HomeMy WebLinkAboutE-11 Staff Report - Tract Map 82207-LumiaCONSENT ITEM
E-11
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
VIA: SERGIO GONZALEZ, CITY MANAGER
FROM: ROBERT DELGADILLO, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
DATE: JUNE 19, 2023
SUBJECT: APPROVE FINAL TRACT MAP NO. 82207, LUMIA
BACKGROUND:
The Final Map for Tract 82207 involves the approval of a subdivision map which consist of two
condominium airspace lots. One residential lot with 127 residential units and one commercial lot. The
site address is 850 N Azusa Avenue. The developer for this subdivision is The Avenue LLC, a Delaware
Limited Liability Company, and the Civil Engineer and Land Surveyor is Sitetech Inc.
C ity staff or qualified on-call consultants have completed plan check procedures for the subject Final
Maps, reviewing for mathematical accuracy, survey analysis, title information, and compliance with the
State Subdivision Map Act, City ordinances and conditions of approval. The applicant has submitted the
checked Final Map, the subdivision agreements, posted necessary bonds, and paid the applicable fees.
RECOMMENDATIONS:
Staff recommends the City Council take the following actions:
1)That this project complies with the General Plan and is consistent with the approved tentative
map and any amendments thereto;
2)That the City Council approve the subject maps and accept the Offers of dedication shown on
said maps;
3)That pursuant to Section 66436(a)(3)(A)(i-vii) of the Subdivision Map Act, the City Council
hereby finds that the development of the property, in the manner set forth on the subject division
of land, will not unreasonably interfere with the free and complete exercise of the easements held
by Metro Gold Line Foothill Extension Construction Authority, a public entity of the State of
California and accepts the maps without the signatures of said easement holders;
4) Approve Final Tract Map No. 82207; and
Approved
City Council
June 19, 2023
Final Tract Map No. 82207, Lumia
June 19, 2023
Page 2
5) Authorize the City Clerk to endorse on the face of the map the certificates, which embodies the
approval of said map and acceptance of any grants, easements and dedications.
ANALYSIS:
An Agreement for the completion of the public improvements associated with Tract No. 82207 is
attached, as well as a faithful performance bond in the amount of $417,315.52 guaranteed by Atlantic
Specialty Insurance Company. The public improvements are expected to be completed in the near
future, and will be offered to the City for acceptance as they are completed.
With the technical review having been completed, and the map meeting State and City requirements, the
Council’s approval would be a ministerial action.
FISCAL IMPACT:
There is no fiscal impact associated with the proposed recommendations.
Prepared by: Reviewed by:
Miguel Cabanas, P.E. Robert Delgadillo, P.E.
Principal Civil Engineer Director of Public Works / City Engineer
Fiscal Impact Reviewed by: Reviewed and Approved by:
Talika M. Johnson Sergio Gonzalez
Director of Administrative Services City Manager
Attachment:
1) Agreement for Completion of Public Improvements
2) Final Map 82207
Attachment 1
SHEET 1 OF 8 SHEETS2 NUMBERED LOTS
1.24 ACRES
53,983 SQ. FT.
Attachment 2
SHEET 2 OF 8 SHEETS2 NUMBERED LOTS
1.24 ACRES
53,983 SQ. FT.
SHEET 3 OF 8 SHEETSSCALE 1" = 30'
SURVEYOR'S NOTES:
SHEET 4 OF 8 SHEETSSCALE 1" = 30'
SHEET 5 OF 8 SHEETSSCALE 1" = 30'
SHEET 6 OF 8 SHEETSSCALE 1" = 30'
SHEET 7 OF 8 SHEETSSCALE 1" = 30'
SHEET 8 OF 8 SHEETSSCALE 1" = 30'