HomeMy WebLinkAboutE-10 Staff Report - Award of Contract Arrow Highway ParkwayCONSENT ITEM
E-10
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
VIA: SERGIO GONZALEZ, CITY MANAGER
FROM: ROBERT DELGADILLO, P.E., DIRECTOR OF PUBLIC WORKS/CITY
ENGINEER
DATE: APRIL 17, 2023
SUBJECT: AWARD A CONTRACT FOR THE ARROW HIGHWAY PARKWAY &
MEDIAN LANDSCAPE IMPROVEMENTS PROJECT – PHASE II; AND
ENTER INTO A MEMORANDUM OF UNDERSTANDING WITH THE
CITY OF COVINA
BACKGROUND:
On September 19, 2022 the City Council authorized staff to solicit a Notice of Inviting Bids for
the Arrow Highway Street Resurfacing and Highway Safety Improvement Project – Phase I and
Phase II. The proposed improvements in Phase II include median landscaping, irrigation, and
parkway improvements within Azusa, Covina and Los Angeles County jurisdictions. Sealed bids
were received on March 22, 2023. The proposed actions will award a contract to KASA
Construction for the improvements included in the Base Bid and Alternate Bid Schedules, and will
authorize the City Manager to execute a Memorandum of Understanding with the City of Covina
for the construction of improvements within Covina’s jurisdiction.
RECOMMENDATIONS:
Staff recommends the City Council take the following actions:
1)Award a contract in the amount of $1,945,183.73, which includes a contingency in the
amount of $105,125.48 for potential change orders as needed, to KASA Construction; and
2) Authorize the City Manager to execute a Memorandum of Understanding with the City of
Covina for a not to exceed amount of $698,569.70 for the construction of the Arrow
Highway Parkway and Median Landscape Improvements within Covina’s jurisdiction; and
Approved
City Council
April 17, 2023
AWARD A CONTRACT FOR THE ARROW HIGHWAY PARKWAY & MEDIAN
LANDSCAPE IMPROVEMENTS PROJECT – PHASE II
APRIL 17, 2023
Page 2
3) Authorize the City Manager to execute contracts, in a form acceptable to the City Attorney,
on behalf of the City.
ANALYSIS:
The City of Azusa is currently under contract with Toro Enterprises, Inc. for the construction of
the Arrow Highway improvements in Phase I which includes the installation of raised median
islands, street resurfacing, signage & striping, and traffic signal modifications. The proposed
improvements in Phase II for the Arrow Highway Parkway and Median Landscape Improvements
Project includes landscaping and irrigation in the raised median islands and parkway areas located
within the City of Azusa, City of Covina and Los Angeles County jurisdictions along Arrow
Highway from 500 feet west of Azusa Avenue to 855 feet east of Citrus Avenue.
As a part of the Phase II improvements, an alternate bid schedule was included in the contract bid
forms for proposed improvements throughout the project limits that fall within the City of Covina.
By entering into this memorandum of understanding, the City of Azusa is acting as the lead agency
for the project and the City of Covina will be providing payment for those improvements made
within their jurisdiction.
Sealed bids were received publicly on March 22, 2023. The results are as follows:
No. Company Location Total Base Bid
1 KASA Construction Chino, CA $1,051,254.75
2 Marina Landscape, Inc. Orange, CA $1,142,653.00
3 Southern California Landscape, Inc. Fontana, CA $1,214,217.05
4 Mariposa Landscape, Inc. Irwindale, CA $1,292,238.36
5 C.S. Legacy Construction, Inc. Walnut, CA $1,394,161.35
The lowest, responsive bid was submitted by KASA Construction who has been in business in
Southern California since 2008. KASA Construction is a general and landscape contractor which
holds additional contractor licenses including Class B and C-10.
ENVIRONMENTAL CLEARANCE:
This action is categorically exempt from the requirements of the California Environmentally
Quality Act (CEQA) pursuant to Section 15301 Class 1 (c) – Rehabilitation of Existing Streets and
Highways. Staff has filed a Notice of Exemption with the Los Angeles County Clerk’s Office.
AWARD A CONTRACT FOR THE ARROW HIGHWAY PARKWAY & MEDIAN
LANDSCAPE IMPROVEMENTS PROJECT – PHASE II
APRIL 17, 2023
Page 3
FISCAL IMPACT:
The recommended actions award a contract to KASA Construction in the amount of $1,840,058.25
(Base Bid $1,051,254.75 + Alternate Bid $788,803.50) and further authorizes staff to amend the
contract up to 10% of the Base Bid Price or $105,125.48 for a total not-to-exceed contract amount
of $1,945,183.73. This construction project will be funded by $940,000 with LACMTA Local-
Return Funds per Exchange Agreement (STPL Funds Balance), and $1,005,183.73 with available
Measure M funds. Upon Council approval, staff will prepare a budget amendment and increase
$940,000 in STPL budget and $1,005,183.73 in Measure M budget under the Public Works
Department.
The City of Azusa has agreed to fund the landscaping improvements within the County’s
jurisdiction per the Cooperative Agreement approved by Council on April 5, 2022.
Per the Memorandum of Understanding (MOU), the City of Covina shall reimburse the City of
Azusa for construction administration services and improvements constructed within the City of
Covina’s right of way as a part of this project. The total estimated cost for Covina’s improvements
is $698,569.70. Any increases related to the construction of the project will be reflected in an
amendment to the proposed agreement. Covina’s actual shared costs will be based upon a final
accounting after completion of the project. After the City of Covina reimburses the City of Azusa
for the stated scope of work in the amount of $698,569.70, the net project costs will be
$1,246,614.03 ($1,945,183.73 - $698,569.70)
Prepared by: Reviewed by:
Christina Curiel Robert Delgadillo, P.E.
Public Works Project Manager Director of Public Works/ City Engineer
Fiscal Review by: Reviewed and Approved by:
Talika M. Johnson Sergio Gonzalez
Director of Administrative Services City Manager
Attachment:
1) Public Works Contract
2) KASA Construction Bid
3) MOU between the City of Azusa and the City of Covina
CONTRACT
- 1 -
CITY OF AZUSA STANDARD CONTRACT
ARROW HIGHWAY PARKWAY AND MEDIAN LANDSCAPE IMPROVEMENTS
PROJECT – PHASE II
THIS CONTRACT is made this __ day of April, 2023, in the County of Los Angeles,
State of California, by and between the City of Azusa, hereinafter called City, and KASA
Construction, Inc., hereinafter called Contractor. The City and the Contractor for the
considerations stated herein agree as follows:
ARTICLE 1. SCOPE OF WORK. The Contractor shall perform all Work within the time
stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services,
and transportation to complete all of the Work required in strict compliance with the Contract
Documents as specified in Article 5 below for the following Project:
ARROW HIGHWAY PARKWAY AND MEDIAN LANDSCAPE IMPROVEMENTS
PROJECT – PHASE II
The Contractor and its surety shall be liable to the City for any damages arising as a result of the
Contractor’s failure to comply with this obligation.
ARTICLE 2. TIME FOR COMPLETION. The Work shall be commenced on the date stated
in the City’s Notice to Proceed. The Contractor shall complete all Work required by the Contract
Documents within 60 working days from the commencement date stated in the Notice to
Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is
adequate and reasonable to complete the Work.
ARTICLE 3. CONTRACT PRICE. The City shall pay to the Contractor as full compensation
for the performance of the Contract, subject to any additions or deductions as provided in the
Contract Documents, and including all applicable taxes and costs, the sum of One Million Eight
Hundred Forty Thousand Fifty Eight Dollars and Twenty Five Cents ($1,840,058.25). Payment
shall be made as set forth in the General Conditions.
ARTICLE 4. LIQUIDATED DAMAGES. In accordance with Government Code section
53069.85, it is agreed that the Contractor will pay the City the sum of $500 for each and every
calendar day of delay beyond the time prescribed in the Contract Documents for finishing the
Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the
Contractor agrees the City may deduct that amount from any money due or that may become due
the Contractor under the Contract. This Article does not exclude recovery of other damages
specified in the Contract Documents.
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents”
include the following:
Attachment 1
CONTRACT
- 2 -
Notice Inviting Bids
Instructions to Bidders
Bid Form
Contractor’s Certificate Regarding Workers’ Compensation
Bid Bond
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Affidavit form
Contract
Performance Bond
Payment Bond
General Conditions
Special Conditions
Technical Specifications
Addenda
Plans and Drawings
Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract
The Contactor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. This Contract shall
supersede any prior agreement of the parties.
ARTICLE 6. PROVISIONS REQUIRED BY LAW. Each and every provision of law
required to be included in these Contract Documents shall be deemed to be included in these
Contract Documents. The Contractor shall comply with all requirements of the California Labor
Code applicable to this Project.
ARTICLE 7. INDEMNIFICATION. Contractor shall provide indemnification as set forth in
the General Conditions.
ARTICLE 8. PREVAILING WAGES. Contractor shall be required to pay the prevailing rate
of wages in accordance with the Labor Code which such rates shall be made available at Azusa
City Hall or may be obtained online at http//www.dir.ca.gov/dlsr and which must be posted at the
job site.
ARTICLE 9. DECLARATION OF POLITICAL CONTRIBUTIONS. Consultant shall,
throughout the term of this Agreement, submit to City an annual statement in writing declaring
any political contributions of money, in-kind services, or loan made to any member of the city
council within the previous twelve-month period by the Consultant and all of Consultant's
employees, including any employee(s) that Consultant intends to assign to perform the Services
described in this Agreement.
ARTICLE 10. CONFLICT OF INTEREST. In the procurement of supplies, equipment,
construction, and services by sub-recipients, the conflict of interest provisions in (State LCA –
CONTRACT
- 3 -
24 CFR 85.36 and Non-Profit Organizations – 24 CFR 84.4), OMB Circular A-110, and 24 CFR
570.611, respectively, shall apply. No employee, officer or agent of the sub-recipient shall
participate in selection, or in the award or administration of a contract supported by Federal
funds if a conflict of interest, real or apparent, would be involved.
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named
parties, on the day and year above written.
KASA CONSTRUCTION, INC.
________________________________
Name and Title
________________________________
Signature of Contractor
License No. ______________________
CITY OF AZUSA
________________________________
Robert Gonzales
Mayor
________________________________
Sergio Gonzalez
City Manager
________________________________
Jeffrey Lawrence Cornejo Jr.
City Clerk
Approved as to Form:
______________________________
Best Best & Krieger LLP
City Attorney
BONDS
- 4 -
PERFORMANCE BOND
FOR
ARROW HIGHWAY PARKWAY AND MEDIAN LANDSCAPE IMPROVEMENTS
PROJECT – PHASE II
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, City of Azusa (hereinafter referred to as “City”) has awarded to KASA
Construction, Inc., (hereinafter referred to as the “Contractor”) an agreement for ARROW
HIGHWAY PARKWAY AND MEDIAN LANDSCAPE IMPROVEMENTS PROJECT -
PHASE II (hereinafter referred to as the “Project”).
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project, (hereinafter referred to as “Contract Documents”), the terms
and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof
and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, KASA Construction, Inc., the undersigned Contractor and
_____________________________________________ as Surety, a corporation organized and
duly authorized to transact business under the laws of the State of California, are held and firmly
bound unto the City in the sum of One Million Eight Hundred Forty Thousand Fifty Eight
Dollars and Twenty Five Cents ($1,840,058.25), said sum being not less than one hundred
percent (100%) of the total amount of the Contract, for which amount well and truly to be made,
we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and
severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs,
executors, administrators, successors or assigns, shall in all things stand to and abide by, and
well and truly keep and perform the covenants, conditions and agreements in the Contract
Documents and any alteration thereof made as therein provided, on its part, to be kept and
performed at the time and in the manner therein specified, and in all respects according to their
intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of
all materials and workmanship; and shall indemnify and save harmless the City, its officers and
agents, as stipulated in said Contract Documents, then this obligation shall become null and void;
otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefore,
there shall be included costs and reasonable expenses and fees including reasonable attorney’s
fees, incurred by City in enforcing such obligation.
As a condition precedent to the satisfactory completion of the Contract Documents, unless
otherwise provided for in the Contract Documents, the above obligation shall hold good for a
period of one (1) year after the acceptance of the work by City, during which time if Contractor
shall fail to make full, complete, and satisfactory repair and replacements and totally protect the
City from loss or damage resulting from or caused by defective materials or faulty workmanship.
BONDS
- 5 -
The obligations of Surety hereunder shall continue so long as any obligation of Contractor
remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations
under the Contract, law or equity, including, but not limited to, California Code of Civil
Procedure section 337.15.
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract
Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall
promptly, at the City’s option:
(1) Take over and complete the Project in accordance with all terms and conditions in
the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and
conditions in the Contract Documents and upon determination by Surety of the
lowest responsive and responsible bidder, arrange for a Contract between such
bidder, the Surety and the City, and make available as work progresses sufficient
funds to pay the cost of completion of the Project, less the balance of the contract
price, including other costs and damages for which Surety may be liable. The
term “balance of the contract price” as used in this paragraph shall mean the total
amount payable to Contractor by the City under the Contract and any
modification thereto, less any amount previously paid by the City to the
Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with California
law and make available as work progresses sufficient funds to pay the cost of
completion of the Project, less the balance of the contract price, including other
costs and damages for which Surety may be liable. The term “balance of the
contract price” as used in this paragraph shall mean the total amount payable to
Contractor by the City under the Contract and any modification thereto, less any
amount previously paid by the City to the Contractor and any other set offs
pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be
proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from
Contractor for completion of the Project if the CITY, when declaring the Contractor in default,
notifies Surety of the City’s objection to Contractor’s further participation in the completion of
the Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract Documents or to the Project to be performed
thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of
any such change, extension of time, alteration or addition to the terms of the Contract Documents
or to the Project.
BONDS
- 6 -
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________________, 2023.
_________________________________________
CONTRACTOR/PRINCIPAL
_________________________________________
Name
By_______________________________________
SURETY:
By: ______________________________________
Attorney-In-Fact
The rate of premium on this bond is ____________ per thousand. The total amount of premium
charges, $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________
___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________
Representative for service of
process in California, if different ___________________________________________
from above)
___________________________________________
(Telephone number of Surety and ___________________________________________
Agent or Representative for service
of process in California
BONDS
- 7 -
STATE OF CALIFORNIA
COUNTY OF
On before me, (here insert
name and title of the officer), personally appeared , who proved
to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to
the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under penalty of perjury under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature __________________________________
(Seal)
NOTE: A copy of the Power-of-Attorney to local representatives of the bonding company must
be attached hereto.
BONDS
- 8 -
PAYMENT BOND
FOR
ARROW HIGHWAY PARKWAY AND MEDIAN LANDSCAPE
IMPROVEMENTS PROJECT - PHASE II
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Azusa (hereinafter designated as the “City”) has awarded to KASA Construction, Inc., hereinafter designated as the “Principal,” a contract for the work described as follows: ARROW HIGHWAY PARKWAY AND MEDIAN LANDSCAPE IMPROVEMENTS PROJECT – PHASE II (the “Project”); and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of One Million Eight Hundred Forty Thousand Fifty Eight Dollars and Twenty Five Cents ($1,840,058.25) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 3181 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.
This bond shall inure to the benefit of any of the persons named in Section 3181 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for
BONDS
- 9 -
performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 3110 or 3112 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned.
IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed unoriginal thereof, have been duly executed by the Principal and Surety above named, on the _____ day of ______________________ 2021 the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.
(Corporate Seal of Principal,
if corporation) Principal (Property Name of
Contractor)
By
(Signature of Contractor)
(Seal of Surety)
Surety
By
Attorney in Fact
(Attached Attorney-In-Fact
Certificate and Required
Acknowledgements)
*Note: Appropriate Notarial Acknowledgments of Execution by
Contractor and +surety and a power of Attorney MUST BE ATTACHED.
MEMORANDUM OF UNDERSTANDING
BETWEEN
THE CITY OF AZUSA AND THE CITY OF COVINA
FOR THE ARROW HIGHWAY PARKWAY AND MEDIAN LANDSCAPING
IMPROVEMENTS PROJECT – PHASE I & II
THIS MEMORANDUM OF UNDERSTANDING (“MOU”) is entered into this ___ day
of ________, 2023 (“Effective Date”), between the CITY OF AZUSA, a California municipal,
hereinafter called “Covina” and the CITY OF COVINA, a California municipal corporation,
hereinafter called “Covina.” Azusa and Covina are sometimes referred to herein as “Party” and
collectively as the “Parties” or “Cities.”
RECITALS
1. Both Azusa and Covina desire to construct new medians with landscaping and improve
the roadway pavement on Arrow Highway from 500 feet west (Westerly City Limit) of
Azusa Avenue to 855 feet east of Citrus Avenue (Southerly City Sidewalk). The work
will consist of construction of raised medians with landscaping, construction of bio-
infiltration basins, construction of ADA curb ramps, revised signage and striping,
resurfacing of the roadway, and reconstruction of damaged sidewalks.
2.The Arrow Highway Street Resurfacing and Highway Safety Improvement Project herein
and after referred to as the “Project Improvements”, will be constructed in two phases as
detailed below:
a.Phase I
i.Remove existing and construct curb ramp per Caltrans Std Plan A88A,
Type per plan.
ii.Install Truncated Domes
iii.Construct Bio-Infiltration Basins Curb Cut Openings – R & R Curb and
Gutter, 10 feet per Bio-Filtration Basin.
b.Phase II
i.Remove existing AC pavement and Construct 4-inch Thick PCC Sidewalk
over compacted native, per SPPWC Std. Plan 113-2
ii.Remove existing parkway tree and stump
iii.Remove and construct tree well along parkway, complete per plan.
iv.Remove existing AC paving and sub-base. Construct bio-infiltration
basins, complete assembly per plans and specifications.
v.Furnish and install 36-in box size Muskogee Crape Myrtle tree in tree well
and parkway, complete per plan including root barrier, decomposed
granite tree well cover, Class A top soil as shown on plan and details.
vi.Perform soil preparation in bio-infiltration basin planting area.
vii.Furnish and install 3-inch layer of shredded red wood mulch top dress.
viii. Furnish and install 1-gallon size shrub complete per plan.
ix. Perform 90-calendar day landscape maintenance complete per
specifications including manual tree well and bio-infiltration basin
irrigation.
x. Remove, dispose and construct PCC curb ramp per SPPWC Std. Plan No.
111-5, case and type as indicated on the construction plans.
3. The Parties desire that Azusa, and not Covina, shall have the responsibility and express
authority/permission to construct or cause to be constructed all of the Landscape and
Roadway Improvements.
4. The City of Covina desires to contribute financially to the construction of the Project
Improvements within City of Covina city limits, the area defined as Arrow Highway from
500 feet west (Westerly City Limit) of Azusa Avenue to 855 feet east of Citrus Avenue
(Southerly City Sidewalk), including the actual costs of construction, inspection, material
testing and construction management , as set forth in this MOU.
5. The Parties desire to divide the ongoing maintenance responsibilities and costs related to
the Landscape and Project Improvements in the manner set forth in this MOU.
AGREEMENT
NOW, THEREFORE, for and in consideration of the mutual covenants and conditions
contained herein, the parties hereby agree as follows:
1. CONSTRUCTION OF LANDSCAPE AND ROADWAY IMPROVEMENTS.
Azusa shall have the sole responsibility to construct and install and/or cause to be constructed
and installed all Project Improvements within nine (9) months after award of a contract to the
contractor. Covina hereby, agrees to cooperate with Azusa, as may be necessary, and respond to
reasonable inquiries and requests from Azusa throughout the construction phase of this MOU.
Azusa agrees to construct the Project Improvements as they are shown in Exhibit A. In the event
a modification to the design becomes necessary due to changed conditions or later discovered
conditions, Azusa shall advise Covina of the design change, or modification, and the costs of
such change or modification and shall obtain Covina’s written approval prior to Azusa’s
approval of any design change or modification.
2. COST ALLOCATION OF CONSTRUCTION SERVICES. All costs associated with
the construction of the - Project Improvements within the City of Covina city limits, the area
defined as Arrow Highway from 500 feet west (Westerly City Limit) of Azusa Avenue to 855
feet east of Citrus Avenue (Southerly City Sidewalk), including actual costs of construction and
all costs incurred by Azusa to let and administer any construction contract, shall be paid by
Covina.
The Cost Estimate for the construction of the Project Improvements within the City of Covina is
set forth in Exhibit “B,” attached hereto and incorporated herein by this reference. In no event
shall Covina’s share of the costs of the Project Improvements exceed Six Hundred and Ninety-
Eight Thousand Five Hundred and Sixty-Nine Dollars and Seventy Cents ($698,569.70)
without prior written approval of both Cities memorialized by an amendment to this MOU.
3. PAYMENT OF CONSTRUCTION COSTS.
A. Azusa agrees to submit to Covina invoices in electronic format (pdf) for construction,
inspection and construction administration costs (and with supporting documentation
satisfactory to Covina), that are itemized and specify (i) the particular construction
service rendered; (ii) the total cost thereof; and (iii) that dollar amount which shall
correspond to the quantities and unit prices shown on the Cost Estimate; and which
represent the total amount to be contributed by Covina for the construction of the
Project Improvements.
B. Covina shall submit payment to Azusa for the full amount showing due on any and all
invoices submitted by Azusa pursuant to this MOU, thirty (30) days following
Covina’s receipt of an invoice.
C. In the event that Covina disputes the amounts stated on any itemized invoice, Azusa
shall submit along with payment of the full amount showing due, including the
amount in dispute, a written notice of such dispute and the basis for the dispute. The
Parties shall endeavor to resolve any such disputes within a reasonable time after
Azusa’s receipt of a notice of dispute and payment. Any adjustments in the invoice
amount upon resolution of the dispute will be credited to future invoices, or returned
if no invoices are forthcoming.
4. MAINTENANCE. Azusa and Covina shall each perform and pay the cost of all
operation and maintenance services, as necessary, for the proper operation, maintenance and
repair of the Project Improvements, and any portion thereof, situated within their respective city
limits.
5. INDEMNITY. Azusa and Covina both mutually agree to indemnify, defend and hold
harmless each other and their respective officers, agents, volunteers, servants and employees
from any and all claims, demands, liabilities, debts, damages, suits, losses, actions and causes of
action, of whatever kind, nature or sort, including, but not by way of limitation, wrongful death,
personal injury or damage to property, the expenses of the defense of said parties and the
payment of attorneys’ fees in any such claim or action, occurring or resulting, in any way, from
the actual or alleged negligent acts or omissions or willful misconduct of either party arising out
of the performance of services by either party, or their officers, agents, volunteers, servants and
employees, in connection with the performance of this MOU.
6. TERM. This MOU shall be deemed to have become effective on the Effective Date and
shall expire on December 31, 2023.
7. NOTICE. Any notice required or permitted to be sent to each party shall be sent by
regular mail, addressed as follows:
City of Azusa
213 E. Foothill Blvd
Azusa, CA 91702
ATTN: Robert Delgadillo
Director of Public Works/City Engineer
City of Covina
125 E. College Street
Covina, CA 91723
ATTN: Rafael M. Fajardo
City Engineer
9. GOVERNING LAW/VENUE. This MOU shall be governed by the laws of the State of
California. Any action or proceeding between the Parties concerning the interpretation of this
MOU shall be instituted and prosecuted in the Los Angeles County Superior Court, Pomona
Courthouse.
10. AMENDMENTS. Only a writing executed by the parties hereto or their respective
successors and assigns may amend this MOU.
11. WAIVER. The delay or failure of either party at any time to require performance or
compliance by the other of any of its obligations or agreements shall in no way be deemed a
waiver of those rights to require such performance or compliance. No waiver of any provision of
this MOU shall be effective unless in writing and signed by a duly authorized representative of
the party against whom enforcement of a waiver is sought. The waiver of any right or remedy in
respect to any occurrence or event shall not be deemed a waiver of any right or remedy in respect
to any other occurrence or event, nor shall any waiver constitute a continuing waiver.
12. SEVERABILITY. If any provision of this MOU is determined by a court of competent
jurisdiction to be unenforceable in any circumstance, such determination shall not affect the
validity or enforceability of the remaining terms and provisions hereof or of the offending
provision in any other circumstance. Notwithstanding the foregoing, if the value of this MOU,
based upon the substantial benefit of the bargain for any party, is materially impaired, which
determination made by the presiding court or arbitrator of competent jurisdiction shall be
binding, then both Parties agree to substitute such provision(s) through good faith negotiations.
13. COUNTERPARTS. This MOU may be executed in one or more counterparts, each of
which shall be deemed an original. All counterparts shall be construed together and shall
constitute one agreement.
[SIGNATURES ON FOLLOWING PAGE]
IN WITNESS WHEREOF, the Parties hereto have caused this MOU to be executed by
and through their respective authorized officers, as of the date first above written.
City of Azusa, a Municipal Corporation
Date By
Sergio Gonzalez, City Manager
Approved as to Form: ATTEST:
Best, Best & Krieger LLP, City Attorney Jeffrey L. Cornejo, Jr., City Clerk
City of Covina, a Municipal Corporation
Date By
Christopher Marcarello, City Manager
Approved as to Form: ATTEST:
Candice K. Lee, City Attorney Fabian Velez
Deputy City Clerk
EXHIBIT A
(PHASE I AND PHASE II DESIGN PLANS)
1477
17263
17511
1453
1476
887
942
155
273
17523
768
17515
433
1480
1460
17525
433
CITY OF AZUSA
ENGINEERING DIVISION
Know what'sbelow.
Callbefore you dig.
®
AZUSA AVE
AZUSA AVE
ARROW HIGHWAY
ARROW HIGHWAY
PHASE I
1484
603
1479
583
478
563
565
1474
573
520
576
536 562
565
469
543
644 628
475
610
1481
461
636
531
1473
523
652 620 602660
543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543543
469
543543543543543543543543543543543543543543543543543543543543
700
543543543543543543543543543
461
543543543543543543543543543543543543543543543543
CITY OF AZUSA
ENGINEERING DIVISION
Know what'sbelow.
Callbefore you dig.
®
ARMEN DR
CERRITOS AVE
HEATHDALE AVE
ARROW HIGHWAY
ARROW HIGHWAY
CERRITOS AVE
PHASE I
713705 721
338356384
693
374
651
412
685
1477346366
701
265
1476
217249
729
257273 225235
735
1481
743
281 211
791753767
257
CITY OF AZUSA
ENGINEERING DIVISION
Know what'sbelow.
Callbefore you dig.
®
ARROW HIGHWAY
ARROW HIGHWAY
FENMORE AVE
PHASE I
205
855
136108
1371
915
211
110
873
154
18659
176 236216
18615
18537
CITY OF AZUSA
ENGINEERING DIVISION
Know what'sbelow.
Callbefore you dig.
®
ARROW HIGHWAY
ARROW HIGHWAY
CITRUS AVE
CITRUS AVE
PHASE I
ARROW HIGHWAY
AZUS
A
A
V
E
N
U
E
AZUS
A
A
V
E
N
U
E
ARROW HIGHWAY
ARM
E
L
D
R
I
V
E
AZUSA
ALDE
N
V
I
L
L
E
A
V
E
N
U
E
FENIM
O
R
E
A
V
E
N
U
E
CITY OF AZUSA
ENGINEERING DIVISION
Know what'sbelow.
Callbefore you dig.
®
NOTE: ALL DIMENSIONS ARE SHOWN IN FEET
UNLESS OTHERWISE NOTED.
ABBREVIATIONS
CITY OF AZUSA
CALIFORNIA
ARROW HIGHWAY
PARKWAY AND MEDIAN LANDSCAPE IMPROVEMENTS PROJECT
PHASE 2
PLAN DESCRIPTION
SHEET INDEX
VICINITY MAP
NO
R
T
H
PROJECT
LOCATION
PROJECT
LOCATION
SEWER
PUBLIC UTILITIES CONTACTS
WASTEWATER
ELECTRICITY
TELEPHONE
CHARTER
POLICE
FIRE
LANDFILLS
LEGEND
FOOTHILL TRANSIT
WATER AND LIGHT
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
TITLE SHEET
T-1
1453
887
5A 5A
A
B
5A
5B
5A A
5A 5A 5A 5A
5A 5A
3
2 24
3
4
2
1
17523
1476
17515 17525
5A 5A 5A 5A 5A 5A
5A 5A 5A
3
2 4 24
1 1
1
CONSTRUCTION NOTES:
2
REMOVAL NOTES:
A
B
3
4
5A
5B
6
GENERAL CONSTRUCTION NOTES:
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
SE
E
B
E
L
O
W
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
1
6
+
8
7
ARROW HIGHWAY
AZUSA AVE
AZUSA AVE
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
1
6
+
8
7
SE
E
P
L
A
N
N
O
.
L
2
MA
T
C
H
L
I
N
E
S
T
A
2
3
+
5
0
L-1
ARROW HIGHWAY
BIG
D
A
L
T
O
N
W
A
S
H
AZUSA AVE
AZUSA AVE
CITY OF COVINA
LEGEND
MEDIAN AND PARKWAY LANDSCAPE LAYOUT AND CONSTRUCTION PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
768 1480 700
5A 5A 5A
5A
5A 5A 5A 5A 5A 5A 5A 5A
3 3 33
2
4
2
2
4
2
1 1 1 1 1
1481
5A 5A 5A
3 3
5A 5A 5A 5A 5A 5A 5A 5A 5A
5A
6 5A
6
4
2
2
4
2
2
4
·
·
11
1
CONSTRUCTION NOTES:
2
REMOVAL NOTES:
A
B
3
4
5A
5B
6
GENERAL CONSTRUCTION NOTES:
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
SE
E
L
O
W
E
R
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
2
9
+
8
5
SE
E
P
L
A
N
N
O
.
L
1
MA
T
C
H
L
I
N
E
S
T
A
2
3
+
5
0
L-2
ARROW HIGHWAY
SE
E
U
P
P
E
R
R
I
G
H
T
-
M
A
T
C
H
L
I
N
E
S
T
A
2
9
+
8
5
SE
E
P
L
A
N
N
O
.
L
3
MA
T
C
H
L
I
N
E
S
T
A
3
6
+
5
0
ARMEL DR
ARROW HIGHWAY
CITY OF COVINA
LEGEND
A
B
C
D
E
B
A
B
C
A
D
D
G
E
G
F
F
F
F
F
F
AA
A
A
G
AA BB
BB
GENERAL NOTES BIO-INFILTRATION BASIN - TYPICAL LAYOUT
NOT TO SCALE
·
·
MEDIAN AND PARKWAY LANDSCAPE LAYOUT AND CONSTRUCTION PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
K
J
H
PLAN SECTION A-A
K
J
I
1
H
I
J
K
M
L
L
M
NOTE N
N
O
O
SECTION B-B
M
P
Q
R
Q
Q
P
P
R
M
A A
PCC WARNING/RETAINING CURB
NOT TO SCALE
COMPACTED NATIVE, PER SPPWC
1484
1479
520536 562
5B
A
5B
A
3
5A 5A 5A6
3 3
2
4
2
2
4
·
·
1 1
478
412
5A 5A
5A 5A 5A 5A 5A 5A
3 3
2
4
2
2
4
1
CONSTRUCTION NOTES:
2
REMOVAL NOTES:
A
B
3
4
5A
5B
6
GENERAL CONSTRUCTION NOTES:
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
L-3
SE
E
L
O
W
E
R
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
4
3
+
0
0
SE
E
P
L
A
N
N
O
.
L
2
MA
T
C
H
L
I
N
E
S
T
A
3
6
+
5
0
HEATHDALE AVE
ARROW HIGHWAY
HOLLENBECK AVE
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
4
3
+
0
0
SE
E
P
L
A
N
N
O
.
L
4
MA
T
C
H
L
I
N
E
S
T
A
4
9
+
3
6
ARROW HIGHWAY
CERRITOS AVE
HOLLENBECK AVE
CERRITOS AVE
CITY OF COVINA
LEGEND
·
·
MEDIAN AND PARKWAY LANDSCAPE LAYOUT AND CONSTRUCTION PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
OVER COMPACTED NATIVE,
3 3 3
6 5A 6 5A3A3A5A5A5A5A5A5A 5A
2 2
2
4 2
·
·
265 249257273281257
2 3 3
65A 5A
2
4
2
4
2 7
·
·
1
CONSTRUCTION NOTES:
2
REMOVAL NOTES:
A
B
3
4
5A
5B
6
GENERAL CONSTRUCTION NOTES:
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
L-4
SE
E
L
O
W
E
R
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
5
5
+
0
7
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
5
5
+
0
7
SE
E
P
L
A
N
N
O
.
L
3
MA
T
C
H
L
I
N
E
S
T
A
4
9
+
3
6
ARROW HIGHWAY
ALDENVILLE AVE
SE
E
P
L
A
N
N
O
.
L
5
MA
T
C
H
L
I
N
E
S
T
A
6
1
+
5
0
ARROW HIGHWAY
LEGEND
FENMORE AVE
·
·
MEDIAN AND PARKWAY LANDSCAPE LAYOUT AND CONSTRUCTION PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
CITY OF COVINA
COUNTY OF LOS ANGELES
COMPACTED NATIVE, PER SPPWC
COMPACTED NATIVE PER SPPWC
217225
1371
235 211
3 3 32
2
4
2
24
154136108
110
3 3
2
4
2
1
1
CONSTRUCTION NOTES:
2
REMOVAL NOTES:
A
B
3
4
5A
5B
6
GENERAL CONSTRUCTION NOTES:
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
L-5
SE
E
L
O
W
E
R
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
6
8
+
0
0
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
6
8
+
0
0
SE
E
P
L
A
N
N
O
.
L
6
MA
T
C
H
L
I
N
E
S
T
A
7
4
+
5
0
CITRUS AVE
SE
E
P
L
A
N
N
O
.
L
4
MA
T
C
H
L
I
N
E
S
T
A
6
1
+
5
0
ARROW HIGHWAY
ARROW HIGHWAY
CITRUS AVE
CITY OF COVINA
COUNTY OF LOS ANGELES
MEDIAN AND PARKWAY LANDSCAPE LAYOUT AND CONSTRUCTION PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
176 216
3 3
2
4
2
4
1
CONSTRUCTION NOTES:
2
REMOVAL NOTES:
A
B
3
4
5A
5B
6
GENERAL CONSTRUCTION NOTES:
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
L-6
SE
E
P
L
A
N
N
O
.
L
5
MA
T
C
H
L
I
N
E
S
T
A
7
4
+
5
0
ARROW HIGHWAY
1
2
3
4
·
·
·
·
·
·
1
2
3
4
5
6
6
2
3
1
45
5
4
1
3
1
2
TYPICAL MEDIAN SECTION
4
3
NOTE:
COBBLESTONE PAVING AND LANDSCAPE BOULDERS
NOTES:
1
2
3
4
5
6
7
1
2
2
2
3
3
3
44
NOTES:
5
866
TYPICAL PLAN
A A
9
10
9
7
3 2 8
CROSS SECTION A-A
2NEW TREE WELL OR RECONSTRUCTED EXISTING TREE WELL NTS1
TOOLED
JOINT
EXPANSION
JOINT
1
2
3
4
5
2 3
2
1
3
4
5
3 JOINT(S)NTSTYPICAL MEDIAN CROSS SECTION
GENERAL NOTES
CROSS SECTION X-X
PLAN
X X
1
4
5
2
6
5
1
2
3
4
5
6
7
8
8
23
9
9
77
7
10
10
10
1
1
11
1111
12
13
12
4 83
13
6
7
NOTES:
11
4 NTS
NTS8
NTS
NTS
SUMP DRAIN
PCC CURB OPENING - INLET/OUTLET
1 NTSSLOT CUT - CURB & GUTTER REPLACEMENT
MEDIAN AND PARKWAY LANDSCAPE LAYOUT AND CONSTRUCTION PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
NOT USED
5
CITY OF COVINA
COUNTY OF LOS ANGELES
1453
887
POC 1
EX. WATER METER: 1"
BACKFLOW: 112"
112"
A
·
·
1
2 3 3
3
1
1"
5.5A-1
DRIP
3 3
3
3
3
3 3 3
3
3 3
17523
1476
17515 17525
112"
1"
6.0B-1
1"
4.0B-2
DRIP RZWS
BACKFLOW: 112"
·
·
1
POC 2
EX. WATER METER: 1"
1
B
3 3 3 3
3 3
3 3 3
2
IRRIGATION CONSTRUCTION NOTES
·
·
·
1
3
2
THIS SYSTEM IS DIAGRAMMATIC. ALL PIPE, VALVES, CONTROLLERS, EQUIPMENT AND ETC. SHOWN WITHIN PAVED AREAS
ARE FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED IN PLANTING AREAS WHEREVER POSSIBLE.
CITY OF AZUSA
ENGINEERING DIVISION
Know what'sbelow.
Callbefore you dig.
®
SE
E
B
E
L
O
W
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
1
6
+
8
4
ARROW HIGHWAY
AZUSA AVE
AZUSA AVE
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
1
6
+
8
4
SE
E
P
L
A
N
N
O
.
L
-
8
MA
T
C
H
L
I
N
E
S
T
A
2
3
+
5
0
L-7
ARROW HIGHWAY
BIG
D
A
L
T
O
N
W
A
S
H
AZUSA AVE
AZUSA AVE
SEE PLAN NO. L-10 FOR IRRIGATION
SCHEDULE & L-12 FOR IRRIGATION
LEGEND, TABLES AND NOTES
IRRIGATION PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
768 1480 700
112"
1"
9.0C-1
DRIP 1"
12.0C-2
RZWS 1"
7.0C-3
DRIP 1"
7.0C-4
DRIP 1"
7.5C-5
DRIP
333333
·
·
1
BACKFLOW: 112"
POC 3
EX. WATER METER: 1"
1
C
112"
3 3
3
3
3 3 3 3 3 3 3 3
112"
2
1481
BACKFLOW: 112"
D
112"
1"
7.0D-1
DRIP 1"
8.0D-3
DRIP
3 3 3 3 3 3 3
3
1"
9.0D-2
RZWS
POC 4
EX. WATER METER: 1"
1
·
·
1
3 33 3 3 3
3 3 3 3 3 3 3 333
2
IRRIGATION CONSTRUCTION NOTES
·
·
·
1
3
2
THIS SYSTEM IS DIAGRAMMATIC. ALL PIPE, VALVES, CONTROLLERS, EQUIPMENT AND ETC. SHOWN WITHIN PAVED AREAS
ARE FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED IN PLANTING AREAS WHEREVER POSSIBLE.
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
SE
E
L
O
W
E
R
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
3
0
+
0
0
SE
E
P
L
A
N
N
O
.
L
-
7
MA
T
C
H
L
I
N
E
S
T
A
2
3
+
5
0
L-8
ARROW HIGHWAY
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
3
0
+
0
0
SE
E
P
L
A
N
N
O
.
L
-
9
MA
T
C
H
L
I
N
E
S
T
A
3
6
+
5
0
ARMEL DR
ARROW HIGHWAY
SEE PLAN NO. L-10 FOR IRRIGATION
SCHEDULE & L-12 FOR IRRIGATION
LEGEND, TABLES AND NOTES
IRRIGATION PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
1484 520536 562
112"11 2"
1"
8.0D-4
DRIP 1"
8.0D-6
DRIP 1"
8.0D-7
DRIP
3
1"
11.0D-5
RZWS
3 3 3 3
3 3 3
3 3
478
412
1"
8.0E-1
DRIP 1"
8.0E-2
DRIP 1"
12.0E-3
RZWS
3 3 3 3 3 3 3
11 2"
3 3
3 3 3 3 3 3
IRRIGATION CONSTRUCTION NOTES
·
·
·
1
3
2
THIS SYSTEM IS DIAGRAMMATIC. ALL PIPE, VALVES, CONTROLLERS, EQUIPMENT AND ETC. SHOWN WITHIN PAVED AREAS
ARE FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED IN PLANTING AREAS WHEREVER POSSIBLE.
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
L-9
SE
E
L
O
W
E
R
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
4
3
+
0
0
SE
E
P
L
A
N
N
O
.
L
-
8
MA
T
C
H
L
I
N
E
S
T
A
3
6
+
5
0
HEATHDALE AVE
ARROW HIGHWAY
HOLLENBECK AVE
HOLLENBECK AVE
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
4
3
+
0
0
SE
E
P
L
A
N
N
O
.
L
-
1
0
MA
T
C
H
L
I
N
E
S
T
A
4
9
+
0
0
ARROW HIGHWAY
HOLLENBECK AVE
HOLLENBECK AVE
SEE PLAN NO. L-10 FOR IRRIGATION
SCHEDULE & L-12 FOR IRRIGATION
LEGEND, TABLES AND NOTES
IRRIGATION PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
11 2"11 2"
1"
7.5E-4
DRIP 1"
7.5E-5
DRIP 1"
8.0E-6
DRIP 1"
10.0E-7
RZWS 1"
7.5E-8
DRIP
3 3 3 3 3
3
BACKFLOW: 112"
E
POC 5
EX. WATER METER: 1"
1
·
·
2
1
3 3 3 3 3 3 3 3
3 3 3
265 249257273281257
1"
7.5E-9
DRIP
1"
7.5F-1
DRIP 1"
7.0F-2
DRIP
3 3
3 3 3 3 3 3 3 3 3
112"
3
3
33
11 2"
IRRIGATION CONSTRUCTION NOTES
·
·
·
1
3
2
THIS SYSTEM IS DIAGRAMMATIC. ALL PIPE, VALVES, CONTROLLERS, EQUIPMENT AND ETC. SHOWN WITHIN PAVED AREAS
ARE FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED IN PLANTING AREAS WHEREVER POSSIBLE.CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
L-10
SE
E
L
O
W
E
R
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
5
5
+
0
0
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
5
5
+
0
0
SE
E
P
L
A
N
N
O
.
L
-
9
MA
T
C
H
L
I
N
E
S
T
A
4
9
+
0
0
ARROW HIGHWAY
ALDENVILLE AVE
SE
E
P
L
A
N
N
O
.
L
-
1
1
MA
T
C
H
L
I
N
E
S
T
A
6
1
+
5
0
FENMORE AVE
ARROW HIGHWAY
SEE PLAN NO. L-10 FOR IRRIGATION
SCHEDULE & L-12 FOR IRRIGATION
LEGEND, TABLES AND NOTES
IRRIGATION PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
217225
1371
235 211
1"
16.0F-3
RZWS 1"
7.0F-4
DRIP
1"
7.5F-5
DRIP 1"
6.0F-6
DRIP
3 3 3 3 3 3 3
3 3 3 3 3 3 3 3
11 2"
3 3 3 3
BACKFLOW: 112"
F
POC 6
EX. WATER METER: 1"
1
·
·
2
1
154136108
915 18537
110
873
1"
8.0G-1
DRIP
11 2"
IRRIGATION CONSTRUCTION NOTES
·
·
·
1
3
2
THIS SYSTEM IS DIAGRAMMATIC. ALL PIPE, VALVES, CONTROLLERS, EQUIPMENT AND ETC. SHOWN WITHIN PAVED AREAS
ARE FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED IN PLANTING AREAS WHEREVER POSSIBLE.
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
L-11
SE
E
L
O
W
E
R
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
6
8
+
0
0
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
6
8
+
0
0
SE
E
P
L
A
N
N
O
.
L
-
1
2
MA
T
C
H
L
I
N
E
S
T
A
7
4
+
5
0
CITRUS AVE
SE
E
P
L
A
N
N
O
.
L
-
1
0
MA
T
C
H
L
I
N
E
S
T
A
6
1
+
5
0
ARROW HIGHWAY
ARROW HIGHWAY
CITRUS AVE
SEE PLAN NO. L-10 FOR IRRIGATION
SCHEDULE & L-12 FOR IRRIGATION
LEGEND, TABLES AND NOTES
IRRIGATION PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
176
BACKFLOW: 112"
1"
8.5G-2
DRIP 1"
18.0G-3
RZWS 1"
7.5G-4
DRIP 1"
8.5G-5
DRIP
G2
POC 7
EX. WATER METER: 1"
1
·
·
1
11 2"
IRRIGATION CONTROL
WIRE SIZING TABLE
IRRIGATION DESIGN CRITERIA:
IRRIGATION CONSTRUCTION NOTES
·
·
·
1
1"
X.XX-X
CONTROL VALVE INFORMATION
DET.PSI RAD GPMNOZ.BODYMANF.DESCRIPTIONSYM
x
PLANREMARKSDESCRIPTIONSYMMODELMANUF.DET.
IRRIGATION LEGEND
PLAN
WORST CASE PRESSURE CALCULATION
LONGEST RUN - P.O.C.
3
2
G.P.M. DEMAND PIPE SIZE TYPE
PIPING SIZES:
·
·
·
·
·
IRRIGATION GENERAL NOTES
1.THIS SYSTEM IS DIAGRAMMATIC. ALL PIPE, VALVES, CONTROLLERS, EQUIPMENT AND ETC. SHOWN WITHIN PAVED AREAS
ARE FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED IN PLANTING AREAS WHEREVER POSSIBLE.
PROJECT INFORMATION (SECTION 492.3(1))*
LANDSCAPE AND IRRIGATION MAINTENANCE SCHEDULE
(SECTION 492.11)*
·
·
·
·
·
·
IRRIGATION AUDIT/IRRIGATION WATER USE ANALYSIS
(SECTION 492.12)*
SOIL MANAGEMENT REPORT (SECTION 492.5)*
·
·
·
·
·
·
* REFERENCE:
WATER EFFICIENT LANDSCAPE WORKSHEET (SEC. 492.4)*
MAXIMUM APPLIED WATER ALLOWANCE (MAWA)
MAWA = 565,029 GALLONS
ESTIMATED TOTAL WATER USE (ETWU)
ETWU= 465,044GALLONS
HYDROZONE PLANT
FACTOR*
IRRIGATION
METHOD**
IRRIGATION
EFFICIENCY
(IE)
ETAF
(PF/IE)
AREA
(S.F.)ETAF X AREA
ESTIMATED TOTAL
WATER USE
(ETWU)
CONTROLLER A
CONTROLLER B
CONTROLLER C
CONTROLLER D
CONTROLLER E
CONTROLLER F
CONTROLLER G
SPECIAL LANDSCAPE AREAS
BACKFLOW: 112"
D
POC 4
EX. WATER METER: 1"
·
·
1
2
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
L-12
SE
E
P
L
A
N
N
O
.
L
-
1
1
MA
T
C
H
L
I
N
E
S
T
A
7
4
+
5
0
ARROW HIGHWAY
IRRIGATION PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
TYPICAL POC LAYOUT
1453
887
2
2
2
2
2
17523
1476
17515 17525
1 1 1 1
2 2 2
PLANTING CONSTRUCTION NOTES:
1
2
3
4
CITY OF AZUSA
ENGINEERING DIVISION
Know what'sbelow.
Callbefore you dig.
®
SE
E
B
E
L
O
W
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
1
6
+
8
4
ARROW HIGHWAY
AZUSA AVE
AZUSA AVE
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
1
6
+
8
4
SE
E
P
L
A
N
N
O
.
1
4
MA
T
C
H
L
I
N
E
S
T
A
2
3
+
5
0
L-13
ARROW HIGHWAY
BIG
D
A
L
T
O
N
W
A
S
H
AZUSA AVE
AZUSA AVE
·SEE PLAN NO. L-18 FOR PLANTING
LEGEND (CITY OF AZUSA & COUNTY OF
LOS ANGELES) AND NOTES
·SEE PLAN NO. L-17 FOR PLANTING
LEGEND (CITY OF COVINA)
MEDIAN AND PARKWAY PLANTING PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
768 1480 700
1
1 1 1 1 1 1 1 1 1 1 1
2 2
2
2 2 2
2
1481
1 1 1 1 1 1 1 1 1
2
3
2
3
22
2
2 2 2
2 2
A D D D D D D D
D D D D D D D
A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
PLANTING CONSTRUCTION NOTES:
1
2
3
4
A A
A A
A A
A A
A A
A A
A D D D D D D D
D D D D D D D
A
A A
A A
A A
A A
A A
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
SE
E
L
O
W
E
R
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
3
0
+
0
0
SE
E
P
L
A
N
N
O
.
L
-
1
3
MA
T
C
H
L
I
N
E
S
T
A
2
3
+
5
0
L-14
ARROW HIGHWAY
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
3
0
+
0
0
SE
E
P
L
A
N
N
O
.
L
-
1
5
MA
T
C
H
L
I
N
E
S
T
A
3
6
+
5
0
ARMEL DR
ARROW HIGHWAY
·SEE PLAN NO. L-18 FOR PLANTING
LEGEND (CITY OF AZUSA & COUNTY OF
LOS ANGELES) AND NOTES
·SEE PLAN NO. L-17 FOR PLANTING
LEGEND (CITY OF COVINA)
MEDIAN AND PARKWAY PLANTING PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
1484 520536 562
1 1 1 1 1 1 1 1 1
2
2
4
1 2
A D D D D D D D
D D D D D D D
A
A A
A A
A A
A A
A A
478
412
1 1 1 1 1 1 1
1 1 1
2 2 2 2
2 2 2 2
444
PLANTING CONSTRUCTION NOTES:
1
2
MANUAL IRRIGATION ALONG NORTH PARKWAY OF ARROW HIGHWAY
CITY OF AZUSA AND COUNTY OF LOS ANGELES
3
4
A D D D D D D D
D D D D D D D
A
A A
A A
A A
A A
A A
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
L-15
SE
E
L
O
W
E
R
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
4
3
+
0
0
SE
E
P
L
A
N
N
O
.
L
-
1
4
MA
T
C
H
L
I
N
E
S
T
A
3
6
+
5
0
HEATHDALE AVE
ARROW HIGHWAY
HOLLENBECK AVE
HOLLENBECK AVE
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
4
3
+
0
0
SE
E
P
L
A
N
N
O
.
L
-
1
6
MA
T
C
H
L
I
N
E
S
T
A
4
9
+
0
0
ARROW HIGHWAY
HOLLENBECK AVE
HOLLENBECK AVE
·SEE PLAN NO. L-18 FOR PLANTING
LEGEND (CITY OF AZUSA & COUNTY OF
LOS ANGELES) AND NOTES
·SEE PLAN NO. L-17 FOR PLANTING
LEGEND (CITY OF COVINA)
MEDIAN AND PARKWAY PLANTING PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
1 1 1 1 1 1 1 1 1 1 1 1
2 2 2
2 2 2 2 2
A A
A A
A A
A A
A A
A A
A D D D D D D D
D D D D D D D
A
A A
A A
A A
A A
A A
265 249257273281257
1 1 1 1 1 1 1 1 1
2
11
2 2 2
A A
A A
A A
A A
A A
A A
2
44
1
PLANTING CONSTRUCTION NOTES:
1
2
3
4
A A
A A
A A
A A
A A
A A
A D D D D D D D
D D D D D D D
A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
L-16
SE
E
L
O
W
E
R
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
5
5
+
0
0
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
5
5
+
0
0
SE
E
P
L
A
N
N
O
.
L
-
1
5
MA
T
C
H
L
I
N
E
S
T
A
4
9
+
0
0
ARROW HIGHWAY
ALDENVILLE AVE
SE
E
P
L
A
N
N
O
.
L
-
1
7
MA
T
C
H
L
I
N
E
S
T
A
6
1
+
5
0
FENMORE AVE
ARROW HIGHWAY
·SEE PLAN NO. L-18 FOR PLANTING
LEGEND (CITY OF AZUSA & COUNTY OF
LOS ANGELES) AND NOTES
·SEE PLAN NO. L-17 FOR PLANTING
LEGEND (CITY OF COVINA)
MEDIAN AND PARKWAY PLANTING PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
217225
1371
235 211
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
22 2 2 2 2
444
44444
1
154136108
110
1 1 1 1 1 1 1
PLANTING CONSTRUCTION NOTES:
1
2
3
4
PLANTING LEGEND
PARKWAY TREE - CITY OF COVINA
·
·
SIZESYMCOMMON NAMEBOTANICAL NAME QTY DET.REMARKS
SHRUBS - CITY OF COVINA
HT.WUCOLSSP.DETAIL
A
D
GROUNDCOVERS - CITY OF COVINA
SIZESYMCOMMON NAMEBOTANICAL NAME QTY DET.REMARKS PLAN HT.WUCOLSSP.
PLANTING NOTES (THIS SHEET ONLY):
TREES, SHRUBS AND GROUNDCOVER PROCUREMENT
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
L-17
SE
E
L
O
W
E
R
L
E
F
T
MA
T
C
H
L
I
N
E
S
T
A
6
8
+
0
0
SE
E
U
P
P
E
R
R
I
G
H
T
MA
T
C
H
L
I
N
E
S
T
A
6
8
+
0
0
SE
E
P
L
A
N
N
O
.
L
-
1
7
MA
T
C
H
L
I
N
E
S
T
A
7
4
+
5
0
CITRUS AVE
SE
E
P
L
A
N
N
O
.
L
-
1
5
MA
T
C
H
L
I
N
E
S
T
A
6
1
+
5
0
ARROW HIGHWAY
ARROW HIGHWAY
CITRUS AVE
·SEE PLAN NO. L-18 FOR PLANTING
LEGEND (CITY OF AZUSA & COUNTY OF
LOS ANGELES) AND NOTES
MEDIAN AND PARKWAY PLANTING PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
18659
176 236216
1 1 1 1 1 1 1 1 1 1 1
SIZESYMCOMMON NAMEBOTANICAL NAME QTY DET.REMARKS
MEDIAN TREE - COUNTY OF LOS ANGELES
HT.WUCOLSSP.
PLANTING LEGEND
SIZESYMCOMMON NAMEBOTANICAL NAME QTY DET.REMARKS PLAN
MEDIAN TREE - CITY OF AZUSA
HT.WUCOLSSP.
PARKWAY TREE - CITY OF AZUSA
PLAN
SIZESYMCOMMON NAMEBOTANICAL NAME QTY DET.REMARKS
SHRUBS - CITY OF AZUSA
HT.WUCOLSSP.PLAN
GROUNDCOVERS - CITY OF AZUSAPARKWAY TREE - COUNTY OF LOS ANGELES
SIZESYMCOMMON NAMEBOTANICAL NAME QTY DET.REMARKS
SHRUBS - COUNTY OF LOS ANGELES
HT.WUCOLSSP.PLAN
GROUNDCOVERS - COUNTY OF LOS ANGELES
SIZESYMCOMMON NAMEBOTANICAL NAME QTY DET.REMARKS HT.WUCOLSSP.PLAN
PLANTING NOTES (THIS SHEET ONLY):
TREES, SHRUBS AND GROUNDCOVER PROCUREMENT
PLANTING CONSTRUCTION NOTES:
1
2
MANUAL IRRIGATION ALONG NORTH PARKWAY OF ARROW HIGHWAY
CITY OF AZUSA AND COUNTY OF LOS ANGELES
3
4
CITY OF AZUSA
ENGINEERING DIVISION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Know what'sbelow.
Callbefore you dig.
®
L-18
SE
E
P
L
A
N
N
O
.
L
-
1
7
MA
T
C
H
L
I
N
E
S
T
A
7
4
+
5
0
ARROW HIGHWAY
MEDIAN AND PARKWAY PLANTING PLAN
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
LEIT IRRIGATION CONTROLLER ASSEMBLY1 NTS
4 NTS
1
45
9
8
7
6
1
2
3
4
5
6
7
8
9
2 3
WYE STRAINER NTS5
9
GATE VALVE
NTS NTS10
QUICK COUPLER VALVE
NTS11
REMOTE CONTROL VALVE
TRENCHING IN PLANTING AREA
12 NTS 13
BORING UNDER ROADWAY/SIDEWALK,
IF APPICABLE
NTSTYPICAL DRIP IRRIGATION LAYOUT
RZWS
MASTER VALVE2 NTS
NTS NTS67CONTROL WIRE SPLICE BOX
TRENCHING IN ROADWAY
TYPICAL LAYOUT TYPICAL CROSS SECTION
DRIP ZONE CONTROL KIT
NOTES
4
CITY OF AZUSA
ENGINEERING DIVISION
Know what'sbelow.
Callbefore you dig.
®
NTS14OPERATION INDICATOR NTS15LINE FLUSHING VALVE
1
3
2
3
4
5
6
7
8
9
2
1
4
5
8
6
7
9
10
11
12
13
14RZWS
L-19
MEDIAN IRRIGATION DETAILS
3 NTS
NTS 8
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
LEIT X SERIES
YESNO
6
5
4
3
2
1
7
8
9
10
7
9
1
10
1
2
8
5 6
11
11
12
12
13
13
NOTE:
RESERVED
CITY OF AZUSA
ENGINEERING DIVISION
Know what'sbelow.
Callbefore you dig.
®
L-20
2
1
3
TREE PLANTING & STAKING IN MEDIAN NTS 2 NTSROOT CONTROL BARRIER INSTALLATION
PLAN
PLAN
NTS
NTS 31
4
1
2
3
SHRUB & GROUNDCOVER PLANTING AND TYPICAL LAYOUT
1
1
2
2
3
4
4
5
5
6
6
7
8
8
9
9
10
10
11
11
13
12
13
14
14
3
15
15
TREE PLANTING & STAKING IN TREE WELL AND PARKWAY ALONG EXISTING SIDEWALK
GENERAL NOTES
·
·
WATER PERCOLATION TEST NOTES:
12
PLANTING DETAILS
ARROW HIGHWAY
STREET IMPROVEMENTS PROJECT PHASE 2
EXHIBIT B
COST ESTIMATE
UNIT PRICE AMOUNT
27 Remove existing AC pavement and Construct 4- inch Thick PCC
Sidewalk over compacted native, per SPPWC Std. Plan 113-2 16635 SF $12.50 $207,937.50
28 Remove existing parkway tree and stump 5 EA $1,250.00 $6,250.00
29 Remove and construct tree well along parkway, complete per plan. 35 EA $1,550.00 $54,250.00
30 Remove existing AC paving and sub-base. Construct bio-infiltration
basins, complete assembly per plans and specifications.6 EA $26,000.00 $156,000.00
31
Furnish and install 36-in box size Muskogee Crape Myrtle tree in
tree well and parkway, complete per plan including root barrier,
decomposed granite tree well cover, Class A top soil as shown on
plan and details
35 EA $2,150.00 $75,250.00
32 Perform soil preparation in bio-infiltration basin planting area 1050 SF $15.00 $15,750.00
33 Furnish and install 3-inch layer of shredded red wood mulch top
dress.10 CY $260.00 $2,600.00
34 Furnish and install 1-gallon size shrub complete per plan. 266 EA $26.00 $6,916.00
35
Perform 90-calendar day landscape maintenance complete per
specifications including manual tree well and bio-infiltration basin
irrigation
1 LS $10,000.00 $10,000.00
36 Remove, dispose and construct PCC curb ramp per SPPWC Std.
Plan No. 111-5, case and type as indicated on the construction plans 0 EA $8,500.00 $0.00
$534,953.50
4 Remove existing and construct curb ramp per Caltrans Std Plan
A88A, Type per plan 11 EA $5,375.00 $59,125.00
5 Install Truncated Domes 2 EA $745.00 $1,490.00
20 Bio-Filtration Basins (Curb Cut Opening - R & R Curb and Gutter) 60 LF $109.00 $6,540.00
$67,155.00
$602,108.50
$60,210.85
$36,250.35
$698,569.70
CONSTRUCTION COST ESTIMATE
ARROW HIGHWAY PARKWAY AND MEDIAN LANDSCAPE IMPROVEMENTS PROJECT - PHASE II
BID
ITEM DESCRIPTION QTY UNIT
KASA Construction
DATE: 3/29/2023
10%Contingency:
Construction Management and Inspections:
Total Estimated (City of Covina) Project Cost:
ALTERNATE BID
TOTAL CONSTRUCTION COST :
WORK TO BE COMPLETED IN PHASE I
REIMBURSEMENT TO THE CITY OF AZUSA
PHASE II SUBTOTAL