-related debris, either directly or indirectly carried by water, will be permitted to leave the construction site. 7. All grading projects require an Erosion Control Plan as part of the grading plans. Grading permits will not be issued until an Erosion Control Plan is approved. For projects with a disturbed area of one acre or greater, a Storm Water Pollution Prevention Plan (SWPPP) is required. A Notice of Intent (NOI) shall also be filed with the State Water Resources Control Board. When submitting the SWPPP for the City's review, please include the NOI and the Waste Discharger Identification (WDID) number. 8. Remove and replace cracked or uplifted curb and gutter along the frontages of 10th street, Todd Ave and Sierra Madre Ave. 9. Remove and replace cracked or uplifted sidewalk along the frontages of 10th street, Todd Ave and Sierra Madre Ave. 10. Remove driveway apron on First Street and reconstruct curb, gutter, and sidewalk. 11. Construct ADA compliant 7-foot sidewalk on Todd Ave, 6-foot sidewalk and 4’ parkway on 10th street and 8-foot sidewalk on Sierra Madre Ave. 12. Construct driveway apron(s) on 10th street, Todd Ave and Sierra Madre Ave as shown on approved Site plan. 13. Remove all unused driveways on Sierra Madre Ave. and reconstruct curb, gutter and sidewalk. 14. Replace any damage, lifted, or non-ADA compliant sidewalk fronting the property. 15. Construct or reconstruct wheelchair ramp(s) at Todd/10th and Sierra Madre/Todd Ave. Ramps shall comply with the latest Americans with Disabilities Act (ADA) requirements. 16. A bond or security device shall be posted with the City in an amount sufficient to cover the cost of off-site work to be performed, as determined by the City Engineer. Neither a building permit or encroachment permit will be issued until the device is posted. 17. A City Encroachment Permit shall be obtained for all work undertaken in the public right -of- way. All work shall be done in accordance with City of Azusa Standards and Standard Specifications for Public Works Construction (Green Book), latest edition and to the satisfaction of the City Engineer or his designee and shall be completed before issuance of Certificate of Occupancy. 18. Prepare and submit 2 sets of improvement plans for work in the right of way per the Improvement Plan Guidelines. Improvement Plan Guidelines may be obtained from the Engineering Division. The Improvement Plans shall be stamped and signed by a California State Registered Civil Engineer. 19. A City Transportation Permit shall be obtained. Proposed truck route shall be approved by the Engineering Division. 20. All work shall be done in accordance with the Work Area Traffic Control Handbook (WATCH), latest edition. 21. Provide a Roadway Illumination Study. 22. Traffic signals shall be installed at TBD pending the traffic study findings 23. Connect to a public sewer with a 6-inch sewer lateral min. Larger sewer laterals will require sizing calculations and potentially a new sewer manhole. 24. Pay $3.00/ front foot sewer connection fee, plus any other required sewer fees. CITY OF AZUSA | ECONOMIC & COMMUNITY DEVELOPMENT DEPARTMENT | (626) 812-5200 www.azusaca.gov 25. Sewer video inspection shall be provided to the Engineering Division prior to final approval any damages identified in the video shall be repaired to the satisfaction of the City Engineer prior to final approval. 26. 2-inch grind and overlay of the streets fronting the project (10th St, Todd Ave and Sierra Madre Ave). The paving limits shall extend to the street center line. At the discretion of the City Engineer the paving requirements may be reduced if the streets fronting the project have been recently resurfaced. 27. Submit sewer capacity study Submit Traffic Study - Findings shall determine if the proposed project will have an impact in the intersections adjacent to the project and if additional improvements are required. Submit Final ALTA survey. Parks Division Comments: Staff Contact: Roy Chavez, Recreation Superintendent – Park Operations rchavez@AzusaCa.Gov 626-812-5259 1. TBA 24” box trees shall be planted in parkway. Trees shall be located no closer than 30ft not greater than 65 ft apart and shall be irrigated per City specification. 2. This project shall comply with the City of Azusa’s Water Efficient Landscape Regulations. Water Efficient Landscape Regulations can be found on the City of Azusa’s website, www.ci.azusa.ca.us under Community Development Department. 3. Landscape and irrigation plans shall include parkways. If parkway is irregular shaped or less than 8’ wide, drip irrigation or pop up heads with Rainbird XPCN nozzles will be required. 4. Landscape and irrigation plan shall show location, quantities, size and type of plant materials, landscape summary with total square footage, and a design of an automatic irrigation system. No final release from Parks Division will be granted until plans have been approved. 5. If the proposed project includes the construction of one or more bedrooms, Parks and Recreation in-lieu fees shall be paid in accordance with the City of Azusa Municipal code Section 66-5. 6. Special Conditions: a. Must have a certified Arborist evaluate all mature trees that are to be removed within the entire project and compile a comprehensive report on the condition of each tree. b. All mature trees that are removed, shall be replaced at a 3 to 1 ratio within the project. c. Must improve fencing along Northside Park on tree #2 to reduce vandalism. The property owner will be responsible for making repairs as needed year around. Fencing is vandalized several times a year. May consider wrought iron fencing with netting. d. A minimum 2” layer of mulch shall be applied be applied on all exposed soil of planter area. e. A dedicated Landscape Design Shall be provided by professional appropriately licensed in the State of California to provide to provide professional landscape design services. f. Certification of Landscape Design shall be provided by professional appropriately licensed in the State of California to provide professional landscape design services. g. Certification of Landscape Design shall be provided by professional appropriately licensed in the State of California to provide professional landscape design services. CITY OF AZUSA | ECONOMIC & COMMUNITY DEVELOPMENT DEPARTMENT | (626) 812-5200 www.azusaca.gov h. Certificate of Completion shall be provided by professional appropriately licensed in the state of California to provide professional landscape design services. i. Parkway trees, parkway will be required in all parkway areas that are appropriate size throughout project. The Developer will be responsible for installing all parkway trees. Electric Division Comments: Staff Contact: Hien Vuong, Senior Electric Engineer hvuong@AzusaCa.Gov 626-812-5172 1. Prior to approval of proposed project, contact Electric Division as soon as possible for details on specifications and requirements, and method of service. 2. Incoming electric utility facilities shall be underground. Developer to provide the following: a. All conduits b. Pull boxes c. Transformer pads d. Street lights 3. Extensive electrical line building may be necessary. Applicant is directed to contact and make arrangement with the Electric Division as soon as possible. 4. Special conditions for new or upgrade of electric service on commercial construction projects: a. Owner/Developer shall contact Customer Service Division for information to set up new account, and to make change on upgrading account. b. Owner/Developer shall submit to Azusa Light Division two (2) separate sets of plans showing the following: • Site survey plan of building to include additions and remodeling foundations, elevations, sections and location of existing electric easements. • Electric service desired, electrical load calculation and single line diagram. Transformer will not be ordered until this information is provided. Transformer procurement has long lead time, it could take up to 23 weeks for the delivery of transformers. • Proposed location of electric panel/main switchgear. Coordinate with Electric Division for the best location which would satisfy all stake holders. • Location of transformer pad and related substructures. 5. All existing electric service and facilities shall remain. Any relocation, modification, alteration, or upgrade of existing electric service and facilities shall be at the cost and expense of owner/applicant. 6. Additional Requirements: a. Applicant/Developer shall submit TOPO Map of the proposed development site/s for Azusa Light & Water to assess impacted electric facilities. b. Applicant/Developer is required to relocate the existing aerial power lines along the north and west property line of proposed 9-hole golf course, and along Montecito Way to underground. Applicant/Developer is responsible for cost associated with the power line relocations. c. Applicant/Developer is responsible for all cost associated with impacts on existing electric facilities along 10th street an Todd Ave at the proposed Industrial site. CITY OF AZUSA | ECONOMIC & COMMUNITY DEVELOPMENT DEPARTMENT | (626) 812-5200 www.azusaca.gov d. Applicant/Developer/Property Owner shall grant utility easement to Azusa Light & Water for all relocated facilities. e. Applicant/Developer shall pay for the cost associated with obtaining electric utility for the entire development. This cost includes but not limits to cost of engineering, planning inspection, and installing of electric infrastructure. Water Division Comments: Staff Contact: Melissa Barbosa, PE Senior Water System Engineer mbarbosa@AzusaCa.Gov 626-812-5173 1. Owner/applicant shall apply for water services & meters and pay applicable associated installation deposit and inspection fees. 2. Owner is required to size their own meters to meet their proposed needs. Each building will require a new water meter and new water service. New services and meters are required to be installed per ALW Standards W-1 through W-4. Install new irrigation, and fire services per ALW Standards. All commercial and industrial meters and irrigation meters all required to have backflow devices. 3. Will require approved backflow devices on all services (residential, commercial, irrigation, fire) per ALW standard W-15 with cages installed. Backflow devices shall be field verified with ALW Water Inspector prior to placement (5) working days prior to start of work. The backflow devices shall be installed on private property directly behind the property line by owner, tested by LA County Certified backflow tester at owner's expense. The reports shall be filed with ALW immediately after the devices are in place and required prior to certificate of occupancy. Required to install backflow cages. 4. All easements shall be identified on the water plans and on the Tract Map. The existing water main(s) shall be identified on improvement plans including any/all easements. Required to submit Tract Map to ALW Water Division for review and approval prior to recording. 5. Plan check required. Required to submit a Water Plan & Tract Map for review and approval by Azusa Light & Water (ALW) using ALW latest title block. The plan approval is valid for one year from the date the plans are signed by ALW. 6. The owner shall take sole responsibility for cost incurred due to any modification, relocation or alteration of existing water facilities cause by this project to the satisfaction of Azusa Light and Water Department. 7. This project is subject to Ordinance No. 96-08 City of Azusa Municipal Code Section 78- 471 through 477 of Article VI, Division 5 entitled "Water System Development Fee" if there is any change in floor footage. Fees must be paid to the Azusa Light and Water Department prior to the final plan approval by Building Department. 8. This project- is subject to the Water Conservation requirements under the ALW Rules & Regulations - Water Utility Rule No. 21. This also includes the installation of water saving devices, such as ultra low-flow toilets (1.28 gallons per flush), low flow faucets, auto irrigation control units, SMART watering and drip irrigation. 9. The owner is required to remove any unused water facilities, including services, meters, fire services, irrigation meters, water vaults, etc. within project vicinity, abandon and completely sever from water main per ALW standards & shall be inspected & approved by ALW Water Inspector. This shall be done along all property boundaries (off-site and CITY OF AZUSA | ECONOMIC & COMMUNITY DEVELOPMENT DEPARTMENT | (626) 812-5200 www.azusaca.gov on-site) and within the project location along Todd Avenue, 10th Street, Sierra Madre Avenue, and all property boundaries. 10. The Fire Department Connection(s) (FDC)(s) shall not be installed on the riser of the backflow device. ALW is required to inspect the backflow devices. FDC(s) and fire backflow devices shall be painted red. 11. No public water facilities, including water mains, fire hydrants, and water meters are allowed on private property or private sidewalks. All proposed water meters, public fire hydrants, and public water mains shall be within the public right-of-way or within the street. 12. The proposed development shall have meters for each unit/building per ALW Water Standards. 13. If fire service line(s) are required for this project by the Fire Department it shall be placed on the ALW Water Plan. 14. The onsite private water system shall be labeled private and owned and maintained by the property owner. 15. The Water System Development fees are required to be paid in full for this development prior to the Water Plan approval. 16. The owner shall pay all current applicable fees and deposits required for this project. ALW staff shall be consulted for current and applicable fees. 17. The owner shall submit proposed water meter sizes for the proposed units. 18. Currently in Phase Ill of the Drought, recommend drought tolerant landscaping. 19. Will require installation of a new water mains along all property frontages including 10th Street, Todd Ave, Sierra Madre and a new 12" class 350 ductile iron water main from Todd Ave to the Rain Bird property tie in within the reconfigured golf course. Public water mains shall be ductile iron class 350 with a minimum size of 12-inches in diameter, sized & designed for project needs. The public water mains shall be inspected & approved by ALW Water Inspector prior to certificate of occupancy including: trenching, bedding, shading, placing of pipe, valves, fittings, thrust blocks, other underground utilities in place, vertical & horizontal crossing separations, leakage testing, flushing, disinfection, bacteriological, valve boxes raised to grade and lines flushed, final inspection, etc. 20. Contact Water Division for details on Specifications and Requirements. 21. The owner shall submit a water system and hydraulic analysis for proposed plan with proposed water demands for development including average day demand, max day demand, and peak hour demand. CITY OF AZUSA | ECONOMIC & COMMUNITY DEVELOPMENT DEPARTMENT | (626) 812-5200 www.azusaca.gov 22. The following estimated Water System Development Fee is based on Resolution No. 2021-C01 and will be changed to reflect the actual rate as of the day fees are paid. (Actual fees will be determined once additional information is provided and the plans have been approved by ALW) TOTAL $ 650,153.31 Fire Department: Preliminary Plan Review does not include Fire Department Comments. You will have to visit or call the County of Los Angeles Fire Department Fire Prevention Division Land Development Unit at 323-890-4243. Police Department: Should you choose to proceed with the subject project, the Police Department will provide comments at a later date. Residential $92,189/dwelling unit $ Commercial $1.00/square feet $ 1 x 288,000 = 288,000 Industrial $.43 /Square feet $ .43 x 842,217 = 362,153.31